R 3375 RESOLUTION NO. 3375 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE AUTHORIZING THE MAYOR TO EXECUTE SHAlSTP COOPERATIVE AGREEMENT WHEREAS, the SLOCOG Board approved allocation of regional Surface Transportation Program (STP) funds for projects within the City of.Arroyo Grande ("City"); and, WHEREAS, SLOCOG intends to exchange its apportionment of Federal Surface Transportation Program (STP) funds for State Highway Account (SHA) funds for projects within the City; and, WHEREAS, the City and SLOCOG are authorized, pursuant to the requirements of the Transportation Equity Act for the 21st Century (TEA21) and State Statutes enacted by Senate Bill 45 (1997), to enter into a Cooperative Agreement for any transportation purpose within the City. NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of-Arroyo Grande hereby: , 1. Approves Exhibit 1 attached hereto and incorporated herein, entitled "San Luis Obispo Council of Governments SHAlSTP Cooperative Agreement No. AG- TEA21-01". - - 2. Hereby appoints the Mayor as the official representative authorized to sign SLOCOG SHAlSTP Cooperative Agreements. On motion by Council Member Runels, seconded by Council Member Dickens, and by the following roll call vote, to wit: AYES: Runels, Dickens, Tolley, Ferrara, and Mayor Lady NOES: None ABSENT: None The foregoing Resolution was adopted this 22nd day of June, 1999. r l: ,- _.~----_..- Resolution No. 3375 Page Two ~. MICHAEL A. LADY, aO~ ATTEST: ORE, DIRECTOR OF ADMINISTRATIVE SERVICESI DEPUTY CITY CLERK APPROVED AS TO CONTENT: l~klJ L~ thlli, ~ ROBERT L. HUNT, CITY MANAGER APPROVED AS TO FORM: ,. - RESOLUTION NO. 3375 PAGE 3 OFFICIAL CERTIFICATION I, KELLY WETMORE, Director of Administrative Services of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of pe~ury, that Resolution No. 3375 is a true, full, and correct copy of said Resolution passed and adopted at a special meeting of the City Council of the City of Arroyo Grande on the 22nd day of June, 1999. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 28th day of June, 1999. -. ORE, ADMINISTRATIVE SERVICES DIRECTOR! DEPUTY CITY CLERK . ------,------------, , I EXHmIT "1" San Luis Obispo Council of Governments Agreement No. AG-TEA21- 01 SHAlSTP COOPERATIVE AGREEMENT THIS AGREEMENT, ENTERED INTO ON THE DATE BELOW STATED is between the San Luis Obispo Council of Governments, referred to herein as "SlOCOG", and the CITY OF ARROYO GRANDE . a political subdivision of the State of California, referred to herein as the "CITY". RECITALS WHEREAS, SlOCOG and the CITY are authorized, pursuant to the requirements of the Transportation Equity Act for the 21st Century (TEA21) and State Statutes enacted by SB 45 (1997), to enter into a Cooperative Agreement for any transportation purpose within the CITY; and WHEREAS, the SlOCOG Board approved allocation of regional Surface Transportation Program (STP) funds for the projects identified on the attached Exhibit A (summary table and project summary sheets) and each of the individual project is herein referred to as "PROJECr; and WHEREAS, SlOCOG intends to exchange its apportionment of Federal Surface Transportation Program (STP) funds for State Highway Account (SHA) funds for the PROJECTs, therefore eliminating the non-federal match and compliance with the National Environmental Policy Act (NEPA); and WHEREAS, all applicable laws, regulations, and policies relating to the use of State Highway Account (SHA) funds for the PROJECTs, including "funds at work" insignia information, shall apply notwithstanding any other provisions of this J\greement; and - WHEREAS, all obligations of the CITY under the terms of this Agreement are subject to funding appropriation by the Legislature, and the receipt and allocation of funding by SlOCOG; and NOW, THEREFORE, in consideration of the above noted findings and considerations, the parties agree as follows: 1) The CITY agrees to administer each PROJECT and conduct the applicable environmental process required under the California Environmental Quality Act (CEQA) for each PROJECT. 2) The CITY agrees to advertise, open and review bids, and to award the contract for each applicable PROJECT (or combination of projects) as needed, in accordance with State laws. I I 3) The CITY agrees that all phases of each PROJECT will be developed in accordance with policies, procedures, practices, standards, regulations, and laws that apply to the CITY, Caltrans (where appropriate), and SlOCOG. If in the judgment of SLOCOG a project may impact a street, road or highway owned or controlled by a jurisdiction other than CITY (including without limitation the County, another city, or the State of California), SlOCOG may require the CITY to establish a project development team (PDT) composed of representatives of such jurisdictions, as well as SLOCOG. 4) The CITY agrees to construct each PROJECT in accordance with the plans and specifications of the CITY (and Caltrans when PROJECT involves state highway facilities), and in accordance with the conditions of funding adopted by SlOCOG. 5) The CITY agrees to maintain the facilities constructed, improved, or otherwise modified. .. SLOCOG SHNSTP General Cooperative Agreement page 1 6) The CITY agrees to utilize, for each PROJECT, an amount of Regional SHA funds equal to or less . than that adopted by SLOCOG, and that SLOCOG's total obligation shall not exceed the amounts shown in Exhibit A unless a greater amount has been authorized in advance in writing by SLOCOG. 7) The CITY agrees to account for all costs for the PROJECTS to be paid by SLOCOG pursuant to this Agreement and agrees to perform all the reimbursable work for each project according to the billing period identified in the project summary sheets. ' 8) After the opening of bids on applicable PROJECTS, the CITY shall notify SLOCOG of any cost overruns or underruns to the original cost estimate. The following will be assumed and reflected in SLOCOG's SHA accounting spreadsheets: a) If less funding than what was programmed is required for a PROJECT, the cost savings will be made available for reprogramming into another CITY project as approved by SLOCOG. b) If more funding than what was programmed is required for a PROJECT, the CITY will be solely responsible for providing the additional funding, which can be comprised of various non-regional funding sources, including cost savings from other CITY SHA projects. 9) The CITY may submit an invoice for reimbursement of funds expended for each PROJECT no more than once a month, using the attached Reimbursement Request Form (Exhibit B). All Payments will be prorated between CITY and SLOCOG based on the agreed percentages of funding, as adopted by SLOCOG and listed on each project summary sheet (Exhibits A-I through A-9, attached hereto). As identified in Exhibit B, all invoices must contain the following: a. SHA PROJECT number and name b. A brief description of work accomplished during the billing period. c. A copy of the consultant's bill to the CITY (if applicable). d. Amount expended by the CITY during the billing period, with evidence of funds expended (e.g. a copy of a CITY check to consultant or accounting documentation, etc.) e. The pro-rata share reimbursement rate for the PROJECT as specified on the project summary sheet f. Amount requested for reimbursement for the billing period - - 10) SLOCOG agrees to reimburse the CITY within 30 days of receipt of a completed reimbursement request form (Exhibit B) with all applicable attachments and signatures or as funds become available on a "1st come, 1st served" basis, an amount expended by the CITY during the invoices' billing period less the aforesaid proration. If a PROJECT receives both Regional and Urban State Highway Account funding (referred to in Exhibits hereto as "RSHA" and "USHA" respectively), reimbursements shall be made on a pro rata basis from each source for SLOCOG's share. SLOCOG's total obligation for each PROJECT cost shall not exceed the amount shown in Exhibit A as the "Approved $ Amount," unless SLOCOG has in writing authorized a greater amount per adopted SLOCOG policy. 11) Within two months of each PROJECT's completion and all work incidental thereto, the CITY must provide SLOCOG certification in the form provided in Exhibit C hereto, of completion in accordance with the provisions in this Agreement, and a final invoice containing those items listed above. In the event that final project costs are less than those listed as "Total Project cosr on Exhibit A, hereto, the funds shall be reallocated in accordance with item #8 above. 12) If this project has been paid for either entirely, or in part with Regional SHA funds, and CITY, or any of its officials, chooses to publicly memorialize participation in said pr.oject, then CITY shall also memorialize SLOCOG's financial participation in said project in a manner agreeable to SLOCOG. This paragraph shall apply to, but is not limited to, signage during construction, representation at dedications and placement of plaques or other objects of memorialization, whether at or near the project site or not. 13) The CITY grants to the State of California and/or SLOCOG access to the CITY's books and records for the purpose of verifying that SHA funds paid are properly accounted for and the proceeds are expended in accordance with the terms of this Agreement. All documents shall be available for inspection by authorized Caltrans and/or SLOCOG agents at any time - during the PROJECT SLOCOG SHNSTP General Cooperative Agreement page 2 '--'-.-.- development and for a four-year period from the date of completion, or for one year after the audit is . completed or waived by Caltrans and/or SLOCOG, whichever is later. 14) Upon completion of all work under this Agreement, ownership and title to all materials will automatically be vested in the CITY and no further agreement will be necessary to transfer own~rship to the CITY. 15) If existing public and/or private utilities conflict with the PROJECT construction or violate the CITY's encroachment policy (as applicable), the CITY shall make all necessary arrangements with the owners of such utilities for their protection,. relocation or removal. The CITY shall review the plans for protection, relocation or removal. If there are costs of such protection, relocation, or removal which the CITY must legally pay, the CITY shall pay the cost ~f said protection, relocation or removal, plus cost of engineering, overhead and inspection. If any protection, relocation or removal of utilities is required, such work shall be performed in accordance with CITY policy and procedure. 16) The CITY shall defend, indemnify and save harmless SLOCOG, its officers and employees from all and any claims, demands, damages, costs, expenses, judgments, attorneys' fees or any liability arising out of this Cooperative Agreement to the performance or attempted performance of the provisions hereof, or any project referred to in the Exhibits hereto. Nothing contained in the foregoing indemnity provision shall be construed to require CITY to indemnify SLOCOG against any responsibility of liability in contravention of Civil Code section 2782. 17) If the CITY transfers its risk connected with design or construction of this project to independent contractors, CITY agrees to use its best efforts to obtain the independent contractor's Inclusion of SLOCOG as an indemnitee and in any insurance procured by such independent contractor(s) for the project, to name SLOCOG as an additional insured. 18) Both the CITY and SLOCOG shall designate a Project Coordinator who shall represent the respective agencies and through whom all communications between the parties to this agreement shallaccur. 19) Both parties agree that if, in the course of carrying out the PROJECT, there is a disagreement among the !,roject Coordinators over the direction of the project, the matter will be forwarded through a three step conflict resolution process. First, resolution will be attempted between the CITY Manager and SLOCOG Executive Director. If a dispute continues, a determination shall be made by the SLOCOG Executive Committee, and, if required, final determination by the full SLOCOG Board. 20) Nothing in the provisions of this Agreement is intended to create duties, obligations, or rights for third parties not signatories to this Agreement or affect the legal liability of either party of the Agreement by imposing any standard of care with respect to the maintenance of local roads different from the standard of care imposed by law. 21) No alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties thereto, and no oral understanding or agreement not Incorporated herein or in the attached Exhibit A shall be binding on any of the parties thereto. 22) This Agreement may be terminated or provisions contained therein may be altered, changed, or amended by mutual consent, in writing, of the parties hereto. 23) Prior to award of a contract for any PROJECT, SLOCOG may terminate the applicable PROJECT in the Cooperative Agreement by written notice, provided SLOCOG pays the CITY for all PROJECT- [ related costs reasonably incurred by the CITY prior to termination. Also, prior to award of a contract for any PROJECT, the CITY may terminate the applicable PROJECT in the Cooperative Agreement I by written notice, provided the CITY pays SLOCOG for all costs reasonably incurred by SLOCOG -. prior to termination. :j' 5 LOCOG SHNSTP General Cooperative Agreement page 3 -----~_.- - SIGNATURES: CITY OF ARROYO GRANDE SAN LUIS OBISPO COUNCIL OF GOVERNMENTS By: By: ~^~~ Ronald L. De Carli, Executive Director Date: C,/Z8/f:/t; Date: 7(7(?9. By: ~ By: Date: Date: fllo/'~' ,. SlOCOG SHNSTP General Cooperative Agreement page 4 EXHIBIT A APPLICABLE PROJECTS for Agreement No. AG-TEA21- 01 EXHIBIT PROJECT NAME PROJECT #(s) Funding Exhibit A-1 Pavement Maintenance - Selected City PUAG01 $245,500 Streets Exhibit A-2 Pavement Management Program Plan PUAG02 $28,000 Exhibit A-3 Bridge Street Bridge Rehabilitation PUAG03 $49,500 Exhibit A-4 Creekside Pedestrian Path PUAG04 $2,000 Exhibit A-5 Brisco Rd.-Halcyon Rd/Rte 101 Project PRAG01 $50,000 Study Report Exhibit A-6 Grand Avenue/East Branch StlRt. 227 PRAG02 , $10,000 Corridor Study Exhibit A-7 EI Campo Rd/Rte 101 Project Study Report PRAG03 $25,000 Exhibit A-8 Paulding Middle School Bike Lanes PRAG04 $111 ,400 - Exhibit A-9 Grand Avenue Reconstruction Project PRAG05 $125,000 Total. Funding $646,400 ,. Exhibit A-1 (to Agreement No. AG -TEA21- 01) Project Number: PUAG01 Grantee: City of Arroyo Grande Project Title: Pavement Maintenance Funding Type: Urban SHA ($245,500) Work Implementation Period: Jul1, 1998 to Jun 30, 2003. Approved: October 6, 1998 Project Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL Expected Milestones (date complete) FY 98/99 $ 45,500 $ 200,000 $ 245,500 Annual Maintenance Construction FY 99/00 $ 50,000 $ 200,000 $ 250,000 Projects FY 00/01 $ 50,000$ 200,000 $ 250,000 FY 01/02 $ 50,000 $ 200,000 $ 250,000 , FY 02103 $ 50,000 $ 200,000 $ 250,000 Total $ - $ 245,500 $1,000,000 $ - $ - $ Reimburse- 0.0% 19.7% 80.3% 0.0% 0.0% 0.0% ' ment Rate - Project Description: An annual apportionment of USHA funds for the maintenance of City streets as presented in the City of Arroyo Grande's Pavement Management Program Plan. Billing Period: Reimbursement of this project may begin upon the San Luis Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. Opportunities for enhancing bicycle and pedestrian travel in the project area should be considered and implemented, where appropriate and feasible, as part of the project. ---~ --~ , Exhibit A.2 (to Agreement No. AG -TEA21- 01) Project Number: PUAG02 Grantee: City of Arroyo Grande Project Title: Pavement Management Program Plan Funding Type: Urban SHA ($28,OOO) Work Implementation Period: July 1, 1997 to Jun 30, 2003. Approved: October 6, 1998 Project Schedule and Funding Summary: RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL Expected Milestones (date complete FY 98/99 $ 16,000 $ 16.000 20 yeerPMP .10197 FY 99/00 $ 3,000 $ 3.000 Annual Updates to PMP - 7/98 to 6103 FY 00/01 $ 3,000 $ 3.000 FY 01/02 $ 3,000 $ 3,000 . FY 02/03 $ 3,000 $ 3.000 Total $ - $ 28,000 $ $ - $ 28,000 Reimburse- 0.0% 100.0% 0.0% 100.0% ment Rate - Project Description: Maintain and update the City's Pavement Management Program Plan; prioritizing street maintenance projects based on pavement distress ranking criteria, manage a fixed annual maintenance budge over a 20-year period in order to program future projects. Billing Period: Reimbursement of this project may begin upon the San Luis Obispo Counci1 of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation P$riod. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. Opportunities for enhancing bicycle and pedestrian travel in the project area should be considered and implemented, where appropriate and feasible, as part of the project. - ---..-- Exhibit A-3 (to Agreement No. AG-TEA21- 01) Project Number: PUAG03 Grantee: City of Arroyo Grande Project Title: Bridge Street Bridge Rehabilitation Funding Type: Urban SHA ($49,500) Work Implementation Period: July 1, 1998 to Jun 30, 2001. Approved: October 6, 1998 Project Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL Expected Milestones Utility Users Construc-tlon HBRR (date c:ompIete) Tax Tax FY 98/99 $ 3,000 $ 3,000 Project schedule pending outcome of FY 99/00 $ 12.880 $ 37.650 $ 50,530 preliminary studies and approval by Caltrans. FY 00/01 $ 49,500 $ 449.230 $ 498,730 Total $ - $ 49,500 $ 12.880$ 40.650 $ 449.230 $ - $ 552,260 Reimburse- 0.0% 9.0% 2.3% 7.4 % 100.0% m~nt Rate - Project Description: Rehabilitation construction of Bridge Street Bridge in the City of Arroyo Grande to bring it up to a standard load limit of H20 (20 tons). Billing Period: Reimbursement of this project may begin upon the San Luis Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. Opportunities for enhancing bicycle and pedestrian travel in the project area should b~ considered and implemented, where appropriate and feasible, as part of the project. . --'----..------------------.---- Exhibit A-4 (to Agreement No. AG- TEA21- 01) Project Number: PUAG04s Grantee: City of Arroyo Grande Project Title: Creekside Pedestrian Path Funding Type: Urban SHA ($2,000) Work Implementation Period: May 25, 1999 to Jun 30, 2001. Approved: May 25, 1999 Project Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL BegIn canst FY 98/99 $ 2,000 $ 2,000 7/99 Total End canst 9199 Reimburse- ... ment Rate Project Description: The project will consist of the reconstruction of existing non- standard access points and other pedestrian treatments. The existing access points (e.g. stairways aOd ramps) that lead down to the pathways that run along Arroyo Grande Creek are not constructed to current design standards and have deteriorated to such a point that in some areas they could be dangerous for public access - - Billing Period: Reimbursement of this project may begin upon the San Luis Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. Opportunities for enhancing bicycle and pedestrian travel in the project area should be considered and implemented, where appropriate and feasible, as part of the project. ,. --~~.~_._- --.- r Exhibit A-5 (to Agreement No. AG-TEA21- 01) Project Number: PRAG01 Grantee: City of Arroyo Grande Project Title: Brisco Rd-Halcyon Rd/Rte. 101 PSR Funding Type: Regional SHA ($50,000) Work Implementation Period: Oct. 6, 1998 to Jun 30, 2004. Approved: October 6, 1998 Project Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL Expected Milestones Utility Users Traffic (date complete) Tax Circulation FY 98/99 $ 50,000 $ 12,565 $ 65,435 $ 128,000 PDT Meetings Mar 99 - Aug 99 FY 99/00 $ 12,410 $ 12,410 Completion of PSR Sep-99 Total $ 50,000 $ - $ 12,565 $ 77,845 $ 1..0,410 Reimburse- 35.6% 0.0% 9.0% 55.4% 0.0% 0.0% 100.0% ment Rate SLOCOG reimbursement rate is 53.2% as determined by the SLOCOG Board 10/6198; not to exceed $50,000. Project Description: Preparation of a Caltrans approved Project Study Report to improve the traffic operations at the interchange on Route 101 at Brisco and Halcyon Roads. - Billing Period: Reimbursement of this project may begin upon the San Luis Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. Evaluation of a low cost alternative shall be evaluated thoroughly, including, but not limited to, a sub contract for the detailed review of a roundabout option. 4. In order for any subsequent construction project based on this PSR to be eligible for inclusion ina future State Transportation Improvement Program (STIP), the PSR shall be completed to the satisfaction of Caltrans and signed by the District 5 Director. 5. The PSR shall discuss funding availability for interchange improvements. . Special Provision Continued on Page 2 of Exhibit A-4 ---~- - 6. The CITY agrees to be the lead agency for the PSR and also agrees to establish a Project Development Team (PDT) composed of planning andlor engineering staff as appropriate from the City, County of San Luis Obispo, Caltrans, and SLOCOG will jointly guide development and comp1etion of the Project, including but not limited to: 1) defining the scope of the project, 2) technical factors to be addressed, 3) consultant selection, and 4) final recommendations to the City or other jurisdictions as necessary'. 7. Both the CITY and SLOCOG shall designate a Project Coordinator who shall represent the respective agencies on the PDT and through whom all communications between the various parties to this agreement (including Caltrans) shall o~cur. 8. The PSR shall assess and propose express bus stop and park and ride lot facilities at/near the interchange as appropriate per SLOCOG policy of 12/97. For information on identification, selection and design of these facilities see the Express Bus Stop Study approved by SLOCOG 8/98. 9. The PSR shall identify the impacts to bicycle and pedestrian travel associated. with each improvement alternative being considered. In addition, the PSR shall evaluate and recommend opportunities for maintaining and enhancing bicycle and pedestrian travel throughout the study area as part of the project. - - ,. --.--_., Exhibit A-6 (to Agreement No. AG-TEA21- 01) Project Number: PRAG02 Grantee: City of Arroyo Grande Project Title: Grand Ave/East Branch StlRte 227 Funding Type: Regional SHA ($10,000) Corridor Study Work Implementation Period: Oct 6, 1998 to Jun 30, 2000 Approved: October6, 1998 Project Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL Expected Milestones RSHA .ISTEA (date complete) Contract Bid . 2199 FY 98/99 $ 10,000 $ 20,000 $ 30,000 Contract Admin 2199 - 7/99 Total $ 20,000 $ Confdor Study. 7/99 Reimburse- 0.0% 66.7% mentRate .... Note: Other (1) - previously programmed RSHA funds fy 97/98 . Reimbursement rate 100% not to exceed $30,000. Project Description: A study of Grand Ave/East Branch St./Route 227 in the City of Arroyo Grande from Oak Park Boulevard to Crown Hill to update and expand the 1983 Grand Ave. Study. Study will examine on-street parking, lane striping, traffic signalization, and shall address future traffic conditions. . Billing Period: Reimbursement of this project may begin upon-the San Luis Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. Opportunities for enhancing bicycle (e.g. consideration of reduced lane widths for the striping of Class II bikelanes) and pedestrian travel in the project area should be considered and implemented, where appropriate and feasible, as part of the project. ,. -_._-"-'~"-'- Exhibit A-7 (to Agreement No. AG-TEA21- 01) Project Number: PRAG03 Grantee: City of Arroyo Grande Project Title: EI Campo Rd/Rte 101 PSR Funding Type: Regional SHA ($25,000) Work Implementation Period: Oct. 6,1998 to Jun 30, 2002 Approved: October 6, 1998 Project Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL Expected MII..tone. Utility Developer (date complete) Users Tax PDT Meetings FY 98/99 $ 25.000 $ 53,000 $ 30,000 $ 108,000 Mar 99 . Aug 99 Complellon of PSR FY 99/00 $ 9.435 $ 9.435 Sep-99 Total $ 2~,OOO $ $ 62,435 $ $ 3O,O()O $ Reimburse- 21.3% 0.0% 53.2% 0.0% 25.5% 0.0% ment Rate SLOCOG reimbursement rate Is 26.60/. as determined by the SLOCOG Board 10/6198; not to exceed $25,000. Project Description: Preparation of a Caltrans approved Project Study Report to improve the traffic operations at the existing at-grade intersection EI Campo Road (south of the City of Arroyo Grande) . and Rte. 101 The PSR will evaluate interchange/circulation improvements north of the existing EI Campo at grade intersection, the existing location, and south of the existing location. Billing Period: Reimbursement of this project may begin upon the San Luis Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. A PSR should closely address all connectivity issues (land use, environmental constraints, cost and alignment) affecting the improvement of EI Campo Rd to Los Berros Rd to enhance regional circulation to the Nipomo Mesa. 4. In order for any subsequent construction project based on this PSR to be eligible for inclusion in a futur~. State Transportation Improvement Program (STIP), the PSR shall be completed to the satisfaction of Caltrans and signed by the District 5 Director. .. Special Provision Continued on Page 2 of Exhibit A-6 5. The PSR shall discuss funding availability for interchange improvements. 6. The CITY agrees to be the lead agency for the PSR and also agrees to establish a Project Development Team (PDT) composed of planning and/or engineering staff as appropriate from the City, County of San Luis Obispo, Caltrans, and SLOCOG will jointly guide development and completion of the Project, including but not fimited to: 1) defining the scope of the project, 2) technical factors to be addressed, 3) consultant selection, and 4) final recommendations to the City or other jurisdictions as necessary. 7. Both the CITY and SLOCOG shall designate a, Project Coordinator who shall represent the respective agencies on the PDT and through whom all communications between the various parties to this agreement (including Caltrans) shall occur. 8. The PSR shall assess and propose express bus stop and park and ride lot facilities at/near the interchange as appropriate per SLOCOG policy of 12/97. For information on identification, selection and design of these facilities see the Express Bus Stop Study approved by SLOCOG 8/98. 9. The PSR shall identify the impacts to bicycle and pedestrian travel associated with each improvement alternative being considered. In addition, the PSR shall evaluate and recommend opportunities for maintaining and enhancing bicycle and pedestrian travel throughout the study area as part of the project. - - -------..--.---- Exhibit A-8 (to Agreement No. AG-TEA21- 01) Project Number: PRAG04 Grantee: City of Arroyo Grande Project Title: Paulding Middle School Bike Lan.e.s Funding Type: Regional SHA($114,OOO} Work Implementation Period: Oct 6, 1998 to Jun 30, 2000 Approved: October 6, 1998 Project Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) other (2) TOTAL Expected Milestones PROP 116 (date complete) Design. 2J99 FY 98/99 $ 11,000 $ 11,000 Award BIeI. 5199 Cansl Start. 6199 Conal End .8/99 FY 99/00 $ 111 ,400 $ 211,760 $ 323,160 Total $ 111,400 $ - $ - $ 222,760 $ - $ 334.160 Reimburse- 33.3% 0.0% 0.0% 0.0% 66.7% 0.0% 100.0% ment Rate Project Description: The proposed project will consist of installing new utilities, sewer, water, storm drains, curb, gutter, and sidewalk in a 300 foot long widened section ofHuasna Rd, and restriping the entire length of Huasna Rd. from East Branch St. to the eastern City limits to create Class II bike lanes. Installation of signage and delineating five-foot lanes on the edge of the vehicle lanes for bike traffic only. Billing Period: Reimbursement of this project may begin upon the San Luis Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a . pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts'identified in the table above under RSHA and USHA totals. 3. Opportunities for enhancing bicycle and pedestrian travel in the project area should be considered and implemented, where appropriate and feasible, as part of the project. - "---- ----- Exhibit A-9 (to Agreement No. AG-TEA21- 01) Project Number: PRAG05 Grantee: City of Arroyo Grande Project Title: Grand Ave. Reconstruction Project Funding Type: Regional SHA ($125,000) Work Implementation Period: Oct 6, 1998 to Jun 30, 2000 Approved: October 6, 1998 Pro'ect Schedule and Funding Summary: Fiscal Year RSHA USHA Local (1) Local (2) Other (1) Other (2) TOTAL Expected Milestones Fed Demo. (date complete) TEA21 FY 98/99 $ 113,300 $ 113,300 Design - 4199 Award Bid - 6199 Conal Start. 7/99 FY 99/00 to $ 125,000 $ 1,397,200 $ 375,000 $ 1,897,200 Consl End - 01100 FY 03/04 Total $ 125,000 $ - $ 1,510,500 $ - $ .375,000 $ - $ 2,010,500 Reimburse- 6.2% 0.0% 75.1% 0.0% 18.7% 0.0% 100.0% m$ntRate Project Description: The project will consist of pavement reconstruction and spot repair of curb, gutter, sidewalks, and cross gutters where needed along Grand Avenue between Halcyon Road and Elm Street. The existing water main will be replaced with a 12-inch water main, new fire hy.drants will be installed in areas that are currently deficient, and all services will be replaced as well as most meters boxes. The existing sewer main will be replaced with a 8-inch sewer main and laterals servicing each property will be replaced or a new lateral installed. Storm drain inlets and an existing CMP drainage culvert will be replaced. The project provides conduit and other facilities necessary to underground existing overhead utilities and possibly additional conduits to accommodate future fiber optic cable. Billing Period: Reimbursement of this project may begin upon the San Lujs Obispo Council of Government's (SLOCOG) receipt of the signed cooperative agreement. The CITY may submit invoices on a monthly basis during the Work Implementation Period, and must submit certification of project completion and a final invoice within 2 months after the Work Implementation Period. Costs incurred outside the Work Implementation Period are ineligible for reimbursement. Special Provisions: 1. Equipment purchases not identified herein, must have written approval prior to purchase. 2. Reimbursement of costs from funding sources administered by SLOCOG shall be provided on a pro rata basis determined by the percentage share each source is of the total project cost. The total funding contribution from SLOCOG for this project is not to exceed the amounts identified in the table above under RSHA and USHA totals. 3. Opportunities for enhancing bicycle and pedestrian travel in the project area should be considered and implemented, where appropriate and feasible, as part of the project._ EXHIBIT B San Luis Obispo Council of Governments State Highway Account (SHA) REIMBURSEMENT REQUEST FORM Agency Name: Date: Contact Person: Project Number(s): RSHA: USHA: Project Title: This Invoice Covers Work Completed from: I I to: I I Project Budget Information: (complete box below - refer to cooperative agreement "Exhibit A" for budget information) Tote" SPENT This Invoice ,.,,", Regional SHA .... U~biri~"'A;' Relm.6~rserl1ent ({ate, by Fund 0% Source (must be Consistent with Exhibit A ProjectSheet). Pro-rata Rel,ri1biJrsement by Funcllng Source (RSHAlUSHA) Please send a check for $ Total SHA share due this invoice (total of heavier shaded boxes above) Attachments: 1) A brief description of work completed; and 2) Consultant invoices 3) Proof of payment (e.g. copy of City check to consultant). Signed: (Agency Rep,) Shaded boxes below for SLOCOG Use .mr~ -- ~';i)f~I':'~""----~~-~~---'--'71 < ~ ,^ o"''"~'' ",~""\,,-,~'V> w.,+~. L~'; . ~j _-5jlv~~--~%~,~'~- ~_-...~' ._~~-.."':":'~:"~'---;;' ;c':::::;:-;~ ." "'~ >.: ''1t''~] "'''''''''10"''.,%';'' >"'$(>'""'> "'~~:~"'4 1 ~j>;~," ""'~ .&;;:.:~-..-<;...<..."-"~,,~""'~~~-........._~...~...;~U 5 LOCOG SHNSTP General Cooperative Agreement page 5 EXHIBIT C PROJECT COMPLETION FORM for SHA Projects This form notifies SLOCOG of project completion in accordance with the provisions in the Cooperative Agreement noted below. Our records indicate that the project listed below, funded all or in part with SHA. funds, has been completed: Project Name: Project Number(s): Cooperative Agreement Date (Recipient Agency): Approved SHA amount: I certify, on behalf of the City/County name of authorized official of , that the project named above was completed name of jurisdiction on in accordance with the provisions set forth in the cooperative - .. approximate date of completion agreement dated . It is my understanding that all savings date jurisdiction representative signed from a cost underrun will be returned to for city/county or SLOCOG reprogramming in accordance with the cooperative agreement. Signed: Date: signature of authorized official date signed - Return completed and signed Project Completion Forms within 2 months of the completion of each project to: SLOCOG, Attn: [RICHARD MURPHY] 1150 Osos Street, Suite 202 San Luis Obispo, CA 93401 SLOCOG SHNSTP General Cooperative Agreement page 6 ... -~ -- -----'--.--- -_...,,-