Loading...
HomeMy WebLinkAboutR 2026-00665501.00015\42788974.6 RESOLUTION NO. 2026-006 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE AUTHORIZING THE CITY MANAGER TO EXECUTE A CONSTRUCTION CONTRACT FOR THE 2026 PEDESTRIAN IMPROVEMENTS PROJECT (PW 2025-19) TO V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS INC. WHEREAS, longstanding pedestrian safety concerns along East Branch Street from Mason Street to Huasna Road, and on Husana Road near Strother Park, were documented in multiple City safety planning documents and the San Luis Obispo Council of Governments (SLOCOG) Regional Road Safety Action Plan; and WHEREAS, a sidewalk gap on Elm Street south of Sunset Drive was prioritized in the 2025 Active Transportation Plan (ATP) due to safety concerns and a history of a serious injury accident; and WHEREAS, sidewalk deficiencies, including displacements greater than three inches, were evaluated and prioritized in the City’s 2025 Sidewalk Management Program; and WHEREAS, on December 11, 2025, the City solicited bids for the 2026 Pedestrian Improvements Project to address the pedestrian and safety concerns described above; and WHEREAS, six bids were received by the bid opening deadline of 2:00 pm on January 7, 2026, and the lowest bid was submitted by V. Lopez Jr. & Sons General Engineering Contractors Inc.; and WHEREAS, funding for this project, consisting of a Highway Safety Improvement Program (HSIP) grant award and City budgeted funds from Fiscal Years 24 -25 and 25-26, is sufficient to complete the Base Bid, Bid Alternate 1 and Bid Alternate 2; and WHEREAS, staff recommends awarding the construction contract to V. Lopez Jr. & Sons General Engineering Contractors Inc. for the Base Bid, Bid Alternate 1, and Bid Alternate 2; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Arroyo Grande, as follows: 1. RECITALS. The foregoing recitals are true and correct and are incorporated herein. 2. BID AWARD. The City Council authorizes the City Manager or designee to execute a construction contract for the 2026 Pedestrian Improvements Project 65501.00015\42788974.6 RESOLUTION NO. 2026-006 PAGE 2 (PW 2025-19) to V. Lopez & Sons General Engineering Contractors Inc. for $771,594.35 subject to any minor, technical, or non-substantive changes as approved by the City Manager in consultation with the City Attorney , and to approve change orders of 20% of the contract amount, $154,318.87, for unanticipated costs and additional sidewalk repairs during the construction phase of this Project. The City Council incorporates the analysis of the Staff Report dated January 27, 2026, accompanying this item, as part of the passage of this Resolution. 3. CEQA FINDINGS. categorically exempt from the California Environmental Quality Act (“CEQA”) under Sections 15301 (Class 1 – Existing Facilities) and 15303 (Class 3 – New Construction of Small Facilities), as it consists of repair and minor alteration of existing public fa cilities and construction of small pedestrian and traffic safety improvements within the existing public right -of- way, with no expansion of use beyond existing conditions. On motion of Council Member Maraviglia seconded by Council Member Secrest, and on the following roll call vote, to wit: AYES: Council Members Maraviglia, Secrest, Loe, and Mayor Ray Russom NOES: None ABSENT: Council Member Guthrie The foregoing Resolution was passed and adopted this 27th day of January, 2026. CAREN RAY RUSSOM, MAYOR ATTEST: JESSICA MATSON, CITY CLERK APPROVED AS TO CONTENT: MATTHEW DOWNING, CITY MANAGER APPROVED AS TO FORM: ISAAC ROSEN, CITY ATTORNEY RESOLUTION NO. 2026-006 PAGE 3 65501.00015\42788974.6 RESOLUTION NO. 2026-006 PAGE 4 Exhibit A License: Class A 372751 DIR#:1000004631 Addendum:Yes Bid Bond:Yes No. SS(1)Description Estimated Quantity Unit Unit Cost Total Cost 1 77 Mobilization, Pothole, Demobilization and Cleanup 1 LS $18,000.00 $18,000.00 2 77 Sheeting, Shoring, Bracing, Shielding and Excavation Safety Measures 1 LS $6,000.00 $6,000.00 3 7, 12 Traffic Control 1 LS $35,000.00 $35,000.00 4 13 Water Pollution Control Plan 1 LS $3,000.00 $3,000.00 5 77 6" C900 PVC Waterline 221 LF $180.00 $39,780.00 6 77 8" C900 PVC Waterline 296 LF $190.00 $56,240.00 7 77 8" Waterline Tie-in at Wesley St & W Branch St 1 LS $14,000.00 $14,000.00 8 77 Larchmont Drive & Wesley Street Lowering & Connection 1 LS $13,000.00 $13,000.00 9 77 6" Waterline Tie-in at Vernon St & W Branch St (special order hot tap sleeve per plan)1 LS $13,000.00 $13,000.00 10 77 Connection on Vernon Street to Existing 6" ACP 1 LS $10,000.00 $10,000.00 11 77 Install Air & Vacuum Relief Valve Assembly 1 EA $7,000.00 $7,000.00 12 77 Install Fire Hydrant Assembly (hydrant provided by City) & Blue Reflector 1 EA $14,000.00 $14,000.00 13 77 Reconnect Fire Hydrant Assembly in Street 1 EA $8,500.00 $8,500.00 14 77 Reconnect Double Check Detector w/ FDC in Street 1 LS $8,500.00 $8,500.00 15 73, 77 Reconnect Water Service Manifold in Street 1 LS $8,000.00 $8,000.00 16 73, 77 Reconnect 1" Water Services in Street 2 EA $2,500.00 $5,000.00 17 73, 77 Reconnect 2" Water Services in Street 1 EA $4,000.00 $4,000.00 18 73, 77 1.5"-2" Water Service Replacement & Sidewalk Repairs 1 EA $12,000.00 $12,000.00 19 73, 77 1" Water Service Replacement in Unpaved 1 EA $5,500.00 $5,500.00 20 77 Disinfection & Pressure Testing of Piping 517 LF $12.00 $6,204.00 21 77 Abandonment, Cap and Demolition of Existing Water Lines & Valves 1 LS $9,000.00 $9,000.00 22 77 Remove Fire Hydrant Assembly & Abandon 1 EA $1,500.00 $1,500.00 23 39, 77, 84 Pavement Trench Repair (allowance)51 TON $700.00 $35,700.00 24 39, 77, 84 Pavement Stencil (allowance)1 LS $2,000.00 $2,000.00 25 39, 77, 85 Red Curb Paint (allowance)60 LF $10.00 $600.00 $335,524.00 BASE BID R. Baker, Inc. P.O. Box 419 Arroyo Grande, CA 93421 BASE BID: No. Description Unit Unit Cost Quantity Total Cost Quantity Total Cost 1 Replace 1" Galvanized Water Service with Brass & PVC per City Standard 6210, average 20 LF length, including meter box (OldCastle Fibrelyte FL12)EA $3,300.00 164 $541,200.00 66 $217,800.00 2 Replace and Reconnect Meter Boxes (OldCastle Fibrelyte FL12) on a shared water service EA $2,400.00 24 $57,600.00 7 $16,800.00 3 Concrete pad and sidewalk repair around meter boxes, estimated 20 SF per service, per City Std. 4110 SF $47.50 3280 $155,800.00 1320 $62,700.00 $754,600.00 $297,300.00 REVISEDBID ALTERNATE 1 ORIGINAL OFFICIAL CERTIFICATION I, JESSICA MATSON, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 2026-006 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 27th day of January, 2026. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 3rd day of February, 2026. JESSICA MATSON, CITY CLERK