Loading...
HomeMy WebLinkAboutR 2026-04165501.00015\42788974.6 RESOLUTION NO. 2026-041 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE AUTHORIZING THE CITY MANAGER TO EXECUTE A CONSTRUCTION CONTRACT FOR THE REBID ROOF REPAIRS ON CITY STRUCTURES PROJECT TO KRGS ROOFING, INC. AND A CONSTRUCTION CONTRACT FOR THE CITY HALL BALCONY AND EXTERIOR REHABILITATION PROJECT TO BC CONSTRUCTION AND ELECTRIC (BC) WHEREAS, the City commissioned an assessment of the roofs on City facilities and determined that minor repairs were required at four facilities and major repairs at three facilities; and WHEREAS, in September 2025, the City received responsive bids for the Roof Repairs on City Structures Project, but City Council rejected all bids on October 15, 2025, due to the bids being significantly over budget and directed staff to rebid the minor repairs and major repairs separately; and WHEREAS, minor roof repairs were completed at City Hall, Police Department, Fire Department, and Women’s Club in February 2026; and WHEREAS, staff advertised the Rebid Roof Repairs on City Structures Project to address major roof repairs at City Council Chambers and Old City Hall, receiving responsive bids on May 22, 2026, that were within the budget; and WHEREAS, staff recommends awarding the construction contract for the Rebid Roof Repairs on City Structures to the lowest responsive bidder, KRGS Roofing, Inc., for $117,000; and WHEREAS, the City Hall Balcony and Exterior Rehabilitation Project was identified to address ongoing water intrusion and exterior deterioration at City Hall including repairs to the balcony, railing, and decking systems, waterproofing, and siding; and WHEREAS, staff advertised the City Hall Balcony and Exterior Rehabilitation Project , and received responsive bids on May 22, 2026, that were within the budget; and WHEREAS, staff recommends awarding the construction contract for the City Hall Balcony and Exterior Rehabilitation Project to the lowest responsive bidder, BC Construction, for $188,749; and WHEREAS, the FY 2025-26 budget includes $370,000 for the completion of both the Roof Repairs on City Structures and the rehabilitation of City Hall balcony and exterior. RESOLUTION NO. 2026-041 PAGE 2 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Arroyo Grande, as follows: 1.RECITALS. The foregoing recitals are true and correct and are incorporated herein. 2.BID AWARD. The City Council authorizes the City Manager or designee to execute a construction contract for the Roof Repairs on City Structures Project to KRGS Roofing, Inc. for $117,000, and a construction contract for the City Hall Balcony and Exterior Rehabilitation Project to BC Construction for $188,749, subject to any minor, technical, or non-substantive changes as approved by the City Manager in consultation with the City Attorney, and to approve change orders as needed for either project up to $44,639.14 for unanticipated costs during the construction phase of both Projects. The City Council incorporates the analysis of the Staff Report dated June 9, 2026, accompanying this item, as part of the passage of this Resolution. 3.CEQA FINDINGS. The City Council finds that the proposed action is categorically exempt from the California Environmental Quality Act (“CEQA”) under the Class 2 exemption, which applies to the replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. (State CEQA Guidelines, § 15302.) Since the projects involve the repair, replacement, and rehabilitation of existing City facility components, there will be no expansion of use or capacity. Therefore, the Class 2 exemption applies. On motion of Council Member Guthrie, seconded by Council Member Secrest, and on the following roll call vote, to wit: AYES: Council Members Guthrie, Secrest, Loe, Maraviglia, and Mayor Ray Russom NOES: None ABSENT: None the foregoing Resolution was passed and adopted this 9th day of June, 2026. CAREN RAY RUSSOM, MAYOR ATTEST: JESSICA MATSON, CITY CLERK APPROVED AS TO CONTENT: MATTHEW DOWNING, CITY MANAGER APPROVED AS TO FORM: ISAAC ROSEN, CITY ATTORNEY RESOLUTION NO. 2026-041 PAGE 3 RESOLUTION NO. 2026-041 PAGE 4 Exhibit “A” License: Class A 372751 DIR#:1000004631 Addendum:Yes Bid Bond:Yes No. SS(1)Description Estimated Quantity Unit Unit Cost Total Cost 1 77 Mobilization, Pothole, Demobilization and Cleanup 1 LS $18,000.00 $18,000.00 2 77 Sheeting, Shoring, Bracing, Shielding and Excavation Safety Measures 1 LS $6,000.00 $6,000.00 3 7, 12 Traffic Control 1 LS $35,000.00 $35,000.00 4 13 Water Pollution Control Plan 1 LS $3,000.00 $3,000.00 5 77 6" C900 PVC Waterline 221 LF $180.00 $39,780.00 6 77 8" C900 PVC Waterline 296 LF $190.00 $56,240.00 7 77 8" Waterline Tie-in at Wesley St & W Branch St 1 LS $14,000.00 $14,000.00 8 77 Larchmont Drive & Wesley Street Lowering & Connection 1 LS $13,000.00 $13,000.00 9 77 6" Waterline Tie-in at Vernon St & W Branch St (special order hot tap sleeve per plan)1 LS $13,000.00 $13,000.00 10 77 Connection on Vernon Street to Existing 6" ACP 1 LS $10,000.00 $10,000.00 11 77 Install Air & Vacuum Relief Valve Assembly 1 EA $7,000.00 $7,000.00 12 77 Install Fire Hydrant Assembly (hydrant provided by City) & Blue Reflector 1 EA $14,000.00 $14,000.00 13 77 Reconnect Fire Hydrant Assembly in Street 1 EA $8,500.00 $8,500.00 14 77 Reconnect Double Check Detector w/ FDC in Street 1 LS $8,500.00 $8,500.00 15 73, 77 Reconnect Water Service Manifold in Street 1 LS $8,000.00 $8,000.00 16 73, 77 Reconnect 1" Water Services in Street 2 EA $2,500.00 $5,000.00 17 73, 77 Reconnect 2" Water Services in Street 1 EA $4,000.00 $4,000.00 18 73, 77 1.5"-2" Water Service Replacement & Sidewalk Repairs 1 EA $12,000.00 $12,000.00 19 73, 77 1" Water Service Replacement in Unpaved 1 EA $5,500.00 $5,500.00 20 77 Disinfection & Pressure Testing of Piping 517 LF $12.00 $6,204.00 21 77 Abandonment, Cap and Demolition of Existing Water Lines & Valves 1 LS $9,000.00 $9,000.00 22 77 Remove Fire Hydrant Assembly & Abandon 1 EA $1,500.00 $1,500.00 23 39, 77, 84 Pavement Trench Repair (allowance)51 TON $700.00 $35,700.00 24 39, 77, 84 Pavement Stencil (allowance)1 LS $2,000.00 $2,000.00 25 39, 77, 85 Red Curb Paint (allowance)60 LF $10.00 $600.00 $335,524.00 BASE BID R. Baker, Inc. P.O. Box 419 Arroyo Grande, CA 93421 BASE BID: No. Description Unit Unit Cost Quantity Total Cost Quantity Total Cost 1 Replace 1" Galvanized Water Service with Brass & PVC per City Standard 6210, average 20 LF length, including meter box (OldCastle Fibrelyte FL12)EA $3,300.00 164 $541,200.00 66 $217,800.00 2 Replace and Reconnect Meter Boxes (OldCastle Fibrelyte FL12) on a shared water service EA $2,400.00 24 $57,600.00 7 $16,800.00 3 Concrete pad and sidewalk repair around meter boxes, estimated 20 SF per service, per City Std. 4110 SF $47.50 3280 $155,800.00 1320 $62,700.00 $754,600.00 $297,300.00 REVISEDBID ALTERNATE 1 ORIGINAL OFFICIAL CERTIFICATION I, JESSICA MATSON, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 2026-041 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 9th day of June, 2026. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 11th day of June, 2026. JESSICA MATSON, CITY CLERK