Loading...
HomeMy WebLinkAboutR 2025-005 RESOLUTION NO. 2025-005 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE APPROVING THE ANNUAL ADJUSTMENT OF SEWER CONNECTION FEES TO INCREASE FEES BY 1.6% CONSISTENT WITH THE ENGINEERING NEWS RECORD CONSTRUCTION COST INDEX WHEREAS, the City Council adopted Ordinance No. 528 C.S. amending Section 13.12.190 of the Municipal Code regarding sewer connection fees; and WHEREAS, pursuant to Section 13.12.190, the City Council may by Resolution establish the amount of the sewer connection fees; and WHEREAS, Resolution No. 4507 authorizes an annual adjustment in the sewer connection fees based on the changes in the annual average Engineering News Record (ENR) Construction Cost Index (CCI). WHEREAS, it is determined that an increase of 1 .6% of the ENR CCI has been calculated to warrant an adjustment to the City sewer connection fees, effective February 18, 2025. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo Grande hereby implements the CCI increase to the sewer connection fees set forth in Exhibit "A" attached hereto and incorporated herein by this reference as though set forth in full. The adjusted sewer connection fees shall take effect on February 18, 2025. On motion of Council Member Guthrie, seconded by Council Member Loe, and on the following roll call vote, to wit: AYES: Council Members Guthrie, Loe, Maraviglia, Secrest, and Mayor Ray Russom NOES: None ABSENT: None The foregoing Resolution was passed and adopted this 28th day of January, 2025. RESOLUTION NO. 2025-005 PAGE 2 O _/.1k42iiiilt, i CAREN RAY !SSOM, MAYOR ATTEST: ( 23,_4.4.j.....c_e.._(„1„..... 4..., J SICA MATSON, CITY CLERK APPROVED AS TO CONTENT: 7- 7 MATTHEW DOWNING, CITY MANAGER APPROVED AS TO FORM: Pz.":77 ISAAC ROSEN, CITY ATTORNEY RESOLUTION NO. 2025-005 PAGE 3 EXHIBIT A SEWER CONNECTION FEES EFFECTIVE 2/18/2025 For each connection of a building sewer to a public sewer,a connection fee shall be collected by the City before the permit for the connection work is issued. The amount of the fee collected is as follows: Connection Fee 2021 2022 2023 2024 2025 ENR Index 11455 12133 13007 13358 13358 Residential-per dwelling unit Single Family $ 1,445 $ 1,530 $ 1,640 $ 1,667 $ 1,693 Multifamily(a) 1,071 1,135 1,216 1,236 1,256 Trailer Park/Mobile Home 1,185 1,255 1,346 1,367 1,389 Non-Residential-per water meter size (b) 5/8 inch $ 1,445 $ 1,530 $ 1,640 $ 1,667 $ 1,693 3/4 inch 2,166 2,295 2,460 2,499 2,539 1 inch 3,615 3,829 4,105 4,171 4,238 1 1/2 inch 7,231 7,659 8,210 8,342 8,475 2 inch 11,569 12,254 13,137 13,347 13,560 3 inch 21,694 22,978 24,633 25,027 25,427 4 inch 36,157 38,298 41,055 41,712 42,379 6 inch 72,313 76,594 82,108 83,422 84,757 8 inch 144,627 153,189 164,219 166,846 169,516 10 inch 216,940 229,783 246,327 250,268 254,272 12 inch 318,177 337,014 361,278 367,059 372,932 (a)Multifamily includes duplex,triplex, apartments,and condominiums (b)For meter sizes larger than shown,connection fee determined based on the ratio of the maximum safe operating capacity of the meter to that of a 5/8 inch meter. The connection fees shall be increased each year with the annual percentage increase of the annual average ENR Construction Cost Index as established in the Engineering News Record Adjustment Formula: Adjusted Fee =(Current Fee)x(Current Year ENR index)/(Prior Year ENR index) Adjusted Fee =(Current Fee)x(13571)/(13358) OFFICIAL CERTIFICATION I, JESSICA MATSON, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 2025-005 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 28th day of January, 2025. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 30th day of January, 2025. J SICA MATSON, CITY CLERK