Loading...
HomeMy WebLinkAboutCC 2026-04-28_11c Halcyon Complete Streets Project Pre-Bid_PP Preentation Halcyon Complete Streets Project Pre-Bid 1 Project Goal Transform Halcyon Road from a vehicle-centric facility to a welcoming environment that will provide for safe mobility and accessibility, connecting people by enhancing the built environment for all modes of travel. 2 Project Elements Storm drain line New paving Continuous, repaired sidewalks Bike lanes Trees Roundabout at Halcyon and Fair Oaks 3 Background Project initiated in 2013. Active Transportation Program Grant Conceptual Plan adopted by Council 7/25/23 Hired North Coast Engineering 30% design review 2/25/25 CTC allocated construction funding 3/19/26 100% plans 3/13/26 4 Street Trees Goal: 200 Actual: 127 Why not more? Sight Distance  19 cross streets 84 drive approaches Utility conflicts 5 On-street Parking 161 existing parking spaces. Conceptual Plan – keep 39, lose 122. Actual – lose 127. 6 Budget Current construction funding: $9,548,500 ATP grant: $6,885,000 Measure E-24 sales tax: $1,875,000 Development Impact Fees: $788,500 7 Utilities 8 Outreach Conceptual Plan 4 interactive Charettes Surveys City Council Meetings 7/25/23 - Conceptual Plan 2/25/25 – 30% design review Community Meeting 4/27/26 173 letters mailed Project Webpage: arroyogrande.org/hcs Project email: halcyon@arroyogrande.org 9 Review specific details of the draft final design of the Halcyon Complete Streets Project (“Project”) and direct staff to advertise the Halcyon Complete Streets Project for construction as designed. Recommendation 10