R 4507RESOLUTION OF •
OF • • GRANDE ADJUSTING SEWE
CONNECTION
CONSTRUCTION ENGINEERING NEWS RECORD
WHEREAS, the City Council adopted Ordinance 528 C.S. amending Section 13.12.190
of the Municipal Code regarding sewer connection fees; and
WHEREAS, pursuant to Section 13.12.190 the City Council may by resolution establish
the amount of the sewer connection fees, pursuant to the above referenced Ordinance;
and
WHEREAS, Resolution 3567 authorizes an annual adjustment in the sewer connection
fees based on the changes in the annual average Engineering News Record
Construction Cost Index.
NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo
Grande hereby adopts the sewer connection fees set forth in Exhibit "A" attached hereto
and incorporated herein by this reference as though set forth in full. In accordance with
Government Code Section 66017, this Resolution shall take effect sixty (60) days after
its adoption.
On motion of Council Member Costello, seconded by Council Member Guthrie, and on
the following roll call vote, to wit:
AYES: Council Members Costello, Guthrie, Ray, Brown and Mayor Ferrara
NOES: None
ABSENT: None
the foregoing Resolution was passed and adopted this 12th day of February, 2013.
o • ;1 i
F-w4mmommumm., Wnrufalf mf
• -iE. CITY CLERK
"Z• • •\ tic
InAb .
r,
TI THY J. dARMt , 1TY ATTORNEY
EXHIBIT A
SEWER CONNECTION FEES
EFFECTIVE 4/15113
For each connection of a building sewer to a public sewer,, a connection fee shall be collected by the
City before the permit for the connection work is issued. The amount of the fee ,collected is as follows.,
'Connection Fee,
2009 2010 2011
2012
9070
ENR index
8310
8570
8802
Residential - per dwelling unit
3/4 inch
1,456
1,502
Single Family $
972 $
1,002 $
1,029 $
Multifamily (a)
720
743
763
Trailer Park/Mobile Home
797
822
844
Non - Residential - per water meter size (b)
'7,780
8,023 8;240
2013
9308
1,056 $ 1,084
783 804
866 889
5/8 inch
$ 972
$ 1,002
$ 1,029
$ 1,056 $
3/4 inch
1,456
1,502
1,543
1,583
1 inch
2,431
2,507
2,575
2,642
1 1/2 !rich
4,862
5,014
5,150
5,285
2 inch
'7,780
8,023 8;240
•8,456
3 inch
14,587
15,043
1.5;451
15,856
4 inch
24„312
25,07,3
25•752
26,427
6 inch
48,623
50,144.
61,503
52,852
8 inch
97;246
1.00,289,
103,,,007
105,,,7,06;
10 inch
145,869
150,433
154,510
158,,558
12 inch
213941
220,635
226,614
232,551
(a) Multifamily includes duplex, triplex, apartments, and condominiums
(b) For meter sizes larger than shown, connection fee determined based
on the ratio of the maximum safe operating capacity of the meter to
that of a 5/8 inch meter.
The connection fees shall be increased each year with the annual percentage increase of the
annual average ENR Construction Cost Index as established in the Engineering News Record
publication.
Adjustment Formula:
Adjusted Fee = (Current Fee) x (Current Year ENR index)1 (Prior Year ENR index)
1,084
1,625
2,712
5,423
8,677
16,271
27',119
54,237
108,475
162 „712
238,644
AI U 9 LGA F-Al :4 0 1 a �
I, KELLY WETMORE, City Clerk of the City of Arroyo Grande, County of San Luis
Obispo, State of California, do hereby certify under penalty of perjury, that the attached
Resolution No. 4507 is a true, full, and correct copy of said Resolution passed and
adopted at a Regular meeting of the City Council of the City of Arroyo Grande on the
12th day of February, 2013.
WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 13th day of
February 2013.