Loading...
CC 2013-08-27_08.g. Award Contract - 2013 Street ResurfacingTO: FROM: BY: MEMORANDUM CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTO~ MIKE LINN, ASSISTANT CITY ENGINEER SUBJECT: CONSIDERATION OF AN AWARD OF CONTRACT TO AMERICAN ASPHALT SOUTH, INC. FOR CONSTRUCTION OF THE 2013 STREET RESURFACING PROJECT, PW 2013-08 DATE: AUGUST 13, 2013 RECOMMENDATION: It is recommended the City Council: 1. Award a contract for the 2013 Street Resurfacing Project to American Asphalt South, Inc. in the amount of $304,725; 2. Authorize the City Manager to approve change orders for 5% of the contract amount, $15,236 for unanticipated costs during the construction phase of the project (total construction costs= $304,725 + $15,236 = $319,961); and 3. Appropriate $45,706 from the Sales Tax Fund. Funds not used for potential cost over-runs will be returned to the fund balance. (total construction costs = $304,725.07 + $15,236.00 = $319,961.07 x 5% = $45,706); and 4. Direct the City Clerk to file a Notice of Exemption. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The Pavement Management Fund in the 2013/2014 Capital Improvement Program Budget includes $1,261,019 for the 2013 Street Resurfacing Project, the 2013 Citywide Digout Project, and the paving portion of the Fair Oaks Waterline and Street Rehabilitation Project. The street resurfacing project requires significant staff time, but is a top priority in the City's Critical Needs Action Plan. Funding is included in the project budget for construction management services. However, the amount of funding for the resurfacing project does not allow for adequate contingency funding for potential project cost over- runs. Typically, staff requests 10% contingency for capital improvement projects. Due to the nature of the street resurfacing projects and a history of limited cost over-runs for similar projects, staff is requesting a 5% contingency for this project. Item 8.g. - Page 1 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO AMERICAN ASPHALT SOUTH, INC. FOR CONSTRUCTION OF THE 2013 STREET RESURFACING PROJECT PW 2013-08 AUGUST 13, 2013 PAGE2 To include all schedule and bid portions of the Pavement Management projects and to provide a 5% contingency, staff is requesting the authorization to allocate $45,706 from Sales Tax. Staff does not anticipate using this full amount and funds not used for potential cost over-runs will be returned to the Sales Tax fund balance. PROJECT FUNDING SUMMARY EXPECTED PROJECT EXPENDITURES Expenditure Original Contract: Dia-outs-Cal Portland Construction $ 766,041 Contract: Street Resurfacing-American $ 304,725 Inspection Services @ 5% $ 53,538 Contingency (5% of Contract price-$53,538) $ 53,528 TOTAL PROJECT EXPENDITURES $ 1,177,832 PROJECT FUNDING I Pavement Manaaement (FY 13-14) $ 819,335 Pavement Management (Carry over FY 12-13) $ 441,684 Pavement Management (Fair Oaks: Halcyon to Alder) $ (128,893) TOTAL PROJECT REVENUES $ ' 1,132,126 PROJECT BALANCE OF FUNDS $ (45,706) BACKGROUND: The scope of work involves the application of a surface membrane; a Type II slurry seal for residential streets and Type II microsurfacing on arterial and collector streets. Since the membrane applications completely cover the roadway, striping and pavement markings will also be performed. ·Staff developed the project scope of work to correspond to the recommendations of the Pavement Management Master Plan, adopted by Council in September 2010. Street improvements were identified as the City's highest priority unfunded need when the Local Sales Tax measure was approved in 2006. Since then, the City has made significant progress in addressing the worst streets in the City. The City has established a goal of improving all streets on a 7-year cycle. ANALYSIS OF ISSUES: It is important to emphasize again the general pavement management strategy that the City has been pursuing since the Local Sales Tax measure was approved. It includes an effort to concurrently improve some of the worst streets each year, while also providing maintenance to those streets that are in good condition. This sometimes results in confusion by the public when they see streets improved, while there are others in worse condition. However, since street reconstruction work is so expensive, the City would fall further behind each year if all the funds were invested in ~those Item 8.g. - Page 2 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO AMERICAN ASPHALT SOUTH, INC. FOR CONSTRUCTION OF THE 2013 STREET RESURFACING PROJECT PW 2013-08 AUGUST 13, 2013 PAGE3 projects. Under the current strategy, more streets are brought up to good condition each year, while preventative maintenance is provided to those in good condition to avoid more expensive treatments in the future. On August 30, 2013, six bids were opened for the 2013 Street Resurfacing Project. The lowest bid, from American Asphalt South, Inc. was in the amount of $304,725. The project scope of work is as follows: Street Name From To Surface SF Treatment Schedule A -Villal!:e Area Allen Street Traffic Way Garden Street Micro Surfacing 76,248 Cherry A venue Traffic Way PC Railway Place Micro SurfaCing 38,135 Cherry A venue PC Railway Branch Mill Road Micro Surfacing 51,000 Cross Street Allen Street Ide Street Slurry Seal 26,400 Garden Street East Cherry Ave Ide Street Slurry Seal 49,760 Hawkins Court End of Cul-de-Sac Cross Street Slurry Seal 5,320 Ide Street Whiteley Street Garden Street Slurry Seal . 38,400 Mason Street E. Branch Street Nelson Street Micro Surfacing 22,212 Mason Street Nelson Street Allen Street Micro Surfacing 33,408 Nelson Street Traffic Way Mason Street (South) Micro Surfacing 34,940 Nelson Street Mason Street (South) End of Cul-de-Sac Micro Surfacing 24,876 Noguera Place End of Cul-de-Sac Myrtle Street Slurry Seal . 13,896 PC Railway Place East Cherry Ave Allen Street Slurry Seal 14,760 PC Railway Place Allen Street End of Street Slurry Seal 4,200. Poole Street Traffic Way Mason Street (South) Slurry Seal 30,000 Poole Street Mason Street (South) Whitely Street Slurry Seal 4,824 Short Street Allen Street Nelson Street Slurry Seal 32,904 Short Street Nelson Street End of Street (creek) Slurry Seal 10,980 Whitely Street Poole Street Nelson Stret Slurry Seal 23,256 Whitley Street End of Street Poole Street Slurry Seal 14,400 Whitley Street Nelson Street End of Street (creek) Slurry Seal 15,120 Schedule B -Bril!:hton and Fair View Bricltton Ave Oak Park Blvd Courtland Street Slurry Seal 27,120 Fair View Drive East Grand Ave Bri!!hton Ave Slurry Seal 40,248 Schedule C -Fair Oaks Avenue Fair Oaks Ave Halcyon Road (South) Woodland Drive Micro Surfacing 47,400 Fair Oaks Ave Elm Street (South) Pecan Street Micro Surfacing 71,400 Fair Oaks Ave Pecan Street S. Halcyon Rd. Micro Surfacing 84,000 Schedule D -Halcvon Road Halcyon Pike Fair Oaks Micro Surfacing 90,000 Halcyon Fair Oaks Grand Micro Surfacing 82,560 Halcyon Grand El Camino Micro Surfacing 63,600 Schedule E -East Grand Avenue East Grand A venue Halcyon Road El Camino Real Micro Surfacing 134,368 Item 8.g. - Page 3 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO AMERICAN ASPHALT SOUTH, INC. FOR CONSTRUCTION OF THE 2013 STREET RESURFACING PROJECT PW 2013-08 AUGUST 13, 2013 PAGE4 Staff has determined the bid to be responsive and recommends the award of a construction contract to American Asphalt South, Inc. in the amount of $304,725.07. The contract time is 30 calendar days. Work is expected to begin in October and complete in November. The primary reason the project is over budget is that it was recently determined the City is responsible for paving East Grand Avenue over the bridge instead of Caltrans. As a result, repaving of this segment was added to the project. ALTERNATIVES: The following alternatives are provided for the Council's consideration: 1. Approve staffs recommendations to award a construction contract to American Asphalt South, Inc. for the 2013 Street Resurfacing Project; 2. Do not award a construction contract for the project; or 1 3. Provide direction to staff. ADVANTAGES: The consistent application of slurry seals and microsurfacing is part of a yearly maintenance program essential to ensure the integrity of the City's roadway network. The program is designed to apply maintenance treatments to every street in the City on an ongoing seven year cycle. The recommendations maintain funding for the highest priority projects and minimize deferring improvement of streets in the approved pavement management program. DISADVANTAGES: There is a temporary inconvenience to the traveling public as vehicles are rerouted when the surface treatments are applied. ENVIRONMENTAL REVIEW: The project is categorically exempt from CEQA pursuant to Section 15301 (c). PUBLIC NOTIFICATION AND COMMENTS: The agenda was posted at City Hall on Thursday, August 8, 2013. The agenda and staff report was posted on the City's website on Friday, August 9, 2013. No public comments were received as of the time of preparation of this report. Attachment: 1. Bid Tabulations 2. Notice of Exemption Item 8.g. - Page 4 Attachment No. 1 BID OPENING LOG SHEET CITY OF ARROYO GRANDE DEADLINE: JULY 30, 2013 -3:00 PM Street Resurfacing Project SUBMITTED BY: Roy Allen Slurry Seal, Inc. Santa Fe Springs, CA lntermountain Slurry Seal French Camp, CA Graham Contractors, Inc. San Jose, CA Central Valley Engineering & Asphalt, Inc. Roseville, CA VSS International West Sacramento, CA American Asphalt South, Inc. Fontana, CA , Deputy City Clerk c. Director of Public Works Director of Community Development Assistant City Engineer City Manager TOTAL $429,496. 76 $370,370.00 $383,470.90 $412,277.68 $399,204.00 $304,725.07 Item 8.g. - Page 5 Attachment No. 2 Notice of Exemption To: Office of Planning and Research 1440 Tenth Street, Room 121 Sacramento, CA 95814 From: (Public Agency) City of Arroyo Grande l!I County Clerk County of San Luis Obispo County Government Center San Luis Obispo, CA 93408 Project Title: 2013 Street Resurfacing Project. PW 2013-08 Project Location -Specific: Various roadwavs throughout the Citv 300 East Branch Street Arroyo Grande, CA 93420 Project Location -City: A"ovo Grande Project Location -County: San Luis Obispo Description of Project: Perform placement of Slurry Sea/ and Microsurfacing surface maintenance treatments to selected streets throughout the Citv Name of Public Agency Approving Project: Citv of A"ovo Grande -Public Works Department Name of Person or Agency Carrying Out Project: --=G=e=o.:.:..ff-=E:.:..:n.,..gl=is...,h.__ ________ _ Exempt Status: (check one) D Ministerial (Section 12080(b)(1); 15268); D Declared Emergency (Sec. 21080(b)(3); 15269(a)); D Emergency Project (Sec. 21080(b)(4); 15269(b)(c)); l!I Categorical Exemption. State type and section number: -=S=ec=t=io""'"n_,1-=5=3=-01,_,,~=-c).__ __________ _ D Statutory Exemptions. State code number: ---------------------- Reasons Why Project Is Exempt: Application of maintenance surface coatings to Citv streets Lead Agency Contact Person: Michael Linn, P.E. Area CodefTelephone/Extension: (805) 473-5444 If filed by Applicant: 1. Attach a certified document of exemption finding. 2. Has a Notice of Exemption been filed by the public agency approving the project? l!I Yes D No Signature: ------------ Geoff English Public Works Director l!I Signed by Lead Agency D Signed by Applicant D Date: _____ _ Date received for filing at OPR: Item 8.g. - Page 6