HomeMy WebLinkAboutR 2025-005 RESOLUTION NO. 2025-005
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ARROYO GRANDE APPROVING THE ANNUAL
ADJUSTMENT OF SEWER CONNECTION FEES TO
INCREASE FEES BY 1.6% CONSISTENT WITH THE
ENGINEERING NEWS RECORD CONSTRUCTION COST
INDEX
WHEREAS, the City Council adopted Ordinance No. 528 C.S. amending Section
13.12.190 of the Municipal Code regarding sewer connection fees; and
WHEREAS, pursuant to Section 13.12.190, the City Council may by Resolution
establish the amount of the sewer connection fees; and
WHEREAS, Resolution No. 4507 authorizes an annual adjustment in the sewer
connection fees based on the changes in the annual average Engineering News Record
(ENR) Construction Cost Index (CCI).
WHEREAS, it is determined that an increase of 1 .6% of the ENR CCI has been
calculated to warrant an adjustment to the City sewer connection fees, effective
February 18, 2025.
NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo
Grande hereby implements the CCI increase to the sewer connection fees set forth in
Exhibit "A" attached hereto and incorporated herein by this reference as though set forth
in full. The adjusted sewer connection fees shall take effect on February 18, 2025.
On motion of Council Member Guthrie, seconded by Council Member Loe, and on the
following roll call vote, to wit:
AYES: Council Members Guthrie, Loe, Maraviglia, Secrest, and Mayor Ray Russom
NOES: None
ABSENT: None
The foregoing Resolution was passed and adopted this 28th day of January, 2025.
RESOLUTION NO. 2025-005
PAGE 2
O
_/.1k42iiiilt, i
CAREN RAY !SSOM, MAYOR
ATTEST:
( 23,_4.4.j.....c_e.._(„1„..... 4...,
J SICA MATSON, CITY CLERK
APPROVED AS TO CONTENT:
7- 7
MATTHEW DOWNING, CITY MANAGER
APPROVED AS TO FORM:
Pz.":77
ISAAC ROSEN, CITY ATTORNEY
RESOLUTION NO. 2025-005
PAGE 3
EXHIBIT A
SEWER CONNECTION FEES
EFFECTIVE 2/18/2025
For each connection of a building sewer to a public sewer,a connection fee shall be collected
by the City before the permit for the connection work is issued. The amount of the fee
collected is as follows:
Connection Fee
2021 2022 2023 2024 2025
ENR Index 11455 12133 13007 13358 13358
Residential-per dwelling unit
Single Family $ 1,445 $ 1,530 $ 1,640 $ 1,667 $ 1,693
Multifamily(a) 1,071 1,135 1,216 1,236 1,256
Trailer Park/Mobile Home 1,185 1,255 1,346 1,367 1,389
Non-Residential-per water meter size (b)
5/8 inch $ 1,445 $ 1,530 $ 1,640 $ 1,667 $ 1,693
3/4 inch 2,166 2,295 2,460 2,499 2,539
1 inch 3,615 3,829 4,105 4,171 4,238
1 1/2 inch 7,231 7,659 8,210 8,342 8,475
2 inch 11,569 12,254 13,137 13,347 13,560
3 inch 21,694 22,978 24,633 25,027 25,427
4 inch 36,157 38,298 41,055 41,712 42,379
6 inch 72,313 76,594 82,108 83,422 84,757
8 inch 144,627 153,189 164,219 166,846 169,516
10 inch 216,940 229,783 246,327 250,268 254,272
12 inch 318,177 337,014 361,278 367,059 372,932
(a)Multifamily includes duplex,triplex, apartments,and condominiums
(b)For meter sizes larger than shown,connection fee determined based on the ratio of the
maximum safe operating capacity of the meter to that of a 5/8 inch meter.
The connection fees shall be increased each year with the annual percentage increase of the
annual average ENR Construction Cost Index as established in the Engineering News Record
Adjustment Formula:
Adjusted Fee =(Current Fee)x(Current Year ENR index)/(Prior Year ENR index)
Adjusted Fee =(Current Fee)x(13571)/(13358)
OFFICIAL CERTIFICATION
I, JESSICA MATSON, City Clerk of the City of Arroyo Grande, County of San Luis
Obispo, State of California, do hereby certify under penalty of perjury, that the attached
Resolution No. 2025-005 was passed and adopted at a regular meeting of the City
Council of the City of Arroyo Grande on the 28th day of January, 2025.
WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 30th day of
January, 2025.
J SICA MATSON, CITY CLERK