Loading...
HomeMy WebLinkAboutR 5339 RESOLUTION NO. 5339 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE APPROVING CONDITIONAL USE PERMIT NO. 23-002 TO IMPLEMENT A STREAM GAUGE FISH PASSAGE IMPROVEMENT PROJECT ON PROPERTY LOCATED WITHIN ARROYO GRANDE CREEK IN PROXIMITY TO CLARENCE AVENUE AND MYRTLE STREET (APN 077-572-031), APPLIED FOR BY CREEK LANDS CONSERVATION (CLC), APPROVING THE REQUESTED FEE WAIVER, AND FINDING THE PROJECT EXEMPT FROM CEQA WHEREAS, the City Council of the City of Arroyo Grande has considered Conditional Use Permit No. 23-002, applied for by CLC to modify an existing broad- crested weir spanning the width of Arroyo Grande Creek ("Project"); and WHEREAS, the funding for the Project was received from the National Fish and Wildlife Foundation (NFWF) and the California Department of Fish and Wildlife (CDFW); and WHEREAS, CLC applied for and received funding through NFWF and CDFW to implement the proposed Project which will lower the weir and restore reliable access to 3.3 miles of critical steelhead habitat upstream of the barrier; and WHEREAS, the City Council has reviewed the project in compliance with CEQA and has determined that the project is exempt based upon Sections 15301, 15302, and 15304 of the State CEQA Guidelines for the reasons articulated below; and WHEREAS, the Project is consistent with General Plan Objective C/OS2, which aims to "[s]afeguard important environmental and sensitive biological resources contributing to healthy, functioning ecosystems." The Project is also consistent with General Plan Implementing Policy C/OS2-1.6: "[p];an, design, and develop sites to: Protect scenic resources, water quality and natural creekside habitat, including opportunities for wildlife habitation, rest, and movement. Further the restoration of damaged or degraded habitat, especially where a continuous riparian habitat corridor can be established;" and WHEREAS, on December 12, 2023, the City Council conducted a duly noticed public hearing to consider the staff report, recommendations by staff, and public testimony concerning the proposed ordinance. Following the public hearing, the City Council to adopt the prepared Resolution. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Arroyo Grande finds, determines, resolves, and recommends: RESOLUTION NO. 5339 • PAGE 2 1. Recitals. All recitals above are true and correct and hereby incorporated by reference. 2. CEQA. This Project is exempt from review under the California Environmental Quality Act ("CEQA") pursuant to State CEQA Guidelines Section 15301 (Existing Facilities). This exemption consists of the operation, repair, maintenance or minor alterations to existing public or private structures involving negligible or no expansion of existing or former use. This includes maintenance of artificial wildlife waterway devices to protect fish and wildlife resources. Here, the Project involves the operation, repair, and minor alteration to the existing stream gauge that involves little to no expansion of the existing use. Further, the stream gauge will continue to be used for its original purpose of improving the critical steelhead trout habitat. Alternatively, the Project is also exempt from review under CEQA pursuant to State CEQA Guidelines Section 15302 (Replacement or Reconstruction). This exemption consists of the replacement or reconstruction of existing structures where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. The Project will involve the reconstruction of the stream gauge, located on the same site as the existing stream gauge, and will have the same purpose of improving the steelhead trout habitat with the same capacity as the existing structure. Lastly, the Project is exempt from review under CEQA pursuant to State CEQA Guidelines Section 15304 (Minor Alterations to Land). This exemption consists of minor alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees. This includes minor alterations in land and water to fish production facilities which result in improvement of habitat for fish and wildlife resources or greater fish production. Here, the Project involves reconstruction of the stream gauge that will lead to the improvement of habitat for the steelhead trout. None of the exceptions to the categorical exemptions set forth in State CEQA Guidelines section 15300.2 have any applicability here. The Project will not impact any environmental resource of hazardous or critical concern, will not result in significant cumulative impacts, is not subject to any unusual circumstances that could result in a significant environmental impact, would not damage any scenic resources within a scenic highway, is not located on -2- RESOLUTION NO. 5339 PAGE 3 a hazardous waste site identified on any list compiled pursuant to Government Code section 65962.5, and would not impact an historical resource. Staff is directed to file the corresponding Notice of Exemption within five working days from the approval of this Project. 3. Conditional Use Permit Findings: a) The proposed use is permitted within the subject district pursuant to the provisions of this section and complies with all the applicable provisions of this title, the goals, and objectives of the Arroyo Grande General Plan, and the development policies and standards of the City. The proposed use of the site for a stream gauge improvement project is permitted with approval of a conditional use permit by the City Council after receiving a recommendation from the Planning Commission, and the project complies with all applicable provisions of the Arroyo Grande General Plan and Municipal Code. b) The proposed use would not impair the integrity and character of the district in which it is to be established or located. The proposed use of the site for a stream gauge improvement project will not impair the integrity of the project site due to the intent of the project to return the site to its natural condition after construction along with biological monitoring. c) The site is suitable for the type and intensity of use or development that is proposed. The site is an existing stream gauge that will be improved to remove a fish passage barrier. The type of development is suitable for the location near the creek and will be monitored by various responsible agencies. d) There are adequate provisions for water, sanitation, and public utilities and services to ensure public health and safety. The project involves completing a stream gauge replacement in Arroyo Grande Creek. No aspect of the proposed project is anticipated to be overly impactful to the existing services. Conditions of approval developed for the project will additionally ensure public services are minimally impacted. e) The proposed use will not be detrimental to the public health, safety or -3- RESOLUTION NO. 5339 PAGE 4 welfare or materially injurious to properties and improvements in the vicinity. The proposed use will not be detrimental to the public health, safety or welfare, nor materially injurious to properties or improvements in the vicinity, as it will comply with City conditions of approval specifically developed for the project as well as monitoring conditions required of the project's funding sources. 4. Fee Waiver. a) The proposed fee waiver request of$6,388 otherwise required for project is granted by the City Council because the project: i. Serves a public purpose of promoting the public health, safety, and general welfare by: 1) Implementing general plan policies to enhance natural creek functions and values by providing erosion control, sedimentation prevention, enhancement of riparian habitat corridors, water quality protection and aesthetic and recreational opportunities; and 2) Improving habitat for a federally threatened fish species. ii. Serves a public purpose by safeguarding important environmental and sensitive biological resources contributing to a healthy, functioning ecosystem. 5. Severability. If any section, division, sentence, clause, phrase or portion of this resolution or the document in the record in support of this resolution is determined by a court of competent jurisdiction to be invalid, unenforceable, unconstitutional or otherwise void, that determination shall not affect the validity of the remaining sections, divisions, sentences, clauses, phrases of this Resolution. On motion of Council Member Barneich, seconded by Council Member George, and on the following roll call vote, to wit: AYES: Council Members Barneich, George, Guthrie, Secrest, and Mayor Ray Russom NOES: None ABSENT: None The foregoing Resolution was passed and adopted this 12th day of December, 2023. -4- RESOLUTION NO. 5339 PAGE 5 CAREN RAY WS:OM, MAYOR ATTEST: SSICA MATSON, CITY CLERK APPROVED AS TO CONTENT: BILL ROBESON, INTERIM CITY MANAGER APPROVED AS TO FO AlfIS ' S N, C ATT• -NEY -5- RESOLUTION NO. 5339 PAGE 6 EXHIBIT A CONDITIONS OF APPROVAL CONDITIONAL USE PERMIT 23-002 AG CREEK STREAM GAUGE REPLACEMENT PROJECT COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION GENERAL CONDITIONS 1. The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project. 2. The applicant shall comply with all conditions of approval for Conditional Use Permit 23-001. 3. This application shall automatically expire on December 12, 2025 unless a Lake and Streambed Alteration permit is issued by the California Department of Fish and Wildlife (CDFW). Thirty (30) days prior to the expiration of the approval, the applicant may apply for an extension of one (1) year from the original date of expiration. 4. Development shall occur in substantial conformance with the plans presented to the City Council at the meeting of December 12, 2023, and marked Exhibit B. 5. The applicant shall agree to indemnify and defend at his/her sole expense any action brought against the City, its present or former agents, officers, or employees because of the issuance of City's discretionary approvals associated with this project, or in any way relating to the implementation thereof, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations. under this condition. 6. A copy of these conditions shall be incorporated into all construction documents. 7. At the time of application for construction permits, plans submitted shall show all development consistent with the approved site plan, floor plan, architectural elevations and landscape plan. 8. All conditions of this approval run with the land and shall be strictly adhered to, within the time frames specified, and in an on-going manner for the life of the project. Failure to comply with these conditions of approval may result in an immediate enforcement action. If it is determined that violation(s) of these conditions of approval have occurred, or are occurring, this approval may be revoked pursuant to Development Code Section 16.08.100. 9. All project improvements shall be designed and constructed in accordance with the most recent version of the City of Arroyo Grande Standard Specifications and Engineering Standards. 10. Preserve existing survey monuments and vertical control benchmarks in compliance with Standard Specifications Section 5-1.26A. -6- RESOLUTION NO. 5339 PAGE 7 11. The applicant shall be responsible for obtaining an encroachment permit for all work within a public right-of-way (City, County and/or Caltrans). This shall include City approval of a traffic control plan for the partial closure of Myrtle Street. 12. At least thirty (30) days prior to commencement of any earthmoving activities, the applicant shall notify all neighbors located within a 500' radius of the project area. The notification shall include information about the construction schedule and location of the staging area. 13. Prior to issuance of an Encroachment Permit, submit property owner authorization for staging and construction areas. 14. Construction activities shall be limited to 8:00 AM — 5:00 PM Monday through Friday (no construction on Saturdays or Sundays). 15. The applicant shall submit evidence of obtaining permits from all resource agencies that have regulatory authority over this project. 16. The applicant shall submit a Stormwater Pollution Prevention Plan/Erosion Control Plan prior to any earthmoving activities. 17. The applicant shall restore the site access area to pre-construction condition. 18. The applicant shall coordinate project work with the County Flood Control District. 19. The applicant shall submit a creek bypass plan, including any pumping requirements, pump hours of operation, pump storage, who to call with noise complaints, and the size of the pump. CDFW shall be responsible for approving the bypass plan. 20. The applicant shall adhere to all conditions of approval associated with permits issued by CDFW, NFWF and other responsible agencies. 21. The applicant shall be responsible for replacing in-kind any fencing that is removed as part of this project. 22. If it is determined that the rock slope on the southern creek bank is not connected to the outfall structure, the applicant shall obtain all necessary permits to complete the work. -7- Exhibit B in Qz gym= ARROYO GRANDE GAGE J F,mo W v i "ami FISH PASSAGE IMPROVEMENT R®JE p g _ 10070 SUBMITTAL No PREPARED AT THE REQUEST OF ��,E1NILE„ CREEK LANDS CONSERVATION /� -a - 9 LL 1 -- T O SHEET INDEX PROJECT AZIMUTH I SHEET TITLE (E)ROCK SLOPE 1 W (n Z C1 COVER SHEET PROTECTION _24 . O CIO C2 NOTESHop C3 STAGING,ACCESS AND DIVERSION PIAN Oki BA ¢¢ C4 MYRTLE STREET STAGING PLAN a114 (E)WET WELL AND /N ABBREVIATIONS W Jcc C5 SITE PLAN ��- ,R` STREAM GAGE v APN ASSESSOR'S PARCEL NUMBER D w C6 WEIR PLN&SECTION \� i1• / APPROX APPROXIMATE F w(D CJ SECTION AND ttPICAL WEIR ELEVATION DETAILSWard BMP BEST MANAGEMENT PRACTICES ¢ CB DETAILS ti� o _ oo z ��� y r?2_ ?a CC CONCRETE O �O I- �,/le ,.,—r2� CK CREEK W - kW. oe -*/ CY CUBIC YARDS U U PROJECT DESCRIPTIONyo�Rq "'-- ° A 102 112 s\ DIA DIAMETER a �1 0 roe\ CO( EXISTING W � '967-- 96 Ox EF EACH FACE CC PROPOSED PROJECT ~ —�F # y2 U00 (N)CONCRETE WEIR G EXISTING GROUND THIS PROTECT MODIFIES AN EXISTING STREAM GAGE SITE ON -�__ 8 EL ELEVATION ARROYO GRANDE CREEK WITH THE GOAL OF IMPROVING FISH ` 1'i/_� , EP EDGE OF PAVEMENT PASSAGE CONDITIONS. STREAM GAGING EQUIPMENT WILL BE T02 • EW EACH WAY UPGRADED AND INCORPORATED INTO THE COUNTY"ALERT -‘,.,_,..--702 10 (� \ FG FINISHED GRADE SYSTEM". r GALV HORIZONTALGALVANIZEw 106 / H CONSTRUCTION ACTIVITY °�8 � -9';',,,,,,,,--6... 92 -`^, LF LINEAR FEET w CONSTRUCTION INCLUDES TEMPORARY FLOW DIVERSION, E 9sp MIN MINIMUM IN-CHANNEL GRADING AND DEMOLITION,AND CONSTRUCTION OFA PROPOSED GRADING ._. -mo\, (N) NEW CO NIG NOT IN NEW CONCRETE WEIR. LIMITS #o._` -100 yg� +\`I NTS NOT i0 SCALE ACT CC w �F OC ON CENTER , RMC RIGID METAL CONDUIT O 0 SFE OVERVIEW SCALE:1"=20' W H00 U < w SURVEY NOTES 0 w 3 a 1. ELEVATION DATUM NGVD 1929:THE BENCHMARK FOR THIS SURVEY IS POINT/4,A USGS 4 — A 4K p.m Ro w Q CC r BRONZE DISC SET IN THE TIP OF CONCRETE BLOCK SUPPORTING THE LANDWARD END OF S' ,�y0 'a urge 0 d_ co THE WALKWAY LEADING TO THE GAGE SHELTER WITH THE ELEVATION:127.92" `•c VP s PROJECT SITE ¢CO H m 2. BASIS OF BEARINGS:LOCAL ASSUMED AZIMUTH(NOOOO'OO"E)BASED ON THE ALIGNMENT y`' c "Q SECTION AND DETAIL CONVENTION d w p BETWEEN POINTS#1 AND#2.THE TWO POINTS ARE LOCATED IN THE CENTER OF MYRTLE 1B can B 4 Y 9 4 0 CO AVENUE. SECTION OR DETAIL yM E� W IDENTIFICATION O w N 3. TOPOGRAPHIC MAPPING WAS PERFORMED BY SH+G ENGINEERING ON APRIL 1tTH AND £ ` 'S r 0 O 12TH.2007. ao- _I. onQ yAP y Q w 2 O 4. UPDATED TREE MAPPING WAS COMPLETED BY CREEK LANDS AREVATION DURING JULY - W,� T o �.u11 i, Y 9 4i` µM1 r / \ CC CI- 2022 AND PROVIDED TO WATERWAYS. TREE LOCAPONS SHOWN APPROXIMATE. C�^qyT `� s b • ga E�,m`i N REFERENCE SHEET FROM WHICH_ `REFERENCE SHEET ON WHICH S. CONTOUR INTERVAL IS TWO FOOT ELEVATIONS AND DISTANCES SHOWN ARE IN DECIMAL a �"^O Rsy CZ CD R4 DETAIL OR SECTION IS TAXER SECTION OR DETAIL IS SHOWN Q FEET.EXCEPT TREE DIMENSIONS,WHICH ARE SHOWN IN INCHES. ° , /I` v^,•A k •H`fA m WHO e, I/4/an /� DESIGNED BY: MWW 6. UNDERGROUND UTILITIES WERE NOT LOCATED. [:; 3,o„ • W aa�c DRAWN BY: BMC wxv J. THIS IS NOT A BOUNDARY SURVEY. PROPERTY LINES WERE COMPILED FROM RECORD 0. CHECKED BY: M20 INFORMATION. THE LOCATION OF THESE LINES IS SUBJECT TO CHANGE,PENDING THE FN eOs 3 E a9 e DATE: 1/23/23 RESULTS OF A COMPLETE BOUNDARY SURVEY JOB NO.: OJ-580 P BAR IS ONE INCH ON 6. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE CURRENT EDITION OF THE MP. ,e• FMil ORIGINAL DRAWING, STATE OF CALIFORNM STANDARD SPECIFICATIONS,ISSUED BY THE DEPARTMENT OF ADJUST SCALES FOR TRANSPORTATION(HEREARER REFERRED TO AS"STANDARD SPECIFICAPONS"). VICINITY MAP REDUCED PLOTS 9. THESE DESIGNS ARE INCOMPLETE WITHOUT THE FINAL STAMPED TECHNICAL SPECIFICATIONS N.T.S. "CALL BEFORE YOU DIG* 0®1" PREPARED BY WATERWAYS CONSULTING,INC. REFER TO TECHNICAL SPECIFICATIONS FOR AtEATNSN 1 DETAILS NOT SHOWN HEREON. PIMA TO ANY CONSMUCnON WORK 1-80,132-2341 C OF 8 GENERAL NOTES EARTHWORK/GRADING NOTES EROSION CONTROL NOTES (I) 1. NOTIFY THE ENGINEER AT LEAST 96 HOURS PRIOR TO CONSTRUCTION. THE ENGINEER OR A DESIGNATED REPRESENTATIVE GRADING SUMMARY: 1. THE EROSION CONTROL PLAN SHOWN IS INTENDED FOR THE SUMMER CONSTRUCTION SEASON(APRIL (9 SHALL OBSERVE THE CONSTRUCTION PROCESS,AS NECESSARY i0 ENSURE PROPER INSTALLATION PROCEDURES' 1 TOTAL CUT VOLUME= 95 CY 15TH TO OCTOBER 15TH). IF THE DRAINAGE FEATURES SHOWN ON THESE DRAWINGS ARE NOT o ms 2. EXISTING UNDERGROUND UTILITY LOCATIONS: TOTAL FILL VOLUME= 0 CY COMPLETED AND DISTURBED AREAS STABILIZED BY OCTOBER 1ST,CONSULT THE ENGINEER FOR J< .‘g. m mO NET(CUT/FILL)= 95 CY ADDITIONAL MAINE SEASON EROSION CONTROL MEASURES. A. CALL UNDERGROUND SERVICE ALERT(1-800-642-2444)TO LOCATE ALL UNDERGROUND UTILITY LINES PRIOR TO Cr) G , COMMENCING CONSTRUCTION. THE ABOVE QUANTITIES ARE APPROXIMATE IN-PLACE VOLUMES CALCULATED AS THE DIFFERENCE 2. PRIOR TO COMMENCING WORK,PROTECT AREAS TO REMAIN UNDISTURBED WITH ESA FENCING,AS N\5 BETWEEN EXISTING GROUND AND THE PROPOSED FINISH GRADE,PREPARED FOR PERMITTING SHOWN ON THE DRAWING, ADDITIONAL FENCING MAY BE REQUIRED AT THE DIRECTION OF THE 0 B. PRIOR TO BEGINNING WORK,CONTACT ALL UTILITIES COMPANIES WITH REGARD TO WORKING OVER,UNDER,OR PURPOSES ONLY.EXISTING GROUND IS DEFINED BY THE TOPOGRAPHIC CONTOURS AND/OR SPOT ENGINEER. LLI L u n3 AROUND EXISTING FACILITIES AND TO OBTAIN INFORMATION REGARDING RESTRICTIONS THAT ARE REQUIRED TO PREVENT ELEVATIONS ON THE PUN. PROPOSED FINISH GRADE IS DEFINED AS THE DESIGN SURFACE m3 DAMAGE TO THE FACILITIES. ELEVADON OF WORK TO BE CONSTRUCTED. THE QUANTITIES HAVE NOT BEEN FACTORED TO 3. UTILIZE ONLY THE APPROVED HAUL ROADS AND ACCESS POINTS(AS SHOWN ON THE DRAWINGS)FOR INCLUDE ALLOWANCES FOR BULKING,CLEARING AND GRUBBING,SUBSIDENCE,SHRINKAGE,OVER TRANSPORT OF MATERIALS AND EQUIPMENT. < n 3 C. EXISTING UTILITY LOCATIONS SHOWN ARE COMPILED FROM INFORMATION SUPPLIED BY THE APPROPRIATE UTILITY EXCAVATION,AND RECOMPACTION,UNDERGROUND UTILITY AND SUBSTRUCTURE SPOILS AND l 111 AGENCIES AND FROM FIELD MEASUREMENTS TO ABOVE GROUND FEATURES READILY VISIBLE AT THE TIME OF SURVEY. CONSTRUCTION METHODS. 4. BETWEEN OCTOBER 15 AND APRIL 15,PROTECT EXPOSED SOIL FROM EROSION AT ALL TIMES. LOCATIONS SHOWN ARE APPROXIMATE.THE CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL REVEAL DURING CONSTRUCTION,SUCH PROTECTION MAY CONSIST OF MULCHING AND/OR PLANTING OF n THE DIMENSIONS,SIZE,MATERIALS,LOCATIONS,AND DEPTH OF UNDERGROUND UTILITIES. THE CONTRACTOR SHALL PERFORM AN INDEPENDENT EARTHWORK ESTIMATE FOR THE PURPOSE NATIVE VEGETATION OF ADEQUATE DENSITY BEFORE COMPLETION OF THE PROJECT,STABILIZE ALL OF PREPARING BID PRICES FOR EARTHWORK. THE BID PRICE SHALL INCLUDE COSTS FOR ANY EXPOSED SOIL ON DISTURBED SLOPES AGAINST EROSION. D. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE LOCATION AND/OR PROTECTION OF ALL EXISTING AND PROPOSED NECESSARY IMPORT AND PLACEMENT OF EARTH MATERIALS OR THE EXPORT AND PROPER PIPING,UTILITIES,TRAFFIC SIGNAL EQUIPMENT(BOTH ABOVE GROUND AND BELOW GROUND),STRUCTURES,AND ALL DISPOSAL OF EXCESS OR UNSUITABLE EARTH MATERIALS. 5. MAINTAIN A STANDBY CREW FOR EMERGENCY WORK AT ALL TIMES DURING THE RAINY SEASON OTHER EXISTING IMPROVEMENTS THROUGHOUT CONSTRUCTION. 2. PRIOR i0 COMMENCING WORK,PROTECT ALL SENSITIVE AREAS TO REMAIN UNDISTURBED WITH (OCTOBER 15 THROUGH APRIL 15).STOCKPILE NECESSARY MATERIALS AT CONVENIENT LOCATIONS N TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES. E. PRIOR TO COMMENCING FABRICATION OR CONSTRUCTION,DISCOVER OR VERIFY THE ACTUAL DIMENSIONS,SIZES. TEMPORARY FENCING,AS SHOWN ON THE DRAWINGS,AS SPECIFIED,OR AS DIRECTED BY THE MATERIALS,LOCATIONS,AND ELEVATIONS OF ALL EXISTING UTILITIES AND POTHOLE THOSE AREAS WHERE POTENTIAL ENGINEER. 6. CONSTRUCT TEMPORARY EROSION CONTROL MEASURES AS SHOWN ON THIS PLAN AND/OR AS CONFLICTS ARE LIKELY OR DATA IS OTHERWISE INCOMPLETE. DIRECTED BY THE ENGINEER i0 CONTROL DRAINAGE WHICH HAS BEEN AFFECTED BY GRADING yG *b 3. DO NOT DISTRURB AREAS OUTSIDE OF THE DESIGNATED LIMOS OF DISTURBANCE,UNLESS \NEER AUTHORIZED IN WRITING BY THE ENGINEER. THE COST OF ALL ADDITIONAL WORK ASSOCIATED AND/OR TRENCHING OPERATIONS. C yo F. TARE APPROPRIATE MEASURES TO PROTECT EXISTING UTILITIES DURING CONSTRUCTION OPERATIONS.CONTRACTOR IS WITH RESTORATION AND REVEGETATION OF DISTURBED AREAS OUTSIDE THE DESIGNATEDED LIMITS X '^ SOLELY RESPONSIBLE FOR THE COST OF REPAIR/REPLACEMENT OF ANY EXISTING UTILITIES DAMAGED DURING OF DISTURBANCE,AS SHOWN ON THE DRAWINGS,SHALL BE BORNE SOLELY BY THE 7. INCORPORATE ADEQUATE DRAINAGE PROCEDURES DURING THE CONSTRUCTION PROCESS i0 ELIMINATE n d CONSTRUCTION. CONTRACTOR. EXCESSIVE PONDING AND EROSION. G. UPON LEARNING OF THE EXISTENCE AND/OR LOCATIONS OF ANY UNDERGROUND FACILITIES NOT SHOWN OR SHOWN 4. REMOVE ALL EXCESS SOILS,ROCK AND CONCRETE TO AN APPROVED DUMP SITE. 8. CONSTRUCT AND MAINTAIN EROSION CONTROL MEASURES TO PREVENT THE DISCHARGE OF EARTHEN o'dq, s '' OWCCURATELTHE NCTH BY LAMSTELEPHONE OR TAPRONERLYITMARKED BY THE UTILITY OWNER.IMMEDIATELY NOTIFY THE UTILITY MATSRILSTION THE C EEK FROM DISTURBED AREAS UNDER CONSTRUCTION AND FROM COMPLETED 4 y7g lP 5. CLEARING AND GRUBBING,SUBGRADE PREPARATION AND EARTHWORK SHALL BE PERFORMED IN H. UTILITY RELOCATIONS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT FACILITIES WILL BE PERFORMED BY THE ACCORDANCE WITH SECTION IT&19 OF THE STANDARD SPECIFICATIONS,THESE DRAWINGS,AND 9, INSTALL ALL PROTECTIVE DEVICES AT THE END OF EACH WORK DAY WHEN THE FIVE-DAY RAIN UTILITY COMPANY,UNLESS OTHERWISE NOTED. THE TECHNICAL SPECIFICATIONS. PROBABILITY EQUALS OR EXCEEDS 50 PERCENT AS DETERMINED FROM THE NATIONAL WEATHER 6. PRIOR TO STARTING WORK ON THE PROJECT,SUBMIT FOR ACCEPTANCE BY THE ENGINEER A SERVICE FORECAST OFFICE:WWW.SRH.NOAA.GOV. 3. IF DISCREPANCIES ARE DISCOVERED BETWEEN THE CONDITIONS EXISTING IN THE FIELD AND THE INFORMATION SHOWN ON HAZARDOUS MATERIALS CONTROLS AND SPILL PREVENTION PLAN. INCLUDE PROVISIONS FOR THESE DRAWINGS,NOTIFY THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. PREVENTING HAZARDOUS MATERIALS FROM CONTAMINATING SOIL OR ENTERING WATER COURSES, 10.AFTER EACH RAINSTORM,REMOVE ALL SILT AND DEBRIS FROM SEDIMENT CONTROL DEVICES \l\C AND ESTABLISH A SPILL PREVENTION AND COUNTERMEASURE PLAN. 11.THE EROSION CONTROL DEVICES ON THIS PLAN ARE A SCHEMATIC REPRESENTATION OF WHAT MAY BE s 4. IT SHALL BE THE S.RESPONSIBILITY S THE STANDCONTRARDS TOIBE FULLY ANNERED AFFECTOAND TO COMPLY WITH ALL CTIO, REQUIRED. EROSION CONTROL DEVICES MAY BE RELOCATED,DELETED,OR ADDITIONAL ITEMS MAY BE ORDINANCES.PROJECT,S.ECTTHOSE EUINGAGEDSAND PLOYS IN WHICH IN ANY MANNER THE COURSE OF CONSTRUCTION 7. FINE GRADINGEE ELMINED BY CONFORMS,AND SLOPES NOT CLEARLYIC SHOWN ON THE DRAWINGSANNER OF THIS ENGAGED OR EMPLOYED IN THE CONSTRUCTION AND THE MATERIALS USED IN THE SHALL BE DETERMINED BY THE ENGINEER IN THE FIELD TO DIRECT DRAINAGE IN A MANNER REQUIRED DEPENDING ON THE ACTUAL SOIL CONDITIONS ENCOUNTERED,AT THE DISCRETION OF THE IL CONSTRUCTION. THAT SUPPORTS THE INTENT OF THE DESIGN.ALL FINAL GRADING SHALL BE SUBJECT TO ENGINEER. H APPROVAL OF THE ENGINEER. ND 8 ALL TESTS,INSPECTIONS,SPECIAL OR OTHERWISE,THAT ARE REQUIRED BY THE BUILDING CODES,LOCAL BUILDING 12.MAINTAIN ALL EROSION CONTROL DEVICES AND MODIFY THEM AS SITE PROGRESS DICTATES. N DEPARTMENTS.OR THESE PIANS.SHALL BE DONE BY AN INDEPENDENT INSPECTION COMPANY. JOB SITE VISITS BY THE 8. ALL FILL TO BE COMPACTED i0 A MINIMUM OF 90%MAXIMUM DENSITY AS DETERMINED BY WcoZ ENGINEER DO NOT CONSTITUTE AN OFFICIAL INSPECTION.R IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE ASTM-01557. 13.MONITOR THE EROSION CONTROL DEVICES DURING STORMS AND MODIFY THEM IN ORDER TO PREVENT O 0 O REQUIRED TESTS AND INSPECTIONS ARE PERFORMED. PROGRESS OF ANY ONGOING EROSION. W Z P 9. SPREAD MATERIAL IN LIFTS OF APPROXIMATELY 8 INCHES,MOISTENED OR DRIED TO NEAR 14.CLEAN DAILY ANY EROSION OR DEBRIS SPILLING ONTO A PUBLIC STREET. W J 6. PROJECT SCHEDULE:PRIOR TO COMMENCEMENT OF WORK,SUBMIT TO THE ENGINEER FOR REVIEW AND APPROVAL A OPTIMUM MOISTURE CONTENT AND RECOMPACTED.THE MATERIALS FOR ENGINEERED FILL SHALL DETAILED CONSTRUCTION SCHEDULE.DO NOT BEGIN ANY CONSTRUCTION WORK UNTIL THE PROJECT SCHEDULE AND WORK BE THE MATERIAL EXCAVATED ALONG THE BASE OF THE EXISTING ROCK SLOPE PROTECTION PLAN IS APPROVED BY THE ENGINEER.ALL CONSTRUCTION SHALL BE CLOSELY COORDINATED WITH THE ENGINEER SO WITH ORGANIC MATERIAL REMOVED. C t5.CONTACT THE ENGINEER IN THE EVENT THAT THE EROSION CONTROL PLAN AS DESIGNED REQUIRES ANY SUBSTANTIAL REVISIONS. W THAT THE DUALITY OF WORK CAN BE CHECKED FOR APPROVAL.PURSUE WORK IN A CONTINUOUS AND DILIGENT MANNER I- W Tn TO ENSURE A TIMELY COMPLETION OF THE PROJECT. 1G ALL CONTACT HORIZONTAL ORURFACESVERTICAL ALLEORGAN CEEN NAL MATER AL GROUNDAND BECOMPACTED FILL SHALL BE REMOVED AND THE EMANINGHER IN IMPLEMENT ALL REQUIRED BMP'S PRIOR TO COMMENCING SITE DISTURBING ACTIVITIES Q W Z 7 CONTRACTOR SHALL BE MEASURES RESPONSIBLE DEEMEDNECESFOR ARYDESIGN,PERMITTING,INSTALLATION,AND MAINTENANCE OF ANY AND ALL SURFACE REQUIRED BYSCARIFIED THE ENGGINEEREPIH OF AT LEAST 6 INCHES,UNLESS DEEPER EXCAVATION IS STREAM CONSTRUCTION NOTES a 0 OU B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL SAFETY DURING CONSTRUCTION.ALL WORK SHALL CONFORM TO 1. STAGING AND STORAGE AREAS FOR EQUIPMENT,MATERIALS,FUELS,LUBRICANTS AND SOLVENTS, W PERTINENT SAFETY REGULATIONS AND CODES.THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR SHALL BE LOCATED OUTSIDE OF THE STREAM AND CHANNEL BANKS.STATIONARY EQUIPMENT Q FURNISHING,INSTALLING,AND MAINTAINING ALL WARNING SIGNS AND DEVICES NECESSARY TO SAFEGUARD THE GENERAL SUCH AS MOTORS,PUMPS,GENERATORS,COMPRESSORS,AND WELDERS,LOCATED WITHIN OR PUBLIC AND THE WORK,AND PROVIDE FOR THE PROPER AND SAFE ROUTING OF VEHICULAR AND PEDESTRIAN TRAFFIC ADJACENT TO THE STREAM SHALL BE POSITIONED OVER DRIP PAN,ANY EQUIPMENT OR DURING THE PERFORMANCE OF THE WORK.THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR VEHICLE DRIVEN AND/OR OPERATED WITHIN OR ADJACENT TO THE STREAM SHALL BE CHECKED COMPLIANCE WITH ALL APPLICABLE PROVISIONS OF OSHA IN THE CONSTRUCTION PRACTICES FOR ALL EMPLOYEES DIRECTLY AND MAINTAINED DAILY,i0 PREVENT LEAKS OR MATERIALS THAT IF INTRODUCED TO WATER ENGAGED IN THE CONSTRUCTION OF THIS PROJECT SEEDING NOTES COULD BE DELETERIOUS TO AQUATIC LIFE. 9. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCFON PRACTICES, 2. NO DEBRIS,RUBBISH,CREOSOTE-TREATED WOOD,SOIL,SILT,SAND,CEMENT,CONCRETE,OR CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS 1. GENERA, WASHINGS THEREOF,OR OTHER CONSTRUCTION-RELATED MATERIALS OR WASTES,OIL,OR RO DURING THE COURSE OF CONSTRUCTION OF THE PROJECT,INCLUDING SAFETY OF ALL PERSONS AND PROPERTY: THAT THIS A SEED ALL AREAS THAT ARE DISTURBED BY CONSTRUCTION OUTSIDE THE ACTIVE CHANNEL WHICH ARE PETROLEUM PRODUCTS OR OTHER ORGANIC MATERIAL OR EARTHEN MATERIAL SHALL BE W REQUIREMENT SHALL BE MADE TO APPLY TCONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS,AND NOT RECEIVING ROCK,AS STAKED BY THE ENGINEER. ALLOWED TO ENTER INTO.OR BE PLACED WHERE IT MAY BE WASHED BY RAINFALL OR RUNOFF CONSTRUCTION CONTRACTOR FURTHER AGREESEESTO DEFEND,INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM B. SEEDING INCLUDES FURNISHING THE SEED,PREPARATION OF THE SEEDBED,ANO HAND DOWNSTREAM. ANY OF THESE MATERIALS PLACED WITHIN OR WHERE THEY MAY ENTER THE ANY AND ALL LIABILITY,REAL OR ALLEGED,IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, BROADCASTING SEED AS SPECIFIED ON THE DRAWINGS AND IN THESE NOTES. CREEK SHALL BE REMOVED IMMEDIATELY. WHEN CONSTRUCTION IS COMPLETE,ANY EXCESS 0 EXCEPTION LABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. NEITHER THE PROFESSIONAL INTO THE SHALL BE REMOVED FROM THE WORK AREA SO THAT SUCH LS DO NOT WASH Z ACTIVITIES OF CONSULTANT NOR THE PRESENCE OF CONSULTANT OR THEIR OR HER EMPLOYEES OR SUB-CONSULTANTS AT 2, AATFRIAIS INTO THE CREEK. DURING CONSTRUCTION,THE CONTRACTOR SHALL NOT DUMP ANY LITTER OR A CONSTRUCION SITE SHALL RELIEVE THE CONTRACTOR AND ITS SUBCONTRACTORS OF THEIR RESPONSIBILITIES INCLUDING, A. SEED MIX IS SPECIFIED IN TABLE 1. CONSTRUCTION DEBRIS WITHIN THE RIPARIAN/STREAM ZONE. ALL SUCH DEBRIS AND WASTE BUT NOT LIMITED TO,CONSTRUCTION MEANS.METHODS.SEQUENCE,TECHNIQUES OR PROCEDURES NECESSARY FOR B. MULCH SHALL CONSIST OF'WEED FREE"RICE STRAW. SHALL BE PICKED UP DAILY AND PROPERLY DISPOSED OF AT AN APPROPRIATE SITE. PERFORMING,SUPERINTENDING OR COORDINATING ALL PORTIONS OF THE WORK OF CONSTRUCTION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND APPLICABLE HEALTH OR SAFETY REQUIREMENTS OF ANY REGULATORY AGENCY OR OF STATE 3. INSTALLATION 3. NO EQUIPMENT SHALL BE OPERATED IN AREAS OF FLOWING OR STANDING WATER;NO FUELING. LAW. A. PREPARE THE SEEDBED PRIOR i0 SEED APPLICATION. SEEDBED PREPARATION INCLUDES LOOSENING CLEANING OR MAINTENANCE OF VEHICLES OR EQUIPMENT SHALL TAKE PLACE WITHIN ANY AREAS 10.MAINTAIN A CURRENT,COMPLETE,AND ACCURATE RECORD OF ALL AS-BUILT DEVIATIONS FROM THE CONSTRUCTION AS OF COMPACTED SOILS i0 A DEPTH OF 3 i0 5 INCHES,BREAKING DOWN SOIL CLUMPS LARGER WHERE AN ACCIDENTAL DISCHARGE i0 THE CREEK MAY OCCUR;CONSTRUCTION MATERIAL AND W F THAN 2 INCHES IN DIAMETER,GRADING OF THE SURFACE TO BE NON-UNIFORM,ROUGH AND HEAVY EQUIPMENT MUST BE STORED OUTSIDE OF THE ORDINARY HIGH WATER LEVEL. SHOWN ON THESE DRAWINGS AND SPECIFICATIONS,FOR THE PURPOSE OF PROVIDING THE ENGINEER OF RECORD WITH A NATURAL IN APPEARANCE. 0 U BASIS FOR THE PREPARATION OF RECORD DRAWINGS. R COMMENCE SEED APPLICATION FOLLOWING PREPARATION OF THE SEEDBED. SEED APPLICATION < W 11.MAINTAIN THE SITE INA NEAT AND ORDERLY MANNER THROUGHOUT THE CONSTRUCTION PROCESS.STORE ALL MATERIALS INCLUDES KE UNIFORMLYDBROADCASTING SEED IONCH PREPARED AREAS. 0 0 w 0< WITHIN APPROVED STAGING AREAS. C FOR AMORE THAN 204 THOURSEPTH OF 1/a NCH TO 1/2 INCH. DO NOT LEAVE SEED UNCOVERED W<CC Q D HAND RECEIVING BROADCAST SLOPE PROTECTION FABRIC AND 3,000 POUNDS PER ACRE OVER AULCH AT A RATE OF 500 POUNDS PER ACRE LLALL SEEDED AREAS SEEDED AREAS NOT CONSTRUCTION SCPRIOR TO COMMENCEMENT OF DHEDULLE/PHASINGRK,CONTRACTOR SHALL NOTES VIDE ENGINEER A DETAILED Z Q 12.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BE FULLY INFORMED OF AND TO COMPLY WITH ALL PERMIT Cn CONDITIONS,LAWS,ORDINANCES,CODES,REQUIREMENTS AND STANDARDS,WHICH IN ANY MANNER AFFECT THE COURSE RECEIVING FABRIC. CONSTRUCTION SCHEDULE FOR APPROVAL. THE CONTRACTOR SHALL NOT BEGIN ANY Q Cn~ IN Cri F CONSTRUCTION OF THIS PROJECT,THOSE ENGAGED OR EMPLOYED IN THE CONSTRUCTION AND THE MATERIALS USED CONSTRUCTION WORK UNTIL THE PROJECT SCHEDULE AND WORK PLAN IS APPROVED BY THE CC I w D TABLE 7. EROSION CONTROL SEED MIX ENGINEER. ALL CONSTRUCTION SHALL BE CLOSELY COORDINATED WITH THE ENGINEER SO THAT THE QUALITY OF WORK CAN BE CHECKED FOR APPROVAL. THE CONTRACTOR SHALL PURSUE N. 13.PROVIDE,AT CONTRACTOR'S SOLE EXPENSE,ALL MATERIALS,LABOR AND EQUIPMENT REQUIRED i0 COMPLY WITH ALL Botanical name Gammon Name Propagation Method Ibslacre Grow. WORK INA CONTINUOUS AND DILIGENT MANNER TO ENSURE A TIMELY COMPLETION OF THE Q U)w APPLICABLE PERMIT CONDITIONS AND REQUIREMENTS. fpm PROJECT. CONSTRUCTION PHASING SHALL BE GENERALLY ACCOMPLISHED AS FOLLOWS: >-,-, >O 14.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKING AND LAYOUT,UNLESS OTHERWISE SPECIFIED. Achilles millefolium yarrow Broadcast seed 2 forb O W O O Artemisia Jouglasiana mugwort Broadcast seed 4 (orb1) INSTALL BMPS. 15.FIELD INSPECTIONS OR THE PROVISION OF CONSTRUCTION STAKES DO NOT RELIEVE THE CONTRACTOR OF THEIR SOLE COIlinsia heterophylla Chinese houses Broadcast seed 2 • 2) ESTABLISH ACCESS AND EQUIPMENT STAGING AREAS. d RESPONSIBILITY FOR ESTABLISHING ACCURATE CONSTRUCTED LINES AND GRADES.AS SPECIFIED. 3) COORDINATE WITH FISHERIES BIOLOGIST i0 INSTALL BLOCKNETS AND RELOCATE FISH(NIC). Q Elymus glauu blue wildrye Broadcast seed 10 grass 4) INSTALL DIVERSION AND DEWATER THE SITE. IN THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND PRESERVATION OF ALL SURVEY MONUMENTS OR i Horde=brachyanthelum Celifomia barley Broadcast seed 10 grass 5) PERFORM CLEARING AND GRUBBING. PROPERTY CORNERS.DISTURBED MONUMENTS SHALL BE RESTORED BACK i0 THEIR ORIGINAL LOCATION AND SHALL BE I Leymus lrificoitlas creeping wild rye Broadcast seed 10 grass 6) DEMOLISH CONCRETE. DESIGNED BY: AMY CERTIFIED BY A REGISTERED CIVIL ENGINEER OR LAND SURVEYOR AT THE SOLE EXPENSE OF THE CONTRACTOR. LONA acoperiva de** Broadcast seed 0 (orb EXCAVATE BEDROCK AND EXPLORATORY TRENCH. DRAWN BY: BMZ TTIMllum obluaiflomm creek clover Broadcast seed 2 {Oro 8) OFFHAUL WASTE CHECKED BY: MAW 17.CONTRACTOR IS REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE 9) PLACE CONCRETE DATE: 1/23/23 COURSE OF CONSTRUCTION OF THE PROJECT,INCLUDING SAFETY OF ALL PERSONS AND PROPERTY;THIS REQUIREMENT Sieynnchium bellum blue eyed grass Broadcast seed 2 forb 10)ALLOW CONCRETE TO CURE. JOB NO.: 07-580 SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. Weis microatachya vulpiaBroadcast seed 10 grass 11)INSTALL GAUGE. 18.THE CONTRACTOR SHALL CONFORM TO THE RULES AND REGULATIONS OF THE CONSTRUCTION SAFETY ORDERS OF THE 12)RESTORE DISTURBED AREAS. BAR IS ONE INCH ON CALIFORNIADIVISION OF OCCUPATIONAL SAFETY AND HEALTH PERTAINING TO EXCAVATION AND TRENCHES THE CALIFORNIA 13)REMOVE DIVERSION/REWATER. ORIGINAL DRAWING, CODE OF REGULATIONS TITLE 8,SUBCHAPTER 4 CONSTRUCTION SAFETY ORDERS,ARTICLE 6 EXCAVATION. 14)SEED DISTURBED AREAS. ADJUST SCALES FOR REDUCED PLOTS 0®1" 2 C2 OF 8 1x I KEY NOTES: ci _ EAM ROCK -_____ I SLOPE PROTECTION TO TRENFRMNCH TE%EXISTING DEPTTOE OF H OF EMBEDMENT Z ACCESS TCL __ CONCRETE TRENCH DIMENSIONS SHALL BE APPROXIMATELY 18"WIDE X 5' (9 NOTES I OUT DEEP%12'LONG. BENCHING IS i0 BE PERFORMED UNDER sE TO O FROM SUPERVISION OF ENGINEER. FOLLOWING INSPECTION OF THE J ms 1)PEDESTRIAN ACCESS TO THE CREEK SHALL BE LIMITED TO THE TOP OF BANK .A m41 PORTION OF THE BANK WHERE RSP IS PRESENT,EXCEPT DURING (MIN) TRENCH BY THE ENGINEER,CONTRACTOR WILL BE INSTRUCTED i0 P INSTALLATION OF THE BUBBLER GAGING SYSTEM WHERE ACCESS ALONG i ) II EITHER: �.�/ N G THE EXISTING STAIRWAY AND PATH WILL BE PERMITTED. if APNI '� ce Z a,g 4 A.BACKFILL AND COMPACT TRENCH.OR: O 2)EQUIPMENT INGRESS/EGRESS SHALL BE LIMITED TO ONE ROUND I Ix 007-572-030 I RA B.EXTEND RSP DOWN TO EITHER BEDROCK OR ELEVATION 94.0, I— CJ TSU TRIP ALONG THE TEMPORARY ACCESS PATH SHOWN. 1 WHICHEVER IS HIGHER. m I \ / IN THE EVENT THAT ADDITIONAL RSP IS REQUIRED,WIDEN AND Q n e 3 3)INSTALL FIBER ROLL ALONG THE DOWNSLOPE PERIMETER OF THE I I EXTEND THE TRENCH ALONG THE ENTIRE BASE OF IHE EXISTING 81( STAGING AREA. STAGING AREA ROCK SLOPE PROTECTION AND BACKFILL WITH A 4-FOOT THICK 4)WASTE CONCRETE AND ROCK SHALL BE REMOVED TO STAGING LAYER OF CALTRANS CL455 I%RSP(2 TON) IN ACCORDANCE AREA EITHER BY LONG-REACH EXCAVATOR,CRANE OR MANUAL 1ABOR, I I \ X / WITH THE TECHNICAL SPECIFICATIONS AND UNDER THE TO MINIMIZE DISTURBANCE TO STREAMBANK. I I o CONTINUOUS SUPERVISION OF THE ENGINEER. PLACE FILL OVER ¢ APN \ 0'"ENG.WAY / THE RSP TO CONFORM TO ADJACENT GRADES,AS NECESSARY, 5)FOLLOWING CONSTRUCTION,ACCESS PATH SHALL BE RESTORED TO UNDER THE DIRECTION OF THE ENGINEER. 1v o PRE-CONSTRUCTION CONDITIONS.AS DIRECTED BY THE ENGINEER. 007-572-029 I \ / RESTORATION SHALL INCLUDE,BUT NOT BE LIMITED TO,RESTORING I I INSTALL FIBER ROLL(ONLY) I/ ESA FE CE / GRADES,SEEDING,APPLYING SLOPE PROTECTION FABRIC,AND AS SHOWN ON THE SLOPE / REPLACEMENT OF DISTURBED VEGETATION WITH APPROPRIATE NATIVE I PROTECTION DETAIL SHEET C8 SPECIES ALONG PORTIONS OF THE SLOPE WHERE RSP IS NOT I II I • / PROJECT AZIMUTH GANEF@*yy PRESENT 4 v x/ 1r op.0 n 6)CONTRACTOR SHALL UTILIZE ONLY THE APPROVED ACCESS POINT \ x •4'O •40"WNUT / • / .^r d FROM MYRTLE STREET FOR TRANSPORT OF MATERIALS. i26 `O �' FISH BLOCK NET(NIC).TO BE INSTALLED 1 124. / / /mow„ 4i,-,dN z 0 BY QUALIFIED FISHERIES BIOLOGIST. 1 "0 / �/ 'A,/;TJ /Jag P APN A 420 ' 007-572-031 I CA APPROXIMATE 4 CONTOURS IN THIS AREA / ACCESS TO THE STAIRWAY LOCATION OF ROCK 118 3 G k SLOPE PROTECTION 1., ARE APPROXIMATE WILL BE PERMITTED DURING afiQ BEDROCK OUTCROP I 5� / 4L: INSTALLATION OF THE � 3 �• ,, .114 �'Wyi�r BUBBLER GAGING SYSTEM �-�' /�� - 24" `\iiii .. W UNITED STATES GEOLOGICAL \s ��� \ - * .,vN y/0. .� O SURVEYGAGING CRANNDE ATTION ON ARROYO 0 + � 1 ,'• :NS 4i GRANDE.CA r • 4:04-— F� Hz -©VrVIVir �� GAGE#:11741500 W Z I 0-.4 —� ^_- _\ 4W 2a"w 1,� /z2_ 11< p p 0 ___ __ / -rte 1 ro--CONTOURS >zo ¢ Z H ��_I - iginglillill . ' � � IN THIS AREA \ _I> .F / 114- ARE APPROXIMATECC —I- � a /�`�12- \ Q W W BEDROCK OUTCROP \ -1� will="613/ -40X,Q DIVERSION DAM ��� 7.„,.„ � a—`� oz +_ a/�� o \ FISH BLOCK NETMIG). ¢ ZAPN / 2W - - FISHERIESSBOLOGIST.QUALIFIED 007-522-018 / -- , / \�[/-102- I I / G Q LIMITS OF DISTURBANCE ppg \ ey,\ I I I ® Z 0- LEGEND (0.21 ACRE) s z_Q •° — >oi �) A �I (D Z Q31 SURVEY CONTROL POINT (E)CONCRETE WALL - �A / \ O O TEMPORARY DIVERSION —� m.„8 +9� ' Q W() X9747 SPOT ELEVATION ❑ 0 (E)FENCE PIPE / • r11 \ 48 OR cc 24"W / 8. -106- C-� 2 5- �// 's li`I: ".-.....<1,41.0.4„ CO OW • (E)TREE (E)RAILING APN /(E)FOUR-STEP \ '. Y4 V� Yo.'KANDE <Q CONCRETE WEIR •2A COTe10"W \`M y� 007-522-01 9 6EDROe6 A TC-.- JR 2a"W (E)TREE i0 BE REMOVED OHE (E)OVERHEAD ELECTRIC 8_'•34 \ '3--1-41-47C p.,,_x -—PARCEL LINE(APPROXIMATE) ��� (E)OVERHANGING VEGETATION DRIPLINE / / � � %h' W I- (APPROXIMATE) / A \\ Q W —--—(E)CHANNEL ALIGNMENT -- 100—(E)MAJOR CONTOUR (E)BEDROCK (�)ff J X38--_(E)MINOR CONTOUR (E)CONCRETE /STAGING,ACCESS,AND DIVERSION PLAN // APN ` J \ W 0 d Q % PROPOSED ESA FENCE / SCALE i"=10 ) / 007-511-001 F CC LIMITS OF DISTURBANCE / / W m �nMM/T. 0 CO FIBER ROLL STA:2+23.63 O W >O 108 toe O IL 0 O CC CC +36 CC CL 104 ELEV.x9681 STA:4+00 ——— (E)GROUND 104 C STA:2+59.90 (E)LOW FLOW LINE Q 100 ELEV:95.22 L ELEV:95.11 100 96 -- - __ --- --__ LL _ 96 DESIGNED BY: MWW ��8..aaa I— DRAWN BY: BMZ yyy CHECKED BY: Mww 92 \\` STA:3+20.83 STA:2+98 _ / ------- ————_——— 92 DATE: 1/23/23 ELEV:95.73 ELEV'95.42 TA:2+43.60 J E BEDROCK GRADE T JOB NO.: 0Z-580 88 \� -STA:3+80 ,TA: 93.47 CONTROL ELEV.93.4 BB ELEV:90.82 STA:3+50 BAR IS ONE INCH ON 84 ELEV:91.88 Bq ORIGINAL DRAWING, ADJUST SCALES FOR REDUCED PLOTS 80 80 0®1" 4+00 3+50 3+00 2+50 2+00 1+60 3 —— EXISTING GROUND EXISTING BEDROCK ELEVATION EXISTING CHANNEL PROFILE C 3 OF SCALE:1"=10' -EXISTING BEDROCK PROFILE(ESTIMATED) 8 -0 W u STAGING AND VEGETATION CLEARING NOTES: - � 1. A CRANE MAY BE OPERATED FROM THE STAGING ARE4 SHOWN ON TH15 o a SHEET TO DELIVER EQUIPMENT AND MATERIALS TO THE WORK AREA WITHIN • D Z n m THE CREEK CHANNEL.ADDITIONAL STAGING AREA IS SHOWN ON SHEET C3. Z J .N w 2. PROTECT ROAD FROM DAMAGE BY EQUIPMENT AND ALL OPERATIONS v�O1 m O0 REQUIRED i0 COMPLETE THE WORK. Fll 3. PLACE FIBER ROLL ACROSS DOWNSLOPE LIMITS OF STAGING AREA. \ { / ,1 Z j 4. CLEAR VEGETATION WITHIN THE LIMITS OF DISTURBANCE TO PROVIDE LINES 'y OF SITE,AS NEEDED,FOR SAFE OPERATION OF A CRANE IF USED DURING / w Ou rc L.,^' CONSTRUCTION.CONTRACTOR SHALL VERIFY CLEARING REQUIREMENTS FOR ➢ I� u LINES OF SITE. a LIMIT VEGETATION CLEARING TO THE EXTENT POSSIBLE BY UTILIZING •--,- 4.1. / Q 1 n�^i PRUNING AND THINNING RATHER THAN COMPLETE TREE REMOVAL. 4.2. LEAVE LOWER TRUNK AND ROOTS IN PLACE WHERE TREES ARE / 7 REMOVED. 4.3. FLAG MAIN BRANCHES AND TREES TO BE PRUNED AND REMOVED FOR FIELD RENEW AND APPROVAL BY A CREEK LAND'S REPRESENTATIVE / PRIOR TO COMPLETING ANY VEGETATION CLEARING WORK. r THE LOCATION OF ALL EXISTING FEATURES SHOWN IS PROPOSED GRADING LIMITS ,,'IX N APPROXIMATE. FEATURES WERE APPROXIMATELY LOCATED ,- USING AERIAL AND GROUND PHOTOGRAPHY AND WERE NOT (E)ROdE SLOPE PROTECTION b(,twfLR+b SURVEYED. CONTRACTOR SHALL MAKE AN INDEPENDENT \ -- — — ------ ASSESSMENT -/� ° ASSESSMENT OF FIELD CONDITIONS FOR PURPOSES OF — — - ) oma° �A CONSTRUCTION STAGING, ACCESS, AND BID PREPARATION. V A PORTION OF THE(E)FENCE MAY az A? =@ F, i i • i i ' ^ i i // \ BE REMOVED TO PROVIDE ACCESS. _ �d3J 97tl Stir / REPLACE IN-KIND(LOCATION AND / / �/) \ ALIGNMENT SHOWN ARE APPROX.) // _ ..\ 3 �v �� ^ \ //• /t\ MYRTLE ST o 1% • - 1 p ESA FENCE // •j/ >\ w p O ESA FENCE NOTES _ •/ • \\ +/ W 1. PORTIONS OF ESA FENCE MAY BE REPLACED WITH TEMPORARY STAGING CHAIN LINK FENCE AT THE CONTRACTOR'S OPTION. ��'� AREA(SEE SHEET C3) / x ,I% Q W Z 2. ALL FENCING IS TEMPORARY REMOVE FENCING AT 0 / THE COMPLETION of PROJECT CONSTRUCTION. 1 // • • ¢ 0 / a 'TRAFFIC CONTROL NOTES: \ �1 / j 1. PROVIDECONTROL FOR THE SAFE MOVEMENT / TEMPORARY CRANE STAGING AREA CO SEHICLESLES AND PEDESTRIANS THROUGHOUT1 \O\ / , CONSTRUCTION IN ACCORDANCE WITH THE TECHNICAL / SPECIFICATIONS. \ / • 1 v • / 0¢ // Act ROLL ON PAVEMENT ct I-J .. • N \\ / /: ^\ / 4C. W D°d / j+� \ �� I-FZ 0)0 a(1c \ . 47 /' ›-z< • \ / PROTECT S IN PLACE ALL ABOVE ADD BELOW GROUND ✓/ UTILITIES AND THROUGHOUT THELOCATED WITHIN BOUNDARY � SHOWN AND THROUGHOUT THE PROJECT AREA W I- ".. Q Q Z m S O W O I-1O ° CP- s� LEGENDcc cc r /! —OHE— EXISTING OVERHEAD ELECTRICAL Q M l (n EXISTING OVERHEAD UTILITY o o o EXISTING FENCELIKE DESIGNED BY: MWW . a/ 0 DRAWN BY: BMZ O EXISTING UTILITY POLE CHECKED BY: WNW • DATE: 223 I\\\\\\\y TEMPORARY STAGING AREA JOB NO.: 10)35 . 80 C� — — — LIMITS OF DISTURBANCE BAR IS ONE INCH ON ,4 ORIGINAL DRAWING, —X — PROPOSED ESA FENCE ADJUST SCALES FOR REDUCED PLOTS PROPOSED OBER ROLL p®1^ MYRTLE ST.CONSTRUCTION STAGING PLAN a SCALE:I"-20' C 4 OF 8 Li - 11 BUBBLER GAGING SYSTEM INSTALLATION NOTES: 110 2 qD U) E GENERA,• A. PROVIDE 5 WORKING DAYS NOTICE i0 THE DESIGNATED REPRESENTATIVE OF THE SAN LUIS OB/SPO WATER RESOURCES �� IIB Q -I .‘,0. o DIVISION OF PUBLIC WORKS(COUNTY'S REPRESENTATIVE)PRIOR TO THE START OF CONSTRUCTION.CONTRACTOR SHALL MEET PROTECT IN PLACE THE SOLAR PANEL, 1C I^ °j WITH THE COUNTY'S REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION i0 REVIEW THE EXISTING STREAM GAGE RAIN GAGE,ANTENNA AND ALL OTHER / N Gcai'� SYSTEM COMPONENTS AND CONFIRM THE WORK TO BE COMPLETED BY THE CONTRACTOR. ,. EQUIPMENT INSTALLED ON THE W� C Z a-j B. THE COUNTY'S REPRESENTATIVE WILL REMOVE THE EXISTING ALERT 205 DATA LOGGER AND TELEMETRY SYSTEM IN THE WHITE �" WELL ROOF. 0 ,. ENCLOSURE PRIOR TO THE START OF CONSTRUCTION i0 PROTECT THESE COMPONENTS FROM DUST AND DEBRIS THAT MAY Q 112— 0 a ]J6 1,1 3 BE GENERATED DURING CONSTRUCTION. 4'W2ITT- C. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT IN PLACE ANY EXISTING COMPONENTS TO REMAIN. ---- Q 33 D. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE EXISTING SHAFT ENCODER AND ALL ASSOCIATED STILLING WELL •4W i •�„ \ I1 n a COMPONENTS EXTENDING DOWN INTO THE WET WELL AS IDENTIFIED BY THE COUNTY'S REPRESENTATIVE. E. THE INSIDE OF THE WET WELL IS CONSIDERED A"CONFINED SPACE".THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY I IOBDT• RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE PROVISIONS OF OSHA IN THE CONSTRUCTION PRACTICES FOR ALL EMPLOYEES DIRECTLY ENGAGED IN THE CONSTRUCTION OF THIS PROJECT __ (2)-2..,„.„.„ 0 THE BUBBLER GAGING SYSTEM COMPONENTS WILL BE PROVIDED BY THE COUNTY'S REPRESENTATIVE AND WILL INCLUDE THE I \o FOLLOWING CAMPBELL SCIENTIFIC COMPONEMS: �- YODEL PART FSF.RIPTION • ALERT 205 WITH ENCLOSURE ALERi205-F1-E-NA DATA LOGGER AND TELEMETRY SYSTEM • LEJELVUE810-15 34813-4 WATER LEVEL CONTINUOUS FLOW BUBBLER _---- �' /�� • LEVELVUEBCBL-L5 35759-7 POWER AND COMMUNICATION CABLE ,LGTgEERtFyy 34962 DESICCATOR KIT I '/Y�` ,iXO v 34960 ORIFICE LINE __ - 34961 ORIFICE LINE END CAP 1 9R 2'-''.' d i 34970 LONG DESICCANT TUBE _- 98.19 A. THE CONTRACTOR SHALL MOUNT THE PROVIDED BUBBLER SYSTEM AND DESICCATOR KIT COMPONENTS TO THE WALL OF THE - )) d 98.77 � �....�I� ,n} o � Jl 93ll WET WELL AT THE LOCATION IE WILL IN THE COUNTY'S REPRESENTATIVE. -- / - /' 98.84- B. THE COUNTY'S REPRESENTAPVE WILL REINSTALL THE ALERT 205 DATA LOGGER AND TELEMETRY SYSTEM COMPONENTS ONCE _ 1 MRI 98.20 I-- -\ THERE IS NO LONGER A RISK OF DAMAGE FROM DUST AND DEBRIS AND CONNECT THE WIRING TO THE BUBBLER SYSTEM. gg./5' I i INSTALL CONDUIT AND THE COUNTY'S REPRESENTATIVE WILL A00 ATTACH THE STREAM GAGE SYSTEM COMPONENTS i0 THE EXISTING POWER TA BUBBLER LINE IN SUPPLY. I ��11 ACCORDANCE WITH THE C. INSTALLATION AND OPERATION OF THE BUBBLER GAGING SYSTEM SHALL BE INSPECTED AND APPROVED BY THE COUNTY'S 'I NOTES,THIS SHEET. \ REPRESENTATIVE. '(I / �p \ O I f,'3j 99.08- \2 INSTALL 2-INCH DIAMETER HOT-DIPPED GALVANIZED STEEL RIGID METAL CONDUIT CONTINUOUS FROM ORIFlCE LINE END CAP TO aGAGE EQUIPMENT ENCLOSURE INSTALLED WITHIN THE WET WELL - -�1- _ 100.02-"NIIIIIIIIIIII A. SUBMIT SHOP DRAWINGS FOR STEEL CONDUIT INSTALLATION FOR REVIEW AND APPROVAL BY THE ENGINEER IN ADVANCE OF N / - - - • LL ANY WORK.SEE SPECIFICATIONS FOR FURTHER DETAILS. FLOW B. MAINTAIN A MINIMUM OF 2 PERCENT FALL ALONG THE CONDUIT'S ENTIRE LENGTH. - / I co C. SECURE CONDUIT TO WALL OF WET WELL WITH CONCRETE ANCHORS. / g.BaJ I a D. THE CONDUIT SHALL EXIT THE WET WELL AT THE CAPPED PIPE IN THE NEC WELL WALL ON THE CREEK-SIDE FACE OF THE WET WELL. \ Z •THE CAPPED PIPE IS 6-INCH DIAMETER AND LOCATED APPROXIMATELY 2 INCHES FROM THE GROUND AND APPROXIMATELY I v Q Q 10 FEET HORIZONTALLY FROM THE TOP OF THE CONCRETE RETAINING WALL BUILT ALONG THE CREEK BANK. 1 I I J •FILL GAP BETWEEN CONDUIT AND PIPE USING"GREAT STUFF BIG GAP FILLER".OR APPROVED EQUIVALENT REMOVE EXCESS CC FOAM FROM FACE OF WALL. I ! I I Ui W •SUPPORT CONDUIT AS NECESSARY ALONG ITS ENTIRE LENGTH i0 PROTECT FROM DAMAGE. 100 99 76 5 Q W Z E. EXTEND THE CONDUIT DOWN THE FACE OF THE CONCRETE WALL TO THE RECESSED NOTCH TO BE CONSTRUCTED WITHIN THE ��,1 I 9T 26 @ m 0 PROPOSED CONCRETE WEIR. I ¢ •INSTALL CONDUIT FLUSH AGAINST THE RETAINING WALL.MINIMIZE FITTING ANGLES Oa�.�� - - Q U U •USE SWEEP FITTINGS WHERE A CHANGE IN DIRECTION IS REQUIRED. I 102 `� •.21— 1 LL •THE TOP OF THE EXISTING CONCRETE WALL MAY BE MODIFIED TO P1LOW FOR THE CONDUIT TO SIT FLUSH AGAINST THE I ® ��Ilk I T�T FACE OF THE WALL,PENDING APPROVAL IN ADVANCE BY THE ENGINEER. "YYYIIl11/I /// / at a F. INSTALL ORIFICE BUBBLER LINE THROUGH THE STEEL CONDUIT AFTER CONDUIT INSTALLATION HAS BEEN APPROVED BY THE \ ""'�' ENGINEER.ENSURE ORIFICE BUBBLER LINE DOES NOT KINK OR BECOME OTHERWISE COMPROMISED WHEN INSERTED INTO THE _ c,'.�'...... STEEL CONDUITNM III-8W 1 WEIR DET' p o -.i 6 ® Z 04 I/ Q SAW-CUT CONCRETE J LEGEND I a_ • (E)TREE GM PROPOSED GRADE DESIGN CONTOURS 6 1 W 02.20 0 cn (E)CHANNEL ALIGNMENT - PROPOSED CHANNEL ALIGNMENT 'i X100- (E)MAJOR CONTOUR OHE (E)OVERHEAD ELECTRIC • T06- X _ 1 Bw , '� ------29''----------29''---- (E)MINOR CONTOUR (E)BEDROCK -- W I- (E)CONCRETE WALL ` „ „ '2 I (E)CONCRETE SITE PLAN SCALE 1"=4' Q W ❑ ❑ (E)FENCE 0(W.�O Q (E)RAILING dI- Da —--— PARCEL LINE CONFORM TO EXISTING GROUND ZCn STA:2+48.8 STA:2+23.63 REMOVE AND DISPOSE OF EXISTING Q Q Z m ELM 98.57(APPROX.) ,4E),95.33 CONCRETE AND BEDROCK AS NEEDED TO 0-W CONSTRUCT THE PROPOSED 108 - (DEPTH OFCONCRETE UNKNOWN)RETE WEIR CE 0 i W 104 STA:4+36 - - E�PROTFILLEFUTURE GRADE 104 >,_LL,O ELEV:96.81 STA:4+00 GROUND STA:2+59.90 FINISHED GRADE 0 m ELEV:95.22 ELEV.95.11 (E)LOW FLOW LINE 100 - 1.0%------- -LLL-- ",•• 100 a CI- ---- - STA 6 2+a8 ELEV'93.70 96 -- __ °I 4 _ -- --_ 56 92 ___- 2.53 ,.. -____ - - __ .. _ DESIGNED BY: NNW _ _STA:3+20.83 STA:2+ _ AM� DRAWN BY: BMZ BB ELEV:95.73 Div:95.42 -- E BEDROCK GRADE C:;O : EV:93.4 082 CONTROL ELEV.9EV:91.88 ETE NGTEDU SCALES FOR ELEV:91.40 REDUCED PLOTS ---EXISTING GROUND EXISTING BEDROCK ELEVATION DESIGN- CHANNEL PROFILE ol= 'I SCALE:1"=10' ------EXISTING BEDROCK PROFILE(ESTIMATED) 05 OF ---ESTIMATED FUTURE PROFILE GRADE 8 i n 1 0,„, s° - -- - L a .,,,:, , ,, _ ,, , __ _,.,._ I ' ° sem , ,- -__:. __ - ° " °paQz ., TI- W c N3 ---t0' • fl -- ,T�2 • CONFORM THE 1-FOOT O7 TALL'WEIR LIP"TO THE WEIR SECTION WITH NO LIP MP) N • 0' oR�W ag N4 b .. I K ' I o3d'! 73Ni lti USE SWEEPS FOR.LL ANGLED p IpLl - , - FITIING.ENSURE C C VAL SITS a ASTALL 2-INCH DIAMETER IRIVID METAL ° a I a° • ° 9 FLUSH AGAINLT FACE OF fr ° I ap° CONDUIT IN 2.5"x 2.5"REC�SED NOTCH �}' RETAINING WAIL,.SEE THE y EE a '- BUBBLER GAGE INSTALLATION ALONG ITS LENGTH WHERE INSTA(.LED IN THE p a - a NOTES ON SHE HT C4 FOR p CgN�CRETE 44EIR,PER THE N TE]5 ON dfHE— a a ° �a ° --. ,. p° ° _�. a CONFORM ALL EDGES FORTHERI DETAILS. a '*NOT WEIR ELEJNTION'sr C6.THE a p° ° a INSTALL"CAMPBELL SCIENTIFIC a '4RR�YC- a i0 EXISTING " K NOTCH DIMENSIONS5 MAY N ED CO BE, A ORIFICE LINE END CAP OR A �G RANDS CONCRETE TO REMAIN a EXPANDED TO ACC0�1MOM NT °FITTINGS. ��� a I APPROVED EQUAL.SET BUBBLER //////CREgK �a ° ° a a ° °�Hq a ORIFICE ELEVATION TO 93.1. ° a a °a 4 a �"X 4"aX 8"STAINLESS STEEL PI2TE. ° i�• a a° a a SAW CUT CONCRETE a p I 0 (E)CONCRETE—w SECURED WITH TW }a STAINLESS STEEL p a ° a ° a ° a N 0 a fl p (ALIGNMENT APPROX.) r ANCHOR SOUS. ANC DRI BOLTS SMALL BE—" AREA OF BEDROCK,EXCAVATED TO A p°a a > a ° W Z RETAINING WALL J. SET 14"CLEAR OF iH TV, CONCRETE ° a ° ° a ° ° ° ° ° O Q O FORM POO REF i0 SHEET C4 p° �� W Z \ o NOTCH I AND EMBEDDED 6".- a a a FOR GRADING DETAILS .• ° a a °z-INaHi"DwMETER BUBBLER TBBE of a a . WEIR DETAIL an • p p a 9' a p a CC w J A a a e CONWIF(PFR NOTES SHEET C4) p a° °p •a ° a a ° 0CC °p ° °4 ° SCALE:1=1 SC _ W a0 I Ip a a n ° a " a a ° p a w z 24.8' SAWCUT(E) W CE O CONCRETE Q O 0 W 100 '1 6.- Q 6 0_ 3/4"CHAMFER ON ALL ABOVE .-.2X- • a" GROUND CORNERS EXCEPT WHERE 14.8' 2R RADIUS IS SPECIFIED MP) �(�• Q (E)CONCRETE Q O 98 • (~j W 3"(TYR) 'ill" 0— CC 03 \ iV BOUNDARY OF CONCRETE ` 3 WITH BEDROCK SHOWN IS APPROXIMATE H 96 OQ _0,_ paa_I- 20 z co .,, / 141111i;'\' :' —_ OICoelp�W ,, 94.1 94.7 1.61'(MIN) 94 Q O ,:Ill Sil 0 iii 0 i �.�■�� (E)BEDROCKCC 0— CC • INVERT=93.1 / 4 M TOP OF CONCRETE BIAS IN i F (E)CONCRETE O FOREGROUND,PER THE TYPICAL fi"(MIN)J N5 DOWELS 0 24"OC, EMBED REBAR DESIGNED BY: MWw WEIR ELEVATION SHEET C7 --- TO MIN.DEPTH OF 12"INTO COMPETENT DRAWN BE BRE �� BEDROCK.SECURE WITH EPDXY(T'P). CHECKED BY: Mww #5 0 12"OC,EW DATE 1/23/23 92 APPROX. 92 JOB NO.: 07-580 CONCRETE WEIR NOTES: BAR IS ONE INCH ON EXCEEDANCE APPROX. VELOCITY UPSTREAM I.EXTENT OF EXISTING CONCRETE AND BEDROCK HAVE BEEN APPROXIMATED. ORIGINAL DRAWING, DESIGN PARAMETER FLOW FLOW RATE DEPTH AT WEIR (FT) OF WEIR. (F F/) 2.IT IS EXPECTED THAT EXCAVATION OF THE EXISTING CONCRETE AND/OR BEDROCK WILL LEAVE AN UNEVEN SURFACE ADJUST SCALES FOR 10 LOW FLOW JUVENILE 95% 1.8 CFS 0.7 0.2 WITH AREAS GREATER THAN DIMENSIONS AND THICKNESS OF CONCRETE SHOWN ON THE DRAWINGS.ALL AREAS OF REDUCED PLOTS WEIR SECTION n OVER-EXCAVAPON SHALL BE BACKFILLED WITH CONCRETE. O®t" © LOW FLOW ADULT 50% 5.1 CFS 1.1 0.3 SCALE:,"_1' ac ak, HIGH FLOW JUVENILE 10% 25 CFS 1.7 1.0 6 HIGH FLOW ADULT 1% 349 CFS 4.8 4.6 C6 OF *VELOCITY CALCULATED WITHIN CONCRETE CHANNEL UPSTREAM OF WEIR(STA. 2+10). 8 U 100 100 E TO B (E)E REMOVECONCRETED >— C7 m Q .. .:"0,!,1 J N 98 98 Ve3 2"DIAMETER GALVANIZED RIGID METAL CONDUIT INSTALLED IN 2.5"X 2.5"RECESSED NOTCH IN n RE CONCTE. THE RECESSED NOTCH SHALL BE ilk CONCRETE. CONDUIT COUPLINGS AND THE ORIFICE END CAP. Eilliilliiiiiiililil m----,, PLACE THREE iN4."X8"GALVANIZED STEEL (E)BEDROCK PROFILE \ PLATES ALONG NOTCH WHERE SHOWN ON HEED CS 96 96 NEER k5 WHERE SHOWN(12" WEIR LIP 0 *b1 MAX OC SPACING EW). -''0 n ` FLAT CREST(6') #5®,2"OC 4 U., _ t 4 -3"RADIUS(TYE) vvt, ',a ''' 930 lP _ 3. 12" \I6:4• 3"CL y 94 I ) 94 8"(MIN) P r1 • 9",MIN. \ 1 t 'N,FINISHED GRADE IL " S,-8, '�ELEV:91.40 0 IF)w co Z 92 92 8 Q O WZ H //5 DOWELS®18"(MAX)OC,EW.EMBED Q Q Q NOTE:EXACT DEPTH OF CONCRETE REBAR TO MIN.DEPTH OF 12"INTO COMPETENT- • LU J AND BEDROCK UNKNOWN BEDROCK.SECURE WITH EPDXY,(TYP) 5.. \,b5 WHERE SHOWN(12" CC MAX OC SPACING EW). r W w 1 Q 63" 1 0 Q Q LCE V U TYPICAL WEIR ELEVATION W SCALE:,"=1' 6C 128 128 OCC Z 124 124 4 O Z F OQ> .S.G.S.GAGING STATION WELL IN BACKGROUND I 0 W 120 / 120 0 S-W / PENDING CONDITION,THICKNESS AND co ORIENTATION OF CONCRETE DISCOVERED 116 AT FINISHED GRADE DURING DEMOLITION, 116 ADDITIONAL SLOPE STABILIZATION MAY BE REQUIRED.THE ENGINEER WILL ASSESS APPROXIMATE BANK SLOPE W I— ���94 THE AREA AFTER CONCRETE REMOVAL TO 112 -I '2 PROVIDE RECOMMENDATIONS. 12 ✓ �^q� EXISTING GROUND 0 w O Q ✓ 0 Q d 108 ✓✓✓✓� //// 108 Q Cn F 104 • 104O=W 0 IL, 100 .. ,� ' 100 d 96 1 (E)SHOWNN THICKNESSCRETE S APPROXIMATE-96 1 THICKNESS UNKNOWN DESIGNED BY: AMY DRAWN BY: BMD CHECKED MW a ELEV:94.0 FINISHED GRADE DATE: ,/23/233 92 ELEV:92.7 92 JOB NO.: 07-580 -.I I-2.0' BAR IS ONE INCH ON 5.0' ORIGINAL DRAWING, ADJUST SCALES FOR REDUCED PLOTS SECTION rn1 U®1 SCALE:I".5' ,5C�C 07 7 OF 8 DAM HEIGHT SHALL BE SUFFICIENT TO /1 U NOTESCREATE 12'OF FREEBOARD,WHILE (. I Z WRAP. EXTEND DAM WITHM ',MIL. PASSING DESIGN FLOW.TOP COURSE Fa 1. THE SLOPE PROTECTION RETAIL APPLIES IO ALL PORTIONS OF PLASTIC.EXTEND UPSTREAM 6',MIN. < o O1 THE BANK DISTURBED DURING CONSTRUCTION. SHALL BE 2 BAGS WIDE,MIN. o m 2. THE AREAS i0 RECEIVE SLOPE PROTECTION FABRIC AND FIBER J ��m�0 CONST WILL BE STAKED BY THE ENGINEER AFTER ALL SEAL PLASTIC WITH ZIP TIES,TAP. FLEXIBLE WA DRAIN PIPE,NTS CAL ER(MIN).PIPE MUST �a y CONSTRUCTOR ACTIVITIES HAVE BEEN COMPLETED AND HAVE WATER-TIGHT JOINTS.CLAMSHELL FITTINGS ON D. EQUIPMENT HAS BEEN REMOVED FROM THE CHANNEL L �g SINGLE-WALLED HDPE PIPE WILL NOT BE ALLOWED. LI)Z G 6 E%TEND PLASTIC 4��i� � Z �^'\� UPSTREAM 6•,MIN L©��� O SLOPE PROTECTION FABRIC NOTES _�- _ _ (E)STREAM BED W ,,�3 1. SLOPE PROTECTION FABRIC SHALL BE"NORTH AMERICAN GREEN C125BN',OR APPROVED EQUAL. 4111) I 2. GROUND ANCHORING DEVICES SHALL CONSIST OF 10'LONG METAL STAPLES. IN LOOSE SOIL CONDITIONS,THE USE OF STAPLE LENGTHS GREATER { }� 7 -_ __I�� '���_ '_! 1 — J < ~-0 THAN 10"MAY BE NECESSARY TO PROPERLY ANCHOR SLOPE PROTECTOR FABRIC. _41/14.40,41,' � 1pJ Y n vg 3. SECURE UPSLOPE EDGE OF SLOPE PROTECTION FABRIC INTO A 6' % 6" TRENCH WITH A ROW OF GROUND ANCHORING DEVICES SPACED /1 �f APPROXIMATELY 12'APART IN THE BOTTOM OF THE TRENCH.BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED '46 .I I '. .. I I ../'.GI' SOIL AND FOLD REMAINING 12"PORTION OF SLOPE PROTECTION FABRIC'S BACK OVER SEED AND COMPACTED SOIL. SECURE SLOPE PROTECTION 1Jte�.�Pi"k�III r� 1J•�,I��'.I n FABRIC OVER COMPACTED SOIL WITH A ROW OF GROUND ANCHORING DEVICES SPACED APPROXIMATELY 12'APART ACROSS THE WIDTH OF THE SLOPE COTFORM DAM BBEE PROTECTION FABRIC TO EXISTING STREAM BED 4. UNROLL SLOPE PROTECTION FABRIC DOWNSLOPE.CONSECUTIVE ROLLS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END(SHINGLE SME) DISCHARGE TO WITH AN 18"OVERLAP. WHEN EN MORE THAN ONE ROLL WIDTH IS REQUIRED, CONSECUTIVE ROLLS SHALL BE SPLICED END OVER END IN THE (E)BEDROCK DOWNSTREAM DIRECTION WITH AN 18"OVERLAP.STAPLE THROUGH OVERLAPPED AREA,APPROXIMATELY 12"APART ACROSS ENTIRE SLOPE PROTECTION NOTE:CONTRACTOR MAY USE ALTERNATE DIVERSION DAM PROFILE ("" POOL FABRIC'S LENGTH. DAM DETAIL, T i0 APPROVAL OF 5. SECURE SLOPE PROTECTION FABRIC TO SLOPE WITH GROUND ANCHORING DEVICES AT 2.5'ON-CENTER SPACING. ADDITIONAL STAPLES SHALL BE THE ENGINEERR AND AND THE PERMITTING N.T.S. C,319.6 INSTALLED,AS NECESSARY,i0 ENSURE CONSISTENT CONTACT WITH THE GROUND SURFACE. AGENCIES. 1XEER 6. ALL SLOPE PROTECTION FABRIC EDGES SHALL BE INSTALLED IN A 6"X 6"TRENCH WITH A ROW OF GROUND ANCHORING DEVICES SPACED �40 *bb, APPROXIMATELY 12"APART AS DESCRIBED ABOVE. o< 0 v a '�a FIBER ROLL NOTES DIVERSION NOTES - m 4 THE DIVERSION PLAN SHOWN IS SCHEMATIC.THE LOTION OF THE TEMPORARY LA ARY DIVERSION DAM SHOWN ON THE DIVERSION PN IS APPROXIMATE. 1.FIBER ROLL SHALL BE 0"0 STRAW WATTLE,'EARTH SAVER BIODEGRADABLE RICE STRAW WATTLE"OR APPROVED EQUAL CA °' z 4. 2.STAKES SHALL BE INSTALLED AT THE ON-CENTER SPACING SHOWN ALONG THE LENGTH OF THE FIBER ROLL AND STOPPED AT 12 INCHES FROM EACH THE FINAL LOCATION WILL BE BASED ON FIELD CONDITIONS AT THE TIME OF CONSTRUCTION.GENERAL REQUIREMENTS ARE PROVIDED BELOW.THE sodN lP FULL REQUIREMENTS OF THE DIVERSION AND DEWATERING PLANd, 71 END OF THE ROLLS. ARE SPECIFIED IN THE PROJECT TECHNICAL SPECIFICATIONS AND PERMIT CONDITIONS. ! 3.FIBER ROLLS SHALL BE PLACED 10 FEET APART ALONG THE SLOPE FOR SLOPE INCLINATION OF 2H:1V AND STEEPER,AND 15 FEET APART ALONG 1. GENERAL THE SLOPE FOR SLOPE INCLINATION BETWEEN SH:IV AND 411:1V. 1.1. DEWATER THE PROJECT SITE AS REQUIRED TO FACILITATE IN-STREAM CONSTRUCTOR AND REDUCE POTENTIAL IMPACTS TO WATER QUALITY i 4.THE BEDDING AREA FOR THE FIBER ROLL SHALL BE CLEARED OF OBSTRUCTIONS INCLUDING ROCKS,CLODS,AND DEBRIS GREATER THAN ONE INCH IN DOWNSTREAM OF THE PROJECT SITE. DIAMETER BEFORE INSTALLATION. 1.2. CONFIRM THAT A FAVORABLE LONG TERM WEATHER FORECAST(1 WEEK,MIN)IS OBSERVED PRIOR TO PLACEMENT OF DIVERSION STRUCTURES. 5.FIBER ROLLS SHALL BE INSTALLED APPROXIMATELY PARALLEL TO THE SLOPE CONTOUR AND THE TERMINUS OF ROWS SHALL BE ANGLED UP-SLOPE T.S. PRIOR TO PLACEMENT OF DIVERSION STRUCTURE,REMOVE FISH FROM THE PROJECT REACH,IN ACCORDANCE WITH SECTION 2. N.3 AT 45 DEGREES FOR A DISTANCE OF THREE FEET WHERE FIBER ROLLS MEET,PROVIDE AN OVERLAP OF TWO FEET,WITH ADJACENT ROLLS TIGHTLY i.q. DIVERT FLOW ONLY WHEN THE DIVERSION CONSTRUCTION IS OTHERWISE COMPLETE.FOLLOWING ENGINEER'S APPROVAL OF THE COMPLETED ABUTTINGEROLLS EACH OTHER. WORK,REMOVE DIVERSION BEGINNING AT THE DOWNSTREAM LIMIT,IN AN UPSTREAM DIRECTION. t 6.FIBER ROLLS HALLL BE INSTALLED VER B SEEDING WHERE USED WHEREEHSLT ELOPE ECTTN AN FABRIC. J.FIBER ROLL SHALL BE INSTALLED OVER FABRIC(AFTER SEEDING) SLOPE PROTECTION FABRIC IS TO BE INSTALLED. 2. FISH REMOVAL LL 2.1. COORDINATE WITH CREEK LANDS FOR THE REMOVAL OF FISH AND OTHER AQUATIC ORGANISMS FROM THE PROJECT AREA BY A OUPIIFIED O FISHERIES BIOLOGIST,AUTHORIZED i0 PERFORM SUCH ACTIVITIES BY THE NATIONAL MARINE FISHERIES SERVICE AND THE CALIFORNIA r DEPARTMENT OF FISH AND WILDLIFE.(NIC) N 2.2. BLOCK NETS WILL BE PROVIDED AND INSTALLED BY THE FISHERIES BIOLOGIST.BLOCK NETS SHALL BE MAINTAINED BY THE CONTRACTOR BOTH W Z UPSTREAM AND DOWNSTREAM OF THE DIVERSION,THROUGHOUT THE PERIOD OF CONSTRUCTION.MAINTENANCE INCLUDES PERIODIC REMOVAL OFO ACCUMULATED DEBRIS,AS NECESSARY TO ENSURE FUNCTION. BLOCK NETS SHALL BE REMOVED BY THE FISHERIES BIOLOGIST AFTER THE W z P DIVERSION IS REMOVED AND THE IN CHANNEL WORK AREA IS RE-WATERED, Q Q 3, DIVERSION SYSTEM W J> I� 3.1. INSTALL A SEALED.TEMPORARY DIVERSION DAM CONSTRUCTED USING SAND BAGS FILLED WITH CLEAN WASHED PEA GRAVEL THE DAM AND 16 SLOPE PROTECTION FABRIC METHOD OF SEALING SHALL BE PLACED AT AN APPROPRIATE DEPTH TO CAPTURE SUBSURFACE STREAM FLOW,AS NEEDED TO DEWATER THE F W -I STREAMBED.THE USE OF SAND WILL NOT BE ALLOWED,NO OTHER DIVERSION METHOD SHALL BE USED WITHOUT AUTHORIZATION OF THE a W Z op Ya"ROPE ENGINEER.IF AN ALTERNATE DIVERSION METHOD IS PREFERRED BY THE CONTRACTOR,THE CONTRACTOR SHALL SUBMIT A PLAN TO THE 0 6' \\ \` ENGINEER FOR APPROVAL,DETAILING THE DESIRED DIVERSION METHOD. W Ir O 9"STRAW WATTLE,"EARTH SAVER 3.2. THE DIVERSION STRUCTURE SHALL BE CONSTRUCTED ASE SHOWN ON THE DRAWINGS,OR AS DIRECTED BY THE ENGINEER IN THE FIELD. Q 0 U \ _ BIODEGRADABLE RICE STRAW 3.3. IN THE EVENT OF A SIGNIFICANT STORM FORECAST,THE CONTRACTOR SHALL BE PREPARED TO TAKE NECESSARY MEASURES TO ENSURE SAFE �.•�., WATTLE"OR APPROVED EQUIVALENT PASSAGE OF STORM WATER FLOW THROUGH THE PROJECT AREA,WITHOUT DAMAGE TO EXISTING STRUCTURES,OR INTRODUCTON OF EXCESSIVE W SEDIMENT THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY EROSION CONTROL B M.PBS. Q ANCHOR TRENCH 3.4. THE DIVERSION SHALL BE CAPABLE OF CONVEYING ANTICIPATED FLOWRATES WITH LESS THAN 6 INCHES OF HEAD OVER THE TOP OF PIPE AT (TM) THE INLET.AND SHALL BEA MINIMUM DIAMETER OF 10",WITH A MANNING'S ROUGHNESS NOT EXCEEDING.012. "' y"6,uI (I ry/ \ 4. DEWATERING OF CONSTRUCTOR AREAS _I 1811/7'/" \ 4.1. THE CONTRACTOR SHALL SUPPLY ALL NECESSARY PUMPS,PIPING,FILTERS,SHORING,AND OTHER TOOLS AND MATERIALS NECESSARY FOR 6,4 -- 6 DEWATERING.IF A PUMPED SYSTEM IS RELIED UPON TO ENSURE DOWNSTREAM WATER DUALITY,A BACKUP PUMP OF EQUAL CAPACITY SHALL BE PROVIDED AT ALL TIMES AND THE PUMP MUST BE CONTINUOUSLY MONITORED. A.D. DEWATERING ACTIVITIES WHICH MAY BE REQUIRED FOR CONSTRUCTION PURPOSES SHALL COMPLY WITH WATER QUALITY STANDARDS ISSUED BY CO THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD. J 4.3. DISCHARGE OF WATER FROM THE DEWATERED CONSTRUCTION SITE,EITHER BY GRAN.OR PUMPING,SHALL BE PERFORMED INA MANNER Q INSTALL 1"%2"X24"WOODEN STAKES,AT 4 FT. THAT PREVENTS EXCESSIVE TURBIDITY FROM ENTERING THE RECEIVING WATERWAYS AND PREVENTS SCOUR AND EROSION OUTSIDE OF THE O.C.STAGGERED EITHER SIDE.RUN TWINE CONSTRUCTOR SITE. PUMPED WATER SHOULD BE PRE-FILTERED WITH A GRAVEL PACK AROUND SUMPS FOR SUBSURFACE FLOWS AND A SILT W DIAGONALLY BETWEEN STAKES FROM SIDE TO SIDE. FENCE AROUND PUMPS FOR SURFACE FLOW. PUMPED WATER SHALL BE DISCHARGED INTO ISOLATED LOCAL DEPRESSIONS,FILTER BAGS. PLACE STAKES IN PAWS AT JOINTS,PER SETTLING(BAKER)TANKS,OR TEMPORARY SEDIMENT BASINS,AS NECESSARY TO MEET WATER QUALITY REQUIREMENTS. WHERE WATER TO BE 0 CALTRANS STANDARD SC-5,TYPE 2 INSTALLATION. DISCHARGED INTO THE CREEK WILL CREATE EXCESSIVE TURBIDITY,THE WATER SHALL BE ROUTED THROUGH A SEDIMENT INTERCEPTOR OR OTHER FACILITIES i0 REMOVE SEDIMENT FROM WATER. SLOPE PROTECTION AND FIBER ROLL DETAIL 3 SCALE 1"=1' C3,C49 W F 0 O W C7W0< O< PLACE SANDBAG WEIGHTS ON W Q I- FIBER ROLL(PUCE AT ENDS 0 d AND 4-FT O.C.STAGGERED) STEEL OR Z H TIMBER POST SAVERBIODEGRADABLE 8"0 FIBER ROLL, TH �f1 0 w-W CO RICE STRAW WATTLE'OR ORANGE PLASM FENCE OASO0OA0O6././..././../........?K • N 'K I 0 W CO APPROVED EQUAL 0�0000 •• iYTn 1 O 0- GROUND 800'.00®0. ffiJ�J•'1i1; }U W O EXISTING ASPHALT �PAO SURFACE NO 0 O PAVEMENT <� W ****00�*®OOf{f}ff}f{fOOOI,f0 •O®0 iP.li OA.n_A9_ii_i!f}fhAA i':.:N� cc cc o_ ����� ,,e' 16",MN. fn) e'Max * Q DESIGNED BY: MWW DRAWN BY: BMZ CHECKED BY: NM/ ESA FENCE DETAILn DATE: 1/23/23 FIBER ROLL ON PAVEMENT SCALE 1"=4' C3,C4C HOB No.: TT-580 BAR IS ONE INCH ON ORIGINAL DRAWING, ADJUST SCALES FOR REDUCED PLOTS 0®I" 8 C8 OF 8 OFFICIAL CERTIFICATION I, JESSICA MATSON, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 5339 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 12th day of December, 2023. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 16th day of December, 2023. JESSICA MATSON, CITY CLERK