CC 2013-04-23_08.f. Award Contract - Concrete Repair ProjectMEMORANDUM TO: CITY COUNCIL FROM: BY: GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER SUBJECT: CONSIDERATION OF AN AWARD OF CONTRACT TO J. J. FISHER CONSTRUCTION, INC. FOR CONSTRUCTION OF THE 2013 CONCRETE REPAIR PROJECT, PW 2013-01 DATE: APRIL 23, 2013 RECOMMENDATION: It is recommended the City Council: 1. Award a contract for construction of the 2013 Concrete Repair Project to J.J. Fisher Construction, Inc. in the amount of $41,469; 2. Authorize the City Manager to approve change orders for 20% of the contract amount, $8,294, for additional work and unanticipated costs during the construction phase of the project (total construction costs = $41,469 + $8,294 = $49, 763); and 3. Direct the City Clerk to file a Notice of Exemption. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: As of March 18, 2013, there was $70, 107 remaining in the Capital Improvement Program budget concrete repair account for FY 2012-13. BACKGROUND: The City has established a goal of eliminating all trip and fall hazards located on City right of way. The project scope of work involves the replacement of sidewalk, curb and gutter, and driveway approach segments along East Grand Avenue, Halcyon Road, and South Elm Street that have experienced damage from adjacent trees. Each site is unique, but the general scope of work involves selective demolition of concrete and asphalt, inspection of the tree roots by the City Arborist, root pruning, and the replacement of concrete sidewalk, driveway approaches, and curb and gutter to return the area to its original condition. Tree removal and replacement is necessary at three specific locations. The work requires coordination to ensure that disruptions to the streets are minimized. Item 8.f. - Page 1 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO J.J. FISHER CONSTRUCTION, INC. FOR CONSTRUCTION OF THE 2013 CONCRETE REPAIR PROJECT, PW 2013-01 APRIL 23, 2013 PAGE2 The City administered two similar projects in 2012 to address damaged concrete sidewalk and driveway approach segments for various locations throughout the City. ANALYSIS OF ISSUES: Sidewalk improvements are one of the priorities identified in the City's Critical Needs Action Plan. In particular, City staff has received a number of complaints from the public regarding sidewalks in this area. On March 26, 2013, nine bids were opened for the 2013 Concrete Repair Project. The lowest bid, from the J.J Fisher Construction, Inc., was in the amount of $41,469. Staff has determined the bid to be responsive and recommends the award of a construction contract to the J.J Fisher Construction, Inc. The contractor will complete some additional concrete repair work as directed by staff under this agreement using available contingency funds. The contract time is 30 calendar days. Work is expected to begin in late October. ALTERNATIVES: The following alternatives are provided for the Council's consideration: 1. Approve staff's recommendations to award a construction contract to the lowest responsive bidder; 2. Do not award a construction contract for the project at this time; or 3. Provide direction to staff. ADVANTAGES: The project will reduce the number of trip and fall hazards along selected city streets, address complaints from the public and improve access for individuals with disabilities. DISADVANTAGES: No disadvantages were identified at this time. ENVIRONMENTAL REVIEW: The project is categorically exempt from CEQA pursuant to Guidelines Section 15301(c). PUBLIC NOTIFICATION AND COMMENTS: The agenda was posted on Thursday, April 18, 2013. The agenda and staff report was posted on the City's website on Friday, April 19, 2013. No public comments were received as of the time of preparation of this report. Attachment: 1. Bid Tabulations 2. Notice of Exemption Item 8.f. - Page 2 BID OPENING LOG SHEET CITY OF ARROYO GRANDE DEADLINE: MARCH 26, 2013 -2:00 PM 2013 Concrete Repair Project SUBMITTED BY: R. Burke Corporation San Luis Obispo, CA Cooks and Son, Inc. Santa Maria, CA V. Lopez, Jr. & Sons Santa Maria, CA D-Kal Engineering, Inc. San Luis Obispo, CA Rockwood General Contractors, Inc. Nipomo, CA MJ Ross Construction, Inc. Oceano, CA JJ Fisher Construction, Inc. Arroyo Grande, CA Calportland Construction Santa Maria, CA Brough Construction, Inc. Arroyo Grande, CA , Deputy City Clerk c: Director of Community Development Director of Public Works Assistant City Engineer City Manager TOTAL $78,367.00 $44,102.15 $59,966.53 $42,237.50 $63,929.36 $59,913.10 $41,469.00 $42,346.00 $72,152.00 ATTACHMENT 1 Item 8.f. - Page 3 Attachment No. 2 Notice of Exemption To: Office of Planning and Research 1440 Tenth Street, Room 121 Sacramento, CA 95814 l!J County Clerk County of San Luis Obispo County Government Center San Luis Obispo, CA 93408 From: (Public Agency) City of Arroyo Grande 300 East Branch Street Arroyo Grande, CA 93420 Project Title: 2013 Concrete Repair Project. PW 2013-01 Project Location -Specific: Various locations along East Grand Avenue. El Camino Real. North Halcyon Road, and South Elm Street Project Location -City: Arroyo Grande Project Location -County: San Luis Obispo Description of Project: Replacement of damaged concrete sidewalk. curb and gutter. and driveway approach segments that were damaged by adjacent street trees Name of Public Agency Approving Project: City of Arroyo Grande -Public Works Department Name of Person or Agency Carrying Out Project: ---'G=e~o~ff~E=n"""g_11=·s"""h __________ _ Exempt Status: (check one) D Ministerial (Section 12080(b)(1); 15268); D Declared Emergency (Sec. 21080(b)(3); 15269(a)); D Emergency Project (Sec. 21080(b)(4); 15269(b)(c)); l!J Categorical Exemption. State type and section number: ~S~ec=t~io~n~1~5~3~0~1~(c~J ____________ _ D Statutory Exemptions. State code number: Reasons Why Project Is Exempt: Demolish/Replace damaged concrete segments in same location Lead Agency Contact Person: Michael Linn. P.E. Area Code/Telephone/Extension: (805) 473-5444 If filed by Applicant: 1. Attach a certified document of exemption finding. 2. Has a Notice of Exemption been filed by the public agency approving the project? l!J Yes D No Signature: Geoff English Public Works Director l!J Signed by Lead Agency D Signed by Applicant Date: ______ _ D Date received for filing at OPR: Item 8.f. - Page 4