Loading...
HomeMy WebLinkAboutCC 2026-04-28_11b Trafic Way Bridge Detour Elements_PP PResentation Traffic Way Bridge Replacement Project Detour Elements Discussion 1 Background March 28, 2018 – secured grant funding for TWB replacement September 9, 2024 – discussed detour options. December 10, 2024 – awarded project May 17, 2025 – began detour December 17, 2025 – removed detour February 24, 2026 – project accepted March 24-26, 2026 – FlashVote survey 2 Detour Elements Installed a temporary traffic signal light at the Bridge Street and East Branch Street intersection, closed Nevada Street at Branch Street, and made Bridge Street one-way.   Installed a temporary traffic signal on Fair Oaks Avenue at the southbound Highway 101 offramp. Installed a temporary traffic circle on Fair Oaks Avenue in front of the middle driveway to the AGHS parking lot, intended to be removed in the summer of 2026. 3 Bridge and East Branch Signal Olohan Alley N Issues: Offset intersection Some cars still turn left onto Branch Recommendation: Leave as-is (preconstruction configuration) Nevada E. Branch 4 Fair Oaks/101/Orchard Signal Issues: Offset intersection Backup onto freeway Caltrans coordination High improvement costs Recommendation: Leave as-is (preconstruction configuration) N Fair Oaks Offramp 101 Orchard 5 AGHS Temporary Traffic Circle Issues: Size Speeding Poor yielding Traffic patterns Recommendation: Add speed feedback signs Remove 2 trees Education Enforcement Permanency 6 AGHS Permanent Roundabout Option 1 10’ ROW ACQUIRED FROM SOUTH PARCEL 7 AGHS Permanent Roundabout Option 2 30’ ROW ACQUIRED FROM NORTH PARCEL & 10’ ROW ACQUIRED FROM SOUTH PARCEL 8 Bridge Street/Branch Street - make no changes - do not reinstall the traffic signal and keep Nevada Street open. Fair Oaks Avenue/Highway 101/Orchard Street – make no changes – this effort could be prioritized at a later date if feasibility, budgeting, and scheduling factors are clarified. AGHS temporary traffic circle - leave the temporary traffic circle in place at this time: add speed feedback signs increase education and enforcement remove two trees work towards installing a larger, more permanent roundabout as space is obtained or becomes available through cooperative collaboration or as a result of development. Recommendation 9