Loading...
CC 2014-03-25_09.b. Resolution Adjusting Master Fee ScheduleMEMORANDUM TO: CITY COUNCIL FROM: DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SERVICES-\~ SUBJECT: CONSIDERATION OF A RESOLUTION ADJUSTING CERTAIN OPERA TING FEES SET FORTH IN THE MASTER FEE SCHEDULE DATE: MARCH 25, 2014 RECOMMENDATION: It is recommended the City Council adopt a Resolution adjusting certain operating fees set forth in the Master Fee Schedule, effective July 1, 2014. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: Per Resolution No. 4060, operating fees shall be adjusted annually by modifying the adopted value up or down in conformance with the Consumer Price Index for the Los Angeles region. The factor for the adjustment of the fees shall be calculated and established each year by the Director of Administrative Services, utilizing the following formula: Factor= 1 +Current Index-Base Index for Date of Adoption Base Index for Date of Adoption The Annual index is 239.207. The following formula shows the calculated increase/decrease in the CPI over the prior year. 239.207 -236.648 = 1.08% 236.648 The calculated increase is 1.08%. Based on revenue projections, this will result in an increase of approximately $16,300, which has already been accounted for in the bi- annual budget. In addition, certain fees are recommended for changes based on an analysis of the cost of providing the service and/or market comparisons, such as those in the Recreation Department, which are discussed in more detail further. The proposed change to the annual encroachment permit fee is estimated to generate an additional $23,000 in annual revenue, which is recommended to be used for inspection services related to these permits. Item 9.b. - Page 1 CITY COUNCIL MASTER FEE SCHEDULE UPDATE MARCH 25, 2014 PAGE2 There is minimal staff time required to implement the fee increases. BACKGROUND: Propositions 4 and 13 reduced the ability of cities to generate revenue from property and other taxes. As these traditional General Fund revenue sources became more difficult to forecast and to depend on for financing City services, alternative revenue sources became increasingly necessary. One alternative has been to shift the burden of paying for specific governmental services from the general populace to specific recipients who benefit from the service through user fees. The underlying assumption is that for services benefiting specific individuals and businesses, and not the community as a whole, those individuals and businesses should pay for the cost of some or all of the services. The need to determine the cost of providing user-specific services to individuals or businesses was recognized in 2006 when the City Council approved a contract with Wohlford Consulting to conduct a user (operating) fee study. That study began September 2006 and the results were adopted by Council on December 11, 2007. The Recreation Department fees were not included in this study due to the general policy that these fees (such as child care) should not exceed the costs that other agencies in the surrounding area are charging for the same service. In addition, these fees are not included in the CPI increase due to the fact that they would begin to outpace the fees in surrounding communities. The burden for increasing these fees falls upon the staff on an as needed basis. ANALYSIS OF ISSUES: Since the cost to provide services increases each year, it was the intent of the study that these fees be increased annually. The City could have commissioned operating fee studies to recalculate the growth in costs each year. Rather than spend a considerable sum of money and staff time on yearly studies, a simpler solution was instituted. The fees are generally re-calculated each year by the annual consumer price index (CPI}, which measures the increased cost of living for specific regions of the country. With the City Council approval, the fees are then adjusted to include the CPI increase. The annual increase in CPI, as reported by the U.S. Department of Labor, is 1.08% Attached to this report is a Resolution updating the Master Fee Schedule that states the service provided by the City and the recommended fee. All fees were reviewed to determine if additional adjustments were needed. Staff recommends several minor adjustments for fees that are not historically automatically adjusted by CPI, that are intended to reflect the actual cost of providing the services or Item 9.b. - Page 2 CITY COUNCIL MASTER FEE SCHEDULE UPDATE MARCH 25, 2014 PAGE3 respond to changes in the market for comparable services. These include adjusting the fee charged for setting up new utility accounts from $15 to $30, increasing the fee for reconnecting utility service by City personnel from $30 to $45 and increasing the unauthorized reconnecting of utility services from $50 to $65. In addition, staff recommends increasing the Pre-School annual registration fee from $12 to $15, consistent with the annual registration fee for seasonal playground programs, and increasing the hourly rate for Pre-School from $4.14 to $4.20. Staff also recommends eliminating the non-resident fee of $10 per week for the childcare program. This fee is increasingly administratively burdensome and the elimination represents a very small loss in revenue, estimated at approximately $100 to $200 per year. Staff does not recommend eliminating the non-resident fee for adult softball, the only other program that currently charges a non-resident fee for participation. Staff recommends making a change to the annual encroachment permit fee in order to better reflect actual costs. Utility companies, such as PG & E and Charter, currently obtain one encroachment permit per year, but perform many projects within the right-of- way during the year. Therefore, the fees received are very low for this work when compared to many cities. The terms of the annual permit require the utility company to provide notification to the City regarding work in the right-of-way, which means the City is not being reimbursed for the staff time to review plans and inspect the work. The proposed fee is based on a calculation of the average amount of time required to inspect utility projects and the average number of occurrences per utility in the City. Staff recommends establishing this fee at $5,750 and increasing it by CPI in future years consistent with other fees in the Master Fee Schedule. Staff will also review the amount next year once the City has improved data on the amount of work being performed. The recommendation is associated with the other issues identified related to an insufficient amount of inspection being done by the City on these projects, which has resulted in work not always meeting standards. As a result, the additional revenue from the permit fee will help the City address these issues. ALTERNATIVES: The following alternatives are provided for City Council consideration: 1. Adopt a Resolution increasing the operating fees in the Master Fee Schedule as presented; 2. Do not adopt the Resolution; or 3. Provide direction to staff. ADVANTAGES: By approving the recommended increases the City will be able to maximize revenue by recovering the estimated cost of providing the service and reduce the subsidy borne by the General Fund. Item 9.b. - Page 3 CITY COUNCIL MASTER FEE SCHEDULE UPDATE MARCH 25, 2014 PAGE4 DISADVANTAGES: The disadvantage of the recommendations is that it will result in fee increases. ENVIRONMENTAL REVIEW: No environmental review is required for this item. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted in front of City Hall on Thursday, March 20, 2014. The Agenda and report were posted on the City's website on Friday, March 21, 2014. No public comments were received. Item 9.b. - Page 4 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE ADJUSTING CERTAIN OPERA TING FEES SET FORTH IN THE MASTER FEE SCHEDULE WHEREAS, on December 11, 2007, the City Council adopted Resolution No. 4060 approving a Citywide Master Fee Schedule; and WHEREAS, Resolution No. 4060 requires an annual adjustment to the operating fees set forth therein, based upon changes in the Consumer Price Index (CPI) for the Los Angeles region; and WHEREAS, operating fees are intended to be paid by persons utilizing the program or service and to reimburse the City for the actual cost of said program or service; and WHEREAS, said operating fees no longer accurately reflect the cost of the program or service provided; and WHEREAS, at a duly noticed public meeting, the City Council considered all verbal and written presentations that were made regarding the proposed fees. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo Grande hereby amends certain fees set forth in the Master Fee Schedule in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. BE IT FURTHER RESOLVED by the City Council that this Resolution shall be effective July 1, 2014. On motion of Council Member ___ , seconded by Council Member ____ , and by the following roll call vote, to wit: AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this __ day of ___ , 2014. Item 9.b. - Page 5 RESOLUTION NO. PAGE2 TONY FERRARA, MAYOR ATTEST: KELLY WETMORE, CITY CLERK APPROVED AS TO CONTENT: STEVEN ADAMS, CITY MANAGER APPROVED AS TO FORM: TIMOTHY J. CARMEL, CITY ATTORNEY Item 9.b. - Page 6 CITY OF ARROYO GRANDE MASTER FEE SCHEDULE Fiscal Year 2014~15 Fees effective July 1. 2014 Issued by the Administrative Services Department Item 9.b. - Page 7 EXHIBIT A I Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 ADMINISTRATIVE SERVICES Budget (Bound Copy, estimated 200 (double sided) pages x .20 per page) Financial Statements Business License Fees: (Basic fees are prorated per the application date: Jan1-Jun30, 100%; Jul1-Dec31, 50%) Basic Fee-All businesses except Specific License Fees listed below >Per Employee, Partner, or Associate (Except those listed below) Specific License Fees: Contractor Motels & Hotels (Basic Fee) >per room Trailer Pari<s >per space Hospitals, Sanitariums, Rest or Nursing Homes >per bed Taxi Cabs >per vehicle Billboards Commercial Auctions -Per Year Commercial Auctions -Per Day of Auctioning Circuses and similar shows Bazaars and street fairs: >Small Bazaars (1-4 displays or exhibits) per display per every two (2) days >Large Bazaars (5 or more displays or exhibits) • Includes $1 per license per State law (SB 1186) Copies, per page (Black and White) Color copies Maps-Chamber of Commerce Utility Fees and Penalties: Renter's Deposit New Utility Account Set Up Fee Past Due Penalty (% of Past Due Total) Lock Cut Replacement Fee Reconnection Fee (Reconnect by City Personnel) Unauthorized Reconnection Fee (Reconnect by non-City Personnel) Returned check fee (NSF) -Per CA Civil Code Section 1719 I FY 2014-15 Fee $ 40 copy costs 31* 5 61* 31* 1 31* 1 41* 3 46* 15 126* 86* 26* 70 per day+ $1 SB1186 15 + $1 SB1186 70 per day+ $1 SB1186 0.20 Actual cost 180 30 10% 10 45 65 25 Item 9.b. - Page 8 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES I Fee Description City Council Meeting Audio CD City Council Meeting DVD Candidate Filing Fee Candidate Statement Notice of Intent to Circulate Petition (EC 9202) Copies, per page (Black and White) Color copies Copies of records sent to a commercial copier Document Certification Fair Political Practices Commission Forms: Statement of Economic Interests Form 700 (GC 81008) Campaign Statements (GC 81008) Retrieval fee for statements 5 or more years old (GC 81008) Municipal Code (w/out binder) Municipal Code Supplement Subscription Notary Transcript of City Council proceedings 2 I FY 2014-15 Fee I $ 5.00/each Vendor cost no charge actual cost 200 0.20 Actual cost Actual cost 10 .10/page .10/page 5.00/request 150 25.00/year 10 Actual cost Item 9.b. - Page 9 I Fee Description Incident reports Copies, per page (Black and White) Color copies Special Event Inspection (e.g., fairs) Booth I Tent with Electricity Booth I Tent with Cooking Booth I Tent without Electricity Special Event Application Review Hydrant Flow Calculation Fireworks Permit (Pyrotechnic Show) Fireworks Booth Permit Bum Permit Excessive False Alarm Company Inspections: Failed 2nd Inspection City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 FIRE Multi-Dwelling Fire & Life Safety Inspections: 10 or fewer units 11 -30 units 30 or greater units Weed Abatement Administrative Fee Fire Code Permits and Inspections Hourly Rates: Fire Chief Battalion Chief Fire Captain Fire Engineer Administrative Manager Reserve Firefighter Mechanic 3 I FY 2014-15 Fee I $ 10 0.20 Actual cost 26 26 28 28 21 263 257 693 105 63 110 111 227 354 16.5% of total ab; 378 Provided by Admin Svcs Item 9.b. - Page 10 IFee Description Printing/Copying Charges 8 1/2" x 11 (per page) 18" x 30 (per page) 24" x 36" (per page) 36" x 48" (per page) Standard Plans City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 ENGINEERING Land Use Map and Zoning Maps (each) 24 x 36 36 x48 Welcome to Arroyo Grande Maps Overtime Inspections (per hour -2 hour min.) Lot Line Adjustment Parcel Map (0-4 lots): Tentative -First Lot Tentative -Each Add'I Lot Final -First Lot Final -Each Add'I Lot Tract Map: Tentative -First Lot Tentative -Each Add'I Lot Final -First Lot Final -Each Add'I Lot Encroachment Permit Encroachment Permit -Annual 4 I FY 2014-15 Fee I $ 0.20 3 4 5 35 3 4 4 145 2,983 169 9 169 9 618 23 618 23 250 5,750 Item 9.b. - Page 11 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 ENGINEERING I Fee Description Expedited Plan Check: Engineering Project Management Consultant Review of Improvement Plan Checks: Engineering Project Management -Initial Review Engineering Project Management -Each Add'I Review Certificate of Compliance: Engineering Project Management Certificate of Correction Building Plan Review One-time Annual Permit Building I Structure Moving Permit: Within the City Into the City Through the City Hourly Rates: Assistant City Engineer Associate Engineer Assistant Engineer Engineer Assistant I Technician Interns 5 FY 2014-15 Fee I 1,639 1,639 41 332 184 77 77 64 64 64 Provided by Admin Svcs " " Item 9.b. - Page 12 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 COMMUNITY DEVELOPMENT I Fee Description Development Code w/out Appendices Appendice 1 Appendice 2 Development Code w/Appendices General Plan Housing Element 2003 General Plan EIR Design Guidelines for Historic Districts Design Guidelines for Traffic Way/Station Way Design Guidelines for Mixed Use Districts East Grand Avenue Enhancement Plan Land Use Map and Zoning Maps (each) 24 x 36 36x48 DVD (Planning Commission meetings) Audio Tape copies Copies, per page (Black and White) Color copies Arroyo Grande Bike Plan Downtown Parking in lieu fee (per resolution 3994) Notary Appeals: CD Director to Planning Commission Planning Commission to City ARC Review and/or Amendment Certificate of Compliance Conditional Use Permit: Project (multi building) Time and Materials (if project exceeds 50 hours of staff time) Project (routine) -as det'd by COD Amendment 6 FY 2014-15 Fee I $ 50 15 5 70 25 35 12 25 6 30 20 3 4 Vendor cost 10 0.20 Actual cost 26 24,000 10 263 263 315 788 7,352 3,623 945 Item 9.b. - Page 13 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 COMMUNITY DEVELOPMENT IFee Description Design Review Development Agreement Dev. Code Amendment -Major Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment -Minor General Plan Amendment (Major) Time and Materials (if project exceeds 50 hours of staff time) General Plan Amendment (Minor) Home Occupation Permit Lot Line Adjustment Lot Merger I Reversion to Acreage Request for Meeting Continuance Minor Exception Planned Unit Development Permit (Major) Time and Materials (if project exceeds 50 hours of staff time) Planned Unit Development Permit (Minor) Planning Commission Interpretation or Waiver Plot Plan Review Pre-Application -S.A.C. Pre-Application -ARC/PC/CC (each) Research (deposit) Mailing Label Production Signs: Planned Sign Program I Mural Permit Administrative Sign Permit Administrative Sign Program Specific Plan or Amendment (deposit) Time and Materials (if project exceeds 50 hours of staff time) Temporary Use Permit Tentative Parcel Map (0-4 lots) with Vesting (added to base fee) Amendment Tentative Tract Map: 5-20 lots plus $100 per lot over 20 lots with Vesting (added to base fee) Amendment 7 FY 2014-15 Fee I $ 630 3,151 4,201 2,100 7,352 1,785 84 1,260 1,050 168 424 7,352 3,623 525 420 263 263 84 105 630 105 263 7,352 158 1,349 402 756 3,954 1,043 1,996 Item 9.b. - Page 14 I Fee Description Time Extension Variance Viewshed Review: Staff Review Tree Removal(+ consultant cost) Zoning Compliance Letter City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 COMMUNITY DEVELOPMENT Environmental Impact Determination: Initial Study Fee Negative Declaration Mitigated Neg Dec Hourly Rates: Community Development Director (per hour) Associate Planner (per hour) Assistant Planner (per hour) Admin. Secretary (per hour) Office Assistant (per hour) Interns (per hour) 8 FY 2014-15 Fee I $ 760 1,349 596 63 63 990 210 832 Provided by AdminSvcs Item 9.b. - Page 15 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 POLICE IFee Description Copies, per page (Black and White) Color copies PERMITS & LICENSES: Alarm Permit (ALA): Original Application Annual Renewal Commercial filming/photography permit (plus APS rates) Concealed Weapons Permit: Original Application: Police Department investigation fee (CCW) Dept of Justice fingerprint process (DOJ) FBI fingerprint processing {FBI) Fingerprint services {FPS) {per penal code section 13300) Firearms proficiency evaluation (CCW) Bi-Annual Renewal: Police Department investigation fee (CCW) Firearms Proficiency Evaluation (CCW) Dept of Justice annual renewal fee (DOJ) Public Safety and Welfare Permits: Basic Permit (PSWP) -Processing and Admin. {+specific permits, if applicable) Events with alcoholic beverages {PSWP -A): With an ABC licensed caterer Without an ABC licensed caterer Dance Permit (PSWD) 9 FY 2014-15 Fee I $ 0.20 $ actual cost 95 31 244 259 passthrough passthrough 10 71 147 71 passthrough 37 29 94 29 Item 9.b. - Page 16 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 POLICE I Fee Description PERMITS & LICENSES (continued): Entertainment Permit (PSWE): Non-commercial, w/o admission charge: Under 200 people Over 200 people Non-commercial, with admission charge: Under 300 people Over 300 people Commercial, with admission charge: Under 400 people Over 400 people Exhibitions (PSWEX): General Permit (no admission) -per day Commercial (admission) -per day Gun/Weapons Show -per day Replacement of lost/stolen Permits, Licenses and registration receipts Second Hand Dealer Permit: Original Application: City processing fee (SHD) Dept of Justice Application Fee Fingerprint processing (per applicant I partner I corporate officer) Dept of Justice (DOJ) Fingerprint services (FPS) (per penal code section 13300) Second Hand Dealer Permit (continued): Biennial Renewal: City processing fee (SHD) Department of Justice renewal fee (DOJ) Tattoo Parlor Tattoo Artist Solicitation (per solicitor) Mobile Vendor permit Mobile Vendor employee permit Tobacco Retailers 10 FY 2014-15 Fee I 53 105 168 315 630 945 83 83 213 10 115 passthrough passthrough passthrough 10 58 passthrough 110 110 65 63 63 218 Item 9.b. - Page 17 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 POLICE I Fee Description PERMITS & LICENSES (continued): Palmreaderl Fortune Teller Permit: Original Application Department of Justice fingerprinting (DOJ) FBI fingerprint processing (FBI) Fingerprint services (FPS) (per Penal Code Section 13300) Annual Renewal Application Palmreaderl Fortune Teller Establishment Permit: Original Application Department of Justice fingerprinting (DOJ) FBI fingerprint processing (FBI) Fingerprint services (FPS) (per Penal Code Section 13300) Annual Renewal Application Taxi Cab permit/driver: Original: City processing fee (TCD) Dept of Justice fingerprint (if nee) (DOJ) Fingerprint services (FPS) (per penal code section 13300) Annual Renewal (TCD) Taxi Cab vehicle inspection permit (TC/) Wide load permits per CVC 35780 (WLP): Permit Processing & Admin. Staff Services (APS) SERVICES Alarm response (False Alarms) (CSTA): Fourth false alarm within 12 months Fifth false alarm within 12 months Sixth or more false alarm within 12 months (per incident) Citation correction certification (CC): Criminal history summary examination: Local Summary (CHSL) State Summary (CHSS) 11 FY 2014-15 Fee I $ 164 passthrough passthrough 10 137 298 passthrough passthrough 10 189 212 passthrough 10 37 31 63 actual cost 72 107 143 20 31 111 Item 9.b. - Page 18 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 POLICE SERVICES continued) Fingerprinting (FPS): Two (2) cards or Livescan (per penal code section 13300) Mailing Costs (public records) Information research (RES) (Per Hour) Photograph duplication (PHOTO): Service Fee(+ Actual Print Charges) Records sealing pursuant to 851.8 PC (RECS) (no charge for court order) Records sealing other than 851.8 PC (RECS) (no charge for court order) Vehicle releases from Police storage (VEHR): Abandoned, 72 hour violation, parked for sale (2 trips) Illegal parking, vehicle registration, DL violations Driver arrested Towed vehicle VISA I Clearance letters (VISA) Civil Witness Fee (Deposit) Emerg Resp -Impaired Driver Accident ($1,000 max) -APS Property Intake & Release (Guns) -Items 1 -5 Property Intake & Release (Guns) -Each Add'l Item Property Handling for Mailing I Shipping Nuisance response (second party response) Juvenile Alcohol Party Response Auxiliary Police Services (APSJ: Hourly Rates: Hourly Rate: Chief Hourly Rate: Commander Hourly Rate: Sergeant Hourly Rate: Sr. Police Officer Hourly Rate: Police Officer Hourly Rate: Support Services Tech Hourly Rate: Executive Secretary Hourly Rate: Support Services Supervisor 12 FY 2014-15 Fee I $ 10 actual cost hourly rate 21 63 89 51 36 36 62 27 158 hourly rate 61 11 34 53 53 Provided by Admin Svcs Item 9.b. - Page 19 Fee Descri tion Cellular/Mobile Phone, free-standing Cellular Tower with Equipment Shelter Awning (not patio cover) City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING MISC Recove Rate 100% of Cost Change of Occupancy No T.I. w/ plan check & Inspection Close Existing Openings Compliance lnspections/Reinspections Deck Deck (with Cales) Demolition Demolition -MultiFamily/Commercial Door Fence or Wall (wood, chain link, wrought iron): >6 feet in height, 1st 100 s. f. Each additional 100 sf Fence or Freestanding Wall (masonry I garden): City Standard, 1st 100 l.f. Each additional 100 If Engineered Wall, 1st 100 If Each additional 100 If Fireplace (masonry or pre-fab) Flag pole (greater than 6 feet in height) Grading (Cut and Fill): 0-50 Cubic Yards (Cut and Fill) 51-100 CY Each Add'I 100 CY or portion thereof 1,000 CY (minimum) Each Add'I 1,000 CY or portion thereof 10,000 CY (minimum) Each Add'l 10,000 CY or portion thereof 100,000 CY (minimum) Each Add'l 10,000 CY or portion thereof Pilaster each 10 Lighting pole (each) Additional Piles (increments of 10) Stucco Applications Additional Stucco Application Retaining Wall (concrete or masonry): First 50 sf Each additional 50 sf 13 Plan Check Fee Inspection Fee FY 14-15 FY 14-15 $ 718 $ 1,168 718 1,306 83 129 135 259 83 176 151 216 151 209 173 234 83 272 83 272 83 186 83 234 60 83 83 234 60 83 105 234 83 83 83 171 83 171 105 171 143 171 6 204 171 9 287 171 14 415 171 14 83 171 83 148 45 52 171 52 171 166 196 144 108 Item 9.b. - Page 20 Fee Descri tion · Re-roofing: Composition -no tear off Other roofs (first 10 squares) Each additional 10 squares Roof Structure Replacement City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING MISC Recove Rate 100% of Cost Separate additional roof structure replacement Sauna -steam Siding: Stone and Brick Veneer (interior or exterior) All Other Additional siding Signs: Permanent Temporary Directional Each additional Directional Sign Freeway sign Freeway sign with Master Plan Ground I Roof I Projecting Signs Master Plan Sign Check Replacement -Permit Sticker Rework of any existing Ground Sign Wall/Awning Sign, Non-Electric Wall, Electric Skylight (Residential each) Skylight (Commercial) one Each additional Spa or Hot Tub (Pre-fabricated) Stairs -per story Each additional story Storage Racks each set of plans Temporary Utility Connection or Occupancy Window or Sliding Glass Door (first) Each additional Bay Window each 14 Plan Check Fee Inspection Fee FY 14-15 FY 14-15 $ 65 $ 166 65 166 15 40 101 196 101 108 80 206 65 206 50 206 44 118 160 206 160 196 160 206 160 206 364 226 364 226 152 196 160 196 65 166 65 166 65 206 65 206 50 181 65 181 65 181 65 206 233 196 211 108 269 246 70 160 196 138 88 160 196 Item 9.b. - Page 21 Fee Descri tion Board of Appeals Business License Inspection Business License Re-inspection Product Review Disabled Access Compliance Inspection Supplemental Plan Check Fee (first 1/2 hour) Each Additional 1/2 hour (or portion thereof) Supplemental Inspection Fee (first 1/2 hour) Each Additional 1/2 hour (or portion thereof) Emergency (Non-Scheduled) Call-Out Fee After Hours Inspection Each additional hour After Hours Plan Review Each additional hour Hourly Rates: Building Official Building Inspector Building Permit Tech Director of Building and Fire Executive Secretary Neighborhood Services Staff Copies, per page (Black and White) Color copies City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING MISC Recove Rate 100% of Cost .20 per page actual costs 15 Plan Check Fee Inspection Fee FY 14-15 FY 14-15 $ 631 $ 33 48 33 25 446 93 63 146 73 126 63 302 189 126 291 146 146 100 85 255 110 188 Item 9.b. - Page 22 Fee Descri tion Fire Sprinkler Systems -New Construction: 1-50 Heads 51-100 Heads 101-200 Heads Every 200 Heads above 200 Fire Sprinkler Systems -Tenant Improvements: 1-25 Heads 26-100 Heads Every 100 Heads above 100 Fire Alarm System -New Construction: 1-50 Devices 51-100 Devices Every 50 Devices above 100 Sprinkler Monitoring System Fire Alarm System -Tenant Improvements: 1-50 Devices 51-100 Devices Every 50 Devices above 100 Sprinkler Monitoring System Other Suppression Systems: Inert Gas Systems Dry Chemical Systems Wet Chemical/Kitchen Hood Foam Systems Paint Spray Booth Other Fire Fees: City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING FIRE Recove Rate 100% of Cost Hydrants/Underground Fire Service Plan Check Hydrant Flow Test (existing hydrants) 16 Plan Check Fee Inspection Fee $ FY 14-15 FY 14-15 157 $ 195 353 239 120 233 195 157 233 157 347 157 233 157 347 157 195 195 195 347 233 44 160 235 285 160 160 235 210 160 235 210 304 15 160 235 210 304 160 134 210 285 235 134 15 Item 9.b. - Page 23 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING MPE Recove Rate 100% of Cost Fee Descri tion ADMINISTRATIVE (BASE) FEES: Supplemental Permit Issuance MECHANICAL PERMIT FEES FAU less than 100,000 Btulh FAU greater than 100,000 Btu/h Floor furnace (including vent) Suspended, wall, or floor-mounted heaters Appliance vents not included in an appliance permit Boiler or compressor, from 15 HP to 30 HP I absorption system from 500,000 Btu/h to 1,000,000 Btu/h. Boiler or compressor, from 30 HP to 50 HP, I absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h. Boiler or compressor, over 50 HP I absorption system over 1,750,000 Btu/h. Air-handling unit, including attached ducts. Air-handling unit over 10,000 CFM Evaporative cooler Ventilation fan connected to a single duct Ventilation system (not a portion of heating or ale system) Hood and duct system. Incinerator, residential Commercial or Industrial-type incinerator Misc. appliances or equipment. Stand Alone Mechanical Plan Check (hourly rate) Other Mechanical Inspections (per hour) PLUMBING I GAS PERMIT FEES: Plumbing fixtures Building sewer Rainwater systems (per drain) Cesspool -[delete] Private sewage disposal system Water Heater Industrial waste pretreatment interceptor Water piping and/or water treating equipment (each) Repair or alteration of drainage or vent piping, each fixture Each lawn sprinkler system on any one meter -[deleted] Backflow devices each unit Atmospheric-type vacuum breakers: 1-5 units Atmospheric-type vacuum breakers: each unit over 5 units Stand Alone Plumbing Plan Check (hourly rate) Other Plumbing and Gas Inspections (per hour) 17 Plan Check Fee Inspection Fee FY 14-15 FY 14-15 $ 88 $ 38 50 38 75 38 100 38 75 38 75 38 75 38 100 76 100 76 100 113 75 113 75 76 75 113 100 38 50 76 75 113 100 151 126 189 151 227 151 113 100 151 100 38 50 76 75 38 50 38 113 126 76 50 38 75 38 75 38 75 38 76 50 76 50 76 50 151 100 Item 9.b. - Page 24 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING MPE Recove Rate 100% of Cost Fee Descri tion SYSTEM FEES: Residential swimming Pools Outdoor Events Electric generator and electrically-driven rides Mechanically-driven rides/ attractions with electrical lighting Each system of area and booth lighting Temporary Power Service Temporary power pole. Sub poles (each). UNIT FEES: Receptacle, Switch, and Lighting Outlets First 10 Each Additional 10 Lighting Fixtures: First 10 Each additional 10 Pole or platfonn-mounted lighting fixtures (each) Theatrical-type lighting fixtures or assemblies (each) Residential Appliances (each) Nonresidential Appliances Residential appliances and self-contained, nonresidential appliances, (each) Appliances not exceeding one horsepower (HP) kilowatt (KW). or kilovolt-ampere (KVA), in rating,(each) Power Apparatus: Motors, generators, transfonners, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus (all sizes) Busways Trolley and plug-in-type busways -each 100 feet or fraction thereof (An additional fee will be required for lighting fixtures, motors, and other appliances that are connected to trolley and plug-in-type busways. No fee is required for portable tools.) Signs, Outline Lighting, and Marquees: Signs, Outline Lighting, or Marquees supplied from one branch circuit (each) Additional branch circuits within the same sign, outline lighting system, or marquee (each) Services: Services of 600 volts or less and not over 200 amperes in rating (each) Services of 600 volts or less and over 200 amperes to 1000 amperes in rating (each) Services over 600 volts or over 1000 amperes in rating (each) 18 Plan Check Fee FY 14-15 $ 113 113 76 113 76 76 76 38 38 76 76 76 38 76 76 76 113 113 151 113 76 76 76 76 76 113 189 302 Inspection Fee FY 14-15 $ 176 75 75 75 75 50 50 35 50 50 75 75 75 100 50 100 100 100 50 75 75 75 50 100 126 151 Item 9.b. - Page 25 Fee Descri tion UNIT FEES (continued): City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING MPE Recove Rate 100% of Cost Miscellaneous Apparatus, Conduits, and Conductors Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth Photovotaic Systems -each Stand Alone Electrical Plan Check (hourly rate) Other Electrical Inspections (per hour) 19 Plan Check Fee Inspection Fee FY 14-15 FY 14-15 $ 76 $ 75 76 100 113 151 151 100 Item 9.b. - Page 26 ....... (UBC) Use Fee# Type 1 A-1 2 A-2 3 A 4 A-3 5 R-4 6 A-3 7 E 8 E 9 S-2 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION ., .. ,,,. ' Size Basis ejseFe~FY . :occupancy · (square feet) · .14-15 2,000 $ 2,859 8,000 $ 3,752 Assembly Group -Theaters 20,000 $ 5,973 40,000 $ 10,006 100,000 $ 17,861 1,000 $ 1,646 4,000 $ 2,161 Assembly Group: Churches, restaurants 10,000 $ 3,440 20,000 $ 5,763 50,000 $ 10,287 250 $ 561 1,000 $ 736 Assembly Group -Tl 2,500 $ 1,172 5,000 $ 1,963 12,500 $ 3,504 1,000 $ 1,646 4,000 $ 2,161 Church and Religious Bldg -Complete 10,000 $ 3,440 20,000 $ 5,763 50,000 $ 10,287 500 $ 995 2,000 $ 1,306 Conoregate Care -Complete 5,000 $ 2,079 10,000 $ 3,483 25,000 $ 6,217 250 $ 561 1,000 $ 736 Church and Religious Bldg -Tl 2,500 $ 1,172 5,000 $ 1,963 12,500 $ 3,504 2,000 $ 2, 117 8,000 $ 2,778 Educational Building -Complete 20,000 $ 4,423 40,000 $ 7.410 100,000 $ 13,227 250 $ 561 1,000 $ 736 Educational Building -Tl 2,500 $ 1,172 5,000 $ 1,963 12,500 $ 3,504 500 $ 742 2,000 $ 974 Parking Garage -Complete 5,000 $ 1,550 10,000 $ 2,596 25,000 $ 4,634 20 ., Each Additional SF $ 0.149 $ 0.185 $ 0.202 $ 0.131 $ 0.179 $ 0.171 $ 0.213 $ 0.232 $ 0.151 $ 0.206 $ 0.234 $ 0.291 $ 0.316 $ 0.206 $ 0.280 $ 0.171 $ 0.213 $ 0.232 $ 0.151 $ 0.206 $ 0.208 $ 0.257 $ 0.280 $ 0.183 $ 0.249 $ 0.234 $ 0.291 $ 0.316 $ 0.206 $ 0.280 $ 0.110 $ 0.138 $ 0.149 $ 0.097 $ 0.132 $ 0.234 $ 0.291 $ 0.316 $ 0.206 $ 0.280 $ 0.154 $ 0.192 $ 0.209 $ 0.135 $ 0.186 Item 9.b. - Page 27 ....... (UBC) Use Fee# Type 10 R-1 11 R-1 12 R-1 13 B 14 " 15 " 16 " 17 " 18 B 19 B 20 F-1 21 F-1 22 F-1 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Size Basis Base Fee FY Occupancy (square feet) 14·15 1,000 $ 1,646 4,000 $ 2,161 Hotel Low/Mid Rise -Complete 10,000 $ 3,440 20,000 $ 5,763 50,000 $ 10,287 1,000 $ 706 4,000 $ 926 Hotel Low/Mid Rise -Shell 10,000 $ 1,474 20,000 $ 2,470 50,000 $ 4,408 250 $ 525 1,000 $ 689 Hotel Low/Mid Rise -Tl 2,500 $ 1,096 5,000 $ 1,836 12,500 $ 3,278 Offices, etc. -Comolete 500 $ 1,058 " 2,000 $ 1,389 " 5,000 $ 2,211 " 10,000 $ 3,705 " 25,000 $ 6,612 1,000 $ 543 4,000 $ 712 Offices, etc. -Shell 10,000 $ 1,134 20,000 $ 1,900 50,000 $ 3,391 100 $ 387 400 $ 508 Offices, etc. -Tl 1,000 $ 809 2,000 $ 1,355 5,000 $ 2,419 1,000 $ 1,646 4,000 $ 2,161 Industrial Building -Complete 10,000 $ 3,440 20,000 $ 5,763 50,000 $ 10,287 1,000 $ 923 4,000 $ 1,211 Industrial Building -Shell 10,000 $ 1,928 20,000 $ 3,230 50,000 $ 5,765 250 $ 525 1,000 $ 689 Industrial Building -Tl 2,500 $ 1,096 5,000 $ 1,836 12,500 $ 3,278 21 Each Additional SF $ 0.171 $ 0.213 $ 0.232 $ 0.151 $ 0.206 $ 0.074 $ 0.091 $ 0.100 $ 0.065 $ 0.088 $ 0.218 $ 0.272 $ 0.296 $ 0.192 $ 0.263 $ 0.221 $ 0.274 $ 0.298 $ 0.194 $ 0.265 $ 0.057 $ 0.070 $ 0.077 $ 0.049 $ 0.068 $ 0.402 $ 0.501 $ 0.546 $ 0.355 $ 0.484 $ 0.171 $ 0.213 $ 0.232 $ 0.151 $ 0.206 $ 0.096 $ 0.120 $ 0.130 $ 0.084 $ 0.116 $ 0.218 $ 0.272 $ 0.296 $ 0.192 $ 0.263 Item 9.b. - Page 28 ....... (UBC) Use Fee# Type 23 S-1 24 S-1 25 S-1 26 M 27 M 28 M 29 - 30 1-1 31 1-1 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Size Basis Base Fee FY Occupancy (square feet) 14-15 500 $ 923 2,000 $ 1,211 Repair Garage & Service St -Complete 5,000 $ 1,928 10,000 $ 3,230 25,000 $ 5,765 500 $ 452 2,000 $ 594 Repair Garaae & Service St -Shell 5,000 $ 945 10,000 $ 1,583 25,000 $ 2,826 100 $ 507 400 $ 665 Repair Garage & Service St -Tl 1,000 $ 1,058 2,000 $ 1,773 5,000 $ 3,165 500 $ 995 2,000 $ 1,306 Retail Sales -Complete 5,000 $ 2,079 10,000 $ 3,483 25,000 $ 6,217 500 $ 452 2,000 $ 594 Retail Sales -Shell 5,000 $ 945 10,000 $ 1,583 25,000 $ 2,826 100 $ 507 400 $ 665 Retail Sales -Tl 1,000 $ 1,058 2,000 $ 1,773 5,000 $ 3,165 2,000 $ 923 8,000 $ 1,211 Warehouse -Complete 20,000 $ 1 928 40,000 $ 3,230 100,000 $ 5,765 1,000 $ 1,646 4,000 $ 2, 161 Medical/24 Hour Care -Complete 10,000 $ 3,440 20,000 $ 5,763 50,000 $ 10,287 1,000 $ 742 4,000 $ 974 Medical/24 Hour Care -Shell 10,000 $ 1,550 20,000 $ 2,596 50,000 $ 4,634 22 Each Additional SF $ 0.192 $ 0.239 $ 0.260 $ . 0.169 $ 0.231 $ 0.093 $ 0.118 $ 0.127 $ 0.083 $ 0.113 $ 0.528 $ 0.656 $ 0.714 $ 0.464 $ 0.633 $ 0.208 $ 0.257 $ 0.280 $ 0.183 $ 0.249 $ 0.093 $ 0.118 $ 0.127 $ 0.083 $ 0.113 $ 0.528 $ 0.656 $ 0.714 $ 0.464 $ 0.633 $ 0.048 $ 0.060 $ 0.065 $ 0.042 $ 0.058 $ 0.171 $ 0.213 $ 0.232 $ 0.151 $ 0.206 $ O.Q78 $ 0.097 $ 0.105 $ 0.068 $ 0.092 Item 9.b. - Page 29 ..... (UBC) Use Fee# Type .. 32 1-1 33 . B 34 B 35 B 36 - 37 - 38 - 39 1-4 40 1-4 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recoverv Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION . .. Size Basis · ·. · Base Fee FY Occupancy (square feet): 14-15 100 $ 669 400 $ 879 Medical/24Hour Care -Tl 1,000 $ 1,399 2,000 $ 2,343 5,000 $ 4,182 1,000 $ 1,646 4,000 $ 2161 Medical Offices -Complete 10,000 $ 3,440 20,000 $ 5,763 50,000 $ 10,287 1,000 $ 742 4,000 $ 974 Medical Offices -Shell 10,000 $ 1,550 20,000 $ 2,596 50,000 $ 4,634 250 $ 669 1,000 $ 879 Medical Offices -Tl 2,500 $ 1,399 5,000 $ 2,343 ~ 12,500 $ 4,182 500 $ 1,104 2,000 $ 1,449 Restaurant -Comolete 5,000 $ 2306 10,000 $ 3,863 25,000 $ 6,896 500 $ 561 2,000 $ 736 Restaurant -Shell 5,000 $ 1,172 10,000 $ 1 963 25,000 $ 3,504 250 $ 470 1,000 $ 617 Restaurant -Tl 2,500 $ 983 5,000 $ 1,646 12,500 $ 2,939 250 $ 886 1,000 $ 1,164 Day Care Facility -Complete 2,500 $ 1,852 5,000 $ 3,103 12,500 $ 5,539 100 $ 669 400 $ 879 Dav Care Facilitv -Tl 1,000 $ 1,399 2,000 $ 2,343 5,000 $ 4,182 23 Each Additional SF $ 0.701 $ 0.866 $ 0.944 $ 0.613 $ 0.836 $ 0.171 $ 0.213 $ 0.232 $ 0.151 $ 0.206 $ 0.078 $ 0.097 $ 0.105 $ 0.068 $ 0.092 $ 0.280 $ 0.347 $ 0.378 $ 0.245 $ 0.335 $ 0.230 $ 0.286 $ 0.311 $ 0.203 $ 0.276 $ 0.117 $ 0.145 $ 0.159 $ 0.103 $ 0.140 $ 0.196 $ 0.244 $ 0.266 $ 0.172 $ 0.235 $ 0.370 $ 0.459 $ 0.500 $ 0.325 $ 0.443 $ 0.701 $ 0.866 $ 0.944 $ 0.613 $ 0.836 Item 9.b. - Page 30 ....... (UBC) Use Fee# Type 41 H 42 H 43 H 44 - 45 - 46 R-2 47 IRC SFD 48 - 49 - - - 52 IRC SFD 53 - City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE F.EE SCHEDULE FOR NEW CONSTRUCTION Size Basis Base Fee FY Occupancy (square feet) 14-15 500 "$ 778 2,000 $ 1,021 Hazardous H-Complete 5,000 $ 1,625 10,000 $ 2,723 25,000 $ 4,861 500 $ 1,104 2,000 $ 1,449 Hazardous H-Shell 5,000 $ 2,306 10,000 $ 3,863 25,000 $ 6,896 100 $ 669 400 $ 879 Hazardous H-T I 1,000 $ 1,399 2,000 $ 2,343 5,000 $ 4,182 200 $ 380 800 $ 499 Commercial Building -Foundation 2,000 $ 794 4,000 $ 1,330 10,000 $ 2,373 200 $ 416 800 $ 546 Commercial Building -Addition 2,000 $ 869 4,000 $ 1,456 10,000 $ 2,599 1,000 $ 1,646 4,000 $ 2,161 Apartment Building 10,000 $ 3,440 20,000 $ 5,763 50,000 $ 10,287 Single-Family (custom or model) 1,000 $ 1,172 " 2,000 $ 1,269 " 3,000 $ 1,761 " 5,000 $ 2,287 " 7,500 $ 3,207 667 $ 427 1,333 $ 463 Single-Family-Production I Repeat 2,000 $ 642 3,333 $ 834 5,000 $ 1,170 333 $ 37"{ 667 $ 409 Moved Building -Residential 1,000 $ 567 1,667 $ 736 2,500 $ 1,032 24 Each Additional SF $ 0.162 $ 0.202 $ 0.220 $ 0.143 $ 0.194 $ 0.230 $ 0.286 $ 0.311 $ 0.203 $ 0.276 $ 0.701 $ 0.866 $ 0.944 $ 0.613 $ 0.836 $ 0.197 $ 0.246 $ 0.268 $ 0.174 $ 0.237 $ 0.217 $ 0.270 $ 0.294 $ 0.190 $ 0.260 $ 0.171 $ 0.213 $ 0.232 $ 0.151 $ 0.206 $ 0.098 $ 0.492 $ 0.264 $ 0.368 $ 0.427 $ 0.054 $ 0.270 $ 0.144 $ 0.202 $ 0.234 $ 0.095 $ 0.476 $ 0.254 $ 0.355 $ 0.413 Item 9.b. - Page 31 ....... (UBC) Use Fee# Type 54 R-3 55 R-3 " 56 - 57 - 5B - 59 u 60 u 61 - 62 - City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION .. .· ,. " . 2 SiieBa5is. Base Fee FY. Occupancy (square feet) .. 14~1s 800 $ 287 1,600 $ 310 Manufactured Home -Complete 2,400 $ 431 4,000 $ 559 6,000 $ 784 667 $ 287 1,333 $ 310 Prefabricated Dwelling -Complete 2,000 $ 431 3,333 $ 559 5,000 $ 784 120 $ 188 480 $ 247 Commercial Coach -Complete 1,200 $ 393 2,400 $ 658 6,000 $ 1,175 240 $ 188 960 $ 247 Modular Buildina -Complete 2,400 $ 393 4,800 $ 658 12,000 $ 1,175 500 $ 206 2,000 $ 271 Manufactured Building -Fnd 5,000 $ 431 10,000 $ 722 25,000 $ 1,288 167 $ 2B7 333 $ 310 Residential Garage 500 $ 431 B33 $ 559 1,250 $ 784 40 $ 235 160 $ 309 Pool/Spa -Standard Plan 400 $ 491 800 $ B23 2,000 $ 1,469 200 $ 669 BOO $ B79 Commercial Building -Remodel 2,000 $ 1,399 4,000 $ 2,343 10,000 $ 4,182 200 $ 633 BOO $ B31 Commercial Buildina -Repair 2,000 $ 1,323 4,000 $ 2,216 10,000 $ 3,956 25 Each Additional SF $ 0.030 $ 0.150 $ 0.081 $ 0.112 $ 0.131 $ 0.037 $ 0.180 $ 0.097 $ 0.134 $ 0.156 $ 0.164 $ 0.203 $ 0.222 $ 0.144 $ 0.196 $ 0.082 $ 0.102 $ 0.110 $ 0.071 $ 0.098 $ 0.043 $ 0.054 $ 0.058 $ 0.038 $ 0.051 $ 0.145 $ 0.718 $ 0.38B $ 0.540 $ 0.62B $ 0.612 $ 0.761 $ 0.830 $ .0.539 $ 0.735 $ 0.350 $ 0.434 $ 0.473 $ 0.307 $ 0.418 $ 0.329 $ 0.411 $ 0.446 $ 0.290 $ 0.396 Item 9.b. - Page 32 11..1.. (UBC) Use Fee# Type ··-···- 63 S-2 64 U-1 65 U-1 66 IRC SFD 67 R-2 68 IRCSFD 69 R-2 70 IRC SFD 71 U-1 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION " , . ,, " ,siZe Basis Base Fee FY Occupancy ', " , (square feet), ' 14-15", '; 500 $ 307 2,000 $ 404 Commercial Carport -Std. Plan 5,000 $ 642 10,000 $ 1,076 25,000 $ 1,921 50 $ 221 200 $ 290 Accessory Building -Commercial 500 $ 461 1,000 $ 772 2,500 $ 1,378 50 $ 221 200 $ 290 Commercial Carport 500 $ 461 1,000 $ 772 2,500 $ 1,378 167 $ 427 333 $ 463 Single-Family Residential -Addition 500 $ 642 833 $ 834 1,250 $ 1,170 333 $ 578 667 $ 627 Multi-Family Residential -Addition 1,000 $ 869 1,667 $ 1,129 2,500 $ 1,583 333 $ 277 667 $ 300 Sinale-Familv Residential -Remodel 1,000 $ 416 1,667 $ 540 2,500 $ 757 667 $ 382 1,333 $ 414 Multi-Family Residential -Remodel 2,000 $ 574 3,333 $ 746 5,000 $ 1,046 333 $ 307 667 $ 332 Residential Building -Foundation 1,000 $ 461 1,667 $ 599 2,500 $ 839 83 $ 277 167 $ 300 Accessory Buildina -Residential 250 $ 416 417 $ 540 625 $ 757 26 ' Each Additional SF $ 0.064 $ 0.080 $ 0.087 $ 0.057 $ 0.077 $ 0.462 $ 0.570 $ 0.622 $ 0.404 $ 0.551 $ 0.462 $ 0.570 $ 0.622 $ 0.404 $, 0.551 $ 0.214 $ 1.078 $ 0.573 $ 0.807 $ 0.936 $ 0.145 $ 0.728 $ 0.390 $ 0.544 $ 0.633 $ 0.069 $ 0.350 $ 0.186 $ 0.260 $ 0.302 $ 0.047 $ 0.242 $ 0.128 $ 0.181 $ 0.209 $ O.o76 $ 0.388 $ 0.207 $ 0.289 $ 0.336 $ 0.277 $ 1.399 $ 0.744 $ 1.044 $ 1.212 Item 9.b. - Page 33 11,;1,; (UBC) Use Fee# Type 72 U-1 73 IRC SFD 74 IRC SFD 75 IRC SFD 76 IRC SFD City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Size Basis Base Fee FY Occupancy (square feet) 14-15 133 $ 277. 267 $ 300 Residential Carport 400 $ 416 667 $ 540 1,000 $ 757 83 $ 277 167 $ 300 Residential Patio Cover/Ba,lconv/Deck 250 $ 416 417 $ 540 625 $ 757 83 $ 277 167 $ 300 Residential Patio Cover ICC Aooroved 250 $ 416 417 $ 540 625 $ 757 83 $ 277 167 $ 300 Residential Patio Enclosure 250 $ 416 417 $ 540 625 $ 757 83 $ 277 167 $ 300 Residential Patio Enclosure ICC Approved 250 $ 416 417 $ 540 625 $ 757 27 Each Additional SF $ 0.173 $ 0.875 $ 0.465 $ 0.652 $ 0.757 $ 0.277 $ 1.399 $ 0.744 $ 1.044 $ 1.212 $ 0.277 $ 1.399 $ 0.744 $ 1.044 $ 1.212 $ 0.277 $ 1.399 $ 0.744 $ 1.044 $ 1.212 $ 0.277 $ 1.399 $ 0.744 $ 1.044 $ 1.212 Item 9.b. - Page 34 ....... (UBC) Use Fee# Type 1 A-1 2· A-2 3 A 4 A-3 5 R-4 6 A-3 7 E 8 E 9 S-2 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION ' "~ ·'. ,, Size Basis·. Base Fee FY" Occupancy (square feet) 14-15 2,000 $ 2,612 8,000 $ 4,613 Assembly Group -Theaters 20,000 $ 7,090 40,000 $ 10,988 100,0uO $ 22,927 1,000 $ 2,242 4,000 $ 3,960 Assembly Group: Churches, restaurants 10,000 $ 6,086 20,000 $ 9,432 50,000 $ 19,680 250 $ 456 1,000 $ 805 Assembly Group -Tl 2,500 $ 1,237 5,000 $ 1,917 12,500 $ 4,000 1,000 $ 1,946 4,000 $ 3,437 Church and Religious Bldg -Complete 10,000 $ 5,283 20,000 $ 8,187 50,000 $ 17,082 500 $ 1,167 2,000 $ 2,062 Congregate Care -Complete 5,000 $ 3,169 10,000 $ 4,911 25,UUO $ 10,248 250 $ 345 1,000 $ 609 Church and Religious Bldg -Tl 2,500 $ 936 5,000 $ 1,450 12,500 $ 3,026 2,000 $ 2,575 8,000 $ 4,548 Educational Building -Complete 20,000 $ 6,990 40,000 $ 10,833 1UU,uuu $ 22,603 250 $ 345 1,000 $ 609 Educational Building -Tl 2,500 $ 936 5,000 $ 1,450 1<!,5U0 $ 3,026 500 $ 456 2,000 $ 805 Parking Garage -Complete 5,000 $ 1,237 10,000 $ 1,917 25,UOU $ 4,000 28 Each Additional SF $ 0.334 $ 0.207 $ 0.195 $ 0.198 $ 0.229 $ 0.572 $ 0.355 $ 0.335 $ 0.341 $ 0.394 $ 0.465 $ 0.289 $ 0.272 $ 0.277 $ 0.320 $ 0.497 $ 0.308 $ 0.291 $ 0.296 $ 0.341 $ 0.595 $ 0.369 $ 0.349 $ 0.356 $ 0.410 $ 0.353 $ . 0.217 $ 0.206 $ 0.210 $ 0.242 $ 0.329 $ 0.204 $ 0.192 $ 0.196 $ 0.226 $ 0.353 $ 0.217 $ 0.206 $ 0.210 $ 0.242 $ 0.232 $ 0.144 $ 0.135 $ 0.139 $ 0.160 Item 9.b. - Page 35 ,, ........ (UBC) use Fee# Type » 10 R-1 11 R-1 12 R-1 13 B 14 n 15 " 16 n 17 n 18 B 19 B 20 F-1 21 F-1 22. F-1 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION '' ,, ; '" > ,-, •,, ' ·,' ,,, ,. {.:,. » ~ ,., ,, ,. ' ,' , ' -Slie BasiS Base Fee i:v :9ccupancy . (square feet): ·1~15 > 1,000 $ '" 1;945· 4,000 $ 3,437 Hotel Low/Mid Rise -Complete 10,000 $ 5,283 20,000 $ 8,187 50,uuu $ 17,082 1,000 $ 485 4,000 $ 857 Hotel Low/Mid Rise -Shell 10,000 $ 1,317 20,000 $ 2,041 50,uuu $ 4,259 250 $ 345 1,000 $ 609 Hotel Low/Mid Rise -Tl 2,500 $ 936 5,000 $ 1,450 1<!,5UU $ 3,026 Offices, etc. -Complete 500 $ 1,769 n 2,000 $ 3,125 " 5,000 $ 4,803 " 10,000 $ 7,444 " 25,uuu $ 15,533 1,000 $ 285 4,000 $ 504 Offices, etc. -Shell 10,000 $ 775 20,000 $ 1,201 5U,UOU $ 2,506 100 $ 213 400 $ 377 Offices, etc. -Tl 1,000 $ 579 2,000 $ 898 5,uuu $ 1,873 1,000 $ 1,909 4,000 $ 3,372 Industrial Building -Complete 10,000 $ 5,182 20,000 $ 8,031 50,uuu $ 16,758 1,000 $ 328 4,000 $ 579 Industrial Building -Shell 10,000 $ 890 20,000 $ 1,380 50,0UO $ 2,879 250 $ 439 1,000 $ 775 Industrial Building -Tl 2,500 $ 1,192 5,000 $ 1,847 12,:iuu $ 3,854 29 Each Additional SF $ '0.497 $ 0.308 $ 0.291 $ 0.296 $ 0.341 $ 0.124 $ 0.077 $ 0.072 $ 0.074 $ 0.085 $ 0.353 $ 0.217 $ 0.206 $ 0.210 $ 0.242 $ 0.904 $ 0.560 $ 0.528 $ 0.539 $ 0.622 $ 0.072 $ 0.045 $ 0.043 $ 0.043 $ 0.050 $ 0.546 $ 0.336 $ 0.319 $ 0.325 $ 0.375 $ 0.487 $ 0.301 $ 0.285 $ 0.291 $ 0.335 $ 0.084 $ 0.051 $ 0.049 $ 0.050 $ 0.058 $ 0.448 $ 0.278 $ 0.263 $ 0.268 $ 0.309 Item 9.b. - Page 36 11 ..... (UBC) Use Fee# Type 23 S-1 24 S-1 25 S-1 26 M 27 M 28 M 29 - 30 1-1 31 1-1 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Size Basis Base Fee FY Occupancy (square feet) 14-15 500 $ 945 2,000 $ 1,670 Repair Garage & Service St -Complete 5,000 $ 2,566 10,000 $ 3,978 25,uuu $ 8,299 500 $ 310 2,000 $ 547 Repair Garage & Service St -Shell 5,000 $ 840 10,000 $ 1,302 25,uuu $ 2,717 100 $ 213 400 $ 377 Repair Garage & Service St -Tl 1,000 $ 579 2,000 $ 898 5,uuu $ 1,873 500 $ 1,001 2,000 $ 1,768 Retail Sales -Complete 5,000 $ 2,717 10,000 $ 4,211 25,uuu $ 8,786 500 $ 374 2,000 $ 661 Retail Sales -Shell 5,000 $ 1,016 10,000 $ 1,575 25,000 $ 3,285 100 $ 213 400 $ 377 Retail Sales -Tl 1,000 $ 579 2,000 $ 898 :i,uuo $ 1,873 2,000 $ 2,055 8,000 $ 3,630 Warehouse -Complete 20,000 $ 5,579 40,000 $ 8,646 100,uuu $ 18,041 1,000 $ 1,946 4,000 $ 3,437 Medical/24 Hour Care -Complete 10,000 $ 5,283 20,000 $ 8,187 5u,ouo $ 17,082 1,000 $ 347 4,000 $ 612 Medical/24 Hour Care -Shell 10,000 $ 941 20,000 $ 1,458 50,000 $ 3,042 30 Each Additional SF $ 0.483 $ 0.299 $ 0.283 $ 0.288 $ 0.332 $ 0.159 $ 0.098 $ 0.092 $ 0.095 $ 0.108 $ 0.546 $ 0.336 $ 0.319 $ 0.325 $ 0.375 $ 0.511 $ 0.316 $ 0.298 $ 0.305 $ 0.352 $ 0.191 $ 0.119 $ 0.111 $ 0.114 $ 0.131 $ 0.546 $ 0.336 $ 0.319 $ 0.325 $ 0.375 $ 0.263 $ 0.163 $ 0.153 $ 0.156 $ 0.181 $ 0.497 $ 0.308 $ 0.291 $ 0.296 $ 0.341 $ 0.088 $ 0.055 $ 0.051 $ 0.053 $ 0.061 Item 9.b. - Page 37 ........ (UBC) . Use.· Fee# Type ---~ . 32 1-1 33 B 34 B 35 B 36 - 37 - 38 - 39 1-4 40 1-4 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION ., ' v " '' ,• ·~ase F:;e'i=v. · " " Size Basts' • 0 ; Occupancy (sq~are feetf 14-15 >' 100 $ 195 400 $ 344 Medical/24Hour Care -Tl 1,000 $ 529 2,000 $ 820 5,uuu $ 1,710 1,000 $ 1,946 4,000 $ 3,437 Medical Offices -Complete 10,000 $ 5,283 20,000 $ 8,187 50,uuu $ 17,082 1,000 $ 356 4,000 $ 628 Medical Offices -Shell 10,000 $ 966 20,000 $ 1,497 50,000 $ 3,123 250 $ 457 1,000 $ 808 Medical Offices -Tl 2,500 $ 1,242 5,000 $ 1,925 l:l,5UU $ 4,016 500 $ 1,001 2,000 $ 1,768 Restaurant -Complete 5,000 $ 2,717 10,000 $ 4,211 25,uuu $ 8,786 500 $ 319 2,000 $ 563 Restaurant -Shell 5,000 .$ 865 10,000 $ 1,341 :l5,uuu $ 2,798 250 $ 457 1,000 $ 808 Restaurant -Tl 2,500 $ 1,242 5,000 $ 1,925 12,5UO $ 4,016 250 $ 1,001 1,000 $ 1,768 Day Care Facility -Complete 2,500 $ 2,717 5,000 $ 4,211 12,500 $ 8,786 100 $ 176 400 $ 311 Day Care Facility -Tl 1,000 $ 479 2,000 $ 742 5,uuu $ 1,548 31 Each Addltlonal SF $' 0.497 $ 0.308 $ 0.291 $ 0.297 $ 0.342 $ 0.497 $ 0.308 $ 0.291 $ 0.296 $ 0.341 $ 0.090 $ 0.057 $ 0.054 $ 0.055 $ 0.062 $ 0.466 $ 0.289 $ 0.273 $ 0.278 $ 0.321 $ 0.511 $ 0.316 $ 0.298 $ 0.305 $ 0.352 $ 0.163 $ 0.101 $ 0.096 $ 0.097 $ 0.112 $ 0.466 $ 0.289 $ 0.273 $ 0.278 $ 0.321 $ 1.022 $ 0.633 $ 0.598 $ 0.610 $ 0.703 $ 0.452 $ 0.278 $ 0.263 $ 0.269 $ 0.310 Item 9.b. - Page 38 ....... (UBC) Use Fee# Type 41 H 42 H 43 H 44 - 45 - 46 R-2 47 IRC SFD 48 - 49 - - - 52 IRC SFD 53 - City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION .. \ . , S~e Basis. Base Fee FY , . Occupancy. ,, (square feet) 14-15 ' . 500 $ 1,001 2,000 $ 1,768 Hazardous H-Complete 5,000 $ 2,717 10,000 $ 4,211 25,uuu $ 8,786 500 $ 300 2,000 $ 530 Hazardous H-Shell 5,000 $ 815 10,000 $ 1,263 :.:::i,uuu $ 2,636 100 $ 176 400 $ 311 Hazardous H-T I 1,000 $ 479 2,000 $ 742 5,uuu $ 1,548 200 $ 176 800 $ 311 Commercial Building -Foundation 2,000 $ 479 4,000 $ 742 10,uuu $ 1,548 200 $ 195 800 $ 344 Commercial Building -Addition 2,000 $ 529 4,000 $ 820 10,uuu $ 1,710 1,000 $ 1,876 4,000 $ 3,313 Apartment Building 10,000 $ 5,092 20,000 $ 7,892 50,uuu $ 16,467 Single-Family (custom or model) 1,000 $ 1,388 " 2,000 $ 2,214 .. 3,000 $ 3,059 .. 5,000 $ 4,580 .. 1,:iuu $ 6,125 667 $ 837 1,333 $ 1,335 Single-Family -Production I Repeat 2,000 $ 1,844 3,333 $ 2,761 5,uuu $ 3,693 333 $ 156 667 $ 248 Moved Building -Residential 1,000 $ 343 1,667 $ 514 :.::,5uu $ 687 32 Each Additional SF $ 0.511 $ 0.316 $ 0.298 $ 0.305 $ 0.352 $ 0.153 $ 0.095 $ 0.089 $ 0.091 $ 0.105 $ 0.452 $ 0.278 $ 0.263 $ 0.269 $ 0.310 $ 0.226 $ 0.140 $ 0.131 $ 0.134 $ 0.154 $ 0.249 $ 0.154 $ 0.146 $ 0.148 $ 0.171 $ 0.479 $ 0.296 $ 0.280 $ 0.286 $ 0.330 $ 0.825 $ 0.845 $ 0.760 $ 0.618 $ 0.817 $ 0.747 $ 0.765 $ 0.688 $ 0.559 $ 0.738 $ 0.277 $ 0.287 $ 0.255 $ . 0.208 $ 0.275 Item 9.b. - Page 39 ....... (UBC) Use Fee# Type 54 R-3 55 R-3 56 - 57 - 58 - 59 u 60 u 61 - 62 - City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Size Basis Base Fee FY Occupancy (square feet) 14-15 800 $ 122 1,600 $ 194 Manufactured Home -Complete 2,400 $ 268 4,000 $ 401 ti,uuu $ 536 667 $ 122 1,333 $ 194 Prefabricated Dwelling -Complete 2,000 $ 268 3,333 $ 401 5,uuu $ 536 120 $ 99 480 $ 174 Commercial Coach -Complete 1,200 $ 268 2,400 $ 415 6,000 $ 866 240 $ 99 960 $ 174 Modular Building -Complete 2,400 $ 268 4,800 $ 415 12,000 $ 866 500 $ 99 2,000 $ 174 Manufactured Building -Fnd 5,000 $ 268 10,000 $ 415 25,uuu $ 866 167 $ 188 333 $ 299 Residential Garage 500 $ 413 833 $ 619 1,250 $ 828 40 $ 169 160 $ 298 PooVSoa -Standard Plan 400 $ 459 800 $ 711 2,000 $ 1,483 200 $ 308 800 $ 543 Commercial Building -Remodel 2,000 $ 835 4,000 $ 1,294 1u,uuo $ 2,701 200 $ 308 800 $ 543 Commercial Building -Repair 2,000 $ 835 4,000 $ 1,294 10,000 $ 2,701 33 Each Additional SF $ 0.090 $ 0.092 $ 0.083 $ 0.068 $ 0.089 $ 0.109 $ 0.110 $ 0.100 $ 0.081 $ 0.107 $ 0.210 $ 0.130 $ 0.123 $ 0.125 $ 0.145 $ 0.105 $ 0.065 $ 0.061 $ 0.063 $ 0.072 $ 0.050 $ 0.032 $ 0.029 $ 0.030 $ 0.035 $ 0.668 $ 0.687 $ 0.614 $ 0.502 $ 0.662 $ 1.076 $ 0.670 $ 0.630 $ 0.644 $ 0.741 $ 0.392 $ 0.244 $ 0.230 $ 0.234 $ 0.270 $ 0.392 $ 0.244 $ 0.230 $ 0.234 $ 0.270 Item 9.b. - Page 40 ....... (UBC) Use Fee# Type 63 S-2 64 U-1 65 U-1 66 IRC SFD 67 R-2 68 IRC SFD 69 R-2 70 IRC SFD 71 U-1 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION ..; ' .. .. ' . s1Zeeas1~ .· .. .. Base Fee FY ' Occupancy .. ·(square feet) 14-15 500 $ 213 2,000 $ 377 Commercial Carport -Std. Plan 5,000 $ 579 10,000 $ 898 25,uuu $ 1,873 50 $ 113 200 $ 200 Accessory Building -Commercial 500 $ 308 1,000 $ 477 :..:,ouu $ 996 50 $ 134 200 $ 236 Commercial Carport 500 $ 363 1,000 $ 563 2,500 $ 1,175 167 $ 222 333 $ 354 Single-Family Residential -Addition 500 $ 489 833 $ 732 1,250 $ 979 333 $ 563 667 $ 899 Multi-Family Residential -Addition 1,000 $ 1,242 1,667 $ 1,859 <!,5UO $ 2,486 333 $ 210 667 $ 336 Single-Family Residential-Remodel 1,000 $ 464 1,667 $ 694 2,500 $ 928 667 $ 297 1,333 $ 474 Multi-Family Residential -Remodel 2,000 $. 654 3,333 $ 980 5,uuu $ 1,310 333 $ 188 667 $ 299 Residential Building -Foundation 1,000 $ 413 1,667 $ 619 2,500 $ 828 83 $ 133 167 $ 212 Accessory Building -Residential 250 $ 293 417 $ 439 625 $ 587 34 Each Addltlonal SF $ 0.109 $ 0.067 $ 0.064 $ 0.065 $ 0.075 $ 0.581 $ 0.357 $ 0.340 $ 0.346 $ 0.398 $ 0.686 $ 0.423 $ 0.399 $ 0.407 $ 0.469 $ 0.794 $ 0.807 $ 0.731 $ 0.592 $ 0.783 $ 1.005 $ 1.027 $ 0.926 $ 0.754 $ 0.995 $ 0.378 $ 0.381 $ 0.347 $ 0.281 $ 0.372 $ 0.265 $ 0.271 $ 0.245 $ 0.198 $ 0.263 $ 0.334 $ 0.343 $ 0.308 $ 0.251 $ 0.331 $ 0.945 $ 0.970 $ 0.876 $ 0.706 $ 0.938 Item 9.b. - Page 41 ......... (USC) Use Fee# Type 72 U-1 73 IRC SFD 74 IRC SFD 75 IRC SFD 76 IRCSFD City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Size Basis Base Fee FY Occupancy (square feet) 14-15 133 $ 122 267 $ 194 Residential Carport 400 $ 268 667 $ 401 1,uuu $ 536 83 $ 122 167 $ 194 Residential Patio Cover/Ba,lcony/Deck 250 $ 268 417 $ 401 D.£::> $ 536 83 $ 122 167 $ 194 Residential Patio Cover ICC Approved 250 $ 268 417 $ 401 o:.!5 $ 536 83 $ 122 167 $ 194 Residential Patio Enclosure 250 $ 268 417 $ 401 o<!:> $ 536 83 $ 122 167 $ 194 Residential Patio Enclosure 250 $ 268 ICC Approved 417 $ 401 o:.!5 $ 536 35 -----, Each Addltlonal SF $ 0.544 $ 0.551 $ 0.500 $ 0.406 $ 0.537 $ 0.870 $ 0.882 $ 0.800 $ 0.650 $ 0.859 $ 0.870 $ 0.882 $ 0.800 $ 0.650 $ 0.859 $ 0.870 $ 0.882 $ 0.800 $ 0.650 $ 0.859 $ 0.870 $ 0.882 $ 0.800 $ 0.650 $ 0.859 Item 9.b. - Page 42 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 RECREATION AND MAINTENANCE SERVICES IFee Description Copies, per page (Black and White) Park Facility Use Fees: Strother Park-Large Barbecue Strother Park-Security Deposit Strother Park-Small Barbecue Strother Park-Wedding Reception Strother Park-Security 1,2,3 Elm Street Park-Barbecue Elm Street Park-Security Deposit Rancho Grande Park -Large BBQ Rancho Grande Park -Small BBQ (areas 2 and 3) Strother Park Deposit Kingo Park Kingo Park Deposit Rotary Bandstand Fees: Rent Deposit Soto Sports Complex Use Fees: Campbell Field Rental Fee Campbell Field Rental Fee (with lights) Pilg Field Rental Fee Pilg Field Rental Fee (with lights) Santos Field Rental Fee Volunteer Field Rental Fee Volunteer Field with Lights Rental Ikeda Field Rental Ikeda Field with Lights Rental Porter Field Rental Fee Porter Field with Lights Rental Tennis Court Rental-1 Hour Tennis Courts -4 Rental Food Booth Rental Fee (Soto) Soto Sports Complex Use Fees (continued): Meeting Room Rental Fee (Jaycee room) Field Prep Fees (except Porter) Field Prep Fees -Porter Tournam Sch. & Coordin Fee Tournament Deposit Fee 36 FY 2014-15 $ 0.20 75 30 40 155 70 75 30 75 40 30 40 30 75 30 15 35 15 35 15 15 35 15 35 20 40 10 100 35 20 20 35 65 260 Item 9.b. - Page 43 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 RECREATION AND MAINTENANCE SERVICES IFee Description Woman's Club Use Fees: Non-Resident Fee Partial day rental -Mon -Thurs, after 5 pm Full day rental -Friday, Saturday, or Sunday Second day rental -Friday, Saturday or Sunday Security Deposit (No Alcohol/No Band) Security Deposit (with Alcohol) Building Supervision Fee Rental Fee (on-going users): Non-profit groups/Service clubsNouth groups: (20 or less attendees) (21 -50 attendees) (51 or more attendees) Groups with reciprocal services Private groups or clubs: (20 or less attendees) (21 -50 attendees) (51 or more attendees) Groups with reciprocal services For-profit groups Custodial Fee (special event rentals only) Reservation Cancellation Fees: If cancelled 30 days or more ahead of event If cancelled less than 30 days ahead of event Amenities Fees: Chairs Tables Community Garden Deposit Community Garden Plot Elm Street Community Center Use Fees: Rental Fee Rental Fee -full day Building Supervision Fee Security deposit 37 per hr per hr per hr per hr " " " per hr per chair per table per 6 month period per hr per hr FY 2014-15 $ 50 50 450 275 400 750 10 3 4 5 3 8 9 10 5 25 80 100 200 0.25 1 25 18 30 175 10 150 Item 9.b. - Page 44 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 RECREATION AND MAINTENANCE SERVICES I Fee Description Adult Sport League Fees: Adult Softball-Spring Adult Softball-Summer Adult Basketball Non-Resident Fee Seasonal Playground Programs: Annual Registration Fee Playground-Elm Street (Winter/Spring/Summer) Pre-School Fees: Annual Registration Fee Play & Learn-Tues & Thur. Play & Learn-Mon, Wed & Fri. Kindergartens in Training Summer Play & Learn Late Pick-up Fees: First late pick-up Second late pick-up Third late pick-up Child Care Program Fees: Children In Motion Annual Registration Branch School -Mornings 5 Days Per Week 4 Days Per Week 3 Days Per Week 2 Days Per Week Branch School -Afternoons 5 Days Per Week 4 Days Per Week 3 Days Per Week 2 Days Per Week Unassigned Day -Branch School Morning Afternoon per hr per hr " per child " " per4 wks 3.00 per hr " 3.25 per hr 3.50 per hr " 3.75 per hr per 4 wks 3.00 per hr 3.25 per hr 3.50 per hr " 3.75 per hr per day 38 $ FY 2014-15 530 530 560 8 15 3 15 4.20 4.20 4.20 4.20 5 10 20 25 90 78 63 45 165 143 115 82.50 6 11 Item 9.b. - Page 45 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 RECREATION AND MAINTENANCE SERVICES I Fee Description Child Care Program Fees (continued): Kindercare -Branch School 8:40 am -10:40 am 12:45 pm -3:15 pm 2:30 pm -3:15 pm Ocean View School -Mornings 5 Days Per Week 4 Days Per Week 3 Days Per Week 2 Days Per Week Ocean View School -Afternoons 5 Days Per Week 4 Days Per Week 3 Days Per Week 2 Days Per Week Unassigned Day -Ocean View School Morning Afternoon Elm Community Center -Mornings 5 Days Per Week 4 Days Per Week 3 Days Per Week 2 Days Per Week Elm Community Center -Afternoons (5.75 hours) 5 Days Per Week 4 Days Per Week 3 Days Per Week 2 Days Per Week Elm Community Center -Afternoons (3 hours) 5 Days Per Week 4 Days Per Week 3 Days Per Week 2 Days Per Week Unassigned Day-Elm Community Center Morning Care Plan A (12:15 pm -3:15 pm) Care Plan B (12:15 pm -6:00 pm) per day " per4 wks 3.00 per hr " 3.25 per hr " 3.50 per hr " 3.75 per hr per4 wks 3.00 per hr II 3.25 per hr 3.50 per hr " 3.75 per hr per day " per4 wks 3.00 per hr 3.25 per hr " 3.50 per hr " 3.75 per hr per4 wks 3.00 per hr " 3.25 per hr 3.50 per hr " 3.75 per hr per4 wks 3.00 per hr 3.25 per hr 3.50 per hr " 3.75 per hr per day " 39 FY 2014-15 $ 6 8 2.25 90 78 63 45 180 156 126 90 6 12 255 221 178 127.50 345 299 241.50 172.50 180 156 126 90 14 12 23 Item 9.b. - Page 46 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2014-15 RECREATION AND MAINTENANCE SERVICES I Fee Description Child Care Program Fees (continued): Winter/Spring/Summer -Full Day 5 Days Per Week 4 Days Per Week 3 Days Per Week Minimum Days (teacher work day/early release) Regular day of attendance Non-regular day of attendance Late Pick-up Fees: per week 3.50 per hr II 3.75 per hr 4.00 per hr per day II $ Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00 Pickup 6:01 -6:15 pm per child Pickup 6:16 -6:30 pm 11 Pickup 6:31 -6:45 pm 11 40 FY 2014-15 140 120 96 9 15 10 20 30 J Item 9.b. - Page 47 THIS PAGE INTENTIONALLY LEFT BLANK Item 9.b. - Page 48