R 5138 RESOLUTION NO. 5138
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO
GRANDE APPROVING STAFF PROJECT 21-005; PUBLIC ART PROJECT
TO REPAINT STROTHER PARK BASKETBALL COURT, AND
ACCEPTING DONATION OF TIME AND MATERIALS; LOCATION —
STROTHER PARK, 1150 HUASNA ROAD; APPLICANT — PROJECT
BACKBOARD, NOAH PICK
WHEREAS, Arroyo Grande Public Art reviewed and recommended the City Council
approve the proposed renovation of the Strother Park Basketball Court Project proposed
by Project Blackboard and Noah Pick ("project") on November 11, 2021, in accordance
with the Public Arts Guidelines; and
WHEREAS, on December 14, 2021, the City Council reviewed the project at a duly
noticed public hearing; and
WHEREAS, the City Council finds, after due study, deliberation and public hearing, that the
project meets these criteria:
1. Relationship to the social, cultural and historical identity of the area.
The proposed project will have social and cultural impacts as it will improve
the lifespan of the public recreation facility and provide a community asset that
will allow current and future residents to utilize the revitalized basketball court.
2. Evaluation of artistic excellence;
Arroyo Grande Public Art (AGPA) met on November 11, 2021, and selected
the proposed design from a total of eight (8) proposals. AGPA recommended
the proposed design due to the proposal's ability to improve the appearance
of the existing court.
3. Appropriateness of scale, form, material, content and design relative to the
immediate neighborhood;
The proposed artwork is intended to replicate natural elements to help the
artwork seamlessly fit into the surroundings of the public park. The materials
chosen are appropriate and are materials typically utilized for this type of
application. The location at the public park provides a natural setting to
enhance the enjoyment of the art piece.
4. Appropriateness of proposed materials as regards to structural and surface
integrity, protection against vandalism, public safety and weathering;
The materials selected are commonly used in applications on basketball
courts. The quality of the materials selected are such that they will improve the
surface integrity of the public basketball court and are meant to withstand
natural weathering processes. The materials selected will not have adverse
impacts on public safety due to their proper application.
RESOLUTION NO. 5138
PAGE 2
5. Ease of maintenance;
The proposed materials are intended to bond to both asphalt and concrete
surfaces to provide a durable, aesthetic finish that helps protect and extend
the life of the pavement.
6. Appropriateness of proposed method of installation and artwork and safety and
structural factors involved in installation;
The artwork will be installed in accordance with the manufacturer's
specifications and will not cause safety or structural issues during the
installation.
7. Artist's experience in working on comparable projects.
The artist has extensive experience restoring basketball courts and has
worked on projects around the world.
NOW, THEREFORE, BE IT RESOLVED that the Arroyo Grande City Council hereby
approves the Strother Park Basketball Court Public Art Project as described and shown in
Exhibit "B" attached hereto and incorporated herein by this reference with the above
findings and subject to the conditions of approval as set forth in Exhibit "A", attached
hereto and incorporated herein by this reference.
BE IT FURTHER RESOLVED that the Strother Park Basketball Court Public Art Project is
referred to the Public Art Panel for its review and consideration.
On motion of Council Member Storton, seconded by Council Member George, and on the
following roll call vote, to wit:
AYES: Council Members Storton, George, Paulding, Barneich, and Mayor Ray Russom
NOES: None
ABSENT: None
The foregoing Resolution was passed and adopted this 14th day of December, 2021.
RESOLUTION NO. 5138
PAGE 3
pp
/
cMAYOR
. o
pkREN AY RUM,- .
ATTEST:
AMATS°N' CITY CLERK
J SSIC
APPROVED, AS TO CONTENT:
41P if 0
' wi
W ITNE DONALD,t / ITY MANAGER
d 4$7
APPROVED AS TO FORM:
,---- c
_ - ATTORNEY
,
y'l CARM '
----)
TIMOTHY
RESOLUTION NO. 5138
PAGE 4
EXHIBIT "A"
CONDITIONS OF APPROVAL
STROTHER PARK BASKETBALL RENOVATION PROJECT
1150 HUASNA ROAD
CONDITIONS OF APPROVAL
Planning Division
1. The applicant shall ascertain and comply with all Federal, State, County and City
requirements as are applicable to this project.
2. The public art shall be installed in conformance with the site design on Exhibit "B"
of this Resolution.
3. The applicant shall agree to defend at his/her sole expense any action brought
against the City, its present or former agents, officers, or employees because of
the issuance of said approval, or in any way relating to the implementation thereof,
or in the alternative, to relinquish such approval. The applicant shall reimburse the
City, its agents, officers, or employees, for any court costs and attorney's fees
which the City, its agents, officers or employees may be required by a court to pay
as a result of such action. The City may, at its sole discretion, participate at its
own expense in the defense of any such action but such participation shall not
relieve applicant of his/her obligations under this condition.
i, -_
. - # , 1. - ),..,.:1
' ' '.:1.-'11;'t'
f ii
11 ',a #I :a f '},,d 4 r l _ laws . 4
� .' �' '' .
Lk
•
, . r I •
y t;' 'd r '
4F-r fr .
I ,.r_ „„ -- .-, , , , ii,,,t, - - ... 1,,,.; .,-.. -. i •
a i .S.
I
rE - ,
! �>_,.1., wi--_..._._ ----
k!r .,-,e .erg r ',,e -
46i1.,
, RI, T 1 'e
i —4 4 .! • .
• o, r s ,_0• • ' r l .•
f t
or
?a r • rt j . 14#1 If-.. "rthill,l ,Ili.."'• , . '
t _ w,
1
, ill I •,
0 FL
' • n 1 , .,
a e# F .QA' r, • i , . i ..1 ` #
171 lia. " ' ' 1 ,E jii:Liii. . ).11,„.,,r'- , 4 1' _1., 2,-..i i
al
4
E
ea
1
i
nr
91G
,
OFFICIAL CERTIFICATION
I, JESSICA MATSON, City Clerk of the City of Arroyo Grande, County of San Luis
Obispo, State of California, do hereby certify under penalty of perjury, that the attached
Resolution No. 5138 was passed and adopted at a regular meeting of the City Council
of the City of Arroyo Grande on the 14th day of December, 2021.
WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 17th day of
December, 2021.
JESSICA MATSON, CITY CLERK