Loading...
PC 08.a. CUP 15-009 East Grand Avenue MEMORANDUM TO: PLANNING COMMISSION FROM: TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR BY: MATTHEW DOWNING, ASSOCIATE PLANNER SUBJECT: CONSIDERATION OF CONDITIONAL USE PERMIT 15-009; CONSTRUCTION OF AN APPROXIMATELY 7,200 SQUARE-FOOT WAREHOUSE RETAIL BUILDING; LOCATION – BEHIND 995 EAST GRAND AVENUE; APPLICANT – KENT ALLEN; REPRESENTATIVE – MARK VASQUEZ, NORMAN & VASQUEZ ASSOCIATES DATE: APRIL 5, 2016 RECOMMENDATION: It is recommended the Planning Commission adopt a Resolution approving Conditional Use Permit 15-009. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: None. BACKGROUND: Location Subject Property PLANNING COMMISSION CONSIDERATION OF CONDITIONAL USE PERMIT 15-009 APRIL 5, 2016 PAGE 2 The subject property is a vacant parcel located behind the developed property at 995 East Grand Avenue. The site has access easements to East Grand Avenue through the neighboring 995 East Grand Avenue property, owned by the same property owner. The property is zoned Fair Oaks Mixed-Use (FOMU) and is surrounded by commercial uses to the north and east and residential uses to the west and south. Staff Advisory Committee The Staff Advisory Committee (SAC) reviewed the proposed project on February 24, 2016. The SAC discussed several aspects of the proposed project, including utility design, emergency and delivery vehicle access, post construction stormwater requirements, and adequate fire sprinkler sizing. Members of the SAC were in support of the project conditions of approval included in the Resolution. Architectural Review Committee The Architectural Review Committee (ARC) reviewed the proposed project on March 21, 2016 (Attachment 1). The ARC discussed several aspects of the project, including delivery truck and emergency vehicle circulation, the unique orientation and location of the parcel, compatibility with the nearby commercial development, and methods of ensuring compatibility with adjacent residences. The ARC recommended approval of the project to the Planning Commission, with emphasis on addressing traffic circulation and considering adding a fence to the southeast corner of the property to restrict access to the rear of the building. ANALYSIS OF ISSUES: Project Description The proposed project consists of the construction of a 7,200 square-foot warehouse retail building with no tenants currently proposed. The building is proposed to be one (1) story, with a maximum building height of twenty-eight feet (28’). The building is proposed to be located in the southern portion of the site, allowing the surface parking lot containing ten (10) spaces to be located further away from the structure. The applicant is not proposing a tenant at this time; however, the Conditional Use Permit is approving the use of the building for warehouse retail. A warehouse retail use would be permitted through the business license application process. Other uses proposed would be evaluated through separate land use entitlement, if necessary. To clearly communicate prohibited uses, including storage, automotive uses, etc., several uses prohibited in the FOMU zoning district have been identified in the conditions of approval. General Plan The General Plan designates the subject property for Mixed Use land uses. Development of a warehouse retail building meets Objective LU5 of the General Plan Land Use Element, which states: PLANNING COMMISSION CONSIDERATION OF CONDITIONAL USE PERMIT 15-009 APRIL 5, 2016 PAGE 3 LU5: Community commercial, office, residential, and other compatible land uses shall be located in Mixed Use (MU) areas and corridors, both north and south of the freeway, in proximity to major arterial streets. Development Standards The primary purpose of the FOMU district is to provide for the combination of retail and service uses with an emphasis on those related to home improvement, as well as restaurants, offices, visitor service uses and multi-family residences that are preferably incorporated in a mixed-use project. The design of the structure for warehouse retail use is allowed in the FOMU zoning district following approval of a Conditional Use Permit. The development standards for the FOMU district and the proposed project are identified in the following table: Table 1: Site Development Standards for the FOMU Zoning District Development Standards FOMU District CUP 15-009 Notes Maximum Density – Mixed Use Projects 25 dwelling units/acre None Not applicable – residential not proposed Maximum Density Multi-family Housing 15 dwelling units/acre None Not applicable – residential not proposed Minimum Density 75% of maximum density None Not applicable – residential not proposed Minimum Lot Size 15,000 square-feet 19,570 square-feet Code met Minimum Lot Width 80 feet 125.50 feet Code met Front Yard Setback 0-10 feet 64 feet Code met Rear Yard Setback 0-15 feet 10 feet Code met Side Yard Setback 0-5 feet 5 feet, 1 foot 3 inches Code met Street Side Yard Setback 0-15 feet None Not applicable – no street side yard Building Size Limits 35 feet or 3 stories 50,000 square-feet max 28 feet 7,200 square-feet Code met Site Coverage and Floor Area Ratio 70% site coverage Floor Area Ratio: 1 36.79% coverage/Floor Area Ratio Code met Off-Street Parking 1 space/800 sq. ft. gross floor area (9) OR 1 space/employee and 1 space/ company vehicle 10 No uses/operators identified to provide employee information PLANNING COMMISSION CONSIDERATION OF CONDITIONAL USE PERMIT 15-009 APRIL 5, 2016 PAGE 4 Neighborhood Compatibility As mentioned above, the project site is zoned FOMU and is surrounded by commercial uses to the north and east and residential uses to the west and south. The applicant has indicated that the building’s loading dock has been located to the west of the building adjacent to the residential uses due to the location, access to, and orientation of the site. This could create compatibility issues resulting in complaints from neighboring residences associated with noise and vibrations. In order to address these issues, conditions of approval have been included requiring deliveries to be conducted between the hours of 7:00 am and 10:00 pm to reduce noise issues. The applicant has also included a wall around the loading dock to help contain noise associated with deliveries. A second condition of approval has been included in the Resolution requiring delivery vehicles to be shut off and not allowed to idle on site. Signage is required to be posted informing drivers of this requirement to further ensure a successful project. Access and Parking The project site proposes one (1) public access point from East Grand Avenue, following existing easements through the parcels adjacent to the street. The site also has an emergency access point from Alder Street to the west of the proposed structure. This emergency access point is acceptable to emergency services personnel and has been shown to be able to accommodate vehicular turning. A loading dock is proposed on the west side of the building, covered by a sixteen foot (16’) trellis and surrounded by fence screening to reduce truck delivery noise. As identified in the table above, the proposed project requires parking at a ratio of 1/800 square-feet of building space OR 1/employee and 1/company vehicle. The project includes ten (10) surface parking spaces onsite. The proposed project does not identify proposed operators within the building, and therefore information on the number of employees and company vehicles is not available. However, for a warehouse retail building of the size proposed, the parking ratio of 1/800 square feet of floor area appears to adequately provide parking for the future use of the building. Pedestrian Connectivity Due to the project site’s location near the end of the Wood Place cul-de-sac, discussion with the applicant regarding pedestrian connectivity through the site to East Grand Avenue has occurred. The applicant has indicated that due to the building setback on the east side of the project being narrow at 1’ 6”, pedestrian connectivity could not be accommodated on the site. A pedestrian connection utilizing the 1’ 6” area on the subject property would require a minimum of the same width on adjacent properties, as well as a connection point to Wood Place. Architecture The building’s architecture is proposed to be a simple design, with large expanses of vertical box bib siding and a band of horizontal box bib siding breaking up this expanse. PLANNING COMMISSION CONSIDERATION OF CONDITIONAL USE PERMIT 15-009 APRIL 5, 2016 PAGE 5 The proposed building also includes two (2) canvas awnings over the individual storefronts. The trellis proposed over the loading dock is proposed to utilize steel beams, tying into the theme of the building. The building color will primarily be taupe with brim and accents, black awnings, and brown doors (Attachment 2). Trees and Landscaping The conceptual landscape plan indicates a number of Crape Myrtle trees intended to help screen the building from neighboring properties. The applicant proposes an additional seven (7) Purple Leaf Plum trees on the east and north portion of the site around the parking areas. Additional shrubs and ground cover will be included in the project. The final landscape plan will comply with the Model Water Efficient Landscaping Ordinance. Signage The project plans indicate two (2) areas where non illuminated signage would be located. A formal sign application is not proposed as part of the project and would be required to be approved separately. ALTERNATIVES: The following alternatives are provided for the Commission’s consideration: • Adopt the attached Resolution, approving Conditional Use Permit Case No. 15- 009; • Modify and adopt the attached Resolution, approving Conditional Use Permit Case No. 15-009; • Do not adopt the attached Resolution and provide direction to staff regarding findings for denial of Conditional Use Permit Case No. 15-009; or • Provide direction to staff. ADVANTAGES: The proposed project will develop a unique mixed-use property with a low intensity commercial use and maintaining emergency access. Additionally, a condition of approval has been added identifying those uses expressly prohibited from operating on the site for additional notice to potential future tenants. DISADVANTAGES: The proposed project does not have tenants identified as part of the project, which is typically preferable. However, the building has been designed to maximize the use of the site while providing flexibility for the future. ENVIRONMENTAL REVIEW: In accordance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the Arroyo Grande Procedures for the Implementation of CEQA, the project has been determined to be categorically exempt per Section 15332 of the CEQA PLANNING COMMISSION CONSIDERATION OF CONDITIONAL USE PERMIT 15-009 APRIL 5, 2016 PAGE 6 Guidelines regarding In-fill Development Projects. If the Planning Commission finds this determination to be incorrect, project approval shall not be considered. PUBLIC NOTIFICATION AND COMMENTS: A notice of public hearing was mailed to all property owners within 300’ of the project site, was published in The Tribune, and posted at City Hall and on the City’s website and posted at the project site on Friday, March 25, 2016. The agenda and staff report were posted at City Hall and on the City’s website on Thursday, March 31, 2016. No comments have been received. Attachments: 1. Draft minutes of the March 21, 2016 Architectural Review Committee meeting 2. Color sheet 3. Project plans RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ARROYO GRANDE APPROVING CONDITIONAL USE PERMIT 15-009; LOCATED BEHIND 995 EAST GRAND AVENUE (APN 077-223-064); APPLIED FOR BY KENT ALLEN WHEREAS, the project site is currently vacant and located behind 995 East Grand Avenue (APN 077-223-064); and WHEREAS, the applicant has filed Conditional Use Permit 15-009 for the construction of an 7,200 square foot warehouse retail building; and WHEREAS, the Planning Commission has reviewed this project in compliance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the Arroyo Grande Rules and Procedures for Implementation of CEQA and determined that the project is exempt per Section 15332 of the CEQA Guidelines regarding In-fill Development Projects; and WHEREAS, the Planning Commission of the City of Arroyo Grande has reviewed the project at a duly noticed public hearing on April 5, 2016; and WHEREAS, the Planning Commission finds, after due study, deliberation and public hearing, the following circumstances exist: Conditional Use Permit Findings: 1. The proposed use is permitted within the subject district pursuant to the provisions of this section and complies with all the applicable provisions of this title, the goals, and objectives of the Arroyo Grande General Plan, and the development policies and standards of the City. The proposed development for a warehouse retail building is permitted within the FOMU zoning district and is consistent with the Arroyo Grande General Plan. 2. The proposed use would not impair the integrity and character of the district in which it is to be established or located. The proposed use of a warehouse retail building on a commercially zoned property would not impair the integrity and character of the district as the development meets the development standards of the FOMU zoning district and the Arroyo Grande Municipal Code, and conditions of approval have been identified to specifically protect the integrity and character of the district. 3. The site is suitable for the type and intensity of use or development that is proposed. RESOLUTION NO. PAGE 2 The site is approximately 0.45 acres of vacant land and meets the development standards of the FOMU zoning district and the Arroyo Grande Municipal Code, and is suitable for the intensity of the development. 4. There are adequate provisions for water, sanitation, and public utilities and services to ensure public health and safety. The provisions for water, sanitation, and public utilities were examined during processing of the entitlement and it was determined that adequate public services will be available for the proposed project and will not result in substantially adverse impacts. 5. The proposed use will not be detrimental to the public health, safety or welfare or materially injurious to properties and improvements in the vicinity. The proposed use will not be detrimental to the public health, safety or welfare, nor will it be materially injurious to properties or improvements in the vicinity as it will comply with all applicable codes and standards of the Municipal Code and in accordance with conditions of approval specifically developed for the project. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Arroyo Grande hereby recommends the City Council approve Conditional Use Permit 15- 009 as set forth in Exhibit “B”, attached hereto and incorporated herein by this reference, with the above findings and subject to the conditions as set forth in Exhibit "A", attached hereto and incorporated herein by this reference. On motion by Commissioner _______, seconded by Commissioner _______, and by the following roll call vote, to wit: AYES: NOES: ABSENT: the foregoing Resolution was adopted this 5th day of April, 2016. RESOLUTION NO. PAGE 3 _______________________________ LAN GEORGE, CHAIR ATTEST: _______________________________ DEBBIE WEICHINGER, SECRETARY TO THE COMMISSION AS TO CONTENT: _______________________________ TERESA MCCLISH COMMUNITY DEVELOPMENT DIRECTOR RESOLUTION NO. PAGE 4 EXHIBIT ‘A’ CONDITIONS OF APPROVAL CONDITIONAL USE PERMIT 15-009 LOCATED BEHIND 995 EAST GRAND AVENUE (APN 077-223-064) COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION GENERAL CONDITIONS 1. This approval authorizes the construction of a 7,200 square foot warehouse retail building. 2. The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project. 3. The applicant shall comply with all applicable conditions of approval for Conditional Use Permit 15-009. 4. This application shall automatically expire on April 5, 2018 unless a building permit is issued or an extension is granted pursuant to Section 16.12.140 of the Development Code. 5. Development shall conform to the Fair Oaks Mixed-Use zoning district requirements except as otherwise approved. 6. Development shall occur in substantial conformance with the plans presented to the Planning Commission at the meeting of April 5, 2016. 7. The applicant shall agree to indemnify and defend at his/her sole expense any action brought against the City, its present or former agents, officers, or employees because of the issuance of said approval, or in any way relating to the implementation thereof, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations under this condition. 8. A copy of these conditions and mitigation measures shall be incorporated into all construction documents. RESOLUTION NO. PAGE 5 9. At the time of application for construction permits, plans submitted shall show all development consistent with the approved site plan, floor plan, architectural elevations and landscape plan. 10. Signage shall be subject to the requirements of Chapter 16.60 of the Development Code. Prior to issuance of a building permit, all illegal signs shall be removed, if any. 11. Development shall comply with Development Code Sections 16.48.070, “Fences, Walls and Hedges”; 16.48.120, “Performance Standards”; and 16.48.130 “Screening Requirements”, except as otherwise modified by this approval. 12. Setbacks, lot coverage, and floor area ratios shall be as shown on the development plans including those specifically modified by these conditions. 13. The developer shall comply with Development Code Chapter 16.56, “Parking and Loading Requirements”, except as otherwise modified by this approval. All parking spaces adjacent/parallel to a wall, fence, or property line shall have a minimum width of 11 feet. 14. All parking areas of five or more spaces shall have an average of one-half foot- candle illumination per square foot of parking area for visibility and security during hours of darkness. 15. Trash enclosures shall be screened from public view with landscaping or other appropriate screening materials, and shall be made of an exterior finish that complements the architectural features of the main building. The trash enclosure area shall accommodate recycling container(s). The location and function of the trash enclosures shall be reviewed and approved by South County Sanitation prior to approval of the improvement plans. 16. Final architecture and design and location of the trash enclosure(s) shall be approved by the Community Development Director. 17. Noise resulting from construction and operational activities shall conform to the standards set forth in Chapter 9.16 of the Municipal Code. Construction activities shall be restricted to the hours of 7 AM and 5 PM Monday through Friday. No construction shall occur on Saturday or Sunday. 18. At the time of application for construction permits, the applicant shall provide details on any proposed exterior lighting. The lighting plan shall include the height, location, and intensity of all exterior lighting consistent with Section 16.48.090 of the Development Code. All lighting fixtures shall be shielded so that neither the lamp nor the related reflector interior surface is visible from adjacent properties. All lighting for the site shall be downward directed and shall not create spill or glare to RESOLUTION NO. PAGE 6 adjacent properties. All lighting shall be energy efficient (e.g. LED) and shall comply with the 2013 California Energy Code. 19. All new construction shall utilize fixtures and designs that minimize water and energy usage. Such fixtures shall include, but are not limited to, low flow showerheads, water saving toilets, instant water heaters and hot water recirculating systems. Water conserving designs and fixtures shall be installed prior to final occupancy. 20. Landscaping in accordance with the approved landscaping plan shall be installed or bonded for before final building inspection/establishment of use. The landscape and irrigation plan shall be prepared by a licensed landscape architect subject to review and approval by the Community Development and Public Works Departments. The landscape plan shall be in conformance with Development Code Chapter 16.84 (Model Water Efficient Landscaping Ordinance). 21. All planted areas shall be continuously maintained in a healthy, growing condition, shall receive regular pruning, fertilizing, mowing and trimming, and shall be kept free of weeds and debris by the owner or person in possession of such areas. Any damaged, dead or decaying plant material shall be replaced within thirty (30) days from the date of damage. 22. Trees shall be provided at a ratio of one tree for every five parking spaces. 23. All Fire Department Connections (FDC) shall be located near a fire hydrant, adjacent to a fire access roadway, and screened to the maximum extent allowed by the Building Official. 24. Double detector check valve assemblies shall be located directly adjacent to or within the respective building to which they serve. 25. All ducts, meters, air conditioning equipment and all other mechanical equipment, whether on the ground, on the structure or elsewhere, shall be screened from public view with materials architecturally compatible with the main structure. It is especially important that gas and electric meters, electric transformers, and large water piping systems be completely screened from public view. All roof-mounted equipment which generates noise, solid particles, odors, etc., shall cause the objectionable material to be directed away from residential properties. 26. All conditions of this approval run with the land and shall be strictly adhered to, within the time frames specified, and in an on-going manner for the life of the project. Failure to comply with these conditions of approval may result in an immediate enforcement action. If it is determined that violation(s) of these conditions of approval have occurred, or are occurring, this approval may be RESOLUTION NO. PAGE 7 revoked pursuant to Development Code Section 16.08.100. 27. The applicant shall provide for maintenance of the driveways, common areas, sewer lines, and other facilities, in a form approved by the City Attorney. SPECIAL CONDITIONS 28. For the extent of time the applicant is the owner of the subject property and the property located at 995 East Grand Avenue, delivery vehicle access to the subject property shall be provided along the southern boundary of the property located at 995 East Grand Avenue. 29. Prior to issuance of a certificate of occupancy, the applicant shall grant an emergency access easement to the City along the southern boundary of the property located at 995 East Grand Avenue, in a form approved by the City Attorney. 30. Prior to issuance of a certificate of occupancy, the applicant shall record an instrument that establishes and grants or reserves an easement for vehicular access, ingress and egress along the southern boundary of the property located at 995 East Grand Avenue for the benefit of the subject property, which shall become effective upon the transfer of either the subject property or the property located at 995 East Grand Avenue, in a form approved by the City Attorney. 31. No mezzanine shall be constructed within the building without first obtaining a building permit. 32. All store deliveries shall be restricted to between the hours of 7:00 AM to 10:00 PM to ensure compatibility with existing residential development in the vicinity. 33. Delivery truck drivers shall be instructed to turn off engines when trucks are parked or being unloaded. Signs shall be posted in the loading dock informing drivers of this restriction. 34. Proposed uses other than warehouse retail uses are subject to further land use entitlement as indicated by the Arroyo Grande Municipal Code at the time of request to establish the use. The following uses are not permitted on the site: a. Automotive and vehicle services – major repair or body work; b. Automotive and vehicle services – minor maintenance or repair including tire services; c. Equipment rental; d. Kennel, animal boarding; e. Mortuary, funeral home; f. Personal services – Restricted; g. Construction yard; RESOLUTION NO. PAGE 8 h. Agricultural product processing; i. Manufacturing or processing – light; j. Recycling – scrap and dismantling yard; k. Storage – outdoor; l. Storage – mini – storage; m. Wholesaling and distribution; n. Adult business; and o. All other uses identified as Not Permitted in the Municipal Code. BUILDING AND LIFE SAFETY DIVISION AND FIRE DEPARTMENT CONDITIONS CBC/CFC 35. The project shall comply with the most recent editions of all California Building and Fire Codes, as adopted by the City of Arroyo Grande. FIRE LANES 36. Prior to issuance of a certificate of occupancy, the applicant shall post designated fire lanes, per Section 22500.1 of the California Vehicle Code. 37. All fire lanes must be posted and enforced, per Police Department and Fire Department guidelines. FIRE FLOW/FIRE HYDRANTS 38. Project shall have a fire flow in accordance with the California Fire Code. 39. Fire hydrants shall be installed, per Fire Department and Public Works Department standards and per the California Fire Code. 40. Provide one (1) onsite hydrant as directed by the Building Official. SECURITY KEY BOX 41. The applicant must provide an approved "security key vault," per Building and Fire Department guidelines and per the California Fire Code. The location shall be determined by the Building Official or Fire Chief. FIRE SPRINKLER 42. All buildings must be fully sprinklered per Building and Fire Department guidelines and per the California Fire Code. RESOLUTION NO. PAGE 9 ABANDONMENT / NON-CONFORMING 43. The applicant shall show proof of properly abandoning all non-conforming items such as septic tanks, wells, underground piping and other undesirable conditions. 44. Remove all obstructions that might be within the fire apparatus access roadway, such as fences, etc. Alternatively, provide a method for emergency and delivery vehicles to access the site through any remaining gate, so long as adequate clearance is provided. DEMOLITION PERMIT / RETAINING WALLS 45. A demolition permit must be applied for, approved and issued. All asbestos and lead shall be verified if present and abated prior to permit issuance. Proof of ACM and lead must be given to the Building Official prior to abatement. After abatement, proof of abatement and proper disposal must also be provided. SPECIAL CONDITIONS 46. One week prior to scheduling of final inspection or any issuance of certificate of occupancy, a project inspection by the Building, Planning, and Engineering Divisions and Public Works Department is required. 47. The developer shall reimburse the City for all costs associated with outside plan checks performed at either the developer’s or City’s request. ENGINEERING DIVISION AND PUBLIC WORKS DEPARTMENT CONDITIONS POST CONSTRUCTION REQUIREMENTS REGIONAL WATER QUALITY CONTROL BOARD, STORMWATER CONTROL PLAN, OPERATIONS AND MAINTENANCE PLAN, AND ANNUAL STORMWATER CONTROL FACILITIES MAINTENANCE 48. The Applicant shall develop, implement and provide the City a: a. Stormwater Control Plan that clearly provides engineering analysis of all Water Quality Treatment, Runoff Retention, and Peak Flow Management controls. b. Operations and Maintenance Plan and Maintenance Agreements that clearly establish responsibility for all Water Quality Treatment, Runoff Retention, and Peak Flow Management controls. c. Annual Maintenance Notification indicating that all Water Quality Treatment, Runoff Retention, and Peak Flow Management controls have been maintained and are functioning as designed. d. All reports must be completed by either a Registered Civil Engineer or Qualified Stormwater Pollution Prevention Plan Developer (QSD). RESOLUTION NO. PAGE 10 49. Prior to any Permit – Stormwater Control Plan. The Stormwater Control Plan must include, at minimum: Contents a. Project information including project name; application number; location; parcel numbers; applicant contact information; land use information; site area; existing, new, and replaced impervious area, and applicable PCR requirements and exceptions. b. Narrative analysis or description of site features and conditions, and opportunities and constraints for stormwater control. c. Narrative description of site design characteristics that protect natural resources including endangered species habitat, protected vegetation, and archaeological resources, and preserve natural drainage features, minimize imperviousness, and disperse runoff from impervious areas. d. Tabulation of proposed pervious and impervious DMAs, showing self- treating areas, self-retaining areas, areas draining to self-retaining areas, and areas tributary to each LID facility. e. Proposed sizes, including supporting calculations, for each LID facility. f. Narrative description of each DMA and explanation of how runoff is routed from each impervious DMA to a self-retaining DMA or LID facility. g. Description of site activities and potential sources of pollutants. h. Table of pollutant sources identified from the list in Appendix A and for each source, the source control measure(s) used to reduce pollutants to the maximum extent practicable. i. Description of signage for bioretention facilities. j. General maintenance requirements for bioretention facilities and site design features. k. Means by which facility maintenance will be financed and implemented in perpetuity. l. Statement accepting responsibility for interim operation & maintenance of facilities. Exhibits m. Existing natural hydrologic features (depressions, watercourses, relatively undisturbed areas) and significant natural resources. n. Proposed design features and surface treatments used to minimize imperviousness and reduce runoff. o. Existing and proposed site drainage network and connections to drainage off-site. p. Entire site divided into separate Drainage Management Areas (DMAs). Each DMA has a unique identifier and is characterized as self-retaining (zero-discharge), self-treating, or draining to a LID facility. q. Proposed locations and footprints of LID facilities. r. Potential pollutant source areas, including loading docks, food service areas, refuse areas, outdoor processes and storage, vehicle cleaning, repair or maintenance, fuel dispensing, equipment washing, etc. RESOLUTION NO. PAGE 11 50. Prior to Final Approval - Operations and Maintenance Plan. The Operations and Maintenance Plan must include, at minimum: a. Stormwater Control Measures report number b. A site map identifying all Stormwater Control Measures requiring Operations and Maintenance practices to function as designed. c. Operations and Maintenance Procedures for each structural stormwater control measure including, but not limited to, Low Impact Design facilities, retention and detention basins, and manufactured or propriety devices operations and maintenance. d. Short-and long-term maintenance requirements, recommended frequency of maintenance, and estimated cost for maintenance. 51. Prior to Occupancy - Maintenance Agreement. The Applicant shall provide a signed statement accepting responsibility for the Operations and Maintenance of the installed Storm Water Control Measures. The Applicant shall include written conditions in the sales, lease agreements, deed, CCRs, HOA or any other legally enforceable mechanism that require the assumed responsibility for the Operations and Maintenance of Stormwater Control Facilities. Additionally, the signed statement shall include the following information: a. Stormwater Control Measures Report Number b. The location and address of Storm Water Control Facilities c. Completion dates of the following milestones i. Construction ii. Field verification of Stormwater Control Facilities iii. Final Project approval/occupancy d. Party responsible for O&M e. Source of funding for O&M f. Statement indicating the Storm Water Control Facilities are Maintained as required in the Operations and Maintenance Plan and facilities continues to function as designed or have been repaired or replaced g. Statement describing any vector or nuisance problems. 52. Annual - Maintenance Notification. The Owner/Applicant shall provide a signed statement notifying the City of all maintenance of the installed Storm Water Control Measures. Additionally, the signed statement shall include the following information: a. Stormwater Control Measures Report Number b. The location and address of Storm Water Control Facilities c. Completion date of the maintenance activities d. Party responsible for O&M e. Source of funding for O&M f. Statement indicating the Storm Water Control Facilities are Maintained as required in the Operations and Maintenance Plan and facilities continues to function as designed or have been repaired or replaced RESOLUTION NO. PAGE 12 g. Statement describing any vector or nuisance problems. GENERAL CONDITIONS 53. The developer shall be responsible during construction for cleaning City streets, curbs, gutters and sidewalks of dirt tracked from the project site. The flushing of dirt or debris to storm drain or sanitary sewer facilities shall not be permitted. The cleaning shall be done after each day’s work or as directed by the Director of Public Works, the Community Development Director or his/her representative. 54. For work requiring engineering inspections, perform construction activities during normal business hours (Monday through Friday, 7 A.M. to 5 P.M.), for noise and inspection purposes. The developer or contractor shall refrain from performing any work other than site maintenance outside of these hours, unless an emergency arises or approved by the Community Development Director. The City may hold the developer or contractor responsible for any expenses incurred by the City due to work outside of these hours. 55. Trash enclosure area(s) shall have a roof structure. Provide a grease trap prior to draining to sanitary sewer or appropriate LID stormwater device. 56. Trash enclosure area(s) shall be screened from public view with landscaping or other appropriate screening materials, and shall be reserved exclusively for dumpster and recycling container storage. Interior vehicle travel ways shall be designed to be capable of withstanding loads imposed by trash trucks. 57. All public project improvements and applicable private improvements shall be designed and constructed in accordance with the City of Arroyo Grande Standard Drawings and Specifications. 58. The property owner shall provide maintenance of all landscaping placed in and adjacent to the development. 59. Submit as-built plans at the completion of the project or improvements as directed by the Community Development Director. One (1) set of mylar prints and an electronic version on CD in AutoCAD format shall be required. 60. Submit three (3) full-size paper copies and one (1) full-size mylar copy of approved improvement plans for inspection purposes during construction. 61. Provide a Licensed Land Surveyor or a Registered Civil Engineer to tie-out survey monuments or vertical control bench marks within 24 inches of work. Should any existing survey monument be disturbed or destroyed during construction, it must be reset at the previous location. Should any existing bench mark be disturbed or destroyed during construction, a new one must be set at a nearby, but different, RESOLUTION NO. PAGE 13 location than the existing, as determined by the City Engineer. For monuments, a Corner Record must be filed with the County and a copy delivered to the City Engineer. For bench marks, documentation of the bench mark and how it was reset must be delivered to the City Engineer prior the project acceptance or sign off of the Encroachment Permit. 62. It is recommended to connect water, sewer and fire protection devices to facilities in Alder Street. The applicant may connect to Wood Place if appropriate facilities and agreements are in place and feasible. 63. Remove and replace driveway on Grand Avenue so that driveway is large enough for truck traffic, if necessary. 64. Relocate existing water meter out of truck turn paths, if necessary. 65. Remove and replace driveway on Alder Street so that driveway is large enough for truck traffic, if necessary. IMPROVEMENT PLANS 66. Improvement plans (including the following) shall be prepared by a registered Civil Engineer or qualified specialist licensed in the State of California and approved by the Public Works or Community Development Department: a. Grading, drainage and erosion control. b. Street paving, curb, gutter and sidewalk. c. Public utilities. d. Water and sewer. e. Landscaping and irrigation. f. Other improvements as required by the Community Development Director. (NOTE: All plan sheets must include City standard title blocks). g. Engineers estimate for construction cost based on County of San Luis Obispo unit cost. 67. The site plan shall include the following: a. The location and size of all existing and proposed water, sewer, and storm drainage facilities within the project site and abutting streets or alleys. b. The location, size and orientation of all trash enclosures. c. The location and dimension of all existing and proposed paved areas. d. The location of all existing and proposed public or private utilities. 68. Improvement plans shall include plan and profile of existing and proposed streets, utilities and retaining walls. RESOLUTION NO. PAGE 14 69. Submit all retaining wall calculations for review and approval by the Community Development Director for walls not constructed per City standards. 70. Prior to approval of an improvement plan the applicant shall enter into an agreement with the City for inspection of the required improvements. 71. The applicant shall be responsible for obtaining an encroachment permit for all work within a public right-of-way. STREET IMPROVEMENTS 72. Obtain approval from the Public Works Director prior to excavating in any street recently over-laid or slurry sealed. The Director shall approve the method of repair of any such trenches, but shall not be limited to an overlay, slurry seal, or fog seal. 73. All street repairs shall be constructed to City standards. 74. Overlay, slurry seal, or fog seal any roads dedicated to the City prior to acceptance by the City may be required as directed by the Public Works Director. 75. The developer shall show that emergency vehicles can negotiate the final site plan. CURB, GUTTER, AND SIDEWALK 76. In areas where driveways cross pedestrian sidewalks, new facilities shall be colored and textured as directed by the Community Development Director. 77. Install ADA compliant facilities where necessary or verify that existing facilities are compliant with State and City Standards. 78. Any sections of damaged or displaced curb, gutter & sidewalk or driveway approach shall be repaired or replaced to the satisfaction of the Public Works Director. DEDICATIONS AND EASEMENTS 79. All easements, abandonments, or similar documents to be recorded as a document separate from a map, shall be prepared by the applicant on 8 1/2 x 11 City standard forms, and shall include legal descriptions, sketches, closure calculations, and a current preliminary title report. The Developer shall be responsible for all required fees, including any additional required City processing. RESOLUTION NO. PAGE 15 GRADING AND DRAINAGE 80. All grading shall be performed in accordance with the City Grading Ordinance. 81. All drainage facilities shall be designed to accommodate a 100-year storm flow. 82. Submit a soils report for the project prepared by a registered Civil Engineer and supported by adequate test borings. All earthwork design and grading shall be performed in accordance with the approved soils report. 83. The applicant shall submit an engineering study regarding flooding related to the project site. The study shall be approved by the Director of Public Works. 84. Infiltration basins shall be designed based on soil tests and with an adequate number of borings per a qualified hydraulic engineer to determine infiltration. 85. The applicant shall provide on-site storm water retardation facilities designed and constructed to Public Works and Community Development requirements, and the 100-year basin overflow shall not exceed the pre-development flow. WATER 86. A Double Detector Check (DDC) backflow device is required on the water service line. 87. Non-potable water is available at the Soto Sports Complex. The City of Arroyo Grande does not allow the use of hydrant meters. SEWER 88. All sewer laterals within the public right-of-way must have a minimum slope of 2%. 89. The parcel shall be provided a separate sewer lateral. Laterals shall be sized for the appropriate use, minimum 4”. 90. All sewer mains or laterals crossing or parallel to public water facilities shall be constructed in accordance with City standards. PUBLIC UTILITIES 91. The developer shall comply with Development Code Section 16.68.050: All projects that involve the addition of over 100 square feet of habitable space shall be required to place service connections underground - existing and proposed utilities. RESOLUTION NO. PAGE 16 92. Prior to approving any building permit within the project for occupancy, all conditions of approval for the project shall be satisfied.. FEES AND BONDS FOR ALL CITY DEPARTMENTS The applicant shall pay all applicable City fees, including the following: 93. FEES TO BE PAID PRIOR TO ISSUANCE OF PERMIT a. Plan check for improvement plans. (Based on an approved construction cost estimate) b. Inspection Fee of subdivision or public works construction plans. (Based on an approved construction cost estimate) c. Plan Review Fee (Based on the current Building Division fee schedule) 94. FEES TO BE PAID PRIOR TO ISSUANCE OF A BUILDING PERMIT a. Water Neutralization fee, to be based on codes and rates in effect at the time of building permit issuance, involving water connection or enlargement of an existing connection. b. Water Distribution fee, to be based on codes and rates in effect at the time of building permit issuance, in accordance with Municipal Code Section 13.04.030. c. Water Meter charge to be based on codes and rates in effect at the time of building permit issuance, in accordance with Municipal Code 6-7.22. d. Water Availability charge, to be based on codes and rates in effect at the time of building permit issuance, in accordance with - (not correct). e. Traffic Impact fee, to be based on codes and rates in effect at the time of building permit issuance, in accordance with Ord. 461 C.S., Res. 3021. f. Traffic Signalization fee, to be based on codes and rates in effect at the time of building permit issuance, in accordance with Ord. 346 C.S., Res. 1955. g. Sewer Connection fee, to be based on codes and rates in effect at the time of building permit issuance, in accordance with Municipal Code Section 13.12.190. h. South San Luis Obispo County Sanitation District Connection fee in accordance with Municipal Code Section 13.12.180. i. Drainage fee, as required by the area drainage plan for the area being developed. j. Alarm Fee, to be based on codes and rates in effect at the time of development in accordance with Ord. 435 C.S. k. Strong Motion Instrumentation Program (SMIP) Fee, to be based RESOLUTION NO. PAGE 17 on codes and rates in effect at the time of development in accordance with State mandate. l. Building Permit Fee, to be based on codes and rates in effect at the time of development in accordance with Title 8 of the Municipal Code. BONDING SURETY 95. Erosion Control, prior to issuance of the grading or building permit, a performance bond for erosion control and landscaping shall be furnished based on Engineer’s Estimate. This bond is refundable upon successful completion of the work, less expenses incurred by the City in maintaining and/or restoring the site. 96. The applicant shall provide bonds or other financial security for the following. All bonds or security shall be in a form acceptable to the City, and shall be provided prior to recording of the map, unless noted otherwise. The minimum term for Improvement securities shall be equal to the term of the subdivision agreement. a. Faithful Performance, 100% of the approved estimated cost of all subdivision improvements. b. Labor and Materials, 50% of the approved estimated cost of all subdivision improvements. c. One Year Guarantee, 10% of the approved estimated cost of all subdivision improvements. This bond is required prior to acceptance of the subdivision improvements. d. Monumentation, 100% of the estimated cost of setting survey monuments. POLICE DEPARTMENT CONDITIONS 97. Prior to issuance of building permit, applicant to submit exterior lighting plan for Police Department approval. 98. Prior to issuance of a certificate of occupancy, the applicant shall post handicapped parking, per the California Building Code. 99. Prior to issuance of a certificate of occupancy, the applicant shall install a burglary [or robbery] alarm system on commercial buildings per Police Department guidelines, and pay the Police Department alarm permit application fee of ($94.00). Annual renewal fee is $31.00. 100. Prior to issuance of a certificate of occupancy, for any parking lots available to the public located on private lots, the developer shall post private property “No Parking” signs in accordance with the handout available from the Police Department. RESOLUTION NO. PAGE 18 ARCHITECTURAL REVIEW COMMITTEE CONDITIONS 101. The applicant shall consider the installation of a fence at the southeast corner of the site to restrict pedestrian access to the rear of the building. BYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time:8:48:00 AM3 PARKING SPACESTRASH ENCLOSURE10'-0"5'-0"5 PARKING SPACESDISABLEDACCESSSPACE52'-6" DOCK FENCE7'-6"±16'-0"3600 SF UNIT ARETAIL WAREHOUSE45' X 80 FT3600 SF UNIT BRETAIL WAREHOUSE45' X 80 FT80'-0"5-0"18'-0"17'-6"7'-4"18'-0"4'-4"±45'-0"15'-0"ACCESS EASEMENT TO HALCYON ROAD25'-10" MIN BACKUP7'-2"53'-6"29'-4"1'-3"±1 SPACERAMPFIRE TRUCK "Y" TURNAROUNDPER FIRE AUTHORITY STANDARD10 FT OHD DRRAMP14'-0"DOCKSTEEL TRELLIS ABOVE DOCK, 16 FT ABOVE WAREHOUSE FLOORCONC PATIOLANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPECONCRETE WALK8 FT ACCESS AISLE6" CONCRETE CURBSTRUNCATED DOME WARNING6" CONCRETE CURB6" CONCRETE CURBSN 68º 52' W 125.50'N 21º 08' E 87.00'S 89º 56' E 31.12'N 00º 04' E 150.00'N 00º 04' E 35.50'S 29º 31' 54" E 68.18'64 FT± MINFENCE AT DOCK AREA, 12 FT TALL ABOVE WAREHOUSE FLOORDOCK AREA, 4 FT± STEP DOWN BELOW WAREHOUSE FLOORDOWN 4 FT±TOILETTOILETAC PAVEMENT AT DRIVE AND PARKINGSEE DRAWING A-318'-0"ZERO TO 4 FTRETAINING WALL AT DOCK DRIVE AREA21'-8" CLEAREXISTING POWER POLETO REMAINEXISTING STRUCTURES 89º 56' E 85.00'EXISTING FENCE2'-2"±EXISTING PARKING LOTEXISTING OFFICE BUILDINGEXISTING VACANT COMMERCIAL LANDEXISTING DECKEXISTINGRESIDENCEEXISTING MULTI FAMILY RESIDENTIAL IN FOMU ZONEEXISTING COMMERCIAL PARKINGEXISTING COMMERCIAL PARKINGEXISTING WAREHOUSE STRUCTURE6 FT TALL MASONRY TRASH ENCLOSURE WITH STEEL GATESEXISTING OAK TREEPARCEL A OF PM AG-72-251PARCEL 2 OF PM AG-73-468EXISTING BLOCK FENCEEXISTING WOOD FENCEEXISTING DRIVEWAYEXISTING GARAGE15'-0" PUE PER PM AG-70-95'-0" DRAINAGE & UTILITY ESMTPER PM AG-91-1795'-0" UTILITIES ESMT25 FT ACCESS EASEMENT TO GRAND AVESEE DRAWING A-3DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND FDCWATER CONNECTIONW/ DDCPROPOSED ELECTRIC METER & WIRE UTILITIES RECESS PROPOSED FIRE RISER LOCATIONUNDERGROUND UTILITIESGAS METERWATER TO 12" PVC MAIN IN GRAND AVESEWER TO (E) 6" VCP SEWER INWOOD PLACEACCESS FOR VEHICLE TRAFFIC ONLY,NO LIFE SAFETY TRAFFIC PLANNED DUE TO BUILDING ENCROACHMENTGAS TO (E) GAS LINE IN WOODPLACEHYDRANTNEW WATER TO ALDER STREET10'-0"UTILITYESMTA-1SITE/FLOOR PLAN1" = 10'-0"PROJECT DATA ZONINGFOMU (FAIR OAKS MIXED USE)LOT AREA 19570 SF SF OR 0.45 ACRESCOVERAGE ALLOWED13,699 SF OR 70%FLOOR AREA RATIO ALLOWED1 (19,750 SF)HEIGHT ALLOWED35 FT OR 3 STORIESSETBACKS ALLOWEDFRONTZERO TO 10 FTSIDEZERO TO 5 FTSTREET SIDEZERO TO 15 FTREARZERO TO 15 FTMATCH ADJACENT RESIDENTIAL SETBACK (SIDE - 5 FT, REAR - 10 FT 1 STORY, 15' 2 STORY)PARKING REQUIRED9 SPACES 1 SPACE / 800 SF WAREHOUSE/ WHOLESALECOVERAGE SHOWN7200 SF STRUCTURE OR 36.79 %IMPERVIOUS SURFACE SHOWN7200 SF STRUCTURES + 8377 SF DRIVEWAY & PARKINGLANDSCAPE SPACE SHOWN3993 SF SF OR 20%FLOOR AREA RATIO SHOWN7200 SF OR 36.79%HEIGHT SHOWN28 FT± SETBACKS SHOWN (PROJECT PERIMETER)FRONT64'-0"± MINSIDE 5'-0"± TO TRELLIS (WEST SIDE)SIDE1'-3"± MIN (EAST)REAR10'-0" MINPARKING SHOWN 10 OPEN SPACESLEGAL DESCRIPTIONPARCEL 1, PM AG 73-468IN THE CITY OF ARROYO GRANDECALIFORNIAAPN 077-223-064GRAND AVENUES. ELM STREETBRISCO ROADN. ELM STREETSITEVICINITY MAPNO SCALELINDA DRBENNETTSTREETHALCYON RDEL CAMINO REALHWY 101ALDERTHE ATTACHED PLANS ARE IN SUBSTANTIAL CONFORMANCE WITH ALL APPLICABLE STATE, LOCAL AND OTHER LAWS REGULATING THIS TYPE OF DEVELOPMENT.EXHIBIT "B" 16'-6"±20'-0"±WAREHOUSETRUSSESMEMBRANE ROOFINGCONCRETE FLOOR10'-0"OPNG'SHVAC SCREENED BY PARAPETREAR ELEVATION (SOUTH)LEFT SIDE ELEVATION (EAST)FRONT ELEVATION (NORTH)RIGHTSIDE ELEVATION (WEST)26'-0"18'-0"11'-4"16'-0"12'-0"VERTICAL BOX RIB SIDINGHORIZONTAL BOX RIB SIDINGCANVAS AWNINGSSTOREFRONT WINDOWS6X10 STEEL TRELLIS BEAMSHORIZONTAL BOX RIB SIDINGHORIZONTAL BOX RIB SIDINGVERTICAL BOX RIB SIDINGBUILDING SECTIONA-2SIGNAGE LOCATION4' X 20' SURFACE MOUNTEDNON LIGHTED SIGNAGESIGNAGE LOCATION4' X 20' SURFACE MOUNTEDNON LIGHTED SIGNAGEBYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time: 8:48:27 AM BYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time:8:48:51 AMSURVEYOR'S STATEMENTTHIS TOPOGRAPHIC MAP CORRECTLY REPRESENTS A SURVEYMADE BY ME OR UNDER MY DIRECTION AT THE REQUEST OFJIMI BREAZEALE IN JULY, 2005. TERRI A. GREEN P.L.S. 7868, EXP.12/31/2006TEC JOB NO. BREAZE001SDNRU.GV ARO E N YE RE ALESDINTERSCLIERPLS 7868AFLAIORNFOETA CITEXP 12/31/061 inch = ft.( IN FEET )GRAPHIC SCALE020 20 402010S 00°18'07" E 1154.09' BASIS OF BEARING PER RICHARD CASSERA - MATCH 52 PM 70 24"TREE24"TREEWMWMWMGMTELMHGMJPWMJP4"OAKWV12"TREESSCOSPEMSSCODIDIDIDIWM2-WM'SSPJP/LPW/TRANS-CONC- D/W-CONC- D/W-CONC- D/W-CONC- D/WFHHB(E) 3'WOOD FNL(E) 8"BLOCK WALLW/CLF(E) BLDG(E) BLDG(E) BLDG(E) BLDG(E) BLDG(E) BLDGUPPERLEVEL(E) BLDGLOWERLEVEL (TYP)(E) 8"CURB,18"GUTTER &7'SIDEWALK-CONC- D/W-CONC- D/WJPDI(E) 3'WOODFNL(E) CONC WW(E) CONC WW-CONC- D/W(E) 6'WOODFNL(E) 8"BLOCK WALL(E) 6'WOODFNL(E)USD(E) 8"BLOCKWALL(E) DECK(E) 6"BLOCKWALLGATECONCE GRAND AVEHALCYON ROAD SITE BENCHMARKAG BM NO.48EL=112.84CITY OF ARROYO GRANDE DATUM50' 50'40'40'FOUND IPW/TAGLS5661FOUND IPW/TAGLS5661FOUNDN&TLS5661FOUNDCENTERLINEMON30'ALDER STREETLOCATION OFMON ATCENTERLINEINTERSECTIONPER GTALOCATION OFMON ON STREETCENTERLINE ATBEGIN CURVEPER GTAFOUND IP W/PLUG-NO TAG -CONC-PORCH(E)SHED(E)CARPORT-AC--AC--AC--AC--AC-(E) BLDGPARKINGLOT-AC-PARKINGLOT28"OAK(E)6'WOODFNL(E) BLDG(E)6"CURB,18"GUTTER &6'SIDEWALK(TYP ALDER ST)(E)8"CURB,18"GUTTER &VARYING SIDEWALKSSIGNALAHEADSIGNSLOADINGZONESIGNEASEMENT "F"40'X110'ACCESS & PARKINGPER 2491-OR-68AND 1997-002319(E) BLDGEASEMENT "D"25' WIDE FORROADWAYPURPOSESEASEMENT "C"5' WIDE FORSEWER, SIGNAND P.U.E.EASEMENT "B"15' WIDE FORINGRESS & EGRESSPER 13-PM-14EASEMENT "E"5' WIDE FORDRAINAGE, SEWERAND P.U.E.PER 2534-OR-88613'-8"25 FT DRIVE EASEMENTR 19'-6"R 35'-6"R 44'-2"13'-6"R 19'-6"R 35'-6"R 44'-2"R 19'-6"R 35'-6"R 44'-2"DELIVERY & EMERGENCY ACCESS EASEMENT ONLYFIRE TRUCK48 FT TRACTOR TRAILER PATHUTILITYESMTA-3PROJECT SITE993123G802NG6800KINR-7-0RKOR97AR-O99PA9119&49DF"S&24NDT"F0SSR2ANGOTT10ESERANGLOTENT11CCPEKINLOMEX1ACRKEM0'XAARSE40C-PAAS4ACPEA-AC-AC-AEASEMENT 40 FT X 110 FTFOR ACCESS AND PARKINGSEMI TRUCK PATTERNS FOR CIRCULATION PATH VERIFICATIONSEMI TRUCK PATTERNS FOR CIRCULATION PATH VERIFICATIONNEW 7200 SF STRUCTUREEXISTING PARKINGFOR 951 EAST GRANDEXISTING PARKINGFOR 995 & 951 EAST GRANDACCESS FOR VEHICLE TRAFFIC ONLY,NO LIFE SAFETY TRAFFIC PLANNED DUE TO BUILDING ENCROACHMENTACCESS FOR DELIVERY TRUCK TRAFFIC ONLY FOR 995 GRAND AVENUE INCLUDING NEWSTRUCTURE.NOT FOR CUSTOMER VEHICLE OR LIFE SAFETY TRAFFICFIRE APPARATUSHAMMERHEAD TURNAROUND38'-0"38'-0"OVERALL SITE & PROJECT ACCESS 24"TREE24"TREEDI(E) 8"BLOCK WALLW/CLF(E) BLDG(E) BL(E) 8"BLOCKWALL(E) DECK(E) 6"BLOCKWALL113.76113.77113.35112.62113.47112.77112.95113.54112.17112.83113.32113.73112.53111.95113.06110.84111.30112.48113.60112.58112.11111.20110.35110.15110.04110.10109.97109.61110.26110.54110.68110.56110.48111.07113.31114.16113.69113.84114.46114.58114.39115.10114.87115.0794114.99112.4000114.13115.20113.96TPTPTPTPTPTPTGTBTBTB116.08TWL115.24TWLFOUND IPW/TAGLS5661FOUND IPW/TAGLS5661(E)SHED115.37114.92114.98TP(E)CARPORT115.00TPTP115.16115.19TPTP-AC-28"(E)6'WOODFNLEASEMENT15' WIDE FINGRESS &PER 13-PMEASEMENT "E"5' WIDE FORDRAINAGE, SEWERAND P.U.E.PER 2534-OR-886115115115115114114114114114113113 113113112112111111110110 5%5%+3'+2'7200 SF STRUCTUREBLDG FF 114.00TC 114.00TC 114.00TC 113.90FP 113.48TC 113.90FP 113.482%TC 113.74FP 113.24TC 113.18FP 113.18TC 113.12FP 113.12TG 112.67FLR 109.673.5%2%8%2%6%TC 113.48TC 113.48FP 114.35FP 113.00EP 115.07FP 113.48FP 113.122%1.4%1.8%1.8%FP 113.352%FP 113.00FP 113.362%FP 114.003.6%EP 115.00FP 115.002.9%EP 114.98FP 114.23REMOVE & RECONTOUR AC PVMTEP 115.00FP 115.005%grade break FP 113.685%3%1101111121132%24 UNDERGROUND SC-740 CHAMBERS FOR PROJECT DRAINAGE24" SQ GRATE ON SAND & SILT TRAP24" SQ GRATE ON SAND & SILT TRAP4 UNDERGROUND SC-740 CHAMBERSFOR DOCK AREA DRAINAGE ONLY1.5%TC 113.12FP 113.12DOCKFF 114.00OVERFLOW DRAIN TO WOOD PLACEESTIMATED EARTHWORKEXCAVATION 120 CYEMBANKMENT 0 CYDRAINAGE CALCULATIONSTOTAL SITE AREA 19570 SF0.45 ACRESEXISTING IMPERVIOUS SURFACES 0 SF0%PROPOSED IMPERVIOUS SURFACES15577 SF0.82%AVERAGE ANNUAL RAINFALL18 IN/YRCOUNTY STD H-1Tc <10 MINBY INSPECTION (SMALL SITE)RAINFALL INTENSITIESI (2/10)1.70 IN/HRCOUNTY STD H-4I (10/10)2.80 IN/HRCOUNTY STD H-4I (25/10)3.20 IN/HRCOUNTY STD H-4I (50/10)3.70 IN/HRCOUNTY STD H-4I (100/10)4.00 IN/HRCOUNTY STD H-4C (PERVIOUS)COUNTY STD H-3aRELIEF - LOW0.08SOIL INFILTRATION - LOW0.04VEGETAL COVER - NORMAL0.07SURFACE STORAGE - NORMAL0.08TOTAL0.27C (IMPERVIOUS)0.95COUNTY STD H-3PRE-PROJECT COMPOSITE C0.27WEIGHTED AVERAGEPOST- PROJECT COMPOSITE C0.78Storm Frequency (YRS)Q EXISTQ PROPOSEDINCREASE CFS20.200.570.37100.300.950.62250.381.080.70500.441.250.811000.461.350.89DRAINAGE CALCULATIONTRIBUTARY AREA A19570 SF= 0.45 ACRESPROPOSED IMPERVIOUS AREA15577 SFCOMPOSITE C0.78I (100, 1 HR)0.78 IN/HRQ (100, 1 HR0.50 IN/HR1 HR DURATIONVOLUME NEEDED TO RETAIN1828 CFINFILTRATION RATE30 MIN/ HRNEARBY SITE CHARACTERISTICSAPPLY SAFETY FACTOR = 1.520 IN/HR USEDDETERMINATION OF SIZE FOR CHAMBERED SYSTEMVOLUME IN ONE STORMTECH SC-740 CHAMBER45.9 CFCROSS SECTIONAL AREA OF DRAIN ROCK IN SECTION10 SFPOROSITY OF ROCK30%AVAILABLE VOLUME IN ROCK3 CF/FTLENGTH OF ONE STORMTECH SC-740 CHAMBER85.4 IN = 7.12 FTVOLUME OF ONE CHAMBER PLUS ROCK67.25 CFNUMBER OF CHAMBERS NEEDED27.17 USE 28 = 1883 CFFOOTPRINT AREA OF ONE INFILTRATOR + ROCK5.75 SF/FT = 40.92 SF EATOTAL FOOTPRINT AREA OF INFILTRATION SYSTEM1146 SFDRAINAGE PLANBYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time: 8:49:31 AMIRRIGATION SYSTEM TO HAVE AUTOMATIC CONTROLLER WITH WEATHER SENSOR.ALL SHRUB IRRIGATION TO BE DRIP TUBE SYSTEM WITH EMMITTERS AT PLANT BASE.ALL GROUNDCOVER TO BE POP UP SPRAY IRRIGATION ON SEPARATE PROGRAM FOR CONTROL.SIMILAR DROUGHT TOLERANT PLANT MATERIAL MAY BE SUBSTITUTED DURING INSTALLATION IF REQUIRED.Agapanthus 1 GallonSymbol Botanical Name SizeLEGENDXRaphiolepis 1 Galloncottoneaster dam "Lowfast"/ Bearberry 1 GallonXSalvia leucntha 'Santa Barbara"/ Mexican Sage 1 GallonLavenders 1 GallonLSPrunus "Krauter Vesuvius" / Purple Leaf Plum 15 GallonLagerstoemia "Tuscarora"/ Crape Myrtle 15 GallonSLXXXXXXXXXXXXXXXXXXXXLANDSCAPE PLANA-4XSSSSSSSLLL ATTACHMENT 1 ACTION MINUTES REGULAR MEETING OF THE ARCHITECTURAL REVIEW COMMITTEE MONDAY, MARCH 21, 2016 CITY HALL SECOND FLOOR CONFERENCE ROOM, 300 EAST BRANCH STREET ARROYO GRANDE, CA 1. CALL TO ORDER Chair Hoag called the Regular Architectural Review Committee ~ to order at 3:31 p.m. 2. ROLL CALL ARC Members: o~g ;:.::Michael Peachey, Mary Hertel, and John Rubatzky were. esent. Bruce;'Berlin was absent City Staff Present: Associate Planne Holub were pr None. Administrative Intern Patrick Mary He made a 'motion, seconded by John Rubatzky, to approve the minutes of March s.··s.ubmi.tted. ·.:•.•. ··.·::-:-,:·::->~·;· ·-·· <· .. ... . -' ·.~~tion passed ory :9 4-0-1 voice vote with '.Bruce Berlin absent. 6. PROJECTS _ ...... ~. ·_,. 6.a. CONSIDERATION OF::CONDITIONAL USE PERMIT 15-009; CONSTRUCTION OF AN APPROXIMATELY 7 ;200 SQUARE-FOOT WAREHOUSE RETAIL BUILDING; LOCATION -995 . EAST GRAND AVENUE; APPLICANT -KENT ALLEN; REPRESENTATIVE _;,:MARK VASQUEZ, DESIGN GRAPHICS (Downing) Associate Planner Downing presented the project. Associate Planner Downing responded to questions from the Committee. Mark Vasquez, representative, spoke in support of the project and responded to questions from the Committee. Chair Hoag called for a break at 4:00 p.m. The Committee reconvened at 4:02 p.m. Minutes: ARC PAGE2 Monday, March 21, 2016 The Committee provided comments in support of the project. Mary Hertel made a motion, seconded by Michael Peachey, to recommend approval of the project to the Planning Commission with the following concerns to be considered: 1. Review traffic patterns in the area; 2. Allow adjacent residents to have a chance to comment on the project; and 3. Investigate the idea of fencing off the south east side of the building in order to restrict access to the rear of the building The motion carried on a 4-0-1 voice vote with Bruce Berlin ·absent. ',,:~. 6.b. CONSIDERATION OF TENTATIVE PARCEL :M ~P 15-003 AND NIT DEVELOPMENT 15-003· SUBDIVISION OF ONE :· :1 LOT INTO TWO 2 LOI A ND CONSTRUCTION OF A NEW SINGLE -FAMIL·Y RESIDENCE; LOCATION -3 tS SHORT STREET; APPLICANT -WADE KELLY.;·~:REPRESENTATIVE -MARK /V ASQUEZ, DESIGN GRAPHICS (Downing) Associate Planner Downing presented the project. <, / / Associate Planner Downing responded :.to questions ~from the ComnJittee . . . ' . ' ~ ·~·· : ' ~-~ : / Mark Vasquez, representative, spoke .in supportof the prbject and responded to questions from the Committee. ~. •'. · ... ' ' ' . : ~.: ·, .~ ; ~: ... The Committee pr~~ided colllments in support of the project. John Rubatzky made . a :moti .o.~; <=~eco~ded by)~ary Hertel, to recommend approval of the projec~.;:is ·subm'itt€ld to the :i Planning CorJ"!mi~sion . · ':;::._· .. ; ··<···.,-.. ·;·, ' . '/'.?: .. : The ·~otion carried o~ a 4-0-1 voi.ce vote, with Bruce Berlin absent. 6.c. ~~:N~IDERATION -~F ,:DES ~VIEW 16-001; CONSTRUCTION OF ONE (1) NEW TWO-STORY RESIDENCE;>LOCATION -312 MYRTLE DRIVE; APPLICANT -HUASNA DEVELOPMENT '·COMPANY· REPRESENTATIVE -MARK VASQUEZ DESIGN GRAPHICS (Holub) :-.. Administrative Intern olub presented the project. Administrative In rn Holub responded to questions from the Committee . Mark Vasqu , representative, spoke in support of the project and responded to questions from the C mmittee. mittee provided comments in support of the project. ATTACHMENT 2 BODY TRIM AWNINGS DOOR/WINDOW North Elevation street BYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time:8:48:00 AM3 PARKING SPACESTRASH ENCLOSURE10'-0"5'-0"5 PARKING SPACESDISABLEDACCESSSPACE52'-6" DOCK FENCE7'-6"±16'-0"3600 SF UNIT ARETAIL WAREHOUSE45' X 80 FT3600 SF UNIT BRETAIL WAREHOUSE45' X 80 FT80'-0"5-0"18'-0"17'-6"7'-4"18'-0"4'-4"±45'-0"15'-0"ACCESS EASEMENT TO HALCYON ROAD25'-10" MIN BACKUP7'-2"53'-6"29'-4"1'-3"±1 SPACERAMPFIRE TRUCK "Y" TURNAROUNDPER FIRE AUTHORITY STANDARD10 FT OHD DRRAMP14'-0"DOCKSTEEL TRELLIS ABOVE DOCK, 16 FT ABOVE WAREHOUSE FLOORCONC PATIOLANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPECONCRETE WALK8 FT ACCESS AISLE6" CONCRETE CURBSTRUNCATED DOME WARNING6" CONCRETE CURB6" CONCRETE CURBSN 68º 52' W 125.50'N 21º 08' E 87.00'S 89º 56' E 31.12'N 00º 04' E 150.00'N 00º 04' E 35.50'S 29º 31' 54" E 68.18'64 FT± MINFENCE AT DOCK AREA, 12 FT TALL ABOVE WAREHOUSE FLOORDOCK AREA, 4 FT± STEP DOWN BELOW WAREHOUSE FLOORDOWN 4 FT±TOILETTOILETAC PAVEMENT AT DRIVE AND PARKINGSEE DRAWING A-318'-0"ZERO TO 4 FTRETAINING WALL AT DOCK DRIVE AREA21'-8" CLEAREXISTING POWER POLETO REMAINEXISTING STRUCTURES 89º 56' E 85.00'EXISTING FENCE2'-2"±EXISTING PARKING LOTEXISTING OFFICE BUILDINGEXISTING VACANT COMMERCIAL LANDEXISTING DECKEXISTINGRESIDENCEEXISTING MULTI FAMILY RESIDENTIAL IN FOMU ZONEEXISTING COMMERCIAL PARKINGEXISTING COMMERCIAL PARKINGEXISTING WAREHOUSE STRUCTURE6 FT TALL MASONRY TRASH ENCLOSURE WITH STEEL GATESEXISTING OAK TREEPARCEL A OF PM AG-72-251PARCEL 2 OF PM AG-73-468EXISTING BLOCK FENCEEXISTING WOOD FENCEEXISTING DRIVEWAYEXISTING GARAGE15'-0" PUE PER PM AG-70-95'-0" DRAINAGE & UTILITY ESMTPER PM AG-91-1795'-0" UTILITIES ESMT25 FT ACCESS EASEMENT TO GRAND AVESEE DRAWING A-3DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND FDCWATER CONNECTIONW/ DDCPROPOSED ELECTRIC METER & WIRE UTILITIES RECESS PROPOSED FIRE RISER LOCATIONUNDERGROUND UTILITIESGAS METERWATER TO 12" PVC MAIN IN GRAND AVESEWER TO (E) 6" VCP SEWER INWOOD PLACEACCESS FOR VEHICLE TRAFFIC ONLY,NO LIFE SAFETY TRAFFIC PLANNED DUE TO BUILDING ENCROACHMENTGAS TO (E) GAS LINE IN WOODPLACEHYDRANTNEW WATER TO ALDER STREET10'-0"UTILITYESMTA-1SITE/FLOOR PLAN1" = 10'-0"PROJECT DATA ZONINGFOMU (FAIR OAKS MIXED USE)LOT AREA 19570 SF SF OR 0.45 ACRESCOVERAGE ALLOWED13,699 SF OR 70%FLOOR AREA RATIO ALLOWED1 (19,750 SF)HEIGHT ALLOWED35 FT OR 3 STORIESSETBACKS ALLOWEDFRONTZERO TO 10 FTSIDEZERO TO 5 FTSTREET SIDEZERO TO 15 FTREARZERO TO 15 FTMATCH ADJACENT RESIDENTIAL SETBACK (SIDE - 5 FT, REAR - 10 FT 1 STORY, 15' 2 STORY)PARKING REQUIRED9 SPACES 1 SPACE / 800 SF WAREHOUSE/ WHOLESALECOVERAGE SHOWN7200 SF STRUCTURE OR 36.79 %IMPERVIOUS SURFACE SHOWN7200 SF STRUCTURES + 8377 SF DRIVEWAY & PARKINGLANDSCAPE SPACE SHOWN3993 SF SF OR 20%FLOOR AREA RATIO SHOWN7200 SF OR 36.79%HEIGHT SHOWN28 FT± SETBACKS SHOWN (PROJECT PERIMETER)FRONT64'-0"± MINSIDE 5'-0"± TO TRELLIS (WEST SIDE)SIDE1'-3"± MIN (EAST)REAR10'-0" MINPARKING SHOWN 10 OPEN SPACESLEGAL DESCRIPTIONPARCEL 1, PM AG 73-468IN THE CITY OF ARROYO GRANDECALIFORNIAAPN 077-223-064GRAND AVENUES. ELM STREETBRISCO ROADN. ELM STREETSITEVICINITY MAPNO SCALELINDA DRBENNETTSTREETHALCYON RDEL CAMINO REALHWY 101ALDERTHE ATTACHED PLANS ARE IN SUBSTANTIAL CONFORMANCE WITH ALL APPLICABLE STATE, LOCAL AND OTHER LAWS REGULATING THIS TYPE OF DEVELOPMENT.ATTACHMENT 3 16'-6"±20'-0"±WAREHOUSETRUSSESMEMBRANE ROOFINGCONCRETE FLOOR10'-0"OPNG'SHVAC SCREENED BY PARAPETREAR ELEVATION (SOUTH)LEFT SIDE ELEVATION (EAST)FRONT ELEVATION (NORTH)RIGHTSIDE ELEVATION (WEST)26'-0"18'-0"11'-4"16'-0"12'-0"VERTICAL BOX RIB SIDINGHORIZONTAL BOX RIB SIDINGCANVAS AWNINGSSTOREFRONT WINDOWS6X10 STEEL TRELLIS BEAMSHORIZONTAL BOX RIB SIDINGHORIZONTAL BOX RIB SIDINGVERTICAL BOX RIB SIDINGBUILDING SECTIONA-2SIGNAGE LOCATION4' X 20' SURFACE MOUNTEDNON LIGHTED SIGNAGESIGNAGE LOCATION4' X 20' SURFACE MOUNTEDNON LIGHTED SIGNAGEBYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time: 8:48:27 AM BYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time:8:48:51 AMSURVEYOR'S STATEMENTTHIS TOPOGRAPHIC MAP CORRECTLY REPRESENTS A SURVEYMADE BY ME OR UNDER MY DIRECTION AT THE REQUEST OFJIMI BREAZEALE IN JULY, 2005. TERRI A. GREEN P.L.S. 7868, EXP.12/31/2006TEC JOB NO. BREAZE001SDNRU.GV ARO E N YE RE ALESDINTERSCLIERPLS 7868AFLAIORNFOETA CITEXP 12/31/061 inch = ft.( IN FEET )GRAPHIC SCALE020 20 402010S 00°18'07" E 1154.09' BASIS OF BEARING PER RICHARD CASSERA - MATCH 52 PM 70 24"TREE24"TREEWMWMWMGMTELMHGMJPWMJP4"OAKWV12"TREESSCOSPEMSSCODIDIDIDIWM2-WM'SSPJP/LPW/TRANS-CONC- D/W-CONC- D/W-CONC- D/W-CONC- D/WFHHB(E) 3'WOOD FNL(E) 8"BLOCK WALLW/CLF(E) BLDG(E) BLDG(E) BLDG(E) BLDG(E) BLDG(E) BLDGUPPERLEVEL(E) BLDGLOWERLEVEL (TYP)(E) 8"CURB,18"GUTTER &7'SIDEWALK-CONC- D/W-CONC- D/WJPDI(E) 3'WOODFNL(E) CONC WW(E) CONC WW-CONC- D/W(E) 6'WOODFNL(E) 8"BLOCK WALL(E) 6'WOODFNL(E)USD(E) 8"BLOCKWALL(E) DECK(E) 6"BLOCKWALLGATECONCE GRAND AVEHALCYON ROAD SITE BENCHMARKAG BM NO.48EL=112.84CITY OF ARROYO GRANDE DATUM50' 50'40'40'FOUND IPW/TAGLS5661FOUND IPW/TAGLS5661FOUNDN&TLS5661FOUNDCENTERLINEMON30'ALDER STREETLOCATION OFMON ATCENTERLINEINTERSECTIONPER GTALOCATION OFMON ON STREETCENTERLINE ATBEGIN CURVEPER GTAFOUND IP W/PLUG-NO TAG -CONC-PORCH(E)SHED(E)CARPORT-AC--AC--AC--AC--AC-(E) BLDGPARKINGLOT-AC-PARKINGLOT28"OAK(E)6'WOODFNL(E) BLDG(E)6"CURB,18"GUTTER &6'SIDEWALK(TYP ALDER ST)(E)8"CURB,18"GUTTER &VARYING SIDEWALKSSIGNALAHEADSIGNSLOADINGZONESIGNEASEMENT "F"40'X110'ACCESS & PARKINGPER 2491-OR-68AND 1997-002319(E) BLDGEASEMENT "D"25' WIDE FORROADWAYPURPOSESEASEMENT "C"5' WIDE FORSEWER, SIGNAND P.U.E.EASEMENT "B"15' WIDE FORINGRESS & EGRESSPER 13-PM-14EASEMENT "E"5' WIDE FORDRAINAGE, SEWERAND P.U.E.PER 2534-OR-88613'-8"25 FT DRIVE EASEMENTR 19'-6"R 35'-6"R 44'-2"13'-6"R 19'-6"R 35'-6"R 44'-2"R 19'-6"R 35'-6"R 44'-2"DELIVERY & EMERGENCY ACCESS EASEMENT ONLYFIRE TRUCK48 FT TRACTOR TRAILER PATHUTILITYESMTA-3PROJECT SITE993123G802NG6800KINR-7-0RKOR97AR-O99PA9119&49DF"S&24NDT"F0SSR2ANGOTT10ESERANGLOTENT11CCPEKINLOMEX1ACRKEM0'XAARSE40C-PAAS4ACPEA-AC-AC-AEASEMENT 40 FT X 110 FTFOR ACCESS AND PARKINGSEMI TRUCK PATTERNS FOR CIRCULATION PATH VERIFICATIONSEMI TRUCK PATTERNS FOR CIRCULATION PATH VERIFICATIONNEW 7200 SF STRUCTUREEXISTING PARKINGFOR 951 EAST GRANDEXISTING PARKINGFOR 995 & 951 EAST GRANDACCESS FOR VEHICLE TRAFFIC ONLY,NO LIFE SAFETY TRAFFIC PLANNED DUE TO BUILDING ENCROACHMENTACCESS FOR DELIVERY TRUCK TRAFFIC ONLY FOR 995 GRAND AVENUE INCLUDING NEWSTRUCTURE.NOT FOR CUSTOMER VEHICLE OR LIFE SAFETY TRAFFICFIRE APPARATUSHAMMERHEAD TURNAROUND38'-0"38'-0"OVERALL SITE & PROJECT ACCESS 24"TREE24"TREEDI(E) 8"BLOCK WALLW/CLF(E) BLDG(E) BL(E) 8"BLOCKWALL(E) DECK(E) 6"BLOCKWALL113.76113.77113.35112.62113.47112.77112.95113.54112.17112.83113.32113.73112.53111.95113.06110.84111.30112.48113.60112.58112.11111.20110.35110.15110.04110.10109.97109.61110.26110.54110.68110.56110.48111.07113.31114.16113.69113.84114.46114.58114.39115.10114.87115.0794114.99112.4000114.13115.20113.96TPTPTPTPTPTPTGTBTBTB116.08TWL115.24TWLFOUND IPW/TAGLS5661FOUND IPW/TAGLS5661(E)SHED115.37114.92114.98TP(E)CARPORT115.00TPTP115.16115.19TPTP-AC-28"(E)6'WOODFNLEASEMENT15' WIDE FINGRESS &PER 13-PMEASEMENT "E"5' WIDE FORDRAINAGE, SEWERAND P.U.E.PER 2534-OR-886115115115115114114114114114113113 113113112112111111110110 5%5%+3'+2'7200 SF STRUCTUREBLDG FF 114.00TC 114.00TC 114.00TC 113.90FP 113.48TC 113.90FP 113.482%TC 113.74FP 113.24TC 113.18FP 113.18TC 113.12FP 113.12TG 112.67FLR 109.673.5%2%8%2%6%TC 113.48TC 113.48FP 114.35FP 113.00EP 115.07FP 113.48FP 113.122%1.4%1.8%1.8%FP 113.352%FP 113.00FP 113.362%FP 114.003.6%EP 115.00FP 115.002.9%EP 114.98FP 114.23REMOVE & RECONTOUR AC PVMTEP 115.00FP 115.005%grade break FP 113.685%3%1101111121132%24 UNDERGROUND SC-740 CHAMBERS FOR PROJECT DRAINAGE24" SQ GRATE ON SAND & SILT TRAP24" SQ GRATE ON SAND & SILT TRAP4 UNDERGROUND SC-740 CHAMBERSFOR DOCK AREA DRAINAGE ONLY1.5%TC 113.12FP 113.12DOCKFF 114.00OVERFLOW DRAIN TO WOOD PLACEESTIMATED EARTHWORKEXCAVATION 120 CYEMBANKMENT 0 CYDRAINAGE CALCULATIONSTOTAL SITE AREA 19570 SF0.45 ACRESEXISTING IMPERVIOUS SURFACES 0 SF0%PROPOSED IMPERVIOUS SURFACES15577 SF0.82%AVERAGE ANNUAL RAINFALL18 IN/YRCOUNTY STD H-1Tc <10 MINBY INSPECTION (SMALL SITE)RAINFALL INTENSITIESI (2/10)1.70 IN/HRCOUNTY STD H-4I (10/10)2.80 IN/HRCOUNTY STD H-4I (25/10)3.20 IN/HRCOUNTY STD H-4I (50/10)3.70 IN/HRCOUNTY STD H-4I (100/10)4.00 IN/HRCOUNTY STD H-4C (PERVIOUS)COUNTY STD H-3aRELIEF - LOW0.08SOIL INFILTRATION - LOW0.04VEGETAL COVER - NORMAL0.07SURFACE STORAGE - NORMAL0.08TOTAL0.27C (IMPERVIOUS)0.95COUNTY STD H-3PRE-PROJECT COMPOSITE C0.27WEIGHTED AVERAGEPOST- PROJECT COMPOSITE C0.78Storm Frequency (YRS)Q EXISTQ PROPOSEDINCREASE CFS20.200.570.37100.300.950.62250.381.080.70500.441.250.811000.461.350.89DRAINAGE CALCULATIONTRIBUTARY AREA A19570 SF= 0.45 ACRESPROPOSED IMPERVIOUS AREA15577 SFCOMPOSITE C0.78I (100, 1 HR)0.78 IN/HRQ (100, 1 HR0.50 IN/HR1 HR DURATIONVOLUME NEEDED TO RETAIN1828 CFINFILTRATION RATE30 MIN/ HRNEARBY SITE CHARACTERISTICSAPPLY SAFETY FACTOR = 1.520 IN/HR USEDDETERMINATION OF SIZE FOR CHAMBERED SYSTEMVOLUME IN ONE STORMTECH SC-740 CHAMBER45.9 CFCROSS SECTIONAL AREA OF DRAIN ROCK IN SECTION10 SFPOROSITY OF ROCK30%AVAILABLE VOLUME IN ROCK3 CF/FTLENGTH OF ONE STORMTECH SC-740 CHAMBER85.4 IN = 7.12 FTVOLUME OF ONE CHAMBER PLUS ROCK67.25 CFNUMBER OF CHAMBERS NEEDED27.17 USE 28 = 1883 CFFOOTPRINT AREA OF ONE INFILTRATOR + ROCK5.75 SF/FT = 40.92 SF EATOTAL FOOTPRINT AREA OF INFILTRATION SYSTEM1146 SFDRAINAGE PLANBYREVISIONSDate:Scale:Drawn:Approved:Job:Sheet:350051"= 20'-0"AMVOCT'15Project Address: 995 Grand Avenue, Arroyo Grande, CaliforniaDate: Mar 30, 2016Time: 8:49:31 AMIRRIGATION SYSTEM TO HAVE AUTOMATIC CONTROLLER WITH WEATHER SENSOR.ALL SHRUB IRRIGATION TO BE DRIP TUBE SYSTEM WITH EMMITTERS AT PLANT BASE.ALL GROUNDCOVER TO BE POP UP SPRAY IRRIGATION ON SEPARATE PROGRAM FOR CONTROL.SIMILAR DROUGHT TOLERANT PLANT MATERIAL MAY BE SUBSTITUTED DURING INSTALLATION IF REQUIRED.Agapanthus 1 GallonSymbol Botanical Name SizeLEGENDXRaphiolepis 1 Galloncottoneaster dam "Lowfast"/ Bearberry 1 GallonXSalvia leucntha 'Santa Barbara"/ Mexican Sage 1 GallonLavenders 1 GallonLSPrunus "Krauter Vesuvius" / Purple Leaf Plum 15 GallonLagerstoemia "Tuscarora"/ Crape Myrtle 15 GallonSLXXXXXXXXXXXXXXXXXXXXLANDSCAPE PLANA-4XSSSSSSSLLL