Loading...
HomeMy WebLinkAboutWhitaker Contractors Doc No: 1998- 002758 Rpt No: 00003653 Official Records NF —1 0.00 San Luis Obispo Co. Julie L. Rodewald WHEN RECORDED MAIL TO: Recorder Jan 20, 1998 City of Arroyo Grande Ti me : 1 1:40 214 E. Branch Street Arroyo Grande, California 93420 2 ;TOTAL 0.00 NOTICE OF COMPLETION Project Title: Grand Avenue - Halcyon to Barnett Date: December 16,4997 Water, Sewer, and Pavement Reconstruction The Project or portion of the Project completed: Pavement, Markings Water, and Sewer Improvements The Project Owner: City of Arroyo Grande The Location of the Project: Grand Avenue, City of Arroyo Grande, California The work performed under this contract has been inspected by authorized representatives of the City, the Contractor, and the Engineer, and the Project (or specified part of the Project, as indicated above) is hereby accepted by the City and declared to be substantially completed on the above date. Completion of the Work shall be the date of such acceptance of the Work by the City, as provided under Califomia Civil Code Section 3086. Completion shall mean substantial performance of the contract as such is defined in Black's Law Dictionary, Revised Fourth Edition, West Publishing Company. A list of all items remaining to be completed or corrected is appended hereto. All such work shall be completed or corrected to the satisfaction of the City within 60 calendar days, otherwise the Contractor does hereby waive any and all claims to all monies withheld by the District under the Contract to cover the value of such uncompleted or uncorrected items. NO TRANSFERORS N/PannktsS City of Arroyo Grande By � Engineer uu •resentative /Date The Contractor hereby accepts the above Notice of Completion and agrees to complete and correct all of the items on the appended list within 60 calendar days or waives all rights to any monies withheld therefor. Whitaker Contractors By Contractor uthorized Representative /Date The District accepts the project or specified area of the project as substantially completed and assume full possession of the Project or specified area of the Project at Li PM (time), on'z /O"date). The responsibility for heat, utilities, security, and insurance under the Contract Documents will be assumed by the District after that date. I, the undersigned say: I am the CITY ADMINISTRATOR of the declarant of the foregoing Notice of Completion; I have read said Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. For The City of Arroyo Grande /tiV By J/ ia.r 1- 4- Authori -d - .resentative /Date .a PUNCH LIST 4v2 Project ispe..40 Q`6 - 1 .c oWt %Aaig'rt No. 6o• 10- c o• 4m •1 'Dec Location C11rf4JO r Gti'( > Arc?OQt C-91-- \1* Date % fl 91 Inspection was conducted at above project by 3 'U- Co a.cvtS at I IS o'clock this date. REPRESENTATION CONTRACTOR -OWNER } ENGINEER - ARCHITECT Contractor: S Design: �o - 'sJP.a -A.cs i W- tTAY.E�- �.J 4QO.c7CR- rsI9SoG Owner: Staff Spec.: 1A) t1'�'tpafo`Ti ` Job Supervisor: � 1 . R‘AW I �� '?G The following items are to be corrected or completed to comply with the contract documents: ' � Type of Inspection Check Final ✓ 1 Vr. Guar. Guar. NO. ITEM • / % i a» cer VAST 50• eth of Gog 7 4o,3 r rvacun S Z' on 4 -so M.-A C> 30 .*° \3 Z t r/ 5..t(7FCR.as or.\ 1 Y +i ea t t'a e armip A. evirrerV.t1 4 lii.A.. et - t 1 O 6..V O s - c. -t Coo 3. 1 +n �t. i Ce.Jc -RCCr - -5-44,= cZ ,bc ibf¢ �r»sb,Rxtr -lS1 519 TS c 1 INt Sri. -!r� scin c Z&MV ,g.2 .• u- ) �3;: 2) 4. t_t' s-te• 3� S. As-r11-a6 ; 4) '4. 'gas 0. 4. 1�o -r7su /o. U. +'fi t pat o..+ :tit FoU o vs c Lcxs.tto..lz'. 2) tAcv.t \.c PA-1-(P sG a.•(- '; . p e- e1ao -aa 02--".z . A.arU ct o�lRf'c�+- tir o%. -yc -4r kc5'RU. -a "Vre re> ga,v.) t-t( Lacteal 044 10 ' • 2) a *.0c l.,oe•K6 � 1-�G 6. egej.4 - Ihtc .E t174.t4t ?41I> Gcaa' EA Cat .'C ate- VOKT 0.-VD pc f}1e o� t'Gc- 1 st..L + r•xp. 1. G(�1GIG1r.1Cer �,��Ld'7 Ltj'>� END OF DOCUMENT