HomeMy WebLinkAboutCC 2026-04-28_11c Halcyon Complete Streets Project Pre-BidItem 11.c.
MEMORANDUM
TO: City Council
FROM: Bill Robeson, Assistant City Manager/Director of Public Works
BY: Shannon Sweeney, City Engineer
SUBJECT: Halcyon Complete Streets Project Pre-Bid
DATE: April 28, 2026
RECOMMENDATION:
Review specific details of the draft final design of the Halcyon Complete Streets Project
(“Project”) and direct staff to advertise the Halcyon Complete Streets Project for
construction as designed.
IMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
The construction phase of this Project is being funded by three funding sources. The
largest funding source is a state Active Transportation Program (ATP) Grant totaling
$8,169,000. This grant funding is further broken down as follows:
Design and right-of-way: $1,304,000
Construction: $6,765,000
Non-infrastructure activities: $100,000
Approximately $120,000 of unexpended grant funds originally allocated to right-of-way
activities can be transferred to construction, bringing the total ATP project amount for
construction to $6,885,000. Measure E-24 Sales Tax Fund includes an allocation totaling
$1,875,000. Transportation Facilities Development Impact Fee (DIF) can fund 50% of
the roundabout at the Halcyon Road/Fair Oaks Avenue intersection, totaling $788,500
based on the current roundabout estimated cost. Table 1 shows a summarized
breakdown of the current construction funding.
Page 113 of 209
Item 11.c.
City Council
Halcyon Complete Streets Project Pre-Bid
April 28, 2026
Page 2
Table 1: Construction Funding
Source Amount
ATP Grant (including transfer) $6,885,000
Measure E-24 Sales Tax $1,875,000
DIF $788,500
Total $9,548,500
The draft final project cost estimate is $7,872,613.
Note that approximately 25 percent of the Project, from Farroll Avenue to The Pike, was
moved to the 2026 Streets Overlay Project because it involves more paving than other
complete streets elements. This portion of the Project, estimated to be approximately
$1,675,715 will be paid out of the 2026 Streets Overlay Project.
BACKGROUND:
The City obtained grant funding for the Project through the state ATP. The stated purpose
of the Project is to “transform Halcyon Road from a vehicle-centric facility to a welcoming
environment that will provide for safe mobility and acce ssibility, connecting people by
enhancing the built environment for all modes of travel .” The Project's conceptual plan
was initiated in 2015 and completed in 2023.
Significant outreach occurred during conceptual plan development, including pop -up
outreach surveys, four interactive charrette-style meetings, social media and online
engagement, and a stakeholder and neighborhood group meeting.
City Council approved a contract with North Coast Engineering (NCE) to develop plans,
specifications, and an engineer’s estimate (PS&E) on June 25, 20241. NCE has been
working with City staff to convert the conceptual plans into construction documents.
City Council approved the City’s Circulation Element on July 27, 20212, the Halcyon
Complete Streets Conceptual Design on July 25, 20233, and the ATP on January 28,
20254. All three documents helped inform staff of the Council’s and community’s desire
for improvements on Halcyon Road. On February 25, 20255, the Council staff reviewed
the 30% design of the Project and provided further guidance and clarification on the
desired outcome of the project, including:
1https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=e4fec941-ba9c-4535-932a-
fa7d8ff7d8ad&Agenda=Merged&lang=English&Item=52&Tab=attachments
2https://www.arroyogrande.org/AgendaCenter/ViewFile/Agenda/_07272021 -1353?html=true
3https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=ba95ddc8-1575-42c7-ae71-
5ba712dab1bc&Agenda=Agenda&lang=English&Item=35&Tab=attachments
4https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=a9ffd954-d3f0-4b51-9ea9-
4dcb521e64ac&Agenda=Agenda&lang=English&Item=69&Tab=attachments
5https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=586fd20a-05f6-4770-946e-
9227030ef982&Agenda=Agenda&lang=English&Item=42&Tab=attachments
Page 114 of 209
Item 11.c.
City Council
Halcyon Complete Streets Project Pre-Bid
April 28, 2026
Page 3
Class II bike lanes for the extent of the project, buffered where practicable;
200 trees as part of a residential tree plan;
researching if there are alternatives to the use of green paint for bike lanes.
On March 19, 2026, the California Transportation Commission allocated construction
funding for this Project. The City has six months from that date to award the Project.
ANALYSIS OF ISSUES:
City staff received 100% drawings for this project on March 13, 2026. Prior to advertising
this project for construction and because of the Project’s scope, budget, and community
impact, staff is reviewing some final elements of this project with City Council, including:
Street trees,
On-street parking,
Budget,
Utilities.
On-street Trees
At the February 25, 2025, meeting, Council directed staff to maximize street trees
included in the Project, which totals 200 street trees per Engineering Standards. Seventy-
four street trees currently exist on Halcyon Road between El Camino Real and The Pike.
During design, City staff and the design consultant included trees in the design drawings
at all available locations that would not affect sight distances or significantly impact
sidewalk widths.
The construction plans include a total of 154 trees along the Project corridor. This includes
72 new trees, maintaining 55 existing trees, and replacing 27 existing trees with
infrastructure-friendly species selected from the City’s 2025 Recommended Street Trees
List6 as presented to Council on August 26, 20257. This was the maximum number of
trees able to be accommodated due to the number of drive approaches (84), cross streets
(19), and utility conflicts that present sight safety issues and limit tree placement.
Eleven small bottle brush trees on the west side of North Halcyon Road along the
cemetery property are recommended for removal with no replacement because of the
limited sidewalk width, and an additional eight trees are recommended for removal with
no replacement due to impacts to sight distance.
Attachment 1 shows the properties whose frontages will be impacted by the removal,
replacement, and installation of new trees.
6https://www.arroyogrande.org/139/Engineering-Standards
7https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=6e7c7c76-fee2-401c-8aa3-
090ededae737&Agenda=Agenda&lang=English&Item=40&Tab=attachments
Page 115 of 209
Item 11.c.
City Council
Halcyon Complete Streets Project Pre-Bid
April 28, 2026
Page 4
On-street parking
One of the main goals of this Project is to provide continuous bicycle lanes the length of
Halcyon Road from El Camino Real to The Pike. This goal requires the loss of on-street
parking in places where the street is not wide enough to accommodate all desired
features. As the design progressed, staff and the design consultant prioritized features as
follows:
1. Class II bicycle lanes
2. Parking, then
3. Buffered Class II bicycle lanes.
As a result of this prioritization, and as identified in the Halcyon Complete Streets
Conceptual Plan, which is included with the staff report presented to City Council on July
25, 2023,8 122 of the existing 161 on-street parking spaces will be removed, while 39
spaces will be retained in the final Project.
Budget
As previously shown in Table 1, funding currently available for Project construction totals
$9,548,500. Staff has made significant efforts to align the Engineer’s Estimate with
available construction funding. Table 2 lists the initial and current Engineer’s Estimates,
which shows the Project is approximately $400,000 higher than the available budget for
the project.
Table 2: Project Cost Estimates
Cost Item Initial
Engineer’s Estimate
Current
Engineer’s Estimate
Halcyon north of Farroll $11,228,890 $7,872,613
Halcyon south of Farroll $2,000,000 $1,675,715
Quality Assurance $385,000 $385,000
Total $13,613,890 $9,933,328
Difference from budget ($4,065,390) ($384,828)
Actual project costs will not be known until after the Project bid opening. City staff have
not been able to identify any further reductions to the Engineer’s Estimate while still
maintaining the goals and spirit of the grant funding. Staff will continue investigating
funding options as the project is brought forward to City Council for award.
Utilities
The design engineer identified six utility poles in the footprint of the roundabout at Halcyon
Road and Fair Oaks Avenue that need to be removed and/or relocated for construction.
Staff have been working with AT&T, Charter, and PG&E since September 2025 to
8https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=ba95ddc8-1575-42c7-ae71-
5ba712dab1bc&Agenda=Agenda&lang=English&Item=35&Tab=attachments
Page 116 of 209
Item 11.c.
City Council
Halcyon Complete Streets Project Pre-Bid
April 28, 2026
Page 5
develop a plan to conduct this work under the City’s franchise agreements, which requires
that relocation of utility components to accommodate City infrastructure work be done at
no cost to the City. On February 27, 2026, PG&E presented a plan that involves
undergrounding their facilities, indicated that the undergrounding cannot be conducted
under the franchise agreement, and estimated the cost at $1.1 million. The Project cannot
accommodate this additional cost; however, PG&E is currently developing a strategy for
relocating their utilities above grade. City staff will continue to work with utility companies
on coordinating this work and do not anticipate that this to impact project completion.
ALTERNATIVES:
The following recommendations are provided for the Council’s consideration:
1. Direct staff to advertise the Halcyon Complete Streets Project for construction as
designed (recommended) (100% plan set is included as Attachment 2);
2. Provide staff with direction on minor changes to the project design, then direct staff
to advertise the Halcyon Complete Streets Project for construction;
3. Direct staff to not advertise the Halcyon Complete Streets Project for construction
at this time; or
4. Provide other direction to staff.
ADVANTAGES:
The City has six months from the CTC allocation on March 19, 2026, to award this project.
Should the City receive unfavorable bids, attempting to award the project provides staff
the ability to request an extension of the CTC deadline. This project addresses many
issues associated with Halcyon Road including sidewalk deficiencies, missing sidewalk,
lack of bike lanes, poor pavement conditions, and stormwater drainage improvements.
Completing this project will provide a safer, more enjoyab le travel experience for all
modes of transportation, pedestrian safety, and traffic-calming and congestion-reduction
features that will be especially beneficial for operations at Harloe Elementary.
DISADVANTAGES:
Project construction, which is expected to last until the end of summer 2027, will
negatively impact all travelers. Drivers will experience delays, some large old trees will
be removed, and some on-street parking will be lost. City staff will work closely with the
contractor to minimize traffic impacts to the greatest extent possible. City staff will be
communicating with all the property owners listed in Attachment 1 whose property
frontage is impacted by either parking or trees.
ENVIRONMENTAL REVIEW:
On July 25, 20239, the City Council adopted an MND for the Halcyon Complete Streets
Project. The MND analyzed the environmental impacts of the Project in compliance with
CEQA. Advertising this project for construction will have no direct or indirect physical
9https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=ba95ddc8-1575-42c7-ae71-
5ba712dab1bc&Agenda=Agenda&lang=English&Item=35&Tab=attachments
Page 117 of 209
Item 11.c.
City Council
Halcyon Complete Streets Project Pre-Bid
April 28, 2026
Page 6
impacts and does not constitute a substantial change to the Project such that revisions to
the previously adopted MND are required. Thus, none of the conditions requiring
subsequent environmental review called out in State CEQA Guidelines section 15162 or
Public Resources Code section 21166 are present, and no further environmental review
is required.
PUBLIC NOTIFICATION AND COMMENTS:
The Agenda was posted at City Hall and on the City’s website in accordance with
Government Code Section 54954.2.
ATTACHMENTS:
1. Street Tree and On-street Parking Impacts
2. Halcyon Complete Streets 100% Plan Set
Page 118 of 209
ATTACHMENT 1
Page 1/2Page 119 of 209
Page 2/2
Page 120 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
TBM
BENCHMARK
HORIZONTAL AND VERTICAL CONTROL
VICINITY MAP
BASIS OF BEARINGS
LOCATION MAP
CALIFORNIA
CITY OF ARROYO GRANDE
COUNTY OF SAN LUIS OBISPO
GENERAL NOTES
HALCYON COMPLETE
STREETS
IMPROVEMENT PLANS
FOR
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
MAX DEPTH CUT
CUT
FILL
FT
CU YD
CU YD
MAX DEPTH FILL FT
EARTHWORK QUANTITY:
AREA OF DISTURBANCE AC
5.86
4.20
352
302
1.03
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
T
L
.
d
w
g
,
T
I
T
L
E
S
H
E
E
T
,
3
/
1
2
/
2
0
2
6
2
:
5
0
:
2
8
P
M
,
B
E
A
,
1
:
1
03/13/2026
ATTACHMENT 2
Page 121 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SYMBOLS ABBREVIATIONS
LEGEND
SHEET INDEX
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
T
L
.
d
w
g
,
S
H
E
E
T
I
N
D
E
X
,
3
/
1
2
/
2
0
2
6
2
:
5
0
:
2
9
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 122 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
STANDARD NOTES
GRADING NOTES
UNDERGROUND UTILITY NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
T
L
.
d
w
g
,
G
E
N
E
R
A
L
N
O
T
E
S
,
3
/
1
2
/
2
0
2
6
2
:
5
0
:
3
4
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 123 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
HIGH
W
A
Y
1
0
1
EL
C
A
M
I
N
O
R
E
A
L
F
A
E
H
A
V
E
B
E
N
N
E
T
T
A
V
E
N REN
A
S
T
BE
N
N
E
T
T
A
V
E
HALCYON ROAD
LEGEND
221
211
217
230231 230231 230231
230231
230231
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
221
222
222230231
230231
211
230 231
202
231 231 231 231 231 231 231 231 231 231 231 231 231
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
M
O
.
d
w
g
,
D
E
M
O
1
,
3
/
1
2
/
2
0
2
6
2
:
5
0
:
4
8
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 124 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
E
G
R
A
N
D
A
V
E
E
G
R
A
N
D
A
V
E
HALCYON ROAD
LEGEND
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
215
208
230231
220 220
221 221
220
220
221
215
220
222
214 214
214 213
218
211
211
230231
231
231
231
231
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
M
O
.
d
w
g
,
D
E
M
O
2
,
3
/
1
2
/
2
0
2
6
2
:
5
0
:
5
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 125 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
PA
R
K
W
A
Y
HALCYON ROAD
223
LEGEND
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
230231
230215
215
220 220
221 221 221 221 221220
220
230231 230231
241
219
234203212
213
211
217
219 213 211 211237202
231
231
231
231
231231231 231
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
M
O
.
d
w
g
,
D
E
M
O
3
,
3
/
1
2
/
2
0
2
6
2
:
5
1
:
0
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 126 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
DO
D
S
O
N
W
A
Y
DO
D
S
O
N
W
A
Y
HALCYON ROAD
211
223
211
221
211
218
LEGEND
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
230231
230 231
230 231
230231
230
215
215
221 221
221
220
220 220
221
221220220 221 221 221
220
221
220
221
220
241
205211
221
213 217 217
214 214
242211230231
230 231
241
237
237
231
231
231
231
231231
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
M
O
.
d
w
g
,
D
E
M
O
4
,
3
/
1
2
/
2
0
2
6
2
:
5
1
:
1
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 127 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SOUTH HALCYON ROAD SOUTH HALCYON ROAD
FA
I
R
O
A
K
S
A
V
E
N
U
E
FA
I
R
O
A
K
S
A
V
E
N
U
E
HALCYON ROAD
240
221
221
207
240
240
221
226
240
221
221
221
240
221
240
225
225
LEGEND
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
230 231
230 231
230 231
230 231
215
215
220220 220
220
252
252
252
252
252
222
232
238
233
227
228
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
M
O
.
d
w
g
,
D
E
M
O
5
,
3
/
1
2
/
2
0
2
6
2
:
5
1
:
2
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 128 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
TO
D
D
L
A
N
E
OL
I
V
E
S
T
R
E
E
T
FA
R
R
O
L
L
A
V
E
N
U
E
FA
R
R
O
L
L
A
V
E
N
U
E
HALCYON ROAD
211
221
213
211213
221
226217
LEGEND
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
230 231
230231
230 231 230
215
215
221
220
220
204
226
211
221224
231 231
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
M
O
.
d
w
g
,
D
E
M
O
6
,
3
/
1
2
/
2
0
2
6
2
:
5
1
:
3
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 129 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
HIGH
W
A
Y
1
0
1
EL
C
A
M
I
N
O
R
E
A
L
F
A
E
H
A
V
E
B
E
N
N
E
T
T
A
V
E
N REN
A
S
T
BE
N
N
E
T
T
A
V
E
HALCYON ROAD
TRANSVERSE KEYCUT
LONGITUDINAL KEYCUT
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
PAVEMENT TREATMENT ZONE LEGEND
PAVEMENT TRANSITION
TYPICAL SECTION NO. 1 BENNETT AVE PAVEOUT
1 STA 1+50 TO 16+50
ZONE 1 PAVEMENT REPAIR
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
P
A
V
E
T
R
E
A
T
M
E
N
T
S
.
d
w
g
,
P
A
V
E
M
E
N
T
Z
O
N
E
1
,
3
/
1
2
/
2
0
2
6
2
:
5
1
:
5
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 130 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
E
G
R
A
N
D
A
V
E
E
G
R
A
N
D
A
V
E
HALCYON ROAD
1 STA 1+50 TO 16+50
ZONE 1 PAVEMENT REPAIR
2 STA 16+50 TO 37+38
ZONE 2 PAVEMENT REPAIR
TRANSVERSE KEYCUT
LONGITUDINAL KEYCUT
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
PAVEMENT TREATMENT ZONE LEGEND
PAVEMENT TRANSITION
TYPICAL SECTION NO. 1
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
P
A
V
E
T
R
E
A
T
M
E
N
T
S
.
d
w
g
,
P
A
V
E
M
E
N
T
Z
O
N
E
1
(
2
)
,
3
/
1
2
/
2
0
2
6
2
:
5
1
:
5
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 131 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
P
A
R
K
W
A
Y
HALCYON ROAD
2 STA 16+50 TO 37+38
ZONE 2 PAVEMENT REPAIR
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
PAVEMENT TREATMENT ZONE LEGEND
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
P
A
V
E
T
R
E
A
T
M
E
N
T
S
.
d
w
g
,
P
A
V
E
M
E
N
T
Z
O
N
E
2
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
0
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 132 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
DO
D
S
O
N
W
A
Y
DO
D
S
O
N
W
A
Y
HALCYON ROAD
2 STA 16+50 TO 37+38
ZONE 2 PAVEMENT REPAIR
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
PAVEMENT TREATMENT ZONE LEGEND
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
P
A
V
E
T
R
E
A
T
M
E
N
T
S
.
d
w
g
,
P
A
V
E
M
E
N
T
Z
O
N
E
2
(
2
)
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
0
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 133 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SO
U
T
H
H
A
L
C
Y
O
N
R
O
A
D
FAIR OAKS AVENUE
FAIR OAKS AVENUE
SO
U
T
H
H
A
L
C
Y
O
N
R
O
A
D
2 STA 16+50 TO 37+38
ZONE 2 PAVEMENT REPAIR
3 STA 37+38 TO 47+00
ZONE 3 PAVEMENT REPAIR
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
PAVEMENT TREATMENT ZONE LEGEND
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
P
A
V
E
T
R
E
A
T
M
E
N
T
S
.
d
w
g
,
P
A
V
E
M
E
N
T
Z
O
N
E
3
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
1
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 134 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
TO
D
D
L
A
N
E
OL
I
V
E
S
T
R
E
E
T
FA
R
R
O
L
L
A
V
E
N
U
E
FA
R
R
O
L
L
A
V
E
N
U
E
HALCYON ROAD
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
PAVEMENT TREATMENT ZONE LEGEND
3 STA 37+38 TO 47+00
ZONE 3 PAVEMENT REPAIR
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
P
A
V
E
T
R
E
A
T
M
E
N
T
S
.
d
w
g
,
P
A
V
E
M
E
N
T
Z
O
N
E
3
(
2
)
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
1
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 135 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
HIGH
W
A
Y
1
0
1
EL
C
A
M
I
N
O
R
E
A
L
F
A
E
H
A
V
E
B
E
N
N
E
T
T
A
V
E
N REN
A
S
T
BE
N
N
E
T
T
A
V
E
HALCYON ROAD
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
GENERAL NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
S
T
.
d
w
g
,
S
T
R
E
E
T
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
2
8
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 136 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
E
G
R
A
N
D
A
V
E
E
G
R
A
N
D
A
V
E
HALCYON ROAD
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
GENERAL NOTES
DETAIL A
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
S
T
.
d
w
g
,
S
T
R
E
E
T
(
2
)
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
3
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 137 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
P
A
R
K
W
A
Y
HALCYON ROAD
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
GENERAL NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
S
T
.
d
w
g
,
S
T
R
E
E
T
(
3
)
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
4
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 138 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
DO
D
S
O
N
W
A
Y
DO
D
S
O
N
W
A
Y
HALCYON ROAD
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
GENERAL NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
S
T
.
d
w
g
,
S
T
R
E
E
T
(
4
)
,
3
/
1
2
/
2
0
2
6
2
:
5
2
:
5
1
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 139 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SO
U
T
H
H
A
L
C
Y
O
N
R
O
A
D
FAIR OAKS AVENUE
FAIR OAKS AVENUE
SO
U
T
H
H
A
L
C
Y
O
N
R
O
A
D
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
R
O
U
N
D
A
B
O
U
T
,
3
/
1
2
/
2
0
2
6
2
:
5
3
:
1
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 140 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
TO
D
D
L
A
N
E
OL
I
V
E
S
T
R
E
E
T
FA
R
R
O
L
L
A
V
E
N
U
E
FA
R
R
O
L
L
A
V
E
N
U
E
HALCYON ROAD
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
GENERAL NOTES
324
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
S
T
.
d
w
g
,
S
T
R
E
E
T
(
5
)
,
3
/
1
2
/
2
0
2
6
2
:
5
3
:
2
2
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 141 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SO
U
T
H
H
A
L
C
Y
O
N
R
O
A
D
SO
U
T
H
H
A
L
C
Y
O
N
R
O
A
D
FAIR OAKS AVENUE
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
R
B
T
G
E
O
M
E
T
R
Y
,
3
/
1
2
/
2
0
2
6
2
:
5
3
:
4
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 142 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
R
B
T
L
I
N
E
&
C
U
R
V
E
,
3
/
1
2
/
2
0
2
6
2
:
5
3
:
4
4
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 143 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
N HALCYON RD.
SIDEWALK INFILL DETAIL
N HALCYON RD.
SIDEWALK INFILL DETAIL
SIDEWALK INFILL DETAIL
B
E
N
N
E
T
T
A
V
E
.
N RENA
S
T
.
F
A
E
H
A
V
E
.
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
S
W
(
1
-
3
)
,
3
/
1
2
/
2
0
2
6
2
:
5
3
:
5
9
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 144 of 209
0+90 1+00
12
6
.
3
2
12
6
.
1
7
2+00 2+05.02
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
N HALCYON RD.
SIDEWALK INFILL DETAIL
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
1
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
1
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 145 of 209
0+90 1+00
11
3
.
5
4
11
3
.
2
9
2+00
11
3
.
0
4
11
2
.
7
9
3+00
11
2
.
3
8
3+41.09
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
N HALCYON RD.
SIDEWALK INFILL DETAIL
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
2
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
1
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 146 of 209
1+00
10
7
.
9
6
10
8
.
5
4
2+00
10
9
.
2
3
2+48.84
DODSON WAY
EAST OF HALCYON
SIDEWALK INFILL DETAIL
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
3
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
2
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 147 of 209
1+00
10
7
.
7
6
10
8
.
6
1
2+00
10
9
.
0
6
2+40.73
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
DODSON WAY
EAST OF HALCYON
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
4
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
2
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 148 of 209
0+95 1+00
10
9
.
5
1
1+53.60
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
S HALCYON RD.
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
5
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
3
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 149 of 209
0+95 1+00
10
7
.
1
4
10
8
.
0
4
2+00
10
7
.
6
9
10
6
.
7
7
3+00
10
6
.
4
5
10
5
.
4
9
4+00
10
3
.
5
4
4+14.87
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
S
H
A
L
C
Y
O
N
R
D
.
SIDEWALK INFILL DETAIL
FAIR
O
A
K
S
A
V
E
.
CURB RETURN NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
7
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
3
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 150 of 209
0+95 1+00
10
3
.
0
8
10
4
.
4
6
2+00
10
5
.
5
9
10
5
.
6
1
3+00
10
4
.
2
3
10
2
.
2
5
3+74.85
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
F
A
I
R
O
A
K
S
A
V
E
.
S H
A
L
C
Y
O
N
R
D
.
CURB RETURN NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
8
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
4
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 151 of 209
0+95 1+00
10
3
.
7
9
10
4
.
3
7
2+00
10
5
.
3
0
10
6
.
1
6
3+00
10
5
.
4
5
10
3
.
8
5
4+00 4+04.12
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
FAIR
O
A
K
S
A
V
E
.
S
H
A
L
C
Y
O
N
R
D
.
CURB RETURN NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
9
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
4
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 152 of 209
0+95 1+00
10
6
.
6
7
10
7
.
5
7
2+00
10
8
.
1
1
10
6
.
9
9
3+00
10
5
.
7
1
10
4
.
2
0
3+64.62
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
F
A
I
R
O
A
K
S
A
V
E
.
S HA
L
C
Y
O
N
R
D
.
CURB RETURN NOTES
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
1
0
)
,
3
/
1
2
/
2
0
2
6
2
:
5
4
:
5
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 153 of 209
0+95 1+00
10
7
.
8
7
10
8
.
1
7
2+00
10
8
.
4
0
2+03.30
10
8
.
3
6
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
SOUTH HALCYON ROAD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
1
A
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
0
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 154 of 209
0+95 1+00
10
7
.
9
0
10
8
.
3
4
2+00
10
8
.
3
7
2+04.70
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
SOUTH HALCYON ROAD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
1
B
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
1
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 155 of 209
1+00
10
7
.
8
1
10
7
.
0
5
2+00
10
6
.
2
9
10
5
.
3
3
3+00
10
3
.
9
1
3+15.01
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
2
A
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
1
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 156 of 209
1+00
10
7
.
6
1
10
6
.
8
6
2+00
10
6
.
2
8
10
5
.
0
8
3+00
10
3
.
8
3
3+11.02
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
2
B
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
2
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 157 of 209
1+00
10
6
.
8
2
10
6
.
1
3
2+00
10
5
.
2
8
10
4
.
0
5
2+93.18
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
3
A
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
2
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 158 of 209
1+00
10
6
.
3
7
10
5
.
9
2
2+00
10
4
.
9
4
10
3
.
6
1
2+91.96
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
3
B
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
3
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 159 of 209
1+00
10
5
.
4
0
10
4
.
0
4
2+00
10
2
.
2
2
2+05.77
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
SOUTH HALCYON ROAD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
4
A
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
3
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 160 of 209
1+00
10
5
.
6
0
10
4
.
1
3
2+00
10
2
.
2
3
2+06.98
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
SOUTH HALCYON ROAD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
4
B
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
4
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 161 of 209
1+00
10
7
.
0
2
10
5
.
9
9
2+00
10
4
.
9
9
10
4
.
3
7
2+56.09
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
5
A
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
4
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 162 of 209
1+00
10
7
.
3
4
10
6
.
0
5
2+00
10
4
.
8
0
10
4
.
2
4
2+55.76
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SIDEWALK INFILL DETAIL
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
1
5
B
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
5
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 163 of 209
1+00
10
7
.
0
5
10
5
.
8
6
2+00
10
6
.
4
4
10
7
.
4
5
3+00
10
7
.
2
6
3+07.75
10
7
.
0
5
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
TRUCK CAP 1
FAIR OAKS AVENUE
FAIR OAKS AVENUE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
T
C
C
A
P
1
,
3
/
1
2
/
2
0
2
6
2
:
5
5
:
5
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 164 of 209
1+00
10
7
.
3
3
10
6
.
8
9
2+00
10
5
.
9
1
10
5
.
7
0
3+00
10
6
.
6
5
10
6
.
9
8
4+00
10
7
.
9
3
4+33.41
10
7
.
3
3
ROUNDABOUT 1
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
FAIR OAKS AVENUE
FAIR OAKS AVENUE
S
H
A
L
C
Y
O
N
R
D
.
S
H
A
L
C
Y
O
N
R
D
.
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
R
O
U
N
D
A
B
O
U
T
.
d
w
g
,
R
B
T
1
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
0
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 165 of 209
1+00
10
1
.
8
3
10
0
.
4
8
2+00
99
.
6
0
98
.
5
3
3+00
97
.
7
3
96
.
9
3
4+00
96
.
1
3
95
.
0
0
5+00
93
.
7
8
93
.
1
3
6+00
92
.
6
1
6+19.88
92
.
4
5
SIDEWALK INFILL DETAIL
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
S. HALCYON RD.
TO
D
D
L
N
OL
I
V
E
S
T
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
C
.
d
w
g
,
T
C
(
1
6
)
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
1
3
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 166 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
CURB RETURN - CASE CM
BENNETT AVE.
N HALCYON RD.
BE
N
N
E
T
T
A
V
E
895 EL CAMINO REAL
275 N HALCYON RD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
1
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
2
6
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 167 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
N HALCYON RD.
LEGEND
B
E
N
N
E
T
T
A
V
E
.
BENNETT AVE.
CURB RETURN - CASE C CURB RETURN - CASE CM
310 N HALCYON RD
270 N HALCYON RD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
2
-
3
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
3
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 168 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
CURB RETURN - CASE C
N HALCYON RD.
N HALCYON RD.
275 N HALCYON RD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
4
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
3
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 169 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
E GRAND AVE.
CURB RETURN - CASE C
S HALCYON RD.
E
G
R
A
N
D
A
V
E
.
823 E GRAND AVE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
5
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
4
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 170 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
PARK WAY
CURB RETURN - CASE CM
S HALCYON RD.
PA
R
K
W
A
Y
135 S HALCYON RD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
6
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
4
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 171 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
DODSON WAY EAST
CURB RETURN - CASE C
S HALCYON RD.
CURB RETURN - CASE C
DO
D
S
O
N
W
A
Y
231 S HALCYON RD
271 S HALCYON RD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
7
-
8
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
5
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 172 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
DODSON WAY WEST
CURB RETURN
S
H
A
L
C
Y
O
N
R
D
.
DODSON WAY
236 S HALCYON RD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
9
,
3
/
1
2
/
2
0
2
6
2
:
5
6
:
5
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 173 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
DODSON WAY WEST
CURB RETURN - CASE A & CM
S HALCYON RD.
DO
D
S
O
N
W
A
Y
260 S HALCYON RD
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
1
0
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
0
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 174 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
S HALCYON RD.
FA
R
R
O
L
L
A
V
E
FARROLL AVE
CURB RETURN - CASE A
901 FAIR OAKS AVE
903 FARROLL AVE
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
1
1
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
0
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 175 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
CURB RETURN NOTES
LEGEND
S HALCYON RD.
CURB RETURN - CASE C
TO
D
D
L
N
S HALCYON RD.
894 TODD LN
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
1
2
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
1
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 176 of 209
CURB RETURN NOTES
LEGEND
S HALCYON RD.
CURB RETURN - CASE C
OL
I
V
E
S
T
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
S HALCYON RD.
894 OLIVE ST
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
C
R
.
d
w
g
,
C
R
1
3
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
1
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 177 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
HALCYON ROAD
SD PIPE PROFILE (MAIN)
SD PIPE PROFILE (COLLECTOR STA 24+86.44)
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
U
G
.
d
w
g
,
U
G
1
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
2
7
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 178 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SD PIPE PROFILE (MAIN)
SD PIPE PROFILE (COLLECTOR STA 28+97.30)
HALCYON ROAD
SD PIPE PROFILE (COLLECTOR STA 28+25.72)
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
U
G
.
d
w
g
,
U
G
2
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
3
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 179 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
SOUTH HALCYON ROAD SOUTH HALCYON ROAD
FA
I
R
O
A
K
S
A
V
E
N
U
E
FA
I
R
O
A
K
S
A
V
E
N
U
E
ROUNDABOUT
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
U
G
.
d
w
g
,
U
G
3
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
4
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 180 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
TO
D
D
L
A
N
E
OL
I
V
E
S
T
R
E
E
T
FA
R
R
O
L
L
A
V
E
N
U
E
HALCYON ROAD
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
U
G
.
d
w
g
,
U
G
4
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
5
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 181 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
FAIR OAKS WEST
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
FARROLL AVENUE
S
H
A
L
C
Y
O
N
R
O
A
D
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
U
G
.
d
w
g
,
U
G
5
,
3
/
1
2
/
2
0
2
6
2
:
5
7
:
5
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 182 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
FAIR OAKS EAST
GAS UTILITY CONSTRUCTION NOTES
x
x
x
’
x
FARROLL AVENUE
S
H
A
L
C
Y
O
N
R
O
A
D
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
U
G
.
d
w
g
,
U
G
6
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
0
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 183 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
HIGH
W
A
Y
1
0
1
EL
C
A
M
I
N
O
R
E
A
L
F
A
E
H
A
V
E
B
E
N
N
E
T
T
A
V
E
N REN
A
S
T
BE
N
N
E
T
T
A
V
E
HALCYON ROADTREE PALNTING NOTES LEGEND
T TREE WELL
TREE COUNT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
R
E
E
P
L
A
N
T
I
N
G
.
d
w
g
,
T
R
E
E
P
L
A
N
T
I
N
G
1
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
1
3
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 184 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
P
A
R
K
W
A
Y
HALCYON ROAD
TREE PALNTING NOTES
T TREE WELL
LEGEND
TREE COUNT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
R
E
E
P
L
A
N
T
I
N
G
.
d
w
g
,
T
R
E
E
P
L
A
N
T
I
N
G
3
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
2
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 185 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
DO
D
S
O
N
W
A
Y
DO
D
S
O
N
W
A
Y
HALCYON ROADTREE PALNTING NOTES
T TREE WELL
LEGEND
TREE COUNT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
R
E
E
P
L
A
N
T
I
N
G
.
d
w
g
,
T
R
E
E
P
L
A
N
T
I
N
G
4
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
2
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 186 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
TO
D
D
L
A
N
E
OL
I
V
E
S
T
R
E
E
T
FA
R
R
O
L
L
A
V
E
N
U
E
FA
R
R
O
L
L
A
V
E
N
U
E
HALCYON ROAD
TREE PALNTING NOTES
7 TREE WELL
LEGEND
TREE COUNT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
T
R
E
E
P
L
A
N
T
I
N
G
.
d
w
g
,
T
R
E
E
P
L
A
N
T
I
N
G
6
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
3
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 187 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
2 MULTI-USE PATH WITH SWALE
1 TYPICAL PAVE OUT SECTION
3 TRUCK CAP SECTION 4 4" MOUNTABLE CURB
5 CONCRETE BOLLARD
SECTION AA
STA 40+46 TO 42+78
STA 42+78 TO 43+92
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
T
A
I
L
S
.
d
w
g
,
D
E
T
A
I
L
S
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
4
3
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 188 of 209
1+00 2+00 2+80.61
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
RETAINING WALL 1
6 COBBLESTONE MEDIAN & PLANTER
7 OPEN BOTTOM MANHOLE
FAI
R
O
A
K
S
A
V
E
S
H
A
L
C
Y
O
N
R
D
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
T
A
I
L
S
.
d
w
g
,
D
E
T
A
I
L
S
(
2
)
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
4
6
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 189 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
T
A
I
L
S
.
d
w
g
,
S
T
D
D
E
T
,
3
/
1
2
/
2
0
2
6
2
:
5
8
:
5
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 190 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
T
A
I
L
S
.
d
w
g
,
S
T
D
D
E
T
(
2
)
,
3
/
1
2
/
2
0
2
6
2
:
5
9
:
0
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 191 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
T
A
I
L
S
.
d
w
g
,
S
T
D
D
E
T
(
3
)
,
3
/
1
2
/
2
0
2
6
2
:
5
9
:
1
5
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 192 of 209
725 Creston Rd, Suite C
Paso Robles, CA 93446
(805) 239-3127
northcoastengineering.com
CIVIL ENGINEERING
LAND SURVEYING
PROJECT DEVELOPMENT
R:
\
P
R
O
J
\
2
4
1
2
0
\
D
e
s
i
g
n
\
P
l
a
n
S
e
t
\
2
4
1
2
0
D
E
T
A
I
L
S
.
d
w
g
,
S
T
D
D
E
T
(
4
)
,
3
/
1
2
/
2
0
2
6
2
:
5
9
:
2
0
P
M
,
B
E
A
,
1
:
1
03/13/2026
Page 193 of 209
SHARED PATH
SHARED PATH
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
S
H
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SHAR
E
D
P
A
T
H
SHA
R
E
D
P
A
T
H
S
F
A
I
R
O
A
K
S
A
V
E
S HALCYON RD
LEGEND
CONSTRUCTION NOTES (THIS SHEET ONLY):
1
HALCYON COMPLETE STREETS PROJECT
FAIR OAKS AVE AT HALCYON RD ROUNDABOUT LIGHTING PLAN
AIP NS, RM,JAC ACM AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 13/12/2026
Page 194 of 209
35 35
////////////////////////////////////////////
///////////////////////////////////////
////////
/////////////////////
//////
//////
S HALCYON RD
N HALCYON RD
E
G
R
A
N
D
A
V
E
1
HALCYON COMPLETE STREETS PROJECT
GRAND AVE AT HALCYON RD SIGNAL REMOVAL PLAN
AIP NS, RM ACM AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 43/12/2026
Page 195 of 209
/////////////////////////////////////////
///////////////////////////////////////
////////
/
//////
//////
S HALCYON RD
N HALCYON RD
E
G
R
A
N
D
A
V
E
CONSTRUCTION NOTES (THIS SHEET)
2
HALCYON COMPLETE STREETS PROJECT
GRAND AVE AT HALCYON RD SIGNAL MODIFICATION PLAN
AIP NS, RM ACM AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 43/12/2026
Page 196 of 209
CONDUCTOR SCHEDULE
AWG OR
CABLE SIZE
POLE OR
CIRCUIT
RUNS
3-12 WIRE
CONDUCTOR
CABLES
TOTAL 3-12 CABLES
NO. 14
NO. 10
NO. 6
TYPE C DLC
OPTICOM
CABLES
POLE AND EQUIPMENT SCHEDULE
ĕ
ė
ĕ
ė
ĕ
ė
ĕ
ė
HALCYON COMPLETE STREETS PROJECT
GRAND AVE AT HALCYON RD POLE AND CONDUCTOR SCHEDULES 3
AIP NS, RM ACM AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 43/12/2026
Page 197 of 209
//////////////////////////////////////////
//////////////////////////////////////
/
/
/
/
/
/
/
/
/
/
S
F
A
I
R
O
A
K
S
A
V
E
S HALCYON RD TO
D
D
L
N
4
HALCYON COMPLETE STREETS PROJECT
FAIR OAKS AVE AT HALCYON RD SIGNAL REMOVAL PLAN
AIP NS, RM ACM AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 43/12/2026
Page 198 of 209
SIGN LETTER SIGN DESIGNATION PANEL SIZE SIGN MESSAGE
NO OF POSTS
AND SIZE
NO OF SIGNS PER
ASSEMBLY
AIP JAC CN AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 63/12/2026 1
N/A
N/A
ROADSIDE SIGN QUANTITIES
HALCYON COMPLETE STREETS PROJECT
SIGN QUANTITY TABLE & CONSTRUCTION NOTES
CONSTRUCTION NOTES:
Page 199 of 209
7'
-
0
"
1'-0"
4"
3'
-
0
"
3'
-
2
"
3'
-
6
"
1.5'
7'
-
0
"
1'-0
"
4"
3'
-
0
"
3'
-
2
"
3'
-
6
"
1'-0
"
4"
2'-6"
7'
-
0
"
3'
-
6
"
3'
-
6
"
6'
SHARED PATH
SHARED PATH
AIP JAC CN AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 63/12/2026 2
N/A
N/A
HALCYON COMPLETE STREETS PROJECT
CONSTRUCTION DETAILS
Page 200 of 209
B
E
N
N
E
T
T
A
V
E
BE
N
N
E
T
T
A
V
E
F
A
E
H
S
T
EL
C
A
M
I
N
O
R
E
A
L
N HALCYON RD
//
///
//////
////////////
PA
R
K
W
Y
S HALCYON RD
E
G
R
A
N
D
A
V
E
N HALCYON RD
/////////////////////////////////
////////
///////////////////
////
//////////////////
////////
/
/
//////////
///
AIP JAC CN AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 63/12/2026 3
N/A
N/A
HALCYON COMPLETE STREETS PROJECT
SIGNING AND STRIPING PLAN
STRIPING LEGEND (THIS SHEET)
//////////////////////////
/////////////
Page 201 of 209
DO
D
S
O
N
W
Y
S HALCYON RD
/////////////////
///////////////////////////////////////////////////////////////////////
///////////////////////////////////////
S HALCYON RD
////////////////////////////////////////////////////////////////////////
//////////////////////////////////////////////////////////////////////
AIP JAC CN AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 63/12/2026 4
N/A
N/A
HALCYON COMPLETE STREETS PROJECT
SIGNING AND STRIPING PLAN
STRIPING LEGEND (THIS SHEET)
/////////////
/////////////
/////////////
Page 202 of 209
S HALCYON RD
S
F
A
I
R
O
A
K
S
A
V
E
S HALCYON RD
TO
D
D
L
N
SHARED PATH
SHARED PATH
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SHARED PATH
SHARED PATH
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
S
H
A
R
E
D
P
A
T
H
S
H
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SH
A
R
E
D
P
A
T
H
SHA
R
E
D
P
A
T
H
SHAR
E
D
P
A
T
H
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/////////////////////////////////
//////////////////////////////////////
/
/
/
/
/
/
/
/
/
/
//////////////////////////
AIP JAC CN AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 63/12/2026 5
N/A
N/A
HALCYON COMPLETE STREETS PROJECT
SIGNING AND STRIPING PLAN
STRIPING LEGEND (THIS SHEET)
/////////////
/////////////
Page 203 of 209
S FAIR OAKS AVE
SA
N
D
A
L
W
O
O
D
A
V
E
S HALCYON RD
AVE
FA
R
R
O
L
L
A
V
E
OL
I
V
E
S
T
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////////////////////////////////////
///////////////////////////////////////
//////////////////////////////////////////////////
AIP JAC CN AGR004
W-Trans
490 Mendocino Avenue, Suite 201
Santa Rosa, CA 95401
(707) 542-9500 Fax (707) 542-9590 63/12/2026 6
N/A
N/A
HALCYON COMPLETE STREETS PROJECT
SIGNING AND STRIPING PLAN
STRIPING LEGEND (THIS SHEET)
/////////////
/////////////