CC 2015-01-13_08i Accept Leanna Dr Creek Crossing Waterline ProjMEMORANDUM
TO: CITY COUNCIL
FROM:
BY:
GEOFF ENGLISH, DIRECTOR OF PUBLIC WORKS
MIKE LINN, CAPITAL PROJECTS ENGINEER
SUBJECT: CONSIDERATION OF ACCEPTANCE OF THE LEANNA DRIVE CREEK
CROSSING WATERLINE PROJECT, PW 2013-11
DATE: JANUARY 13, 2015
RECOMMENDATION:
It is recommended the City Council:
1. Accept the improvements as constructed by V. Lopez Jr. & Sons General
Engineering Contractors, Inc. for the subject project;
2. Direct staff to file a Notice of Completion; and
3. Authorize release of retention, thirty-five (35) days after the Notice of Completion
has been recorded, if no liens have been filed.
IMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
The 2014/2015 Capital Improvement Program Budget includes $372,200 for the subject
project. The actual construction project cost, including authorized construction changes,
is $165,659. The total cost of the project, including all design, construction, contract
administration, inspection and testing costs is approximately $291,770.
BACKGROUND:
On August 12, 2014, Council awarded a construction contract to perform the subject
project to V. Lopez Jr. & Sons General Engineering Contractors, Inc. for $165,578 and
authorized the City Manager to approve change orders in the amount of $33, 116. The
project scope of work involved the abandonment of an existing 8" water main and
concrete encasement across Arroyo Grande Creek that connects the City's east side
water storage and distribution system with the west side wells and residential users.
The main was replaced with a new 12-inch high-density polyethylene (HOPE) pipe
installed by Horizontal Directional Drilling (HOD) techniques to minimize the disturbance
within the creek. In addition, 160 feet of 6-inch water line was installed to tie in the
existing connection along the east bank of Arroyo Grande Creek.
Item 8.i. - Page 1
CITY COUNCIL
CONSIDERATION OF ACCEPTANCE OF THE LEANNA DRIVE CREEK CROSSING
WATERLINE PROJECT, PW 2013-11
JANUARY 13, 2015
PAGE2
ANALYSIS OF ISSUES:
The contractor has completed the work in accordance with the approved plans and
specifications. There are no outstanding issues.
ALTERNATIVES:
The following alternatives are provided for the Council's consideration:
1. Approve staff's recommendation;
2. Do not accept the project;
3. Accept the project but do not authorize release of retention; or
4. Provide direction to staff.
ADVANTAGES:
The project is complete. Accepting the improvements will allow staff to close out the
project. Remaining funds in the project account will be used for a second phase of
concrete repair work.
DISADVANTAGES:
The disadvantage of accepting the improvements would be if subsequent deficiencies in
the work are identified. However, the contract documents include a one-year warranty
period for the contractor to address any construction defects that may arise.
ENVIRONMENTAL REVIEW:
On May 24, 2014, the City Council approved a Mitigated Negative Declaration for the
subject project.
PUBLIC NOTIFICATION AND COMMENTS:
The agenda was posted on Thursday, January 8, 2015. The agenda and staff report
was posted on the City's website on Friday, January 9, 2015. No public comments
were received as of the time of preparation of this report.
Attachment:
1. Notice of Completion
Item 8.i. - Page 2
RECORDING REQUESTED BY
AND WHEN RECORDED RETURN TO:
CITY CLERK
CITY OF ARROYO GRANDE
300 EAST BRANCH STREET
ARROYO GRANDE, CA 93420
NOTICE IS HEREBY GIVEN THAT:
ATTACHMENT 1
NOTICE OF COMPLETION
1. The undersigned is owner or agent of owner of the interest or estate or the property hereinafter described as stated below.
2. The FULL NAME of the OWNER is: _T.~'h~e~C~r'""'·ty~of~A=r~r=-oy~o~G~ra=n=d=e _________________ _
3. The FULL ADDRESS of the OWNER is: 300 East Branch Street. Arroyo Grande. California 93420
4. The NATURE OF THE INTEREST or ESTA TE of the undersigned is. ~in_fi~ee~----------
5. THE FULL NAME and FULL ADDRESS of ALL PERSONS, if any, who hold such interest or estate with the undersigned as JOINT
TENANTS or as TENANTS IN COMMON are:
NAMES ADDRESSES
None
6. THE FULL NAMES and FULL ADDRESSES of the PREDECESSOR'S in interest of the undersigned ifthe property was transferred
subsequent to the commencement of the work of improvements herein referred to:
NAMES ADDRESSES
None
7. All work of improvement on the property hereinafter described was COMPLETED December 5 2014
8. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is:
V. Lopez Jr. & Sons General Engineering Contractors. Inc.
9. The street address of said property is: None
10. The property on which said work of improvement was completed is in the City of Arroyo Grande, County of San Luis Obispo, State
of California, and is described as follows: Leanna Drive Creek Crossing Water/me Prorect. PW 2013-11
Verification of NON-INDIVIDUAL owner: I, the undersigned, declare under penalty of perjury under the laws of the State of California
that I am the Community Development Director of the aforesaid interest or estate in the property described in the above notice; that I have
read the said notice, that I know and understand the contents thereof, and the facts stated therein are true and correct.
Geoff English, Public Works Director
January 14, 2015, Arroyo Grande, California