HomeMy WebLinkAboutWhitaker Contractors Doc No: 1998- 002758 Rpt No: 00003653
Official Records NF —1 0.00
San Luis Obispo Co.
Julie L. Rodewald
WHEN RECORDED MAIL TO: Recorder
Jan 20, 1998
City of Arroyo Grande Ti me : 1 1:40
214 E. Branch Street
Arroyo Grande, California 93420
2 ;TOTAL 0.00
NOTICE OF COMPLETION
Project Title: Grand Avenue - Halcyon to Barnett Date: December 16,4997
Water, Sewer, and Pavement Reconstruction
The Project or portion of the Project completed: Pavement, Markings Water, and Sewer Improvements
The Project Owner: City of Arroyo Grande
The Location of the Project: Grand Avenue, City of Arroyo Grande, California
The work performed under this contract has been inspected by authorized representatives of the City, the
Contractor, and the Engineer, and the Project (or specified part of the Project, as indicated above) is hereby
accepted by the City and declared to be substantially completed on the above date.
Completion of the Work shall be the date of such acceptance of the Work by the City, as provided under
Califomia Civil Code Section 3086. Completion shall mean substantial performance of the contract as such
is defined in Black's Law Dictionary, Revised Fourth Edition, West Publishing Company.
A list of all items remaining to be completed or corrected is appended hereto. All such work shall be
completed or corrected to the satisfaction of the City within 60 calendar days, otherwise the Contractor does
hereby waive any and all claims to all monies withheld by the District under the Contract to cover the value
of such uncompleted or uncorrected items.
NO TRANSFERORS N/PannktsS
City of Arroyo Grande By �
Engineer uu •resentative /Date
The Contractor hereby accepts the above Notice of Completion and agrees to complete and correct all of
the items on the appended list within 60 calendar days or waives all rights to any monies withheld therefor.
Whitaker Contractors By
Contractor uthorized Representative /Date
The District accepts the project or specified area of the project as substantially completed and
assume full possession of the Project or specified area of the Project at Li PM (time), on'z /O"date).
The responsibility for heat, utilities, security, and insurance under the Contract Documents will be
assumed by the District after that date.
I, the undersigned say: I am the CITY ADMINISTRATOR of the declarant of the foregoing Notice of
Completion; I have read said Notice of Completion and know the contents thereof; the same is true of my
own knowledge. I declare under penalty of perjury that the foregoing is true and correct.
For The City of Arroyo Grande
/tiV
By J/ ia.r 1- 4-
Authori -d - .resentative /Date
.a
PUNCH LIST
4v2
Project ispe..40 Q`6 - 1 .c oWt %Aaig'rt No. 6o• 10- c o• 4m •1 'Dec Location C11rf4JO r Gti'( > Arc?OQt C-91-- \1* Date % fl 91
Inspection was conducted at above project by 3 'U- Co a.cvtS at I IS o'clock this date.
REPRESENTATION
CONTRACTOR -OWNER } ENGINEER - ARCHITECT
Contractor: S Design: �o - 'sJP.a -A.cs i
W- tTAY.E�- �.J 4QO.c7CR- rsI9SoG
Owner: Staff Spec.:
1A) t1'�'tpafo`Ti `
Job Supervisor: � 1 . R‘AW I �� '?G
The following items are to be corrected or completed to comply with the contract documents: ' �
Type of Inspection Check Final ✓ 1 Vr. Guar. Guar.
NO. ITEM
• / % i a» cer VAST 50• eth of Gog 7 4o,3
r rvacun S Z' on 4 -so M.-A C> 30 .*° \3
Z t r/ 5..t(7FCR.as or.\ 1 Y +i ea t t'a e armip A.
evirrerV.t1 4 lii.A.. et - t 1 O 6..V O s - c. -t Coo
3. 1 +n �t. i Ce.Jc -RCCr - -5-44,= cZ ,bc ibf¢ �r»sb,Rxtr -lS1 519 TS
c 1
INt Sri. -!r� scin c Z&MV ,g.2 .• u- ) �3;: 2) 4. t_t' s-te•
3� S.
As-r11-a6 ; 4) '4. 'gas 0.
4. 1�o
-r7su /o. U. +'fi t pat o..+ :tit FoU o vs c Lcxs.tto..lz'.
2) tAcv.t \.c PA-1-(P sG a.•(- '; . p e- e1ao -aa 02--".z
. A.arU ct o�lRf'c�+- tir o%. -yc -4r kc5'RU. -a "Vre re> ga,v.) t-t( Lacteal 044
10 ' • 2) a *.0c l.,oe•K6
� 1-�G
6. egej.4 - Ihtc .E t174.t4t ?41I> Gcaa' EA Cat .'C ate- VOKT 0.-VD pc f}1e
o� t'Gc- 1 st..L + r•xp.
1. G(�1GIG1r.1Cer �,��Ld'7 Ltj'>�
END OF DOCUMENT