Loading...
CC 2013-02-12_08.g. Replacement Pump and Pipe Column for Well No. 6MEMORANDUM TO.: CITY COUNCIL FROM: GEOFF ENGLISH, DIRECTOR OF PUBLIC WORKS BY: SHANE TAYLOR, PUBLIC WORKS SUPERVISOR -UTILITIES SUBJECT: CONSIDERATION TO APPROVE THE PURCHASE OF A REPLACEMENT PUMP AND PIPE COLUMN FOR WELL NO. 6 DATE: FE,BRUARY 12, 2013 RECOMMENDATION: It is recommended the City Council: 1. Approve the purchase of a replacement vertical turbine pump and pipe column for Well No. 6 in the amount of $14, 120; and 2. Authorize an appropriation of$7,000 from the Water Fund. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The funding fer the replacement pump and pipe column will b~ from two sources. The Water Fund will contribute $7,060 and the Parks Department will contribute $7,060. The Water Fund account 640-4711-5603 will r~quire an appropriation from the Water Fund balance of $7,000 to support this replacement. Restoration work will involve approximately 40 manhours. BACKGROUND: Well No. 6 is the City's irrigation well that was drilled in 1956. The pump and pipe co.lumn were replaced in 2005. During the we'ek of December .31, 201.2 the JDUmp shaft. broke 130 feet down the we'll, at the pump. The vertical turbine pump and pipe c0lumn were removed and inspected.. The pump showed signs 0.f bearing failure and the recommendation from the contractor, M & W Pumps, Inc. was to replace the pump and inner column and a portion of the 6-inch column pipe. Quotations were obtained from three (3) licensed well pump contractors. The lowest responsible quotation was from M & W Pump, Inc. ALTERNATIVES: The following alt~rnatives are provided for the Council's consideration: 1) Approve a purchase· b'rder in the amount of $14,t20 and autherize an appropriation of ·$7,000 from the Water Fund; 2) Do not approve the purchase order and appropriation; 3) Modify as appropriate and approve staff's recommendation; or 4) Provide direction to staff. Item 8.g. - Page 1 CITY COUNCIL CONSIDERATION TO APPROVE THE PURCHASE OF A REPLACEMENT PUMP AND PIPE COLUMN FOR WELL NO. 6 FEBRUARY 12, 2013 PAGE2 ANALYSIS OF ISSUES: Well No. 6 is part of the Elm Street Park/Soto Sports Complex irrigation system. The system utilizes stored storm water from the retention basins and the well to provide non-potable water to irrigate the Park/Complex and also provide construction water. The irrigation system has been in service since 1986 and on average saves 100-acre feet of potable water per year. In addition, on average $6,000 per year for the last ten years was reeeived from sales of construction water. ADVANTAGES: Replacement of the pump and pipe will allow continuecl use of non-poJa!Dle water to irrigate the. Park/Complex. DISADVANTAGES.: Ne disadvantages are evident. ENVIRONMENTAL REVIEW: No environmental review is required for this item. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted in front of City Hall on Thursday, February 7,. 2013. The Agenda and staff report were posted on the City's website on Friday, February 8, 2013. No public comments were received. Attachments: 1. Quotation Summary Sheet Item 8.g. - Page 2 CITY OF ARROYO GRANDE QUOTATION EVALUATION SUMMARY DATE PREPARED: 1/28/13 DEPARTMENT: Public Works PREPARED BY: Shane Taylor SUPPLIER'S .NAME x WRITTEN QUOTATIONS VENDOR: Taylor Drilling VERBAL{fELEPHONE QUOTATIONS Telephone QUOTED .Ron Taylor ITEM# DESCRIPTION QUANTITY UNIT UNIT TOTAL PRICE PRICE 1 .Replace pump and pipe column for Well #6 per attached Estimates. Tax TOTAL QUOTATION 1'4,44Q.45. CASH DISCOUNT TERMS F.O.B. DELIVERY TIME FROM RECEIPT OF ORDER Policy#: c~oo11002 SUPPLIER'.S NAME M&W pumps .925-1147 Frank.M. UNIT TOTAL PRICE PRICE 14, 120.00. SUPPLIER'S NAME .Fisher Pump & Well .346-2422 .Rob Thompson UNIT TOTAL PRICE PRICE Tax 16,868.00. )> -f -f )> 0 J: s: m z -f ~ It e m 8 . g . - P a g e 3 THIS PAGE INTENTIONALLY LEFT BLANK Item 8.g. - Page 4