Loading...
PC 2019-04-02_08a Oak Park Plaza ACUP MEMORANDUM TO: PLANNING COMMISSION FROM: TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR BY: MATTHEW DOWNING, PLANNING MANAGER SUBJECT: CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001; AMENDMENTS TO CONDITIONAL USE PERMIT 18-004 FOR THE SUBDIVISION OF APPROVED TENANT SPACES, ADDITION OF A 5,400 SQUARE FOOT GARDEN CENTER; AND AN 1,800 SQUARE- FOOT COMMERCIAL DRIVE-THRU PAD; LOCATION – 1570 W. BRANCH STREET; APPLICANT – RICK GAMBRIL, ARROYO GRANDE COMMERCIAL LLC; REPRESENTATIVE – RRM DESIGN GROUP DATE: APRIL 2, 2019 SUMMARY OF ACTION: Approval of the project would expand and establish new commercial uses in the currently vacant commercial building, as well as entitle an 1,800 square foot commercial building pad with drive-thru. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: Establishing new tenants would increase patronage to a currently vacant commercial building, which is anticipated to increase tax revenue for the City. The construction of an additional commercial pad at the existing center would also increase estimated sales tax revenue; however, estimates are limited at this time due to uncertainty regarding tenant and business model. RECOMMENDATION: It is recommended that the Planning Commission adopt a Resolution approving Amended Conditional Use Permit 19-001. BACKGROUND: The subject property is a previously developed commercial parcel located in the Regional Commercial (RC) zoning district. The parcel is developed with an approximately 82,500 square foot commercial structure, most recently operated by K-Mart. Since K-Mart’s closure, the building has remained vacant and the City has been concerned that the building would experience an extended vacancy. The site fronts W. Branch Street and although the larger site is part of the Oak Park Plaza shopping center, the subject building remains on a separate parcel with appropriate reciprocal access and parking easements to optimize parking and land use at the shopping center. PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 2 On September 4, 2018, the Planning Commission adopted Resolution No. 18-2312 (Attachment 1), approving Conditional Use Permit 18-004 for the following: 1. Expansion of the existing commercial building by 4,500 square feet; 2. Establishment of a 24-hour fitness facility use in approximately 16,500 square feet of the new building footprint; 3. Establishment and permitting the sale of beer, wine, and distilled spirits at a new grocery store occupying approximately 20,500 square feet of the building; 4. Establishment of a new 50,000 square foot retail use; and 5. Architectural modifications to the building’s façade for a more contemporary design. On February 19, 2019, the Planning Commission adopted Resolution No. 19-2318, approving Planned Sign Program 18-002, establishing sign criteria for tenant identification on the commercial building and a new twenty foot (20’) monument sign. Subsequent to these approvals, a new applicant has submitted the subject application to amend Conditional Use Permit 18-004 (Amended Conditional Use Permit, or ACUP). This amendment seeks to accomplish the following: 1. Expand the commercial area to include a new 5,400 square foot garden center and establish a hardware store totaling an additional 20,856 square feet; 2. Expand the approved grocery store from 20,500 square feet to 23,064 square feet; 3. Establish a dance studio of 7,081 square feet; 4. Establish two (2) additional retail spaces of 6,631 square feet and 20,075 square feet; and 5. Entitle an 1,800 square foot commercial building pad with a drive-thru in the existing parking lot. While not all of the above activities requires an amendment to the previous Conditional Use Permit, these items are included in the project description and will all be considered together. Staff Advisory Committee: The Staff Advisory Committee (SAC) reviewed the proposed project on March 13, 2019. Members of the SAC include representatives from the City’s Public Works Department, Police Department, Five Cities Fire Authority, Building Division, Engineering Division, and Planning Division. Members of the SAC were in support of the amended project description, including the drive-thru and revised site circulation. The SAC also discussed internal pedestrian circulation and the lack of ability for pedestrians visiting the rear of the site to access the front of the Plaza on foot. The SAC developed conditions of approval for the project that have been included in the prepared Resolution. Architectural Review Committee: The Architectural Review Committee (ARC) considered the proposed project on March 18, 2019 (Attachment 2). Members of the ARC discussed the location of the new drive- PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 3 thru building and breaking up the expanse of parking, the increased visual interest with the additional tenant entrances, and interest in how product pick up will occur at the proposed home and garden center. Overall, the ARC was in support of the project and recommended approval with conditions included in the prepared Resolution. ANALYSIS OF ISSUES: General Plan The General Plan designates the subject property for Regional Commercial land uses. The proposed changes to the building’s architecture, taking the structure from an existing big box retailer to include more variation in building planes, colors, materials, and fenestration, as well as the proposed increase in balance of uses at the site and in the Plaza help achieve concurrence with the General Plan, including Objective LU12 and Policies LU7-4 and LU12-11.3 of the Land Use Element and Objective ED5 of the Economic Development Element, which state: LU7-4: Freestanding or drive-through fast-food restaurants are allowed in the RC of BP areas subject to consideration of potential air quality and aesthetic impacts. LU12: Components of “rural setting” and “small town character” shall be protected. LU12-11.3: Large roof or building masses should be discouraged and architectural variations encouraged. ED5: Pursue unique opportunities to promote continuity within commercial service and retail business sectors of the City. Development Standards The subject property is zoned RC. The primary purpose of the RC district, as outlined in the Arroyo Grande Municipal Code (AGMC), is to provide for a diversity of commercial uses that serve community and regional needs for retail and personal services within distinctive and internally pedestrian-oriented shopping centers. The proposed establishment of a hardware store (retail) with a 5,400 square foot garden center addition (outdoor retail sales and activities), slight expansion of the approved grocery store, establishment of a 7,000+ square-foot dance studio, further sectioning of remaining retail space, and entitlement of a commercial building pad with drive-thru are allowed in the RC zoning district following approval a discretionary land use entitlement. Table 1 below lists each proposed component of the project, permit requirements (where MUP stands for Minor Use Permit and CUP stands for Conditional Use Permit), and notes. Table 1: Permit Requirements Per Project Description Component Use/Project Component AGMC Permit Requirement Notes Hardware Store (retail) Permitted Could be established separately regardless of ACUP outcome PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 4 Use/Project Component AGMC Permit Requirement Notes Garden Center (outdoor retail sales and activities) CUP Under consideration with current ACUP Grocery Store >20,000 sq. ft. CUP Approved by CUP 18-004; expansion under consideration with current ACUP Dance Studio MUP/PED PED designation prohibits use in prime real estate space within shopping centers. Location of dance studio at rear of building addresses this concern and is therefore permitted Fitness Center operating 24-Hours per day CUP Approved by CUP 18-004 New commercial building pad CUP Under consideration with current ACUP Drive-thru in conjunction with new commercial building pad CUP Under consideration with current ACUP A number of the components of the proposed project require a CUP. The intent of the CUP is to allow for the establishment of uses that have some special impact or uniqueness such that their effects on the surrounding environment cannot be determined in advance of the use being proposed for a particular location. The development standards for the RC district and the proposed project are identified in the following table: Table 2: Site Development Standards for the RC Zoning District Development Standards RC District ACUP 19-001 Notes Minimum Lot Size 5-acre minimum shopping center site. 5,000 square feet conforming to development plan for the entire center Existing project site 6.4-acres Code Met Setbacks and parking All applicable setbacks will be decided by discretionary action. Appropriate easements for reciprocal access, parking and Garden center expansion 55’ from west property line. Building pad ~60’ from front property line Code Met PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 5 Development Standards RC District ACUP 19-001 Notes maintenance must be recorded and maintained Building size limits Maximum height is 35 feet or three stories, whichever is less. Maximum building size is 102,500 square feet 23’-28’, including parapets, building approximately 87,740 sq. ft. Code Met Site Coverage and Floor Area Ratio Maximum coverage of site by structures is 100%. Floor Area Ratio is 1.0 Coverage: 34% FAR: .32 Code Met Vehicular Access & Circulation The existing site has one and one-half (1.5) vehicular entrances on its frontage. The portion of the Plaza that contains Carl’s Jr. has the remaining half of a vehicular entrance, while a third entrance is located between the existing bank and restaurant. No change to vehicular access is proposed as part of the project beyond those improvements conditioned by CUP 18-004. The expansion of the garden center will eliminate a drive aisle leading to the back of the shopping center, which would require motorists to navigate around the new garden center to move through the site. This does have an advantage of reducing vehicle speeds in this area due to the increased turning movements when compared to the straight drive aisle along the side of the existing building. The ARC commented that this area of the project needed additional information due to concerns regarding product pickup from the garden center. The applicant has provided an updated garden center layout that shows a small area carved out for customer garden center loading to be outside the drive aisle for the immediate vicinity (Sheet A9 of Attachment 5). Additionally, at the northern portion of the garden center, the applicant has included a delivery gate to allow loading of garden center product into the area. The final design of these areas will be reviewed through the building permit to ensure the fire apparatus can navigate the modified drive aisles even if a vehicle is parked in these locations, as required by Condition of Approval 38. Circulation patterns around the new commercial pad and drive-thru are also proposed to be modified, as some existing one-way traffic aisles would be reduced to accommodate the building and drive-thru queueing. Staff had originally sought to bring the commercial pad closer to W. Branch Street; however, the performance of the drive-thru in its proposed location is anticipated to be superior to a location closer to W. Branch Street. PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 6 The previously approved accessible pathway from the public right-of-way would remain, with an additional accessible pathway to the front of the drive-thru building. Parking Arroyo Grande Municipal Code (AGMC) Section 16.56.040 requires that when several uses occupy a single structure, the total required parking shall be the sum of the requirements for each individual use. The following table identifies total parking required for the proposed project: Table 3: Parking Requirements Tenant Proposed Use Parking Required ACUP 19-001 Notes A Hardware Store (interior space) 1 space/250 sq. ft. of gross floor area 20,856 sq. ft. 1 space/250 sq. ft. Total: 83.42 spaces None A Garden Center (Outdoor retail) 1 space/2000 sq. ft. of gross floor area 5,400 sq. ft. 1/2000 sq. ft. Total: 2.7 spaces Garden Center separated for AGMC consistency B Fitness Center 1 space/250 sq. ft. of gross floor area 16,734 sq. ft. 1/250 sq. ft. Total: 66.93 spaces Applicant previously provided justification for use of parking ratio for the fitness facility, which was approved by the Planning Commission C Grocery 1 space/250 sq. ft. of gross floor area 23,064 sq. ft. 1/250 sq. ft. Total: 92.25 spaces None D Retail 1 space/250 sq. ft. of gross floor area 6,631 sq. ft. 1/250 sq. ft. Total: 26.52 spaces None E Retail 1 space/250 sq. ft. of gross floor area 10,075 sq. ft. 1/250 sq. ft. Total: 40.3 spaces None F Dance Studio 1 space/3 students + staff Assumption: 50 students, 3 staff Total: 20 spaces Assumption of students may be overestimating, but would lead to more conservative parking requirements PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 7 Tenant Proposed Use Parking Required ACUP 19-001 Notes G Commercial Pad 1 space/75 sq. ft. of public area 1,800 sq. ft. gross 65% accessible Total: 15.6 spaces Assumes the use will be fast food restaurant or similar. Requirement would be reduced if use is sit-down restaurant Total Total: 348 spaces Due to the project site functioning as part of the Plaza, and the provision of shared parking between the uses, parking required for the total site was additionally reviewed as part of Table 4 below. Table 4: Parking Requirements Proposed Use Parking Required Plaza Totals Grand Total ACUP 19-001 348 Spaces 569 spaces General retail/office 1 space/250 sq. ft. of gross floor area 43,250 sq. ft. 1/250 sq. ft. Total: 173 spaces Restaurant 1 space/100 sq. ft. of public area 2,505 sq. ft. 1/100 sq. ft. Total: 25 spaces Fast Food Restaurant (existing) 1 space/75 sq. ft. of public area 1,750 sq. ft. 1/75 sq. ft. Total: 23 spaces As part of the proposed commercial building pad, a total of forty-two (42) spaces will be removed (Attachment 3), resulting in 495 spaces being provided. Section 16.56.050 of the AGMC outlines parking reductions for common parking facilities. The AGMC allows for up to a twenty percent (20%) reduction in parking requirements for common parking facilities. As part of the proposed project, an approximately thirteen percent (13%) parking reduction is necessary. Due to the myriad of uses with overlapping and differing peak hours, the necessary parking reduction is supported by staff and was additionally supported by the ARC. The project was previously conditioned to reseal and restripe the property’s portion of the parking lot. The applicant has been encouraged to work with the other Plaza property owners about resealing the entirety of the parking lot at the same time to provide uniformity and staff will continue to encourage the improvement. Loading The existing loading dock in the rear of the commercial structure is shown to remain and be in operation for the grocery use, when looking at the site plan. However, the north elevation on Sheet A7 of Attachment 5 does not show the loading dock being present. PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 8 The applicant has indicated that the current design and layout of the loading dock will continue to be utilized for the grocery store without additional modifications necessary. Deliveries for the remaining tenants are proposed to be accommodated through rear entry doors for the remaining tenants. Air Quality and Aesthetics The General Plan identifies that drive-thru uses are permitted in the RC district subject to consideration of air quality and aesthetic impacts. In this instance, the project site is a previously developed commercial shopping center surrounded by the freeway, other commercial uses, and a residential development across the project site and open space. As a result, there are no impacts associated with air quality at this time. Regarding aesthetics, the building would eventually be located in a previous parking lot, which would serve to break up the expansive parking as identified by the ARC. Vehicle queuing would occur around the building, away from the public right-of-way, reducing the impact of queued vehicles to the public. Lastly, the final design of the building would be reviewed by the ARC for consistency with the remodel and finalization of any features required for the use, such as trash facilities. Based on review of the concept by the ARC, aesthetic impacts will not result from the proposed drive-thru. Architecture The building’s architecture remains consistent with the previously approved architecture in terms of colors and materials, including stucco in varying shades of gray, bronze anodized metal for window and door trim, blue horizontal lap siding, CMU block accents, and corrugated metal accents. However, due to the increased number of tenants, the building’s elevations are proposed to be modified to accommodate additional entrances, as seen in the image below. The applicant proposes to continue to utilize building vegetation and trellises will help aid in breaking up the building massing. For full building elevations, refer to Sheet A7 of Attachment 5. PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 9 The architecture of the new commercial building pad has not been depicted in the plan set; however, it is anticipated that similar architectural styling will be replicated on that building as well, as the approved architecture was desired to be the model for architectural modifications to the Plaza in the future. Because these details are not proposed, it is recommended that the ARC recommend conditions that the applicant process a subsequent Minor Use Permit – Architectural Review, consistent with architectural design and massing for the updated commercial building, for consideration by the ARC and recommendation to the Community Development Director. Trees and Landscaping The Plaza was previously developed with parking lot landscape areas and trees. The ARC recently reviewed and recommended approval of the final landscaping and tree replacement plan (Attachment 4). The proposed commercial pad would remove five (5) of these trees, but approximately eleven (11) replacement trees would be installed instead. Therefore, the tree requirements of the Municipal Code would be maintained with the proposed project. Signage As stated earlier in the report, a Master Sign Program for the project site was recently approved by the Planning Commission. While that program will need to be amended with the changing number of tenants, it is not proposed to be updated at this time. However, the applicant has shown a potential increase in monument sign height to be consistent with the height of the existing monument sign at the Plaza, based on public comment received during the Commission’s review of the Master Sign Program. If the proposed project is approved by the Commission, it is anticipated that the applicant will return with proposed modifications to the Master Sign Program. ADVANTAGES: The proposed project will reoccupy a large, vacant commercial building with marketable tenant spaces that will fit well with the greater Plaza. The additional building pad will utilize the existing site to accommodate its circulation needs and will bring in additional tax revenue to the City on an infill development site. DISADVANTAGES: The lack of architectural depiction of the proposed commercial building pad makes its ultimate development uncertain. However, requiring final architectural review, not unlike that required of other commercial building pads in the Regional Commercial zoning district, would ultimately maintain community oversight of the building’s aesthetics. ENVIRONMENTAL REVIEW: The project has been reviewed in compliance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and has been determined to be categorically exempt pursuant to Sections 15301(e)(2), 15303(c), and 15332 of the CEQA Guidelines regarding existing facilities, new construction, and in-fill development projects in urban areas. PLANNING COMMISSION CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001 APRIL 2, 2019 PAGE 10 PUBLIC NOTIFICATION AND COMMENT: A notice of public hearing was mailed to all property owners within 300’ of the project site, was posted in The Tribune, and posted at City Hall and on the City’s website on Friday, March 22, 2019. The Agenda was posted at City Hall and on the City’s website in accordance with Government Code Section 54954.2. No comments have been received regarding the proposed project. Attachments: 1. Planning Commission Resolution No. 18-2312 2. DRAFT Architectural Review Committee minutes of March 18, 2019 3. Areas of parking reduction 4. Approved tree replacement plan for Conditional Use Permit 18-004 5. Project plans RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ARROYO GRANDE APPROVING AMENDED CONDITIONAL USE PERMIT 19-001; LOCATED AT 1570 W. BRANCH STREET; APPLIED FOR BY RICK GAMBRIL, ARROYO GRANDE COMMERCIAL LLC WHEREAS, the project site is an approximately 6.4-acre site located in the Regional Commercial (RC) zoning district and currently developed with an approximately 82,600 square-foot commercial building formerly occupied by Kmart; and WHEREAS , the project site is part of the Oak Park Plaza shopping center; and WHEREAS , on September 4, 2018, the Planning Commission adopted Resolution No. 18- 2312 approving Conditional Use Permit 18-004 to expand the existing commercial building and establish new uses; and WHEREAS , the applicant desires to expand the existing commercial structure to accommodate a new 5, 400 square foot garden center, establish a hardware store totaling approximately 20,856 square feet, expanding the approved grocery store from 20,500 to 23,064 square feet, establish a 7,081 square feet, and entitle an 1,800 square foot commercial building pad with a drive-thru; and WHEREAS , the request was reviewed in accordance with the development review process identified in the Municipal Code; and WHEREAS , the Architectural Review Committee reviewed the project on March 18, 2019, recommending approval of the project to the Planning Commission; and WHEREAS, the Planning Commission has reviewed this project in compliance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the Arroyo Grande Rules and Procedures for Implementation of CEQA and determined that the project is exempt per Sections 15301(e)(2), 15303(c), and 15332 of the CEQA Guidelines regarding existing facilities, new construction, and in-fill development projects in urban areas, respectively; and WHEREAS, the Planning Commission of the City of Arroyo Grande has reviewed the project at a duly noticed public hearing on April 2, 2019; and WHEREAS, the Planning Commission finds, after due study, deliberation and public hearing, the following circumstances exist: Conditional Use Permit Findings: 1. The proposed use is permitted within the subject district pursuant to the provisions of this section and complies with all the applicable provisions of this title, the goals, and objectives of the Arroyo Grande General Plan, and RESOLUTION NO. PAGE 2 the development policies and standards of the City. The proposed uses outlined in the recitals are permitted within the Regional Commercial district pursuant to Section 16.36.030 of the Development Code and the project complies with all applicable provisions of the Development Code, the goals and objectives of the Arroyo Grande General Plan including Policies LU7-4, LU12, LU12-11.3, and ED5 of the Land Use Element and Economic Development Element, and the development policies and standards of the City. 2.The proposed use would not impair the integrity and character of the district in which it is to be established or located. The proposed uses will not impair the integrity and character of the district in which it is to be established or located due to the purpose of the Regional Commercial district being to provide for a diversity of commercial uses that serve community and regional needs for retail and personal services, the symbiotic nature of the proposed uses with the remainder of the Oak Park Plaza, and the implementation of conditions of approval developed for the project that are intended to protect the public health, safety and welfare. 3.The site is suitable for the type and intensity of use or development that is proposed. The site is approximately 6.4-acres and the layout of the existing Oak Park Plaza, along with minor infrastructure modifications required as a result of the project, is suitable for the proposed project. 4.There are adequate provisions for water, sanitation, and public utilities and services to ensure public health and safety. The proposed project will utilize City supplied water, sanitation, and public utilizes and services that ensure public health and safety. Nothing in the proposed project is anticipated to be overly impactful to these services, as they are consistent with the General Plan and Municipal Code. Conditions of approval developed for the project will additionally ensure public services are minimally impacted. 5.The proposed use will not be detrimental to the public health, safety or welfare or materially injurious to properties and improvements in the vicinity. The proposed uses will not be detrimental to the public health, safety, or welfare due to the project being located in the existing Oak Park Plaza and the implementation of conditions of approval developed for the project that are intended to protect the public health, safety and welfare. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Arroyo Grande hereby approves Amended Conditional Use Permit 19-001 as set forth in Exhibit “B”, attached hereto and incorporated herein by this reference, with the above RESOLUTION NO. PAGE 3 findings and subject to the conditions as set forth in Exhibit "A", attached hereto and incorporated herein by this reference. On motion by Commissioner _______, seconded by Commissioner _______, and by the following roll call vote, to wit: AYES: NOES: ABSENT: the foregoing Resolution was adopted this 2nd day of April, 2019. RESOLUTION NO. PAGE 4 _______________________________ GLENN MARTIN, CHAIR ATTEST: _______________________________ PATRICK HOLUB SECRETARY TO THE COMMISSION AS TO CONTENT: _______________________________ TERESA MCCLISH COMMUNITY DEVELOPMENT DIRECTOR RESOLUTION NO. PAGE 5 EXHIBIT ‘A’ CONDITIONS OF APPROVAL AMENDED CONDITIONAL USE PERMIT 19-001 1570 W. BRANCH STREET COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION GENERAL CONDITIONS 1. This approval authorizes the expansion and establishment of a garden center of approximately 5,400 square feet, expansion of a previously approved grocer to 23,064 square feet, establishment of a dance studio of 7,081 square feet at the rear of the building, demising the remaining building space into two (2) additional retail spaces, and entitlement of an 1,800 square foot commercial building pad with a drive-thru in the existing parking lot. 2. The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project. 3. The applicant shall comply with all conditions of approval for Amended Conditional Use Permit 19-001. 4. This application shall automatically expire on April 2, 2021 unless a building permit is issued. 5. Development shall conform to the Regional Commercial requirements except as otherwise approved. 6. Development shall occur in substantial conformance with the plans presented to the Planning Commission at the meeting of April 2, 2019 and marked Exhibit “B”. 7. The applicant shall agree to indemnify, defend, and hold harmless at his/her sole expense any action brought against the City, its present or former agents, officers, or employees because of the issuance of said approval, or in any way relating to the implementation thereof, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations under this condition. 8. A copy of these conditions shall be incorporated into all construction documents. RESOLUTION NO. PAGE 6 9. At the time of application for construction permits, plans submitted shall show all development consistent with the approved site plan, floor plan, architectural elevations and landscape plan. 10. Signage shall be subject to the requirements of Chapter 16.60 of the Development Code. Prior to issuance of a building permit, all illegal signs shall be removed. 11. Development shall comply with Development Code Sections 16.48.070, “Fences, Walls and Hedges”; 16.48.120, “Performance Standards”; and 16.48.130 “Screening Requirements”. 12. The developer shall comply with Development Code Chapter 16.56, “Parking and Loading Requirements”. All parking spaces adjacent to a wall, fence, or property line shall have a minimum width of 11 feet. 13. All parking areas of five or more spaces shall have an average of one-half foot- candle illumination per square foot of parking area for visibility and security during hours of darkness. 14. Trash enclosures shall be screened from public view with landscaping or other appropriate screening materials, and shall be made of an exterior finish that complements the architectural features of the main building. The trash enclosure area shall accommodate recycling container(s). 15. Noise resulting from construction activities shall conform to the standards set forth in Chapter 9.16 of the Municipal Code. No construction shall occur on Sundays or City observed holidays. 16. At the time of application for construction permits, the applicant shall provide details on proposed exterior lighting, if applicable. The lighting plan shall include the height, location, and intensity of all exterior lighting consistent with Section 16.48.090 of the Development Code. All lighting fixtures shall be shielded so that neither the lamp nor the related reflector interior surface is visible from adjacent properties. All lighting for the site shall be downward directed and shall not create spill or glare to adjacent properties. All lighting shall be energy efficient (e.g. LED). 17. Landscaping in accordance with the approved landscaping plan shall be installed or bonded for before final building inspection/establishment of use. A total of 110 trees are required for the shopping center (1 tree per 5 parking spaces). The landscape and irrigation plan shall be prepared by a licensed landscape architect subject to review and approval by the Community Development and Public Works Departments. The landscape plan shall be in conformance with Development Code Chapter 16.84 (Water Efficient Landscape Requirements) and shall include the following: a. Tree staking, soil preparation and planting detail; RESOLUTION NO. PAGE 7 b. The use of landscaping to screen ground-mounted utility and mechanical equipment; c. The required landscaping and improvements. This includes: i. Deep root planters shall be included in areas where trees are within five feet (5’) of asphalt or concrete surfaces and curbs; ii. Water conservation practices including the use of low flow heads, drip irrigation, mulch, gravel, drought tolerant plants; iii. An automated irrigation system using smart controller (weather based) technology; iv. The selection of groundcover plant species shall include native plants; v. Linear planters shall be provided in parking areas; vi. Turf areas shall be limited in accordance with Section 16.84.040 of the Development Code. 18. All trees on the construction site to be preserved shall be protected under the conditions of the Community Tree Ordinance which include but are not limited to: a. No mechanical trenching within the drip line of a tree, unless approved by the Public Works Director; b. No storage of equipment, supplies, tools, etc., within 8' of the trunk of any tree; c. No grading shall occur under a trees dripline, unless approved by the Public Works Director; d. For all trees within twenty feet (20’) of construction, a five foot (5') protective fence shall be constructed a minimum of 8' from the trunk or at the dripline, whichever distance is greater; e. At a minimum, all pruning shall comply with the American National Standards Institute (ANSI) A300 Pruning Standards and Best Management Practices. An independent certified arborist, paid for by the developer and selected by the Public Works Director, shall conduct all pruning on site. The independent arborist shall report to the City’s Arborist regarding any pruning activities. 19. For projects approved with specific exterior building colors, the developer shall paint a test patch on the building including all colors. The remainder of the building may not be painted until inspected by the Community Development Department to verify that colors are consistent with the approved color board. A 48-hour notice is required for this inspection. 20. All new electrical panel boxes shall be installed inside the building they serve. 21. All new Fire Department Connections (FDC) shall be located near a fire hydrant, adjacent to a fire access roadway, and screened to the maximum extent feasible. 22. All new double detector check valve assemblies shall be located directly adjacent to or within the respective building to which they serve. RESOLUTION NO. PAGE 8 23. All ducts, meters, air conditioning equipment and all other mechanical equipment, whether on the ground, on the structure or elsewhere, shall be screened from public view with materials architecturally compatible with the main structure. It is especially important that gas and electric meters, electric transformers, and large water piping systems be completely screened from public view. All roof-mounted equipment which generates noise, solid particles, odors, etc., shall cause the objectionable material to be directed away from residential properties. 24. All conditions of this approval run with the land and shall be strictly adhered to, within the time frames specified, and in an on-going manner for the life of the project. Failure to comply with these conditions of approval may result in an immediate enforcement action. If it is determined that violation(s) of these conditions of approval have occurred, or are occurring, this approval may be revoked pursuant to Development Code Section 16.08.100. 25. Electric vehicle charging stations and spaces shall be installed in the parking lot as identified on the project plans. 26. Development of the drive-thru pad shall meet the requirements of Section 16.52.090, or equivalent, of the Municipal Code regarding drive-thru uses. 27. Future internal changes to the number of tenants for permitted uses, and any resulting façade changes, can be approved by the Community Development Department through building permits. The Architectural Review Committee may be consulted for a recommendation to the Community Development Director when inconsistencies with previously approved colors and materials are identified. BUILDING AND LIFE SAFETY DIVISION AND FIRE DEPARTMENT BUILDING CODES 28. The project shall comply with the most recent editions of the California Building Standards Code, as adopted by the City of Arroyo Grande. FIRE LANES 29. Prior to issuance of a certificate of occupancy, the applicant shall post designated fire lanes, per Section 22500.1 of the California Vehicle Code. This includes painting, stenciling, and signage. FIRE FLOW/FIRE HYDRANTS 30. Project shall have a fire flow in accordance with the California Fire Code. 31. Fire hydrants shall be installed, per Fire Department and Public Works Department RESOLUTION NO. PAGE 9 standards and per the California Fire Code. SECURITY KEY BOX 32. The applicant must provide an approved "security key vault" for each tenant, per Building and Fire Department guidelines and per the California Fire Code. FIRE SPRINKLER 33. All tenant spaces must be fully sprinklered with separate systems, per Building and Fire Department guidelines and per the California Fire Code. 34. Provide Fire Department approved access or sprinkler-system per National Fire Protection Association Standards. Fire sprinkler alarm and initiating devices such as heat and smoke detectors shall be monitored by an alarm system. ABANDONMENT / NON-CONFORMING 35. The applicant shall show proof of properly abandoning all non-conforming items such as septic tanks, wells, underground piping and other undesirable conditions. DEMOLITION PERMIT / RETAINING WALLS 36. A demolition permit must be applied for, approved and issued. All asbestos and lead shall be verified if present and abated prior to permit issuance. SPECIAL CONDITIONS 37. The developer shall reimburse the City for all costs associated with outside plan checks performed at either the developer’s or City’s request. 38. All plans shall demonstrate appropriate Fire apparatus access through modified turning aisles throughout the site. ENGINEERING DIVISION AND PUBLIC WORKS DEPARTMENT GENERAL CONDITIONS 39. The developer shall sweep streets in compliance with Standard Specifications Section 13-4.03F. 40. For work requiring engineering inspections, working hours shall comply with Standard Specification Section 5-1.01. RESOLUTION NO. PAGE 10 41. Provide trash enclosures in compliance with Engineering Standard 9060 with solid/rain-deflecting roof. Drain of trash enclosure to tie into the sewer interceptor or the onsite water quality BMP. Identify a trash enclosure for Tenant A. 42. Trash enclosure area(s) shall be screened from public view with landscaping or other appropriate screening materials, and shall be reserved exclusively for dumpster and recycling container storage. Interior vehicle travel ways shall be designed to be capable of withstanding loads imposed by trash trucks. 43. All project improvements shall be designed and constructed in accordance with the most recent version of the City of Arroyo Grande Standard Specifications and Engineering Standards. 44. Record Drawings (“as-built” plans) are required to be submitted prior to release of the Faithful Performance Bond. 45. Submit as-built plans at the completion of the project or improvements as directed by the Community Development Director in compliance with Engineering Standard 1010 Section 9.3 E. Provide One (1) set of paper prints and electronic documents on CD or flash drive in both AutoCAD and PDF format. 46. Submit three (3) full-size paper copies and one (1) electronic PDF file of approved improvement plans for inspection purposes during construction. 47. Preserve existing survey monuments and vertical control benchmarks in compliance with Standard Specifications Section 5-1.26A. IMPROVEMENT PLANS 48. Applicant shall fund outsourced plan and map check services, as required. 49. The applicant shall be responsible for obtaining an encroachment permit for all work within a public right-of-way (City, County and/or Caltrans). CURB, GUTTER, AND SIDEWALK 50. Install ADA compliant facilities on the subject property where necessary or verify that existing facilities are compliant with State and City Standards. 51. Any sections of damaged or displaced curb, gutter & sidewalk or driveway approach shall be repaired or replaced to the satisfaction of the Public Works Director. 52. Install ADA compliant ramps at driveway entrances on West Branch Street. RESOLUTION NO. PAGE 11 GRADING AND DRAINAGE 53. On-site storm drains shall be retrofitted with filters and VOC removal socks. Additional Tier 2 water quality filtration may be necessary based on the full project scope. WATER 54. A new 8” Double Detector Check (DDC) backflow device per City Standard 6410 is required to replace the existing 8” DDC that no longer meets Standard. 55. There is only one (1) two inch (2”) water meter that services the building. It is recommended that the applicant install two (2) new meters for the fitness facility and grocery store. Alternatively, the applicant can install private water sub- meters to properly divide the water bill. 56. The applicant shall relocate the existing fire hydrant in the back of the building within the roadway to the north approximately 15’ and located behind the curb. SEWER 57. There is only one (1) sewer lateral for the building. It is recommended separate sewer laterals be installed for the fitness facility and the grocery store. All sewer laterals shall comply with Engineering Standard 6810. SPECIAL CONDITIONS 58. The applicant shall reseal and restripe the parking lot. 59. The applicant shall install stop signs and exit points along West Branch Street along the subject property only. PUBLIC SAFETY 60. Prior to issuance of building permit, applicant to submit exterior lighting plan for Police Department approval. 61. Prior to issuance of a certificate of occupancy, the applicant shall post accessible parking signage, per California Building Code Section 11A and other applicable standards. 62. Prior to issuance of a certificate of occupancy, the applicant shall install a burglary [or robbery] alarm system per Police Department guidelines, and pay the Police Department alarm permit application fee. 63. Prior to issuance of a certificate of occupancy, for any parking lots available to RESOLUTION NO. PAGE 12 the public located on private lots, the developer shall post private property “No Parking” signs in accordance with the handout available from the Police Department. FEES AND BONDS The applicant shall pay all applicable City fees, including the following: 64. FEES TO BE PAID PRIOR TO PLAN SUBMITTAL a. Plan Review Fee (Based on the current Building Division fee schedule. NOTE: The applicant is responsible to pay all fees associated with outside plan review consultants) 65. FEES TO BE PAID PRIOR TO ISSUANCE OF A BUILDING PERMIT a. Water Neutralization fee, to be based on codes and rates in effect at the time of building permit issuance, involving water connection or enlargement of an existing connection. b. Water Distribution fee, to be based on codes and rates in effect at the time of building permit issuance. c. Water Meter charge to be based on codes and rates in effect at the time of building permit issuance. d. Water Availability charge, to be based on codes and rates in effect at the time of building permit issuance. e. Traffic Impact fee, to be based on codes and rates in effect at the time of building permit issuance. f. Traffic Signalization fee, to be based on codes and rates in effect at the time of building permit issuance. g. Sewer Connection fee, to be based on codes and rates in effect at the time of building permit issuance. h. South San Luis Obispo County Sanitation District Connection fee, to be based on codes and rates in effect at the time of building permit issuance. i. Drainage fee, to be based on codes and rates in effect at the time of building permit issuance. j. Park Development fee, to be based on codes and rates in effect at the time of building permit issuance. k. Construction Tax, to be based on codes and rates in effect at the time of building permit issuance. l. Alarm Fee, to be based on codes and rates in effect at the time of building permit issuance. m. Strong Motion Instrumentation Program (SMIP) Fee, to be based on codes and rates in effect at the time of building permit issuance. n. Building Permit Fee, to be based on codes and rates in effect at the time of building permit issuance. RESOLUTION NO. PAGE 13 ARCHITECTURAL REVIEW COMMITTEE 66. The final location of the loading area for the hardware store and garden center shall not adversely impact on-site circulation or emergency access. 67. The final design of the commercial drive-thru building shall require Architectural Review and shall return to the Architectural Review Committee for review and recommendation to the Community Development Director. Project Site (6.4 acres)Shopping Center (10.845 acres)HWY 101. OAK PARK BLVDW. BRANCH ST.PROPOSED (VIEW A) EXTERIOR IMPROVEMENTSPROPOSED (VIEW C) EXTERIOR IMPROVEMENTSPROPOSED (VIEW B) EXTERIOR IMPROVEMENTSSHEET INDEXTITLE SHEETA1EXISTING CONDITIONSA2EXISTING AREAS AND COUNTSA3ARCHITECTURAL SITE PLANA4CONCEPT PERSPECTIVES A5COLORS AND MATERIALS A6BUILDING ELEVATIONSA7MONUMENT SIGN A8 GARDEN CENTER ENLARGED SITE PLAN A9NEW PAD ENLARGED SITE PLAN A10PROJECT DESCRIPTIONPROJECT TEAMOWNER: ORRADRE RANCH768 TWIN CREEKS WAYSAN LUIS OBISPO, CA 93401CONTACT:PETER ORRADREPORRADRE@SBCGLOBAL.NETAPPLICANT: ARROYO GRANDE COMMERCIAL LLCP.O. BOX 481, OAKHURST, CA 93644CONTACT:RICK GAMBRILRGAMBRIL@YAHOO.COMARCHITECT: RRM DESIGN GROUPLANDSCAPE: 3765 S. HIGUERA ST.SAN LUIS OBISPO, CA 93401TEL: (805) 543-1794FAX: (805) 543-4609CONTACT: PAT BLOTE - PROJECT ARCHITECT WES AROLA - LANDSCAPE ARCHITECTVICINITY MAPPROJECT STATISTICSPROJECT ADDRESS: 1570 W. BRANCH STREET, ARROYO GRANDE, CAPROJECT SITE AREA6.4 ACRESAPN:077-771-068ZONING: RC - REGIONAL COMMERCIALOCCUPANCY: B2 (AS-BUILT)TYPE OF CONSTRUCTION V-N ( EXISTING)EXISTING LAND USE: SHOPPING CENTER (SC)COMMUNITY CODE: ARROYO GRANDE(SC) GROSS AREA: 472,408 SF (10.845 AC.)BUILDING AREA:K-MART BLDG ENVELOPE 87,132 SFSHOP BUILDING #1 11,200 SFSHOP BLDG. #2 - 1RST FLOOR 12,550 SF- 2ND FLOOR12,300 SFCARL’S JR. REST 3,500 SFRESTAURANT 4,800 SFBANK 7,200 SFNEW PAD (FAST FOOD) 1,800 SFTOTAL =140,482 SFSITE BUILDING COVERAGE: 128,182/ 472,408 = 27.13% SITE LANDSCAPE COVERAGE: 56,280 SF / 472,408 SF = 11.91%PARKING CALCULATIONS:Table 1 - Required Parking Tenant Use Square Footage Parking Ratio Required Spaces A Hardware Store (interior space) 20,856 1/250 sq. ft. 83 A Hardware store - Garden Center 5,400 1/2,000 sq.ft. 3 B Fitness Center 16,734 1/250 sq. ft. 67 C Grocery 23,064 1/250 sq. ft. 92 D Retail 6,631 1/250 sq. ft. 27 E Retail 10,075 1/250 sq. ft. 40 F Dance Studio 7,081 1/3 students + staff 20 G New Tenant Pad - Fast Food 1,800 GLA x 65%/100 12 Existing retail, offices & bank 43,250 1/250 sq. ft. 173 Existing restaurants 8,300 GLA x 65%/100 54 Total571 Table 2 - Project Parking Summary Summary Feature Parking Numbers Parking Provided Required Parking 571 13.3% Shared Reduction - 76 Adjusted requirement 495 1 1 Reflects net loss of 42 spaces to provide outdoor garden center and new tenant pad. Previous parking total was 537 spaces (7% shared reduction approved by ARC after PC review of CUP); therefore, new parking total is 495 spaces (537-42 = 495). 1570 WEST BRANCH STREET, ARROYO GRANDE, CAA1WEST BRANCH STREET TENANT AND FACADE UPDATETITLE SHEETTHE SITE HAS BEEN DEVELOPED AS A SHOPPING CENTER WITH K-MART AS ITS ANCHOR FOR SEVERAL DECADES.ON SEPTEMBER 4, 2018, THE CITY PLANNING COMMISSION APPROVED A CUP TO ALLOW THREE TENANT SPACES IN THE FORMER K-MART BUILDING AND ADD 4,500 SQUARE FEET OF FLOOR AREA TO ITS SOUTHWESTERN CORNER RESULTING IN 87,132 SQUARE FEET OVERALL. THE THREE TENANTS INCLUDED A GYM, GROCERY STORE WITH LIQUOR SALES, AND A LARGE RETAIL SPACE. THE NEW PROPOSAL IS STILL TO RE-PURPOSE THE BUILDING FOR VIABLE COMMUNITY USES AND SERVICES, BUT THE REQUEST IS NOW TO DIVIDE THE BUILDING INTO 6 SEPARATE TENANT SPACES AS FOLLOWS:1) HARDWARE STORE OF 20,856 SQUARE FEET WITH A 5,400 SQUARE-FOOT GARDEN CENTER;2) FITNESS FACILITY OF 16, 734 SQUARE FEET;3) GROCERY STORE OF 23,064 SQUARE FEET;4) RETAIL SPACE OF 6,631 SQUARE FEET;5) RETAIL SPACE OF 10,075 SQUARE FEET; AND6) DANCE STUDIO OF 7,081 SQUARE FEET.WITH THE CHANGE IN THE NUMBER OF TENANTS, THE FACADE MASSING HAS GENERALLY REMAINED CONSISTENT WITH PLANS PREVIOUSLY REVIEWED BY THE ARC AND PLANNING COMMISSION. ADDITIONAL ENTRIES TO THE BUILDING WORK TO FURTHER ARTICULATE THE FAÇADE AND REDUCE THE APPARENT BULK AND MASSING OF THE OVERALL BUILDING. THE CHANGES IN THE NUMBER OF TENANTS DO NOT AFFECT CONDITIONS FOR SITE IMPROVEMENTS.IN ADDITION, CURRENT PLANS SHOW A SMALL PAD BUILDING OF 1,800 SQUARE FEET IN THE PARKING FIELD NEARER WEST BRANCH STREET. THE IDEA IS TO PROVIDE SPACE FOR A FAST-FOOD RESTAURANT OR SMALL TO-GO COFFEE SHOP. THE ADDITIONAL PAD HELPS ENLIVEN THE SHOPPING CENTER AND MINIMIZE THE VISUAL EXTENT OF THE PARKING FIELDS. NORTHN.T.S.1192-03-CO19 March 25, 2019EXHIBIT "B" NORTH BOUND HWY 101 VIEWSOUTH BOUND HWY 101 VIEWNORTHERN MOST ENTRANCE (ENTRY 1)ENTRY 2ENTRY 3ENTRY 4 ( UPPER SITE ACCESS @ SOUTHERN END OF SITE) VICINITY MAPMAIN VIEW OF PROPOSED BUILDING FACADE REMODELproject siteHWY 101. OAK PARK BLVDW. BRANCH ST.DEGFCBAABCDEFG1570 WEST BRANCH STREET ARROYO GRANDE CAA2WEST BRANCH STREET TENANT AND FACADE UPDATEEXISTING CONDITIONS1192-03-CO19 March 25, 2019 NORTH3A-2012A-2014A-2011A-201411' - 0"112' - 0"45' - 0"100' - 0"212' - 0"46 spaces 46 spaces46 spaces45 spaces45 spaces26 spaces6 spaces12 spaces6 spaces9 spaces8 spaces 6 spaces9 spaces3 spaces3spaces16 spaces19 spaces20 spaces20 spaces15 spaces8 spaces7 spaces4 spaces11 spaces11 spacestrashtrash23 spaces 26 spaces8 spaces10 spaces10 spaces14 spaces10 spaces3,500 SF50' - 0"70' - 0"60' - 0"120' - 0"60' - 0"80' - 0"80' - 0"140' - 0"60' - 0"3 spaces205' - 0"7,200 SF4,800 SF12,550 SF(1RST FLOOR)12,300 SF(2ND FLOOR)11,200 SF82,632 SF1570 WEST BRANCH STREET ARROYO GRANDE CAA3WEST BRANCH STREET TENANT AND FACADE UPDATEEXISTING AREAS AND COUNTSSCALE: 1” = 40’- 0” (24”X36” SHEET)1192-03-CO19 March 25, 2019SITE PLAN ( W/ EXISTING BUILDING AREAS AND PARKING COUNTS) 1570 WEST BRANCH STREET ARROYO GRANDE CAA4WEST BRANCH STREET TENANT AND FACADE UPDATEARCHITECTURAL SITE PLANSCALE: 1” = 40’- 0” (24”X36” SHEET)1192-03-CO19 March 25, 2019SITE LEASING AND CONCEPT PLANNORTH AVIEW KEY PLANSCALE S: NTSNORTHABCPROPOSED (VIEW C) EXTERIOR IMPROVEMENTSPROPOSED (VIEW B) EXTERIOR IMPROVEMENTSEXISTING GARDEN CENTER (VIEW B)EXISTING REAR NORTH EAST CORNER (VIEW C)1570 WEST BRANCH STREET ARROYO GRANDE CAA5WEST BRANCH STREET TENANT AND FACADE UPDATECONCEPT PERSPECTIVES1192-03-CO19 March 25, 2019 WORDLY GRAYSHERWIN WILLIAMS: 7043EXTRA WHITESHERWIN WILLIAMS: SW7006DOVETAILSHERWIN WILLIAMS: SW7018ACB• HOBBY LOBBY ENTRY• PLASTER TRIM• CORNICE/PARAPET• STUCCO• FASCIA BOARDS• EXTERIOR CEILING SOFITSMAIN BUILDING COLORACCENT COLORCORNICE/PARAPET COLOR BRONZE ANODIZED METAL(WINDOW/DOOR TRIM STEEL TRELLIS FRAME, PIPE RAIL HORIZONTAL LAP SIDINGFIBER CEMENT SIDING(PAINTED Bracing Blue SW 6242)PER ELEVATIONSACCENT CMU BLOCK(PROPOSED COLUMN WALLS AND EXISTING BASE)PER ELEVATIONSACCENT CORRUGATED METAL(ACCENT SIGN ENTRY WALL)PER ELEVATIONSPROPOSED EXTERIOR IMPROVEMENT SUITE 341 ENTRY - (VIEW -A)AVIEW KEY PLANSCALE S: NTSNORTHEXISTINGAPPROVEDPROPOSED (VIEW A) EXTERIOR IMPROVEMENTSDEFGEGFCBA1570 WEST BRANCH STREET ARROYO GRANDE CAA6WEST BRANCH STREET TENANT AND FACADE UPDATE(NO CHANGE TO APPROVED COLORS AND MATERIALS)COLOR AND MATERIALS1192-03-CO19 March 25, 2019ABC (E) T.O.PARAPET HT.+/- 23’-6”SOUTH ELEVATIONSCALE: 1/16” = 1’- 0” (24”X36” SHEET)WEST ELEVATIONSCALE: 1/16” = 1’- 0” (24”X36” SHEET)EAST ELEVATIONSCALE: 1/16” = 1’- 0” (24”X36” SHEET)NORTH ELEVATIONOUTLINE OF NEIGHBORING BUILDINGNEW ENTRY FEATURE WITH DIRECT ACCESS TO ADJACENT PARKING LOT.NEW TENANT “F” MAIN ENTRYENHANCEMENT TO EXISTING TRASH ENCLOSURE LOCATIONNEW TENANT “F” ENTRYNEW GARDEN CENTER AND GARDEN CENTER ENTRYFOR TENANT “A”NEW GARDEN CENTERFOR TENANT “A”NEW GARDEN CENTERFOR TENANT “A”NEW TENANT “E” ENTRYNEW TENANT “D” ENTRYNEW CART CORRAL AND ACCESSIBLE RAMP HOUSED UNDER A NEW SHRUBBED TRELLISOUTLINE OF APPROVED ELEVATION DESIGN FOR THREE TENANT ENTRIESOUTLINE OF APPROVED ELEVATION DESIGN FOR THREE TENANT ENTRIESSCALE: 1/16” = 1’- 0” (24”X36” SHEET)1570 WEST BRANCH STREET ARROYO GRANDE CAA7WEST BRANCH STREET TENANT AND FACADE UPDATEBUILDING ELEVATIONS1192-03-CO19 March 25, 2019 127((;,67,1*3$$5.,1*721(:%8,/',1*  1(:3$' '5,9(7+58(175<7:2:$<75$)),&'5,9(7+58(;,7',1,1*3$7,26)',1,1*3$7,26)02180(176,*1/2&$7,211(:$&&(66,%/(3$7+7238%/,&:$<7(1$17*6):(67%5$1&+675((71(:9$1$&&(66,%/($'$67$//  02180(176,*1/2&$7,21  32 FEET TALLMATCHES EXISTING HEIGHT1570 WEST BRANCH STREET ARROYO GRANDE CAA8WEST BRANCH STREET TENANT AND FACADE UPDATEMONUMENT SIGN1192-03-CO19 March 25, 2019 7(1$17$7(1$17$6) 7:2:$<75$)),&*$5'(1&(17(5/2$',1*$5($1(:*$5'(1&(17(56)'(/,9(5<*$7(1570 WEST BRANCH STREET ARROYO GRANDE CAA9WEST BRANCH STREET TENANT AND FACADE UPDATEGARDEN CENTERENLARGED SITE PLAN1192-03-CO19 March 25, 2019SCALE: 1” = 10’- 0” (24”X36” SHEET)GARDEN CENTER SITE PLANNORTH 127((;,67,1*3$5.,1*72%(5(6($/('$1'5(675,33('7<363$&,1* 1(:%8,/',1*  1(:3$' '5,9(7+58(175<7:2:$<75$)),&21(:$<75$)),&'5,9(7+58(;,77:2:$<75$)),&',1,1*3$7,26)',1,1*3$7,26)02180(176,*1/2&$7,211(:$&&(66,%/(3$7+7238%/,&:$<7(1$17*6)7:2:$<75$)),&:(67%5$1&+675((71(:9$1$&&(66,%/($'$67$//  1570 WEST BRANCH STREET ARROYO GRANDE CAA10WEST BRANCH STREET TENANT AND FACADE UPDATENEW PADENLARGED SITE PLAN1192-03-CO19 March 25, 2019SCALE: 1” = 10’- 0” (24”X36” SHEET)NEW PAD SITE PLANNORTH RESOLUTION NO. 18-2312 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ARROYO GRANDE APPROVING CONDITIONAL USE PERMIT 18-004; LOCATED AT 1570 W. BRANCH STREET; APPLIED FOR BY PETER ORRADRE WHEREAS, the project site is an approximately 6.4-acre site located in the Regional Commercial (RC) zoning district and currently developed with an approximately 82,600 square-foot commercial building formerly occupied by Kmart; and WHEREAS, the project site is part of the Oak Park Plaza shopping center; and WHEREAS, the applicant desires to expand the existing commercial structure by approximately 4,500 square feet and split the resulting commercial space into three (3) tenant spaces, including a fitness facility operating 24-hours per day, a grocery store larger than 20,000 square feet and selling beer, wine, and distilled spirits, and a 50,000 square foot retail store; and WHEREAS, the expansion of an existing commercial building by 4,500 square feet, the establishment of a fitness facility in the RC zoning district, the establishment of a grocery store greater than 20,000 square feet, and the sale of beer, wine and distilled spirits requires approval of a conditional use permit; and WHEREAS, the applicant additionally desires to construct a fifty foot (50') freeway sign to provide advanced notification to motorists traveling on Highway 101; and WHEREAS, freeway signs between 20' and 50' require approval of Planned Sign Programs; and WHEREAS, the request was reviewed in accordance with the development review process identified in the Municipal Code; and WHEREAS, the Architectural Review Committee reviewed the project on August 20, 2018, recommending approval of the project to the Planning Commission; and WHEREAS, the Planning Commission has reviewed this project in compliance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the Arroyo Grande Rules and Procedures for Implementation of CEQA and determined that the project is exempt per Sections 15301(e)(2), 15303(c), and 15332 of the CEQA Guidelines regarding existing facilities, new construction, and in-fill development projects in urban areas, respectively; and WHEREAS, the Planning Commission of the City of Arroyo Grande has reviewed the project at a duly noticed public hearing on September 4, 2018; and ATTACHMENT 1 RESOLUTION NO. 18-2312 PAGE.2 WHEREAS, the Planning Commission finds, after due study, deliberation and public hearing, the following circumstances exist: Conditional Use Permit Findings: 1. The proposed use is permitted within the subject district pursuant to the provisions of this section and complies with all the applicable provision_s of this title, the goals, and objectives of the Arroyo Grande General Plan, and the development policies and standards of the City. The proposed uses outlined in the recitals are permitted within the Regional Commercial district pursuant to Section 16.36.030 of the Development Code and the project complies with all applicable provisions of the Development Code, the goals and objectives of the Arroyo Grande General Plan including Policies LU12, LU12-11.3, LU12-12 and ED5-1 of the Land Use Element and Economic Development Element, and the development policies and standards of the City. 2. The proposed use would not impair the integrity and character of the district in which it is to be established or located. The proposed use will not impair the integrity and character of the district in which it is to be established or located due to the purpose of the Regional Commercial district being to provide for a diversity of commercial uses that serve community and regional needs for retail and personal services, the symbiotic nature of the proposed uses with the remainder of the Oak Park Plaza, and the implementation of conditions of approval developed for the project that are intended to protect the public health, safety and welfare. 3. The site is suitable for the type and intensity of use or development that is proposed. The site is approximately 6.4-acres and the layout of the existing Oak Park Plaza, along with minor infrastructure modifications required as a result of the project, is suitable for the proposed project. 4. There are adequate provisions for water, sanitation, and public utilities and services to ensure public health and safety. The proposed project will utilize City supplied water, sanitation, and public utilizes and services that ensure public health and safety. Nothing in the proposed.project is anticipated to be overly impactful to these services. Conditions of approval developed for the project will additionally ensure public services are minimally impacted. 5. The proposed use will not be detrimental to the public health, safety or welfare or materially injurious to properties and improvements in the vicinity. The proposed use will not be detrimental to the public health, safety, or welfare due to the project being located in the existing Oak Park Plaza RESOLUTION NO. 18-2312 PAGE 3 and the implementation of conditions of approval developed for the project that are intended to protect the public health, safety and welfare. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Arroyo Grande hereby approves Conditional Use Permit 18-002 as set forth in Exhibit "B", attached hereto and incorporated herein by this reference, with the above findings and subject.to the conditions as set forth in Exhibit "A", attached hereto and incorporated herein by this reference. NOW, THEREFORE, BE IT FURTHER RESOLVED that the Planning Commission of the City of Arroyo Grande hereby continues to a date uncertain Planned Sign Program 18-001 to allow for more complete information regarding signage to be submitted by the applicant and allow residences within 300' of the freeway across from the project to be notified of the project and all public hearings. On motion by Commissioner Mack, seconded by Commissioner George, and by the following roll call vote, to wit: AYES: Mack, George, Fowler-Payne, Schiro NOES: None ABSENT: Martin the foregoing Resolution was adopted this 4th day of September, 2018. RESOLUTION NO: 18-2312 PAGE 4 GLENN MARTIN, CHAIR ATTEST: 1), MATTHEW DOWNING SECRETARY TO THE CO' ISSION AS TO CONTENT: G T RCCLISH COMMUNITY DEVELOPMENT DIRECTOR RESOLUTION NO. 18-2312 PAGE 5 EXHIBIT 'A' CONDITIONS OF APPROVAL CONDITIONAL USE PERMIT 18-004 1570 W. BRANCH STREET COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION GENERAL CONDITIONS 1. This approval authorizes the expansion of an existing commercial building 'by approximately 5,000 square feet and the demising of the resulting building into three (3) tenant spaces, including retail, a grocer selling beer, wine, and distilled spirits, and a fitness facility operating 24-hours per day. 2. The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project. 3. The applicant shall comply with all conditions of approval for Conditional Use Permit 18-004. 4. This application shall automatically expire on September 4, 2020 unless a building• permit is issued. 5. Development shall conform to the Regional Commercial requirements except as otherwise approved. 6. Development shall occur in substantial conformance with the plans presented to the Planning Commission at the meeting of September 4, 2018 and marked Exhibit"B". 7. The applicant shall agree to indemnify, defend, and hold harmless at his/her sole expense any action brought against the City, its present or former agents, officers, or employees because of the issuance of said approval, or in any way relating to the implementation thereof, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations under this condition. 8. A copy of these conditions shall be incorporated into all construction documents. 9. At the time of application for construction permits, plans submitted shall show all RESOLUTION NO. 18-2312 PAGE 6 development consistent with the approved site plan, floor plan, architectural elevations and landscape plan. 10. Signage shall be subject to the requirements of Chapter 16.60 of the Development Code. Prior to issuance of a building permit, all illegal signsshall be removed. 11. Development shall comply with Development Code Sections 16.48.070, "Fences, Walls and Hedges"; 16.48.120, "Performance Standards"; and 16.48.130 Screening Requirements". 12. The developer shall comply with Development Code Chapter 16.56, "Parking and Loading Requirements". All parking spaces adjacent to a wall, fence, or property line shall have a minimum width of 11 feet. 13. All parking areas of five or more spaces shall have an average of one-half foot- candle illumination per square foot of parking area for visibility and security during hours of darkness. 14. Trash enclosures shall be screened from public view with landscaping or other appropriate screening materials, and shall be made of ah exterior finish that complements the architectural features of the main building. The trash enclosure area shall accommodate recycling container(s). 15. Noise resulting from construction activities shall conform to the standards set forth in Chapter 9.16 of the Municipal Code. No construction shall occur on Sundays or City observed holidays. 16. At the time of application for construction permits, the applicant shall provide details on proposed exterior lighting, if applicable. The lighting plan shall include the height, location, and intensity of all exterior lighting consistent with Section 16.48.090 of the Development Code. All lighting fixtures shall be shielded so that neither the lamp nor the related reflector interior surface is visible from adjacent properties. All lighting for the site shall be downward directed and shall not create spill or glare to adjacent properties. All lighting shall be energy efficient (e.g. LED). 17. Landscaping in accordance with the approved landscaping plan shall be installed or bonded for before final building inspection/establishment of use. A total of 110 trees are required for the shopping center (1 tree per 5 parking spaces). The landscape and irrigation plan shall be prepared by a licensed landscape architect subject to review and approval by the Community Development and Public Works Departments. The landscape plan shall be in conformance with Development Code Chapter 16.84 (Water Efficient Landscape Requirements) and shall include the following: a. Tree staking, soil preparation and planting detail; b. The use of landscaping to screen ground-mounted utility and mechanical RESOLUTION NO. 18-2312 PAGE 7 equipment; c. The required landscaping and improvements. This includes: i. Deep root planters shall be included in areas where trees are within five feet.(5') of asphalt or concrete surfaces and curbs; ii. Water conservation practices including the use of low flow heads, drip irrigation, mulch, gravel, drought tolerant plants; iii. An automated irrigation system using smart controller (weather based) technology; iv. The selection of groundcover plant species shall include native plants; v. Linear planters shall be provided in parking areas; vi. Turf areas shall be limited in accordance with Section 16.84.040 of the Development Code. 18. All trees on the construction site to be preserved shall be protected under the conditions of the Community Tree Ordinance which include but are not limited to: a. No mechanical trenching within the drip line of a tree, unless approved by the Public Works Director; b. No storage of equipment, supplies, tools, etc., within 8' of the trunk of any tree; c. No grading shall occur under a trees dripline, unless approved by the Public Works Director; d. For all trees within twenty feet (20') of construction, a five foot (5') protective fence shall be constructed a minimum of 8' from the trunk or at the dripline, whichever distance is greater; e. At a minimum, all pruning shall comply with the American National Standards Institute(ANSI) A300 Pruning Standards and Best Management Practices. An independent certified arborist, paid for by the developer and selected by the Public Works Director, shall conduct all pruning on site. The independent arborist shall report to the City's Arborist regarding any pruning activities. 19. For projects approved with specific exterior building colors, the developer shall paint a test patch on the building including all colors. The remainder of the building may not be painted until inspected by the Community Development Department to verify that colors are consistent with the approved color board. A 48-hour notice is required for this inspection. 20. All new electrical panel boxes shall be installed inside the building they serve. 21. All new Fire Department Connections (FDC) shall be located near a fire hydrant, adjacent to a fire access roadway, and screened to the maximum extent feasible. 22. All new double detector check valve assemblies shall be located directly adjacent to or within the respective building to which they serve. RESOLUTION NO. 18-2312 PAGE 8 23. All ducts, meters, air conditioning equipment and all other mechanical equipment, whether on the ground, on the structure or elsewhere, shall be screened from public view with materials architecturally compatible with the main structure. It is especially important that gas and electric meters, electric transformers, and large water piping systems be completely screened from public view. All roof-mounted equipment which generates noise, solid particles, odors, etc., shall cause the objectionable material to be directed away from residential properties. 24. All conditions of this approval run with the land and shall be strictly adhered to, within the time frames specified, and in an on-going manner for the life of the project. Failure to comply with these conditions of approval may result in an immediate enforcement action. If it is determined that violation(s) of these conditions. of approval have occurred, or are occurring, this approval may be revoked pursuant to Development Code Section 16.08.100. 25. A minimum of two (2) electric vehicle charging stations, totaling four (4) parking spaces, shall be installed in the parking lot for the project. 26. In compliance with the 2012 Bicycle and Trails Master Plan, the property owner shall record a pedestrian access easement, on a form approved by the City Attorney, across the rear of the property to facilitate development of pedestrian connectivity utilizing the existing pedestrian bridge to the adjoining hotel property and the trail to the James Way Habitat. BUILDING AND LIFE SAFETY DIVISION AND FIRE DEPARTMENT CONDITIONS BUILDING CODES 27. The project shall comply with the most recent editions of the California Building Standards Code, as adopted by the City of Arroyo Grande. FIRE LANES 28. Prior to issuance of a certificate of occupancy, the applicant .shall post designated fire lanes, per Section 22500.1 of the California Vehicle Code. This includes painting, stenciling, and signage. FIRE FLOW/FIRE HYDRANTS 29. Project shall have a fire flow in accordance with the California Fire Code. 30. Fire hydrants shall be installed, per Fire Department and Public Works Department standards and per the California Fire Code. RESOLUTION NO. 18-2312 PAGE 9 SECURITY KEY BOX 31. The applicant must provide an approved "security key vault" for each tenant, per Building and Fire Department guidelines and per the California Fire Code. FIRE SPRINKLER 32. All tenant spaces must be fully sprinklered with separate systems, per Building and Fire Department guidelines and per the California Fire Code. 33. Provide Fire Department approved access or sprinkler-system per National Fire Protection Association Standards. Fire sprinkler alarm and initiating devices such as heat and smoke detectors shall be monitored by an alarm system. ABANDONMENT/ NON-CONFORMING 34. The applicant shall show proof of properly abandoning all non-conforming items such as septic tanks, wells, underground piping and other undesirable conditions. DEMOLITION PERMIT/ RETAINING WALLS 35. A demolition permit must be applied for, approved and issued. All asbestos and lead shall be verified if present and abated prior to permit issuance. SPECIAL CONDITIONS 36. The developer shall reimburse the City for all costs associated with outside plan checks performed at either the developer's or City's request. ENGINEERING DIVISION AND PUBLIC WORKS DEPARTMENT CONDITIONS GENERAL CONDITIONS 37. The developer shall sweep streets in compliance with Standard Specifications Section 13-4.03F. 38. For work requiring engineering inspections, working hours shall comply with Standard Specification Section 5-1.01. 39. Provide trash enclosure in compliance with Engineering Standard 9060 with solid/rain-deflecting roof. Drain of trash enclosure to tie into the sewer interceptor or the onsite water quality BMP. 40. Trash enclosure area(s) shall be screened from public view with landscaping'or other appropriate screening materials, and shall be reserved exclusively for RESOLUTION NO. 18-2312 PAGE 10 dumpster and recycling container storage. Interior vehicle travel ways shall be designed to be capable of withstanding loads imposed by trash trucks. 41. All project improvements shall be designed and constructed in accordance with the most recent version of the City of Arroyo Grande Standard Specifications and - Engineering Standards. 42. Record Drawings ("as-built" plans) are required to be submitted prior to release of the Faithful Performance Bond. 43. Submit as-built plans at the completion of the project or improvements as directed by the Community Development Director in compliance with Engineering Standard 1010 Section 9.3 E. Provide One (1) set of paper prints and electronic documents on CD or flash drive in both AutoCAD and PDF format. 44. Submit three (3) full-size paper copies and one (1) electronic PDF file of approved improvement plans for inspection purposes during construction. 45. Preserve existing survey monuments and vertical control benchmarks in compliance with Standard Specifications Section 5-1.26A. IMPROVEMENT PLANS 46. Applicant shall fund outsourced plan and map check services, as required. 47. The applicant shall be responsible for obtaining an encroachment permit for all work within a public right-of-way (City, County and/or Caltrans). CURB, GUTTER, AND SIDEWALK 48. Install. ADA compliant facilities on the subject property where necessary or verify that existing facilities are compliant with State and City Standards. 49. Any sections of damaged or displaced curb, gutter & sidewalk or driveway approach shall be repaired or replaced to the satisfaction of the Public Works Director. 50. Install ADA compliant ramps at driveway entrances on West Branch Street. GRADING AND DRAINAGE 51. On-site storm drains shall be retrofitted with filters and VOC removal socks. WATER 52. A new 8" Double Detector Check (DDC) backflow device per City Standard 6410 RESOLUTION NO. 18-2312 PAGE 11 is required to replace the existing 8" DDC that no longer meets Standard. 53. There is only one (1) two inch (2") water meter that services the building. It is recommended that the applicant install two (2) new meters for the fitness facility and grocery store. Alternatively, the applicant can install private water sub- meters to properly divide the water bill. 54. The applicant shall relocate the existing fire hydrant in the back of the building within the roadway to the north approximately 15' and located behind the curb. SEWER 55. There is only one (1) sewer lateral for the building. It is recommended separate sewer laterals be installed for the fitness facility and the grocery store. All sewer laterals shall comply with Engineering Standard 6810. SPECIAL CONDITIONS 56. The applicant shall reseal and restripe the parking lot. 57. The applicant shall install stop signs and exit points along West Branch Street along the subject property only. PUBLIC SAFETY 58. Prior to issuance of building permit, applicant to submit exterior lighting plan for Police Department approval. 59. Prior to issuance of a certificate of occupancy, the applicant shall post accessible parking signage, per California Building Code Section 11A and other applicable standards. 60. Prior to issuance of a certificate of occupancy, the applicant shall install a burglary [or robbery] alarm system per Police Department guidelines, and pay the Police Department alarm permit application fee. 61. Prior to issuance of a certificate of occupancy, for any parking lots available to the public located on private lots, the developer shall post private property "No Parking" signs in accordance with the handout available from the Police Department. FEES AND BONDS The applicant shall pay all applicable City fees, including the following: 62. FEES TO BE PAID PRIOR TO PLAN SUBMITTAL RESOLUTION NO. 18-2312 PAGE 12 a. Plan Review Fee (Based on the current Building Division fee schedule. NOTE: The applicant is responsible to pay all fees associated with outside plan review consultants) 63. FEES TO BE PAID PRIOR TO ISSUANCE OF A BUILDING PERMIT a. Water Neutralization fee, to be based on codes and rates in effect at the time of building permit issuance, involving water connection or enlargement of an existing connection. b. Water Distribution fee, to be based on codes and rates in effect at the time of building permit issuance. c. Water Meter charge to be based on codes and rates in effect at the time of building permit issuance. d. Water Availability charge, to be based on codes and rates in effect at the time of building permit issuance. e. Traffic Impact fee, to be based on codes and rates in effect at the time of building permit issuance. f. Traffic Signalization fee, to be based on codes and rates in effect at the time of building permit issuance. g. Sewer Connection fee, to be based on codes and rates in effect at the time of building permit issuance. h. -South San Luis Obispo County Sanitation District Connection fee, to be based on codes and rates in effect at the time of building permit issuance. i. Drainage fee, to be based on codes and rates in effect at the time of building permit issuance. j. Park Development fee, to be based on codes and rates in effect at the time of building permit issuance. k. Construction Tax, to be based on codes and rates in effect at the time of building permit issuance. I. Alarm Fee, to be based. on codes and rates in effect at the time of building permit issuance. m. Strong Motion Instrumentation Program (SMIP) Fee, to be based on codes and rates in effect at the time of building permit issuance. n. Building Permit Fee, to be based on codes and rates in effect at the time of building permit issuance. ARCHITECTURAL REVIEW COMMITTEE 64. Prior to issuance of a building permit, a tree replacement plan shall be reviewed by the Architectural Review Committee for a recommendation to the Community Development Director. 65. Prior to issuance of a building permit, the final color and materials that takes into consideration the potential remodel of the remainder of the center shall .be reviewed by the Architectural Review Committee for a recommendation to the Community Development Director. RESOLUTION NO. 18-2312 PAGE 13 PLANNING COMMISSION 66. Prior to issuance ofa buildingpermit, the final landscape plan, including building landscape included in plan renderings, shall be reviewed by the Architectural Review Committee for a recommendation to the Community Development Director. 67. Prior to issuance of a building permit, the complete site plan, including trash enclosures, cart corrals, and accurate parking reductions shall be reviewed by the Architectural Review Committee for a recommendation .to the Community Development Director. EXHIBIT "B" I I `' I. - ' moi:,:; 1,......,...-1,,,,..,...,.., STORE 4 a 14.7 )F l f SIGN r- s x',;' fr 7,r 1 t' 44‘.:;'•.:S" -WI: 1, x --F, - 1 'tN't r V.*" t,t y x t`,'"-fes -.:;---' 0-,- y F b,iE i r a;z4-.,AilR• mr1 r i4 r,r S ,` F ' _ 01 Jit „ , . F s r ..,,, + 1} ,... ,, r^ y,, 1;74'N'':yF 4 A J,5Fr' Y.4 ,':' ' Ct`) t -4 ww , I. '1T:.r. PROJECT DESCRIPTION PROJECT STATISTICS PROJECT TEAM SHEET INDEX THE STI E IIAS BEEN DEVELOPED AS A S)IOFPLJGCEI ITER WITH K-MART AS IISANCFIOP TOR PROJECT ADDRESS 1.570 W.BRANCH STREET OWNER: ORRADRE RANCH 111LE SWEET AI SEVFRA1 DECADES.THE APPLF.A.IIT G PR FOSINC;TO ADD 4.5CX)S:-NIAFE FEET OF FLOOR AREA ARROYOORANDE.CA 268 TWIN CREEi.SOVX EASING CONDITTONS TO THE SOUTHWESTERN CORNER OF THE FORMER:.-MART BURDWG EESPLTWG OI 87.132SCFJAPE PROJECT SITE AREA 10 ACRES SAN LUIS OBEFO.CA 93471 EXISTING AREAS AND COUNTS FEET OVERALL THE BUILD5JGWEL BE DIVIDED Pao THREE SEPARATE TENANT SPACES OF 16 748 APN O%:-.7710,8 CONTACT: OE AND ;•IAGE CUrIOEPI AJ SOI TAPS FEET FORA FITNESS FACMI.M.352SOUARE FEET FOR A GROCERY SIURE.AND 50.032 PETER OEUADRE COLORS AND MATERIALS AS SQUARE I LET TOR A CP.AT TS STORE.THE T/TETTI G IU RE-PURPOSE THBUE EDING AND DO MINIMAL ZONING: RC-REGIOIIAI COMMERCIAL PC,F.RADESISBCGICSHAI.Nf L'URDWG LLEVATC:NS P SITEDTPROVEMEI ITS TO ACCOMPANY THE FACADE REMODEL TO CREATE THE THREE TENANT OOCUPAI ICY: B2(AS-BU:LT) SPACES. FITE OF COT 1ST RUCTA.41 V-TI(EXISTING) ARCHITECT: RPM DESIGN GROUP EXISTING LAND USE: LANDSCAPE: 3765 S.HIGUERA ST.' COMdUNEYCODE: ARROYO GRANDE SAN LU6 OBISPO.CA 93401 Shopping Center T+Rn.snn-,,, CROSS AREA.: 4724095E(10.845 AC.) TEU(805)513-1784 BURUNG AREA:FAX:I XU)5434013 VICINITY IU1 A P Pro ect Site ....i.) K'MARTBLDG ETIVELOPE 87.132 SF CONTACT: J SHOP 6UGDi1JG q 1 I I,:VO SF PAI BLOTS-PROJECT ARCHITECT SHOP REDO.R2-I RSF FLOOR 12.550 51 WWES AROLA-LANDSCAPE ARCH AECT q IND TLOOR 12,303 ST 4k_ -Sliff fyNy171, CARL'S.F.RESI 3:,00 SF w t 3' RESIALIR 4P.0(1 SF f.1,-,45_,,s4.-V, Fri2 $( T- Y f I, W.,: a 0, Ar BAM1Y. I J q F p'';',--.;,''.':!-MV. F•.:. 14 TOTAL= 178,682 SI is-y ,Q.t 14-,;'*!. - './'.-,';'` l SITE BU'LDNOCOVEPAC-E:126L2/472408= 6Ae i 5-.. " ITL. ' a c 3 ,f .. .... ,•A, E.i Q Ty4 -we ='t.i -L,.. 1{ ; P.ARI.NG: ti" :k'c E;j::,•'_ 'i_,u:'?fi^, f ` E S REQUIRED-GENERAL RETAIL/G'rM/BANY.:130.382_51/257= 5222 SPACES aT; =.„ +..,,,,,,/:...,-..:.. z.:.,,,... .. F. _ RESTAURANT:B,2V/SF(G.L:.)K 65% Tri- F t.r.•.`,. 2 mat'' 5.385_f(T'LIPUC I,F.EAI/Ilk= Sa SPACES C? L . , Fti '° ".", +' 3ti ` ' 2J, .' 'n L1410, TOTAL 576 SPACES-15%SHAPED USE REDUCTION)= 548 SPACESa ` . v , x . T a . ,. P _--a fP w TOTAL PROVIDED: dl SPACES2„- V:°9" "`.c - c4'i`'*.-;`iii35 Y: av _ '. . . .. _ r Y NIS. SITE LANDSCAPE.COVERAGE:56.280SE/172.4(43 SF=1191 designINE)T BRANCH STREET TENANT AND -FACADE UPDATE TITLE SHEETrrrnIAlgroup1570WESTBRANCHSTREET,ARROYO GRANDE,CA •1192-01-0018 JUNE 15,2018 11111 y>;'.,,,.iq:iT"'•` >.rra' a :r!r +,, ;f}.;.'(':yas,4' iA' a,Y.• F d,h:A£,rrac i-,e 1-„<",'3.au e- ;t;. S h'L.•+h_r,.'' F' : '"•-.:. s. .,A`•,'}.: t«s.t.t. ' olt y tr •, - yy y, >' e.. Y. n,T eco r• y:..a r a; , t' ,,.,:.}- , r } fb : °a•t. $:a_- rj, 1 • r•. ^. f,a:'•ax_,, .s, r ,,•Nr, f '.J',..'.byr'i.S j+,.'?cv,...,.w5 - r•.. t'' t.•,:' ,•z?' i'" -M ', t c r„r.. „ •`' f, .,{ X '1.•'-',f`i:, 4:- u•!'.' 3Y"r 4,t .'l rr 1i r-"xR _5_... J. ` J_ •'i'.ri-: ,..,t4.rW'`-1W. .',t,.s- . :K;.«. l;, .r's 5".y D_ TTS. h Yb n t .•.si, d 1,V-'ori'.,Y. s+ i.", F• Y:a^rr.v.. Jo4zyx F s' l:r.. .. tt rl r'.'/`e y.",>,. y at>"' ',,,.`...4r:^"'I njl 4r. 'Y;: G.i 4 e nL:t•n..l%:n-LL'`".., • +., C' ry `" t` '-" c r 1•.: y ".2 79 Y n`.'4_>;,k. t 4. a •da74 _r'..'' esa:°..' li^ges , - F-.7...."74.„',.,1.,.221._•.•.t,. » f 1Va' e1•{ "3',' i+. xt4 - ` T"'k' i',5 '44C,/ w'-7'. p wsu ---=,"'---t-•-•"-=•.---'-- ,„..,'-'•• hr r'v".T`}C[ '. r Al.z ; D.lb x c " 3-^ Y Qy p i a .:.+ r , 3" :, r`€ /x' Z c N_" ' tt•- iT;Y.ir:.. 4 21 a.. 1 sp' ' +•n+ ' 1:41!.'g•.+ a r r_ti'y F,,"" 4 ' ;' ,- a:+4 , [Lt * Jv '.r'Si` TR r_Y.C/ENTRY!,'}, c.'!.".,j L,,,- rT r ji.t!8 1. Y'/1. rT T :' ,•-Y .a•w+r-, :?-. _ tY• ri {''' l t 1 -, ',r;' NORTHERN MOST ENTRANCE IEN1EY I(. r-t ,••••-:,-,,i4..-,""-:'--- - aT .iJ!. ' T r'-•`• v,r- i w•. G5" « G;1"1•t, 4 et ''. j .+,-,-- ^ v i . ...1',7 --;:m •+",:•s!" ar4'c'i 5.x + i` J.. :k fi 7 + 5 r 4,,,,--14,,,,,y1,..<..4.""C li;._ ..A'3' 4 a' J "= ted.; q' r' _..' yD; t , '«. :, 1. ,,t,; v O ".ya+. i v'.v- "; tya, S r T' 7 f a ,j''."7" ",'jJ' .>., +k, .w'.: • ... `r[:'x f` yVtv, 1". t. s J+.,1 nH,7.,`y'.'•.. d• .r•.:r::5'ir! w'=a ,`1 1 h,:-"-'b . ,D.r4' .,.. 4 r«VrS s'-':a`.,'- ` t .'',•{ =27-7.,",-t7'..., t r, a, r.e•.,,,t 7,,- -•,-.',ri: w • _4 y.,4'.. .r...- i t•+ yryi a: t.20''' ,a. C'?.,A y "...e. ' { ^‘.: 644./. .,nom }': v , s Lt {;1.t•4^ '...:.:.': 4"...1P,;"'r.' r•'-.1%,...e4.1-..t:1-`:. ;,':'`"'- 4-......'`' t' rb"-. i'.r,- ., rye: ' ''''. - v. `'a a F'k,,.. 'ti!t.,,. k "ti4•.'- 4.:„ -. - 4• Srz'c _..G„. - `3lil.'• -'f,,:' 's; Cr-",:-.',-'.. ,-1' .' ,r _ . a • Y•. it ti rxi+ ti j E 1,9 ?.ti "K tJs 4 wszr.,ira.?o-}'.`.. 2 r',^` ter fr- a + ism x kir w4..:-...,,,... c: IIORTH BOUPID HWY IDI VIEW cdt" T ,, Ix y 4''-', MAIN VIEW OF PROPOSED BUILDING FACADE REMODEL iZ HrMt tk t17iTrS;IiS'" ,,, ENTRY 2 Qtric ' J .t u tidt`a'. 6 Y 4 '„ irA.1::.M c`r':t v_l``... • .: 1 '" :. a s. Y,rw•: ; mr ., '••nr'^f:h;,..1: "Sq:i;•,"..; an, 1e..4a,ct,;2,., 4,b§, ''':C. ;;, ,.,;K3 ar--,- ..1, .v,r-1,........,').-,,!,„--;04:,*-:i. 4 a G 4 ,0 5_.,,,. `.'a y,.. „. ..,,.. !` e •"' iW• ,+ ,,:.:Y.., iit -,-. y;rak:- r:2' ? .,`-,,45 `re. .' ;,1 •FY -r: , rr, .;, H ' . 4;.; 2s fi..x.'' m9, _ .[*:",- . 1.,a"Q„ t,{, .' .* . ,w ;: I td -1 {wf xr t. 7 u,•.•,+aar;.,_ p;'-. s- 5 . rye Yt' aa-- a '::Th rasap f:^,..7s'C=` l'n\a': , ye_,c;.r 4t.i,a t .K+:` 1 ; 1 n.'j' ''k .r r "t.^; ?'" d `: u' e' a', i. 4: r. I,-; i-. J a M .q. 7;:i' W f.r T E, 51a£.. { {M, 3{<'}P3 tom , -.., i 5 5 1,}•-fi. vt•N'".. d,6.a S. . t a1e. T,' ^.-`,,, i ,h-, Y:1' _ '.: 4lJa`T La.- An.Rx°l... rt,y,' , .>< iad,Y3 i Y'u.+ t.. S....r., ^qj.. •v'-'`"is ...,. .9.,. s:- ! ">A rr ,nsi£ri S;: . +:* ",'' S'ii, .',C*... iG -., .1 .^.K' ' .'s.•„. „'',YJ;: „{,+ 4yi, tt:''_'&•,.., ':. .c:. .y{:-,3•,:',;y a"'jr 7 ox:-^=Y" c ti- ': r- 1:. w _ x_ 7 .•& k-•lwJt^•S:vy. 4 1?`n r 3.". 1 h s 7; 1.':s '`fi.` •Y' e_.s 'kir.a'.n.,., , A, i'c;, ,f1.t,, ;h,Syy,;, .;, ro"g y..:,.s";t,fi,_,,,,,:t;,, k`^ & y =E:`aP, ;f:," r kf '...8k-..' S',; "wi -: R y., .Jh - ,'a,Y. At'<'''iv- .gl:'(:'vT ,:,?.s r.> a`t,•' k- {AVL,.i''i.s' aT'i=.< idi'' ,.. .1 4jk.. i'',::4 K•rT-Au:1'f. - >,< --,.,'„,•.,-,...,4"'- l V,•-:-,.-bw j^. .fl.) .. x .,t' t - r(i! J•f_ . Y''"4:yy. ...>'. '.;.a:` iiu .'-.- t '•.": Sc J• tz,;-`t aiPa'" . t';:+:d," r' q4 1 4 ta..,x .. r' a• ,:ek;'. „k. ..+r^...-,,.,„ t:,, Z----,--1- sa a,;,t;•;-,.i ;" 1T yF..%, ,r;-.tf ,7 5^Y FFr lt..,D:t dji, ' ,T a. `, IVi4x• F-T„1...' %, `,k i',k R) yy Y'ts.. L'-.` s-4,{ 4' a,.:.: 4•,,t- '43, :•T,r-= '3n.,t ',.- 2...,t' l 4 YS' t`. ., .4•rs• Sr. .tt+'.,,.k^ u,?: lti^ y t;:.+!.i;;w'';' i'r`' r.a^.•-.',„;',.''.•,`(:. _ 'Ty,F1 c. I,.: v!+ z'r. .`;^':a- ,. t.. r r T•,. ..?et• 'fid : a. r,: 114..;.41 .,•.-.-?, t•, - t',, a"+ 7 .. t- S'!;. Fr. r . JJ t.' F ,:':jh''?1Qs 'i 'k:4,; .n ti{S u` D..t` i(" y fIL M- ariM ' .'.' t>wl.e, 2;. y r ` nc.,a= Ir- 1.7y ^}. 1>`•Ii V•,r y' y ` i a,e ' TD. if-- r-. :• 7.17% " 4... L`.se::'N",:r' a_. :=!1- ..`•1>;?.':*' •Fc 4.'4, f7' ` CY` 4• s4'^• 1• + rZ- fir.i a,-.-.....,.,.,tL•:. _.,,.7r-:' .:k36 rr r -c. a .p3, y ' nt^ , F ., y* N_. 2.---?..4 .,- EPiTRY3 hlrLJ, c t-a :,.4- 44,444:•t, E t c,.`"..:.rc . c,•a s. ,,- a y r x:ir« ' e^.a'.M. +fn.++^-°r. ^ : P e I 41r4s1, I I 20$pacal I I I I I 82,532 SF WF I i I, ,.•, 11.100 5F Msh i I I i r— i' ''. ,.. e,f c '° e.- 1=1.5oFoR) I 1 31' .Ti 0 2O'PDZR) I II ...n__ I1,111., 3 i I 31pFc, 4Sç ,1 45 spaces Fe V.03 FS sp... 21 sycieFs 26 spaces ZSsl ' I i i 12 scams I I 3 I I I I i I 3 t 3-f"F.cos r. I 3.500 SF 1 i 7,200 SF I 3 E I a a 4.800 SF 1 CZEMINi A , . ; .,. •I .: • .••• . CAE % -Or=40,0"124"X36"'SI IFE1) NORF11 rAriffereV"Vdesibp WEST BRANCH STREET TENANT AND FACADE UPDATE EXISTING AREAS AND COUNTS mtni 1 i 1,. Ilardup 15 0 WEST BRANCH S1REET ARROYO GRANDE CA , 1192-01-0018 JUNE 15,2018 A3 ONO NM En 11111 Ell111111• r ; r a+y, S k ,-,,,..........„-- m......74,, gni Yl 3'S trFt, A' '>J. F Rte'! i L 2 Y _. 4.2'7.7......',' I., e!":4 t kr«:'''' 4 tTf. q. • ,-i ref W J„ M,p}N `'i'Viti°Y, ,. } x z` 79 ...4,..--1...--.€-.14,---,.....,,,?--,nt 0=';• -•;'• x N; J G`.U1r"r} f x'X'u i 7s ` x .+..t `r r. W'rw ,- z"'k v+te• 1061.-- yr,".sq„ F ,,-•." .. i t s ,`.Yk '- f F 7-, I. y„ ,.; RR ; PR RR E tp • f a I{p. 4 5 Vi f . 4 a. {$ m ' ' F1TI lESS ROCERY RCTA( LAl”' _ 1.,m j:t F , y y T6,748-SF `Z.Q.JF'2F UrVaQ .S F'4.:.-441, taP iI4 irx- O k SJ .F •, N rQ4fta.'$ I pp y5ry.+.J' 4-.., a t G A i. Z.'7,01,11:':".q„'y i F's k. .. I (Fj P tcil• 5 'f } e a' xt _,b, ,x - .x. .+e.MN. ..ffi.Jfr't ..,,,,....A.4„,„...,.. n I r `F, `3 R; y'C,'4"%FS C:. ? 'a.i t'# ,, a'n '. wry ". S:' r J -,rt` fi Ha AF C..s r f't yI t r= 0 7 3-4,.th _'•tr dr y. °ca.' ,. 1.. ` xk, . s i , t. a Y% j 'fT f _ t'd•t y' ,. +.. le.'d ..0 4 Y-+..f[i }.. '21 k {,•' ., ! p' Tr„ r'- "'+07 7 s Ei `1n, 34;:-!,4:', Z,'. ' 1,iar 'rr ;144- . r r Y.t z ',1" 41 Tr d a. a i °.a 7";„ et., I# F r ,€ E r.4a ;q' -`s•",. ate,'•''' 4:G o%`'.',.z• a.^ ", ti;+.r}:_2 3: L4„ „ _ t t„^`" 'a kr=:' F yr yn ai y N, a tr4 t x F, K'f zs r'a 49a*,,' a$o);1' " 9' 4,1 ' e• $y r ' s r..e._ k 1 P:77,,, >.{,s 7--,".43,' w 4..4,:;-„.. x' ''.%, ` fix r,y I. > r t-rt3 far°2o t t .n'i„, L' •h H •tit T ,, r x Wtaa• t.,10. -.:.;',,,, y k a # v s xn;»»€' a, w f -1r, 7 .;VA,,,,, .d.„,%,,' s a i -17--t UCQttf„ 104i5" r" ., ' ' r. 7#; 2.41,"4:1,4'.',,,,O', , sx,,;:$ X,r-` lee"', ,sc ,, ,. 4+, .;+ , f',T _-...,..,..,i,..•—•!--..:4- •cif,=a A _ ff' . r ,, t -.1-,.......--.00r.„,„ • s fi"'.. rt„,.1 .- ' 7: F j ' WA M +._• .. n.. _, ' a' h4} '...,.. 0,:-:- a .---• ', i y 5i- ',.i" '" 37 n-1 1( - l 1. ter mrs. 4. r C ,-^.0 .t M r 4 K,,,td'e t. Vir,,, 1-1 ,/', 7.i,". r En •. ' ti 1 - tt i •, f„,..;:',, t.”.$ PROPOSED NEW FREEWAY SIGNAGE CONCEPT SKETCH t;`iv t C r% t' s 4a aLtrart, t, sCAIE: rt.ts. r'4 . k fir x 4, . ' .7 w? 9 Ia '.k. 3. t'ri-47st' rt g. 4,4 • , . a , SJ:.. p, '. -k r" r` Z Jfi Cr Q yi , y x.' J, W. •t , '..-.:.:"1,.::;.',',',.,... .... a: r° 4 . if:',: , .f-, ''' # _ k `t., ''':-,t4- M11} r f.'. T .. sG+tta 1' t y t FAQ t 7 r3•t atm n k-M t.'r r R ,,,:"4,....;,,,,:1",,r-49" NI E ST,BI 1•C1-1 5T1 T., ' '" µ ,,. };t, t .4:1tal'''144.:4141', A. 4,!'';',.... 1 .F•.6. .4f ....%'3,,',':"'"' EE"., ....,..,..,..„.../,•,-.4-4, 1-1.-1, t ,e 5.w x4 IJORII l 5 '."° t J k 4.46. 4,..".^.;,- T F, yk4 ~ w 'i`''n3r1"w` t i\P-...:-.` ' `si"- <.SCALE: 1"=40'-lt 124 (%" SHEE7)f de ign ESQ BRANCH STREET TENANT AND FACADE UPDATE SITE AND SIGNAGE CONCEPT , Q group 15 0 WEST BRANCH 51REE1 ARROYO GRANDE CA 1192-01-0018 JUNE 15, 2018 3ixt.-,::t."i'kaikri.t,,: z1-41i4,--ifeiliet.A.4.. ...,-iii.giyi...: i.-4,...f:,,,,,•':.: 16 ' • i: 0 ',',".4•••,,,•10,111,:••,•1•1''0""''.'. ,II'•••'•••/"•1,1•-'•'-' x•• .." ''•"•-• v.Y .,,T•''Ii9•'M...-' -•- ' • • 4.'kr4 , v,.,..,•„ ,•t."5.,..T.1.1",..5•.,‘.1', /':,•:••• ••;•'••'-'''.'''. 1, ';'-'''.:.,-•IT.,','''''1:'''•'-'::-••':•.'t/,'-::•• ::'-t:,;21'.•-• IV!ANA fr'' ;•"--•- ' ''•.•'••••. A-`'•'...•'.,•.'6,T•',I•4T••• . 1'/'''/./',-7••?..0 FINI:55.. GRIX"3":: REVV 1 1#!,4'11"ii 1 . InIAI ACVM Arf4t,IP P t • I.Le..::v, i'-".2'.: -:'--..,•;.-.... ,-:....-.-:.,---.-.,-- 1,...-.4-..--.-- ,-,,, - .. , . r.' .•...•. .;;-•.:-,.... .:.---_-.:f'--..., Th?-•,.--',.,-:',--1;-.:-,--li f c....-':-'4--- L' s,''',:-'-':,-:,'--',4:--"-t--•-'-'-':' ' STORE ' 41/41 A0 ., , ..L . • ! 0 :, -: . 14", .:-.'"''•:•,€)-,:•?•,:-.'-i.;•,:.,...,4„.--------- ....... -.. ., '..,.i., i SIE 4P:444.. L‘ St Lai s-r- —i 44.4'.- I -L La,. 4, , s. a.,-. 4 ilq 3.,,,,, _,:,......s.g......4, rf.,.4 ."•,• •••,,,..,-,;; 4•••• f/.41, -........^.•••••7%,•••,,-„.. ••• 47.;Cv•••••lit.•:,'4,7?".I.T.,!1:ik,441•••,1,...:,:l.r 41.•7:. .: a Iris„,wma,....,,„ ,,e.... . ...--i,,,,- ---,r,,I-N;.„,1• . 4 •.-,r,it---:....4 4V,.';-.;: ,L- ` ...110,.z.4.a.....,. VA:...•..t.-,.v'O'• 4-•.• • v,-,•-••••-',•„: • :„II --I L.E..- ''•' j'a"iLfS.4'a IP'` 4'',;'.. .7.,*-••••-----. C• A ''s4ri-'417---;'--',1-4--•-4:1-'' !, ',A- ,41-, 4-4 A ei•-,,,„,iites.,... , i; .k.0.?'t. _..._.I 14•31•!,',' _..,,, , IVE1. v-.•„W!..j..;.;;; -:''a-•.r:•:-,*.• •00 ' -1,1J.1,....•.;71•-•,..:-.73T-_-,74--- 4-:A,...-,.-L,Z.7•T; 7.-.-A.1•1T1':• .7:7'.!.'• k4IN;' '- 'It 'E ,,,,21:3•;• tl•Vit,,,, L-%;,.•T v.77'1•7:•'• 1 ••••-• • .' I '.- 14 .-.:::"135,._....'"7''`..•V'14.zeag-. ... 1S. 11,-,.1...4,,..i.„zlIff r=J.,,:arS. ..._Jr 1 W,,,ot... ijf‘2-......4::',: 4,,,v,',..,-.....c..',.,...'...•.:;,..'..,... ..,. ,... . g-•,,i,,,,,,t, ....... 4,. ._,,p4}ji. ? .• b...,.to:LAls,..__.,•T•v.•••.-'., • 7-7•41.-.41k4''' .. ' 71L,... .•,74`•;-LAkt. A, r Y•••4.- 4T•A'-'•v.:, 1.-. N:-• ••••••••••TI••",• T s,cnE rA tO4f •.! Y`Nc •e mn I:WT?1'tTr:l...R E I, .-'.; s .a, 6 ;4.v^ " a4 .. u' i }' 3 S- r ,,- M sk.'' -' CS m] U tt,i= ti.... : ,c ,.. "'_a 41.,wP R`^ 11FItr 'r.:.._. as ...6_.3:t. ..® M®®_.. al ,.lr tit _ SH . r, SOUTH FLEVATION SCALE: I/IR"=1'0"(26SHEET) i>T tiF,s{ l'u.l!>::.:. r A_.:....•_u......_.. u^ '_.,..v:::r r,.---. . -....:--.z ...w..".. ..nt.. .._..t..s»..f....,i.1 ni-..-1_. -^- .....+Cti... .. ..»A..utry:%:a.z.... +-. »ix_` li'•:» sh .. t-:.',...'. ::. NORTH ELEVATION SCAN: =I'-0'124'036"SHEEP FAST El FVAIION SCALE: Inti'=I'-0"(267036'SHEET) a r i tilt. 1 I®® yq spy V'i a-.rx........2;.'ir.'...r:..:s....rr.rc...r.:.}:.:.............:7eL.7'.::.:.,.._,-......,.-"."......._.:...... c.._«.:.x.-_.-......__.......r.»l,t.—_ WEST ELEVATION SCALE: I/I o'=I'-0"(24Y..3F."SHEET) 111 design WEST BRANCH STREET TENANT AND FACADE UPDATE BUILDING ELEVATIONS r wit r group 15 0 WEST BRANCH STREET ARROYO GRANDE CA 1192-01-0018 JUNE 15,2018 A 6 ACTION MINUTES REGULAR MEETING OF THE ARCHITECTURAL REVIEW COMMITTEE MONDAY, MARCH 18, 2019 ARROYO GRANDE CITY HALL, 300 E. BRANCH STREET ARROYO GRANDE, CA 1.CALL TO ORDER Chair Warren Hoag called the Regular Architectural Review Committee meeting to order at 2:30 p.m. 2.ROLL CALL ARC Members:Chair Warren Hoag and Committee Members Mary Hertel, and Lori Hall were present. Vice Chair Bruce Berlin and Committee Member Jon Couch were absent. City Staff Present: Planning Manager Matt Downing and Assistant Planner Andrew Perez were present. 3.FLAG SALUTE Committee Member Hall led the Flag Salute. 4.AGENDA REVIEW None. 5.COMMUNITY COMMENTS AND SUGGESTIONS None. 6.WRITTEN COMMUNICATIONS None 7.CONSENT AGENDA Committee Member Hertel made a motion, seconded by Committee Member Hall, to approve the minutes of the March 4, 2019 Regular Meeting as submitted. The motion passed 3-0 on the following voice vote: AYES: Hertel, Hal, Hoag NOES: None ABSENT: Berlin, Couch 8.PROJECTS 8.a. CONSIDERATION OF AMENDED CONDITIONAL USE PERMIT 19-001; AMENDMENTS TO CONDITIONAL USE PERMIT 18-004 FOR THE SUBDIVISION OF APPROVED TENANT SPACES, ADDITION OF A 5,400 SQUARE FOOT GARDEN CENTER; AND AN 1,800 SQUARE FOOT COMMERCIAL DRIVE-THRU PAD; LOCATION –1570 W. BRANCH STREET; APPLICANT – RICK GAMBRIL, ARROYO GRANDE COMMERCIAL LLC; REPRESENTATIVE – RRM DESIGN GROUP (Downing) Planning Manager Downing presented the staff report and gave a brief history of the project and previous reviews by the Committee and the Planning Commission. He presented the project and the changes proposed, including the creation of two new pedestrian entrances, the new commercial drive-thru building, changes to the parking lot configuration and ATTACHMENT 2 Minutes: ARC PAGE 2 Monday, March 18, 2019 circulation patterns throughout the site including the potential loading areas for the garden center. Pam Ricci and Pat Blote, project representatives, spoke in support of the project, and explained the details of the loading area will be determined when a tenant is found for the hardware and garden store space. The applicant’s representatives explained the rationale for creating multiple tenant spaces was to make the spaces more attractive to potential long-term tenants, and the addition of the drive-thru commercial pad was fueled both by demand and from an aesthetic perspective. The Committee spoke in support of the project, commenting that the new commercial building breaks up the expanse of parking and adds interest to the center as a whole. The Committee found the additional entrances appropriate and adds articulation and appeal by breaking up the massing of the frontage. The Committee expressed concern with the final location of the loading deck and its impact on circulation and emergency access, and the possibility of an outdoor seating area that may impact the parking demand. Committee Member Hertel made a motion, seconded by Committee Member Hall, to recommend approval of the project to the Planning Commission with the following conditions: 1. The final location of the loading area for the hardware store and garden center shall not adversely impact on-site circulation or emergency access, 2. The project shall return to the Committee for review of the final design of the commercial drive-thru building The motion passed 3-0 on the following voice vote: AYES: Hertel, Hall, Hoag, NOES: None ABSENT: Berlin, Couch 9. DISCUSSION ITEMS 9.a. ELECTION OF CHAIR AND VICE CHAIR (Downing) Planning Manager Downing presented the item and Chair Hoag recommended a continuation of the item to the April 1, 2019 Regular Meeting to allow all Committee Members to be present for the election. The recommendation was unanimously supported. 10. COMMITTEE COMMUNICATIONS Committee Member Hertel announced her resignation from the Committee effective immediately. Committee Member Hall made it known that she will likely miss three (3) consecutive meetings in June and July for a vacation. Chair Hoag presented the non-profit organizations that were allocated funding from the Jim Guthrie Community Service Grant Program, where he served as the Committee’s representative. 11. STAFF COMMUNICATIONS Planning Manager Downing expressed his gratitude for being able to facilitate the Jim Guthrie Community Service Grant Program selection Committee, and emphasized the benefits of the program. ATTACHMENT 3 WEST BRANCH STREET(E) RESTAURANT(E) BANK7070 70706767 68 6869 6971 72 73 74 UPUPTENANT B102TENANT A101TENANT C103NOPARKINGNO PARKI N GNOPARKINGNO PARKI N GNOPARKING TREE GRATE, TYP.TRELLIS WITH CART STORAGENEW RAISED PATHCART STORAGECART STORAGECART STORAGECART STORAGENEW PLANTERNEW PLANTERTRELLIS WITH CART STORAGE18'-10"19'-4"28'-11"18'-2"8'18'(4) NEW ELECTRICVEHICLE STALLSEVEVEVEVENTRY MONUMENTNEW ACCESSIBLESTALLS (7) TOTALTREESBOTANICAL NAMECOMMON NAMECONTQTYLIQUIDAMBAR ORIENTALIS ORIENTAL SWEETGUM 24"BOX 3LIRIODENDRON CHINENSE JAPANESE TULIP TREE 24"BOX 4PISTACIA CHINENSIS CHINESE PISTACHE 24"BOX 12PLATANUS X ACERIFOLIA LONDON PLANE TREE 24"BOX 11TRISTANIA CONFERTA BRISBANE BOX24"BOX 8NEW TREE LEGENDTOTAL NEW TREES = 38EXISTING TREES TO REMAIN39CUPANIOPSIS ANACARDIOIDES/CARROTWOODLIQUIDAMBAR STYRACIFLUA/SWEETGUMPLATANUS SPECIES/LONDON PLANELIRIODENDRON TULIPIFERA/TULIP TREETIPUANA TIPU/TIPU TREEMAGNOLIA GRANDIFLORA/SOUTHERN MAGNOLIAEXISTING TREESN:\1000\1192-01-CO18-West-Branch-St-Multi-Tenant-Comm-Reconfig\Planning\Tree Exhibit\PP-1192-01-CO18.dwg, PL101, Sep 27, 2018 3:40pm, LDWierschem PROJECT MANAGERDRAWN BYPROJECT NUMBERCHECKED BYSHEETSEPTEMBER 20, 20181192-01-CO18DATErrmdesign.com | (805) 543-17943765 S. Higuera, San Luis Obispo, CA 93401THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTSREPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGNGROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS ORUSED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIEDPROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGSOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESERESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEWSHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.RRM DESIGN GROUP COPYRIGHT 2018.RRM IS A CALIFORNIA CORPORATIONNO. REVISIONDATEWEST BRANCH ST. MULTI TENANT RECONFIGURATION 1570 WEST BRANCH ST, ARROYO GRANDE, CA 93420PL101PLANTING PLANCDLWCD ATTACHMENT 4 Project Site (6.4 acres) Shopping Center (10.845 acres) HWY 1 0 1. OAK PARK BLVDW. B R A N C H S T . PROPOSED (VIEW A) EXTERIOR IMPROVEMENTS PROPOSED (VIEW C) EXTERIOR IMPROVEMENTS PROPOSED (VIEW B) EXTERIOR IMPROVEMENTS SHEET INDEX TITLE SHEET A1 EXISTING CONDITIONS A2 EXISTING AREAS AND COUNTS A3 ARCHITECTURAL SITE PLAN A4 CONCEPT PERSPECTIVES A5 COLORS AND MATERIALS A6 BUILDING ELEVATIONS A7 MONUMENT SIGN A8 GARDEN CENTER ENLARGED SITE PLAN A9 NEW PAD ENLARGED SITE PLAN A10 PROJECT DESCRIPTION PROJECT TEAM OWNER: ORRADRE RANCH 768 TWIN CREEKS WAY SAN LUIS OBISPO, CA 93401 CONTACT: PETER ORRADRE PORRADRE@SBCGLOBAL.NET APPLICANT: ARROYO GRANDE COMMERCIAL LLC P.O. BOX 481, OAKHURST, CA 93644 CONTACT: RICK GAMBRIL RGAMBRIL@YAHOO.COM ARCHITECT: RRM DESIGN GROUP LANDSCAPE: 3765 S. HIGUERA ST. SAN LUIS OBISPO, CA 93401 TEL: (805) 543-1794 FAX: (805) 543-4609 CONTACT: PAT BLOTE - PROJECT ARCHITECT WES AROLA - LANDSCAPE ARCHITECT VICINITY MAP PROJECT STATISTICS PROJECT ADDRESS: 1570 W. BRANCH STREET, ARROYO GRANDE, CA PROJECT SITE AREA 6.4 ACRES APN: 077-771-068 ZONING: RC - REGIONAL COMMERCIAL OCCUPANCY: B2 (AS-BUILT) TYPE OF CONSTRUCTION V-N ( EXISTING) EXISTING LAND USE: SHOPPING CENTER (SC) COMMUNITY CODE: ARROYO GRANDE (SC) GROSS AREA: 472,408 SF (10.845 AC.) BUILDING AREA: K-MART BLDG ENVELOPE 87,132 SF SHOP BUILDING #1 11,200 SF SHOP BLDG. #2 - 1RST FLOOR 12,550 SF - 2ND FLOOR 12,300 SF CARL’S JR. REST 3,500 SF RESTAURANT 4,800 SF BANK 7,200 SF NEW PAD (FAST FOOD) 1,800 SF TOTAL = 140,482 SF SITE BUILDING COVERAGE: 128,182/ 472,408 = 27.13% SITE LANDSCAPE COVERAGE: 56,280 SF / 472,408 SF = 11.91% PARKING CALCULATIONS: Parking Calculations Oak Park Plaza Shopping Center March 2019 Table 1 - Required Parking Tenant Use Square Footage Parking Ratio Required Spaces A Hardware Store (interior space) 20,856 1/250 sq. ft. 83 A Hardware store - Garden Center 5,400 1/2,000 sq.ft. 3 B Fitness Center 16,734 1/250 sq. ft. 67 C Grocery 23,064 1/250 sq. ft. 92 D Retail 6,631 1/250 sq. ft. 27 E Retail 10,075 1/250 sq. ft. 40 F Dance Studio 7,081 1/3 students + staff 20 G New Tenant Pad - Fast Food 1,800 GLA x 65%/100 12 Existing retail, offices & bank 43,250 1/250 sq. ft. 173 Existing restaurants 8,300 GLA x 65%/100 54 Total 571 Table 2 - Project Parking Summary Summary Feature Parking Numbers Parking Provided Required Parking 571 13.3% Shared Reduction -76 Adjusted requirement 495 1 1 Reflects net loss of 42 spaces to provide outdoor garden center and new tenant pad. Previous parking total was 537 spaces (7% shared reduction approved by ARC after PC review of CUP); therefore, new parking total is 495 spaces (537-42 = 495). Parking Calculations Oak Park Plaza Shopping Center March 2019 Table 1 -Required Parking Tenant Use Square Footage Parking Ratio Required Spaces A Hardware Store (interior space)20,856 1/250 sq. ft.83 A Hardware store -Garden Center 5,400 1/2,000 sq.ft.3 B Fitness Center 16,734 1/250 sq. ft.67 C Grocery 23,064 1/250 sq. ft.92 D Retail 6,631 1/250 sq. ft.27 E Retail 10,075 1/250 sq. ft.40 F Dance Studio 7,081 1/3 students + staff 20 G New Tenant Pad -Fast Food 1,800 GLA x 65%/100 12 Existing retail, offices & bank 43,250 1/250 sq. ft.173 Existing restaurants 8,300 GLA x 65%/100 54 Total 571 Table 2 - Project Parking Summary Summary Feature Parking Numbers Parking Provided Required Parking 571 13.3% Shared Reduction - 76 Adjusted requirement 495 1 1 Reflects net loss of 42 spaces to provide outdoor garden center and new tenant pad. Previous parking total was 537 spaces (7% shared reduction approved by ARC after PC review of CUP); therefore, new parking total is 495 spaces (537-42 = 495). Parking Calculations Oak Park Plaza Shopping Center March 2019 Table 1 -Required Parking Tenant Use Square Footage Parking Ratio Required Spaces A Hardware Store (interior space)20,856 1/250 sq. ft.83 A Hardware store -Garden Center 5,400 1/2,000 sq.ft.3 B Fitness Center 16,734 1/250 sq. ft.67 C Grocery 23,064 1/250 sq. ft.92 D Retail 6,631 1/250 sq. ft.27 E Retail 10,075 1/250 sq. ft.40 F Dance Studio 7,081 1/3 students + staff 20 G New Tenant Pad -Fast Food 1,800 GLA x 65%/100 12 Existing retail, offices & bank 43,250 1/250 sq. ft.173 Existing restaurants 8,300 GLA x 65%/100 54 Total 571 Table 2 - Project Parking Summary Summary Feature Parking Numbers Parking Provided Required Parking 571 13.3% Shared Reduction -76 Adjusted requirement 495 1 1 Reflects net loss of 42 spaces to provide outdoor garden center and new tenant pad. Previous parking total was 537 spaces (7% shared reduction approved by ARC after PC review of CUP); therefore, new parking total is 495 spaces (537-42 = 495). 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A1WEST BRANCH STREET TENANT AND FACADE UPDATE TITLE SHEET THE SITE HAS BEEN DEVELOPED AS A SHOPPING CENTER WITH K-MART AS ITS ANCHOR FOR SEVERAL DECADES. ON SEPTEMBER 4, 2018, THE CITY PLANNING COMMISSION APPROVED A CUP TO ALLOW THREE TENANT SPACES IN THE FORMER K-MART BUILDING AND ADD 4,500 SQUARE FEET OF FLOOR AREA TO ITS SOUTHWESTERN CORNER RESULTING IN 87,132 SQUARE FEET OVERALL. THE THREE TENANTS INCLUDED A GYM, GROCERY STORE WITH LIQUOR SALES, AND A LARGE RETAIL SPACE. THE NEW PROPOSAL IS STILL TO RE-PURPOSE THE BUILDING FOR VIABLE COMMUNITY USES AND SERVICES, BUT THE REQUEST IS NOW TO DIVIDE THE BUILDING INTO 6 SEPARATE TENANT SPACES AS FOLLOWS: 1)HARDWARE STORE OF 20,856 SQUARE FEET WITH A 5,400 SQUARE-FOOT GARDEN CENTER; 2)FITNESS FACILITY OF 16, 734 SQUARE FEET; 3)GROCERY STORE OF 23,064 SQUARE FEET; 4)RETAIL SPACE OF 6,631 SQUARE FEET; 5)RETAIL SPACE OF 10,075 SQUARE FEET; AND 6)DANCE STUDIO OF 7,081 SQUARE FEET. WITH THE CHANGE IN THE NUMBER OF TENANTS, THE FACADE MASSING HAS GENERALLY REMAINED CONSISTENT WITH PLANS PREVIOUSLY REVIEWED BY THE ARC AND PLANNING COMMISSION. ADDITIONAL ENTRIES TO THE BUILDING WORK TO FURTHER ARTICULATE THE FAÇADE AND REDUCE THE APPARENT BULK AND MASSING OF THE OVERALL BUILDING. THE CHANGES IN THE NUMBER OF TENANTS DO NOT AFFECT CONDITIONS FOR SITE IMPROVEMENTS. IN ADDITION, CURRENT PLANS SHOW A SMALL PAD BUILDING OF 1,800 SQUARE FEET IN THE PARKING FIELD NEARER WEST BRANCH STREET. THE IDEA IS TO PROVIDE SPACE FOR A FAST-FOOD RESTAURANT OR SMALL TO-GO COFFEE SHOP. THE ADDITIONAL PAD HELPS ENLIVEN THE SHOPPING CENTER AND MINIMIZE THE VISUAL EXTENT OF THE PARKING FIELDS. NORTHN.T.S. 1192-03-CO19 March 25, 2019 ATTACHMENT 5 NORTH BOUND HWY 101 VIEW SOUTH BOUND HWY 101 VIEW NORTHERN MOST ENTRANCE (ENTRY 1) ENTRY 2 ENTRY 3 ENTRY 4 ( UPPER SITE ACCESS @ SOUTHERN END OF SITE)VICINITY MAP MAIN VIEW OF PROPOSED BUILDING FACADE REMODEL project site HWY 1 0 1. OAK PARK BLVDW. B R A N C H S T . D E G F C B A A B C D E F G 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A2WEST BRANCH STREET TENANT AND FACADE UPDATE EXISTING CONDITIONS 1192-03-CO19 March 25, 2019 NORTH 3 A-201 2 A-201 4 A-201 1 A-201 411' - 0"112' - 0"45' - 0"100' - 0"212' - 0"46 spaces 46 spaces 46 spaces45 spaces 45 spaces 26 spaces 6 spaces 12 spaces 6 spaces9 spaces8 spaces6 spaces9 spaces 3 spaces3 spaces16 spaces19 spaces 20 spaces 20 spaces 15 spaces 8 spaces7 spaces4 spaces11 spaces11 spacestrash trash 23 spaces 26 spaces 8 spaces 10 spaces10 spaces14 spaces 10 spaces3,500 SF 50' - 0"70' - 0"60' - 0"120' - 0"60' - 0"80' - 0"80' - 0"140' - 0" 60' - 0"3 spaces 205' - 0"7,200 SF 4,800 SF 12,550 SF (1RST FLOOR) 12,300 SF (2ND FLOOR) 11,200 SF 82,632 SF GENERAL NOTES KEYNOTES LEGEND 1" = 40'-0"A-201 AS101 ARCHITECTURAL SITE PLAN1 Todd M. HansenLicensedArchite c t S tateof Ca l iforniaLicense #C-27118Expires 10/31/19 NO . REVISION DATE PROJECT MANAGER DRAWN BY CHECKED BY DATE PROJECT NUMBER SHEET rrmdesign.com | (805) 543-1794 3765 S. Higuera, San Luis Obispo, CA 93401 RRM DESIGN GROUP COPYRIGHT 2017. RRM IS A CALIFORNIA CORPORATION THE INCLUDED DRAWINGS, SPECIFICATIONS, IDEAS, DESIGNS AND ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN THE PROPERTY OF RRM DESIGN GROUP AND NO PART THEREOF SHALL BE COPIED, DISCLOSED TO OTHERS OR USED IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIED PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND DEVELOPED WITHOUT THE WRITTEN CONSENT OF RRM DESIGN GROUP. VISUAL CONTACT WITH THESE DRAWINGS OR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. SUBMITTAL OF THESE DOCUMENTS FOR PUBLIC AGENCY REVIEW SHALL NOT BE CONSIDERED A WAIVER OF RRM DESIGN GROUP'S RIGHTS.N:\1000\1192-01-CO18-West-Branch-St-Multi-Tenant-Comm-Reconfig\Architecture\Model\site.rvt6/14/2018 12:44:10 PMARCHITECTURAL SITE PLANAS101 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A3WEST BRANCH STREET TENANT AND FACADE UPDATE EXISTING AREAS AND COUNTS SCALE: 1” = 40’- 0” (24”X36” SHEET) 1192-03-CO19 March 25, 2019 SITE PLAN ( W/ EXISTING BUILDING AREAS AND PARKING COUNTS) 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A4WEST BRANCH STREET TENANT AND FACADE UPDATE ARCHITECTURAL SITE PLAN SCALE: 1” = 40’- 0” (24”X36” SHEET) 1192-03-CO19 March 25, 2019 SITE LEASING AND CONCEPT PLAN SCALE: N.T.S. NORTH A VIEW KEY PLAN SCALE S: NTS NORTH A B C PROPOSED (VIEW C) EXTERIOR IMPROVEMENTS PROPOSED (VIEW B) EXTERIOR IMPROVEMENTSEXISTING GARDEN CENTER (VIEW B) EXISTING REAR NORTH EAST CORNER (VIEW C) 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A5WEST BRANCH STREET TENANT AND FACADE UPDATE CONCEPT PERSPECTIVES 1192-03-CO19 March 25, 2019 WORDLY GRAY SHERWIN WILLIAMS: 7043 EXTRA WHITE SHERWIN WILLIAMS: SW7006 DOVETAIL SHERWIN WILLIAMS: SW7018 A CB • HOBBY LOBBY ENTRY• PLASTER TRIM • CORNICE/PARAPET • STUCCO • FASCIA BOARDS • EXTERIOR CEILING SOFITS MAIN BUILDING COLOR ACCENT COLORCORNICE/PARAPET COLOR BRONZE ANODIZED METAL (WINDOW/DOOR TRIM STEEL TRELLIS FRAME, PIPE RAIL HORIZONTAL LAP SIDING FIBER CEMENT SIDING (PAINTED Bracing Blue SW 6242) PER ELEVATIONS ACCENT CMU BLOCK (PROPOSED COLUMN WALLS AND EXISTING BASE) PER ELEVATIONS ACCENT CORRUGATED METAL (ACCENT SIGN ENTRY WALL) PER ELEVATIONS PROPOSED EXTERIOR IMPROVEMENT SUITE 341 ENTRY - (VIEW -A) A VIEW KEY PLAN SCALE S: NTS NORTH EXISTING APPROVED PROPOSED (VIEW A) EXTERIOR IMPROVEMENTS D E F G E G F C B A 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A6WEST BRANCH STREET TENANT AND FACADE UPDATE (NO CHANGE TO APPROVED COLORS AND MATERIALS) COLOR AND MATERIALS 1192-03-CO19 March 25, 2019 A B C (E) T.O.PARAPET HT.+/- 23’-6”SOUTH ELEVATION SCALE: 1/16” = 1’- 0” (24”X36” SHEET) WEST ELEVATION SCALE: 1/16” = 1’- 0” (24”X36” SHEET) EAST ELEVATION SCALE: 1/16” = 1’- 0” (24”X36” SHEET) NORTH ELEVATION OUTLINE OF NEIGHBORING BUILDING NEW ENTRY FEATURE WITH DIRECT ACCESS TO ADJACENT PARKING LOT. NEW TENANT “F” MAIN ENTRY ENHANCEMENT TO EXISTING TRASH ENCLOSURE LOCATION NEW TENANT “F” ENTRY NEW GARDEN CENTER AND GARDEN CENTER ENTRY FOR TENANT “A” NEW GARDEN CENTER FOR TENANT “A” NEW GARDEN CENTER FOR TENANT “A” NEW TENANT “E” ENTRY NEW TENANT “D” ENTRY NEW CART CORRAL AND ACCESSIBLE RAMP HOUSED UNDER A NEW SHRUBBED TRELLIS OUTLINE OF APPROVED ELEVATION DESIGN FOR THREE TENANT ENTRIES OUTLINE OF APPROVED ELEVATION DESIGN FOR THREE TENANT ENTRIES SCALE: 1/16” = 1’- 0” (24”X36” SHEET) 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A7WEST BRANCH STREET TENANT AND FACADE UPDATE BUILDING ELEVATIONS 1192-03-CO19 March 25, 2019 NOTE: EXISTING PARKING TO BE RESEALED AND RESTRIPPED. TYP. SPACING18' - 0"1 2 3 4 5 67 8 NEW BUILDING 71' - 6"24' - 0" NEW PAD 77' - 6" DRIVE-THRU ENTRY TWO-WAY TRAFFIC ONE- WAY TRAFFIC DRIVE-THRU EXIT TWO-WAY TRAFFIC DINING PATIO 350 SF DINING PATIO 300 SF MONUMENT SIGN LOCATION NEW ACCESSIBLE PATH TO PUBLIC WAY TENANT G 1,800 SF TWO-WAY TRAFFIC WEST BRANCH STREET NEW VAN ACCESSIBLE ADA STALL 3' - 0"12' - 0"D OF A D rrmde3765 S.RRM DRRM ISTHE INCLUDEDREPRESENTEDGROUP AND USED IN CONPROJECT FORWRITTEN CONSOR SPECIFICATRESTRICTIONSSHALL NOT B NO . PRO DRAAL_01/30/2019D P WEST BRANCH ST MULTI TENANT PB NOTE: EXISTING PARKING TO BE RESEALED AND RESTRIPPED. TYP. SPACING18' - 0"1 2 3 4 5 67 8 NEW BUILDING 71' - 6"24' - 0" NEW PAD 77' - 6" DRIVE-THRU ENTRY TWO-WAY TRAFFIC ONE- WAY TRAFFIC DRIVE-THRU EXIT TWO-WAY TRAFFIC DINING PATIO 350 SF DINING PATIO 300 SF MONUMENT SIGN LOCATION NEW ACCESSIBLE PATH TO PUBLIC WAY TENANT G 1,800 SF TWO-WAY TRAFFIC WEST BRANCH STREET NEW VAN ACCESSIBLE ADA STALL 3' - 0"12' - 0"D OF A D rrmde3765 S.RRM DRRM ISTHE INCLUDEDREPRESENTEDGROUP AND USED IN CONPROJECT FORWRITTEN CONSOR SPECIFICATRESTRICTIONSSHALL NOT B NO . PRO DRAAL_01/30/2019D P WEST BRANCH ST MULTI TENANT PB NOTE: EXISTING PARKING TO BE RESEALED AND RESTRIPPED. TYP. SPACING18' - 0"1 2 3 4 5 67 8 NEW BUILDING 71' - 6"24' - 0" NEW PAD 77' - 6" DRIVE-THRU ENTRY TWO-WAY TRAFFIC ONE- WAY TRAFFIC DRIVE-THRU EXIT TWO-WAY TRAFFIC DINING PATIO 350 SF DINING PATIO 300 SF MONUMENT SIGN LOCATION NEW ACCESSIBLE PATH TO PUBLIC WAY TENANT G 1,800 SF TWO-WAY TRAFFIC WEST BRANCH STREET NEW VAN ACCESSIBLE ADA STALL 3' - 0"12' - 0"D OF A D rrmde3765 S.RRM DRRM ISTHE INCLUDEDREPRESENTEDGROUP AND USED IN CONPROJECT FORWRITTEN CONSOR SPECIFICATRESTRICTIONSSHALL NOT B NO . PRO DRAAL_01/30/2019D P WEST BRANCH ST MULTI TENANT PB NOTE: EXISTING PARKING TO BE RESEALED AND RESTRIPPED. TYP. SPACING18' - 0"1 2 3 4 5 67 8 NEW BUILDING 71' - 6"24' - 0" NEW PAD 77' - 6" DRIVE-THRU ENTRY TWO-WAY TRAFFIC ONE- WAY TRAFFIC DRIVE-THRU EXIT TWO-WAY TRAFFIC DINING PATIO 350 SF DINING PATIO 300 SF MONUMENT SIGN LOCATION NEW ACCESSIBLE PATH TO PUBLIC WAY TENANT G 1,800 SF TWO-WAY TRAFFIC WEST BRANCH STREET NEW VAN ACCESSIBLE ADA STALL 3' - 0"12' - 0"D OF A D rrmde3765 S.RRM DRRM ISTHE INCLUDEDREPRESENTEDGROUP AND USED IN CONPROJECT FORWRITTEN CONSOR SPECIFICATRESTRICTIONSSHALL NOT B NO . PRO DRAAL_01/30/2019D P WEST BRANCH ST MULTI TENANT PB32 FEET TALLMATCHES EXISTING HEIGHT1570 WEST BRANCH STREET, ARROYO GRANDE, CA A8WEST BRANCH STREET TENANT AND FACADE UPDATE MONUMENT SIGN 1192-03-CO19 March 25, 2019 TENANT A 101 TENANT A 20,856 SF 100' - 0" TWO-WAY TRAFFIC TWO- WAY TRAFFIC GARDEN CENTER LOADING AREA NEW GARDEN CENTER 5,200 SF DELIVERY GATE D OF A D rrmde 3765 S. RRM D RRM IS THE INCLUDED REPRESENTED GROUP AND USED IN CON PROJECT FOR WRITTEN CONS OR SPECIFICAT RESTRICTIONS SHALL NOT B NO . PRO DRAAL_01/30/2019D P WEST BRANCH ST MULTI TENANT PB 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A9WEST BRANCH STREET TENANT AND FACADE UPDATE GARDEN CENTER ENLARGED SITE PLAN 1192-03-CO19 March 25, 2019 SCALE: 1” = 10’- 0” (24”X36” SHEET) GARDEN CENTER SITE PLAN NORTH NOTE: EXISTING PARKING TO BE RESEALED AND RESTRIPPED. TYP. SPACING18' - 0"1 2 3 4 5 67 8 NEW BUILDING 71' - 6"24' - 0" NEW PAD 77' - 6" DRIVE-THRU ENTRY TWO-WAY TRAFFIC ONE- WAY TRAFFIC DRIVE-THRU EXIT TWO-WAY TRAFFIC DINING PATIO 350 SF DINING PATIO 300 SF MONUMENT SIGN LOCATION NEW ACCESSIBLE PATH TO PUBLIC WAY TENANT G 1,800 SF TWO-WAY TRAFFIC WEST BRANCH STREET NEW VAN ACCESSIBLE ADA STALL 3' - 0"12' - 0"D OF A D rrmde3765 S.RRM DRRM ISTHE INCLUDEDREPRESENTEDGROUP AND USED IN CONPROJECT FORWRITTEN CONSOR SPECIFICATRESTRICTIONSSHALL NOT B NO . PRO DRAAL_01/30/2019D P WEST BRANCH ST MULTI TENANT PB 1570 WEST BRANCH STREET, ARROYO GRANDE, CA A10WEST BRANCH STREET TENANT AND FACADE UPDATE NEW PAD ENLARGED SITE PLAN 1192-03-CO19 March 25, 2019 SCALE: 1” = 10’- 0” (24”X36” SHEET) NEW PAD SITE PLAN NORTH