CC 2018-03-27_10a CUP Restaurant_Popeyes PP Presentation_2
Consideration of Lot Merger 16-001 and Conditional Use Permit 16-008;
Approximately 2,650 Square Foot Fast-Food Restaurant with Drive-Thru; Location – 727 El Camino Real
5/1/2018
1
Background
Former Redevelopment Agency Property
Transferred to City in 2012, after ABX1 26 eliminated RDA
Required to dispose of former RDA property per HSC 34191.5
Land use entitlement a contingency of sale
5/1/2018
2
Project Location/Site
Zoned Highway Mixed-Use (HMU)
Located at 727 El Camino Real
Surrounding land uses include:
Auto shop, restaurant, office to the north and west
Residential to south
Hotel to the east
Close proximity to SB 101
5/1/2018
Subject Property
3
Proposed Project
Merger of ten (10) underlying lots
Construction of a 2,650 square foot, fast-food restaurant with drive-thru, 450 square foot patio
Associated site improvements, including thirty-eight (38) parking spaces
Proposed hours of operation – 10 am to 10 pm daily, 10 am to 12 am Friday and Saturday for interior only
Level 3 PCU to eliminate odors
5/1/2018
4
Proposed Project
5/1/2018
5
General Plan
The project is consistent with a number of General Plan Policies
LU5, LU5-1, LU5-4, LU5-8, LU5-8.1, ED5, and ED5-2
Generally related to diversity of commercial uses, particularly visitor serving uses
Could be found to be inconsistent with LU5-6, regarding adverse impacts on surrounding commercial/residential uses
5/1/2018
6
Zoning District
Zoned HMU
Primary purpose is to provide areas for a variety of visitor-serving and auto-related uses in areas convenient to both freeway traffic and vehicles or pedestrians.
Construction and establishment of fast-food restaurant with drive-thru is permitted with approval of conditional use permit
Project consistent with development standards of HMU district
5/1/2018
7
Development Standards – Drive-Thru
AGMC Subsection 16.52.090.C.
Hours of Operation
Driveways
Queuing
Parking
Refuse Storage
Noise
Items intended to address neighborhood compatibility issues
5/1/2018
8
Vehicular Access
5/1/2018
9
Vehicular Access
The project’s secondary access on Halcyon Road shall be located furthest from the Halcyon Road/El Camino Real intersection and limited to right-in/right-out vehicular movements. Additionally,
tertiary access to El Camino Real shall be provided to allow full vehicular turning movements.
5/1/2018
10
Parking
Parking required at rate of 1/75 sq. ft. accessible to public
Proposing ~1,700 sq. ft. accessible to public, including 450 sq. ft. patio, totals 23 space requirement
Providing 38 parking spaces on-site
Planning Commission discussed parking restrictions on Faeh
PD recommendation: no additional street parking restrictions
Impacts to personnel resources associated with permitting/enforcement
5/1/2018
11
Traffic
TIAR prepared by City’s on-call civil engineer
61 new AM Peak Hour trips, 73 new Noon Peak Hour trips, and 44 new PM Peak Hour
No NEW impacts to intersections
Contributing to impacts at Brisco/ECR, Grand/ECR, and Brisco/101
Mitigation for project to pay fair share contribution of improvements at intersections
5/1/2018
12
Traffic continued…
Grand/ECR solution potentially signal
LOS impact only on ECR segment, warrants not currently met, but CEQA impact still exists
Traffic Commission recommended requiring installation prior to operation of restaurant
COA 107 – prior to building permit issuance, applicant to submit traffic warrant analysis
If warrants are met = signal installation, if warrant not met = payment of fair share
5/1/2018
13
Noise
Audible ordering system utilizing AVC technology
15 dB above ambient noise at 1’ from speaker
PC required acoustic study to help determine appropriate location of kiosk
Existing ambient noise levels, screen wall, AVC system will not be audible to residences
5/1/2018
14
Architecture
5/1/2018
15
Architecture
5/1/2018
16
Landscaping
Twenty-five (25) new trees
City-approved street trees
Flowering accent trees
Evergreen trees
Heavy vegetation planting on Faeh Avenue side of screen wall, includes flowering vine to soften wall
Final landscape to comply with MWELO and be reviewed by ARC
5/1/2018
17
Landscaping
5/1/2018
18
Signage
Signage depicted but not formally proposed
Will require, at minimum, review by the ARC prior to approval
5/1/2018
19
Advisory Committee Reviews
SAC – September 27, 2017; January 31, 2018
Ingress/egress, hours of operation, emergency vehicle access, odor control methods
In support of the project
Conditions of approval included in Resolution
ARC – June 19, 2017
Previous site plan, neighborhood compatibility, appropriateness of architecture given the zoning
In support of project with conditions included in Resolution
5/1/2018
20
Advisory Committee Reviews
TC – August 14 and September 18, 2017
Concerned with neighborhood traffic issues
In support of the project
Conditions of approval included in Resolution
PC – October 17, 2017 and February 6, 2018
Concerned with neighborhood compatibility and reduction of imposition on residences
In support of the project
Conditions of approval included in Resolution
5/1/2018
21
Environmental Review
The project was reviewed in accordance with the California Environmental Quality Act (CEQA)
Mitigated Negative Declaration prepared to mitigate impacts to:
Air Quality
Cultural/Tribal Cultural Resources
Greenhouse Gas Emissions
Hydrology/Water Quality
Noise
Transportation/Traffic
5/1/2018
22
Public Notification
Expanded notice distribution
Notice of public hearing mailed to all property owners and residents of the ECR/Grand/Halcyon triangle and within 300’ of the site, published in the Tribune, and posted at City Hall,
on the City’s website, and at the project site on March 16, 2018
Tonight’s agenda and staff report were posted at City Hall and on the City’s website in accordance with Government Code Section 54954.2
Comments received and included with agenda, no comments since agenda preparation
5/1/2018
23
Public Notification
5/1/2018
24
Recommendation
The SAC, ARC, TC, and PC recommend that the City Council adopt a Resolution adopting the Mitigated Negative Declaration and approving Lot Merger 16-001 and Conditional Use Permit 16-008.
5/1/2018
25
5/1/2018
26
Proposed Project
5/1/2018
27
February 6, 2018 PC
5/1/2018
28
October 17, 2017 PC
5/1/2018
29