Loading...
CC 2013-08-27_08.h. Award Contract - 2013 Citywide Digout ProjectTO: FROM: BY: MEMORANDUM CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR ~c MIKE LINN, ASSISTANT CITY ENGINEER SUBJECT: CONSIDERATION OF AN AWARD OF CONTRACT TO CALPORTLAND CONSTRUCTION FOR CONSTRUCTION OF THE 2013 CITYWIDE DIGOUT PROJECT, PW 2013-07 DATE: AUGUST 13, 2013 RECOMMENDATION: It is recommended the City Council: 1. Award a contract for construction of the 2013 Citywide Digout Project to CalPortland Construction in the amount of $766,041; 2. Authorize the City Manager to approve change orders for 10% of the contract amount, $76,604, for unanticipated costs during the construction phase of the project (total construction costs = $766,041 + $76,604 = $842,645); and 3. Direct the City Clerk to file a Notice of Exemption. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The Pavement Management Fund in the 2013/2014 Capital Improvement Program Budget includes $1,261,019 for the 2013 Street Resurfacing Project, the 2013 Citywide Digout Project, and the paving portion of the Fair Oaks Waterline and Street Rehabilitation Project. The 2013 Citywide Digout Project requires significant staff time, but is a top priority in the City's Critical Needs Action Plan. Funding is included in the project budget for construction management services. However, the amount of funding for the scheduled resurfacing project does not allow for adequate contingency funding for potential project cost over-runs. Because the Pavement Management budget includes funds for both annual Dig-outs and the Street Resurfacing projects, staff has included the request for additional funds in the 2013 Street Resurfacing Project. Item 8.h. - Page 1 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO CALPORTLAND CONSTRUCTION FOR CONSTRUCTION OF THE 2013 CITYWIDE DIGOUT PROJECT, PW 2013-07 AUGUST 13, 2013 PAGE2 PROJECT FUNDING SUMMARY EXPECTED PROJECT EXPENDITURES Expenditure Original Contract: Dia-outs-Cal Portland Construction $ 766,041 Contract: Street Resurfacino-American $ 304,725 Inspection Services@ 5% $ 53,538 Contingency (5% of Contract price-$53,538) $ 53,528 TOTAL PROJECT EXPENDITURES $ 1,177,832 PROJECT FUNDING Pavement Manaoement (FY 13-14) $ 819,335 Pavement Management (Carrv over FY 12-13) $ 441,684 Pavement Management (Fair Oaks: Halcyon to Alder) $ (128,893) TOTAL PROJECT REVENUES $ 1,132,126 PROJECT BALANCE OF FUNDS $ (45,706) BACKGROUND: "Digouts" are defined as the removal of asphalt and base materials to the roadway subgrade, usually resulting from water intrusion or the lack of compaction during the original construction. Dependent upon the encountered condition, additional material may need to be installed to stabilize the subgrade. The roadway structural section is then rebuilt through the placement and compaction of base rock and asphalt pavement. This work is being performed in preparation of roadway resurfacing applications, such as slurry sealing and microsurfacing, which provides a membrane over the roadway surface. Since the slurry seal and microsurfacing contractors are typically not equipped to perform roadway reconstruction, it is prudent to have the work performed by a company geared to perform asphalt paving. ANALYSIS OF ISSUES: On July 30, 2013, four bids were opened for the 2013 Citywide Digout Project. The lowest bid, from CalPortland Construction, was in the amount of $766,041. Staff has determined the bid to be responsive and recommends the award of a construction contract to CalPortland Construction. The project is essentially split into two separate operations with separate requirements for contract time; Item 8.h. - Page 2 CITY COUNCIL CONSIDERATION OF CONSTRUCTION FOR PROJECT, PW 2013-07 AUGUST 13, 2013 PAGE3 AN AWARD OF CONTRACT TO CALPORTLAND CONSTRUCTION OF THE 2013 CITYWIDE DIGOUT Preparation work (Digouts) for the 2013 Street Resurfacing Project Contract Time: 30 Calendar Days The scope of work is as follows: Street Name From To Schedule A -Villae:e Area Allen Street Traffic Way Garden Street Cherry A venue Traffic Way PC Railway Place Cherry A venue PC Railway Branch Mill Road Cross Street Allen Street Ide Street Garden Street East Cherry Ave Ide Street Hawkins Court End of Cul-de-Sac Cross Street Ide Street Whiteley Street Garden Street Mason Street E. Branch Street Nelson Street Mason Street Nelson Street Allen Street Nelson Street Traffic Way Mason Street (South) Nelson Street Mason Street (South) End of Cul-de-Sac Noguera Place End of Cul-de-Sac Myrtle Street PC Railway Place East Cherry Ave Allen Street PC Railway Place Allen Street End of Street Poole Street Traffic Way Mason Street (South) Poole Street Mason Street (South) Whiteley Street Short Street Allen Street Nelson Street Short Street Nelson Street End of Street (creek) Whitely Street Poole Street Nelson Stret Whitley Street End of Street Poole Street Whitley Street Nelson Street End of Street (creek) Schedule B -Bri2hton and Fair View Brimton Ave Oak Park Blvd Courtland Street Fair View Drive East Grand Ave Brimton Ave Schedule C -Fair Oaks Fair Oaks Ave Halcyon Road (South) Woodland Drive Fair Oaks Ave Elm Street (South) Pecan Street Fair Oaks Ave Pecan Street Halcyon Road (South) Schedule D -Halcvon Halcyon (S) Pike Fair Oaks Halcyon (S) Fair Oaks Grand Digouts SF 80 80 800 0 6060 0 4784 8400 2400 0 2300 1200 1400 400 840 0 2880 0 0 0 0 480 3000 6000 960 600 2000 1000 Item 8.h. - Page 3 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO CALPORTLAND CONSTRUCTION FOR CONSTRUCTION OF THE 2013 CITYVVIDE DIGOUT PROJECT, PW 2013-07 AUGUST 13, 2013 PAGE4 Halcyon (N) I Grand I El Camino I Schedule E -James Wav James Way Equestrian Way Rancho Parkway Schedule F -Brisco Road -El Camino Real to West Branch Street Brisco Road ·El Camino Real West Branch Street Schedule G -La Cresta La Cresta Drive Platino Road Platino Road Schedule H -East Grand Avenue I West Branch Street-El Camino Real to Traffic Way East Grand A venue Halcyon Road El Camino Real East Grand A venue El Camino Real Traffic Way Asphalt Overlays Brisco Road, between El Camino Real and West Branch Street East Grand Avenue, from the US 101 Overcrossing to Traffic Way 1000 5000 4500 3000 2000 2000 Both of the asphalt overlays require the City and the contractor to obtain Caltrans encroachment permits as it will affect the operations of the on/off ramps to US 101. The contract documents require all work on these roadways to be performed at night due to the vehicle volumes and the close proximity to major commercial areas. Contract Time: 60 Calendar Days ALTERNATIVES: The following alternatives are provided for the Council's consideration: 1. Approve staff's recommendations to award a construction contract to CalPortland Construction; 2. Do not award a construction contract for.the project at this time; or 3. Provide direction to staff. ADVANTAGES: Performance of the asphalt digouts will provide a stable surface to facilitate the application of microsurfacing and slurry sealing on a separate project later in the year. The use of digouts reduces project costs by addressing areas with the most significant repair needs prior to microsurfacing or slurry seal application, which reduces the need for a more costly full reconstruction project. Item 8.h. - Page 4 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO CALPORTLAND CONSTRUCTION FOR CONSTRUCTION OF THE 2013 CITYWIDE DIGOUT PROJECT, PW 2013-07 AUGUST 13, 2013 PAGES The two asphalt overlay segments are overdue and the roadway deterioration is accelerating. It is critical to perform this work to avoid having to perform expensive reconstruction of the roadways in the future. DISADVANTAGES: There will be traffic inconveniences to the travelling public during construction. Staff will monitor the traffic control to conform to the requirements of the Municipal Uniform Traffic Control Devices manual (MUTCD) to mitigate any negative effects. City inspectors will be at the site during all phases of the operations to make adjustments for isolated instances (driveway access, etc.). ENVIRONMENTAL REVIEW: The project is categorically exempt from CEQA pursuant to Guidelines Section 15301 (c). PUBLIC NOTIFICATION AND COMMENTS: The agenda was posted at City Hall on Thursday, August 8, 2013. The agenda and staff report was posted on the City's website on Friday, August 9, 2013. No public comments were received as of the time of preparation of this report. Attachments: 1. Bid Tabulations 2. Notice of Exemption Item 8.h. - Page 5 Attachment No. 1 BID OPENING LOG SHEET CITY OF ARROYO GRANDE DEADLINE: JULY 30, 2013 -2:00 PM Citywide Digout Project SUBMITTED BY: CalPortland Construction Santa Maria, CA John Madonna Construction Co., Inc. San Luis Obispo, CA Souza Construction, Inc. San Luis Obispo, CA Ferravanti Paving Paso Robles, CA c. Director of Public Works Director of Community Development Assistant City Engineer City Manager TOTAL $766,041.00 $866,666.00 $856,601.02 $793, 180.00 Item 8.h. - Page 6 Attachment No. 2 Notice of Exemption To: Office of Planning and Research 1440 Tenth Street, Room 121 Sacramento, CA 95814 From: (Public Agency) City of Arroyo Grande l!l County Clerk County of San Luis Obispo County Government Center San Luis Obispo, CA 93408 Project Title: 2013 Citywide Digout Project. PW 2013-07 Project Location -Specific: Various roadwavs throughout the Citv 300 East Branch Street Arroyo Grande, CA 93420 Project Location -City: A"ovo Grande Project Location -County: San Luis Obispo Description of Project: Perform placement of preparatorv subgrade repairs to facilitate the future placement of Slurry Sea/ and Microsurfacing surface membrane treatments to selected streets throughout the Citv. Perform an asphalt overlay of East Grand I West Branch Street between US 101 and Traffic Wav. and Brisco Road between El Camino Real and Traffic Way Name of Public Agency Approving Project: Citv of A"oyo Grande -Public Works Department Name of Person or Agency Carrying Out Project: ---.::G::..::e..,.o""'ff_.E:.:.n:.::ig.._.lis::<!h_,__ ________ _ Exempt Status: (check one) D Ministerial (Section 12080(b)(1 ); 15268); D Declared Emergency (Sec. 21080(b)(3); 15269(a)); D Emergency Project (Sec. 21080(b)(4); 15269(b)(c)); l!l Categorical Exemption. State type and section number: -=S.,..e::<!ct::..::io<'-'n'-1'-"5..,.3'""'0_,_11..>=(c"'"">------------ 0 Statutory Exemptions. State code number: ----------------------- Reasons Why Project Is Exempt: Perfomance of maintenance preparation and surface treatments to existing Citv streets Lead Agency Contact Person: Michael Linn. P.E. Area Code/Telephone/Extension: (805) 473-5444 If filed by Applicant: 1. Attach a certified document of exemption finding. 2. Has a Notice of Exemption been filed by the public agency approving the project? l!l Yes D No Signature: ------------- Geoff English Public Works Director l!l Signed by Lead Agency D Signed by Applicant D Date: ______ _ Date received for filing at OPR: Item 8.h. - Page 7 THIS PAGE INTENTIONALLY LEFT BLANK Item 8.h. - Page 8