HomeMy WebLinkAboutCC 2025-10-14_09e Offer of Dedication 151 S Elm StreetItem 9.e.
MEMORANDUM
TO: City Council
FROM: Bill Robeson, Assistant City Manager/Director of Public Works
BY: Shannon Sweeney, City Engineer
SUBJECT: Offer of Dedication, Frontage at 151 South Elm Street
DATE: October 14, 2025
RECOMMENDATION:
1) Adopt a Resolution accepting the Offer of Dedication for an easement for public right -
of-way along the frontage of 151 South Elm Street for public purposes to fill in a sidewalk
gap on the east side of South Elm Street between Sunset Drive and Poplar Street; and
2) Find that the action is not a project subject to the California Environmental Quality Act
(“CEQA”) because it has no potential to result in either a direct, or reasonably foreseeable
indirect, physical change in the environment. (State CEQA Guidelines, §§ 15060,
subd.(c)(2)-(3), 15378.) or alternatively, that it is exempt from CEQA pursuant to CEQA
Guidelines section 15061(b)(3) (the “common sense exception”).
IMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
The Offer of Dedication has no financial impact, other than the cost of construction of the
curb gutter and sidewalk (CG&SW).
The estimated cost to complete the curb, gutter, and sidewalk to fill in the sidewalk gap
at 151 South Elm Street (approximately 60 feet), is $25,000, which will be paid for from
the $500,000 in the FY 2025-26 budget for the Sidewalk Repairs and Improvements
Capital Improvement Project (CIP) and funded through Measure E -24 sales tax funds.
For economy of scale/cost efficiency and ease of project management, this work is being
designed and scheduled for completion along with the $340,560 Highway Safety
Improvement Program grant funds slated for pedestrian improvements on East Bra nch
Street east of Mason Street and across Huasna Road in front of Strother Park.
BACKGROUND:
Due to the current sidewalk gap at 151 South Elm Street, the City plans to install a new
concrete curb, gutter, and sidewalk in the right-of-way to fill in the gap. This new CG&SW
will connect to the existing CG&SW to the south of this property and to a new segment of
Page 160 of 353
Item 9.e.
City Council
Offer of Dedication, Frontage at 151 South Elm Street
October 14, 2025
Page 2
CG&SW to the north that will continue up South Elm Street to Sunset Drive. The new
CG&SW up South Elm to Sunset Drive did not require an Offer of Dedication but will be
installed at the same time.
The 151 South Elm Street Offer of Dedication for the easement being offered includes an
approximate 90.00-foot by 35.00-foot area of the property frontage. The 151 South Elm
Street ‘IRREVOCABLE AND PERPETUAL OFFER TO DEDICATE’ is included in
Attachment 2, which also includes a survey map of the offered property. The hatched
area on the survey map shows the area of dedication. This area extends out to the
centerline of South Elm Street and was not properly acquired when the street was
originally aligned, nor when the original pavement was installed. Staff is correcting this
oversight with this Offer of Dedication, which the property owner fully supports. The
exchange of property will allow for the City to install new CG&SW, and a new driveway
apron.
This Offer of Dedication includes a portion of already-improved asphalt roadway to the
original centerline of South Elm Street. Accepting this Offer of Dedication adjusts the
property line to behind the sidewalk, which is the appropriate location to differentiate right-
of-way from private property. The red highlighted line on the aerial photo shows the extent
of the new sidewalk CG&SW for the frontage of 151 and for context, the green highlighted
line shows the segment of CG&SW up South Elm Street to Sunset Drive.
The 2025 Active Transportation Plan1 (ATP) recommend 72 pedestrian enhancements.
One of those recommendations is infilling this sidewalk gap on Elm Street from Poplar
1 https://www.arroyogrande.org/DocumentCenter/View/13337/Active-Transportation-Plan?bidId=
NORTH
Page 161 of 353
Item 9.e.
City Council
Offer of Dedication, Frontage at 151 South Elm Street
October 14, 2025
Page 3
Street to Sunset Drive. On August 26, 20252, the City Council provided input on the City’s
Sidewalk Management Program and supported the use of the Sidewalk Repairs and
Improvements. CIP funding for the infill of sidewalk gaps identified in the ATP.
ANALYSIS OF ISSUES:
The Offer of Dedication for the segment of street frontage along 151 South Elm is required
to allow the City to install CG&SW and connect sidewalk gaps. The connection of sidewalk
gaps was a priority direction to staff when the City Council considered the 2025 Annual
Sidewalk Management Program. This connection and infill encourage pedestrian travel,
allowing pedestrians to use the City’s sidewalk system safely.
The City requires this Offer of Dedication to meet sidewalk width requirements. If this offer
is not accepted, this sidewalk will not align with adjacent sidewalk or will not meet
standard sidewalk width.
ALTERNATIVES:
1. Adopt a Resolution accepting the Offer of Dedication for an easement for a public
right-of-way along the frontage of 151 South Elm Street;
2. Do not approve staff’s recommendations and request further inf ormation;
3. Modify staff’s recommendation and approve; or
4. Provide direction to staff.
ADVANTAGES:
Accepting this Offer of Dedication provides the City the property necessary to construct
the curb, gutter, and sidewalk to fill in a sidewalk gap identified in the City’s ATP and
create a safer and more aesthetic pathway for pedestrian travel.
DISADVANTAGES:
None identified.
ENVIRONMENTAL REVIEW:
This action is not a project subject to the California Environmental Quality Act (“CEQA”)
because it has no potential to result in either a direct, or reasonably foreseeable indirect,
physical change in the environment. (State CEQA Guidelines, §§ 15060, subd.(c)(2)-(3),
15378.) or alternatively, that it is exempt from CEQA pursuant to CEQA Guidelines
section 15061(b)(3) (the “common sense exception”).
PUBLIC NOTIFICATION AND COMMENTS:
The Agenda was posted at City Hall and on the City’s website in accordance wit h
Government Code Section 54954.2.
2 https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=6e7c7c76-fee2-401c-8aa3-
090ededae737&Agenda=Agenda&lang=English&Item=40&Tab=attachments
Page 162 of 353
Item 9.e.
City Council
Offer of Dedication, Frontage at 151 South Elm Street
October 14, 2025
Page 4
ATTACHMENTS:
1. Resolution
2. Offer of Dedication for 151 South Elm Street
Page 163 of 353
ATTACHMENT 1
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO
ACCEPTING AN OFFER OF DEDICATION OF FRONTAGE AT 151 ELM
STREET FOR PUBLIC PURPOSES TO FILL IN A SIDEWALK GAP ON
EAST SIDE OF SOUTH ELM STREET BETWEEN SUNSET DRIVE AND
POPLAR STREET
WHEREAS, the Active Transportation Plan (ATP) identified multiple sidewalk gaps in
need of infill, one of which exists on the east side of South Elm Street between Sunset
Drive and Poplar Street; and
WHEREAS, on August 26, 2025, City Council supported the infill of sidewalk gaps
identified in the ATP using Sidewalk Repairs and Improvements Capital Improvement
Project funding; and
WHEREAS, during design, the need for additional right-of-way along the frontage of APN
007-171-001 at 151 South Elm Street was identified; and
WHEREAS, the property owner of APN 007-171-001 at 151 South Elm Street has agreed
to offer the necessary land for additional right-of-way for public purposes, with no financial
impact to the City, as shown in the “Offer of Dedication for 151 South Elm Street” provided
in Attachment 2 to the Staff Report dated October 14, 2025, subject line “Offer of
Dedication, Frontage at 151 South Elm Street” and on file with the City Clerk. Both the
Staff Report and Offer of Dedication for 151 Elm Street are incorporated herein by this
reference; and
WHEREAS , all legal prerequisites to the adoption of this Resolution have occurred.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Arroyo Grande
that:
1. All recitals above are true and correct and incorporated herein.
2. The City Council of the City of Arroyo Grande finds that acceptance of the Offer of
Dedication for 151 South Elm Street is not a project subject to the California
Page 164 of 353
65501.00014\44272638.2
RESOLUTION NO.
PAGE
Environmental Quality Act (“CEQA”) because it has no potential to result in either
a direct, or reasonably foreseeable indirect, physical change in the environment.
(State CEQA Guidelines, §§ 15060, subd.(c)(2)-(3), 15378.) or alternatively, that it
is exempt from CEQA pursuant to CEQA Guidelines section 15061(b)(3) (the
“common sense exception”).
3. The City Council of the City of Arroyo Grande does hereby accept the Offer of
Dedication for 151 South Elm Street, for the property described on Exhibit “A” (the
“Property”), attached and incorporated herein by reference.
4. The City Manager or his designee is hereby authorized to take any actions
necessary or incidental to effect the purposes of this Resolution.
5. This Resolution shall take effect immediately upon adoption.
On motion of Council Member , seconded by Council Member ,
and on the following roll call vote, to wit:
AYES:
NOES:
ABSENT:
the foregoing Resolution was passed and adopted this 14th day of October, 2025.
Page 165 of 353
65501.00014\44272638.2
RESOLUTION NO.
PAGE
___________________________________
CAREN RAY RUSSOM, MAYOR
ATTEST:
___________________________________
JESSICA MATSON, CITY CLERK
APPROVED AS TO CONTENT:
___________________________________
MATTHEW DOWNING, CITY MANAGER
APPROVED AS TO FORM:
____________________________________
ISAAC ROSEN, CITY ATTORNEY
Page 166 of 353
65501.00014\44272638.2
RESOLUTION NO.
PAGE
EXHIBIT “A”
Legal Description
Page 167 of 353
65501.00014\44272638.2
RESOLUTION NO.
PAGE
EXHIBIT B
Depiction of Parcel
(for reference purposes)
Page 168 of 353
ATTACHMENT 2
Page 169 of 353
Page 170 of 353
Page 171 of 353
Page 172 of 353
Page 173 of 353
Page 174 of 353