Loading...
HomeMy WebLinkAbout2026-007241 2026007241 Elaina Cano San Luis Obispo - County Clerk-Recorder 03/10/2026 04:39 PM Recorded at the request of PUBLIC Titles: 1 Pages: 18 RECORDING REQUESTED BY: Fees: $65.00 City of Arroyo Grande Taxes:Total: $0.000 Community Development Department szeniciiirituil WHEN RECORDED,PLEASE RETURN TO (SYSTEM OWNER ADDRESS) CITY OF ARROYO GRANDE CITY CLERK 300 EAST BRANCH STREET ARROYO GRANDE,CA 93420 AGREEMENT Private Stormwater Management System Operation and Maintenance And Right of Entry SWP Case#: SWP23-000031 (From Community Development Department) Property Address: 951 E. GRAND AVENUE,ARROYO GRANDE (Street No. &Street Name, City) Property APN:077-223-005 Building Permit#: BLD23-000580 Project Description (hereinafter referred to as "Project'): TWO-STORY,MIXED-USE BUILDING CONSISTING OF STORAGE SPACE ON THE GROUND FLOOR AND THREE CONDOMINIUM UNITS ON THE UPPER FLOOR. Legal Description: Refer to Exhibit A, attached hereto System Description: Refer to Exhibit B, attached hereto This Private Stormwater Management Facilities Operation and. Maintenance Agreement and Right of Entry ("Agreement") is made and e r this Z 3 day of , 20 2 6 , by and between� � 7 ✓lrG C (hereinafter referred to as "Property Owner") and the City of Arroyo Grande, located in the State of California, (hereinafter referred to as "City"). The Property Owner and City are individually referred to herein as a "party" and collectively as the "parties." This Agreement is made in accordance with existing codes and regulations and in accordance with the approved Project plans and specifications (hereinafter collectively referred to as "Plans") with respect to the following recitals: City of Arroyo Grande Page of UPDATED 17/30/2018 RECITALS The undersigned Property Owner of the real property referenced above, hereby covenants with City to utilize on-site stormwater management systems (i.e. structural and/or non-structural) to minimize runoff and pollutants in stormwater runoff and to provide permanent storm drainage maintenance to control, manage, retain, treat, infiltrate and dispose of (1) on-site storm drainage for the Project and (2) ancillary street and site drainage from the adjoining street and sites, as stipulated in the Plans and in the Private Stormwater Operations and Maintenance Manual on file at the City (hereinafter referred to as "Manual"). The storm drainage improvements shown and described in Exhibit B are hereinafter referred to as the "System." Property Owner is solely responsible for adhering to the requirements set forth in the Plans and Manual and agrees to the following conditions in compliance with all local, state, federal laws and regulations and according to the Plans and Manual: 1. MAINTENANCE: Property Owner shall maintain the System as required in the Plans and Manual. 2. MONITORING: Property Owner shall monitor the System as required in the Plans and Manual. 3. INSPECTIONS: Property Owner shall routinely inspect the System as required in the Plans and Manual. 4. CLEANINGS: Property Owner shall routinely clean the System as required in the Plans and Manual. 5. REPAIRS: Property Owner shall repair the System as required in the Plans and Manual. 6. DOCUMENT & REPORT: Property Owner shall document all maintenance, monitoring, inspections, cleanings and repairs made to the System in the annual report submitted to City by June Pt of each year in a format approved by City as detailed in the Plans and Manual.The Annual Stormwater Post-Construction Processing Fee shall be billed to the Property Owner upon receipt and processing of the annual inspection report as established in the City's standard fee schedule. 7. CITY'S RIGHTS & AUTHORITY: Per this Agreement, City has the right and authority to inspect the System to determine compliance (i.e. maintenance, monitoring, inspections, cleanings, repairs, documentation and reporting) which may result in enforcement activities and/or abatement if necessary pursuant to applicable laws and regulations. Property Owner hereby consents to City conducting said inspections between the hours of 8:00 a.m. through 5:00 p.m., Mondays through Fridays. This Agreement shall not be construed as precluding City from conducting inspections, which may be necessary due to an emergency. 8. FAILURE TO MAINTAIN, CLEAN AND/OR REPAIR SYSTEM: Failure to maintain, monitor, inspect, clean, repair, or document and report as required herein shall constitute a public nuisance. The City may remedy such public nuisance through any of the applicable procedures as set forth in the City of Arroyo Grande Municipal Code, and/or may pursue any other legal or equitable remedies to abate such public nuisance. City of Arroyo Grande Page o/ UPDATED 11/30/2018 9. INDEMNIFICATION: Property Owner further agrees to defend, indemnify, protect and hold the City and its agents, officers and employees harmless from and against any and all claims asserted or liability established for damages or injuries to any person or property, including to Property Owner's tenants, guests, invitees, agents or employees, which arise from or are connected with or caused or claimed by the acts or omissions of Property Owner, and its agents, employees or contractors, in performing the obligations specified herein, and all expenses of investigating and defending against same; provided, however, that Property Owner's duty to indemnify and hold harmless all not include any claims or liability arising from the established sole negligence or willful misconduct of the City, its agents, officers or employees. Nothing in this Agreement, City's approval of the subdivision or other applications or plans and specifications, or inspection of the work, is intended to acknowledge responsibility or liability therefor unless otherwise provided by applicable law. 10. BINDING ON FUTURE OWNERS: This covenant shall run with the land and shall be binding upon the undersigned owners, their heirs, executors, administrators, assigns and successors in interest. Any change in property ownership shall result in notification, including new Property Owner contact information, to the City within 30 days the title transfer. 11. RECORDING OF AGREEMENT: This Agreement shall be recorded in the office of the San Luis Obispo County Recorder, and such recordation shall serve as notice of the restrictions and obligations contained herein to be performed and observed by Property Owner and the successors in interest to all or any portion of Property Owner's Property. 12. NOTICES: Any notice, demand, request, consent, approval or communication to Property Owner under this Agreement (hereinafter collectively referred to as "Notices") shall be in writing and either served personally or sent by prepaid, first-class mail to the person and address set forth below. Alternately, Property Owner may elect to have Notices sent by e- mail if indicated below and an e-mail address is provided. Property Owner shall notify City of any change in address, e-mail, or transfer of ownership. Any notice shall be deemed to be effective five calendar days after the date mailed or, if applicable, on the same date the Notice was e-mailed. C�►2�C 0 Pl COT LL &2E'a-nOTD, L L 76 / Vi 4 V,4 uevto System Owner (Printed Name) Owner's Street Address ( w fL 4r( 4r L( C. ?QC, 14 t1.14 (--s 4/Qc ,�.,�i 9IV 26 Business Affiliation and Title Owner'. City/State, Zip Code (if applicable) ate Owner's Email Address: I agree to receive Notices by e-mail: Yes 53 No El City of Arroyo Grande Page of UPDATED 7 7/30/2018 CITY OF ARROYO GR. :. at ew Downing City Manager, City of Arroyo Grande 2/3/zz?�0 Date ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA ) ) ss. COUNTY OF SAN LUIS OBISPO ) On e.-briwl.4 , 2Q,9-(p, before me, ii. (.� [ .1��•� st_� a Notary Public, in for the State of California, personally appeared 1)'tir /J 14.4 , who proved to me on the basis of satisfactory evidence to bPthe person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature = JU' A.NAWKINS gnature of Notary ublic a Notary Public•California - I ti- San Luis Obispo County [SEAL] ` Commission of 2483897 My Comm.Expires Mar 5,2028 City of Arroyo Grande Page of UPDATED 11/30/2018 PERTY O • 23 - 2� S ste caner zgnature) Date fl ext 774 4'c L ystem Owner(Printed Nanze) d'VE Fc.4TC4T LLc p2�'S • Business Affiliation and Title (ifappl cable) ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA ) ) ss. COUNTY OF SAN LUIS OBISPO ) On tl2 1 2432.Lt , 20 , before me,. l(' a Notary Pubic, in and for the State of California, personally appeared e1YoCep,,1, ct'cv,\\ _ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. +�'`'v�, ASHtEY TOSTE COMM. #2441153 < jsf 4 NOTARY PUBLIC-CALIFORNIA �] g � cn Si nature 1 SAN LUIS OBISPO COUNTY � +t � COSNL,..1 My Camm.Expires March 13,2027 (. ignatu e of Notary Public [SEAL] City of Arroyo Grande Page of UPDATED 11/30/2018 • Exhibit A Property Legal Description in Full City ofArroyo Grande Page of UPDATED 77/30/2018 EXHIBIT A LEGAL DESCRIPTION THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OFARROYO GRANDE, COUNTY OFSAN LUIS OBISPO,STATE OF CALIFORNIA AND IS DESCRIBED AS FOLLOWS: PARCEL 1: THAT PORTION OF LOT2 OFTHE FOLSOM TRACT,IN THE CITY OF ARROYO GRANDE, COUNTY OF SAN LUIS OBISPO,STATE OF CALIFORNIA,ACCORDING TO MAP RECORDED SEPTEMBER 26, 1891 IN BOOK B, PAGE 75 OF MAPS,IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING ATA POINT ON THE NORTH LINE OF SAID LOT DISTANT THEREON, SOUTH 89°56'EAST,90 FEET FROM THE NORTHWEST CORNER OF SAID LOT;THENCE SOUTH 0°04'WEST, 160 FEET;THENCE SOUTH 89° 56'EAST,85 FEET;THENCE NORTH 0°04'EAST, 160 FEETTO A POINT ON THE NORTH LINE OF SAID LOT 2;THENCE NORTH 89°56'WEST ALONG THE NORTH LINE OF SAID LOT,85 FEET TO THE POINT OF BEGINNING. PARCEL 2: THAT PORTION OF LOT 2 OFTHE FOLSOM TRACT, IN THE CITY OFARROYO GRANDE, COUNTY OF SAN LUIS OBISPO,STATE OF CALIFORNIA,ACCORDI NG TO MAP RECORDED SEPTEMBER 26, 1891 IN BOOK B, PAGE 75 OF MAPS,IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT POINT ON THE EASTERLY LINE OF SAID LOT2,DISTANT THEREON SOUTH 160 FEET FROM THE NORTHEAST CORNER OF SAID LOT;THENCE NORTH 89°56' WEST, PARALLEL WITH THE SOUTH LINE OF GRAND AVENUE, 185 FEET TO THE TRUE POINT OF BEGINNING;THENCE CONTINUING NORTH 89°56'WEST,85 FEET;THENCE SOUTH 0°09'WEST PARALLEL WITH THE EASTERLY LINE OF LOT 2,50 FEET;THENCE SOUTH 89°56'EAST,85 FEET;THENCE NORTH 0°09'EAST,50 FEET TO THE TRUE POINT OF BEGINNING. Exhibit B Stormwater Management System City of Arroyo Grande Page of UPDATED 11/30/2018 Exhibit B: Structural Best Management Practice (BMP) Description BM P#:23-000031-01 1. Performance Requirement ❑X Water Quality Treatment 0 Runoff Retention ❑ Peak Management Addressed (Performance Requirement (Performance Requirement (Performance Requirement (Check all that apply): #2) #3) #4) Decentralized BMP: D Biofiltration Feature J Bioretention Feature ®Bioswale 0Catch Basin Insert ut Infiltration Feature 2.Type of BMP Installed: Settling Basin 0 Porous Pavement 0 Filtration Device (Check only one): Centralized BMP: ®Bed Filter 0 Detention Basin Dry Basin D Infiltration Basin D Wet Basin 0 Media Filter 0Treatment Vault 3. Location of BMP Location: Onsite 0Offsite Contributing Impervious Area(ft2): 6,784 (Complete ALL fields) Narrative Location Description: Located under the parking stalls in front of the southwest corner of the proposed building. Drainage Management Drainage Area Area(DMA)Number: 01 Treated(acres): 0.16 Latitude:35°07'04.86"N Longitude: 120°35'33.06"W Design Storm Flow(cfs): n/a 4 Drainage Design Criteria: (As applicable): Design Storm Capacity(ft): 927.5 5.Design Details Width(ft): 8.42 Slope(ft/ft): 0 Full constructed Dimensions Depth(ft): 6.75 BMP CapacityNolume(ft3): 1,064 Ms applicable): Length(ft): 34.42 Surface Area(ft2): 290 Is this BMP EYES ONO BMP Vegetated? DYES ONO subsurface? Design Vegetation Does this BMP involve a DYES ONO n Height(ft): /a manufactured product? 6.Manufactured Product Product Name: StormTech Specifications: Manufacturer/Model Number: (Include manuals and Advanced Drainage Systems, Inc./MC 3500 specifications) Number Installed Onsite: 1 System (4 chambers and 2 end caps) Product Life: 50-years 7. Maintenance and Inspection Frequency: ElPre-Rain ZMonthly 11 Semi-Annually❑Annually inspection Frequency: Maintenance Li Monthly Semi-Annually Annually Biennially Frequency: City of Arroyo Grande Page of UPDATED 11/30/2018 O o ri La ce = , CE 0 o I W I— o < co— ce i=f.-3 1-- cn 0- ci_LA Ln 2 E L.;4 1 I 1 CC il A ii fi 0 W 66.-k9 „00 .89N 111 M ,CC 11 4: *--.,•./...,..-/. fr. ,,,,,,,,,,,,,,,, CO 11 li 1 1 ........I.i N.N.N.,....„.....s.sisl El / / 1.1 ,,,,=,...„......,==c, ..............___...„ ,_ ,: ..,,,..... . 1.: x 0_—I I ! i • L.I Li_ re m I cc , 1 • .=. . .17.9 1 . .1 .. Di 0 El Ei ,, fl w ;,,,,.._....... ........4; II CC ...• CC 0 2 < F 11 ,, C,, —, .., ) 0 W 1-1-I < .. li ---ji cc CC a !'. r _ .„..-.„:„,...:Tai „. / .. .. ,._ .... . . cc<z „.... ; . „ 0 0 W 0 01 ..r.2:!:4.. ..— Li, 17!!!!!! . K, •.- .. cm < .• 1 i C2. 0 1,7 0) ,17/fr. ' i/, .r. ' , .4 4 r,:-[ ,- i <N1 ... /: .-:: ?.1,`• 1. , ...i's u_ 4 11,. i ,- z 0 ..Jr: •,*IA cn .,...1 ..1 v t , . 'i K . . . ce •. r„:,.4 -: -. Ily. I .- 1- - 1.I •u5,,0 .••••• •Cy i.ti i L , ':' ;.-I____ . 1 ;•/- m 0 , r . 1; i i '''fi! .=> • , . . ''i t••••-; w i= ,f- 11 -24/ ,!",`,....:.,`, ..•.:, , . •.. ., -,... •..,:z.,:. .'....,t,. ,I(••' , ii I Ir. ''''.\-----7. . !!• 1 ri• : f•,, z x < E 0 0 _, < Li_ Z '6 I•A IIi1 LI..., iiLi! ,-. .z 1:,••, Iv I 0 re it PC 1 - . . < 0 ,...,2.L.7..s.x.-/-..-4/. riz L',./.,i,-..— •...„ ,,,-4,-.4,...,,,•,,./4 -..,...., , • . . — a ...._...... „ ...,..._ .., „ --___.....7.:,..7. „...,......_..._ .._ ........ / I t C•I 11,66.172 3.00,CC.EMS-.,--...,' - --- ...•=l_. 1.131ED i•I •Mp• 0 I , /1, ViS6'68 3.00,'. ., ! I ' I " co -----—3-1)N3 AK CI N VEI 0 LLI W --I 0 o w 1.0 W > Z y 0 Smp'llw.ixa doms\s5ulmaJp\oa-ano puo.16 a Lge-asn pax!Lu laJ1400-OLLOZOZ\baa-sioafcud\pal oLis\L L'L'89 L'Z6 L\\ CITY OF CITY OF ARROYO GRANDE p yo GR4NoF COMMUNITY DEVELOPMENT DEPARTMENT OFFICE USE ONLY SWP Private Stormwater System Plans CALFFORNIA/. and Manuals Subsurface Structural Best Management Practice Maintenance Information Assigned BMP#: Structural BMP 23-000031-01 Maintenance BMP Feature T Details YPe: Media FilterEj Treatment Vault ❑ Bed Filter Infiltration Feature/Basin 0 Detention Basin Does the BMP include a Contact for vendor who can provide replacement parts or maintenance proprietary device/structure? instructions: Et YES NO ADVANCED DRAINAGE SYSTEM, INC.-TERENCE ZHAO terence.zhao@ads-pipe.com 626-425-2874 Describe short-term maintenance requirements(frequency of replacement or inspection): FOR THE FIRST YEAR,THE ISOLATOR ROW SHOULD BE INSPECTED EVERY 6 MONTHS.AFTER THE FIRST YEAR,INSPECT SYSTEM FOR SEDIMENT,TRASH,AND DEBRIS ACCUMULATION OR STANDING WATER AFTER STORM EVENTS.WHEN THE AVERAGE DEPTH OF SEDIMENT/DEBRIS EXCEEDS 3-INCHES,CLEAN OUT THE ISOLATOR ROW.INSPECT UPSTREAM INLETS AND REMOVE OBSTRUCTIONS MONTHLY.SEE MANUFACTURER MAINTENANCE SPECIFICATIONS FOR ADDITIONAL INFORMATION. Estimated annual cost for maintenance: $200 Describe long-term maintenance requirements: AFTER THE FIRST YEAR,INSPECT SYSTEM FOR SEDIMENT,TRASH,AND DEBRIS ACCUMULATION OR STANDING WATER AFTER STORM EVENTS.WHEN THE AVERAGE DEPTH OF SEDIMENT/DEBRIS EXCEEDS 3-INCHES,CLEAN OUT THE ISOLATOR ROW.INSPECT UPSTREAM INLETS AND REMOVE OBSTRUCTIONS.SEE MANUFACTURER MAINTENANCE SPECIFICATIONS FOR ADDITIONAL INFORMATION. Contact information for local professional qualified to maintain or repair this BMP: TBD Additional notes: 300 E.BRANCH STREET I ARROYO GRANDE, CALIFORNIA 93420 I (805)473-5420 www.arrovogrande.orq I agcitv@arrovogrande.org UPDATED 11/30/2018 1., StormTech. ,1111TforDs Isolator Row O&M Manual ...,.. r.. ,.. , ,, , . t , , . ..„..,: k.A. ____ __ _ __ . . . •,.....,..,.. , .,,. .. . , _ . „... .., !,..„ .:,..,..., . AMt:.• St ••,, - • ., It .001011111111.0b.— P&C-3500 Ikt ! • . . 41.1,.. . , , , 1,............... mummor 'I\ . .. .- • . I.- . r .• • . , f . . .•• . . . , ''' . ' • .I .e.. alai sigh Pr * s . • .' -' Is. , . . ' * •`s. . • 4.. .... SC-7../ . MC-4500 :4, . . it. - 4`"•.' THE AiOST NAE1 IN II,iTIE".?ful,:,,.,.,...1 c,smEN 7,cOLLITIONS I , 10 4111/4 — INSPECTION . The frequency of inspection and maintenance varies by location.A routine inspection schedule needs to be established for each individual location based upon site specific variables.The type of land use(i.e. industrial,commercial,residential),anticipated pollutant load,percent • ` �p imperviousness,climate,etc.all play a critical role in determining the actual frequency of inspection and maintenance practices. ` / At a minimum,StormTech recommends annual inspections.Initially, _ the Isolator Row should be inspected every 6 months for the first year of operation.For subsequent years,the inspection should be adjusted based upon previous observation of sediment deposition. The Isolator Row incorporates a combination of standard manhole(s)and strategically located inspection ports (as needed).The inspection ports allow for easy access to the system from the surface,eliminating the need to perform a confined space entry for inspection purposes. If upon visual inspection it is found that sediment has accumulated,a stadia rod should be inserted to determine the depth of sediment.When the average depth of sediment exceeds 3 inches throughout the length of the Isolator Row,clean-out should be performed. MAINTENANCE The Isolator Row was designed to reduce the cost of periodic maintenance.By"isolating"sediments to just one row,costs are dramatically reduced by eliminating the need to clean out each row of the entire storage bed.If inspection indicates the potential need for maintenance,access is provided via a manhole(s)located on the end(s)of the row for cleanout.If entry into the manhole is required,please follow local and OSHA rules for a confined space entries. Maintenance is accomplished with the JetVac process.The JetVac process utilizes a high pressure water nozzle to propel itself down the Isolator Row while scouring and suspending sediments.As the nozzle is retrieved,the captured pollutants are flushed back into the manhole for vacuuming.Most sewer and pipe maintenance companies have vacuum/JetVac combination vehicles.Selection of an appropriate JetVac nozzle will improve maintenance efficiency.Fixed nozzles designed for culverts or large diameter pipe cleaning are preferable.Rear facing jets with an effective spread of at least 45"are best.Most JetVac reels have 400 feet of hose allowing maintenance of an Isolator Row up to 50 chambers long.The JetVac process shall only be performed on StormTech Isolator Rows that have AASHTO class 1 woven geotextile(as specified by StormTech)over their angular base stone. StormTech Isolator Row(not to scale) Note:Non-woven fabric is only required over the inlet pipe connection into the end cap for SC-180LP,DC-780,MC-3500 and MC-4500 chamber models and is not required over the entire Isolator Row. — ,GTa 6041a COVERENTEF N9DUTGR ROW WIN Nos _ "'OVNOfiY.NNPrsntNPORT GEOSYNRETIGS FOR NON.WOYEN OEORMIE :',... •• _ ...... SC•T7a TPAM MITRE ... „�' SEMI*TI1.5101INWEE "'^--*'-•�. -9TORMTECN CRAMER MGM 1N:0000.IN:TOO.SGIDEP•CRN.PPE OOtMCIWN TOM CAP MINIS comments GMT NONYPOVENGEOIEK"E. STORMIECH BID CAP a T ) , f 1111101111111110MWPOEPIN Tao or SITE Dfi9=ENGINEER RI•N0=MN RECOMNBIDEDI L TWV LAYERS Of ADS OROSYNR ETNE1319NT WOVEN OEOTE)OEESEIWEEN EOMNNITON STONE AND CRAME&GONIMAIIR MERE WITHOUT fiERN - 10O'0. MN I n) WDE/10-1210 - 1T ROOmm)NODE ACCESS PIPE REQUIREDSCS10 O HOPE ARCM PINE REOUIREIN/164500,MOOD0.9G70D,DGTD fi7T R51.1101WEE 1/04500 CR00 mm1 RIPEN:GEES PPE REON01E:90.100IP •fi a1MN WOE:1161D.SYS14E f RE WIN WIDE GCOI0.19GIDIP • STEP 1 Inspect Isolator Row for sediment. A)Inspection ports(if present) I. Remove lid from floor box frame ii.Remove cap from inspection riser M. Using a flashlight and stadia rod,measure depth of sediment and record results on maintenance log. iv. If sediment is at or above 3 inch depth,proceed to Step 2.If not,proceed to Step 3. B)All Isolator Rows i. Remove cover from manhole at upstream end of Isolator Row II.Using a flashlight,inspect down Isolator Row through outlet pipe 1. Mirrors on poles or cameras may be used to avoid a confined space entry 2. Follow OSHA regulations for confined space entry if entering manhole iii. If sediment is at or above the lower row of sidewall holes(approximately 3 inches),proceed to Step 2. If not,proceed to Step 3. STEP 2 Clean out Isolator Row using the JetVac process. A)A fixed floor cleaning nozzle with rear facing nozzle spread of 45 inches or more is preferable B)Apply multiple passes of JetVac until backflush water is clean C)Vacuum manhole sump as required STEP 3 Replace all caps,lids and covers,record observations and actions. STEP 4 Inspect&clean catch basins and manholes upstream of the StormTech system. 1)B).. 2 1)A) { / • ;i1e1 i el IoIN P, SAMPLE MAINTENANCE LOG a/15/11 6.3 fE "acme Net.;- EctL a in.Fixed Fount is CI frame at a3M etude 9/24/11 6.2 o.1 fE Some grit fait SM 6/20/13 5.8 0.5 fE Mucky feel,debris visible th mekkole aka iu Nd Isolator Row,maLutewance due 7/7/13 6.3 fE o SysEev i jeEEed aNd vo c4umed D3M _ I StormTech ' Tom' Ault, rf Drainage Arni Inc. cao TrOr an Qwd Any„ ca 4".0 INTRODUCTION An important component of any Stormwater Pollution Prevention Plan is inspection and maintenance.The StormTech Isolator Row is a technique to inexpensively enhance Total Suspended Solids(TSS) removal and provide easy access for inspection and maintenance. THE ISOLATOR ROW The Isolator Row is a row of StormTech chambers,either SC-160LP, SC-310,SC-310-3,SC-740,DC-780,MC-3500 or MC-4500 models, that is surrounded with filter fabric and connected to a closely located manhole for easy access.The fabric-wrapped chambers provide for Looking down the Isolator Row from the opening,woven is shown settling and filtration of sediment as storm water rises in the Isolator manhole between the chamber and otextfe stone base. Row and ultimately passes through the filter fabric.The open bottom chambers and perforated sidewalls(SC-310,SC-310-3 and SC-740 models)allow storm water to flow both vertically and horizontally out of the chambers.Sediments are captured in the Isolator Row protecting the storage areas of the adjacent stone and chambers from sediment accumulation. Two different fabrics are used for the Isolator Row.A woven geotextile fabric is placed between the stone and the Isolator Row chambers. The tough geotextile provides a media for storm water filtration and provides a durable surface for maintenance operations.It is also designed to prevent scour of the underlying stone and remain intact during high pressure jetting.A non-woven fabric is placed over the chambers to provide a filter media for flows passing through the perforations in the sidewall of the chamber.The non-woven fabric is not required over the SC-160LP,DC-780,MC-3500 or MC-4500 models as these chambers do not have perforated side walls. StormTech Isolator Row with The Isolator Row is typically designed to capture the"first flush"and Overflow Spillway(not to scale) offers the versatility to be sized on a volume basis or flow rate basis. An upstream manhole not only provides access to the Isolator Row but PRE-��„M�rr typically includes a high flow weir such that storm water flowrates or volumes that exceed the capacity of the Isolator Row overtop the over ISTORMTECH SOLATOR w flow weir and discharge through a manifold to the other chambers. The Isolator Row may also be part of a treatment train.By treating }4'y storm water prior to entry into the chamber system,the service life can �� ' be extended and pollutants such as hydrocarbons can be captured. FLOW WEIR ���SDI Pre-treatment best management practices can be as simple as MU MINIM deep sump catch basins,oil-water separators or can be innovative EMI storm water treatment devices.The design of the treatment train and selection of pretreatment devices by the design engineer is often ,ECCENTRIC SMI driven by regulatory requirements.Whether pretreatment is used or not, the Isolator Row is recommended by StormTech as an effective means ®�! to minimize maintenance requirements and maintenance costs. �-a-1'16 Note: See the StormTech Design Manual for detailed information on D designing inlets fora StormTech system,including the Isolator Row. OF„a,,,,L ACCESS STORMTECH CHAMBERS ThE T ADVANCED 11.?TER MiW4CE1;JEIJT SOLUTIONS 2 CITY OF CITY OF ARROYO GRANDE "`' " "'f COMMUNITY DEVELOPMENT DEPARTMENT OFFICE USE ONLY ` SWP _�: . ,,.►'�-yy}®� Engineer's Certification of Stormwater ``,, CALIFORNEA/el Structural Best Management Practices 951 E.GRAND AVENUE ARROYO GRANDE Project Street Address City COTTRELL MIXED USE BLD23-000580 Project Name Construction Permit Number(s) I, the undersigned California Registered Civil engineer, hereby certify that I or my authorized agent have inspected each of the stormwater Structural Best Management Practices (BMPs) required for the approval of the above referenced Project. I have found the BMPs to be installed consistent with the approved Stormwater Control Plan, and that BMPs were constructed and are now sufficiently stabilized in substantial conformance with the approved grading and/or building plans. I state that, to the best of my knowledge, the following elements have been satisfactorily installed or completed: :✓ Drain inlet and outlet elevations are correct. Specialized media (rock or soil)and devices installed correctly per design plans. ❑✓ Appropriate landscape plant species installed per design plans. ❑✓ Relevant maintenance manuals have been provided to the system owner/operator. ✓❑ Owner/operator is aware of any sub-grade features and required maintenance. ❑✓ Piping and connections on any sub-grade features are installed correctly. ❑✓ Structural BMPs are installed and functioning as designed per approved plans. Any revisions made during construction to the originally approved plans were reviewed and approved by City staff and are indicated on As-Builts and revised Operations and Maintenance Plan. Matthew R Walsh,Walsh Engineering p Design Engineer Name and Affiliation Qt ESS/ C79026, Registered Professional Engineer Civil License Number and Type cr C 79026 /174 \)/\ 1/12/2026 'tr Design Engineer Signature Date CIVIL ` OF CO 300 E.BRANCH STREET I ARROYO GRANDE, CALIFORNIA 93420 I (805)473-5420 PAGE 1 OF 1 www.arrovogrande.orq I agcity@arrovogrande.orq UPDATED 77/30/2018 • CITY OF I CITY OF ARROYO GRANDE OFFICE USE ONLY COMMUNITY DEVELOPMENT DEPARTMENT SWP Private Stormwater System Owner, CALIFO RNIA zi; Agent, & Designer Information SWP23-000031 BLD23-000580 Stormwater Permit (SWP) Number Building Permit Number (SWP##-####) (BLD##-######) 951 E.GRAND AVENUE Project Address SYSTEM OWNER: GREG COTTRELL Current Property Owner (Include name of primary contact) 509 TRAFFIC WAY Street Address ARROYO GRANDE CA City State 93420 805-440-6974 Zip Code Phone Number GREG@RUGGEDRADIOS.COM Owner Email: SYSTEM DESIGNER: MATTHEW WALSH-WALSH ENGINEERING Designer Name and Affiliation C79026-CIVIL Designer License Number and Type 1108 GARDEN STREET,SUITE 202 Street Address SAN LUIS OBISPO CA City State 93401 805-319-4948 Zip Code Phone Number MATT@WALSHENGINEERING.NET Designer Email: 300 E.BRANCH STREET I ARROYO GRANDE, CALIFORNIA 93420 I (805)473-5420 PAGE 1 OF 2 www.arrovogrande.orq I agcitv@arrovogrande.orq UPDATED 11/30/2018 • CITY OF CITY OF ARROYO GRANDE OFFICE USE ONLY COMMUNITY DEVELOPMENT DEPARTMENT SWP _ Private Stormwater System Owner, #bLIFORN4 Agent, & Designer Information PROJECT AGENT (if applicable): Agent Name and Affiliation(Include name of primary contact) Street Address City State Zip Code Phone Number Agent Email: COORDINATING CITY REPRESENTATIVE. John Benedetti City Representative(Printed Name) Senior Engineer City Representative Title JBenedetti@arroyogrande.org (805)473-5445 Email Phone 300 E.BRANCH STREET I ARROYO GRANDE, CALIFORNIA 93420 I (805)473-5420 PAGE 2 OF 2 www.arroyogrande.orq I aacity@arrovoarande.orq UPDATED 11/30/2018 END OF DOCUMENT