CC 2014-07-08_11.b. Pre App Traffic Way and East Cherry Ptx�g vp INCORPORATED a MEMORANDUM rn it JULY 10, 1811 '-I F0 It TO: CITY COUNCIL FROM: TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR BY: KELLY HEFFERNON, ASSOCIATE PLANNER SUBJECT: CONSIDERATION OF PRE-APPLICATION NO. 14-001; SPECIFIC PLAN DESIGNATION, GENERAL PLAN AMENDMENT, DEVELOPMENT CODE AMENDMENT AND TENTATIVE TRACT MAP; LOCATION - TRAFFIC WAY AND EAST CHERRY AVENUE; APPLICANT - MANGANO HOMES, INC. DATE: J U LY 8, 2014 RECOMMENDATION: It is recommended the City Council review the conceptual plans and provide comments to the applicant. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: Financial impact information will be provided when a formal application is submitted. However, it is anticipated that the City will receive additional sales and property tax revenues from the project, and that there will be additional costs associated with City maintenance of new public streets. BACKGROUND: Protect Location Fall ✓/�iiol, ��ro� r/ � 1 �'yn� /��y y / r��u r / !r � / i /r/r ry rr r/ ° ro m /%' � � r� ✓ � � 1 /��� � r Dla rrr/ >r � Ij'�°�ti� as / a /r: r i���///✓i ur�ruGl�%����� i���� i p r /�, ii r i I r//. ✓ /r'y17 G!� Y�fi�E'"� iii% /� %/� // � Item 11.b. - Page 1 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 2 The project site is located on the south side of East Cherry Avenue and east of Traffic Way. The site consists of four parcels totaling 15.2 acres under separate ownership. Surrounding the site is single-family residential development to the north and east, St. Barnabas Church to the south, a mobile home park to the southwest and commercial development across Traffic Way to the west. Below is a summary table of the separate properties as currently configured and identified in the General Plan, Zoning Map and the City's GIS mapping system (subareas were assigned in this staff report for reference only and are not delineated as such on the project plans): Summary of Properties - Existing Property Land Use Zoning Size (acres) Owner/Applicant Designation Designation Subarea 1 Dorfman Homes, Mixed Use (MU) Traffic Way 0.6 Inc. Mixed Use TMU D-2.11 Subarea 2 (two Nick Tompkins/ Agriculture Agriculture (AG) 13.1 parcels) Mangano Homes, (AG)(PD) Traffic Way Inc. Mixed Use Mixed Use MU) PD (TMU (D-2.11) Subarea 3 Arroyo Grande Agriculture Agriculture (AG) 1.5 Valley Japanese (AG)(PD) Welfare Assoc. Total: 1 k.2 Project Description Proposed is a preliminary review of a project that will include the following applications: Lot Line Adjustment, Specific Plan, General Plan Amendment, Development Code Amendment and Tentative Tract Map. The conceptual plan focuses on Subarea 2 and includes Subareas 1 and 3 for the primary purpose of coordinating infrastructure needs. The proposed site plan for Subarea 2 (project plans are included under separate cover) includes 59 single-family residential lots on 11.74 acres, which represents a density of roughly 5.0 dwelling units per acre. Currently there are no proposals for Subareas 1 and 3, although it is anticipated that Subarea 3 will be developed with a Japanese Cultural Center based on discussions with the property owner. General Plan Policies The 2001 General Plan Update changed the land use designation of Subareas 2 and 3 from Agriculture (AG) to Mixed Use with a Planned Development (MU-PD) overlay. Likewise, Subarea 1 was changed from General Commercial (GC) to MU-PD. In September 2003, the City Council adopted Resolution No. 3711 to change the land use designation of Subareas 2 and 3 back to Agriculture and revised the Conservation and Open Space Element to include an implementation policy for mitigation of converted agricultural lands. Specifically, Implementation Policy AG 1-4.2 was amended as follows: Item 11.b. - Page 2 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 3 "Possible mitigation for loss of areas having prime farmland soils may include permanent protection of prime farmland soils at a ratio of at least 1:1 and up'. to 2:1 with regard to the acreage of land removed from the capability for agricultural use. Permanent protection may involve, but is not limited to, dedication of a perpetual agricultural or conservation easement or other effective mechanism to ensure that the area chosen as mitigation shall not be subject to loss of its prime farmland soils. Suitability of location shall be determined by the City Council. The aim shall be to protect and preserve prime farmland soils primarily within and contiguous to City boundaries, secondly within the Urban Land Use Element area, and thirdly within the larger Arroyo Grande Valley and La Cienega Valley within the Area of Environmental Concern. Other potential mitigation measures for loss of areas having prime farmland soils include payment of in-lieu fees or such other mitigation acceptable to the City Council." In January 2004, the Zoning Map for Subarea 1 was changed from General Commercial to Traffic Way Mixed Use (TMU) with a D-2.11 Design Overlay. The primary purpose of the D-2.11 Design Overlay is to encourage the use of design that will not detract from the neighboring Village districts and to enhance the character and appearance of this southern commercial gateway to Arroyo Grande from Highway 101. In January 2014, the permitted uses for specific properties located within the D-2.11 Design Overlay District, including Subarea 1, were modified to be limited to-automobile and light truck sales and services, or related automotive parts stores, repair shops, and similar vehicle sales, services and accessory uses. Staff Advisory Committee (SAC) The SAC considered this application on April 30, 2014 and June 11, 2014. Issues discussed included eliminating separate driveways from East Cherry Avenue, providing sufficient right-of-way to allow future through traffic to Launa Lane, relocating the future access to properties located south of the project site further to the west where the slopes are less steep, reconfiguring the lot design to allow a pedestrian path and landscaped enhancement along the drainage channel to the south, providing sufficient guest parking at a ratio of 0.5 spaces per unit (or 30 spaces), and typical engineering requirements regarding drainage, street standards, traffic analysis, etc. The attached East Cherry Avenue Specific Plan (Attachment 1) includes a letter from the City outlining staff comments, recommendations and draft conditions with responses to each issue from the applicant. ANALYSIS OF ISSUES: As mentioned above, the formal proposal will include several different applications. A lot line adjustment is proposed between Subareas 2 and 3 to,provide better access and development potential for a Japanese Cultural Center on Subarea 3. An adjustment is also proposed that gives about 1.7 acres to Subarea 1 for commercial development. The existing TMU zoning of Subarea 1 coincides with this adjustment. Below is a Item 11.b. - Page 3 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 4 summary of proposed land use and zoning designations as well as adjusted site areas for the three subareas: Summary of Properties - Proposed Property Land Use Zoning Size (acres) 0 o nerlApplicant Designation Designation Subarea 1 Dorfman Homes, Mixed Use (MU) Traffic Way 2.3 Inc. Mixed Use (TMU)(D- 2.11)(SP) Subarea 2 Nick Tompkins/ Medium Density Village 10.9 Mangano Homes, Residential (MD) Residential with Inc. Specific Plan and D-2.4 Overlay. (VR— SP) (D-2.4 SP Subarea 3 Arroyo Grande Community Public Facility 2.0 Valley Japanese Facilities (CF) (SP) Welfare Assoc. Total: 15.2 The General Plan and Development Code Amendments necessary to formally approve the project would change the land use and zoning designations for all three subareas to reflect the above table. A Tentative Tract Map will be required to subdivide Subarea 2 as delineated in the project plans. Specific Plan Specific plans contain detailed development standards, distribution of land uses, infrastructure requirements, and implementation measures for the development of a specific geographic area. A specific plan can be as general as setting broad policy concepts, or as detailed as providing direction on every facet of development. The range of issues that is contained in a specific plan is primarily left to the discretion of the decision-making body. However, all specific plans must comply with Sections 65450- 65457 of the Government Code. These provisions require that a specific plan be consistent with the adopted General Plan of the jurisdiction it is located in. In turn, all subsequent subdivisions and developments must be consistent with the specific plan. The adoption of a specific plan is a legislative act similar to adoption of a General Plan or Zoning Ordinance. In effect, a specific plan creates its own zoning standards for a defined area. The applicant has submitted a draft specific plan (Attachment 1) that outlines the general infrastructure requirements for the three subareas, and the land use, development standards, architectural design, open space calculations, and circulation for Subarea 2. The development standards and regulations are the most important Item 11.b. - Page 4 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 5 aspect of a specific plan since it is through these standards that the goals and policies of the General Plan are implemented. Although a planned unit development (PUD) application is not necessary when a specific plan is proposed, the City's PUD standards are used as a guide in reviewing the project. The applicant also proposes that the underlying zoning district for Subarea 2 be designated as Village Residential (VR). The two tables below show how the development proposal for Subarea 2 compares to the VR zoning and PUD standards. Zoning Standards VR Standards Proposed Subarea 2 Maximum Density 4.5 dwellin units/acre 5.0 dwelling units/acre Minimum Lot Size 6,750 s.f. 4,950 s.f. Minimum Lot Width 50' I S5' Minimum Lot Depth I F1-0 0' 90' Maximum Lot Coverage = 40% 45% Maximum Floor Area Ratio =1 0.40 1 0.45 Minimum Front Setback 15' 10' (to porch); 15' to living area Minimum Interior Side Setback 5' 5' 1St floor); 7.5' (2n,floor Minimum Street Side Setback =1 10' 5' IV floor); 7.5' (2 floor) Minimum Rear Setback 10' (1-story); 15' (2-story) 5' (to garage or accessory structure); 20' to living area Minimum Setback Between Structures 10' 71 10' Maximum Building Height 30' 25' Open Space Requirements for Planned Unit Developments General General General General Requirement Requirement Requirement Requirement Private open 100-224 225-499 500-999 +1000 Space (average Proposed minimum is s.f. per lot) 2,294 sq. ft. Common Open 35% 30% 10% 0% Space(minimum Proposed is approximately % of project area) 94,565 sq. ft. Usable Open 40% 40% 45% 45% or 230,127 sq. ft. Space (minimum Proposed is approximately % of project area) 257,908 sq. ft. As indicated in the tables above, the proposed Subarea 2 development meets some, but not all of the zoning standards for the VR district. If a PUD were processed instead of a specific plan, the project would not be acceptable since it exceeds the allowable Item 11.b. - Page 5 CITY COUNCIL PRE 14-001 J U LY 8, 2014 PAGE 6 density. The project meets the PUD requirements for open space, which is in the form of private open space (yards, patios, porches) and usable open space (a quarter acre park off of East Cherry Avenue, a linear park with bioswale, interior landscaped parkways, and the East Cherry Avenue parkway). Design of Subarea 2 Based on SAC direction, the applicant modified several components of the project as follows: The access and circulation was revised to eliminate individual driveways on East Cherry Avenue and alternatively include an alleyway access; guest parking and open space calculations have been provided; the emergency access easement on the east side of Subarea 2 was increased from 20' to 24' wide; maintenance of common facilities is proposed to be through a Landscaping and Lighting District or Community Facility District (CFD); setbacks, lot coverage and floor area ratios have been provided; impervious lining was removed within the stormwater easement located on the southern portion of the property and replaced with permeable material; Low Impact Development features have been included to address post construction stormwater requirements; turf limitations for water conservation purposes has been addressed; and off-site sidewalk connectivity to the existing sidewalk located east of the project site on East Cherry Avenue has been included. Although the project site is not located within the D-2.4 Overlay District, the applicant proposes to utilize the City's Village Design Guidelines for determining the architectural styles of the homes. To comply with the overall character and theme of the Village D- 2.4 Overlay District, the project includes Bungalow, Craftsmen and Cottage styles for the residential units. Homes will-be one or two stories, not to exceed 25' in height, with second stories stepped back by 5'. Lots and homes will be smaller than typical homes developed throughout the City, and therefore more affordable by design. Generally, the garages are situated to avoid dominating the streetscape, and Hollywood driveways, which consist of two parallel strips of concrete with grass or groundcover in between, will be used where appropriate, adding to the overall Village character. All parking and driveway areas will use colored, porous pavers to reduce the contrast between the drives and structures, and to reduce stormwater runoff. Circulation and Road Design The Specific Plan will need to include development standards applicable to each subarea, including circulation and road design. The applicant has provided cross sections for East Cherry Avenue and the internal streets. The proposed right-of-way and lane widths are narrower than City standards. East Cherry Avenue is designated as a collector street with a 56' right-of-way that includes two -11' travel lanes, two bike lanes, parking, a parkway and sidewalk on the project side. Although City standards specify 12' wide travel lanes, the City has approved 11' wide lanes with previous subdivisions (e.g. the Cherry Creek and Huasna Road tracts). A striping plan will need to be submitted for the formal application that provides details of any turn lanes and Item 11.b. - Page 6 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 7 transitional sections. Overall, staff believes the design of East Cherry Avenue complies with the following General Plan policy: CT4-2. Utilize the circulation system as a positive element of community design, including street trees and landscaped parkways and medians, special streetscape features in Mixed Use corridors and Village Core, undergrounding of utilities, particularly along major streets. The project interior street section provides 10' wide lanes with parking on one side, parkways and sidewalks. One stretch of road additionally includes a 25' wide linear park with a meandering sidewalk. These parkway amenities serve as low impact development features to help retain stormwater on site. To date, the City has not accepted public roads that have 10' wide travel lanes. City Staff has requested that the applicant include two roadway segments to connect with future offsite road alignments. The first roadway segment is a route to properties located to the south of Subarea 2 up the open space of the St. Barnabas Church property to connect to the 86-acre Frederick property within the City and the Fredrick and Williams properties within the City's Sphere of Influence. These areas have been designated for future development in the City's General Plan. Although no development is planned for the Frederick property, any development there in the future would also need a minimum of two points of access and it is likely that the proposed road connection from the project site would be needed to serve as a required secondary connection. Although development thresholds will be studied in the forthcoming Circulation Element and Land Use Element updates, it is important to note that it would be needed even for a low intensity development scenario. Currently, South Traffic Way is the only existing local street connection to the Fredrick property, and due to the topography, other options for southerly access are limited. The supporting policies under General Plan Objectives CT1 and CT5 state the need for planning for and preserving future connections and corridors: "CT1. Plan and develop a coordinated and efficient, functional classification system of local streets and highways throughout the community that designates the purpose and physical characteristics of the roadway, composed of the five categories. CT1-4 Collector Streets — 2 lanes with or without turn lane, controlled access, on-street parking optional; incudes bike lanes, sidewalks, some transit and other design features: 84' right-of-way." "CTS.Coordinate circulation and transportation planning and funding of collector and arterial street and highway improvements with other local, County, Item 11.b. - Page 7 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 8 SLOCOG, State and federal agencies. Request County contribution to major street improvement projects. CT5-5 Define and preserve "study area" corridors and alternatives for future freeway, arterial and collector street connections, extensions, completions, reconstruction, widening, frontage road alternatives or extensions, and/or other improvements to Circulation and Transportation networks until cooperative resolution of Element revisions and/or Capital Improvement Programs. (See PSR and other study areas on Circulation Element). CT5-5.3 When new development occurs in vicinity of study areas or plan lines, and where legally and financially feasible, require all or portion of rights-of-way and improvements associated with new development." One of the most viable options for southerly collector road connections is through this specific plan area and it should be studied, per General Plan Objective CT5. Although the road connection would need to traverse the hillside behind the Church property it appears that it could be aligned along a bench in the hillside and provide for an adequate connection. Staff strongly advises that the Specific Plan include the requirement to preserve the connection to the south of the project area for future use. This will require that the access road from East Cherry Avenue be designed through the project as a collector street. The second roadway segment is an alignment to the east of Subarea 2, through Subarea 3, which connects to the stub out to Launa Lane. There are two variations of this required connection. One is to connect with a 40' wide standard residential street that would allow for two-way regular vehicular travel between the proposed residential neighborhood and the existing neighborhood. This is strongly preferred given General Plan Circulation Element Policy CT3-4.2 that states: "Emergency access design standards should limit cul-de-sac lengths, provide a logical grid or connected system of local streets providing at least two directions of neighborhood access, and minimize through traffic on local streets, particularly traversing single family residential neighborhoods." This policy promotes inter-neighborhood connectivity so that residential collectors remain uncongested. Although there may be concerns from existing residents that traffic will increase on their streets, East Cherry Avenue will still be used as a collector and the Launa Lane connection would not serve as a short-cut or preferred pass through route given the circuitous configuration as compared to East Cherry Avenue. Item 11.b. - Page 8 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 9 The other variation for the Launa Lane connection is to allow it to serve as emergency access only and to include bollards. This is not preferable as it would not promote full connectivity through neighborhoods and would require vehicles from the proposed East Cherry Avenue neighborhood to drive out to East Cherry Avenue and then enter the Launa Lane neighborhood by Los Olivos Lane or the Hillside Court neighborhood from Garden Street. It is strongly recommended to not sever the neighborhood connection altogether. Both neighborhoods need the road connections to satisfy Fire Code requirements for two- points of connection and the existing Launa Lane segment is deficient as it is longer than 600 feet. Launa Lane was clearly intended as a through connection and completion of the street segment was anticipated as properties developed. Environmental Issues The most significant environmental issue related to this specific plan is the conversion of approximately fourteen (14) acres of agricultural land. Because this is considered a significant and unavoidable environmental impact, an environmental impact report,(EIR) will be required. The applicant is researching potential agricultural conservation easements within the City limits as mitigation. The EIR will also consider all other environmental effects, including aesthetics, air quality, biological resources, geology and soils, greenhouse gas emissions, hydrology and water quality, land use compatibility, noise, transportation and traffic, and utilities and service systems. The specific plan addresses impacts of the project to the City's water supply by comparing the proposed residential use to the existing agricultural use. The document concludes that the residential use will use less ground water than the current agricultural use. A water study will be required as part of the EIR to adequately analyze the impacts of the project on the City's water resources. Another environmental impact issue is the inclusion of residential backyards within the 25' wide creek setback area located along the southern property line. This channel is not identified as a "blue line" water course per the US Geologic Survey (USGS) maps, but is identified on the City's General Plan Conservation and Open Space Element Creek Map as a waterway. Per Section 16.44.050(D) of the City's Municipal Code, a minimum setback of 25' is required for the purpose of safeguarding environmental and sensitive biological resources that contribute to a healthy, functioning ecosystem, and to minimize public and private losses due to flooding. The intent of the setback is to protect human life and health, minimize the expenditure of public money for costly flood control projects, and to enhance natural creek functions and values by providing erosion control, sedimentation prevention, enhancement of riparian habitat corridors, water quality protection and aesthetic and recreational opportunities. Including residential backyards within the setback area does not ensure environmental protection of the water course, nor provide any aesthetic or passive recreational opportunity. In addition, with fencing on both sides of the channel and therefore the creation of an "out of sight" Item 11.b. - Page 9 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 10 corridor from public view, this area could be an attraction for loitering and trash disposal, and therefore become a maintenance and code enforcement issue. In response to staffs concern about protecting the creek setback area and the lost opportunity to create an amenity, the applicant has designed an alternative plan that includes enhanced riparian vegetation, open rail wire fencing, and a decomposed granite path within the setback area for Council's consideration (see Attachment 2). Next Steps It is recommended the applicant consider and incorporate' feasible suggestions and comments from City Council into the conceptual plan, work with staff to hold community workshops to obtain public input, and then potentially revise the plans in response to public comments. During this time, it is hoped that more information about Subareas 1 and 3 will be provided. The City will then circulate a request for proposal (RFP) for preparation of the EIR. Once the Draft EIR is completed, the City will hold public hearings to formally consider the project. ALTERNATIVES: The following alternatives are presented for City Council consideration: 1. Provide comments and suggestions to the applicant in support of the conceptual project as presented; 2. Provide comments and suggestions to the applicant in opposition of the conceptual project as presented; or 3. Provide direction to staff. ADVANTAGES: The applicant is currently seeking comments and suggestions from the City Council on the conceptual specific plan and development proposal. Ultimate approval of the project would allow commercial, residential and public facility development of the',three subareas, and thereby generate additional sales and property tax revenues for the City. The type of housing development proposed on Subarea 2 includes smaller units on smaller lots than conventional single-family housing, and is therefore more affordable by design, which is consistent with the City's Housing Element policies. The architectural styles of the units are consistent with the Village Design Guidelines, which helps to extend the character of the Village to the southern gateway to the City. Open space amenities would be provided with a park on East Cherry Avenue and landscaped parkways. Importantly, the project may provide access to the City's large, undeveloped area to the southeast (Fredrick's and Williams' properties) if required. Finally, the project is designed to minimize water use and retain all stormwater onsite. DISADVANTAGES: The project would permanently remove approximately fourteen (14) acres of agricultural land from the City. The development would also increase traffic in the vicinity. Item 11.b. - Page 10 CITY COUNCIL PRE 14-001 JULY 8, 2014 PAGE 11 ENVIRONMENTAL REVIEW: No environmental review is required for this item. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted in front of City Hall on Thursday, July 3, 2014. The Agenda and staff report were posted on the City's website on Thursday, July 3, 2014. No public comments were received. Attachments: 1. East Cherry Avenue Draft Specific Plan 2. Alternative Design of Drainage Swale Setback Area Item 11.b. - Page 11 ATTACHMENT 1 East Cherry Avenue Planned Unit Development and Specific Plan Revised Pre-Application Review Draft � w r ' WYr LNidyll Submitted by: Mangano Homes,Inc. 735 Tank Farm Road San Luis Obispo,CA 93401 Pack Planning Item 11.b. - Page 12 Table of Contents INTRODUCTION 1.1 Purpose and Intent 3 1.2 Project Location 5 1.3 Conceptual Site Plan 5 1.4 Existing Site Conditions 7 1.5 Surrounding Land Uses 7 LAND USE 2.1 Land Use and Zoning 8 2.2 Village Design Guidelines 8 2.3 Dimensional Standards 9 2.4 Architectural Standards 10 2.5 General Plan Conformity 10 2.6 Land Use and Lot Development Standards 17 CIRCULATION 3.1 Roadway Development Standards 17 LOW IMPACT DEVELOPMENT/GREEN DEVELOPMENT STANDARDS 4.1 LID Features 21 4.2 Energy Conservation 23 4.3 Night Sky/Glare 23 PARKS AND OPEN SPACE 24 INFRASTRUCTURE MASTER PLAN 5.1 Sewer 24 5.2 Water - 24 5.3 Storm Drainage 27 Item 11.b. - Page 13 INFRASTRUCTURE FINANCING AND MAINTENANCE 27 List of Tables Table 1 Project Dimensional Standards 10 Table 2 Open Space Calculations 25 Table 3 Infrastructure Maintenance Plan 31 List of Figures Figure 1 Project Site Plan 6 Figure 2 East Cherry Avenue Lot w/Entry Treatment 11 Figure 3 Front Load Interior Lots 12 Figure 4 Cherry Avenue/Alley Lots 13 Figure 5 Project Image Boards 14 Figure 6 Cherry Avenue Elevations 15 Figure 7 Interior Street Elevations 16 Figure 8 interior Streets 18 Figure 9 Interior Streets with Linear Park 18 Figure 10 Cherry Avenue Street Sections 19 Figure 11 Access Easement Detail 20 Figure 12 Drainage Channel 22 Figure 13 Linear Park Concept Illustration 26 Figure 14 Infrastructure Master 32 Appendix A Response to Staff Comments Item 11.b. - Page 14 INTRODUCTION The East Cherry Avenue Specific Plan covers the properties on the south side of East Cher- ry Avenue easterly of Traffic Way as illustrated in Figure 1. Two of the subject properties are proposed to be converted from their current agricultural designations to residential and quasi- public ones, and a specific development plan is proposed for the Mangano parcel. The Traffic Way commercial parcel and the public/quasi-public parcels have been included to establish land- scaping and building set back requirements along common property lines,to establish an align- ment and development standards for East Cherry Avenue, and to formalize and establish devel- opment standards for common public facilities. A specific plan is considered appropriate because of the unique site conditions and because multiple properties are involved that would be benefit from site/location specific development guidelines and regulations. According to the City of Arroyo Grande's Development Regulations, a Specific Plan is to include the following: 1. Proposed land uses to be developed with the district; 2. Development concepts to be employed; 3. Schematic maps, illustrative material and narrative sufficient to describe the general rela- tionships between land uses, and the intended design character and scale of principal fea- tures; 4. A preliminary time schedule for development, including quantitative data,such as popula- tion, housing units, land use acreage,and other data sufficient to illustrate phasing of de- velopment and potential impact on public service requirements; 5. A statement of the relationship between the specific plan and the general plan; 6. A boundary survey map of the area within the specific plan and a calculation of the gross land area within the proposed district; 7. A topographic map and, if applicable, a general grading concept plan for the property and adjacent land within one hundred (100)feet of the property, shown at contour intervals not to exceed two feet for natural slopes over two percent or less. For natural slopes of two percent, contour interval shall not exceed five feet; East Cherry Avenue Specific Plan Page 1 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 15 8. Maps and supporting tabulations showing the current general plan land use designation, the current zoning district classification, and the current land use within the proposed dis- trict and on adjacent sites within three hundred (300) feet.The location of structures and other significant improvements shall be shown; 9. The distribution, location and extent of the uses of land, including open space, within the area covered by the specific plan. Projected acreage, population, housing units, employ- ment, and other related planning and development data should be provided for each use; 10. The proposed distribution, location and extent and intensity of major components of pub- lic and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities proposed to be located within the area covered by the specific plan; 11. Text setting forth the basic land use regulations, site development regulations,and per- formance standards and criteria by which development will proceed; 12. A program of implementation measures, including regulations, programs, public works projects and paragraphs. 13. Identification of any project phasing, if applicable; 14. A phasing plan for all major infrastructure, including parks and landscaping adjacent to roadways or major elements of the specific plan; 15. Financing for the construction and maintenance of infrastructure and public facilities. This Revised Pre-Application Review Draft provides the elements necessary for initial re- view by staff, Planning Commission,Architectural Review Commission and the City Council.Addi- tional requirements, elements and features will be added after the initial review, as well as pro- ject phasing and financing. This revised draft includes modifications to address comments on an initial draft to address City staff comments. Among other details this revised draft includes the following modifications: 1. Elimination of all driveway access to East Cherry Avenue and-usage of alleys to provide access to the northern most lots in the residential portion of the development. This change was made to maximize the number of parking spaces along the south side of East Cherry Avenue, and to reduce potential vehicle conflicts. East Cherry Avenue Specific Plan Page 2 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 16 2. Inclusion of a 25'wide linear park along the north side of an interior street. This facility was added to provide additional open space to meet the City's open space requirements, and to provide additional area for LID stormwater storage and treatment. The total quali- fied public and private open space resulting from this now represents 52.4%of the site area. 3. Modification of the neighborhood park so that it is more accessible to the residential neighborhood to the north. 4. Inclusion of a stub street instead of an access easement to the open space area to the south. This is intended to provide fire access to this area,and to provide a future open to extend this road to Trinity Avenue by others. Appendix A includes a response to staff comments on the initial draft, and the disposition of all comments in the Revised Plan. 1.1 PURPOSE AND INTENT The Specific Plan provides a bridge between the City's General Plan and detailed plans such as development plans and subdivisions. It directs all facets of future development within the area including the designation of land uses, designation of required access and circulation ele- ments, location and sizing of infrastructure, phasing of development,financing methods for pub- lic improvements, and the establishment of standards of development. The Specific Plan area is small compared to most specific plans. If the project was con- fined to one property, a Planned Development Permit may be appropriate; however, in this cir- cumstance,there are multiple properties that desire to establish special design standards that have common infrastructure issues and solutions, and common environmental mitigations. For example,there will be pedestrian connections through the properties, common storm drainage easements, a need to establish a plan line for East Cherry Avenue along the frontage of the three properties, and a common storm drainage system for two of the properties. The Specific Plan will also establish high design standards that are appropriate the conver- sion of existing prime farmland site in the City. While the sites are currently surrounded by ur- ban development, are small by production agriculture standards,and therefore should logically develop for non-agricultural uses,the City of Arroyo Grande's policies establish a high threshold East Cherry Avenue Specific Plan Page 3 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 17 for such conversions, and only in cases where the project may warrant it by its design standards and achievement of other public purposes set forth in the General Plan. The project also includes a lot line adjustment between the subject properties to allow for more effective development of the Japanese Cultural Center on parcel APN 76-210-01. That lot line adjustment is dependent on a number of factors including the setbacks between the two properties established by this Specific Plan, eventual development concepts that are approved for each property, and the simultaneous conversion of both properties from an agricultural to non-agricultural land use designations. Both of these properties require full urban services— sewer,water, city streets and utilities, storm drainage, dry utilities, etc. Other common features include: 1. Both properties require discretionary permits making each and both of them subject to CEClA and an EIR based on GP Policy AG1-4. 2. Both projects qualify as non-agricultural uses and "new development" according to Sec- tion E-Agricultural Buffer of the Right to Farm ordinance. Both will therefore be required to provide the minimum 100-foot agricultural buffer to adjoining agricultural lands. 3. Both appear to be subject to ag conversion mitigation per the requirements of the Right to Farm sections of the Development Code. The General Plan seems to clearly indicate, without exception,that any conversion of ag land, large or small is a significant environ- mental impact. Approval of a project with that finding obviously requires an environmen- tal impact report. If these properties are not covered by a single development entitlement such as a specific plan, each one would need to reflect a 100-foot ag buffer which would include only those uses permitted by Section 16.12.170 E (4) of the Development Code. If the properties are treated separately, much of the property that is currently planned to be adjusted in favor of the Japanese Cultural Center would need to be used as an ag buffer instead. Bifurcating the two entitlements would obligate each party to analyze its impacts under the no-project (no approved use permit or zone change) and the project alternative. There are technical and improvement issues that also need to be jointly addressed. There is substantial fill and pave-out that that will be required along the East Cherry Avenue frontage, as well as extension of sewer,water and storm drainage. If each property develops independent- ly, each would be required to have its own detention and retention facilities to comply with new East Cherry Avenue Specific Plan Page 4 of 32 Revised Pre-Application Review Draft Item 11.1b. - Page 18 water board "LID" and "hydromodification" requirements. If provided on the JCC site, a portion of it would be needed for some sort of pond or detention basin. That would reduce the useful area of the site and detract from the intended uses on the site. Adding some of the JCC site's storm drainage load to the subdivision site would require only a minor addition. Finally,the technical engineering work would only need to be done once for consistency. The Specific Plan is intended to facilitate a number of related entitlements for the project including the following: 1. A change in the general plan and zoning designation for the Mangano Site and JCC Site. 2. A lot line adjustment between the JCC Site and the Mangano Site. 3. Special development regulations for the site, including: a. R-1 density for the Mangano Site of up to 5.5 units per gross acre. b. Special setback requirements. C. Special development restrictions driveways on units facing Cherry Avenue. d. Special street standards. e. Integration of Village District design guidelines. f. Special architectural features and treatments that are consistent with the Village District Standards. 1.2 PROJECT LOCATION The project is located on the south side of East Cherry Avenue easterly of Traffic Way and includes parcels APNs 0076-210-23,0076-210-73 (collectively the "Mangano Site"),APN 0076- 210-01 (the "JCC Site"), and APNs 0076-621-76-78(collectively,the "Commercial Site"). 1.3 CONCEPTUAL SITE PLAN The conceptual site plan for the project is shown on Figure 1. It reflects 59 lots on 11.74 gross acres on the Mangano Site. The JCC and Commercial Sites are shown programmatically on- ly. Lots fronting on Cherry Avenue will have alley access to minimize the traffic conflicts that might occur with additional driveways along a collector street. Landscape parkways will be used throughout and will provide streetscape aesthetics as well as providing an area for bio-filtration of stormwater runoff. East Cherry Avenue Specific Plan Page 5 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 19 r t; i 9 W®w � a It � 1 r Figure 1 Project Site Plan East Cherry Avenue Specific Plan Page 6 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 20 Thematic street trees will be planted in the landscape parkways.To echo the sites' historic usage as an important agricultural area, ornamental Cherry trees will be used along the East Cherry Avenue frontage,while ornamental Pear trees will be used in the side and interior streets. A storm drainage detention facility will be employed that will service the Mangano and JCC sites and will be located at the western entrance. This will serve the functional purpose of storm water detention and LID compliance, recreation and open space,and will serve to provide a buffer between the commercial lots that fronts Traffic Way to the west. The open space area to the south provides an opportunity to provide a continuation of storm drainage that comes from the east, and to provide a pedestrian trail to provide connectivi- ty to the neighborhoods to the east and the west. 1.4 EXISTING SITE CONDITIONS The Mangano Site and the JCC Site are both designated for Agriculture in the General Plan and Zoning Ordinance. The Commercial Site is designated in the General Plan and Zoning Ordi- nance for commercial usage with an emphasis on development as a car dealership to facilitate expansion of existing dealers in the community or location of new ones in the Traffic Way corri- dor. The Mangano Site is actively farmed with annual crops. The JCC Site is normally fallow. The Mangano Site is farmed with a variety of truck crops every year ranging from celery, lettuce and vegetables: The typical value of production is approximately$15,000 per acre, according to statistics published by the UC Cooperative Extension. Water usage on the site is an important factor. Water is drawn from the groundwater from an onsite pump and well. Depending on the number and type of crops grown each year, total annual water usage is approximately 3-5 acre feet per year, or approximately 19.1 million gallons in a two to three crop year, and approximately 11.5 million gallons in a one to two crop year. 1.5 SURROUNDING LAND USES Both sites are surrounded on all sides with urban development, with the residential uses to the east and north, commercial uses to the west and community facilities and residential to the south. East Cherry Avenue Specific Plan Page 7 of 32 Revised Pre Application Review Draft Item 11.b. - Page 21 LAND USE 2.1 LAND USE AND ZONING The proposed land use for the Mangano Site is Village Residential with a PD overlay.The JCC Site's proposed land use is Community Facilities with Public Facility zoning, and the Commer- cial Site is proposed for commercial with Traffic Way Mixed Use zoning. 2.2 VILLAGE DESIGN GUIDELINES While the project is'not currently within or contiguous to the existing Village Design Guideline area, it is intended that this development will comply with the overall character and theme of that district. The project will include the following design features that are consistent with the Village Residential District regulations: 1. Residential buildings will be Bungalow, Craftsmen or Cottage styles, as illustrated on the image boards,with usage of horizontal wood siding or vertical board and batten for the exterior walls and trim of the buildings. 2. Homes will be one or two stories high,with single story designs most common, and addi- tional second story setbacks. 3. Lots will be generally smaller and narrower than those in more modern suburban devel- opments and the home will fill much of the width of the lot.Techniques will be used to avoid having the garage dominate the structure and streetscape, including common driveways along Cherry,additional setbacks for garages,additional building articulation, and the usage of"Hollywood"driveways. 4. The height of new buildings will not exceed 25 feet consistent with the Development Code with the maximum wall height no more than 20 feet. 5. The second floors of the units shall be set back from the ground floor building footprint front and street sides of the house a minimum of 5 feet, or at least 50%of the first floor elevation is articulated with a covered porch extending out from the wall plane.The min- imum interior side yard setback for a two-story structure or the second story portion of the structure shall be 7.5 feet. Other methods may also be used to ensure substantial ar- East Cherry Avenue Specific Plan Page 8 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 22 ticulation for two-story single-plane walls, upon approval of the Community Development Director. 6. Lot coverage and floor area ratio requirements displayed in Table 1. 7. Garages shall be recessed at least five feet from the front of the residence, and shall have deep roof overhangs,with individual garage doors for each space provided in the garage. Garage pull throughs shall also be encouraged sot allow storage of recreational vehicles behind the garage. Figures 6 and 7 illustrate this. 8. To reduce the dominance of driveways and garages on the Cherry Avenue streetscape al- ley units will be provided for any units fronting on Cherry Avenue. The materials and ar- chitectural detailing of garage doors will be consistent with the character of the dwelling units. 9. Narrower lots shall be used that are typical of the established Village areas. 10.All parking and driveway areas will use colored, porous pavers to reduce the contrast be- tween the drives and the structures, and to limit runoff from the site. Within the front yard setback along Cherry,the shared drives shall have a 4 foot wide parkway strip in the front yard setback. Figure 5 shows an image board with a representation of the local architectural styles that will be included in the project, and Figure 6 shows a representation of how these concepts would be applied along Cherry with the shared driveways. 2.3 DIMENSIONAL STANDARDS Table 1 shows the project's proposed dimensional standards. They have been established to be consistent with the Village Residential District design guidelines, and the development pat- terns of adjoining non-Village properties. These standards establish'flexibility in meeting the di- mensional requirements by additional architectural detailing and building features rather than setting wall planes or building elements farther away from property lines. This will ensure that the development maintains a "compact"appearance and greater architectural detailing than through the straight application of traditional zoning alone. East Cherry Avenue Specific Plan Page 9 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 23 Figures 2, 3 and 4 show graphical representations of these dimensional development standards. 2.4 ARCHITECTURAL STANDARDS Architectural styles will be consistent with those shown in the Image Board on Figure 5, and with the Village Design Guidelines for the project which are summarized in Section 2.2. 2.5 GENERAL PLAN CONFORMITY The Specific Plan is designed to meet the goals established in the City's General Plan by providing a framework for future development. The Specific Plan is consistent with, and serves as an extension of,the City's General Plan.The policies and standards in the Specific Plan will take precedence over more general policies and standards during the review of public and pri- vate development projects within the Specific Plan Area. In situations where policies or standards relating to a particular aspect of development have not been provided in the Specific Plan,the existing policies and standards of the City's General Plan and Zoning Ordinance will apply. Table 1 Project Dimensional Standards Al ley Lots Front Load Lots Cherry Frontage Interior CornerLots Lots Lots Corner Interior Floor Area Ratio 0.50 0.50 0.50 0.45 0.45 Lot Coverage 0.45 0.50 0.50 0.45 0.45 First Story Side Yard(Feet) 5 5 51 5 5 Building Height 25 25 25 25 25 Second Story Side Yard(Feet)' 7.5 7.5 7.5 7.5 7.5 �Front Yard(To Porch)(Feet) 10 10 10 10 10 '. Front Yard(To Living Area)(Feet) 15 15 15 15 15 Front Yard Setback(To Garage)(Feet) 20 50 20 20 20 lLot Width(Feet) 60 55 551 55 55 Lot Depth(Feet) 90 90 90 90 90 Rear Yard(To Living Area)(Feet) 20 20 20 20 20 Rear Yard(To Garage or Accessory Structure)(Feet) 5 5 5 5 5 Rear Yard Area(Sq Feet) 750 500 500 750 750 Public Facility Site Side Yard Setback to Residential 10 10 10 10 10 lCommercial Site Setback from Residential 10 101 10 10 10 IDriveway Width Maximum(Feet)2 16 NA 161 16 16 'Driveway as Fracton of Lot Width(Max) 30% NA 35% 35% 35% 'May be reduced to T with minumum 5'porch with cover Z Total shared driveway width is 20'with W divider East Cherry Avenue Specific Plan Page 10 of 32 Revised Pre-Application Review Draft Item 11.1b. - Page 24 d v i uuuu rinF i�r R((Illl�li/ra � �, r„ rM re;� ✓ �� n r/r r r rr ii"'i� lllpllll IIII ul U iiilll III �Yfl "l'I ' 1/ ,,�✓� � � /�r i /���A�o/%��r r aor / � i � l l�/!�!r�l/ra��rah _� Figure East Cherry Avenue Corner Lot wwlEntrye Treatment East Cherry Avenue Specific Plan Page 11 of 3 Revised Pre-Application Review Draft Item 11.b. - Page 25 aa° 56 r r W W MIN i 1 i i MIN.LOT AREA=5, SF MN.LOT AREA=4,950SE LOT COVERAGE 2,700 SP(50%) MAX.LOT COVERAGE®2,475 SF(50%) MIN PRIVATE OPEN SPACE a 2 34� 43% MIN,PRIVATE PEN SPACE;-,2,115 F 42 Figure 3 Front Load Interior Lots East Cherry Avenue Specific Plan Page 12 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 26 A. '. ...� IL0 NIL" ALLEY A J :V1 '€ 140"NANU 'UWRI"U�Pd U00PUm WMtlN,&0TA. -5 qq SF° L -5,500 3V WN.k.QR'AM 6000 4F' AMAXL0TC,0VERW-21WSF(W%M h76N'A.k.OT Mi AX ,0V 6 tEUR „C m�.5, $F QOGIg4 N.PRWATE 0FEN''MM-3�.T ,%F P 9 MW MONOMER SPACE-k*0 SA pnV WWN.Br ViWCM.OPEN CE-A,3'+P,SF MM) ALLEY LOADED LOTS Figure 4 Cherry Avenue/Alley Load tots East Cherry Avenue Specific Plan Page 13 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 27 00 N // r9 � E �. � a i, FJ �,. t 1 G 4! i i i Figure 5 Project Image Boards East Cherry Avenue Specific Plan Page 14 of 32 Revised Pre-Application Review Draft rn N . ✓ 1' a Imp �j�pr (Ifl T adq i+ ^Ji rya V ;. NO t N-i " d i dlf i lia ^ I�I y r l if i I IN I .a ai a a w I i Figure 6 Cherry Avenue Elevations East Cherry Avenue specific Plan Page 15 of 32 Revised Pre-Application Review Draft 0 M a �I � T T E i+ � V I 1 ' 0 �a- i f cd i I Figure 7 Interior Street Elevations East Cherry Avenue Specific Plan Page 16 of 32 Revised Pre-Application Review Draft 2.6 LAND USE AND LOT DEVELOPMENT STANDARDS Table 1 shows the lot development standards for the residential portion of the project. CIRCULATION 3.1 ROADWAY DEVELOPMENT STANDARDS Roadway development standards have been developed for Cherry and the internal street system. Cherry is designated as a Collector and the City has developed a special design and cross- section for it.There is also to be limited access along Cherry, and so the project proposes to limit access to it. The portion of Cherry adjacent to the project will feature a 6-foot parkway strip, 5- foot sidewalk, bike lane and special driveway treatments to minimize the effect of curb cuts on a Collector street. Curb cuts along a Collector street are normally discouraged because of the "blind" exiting that is required when vehicles back on to the street. Figure 9 shows the proposed cross section for East Cherry Avenue. The interior streets will be narrower than standard, but will provide for 11-foot travel lanes, 6-foot parkway strips,4-foot sidewalks, and parking on one side of the interior street. Al- leys will also be used to provide pedestrian access to adjacent properties,to the joint storm drainage and pedestrian path adjacent to the open space, and emergency access to the open space area to the south. Figures 8 and 9 show the planned cross section of the interior streets. Pedestrian connections will be provided with a number of features. Sidewalks will pro- vided throughout the development and will be separated from traffic by a landscaped parkway, providing and an added measure of safety and comfort to pedestrians. While vehicular connec- tions through the neighborhood are not emphasized or provided there are significant pedestrian connections to the open space south of the property. An "Access Easement" connection as illus- trated on Figure 11 will provide access to the east. The drainage to the south of the property will also be improved with the combination drainage/pedestrian easement so that this is a communi- ty amenity as well as a functional part of the drainage system. Figure 12 shows the cross section oft a improved drainage channel. East Cherry Avenue Specific Plan Page 17 of 32 Revised Pre-Application Review Draft Item 11.1b. - Page 31 aye. f " ' r Typ. �'f 7a" Pia>°jv,.ii ._ ................,..w.,.a,....... ...,.. .... ......,................».,...._.,.............____.... ..._._.___......_.......,...........,..' ,.,.J......_____... ................................... S-0° F4)' 10°6° 10°4" r_V 01-01 5'-5® TmW Lan TmW Law PS&N PWbr S+ Project Interior Street Section -AA Figure 8 Interior Street �m g 1 t t ve lv4aarcdenng i11k 101•4° TWWLMM TMW LIM PMWM Lima p data 5Wa" I n Project Interior Street Section-CC Figure 9 Interior Street with Linear Park East Cherry Avenue Specific Plan Page 18 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 32 Mmi�� I „1jy'4 r y� 94r 54r fit"-M I�,.(r 810 EA � ESQ� Twmw L"O P&MI L � Y Pacing � SOmalk �w'w da wed �' id ( T car f � a p East Cherry Ave. Steet Section-BB Figure 10 Cherry Avenue Street Section East Cherry Avenue Specific Plan Page 19 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 33 o.. item �1f y J �� R u, ON, 71 F116, 4 2'- 514 Skle�a�d Paer� A taalt Pavers Sg SetSack 20'-f" Setback Vehicle Trm sat -r 24',W Easwmt Access Easement Section - DD Figure 11 Access Easement Detail East Cherry Avenue Specific Plan Page 20 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 34 Figure 12 shows the cross section of the improved drainage channel.. LOW IMPACT DEVELOPMENT/GREEN DEVELOPMENT STANDARDS 4.1 LID FEATURES Projects that are developed after March of 2014 are required to conform with the Central Coast Water Resources Control Board's "Central Coast Joint Effort for LID and Hyclromodification Control Plan"to reduce or limit additional runoff from projects. The project qualifies as a "Tier 3" project and will therefore comply with these requirements by inclusion of the following design features. The site is fortunate to have soils that percolate well, and many of the LID control measure to limit runoff may be applied. The project will use the following seven LID control measures as approved by the Water Board. 1, Vegetated Swales—Select landscape parkways will function as bio-retention swales. Wa- ter will be diverted to the swales which will be improved with subgrade improvements to retain and percolate most storm water. Overflows will be directed to domed standpipes for extreme events. 2. Hollywood Driveway—This feature will be used to provide compatibility with the design guidelines in the Village, and to provide added onsite percolation. 3. Bio-Retention System; Infiltration Planter--Select landscape parkways will function as bio-retention swales. Water will be diverted to the swales which will be improved with subgrade improvements to retain and percolate most storm water. Overflows will be di- rected to domed standpipes for extreme events. 4. Down-Spout Disconnect—Roof drainage downspouts will not be directly connected to yard or area drains. 5. Reduce Roadway Surface—it is essential to provide adequate circulation through the neighborhood for residents, emergency and public service vehicles. Nevertheless, a nar- rower street section can be provided if on-street parking is limited to one side of the street as proposed. This will result in the reduction of approximately one-third of an acre in impervious surface compared to a typical street section. East Cherry Avenue Specific Plan Page 22 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 35 C% Q=rag PermeebW WW r-a;7 Ferm ouf r/ 26-V 15" Building Eamon[ Storm Water Easement section - FF Figure 12 Drainage Channel East CherrV Avenue Specific Plan Page 22 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 36 6. Porous Paving Systems/Open-Cell Block—All driveways will use pavers in lieu of non- porous concrete. Any commercial or parking lot applications will use 25 percent of the surface area as porous concrete in conjunction with underground bio-retention and io- detention systems. 7. Stormwater Ponds—The project will use a .25-acre park/pond, and surface and under- round structures in the linear park to ensure compliance with the maximum 2-year storm water discharge requirement. The Commercial Site will provide for its own onsite stormwater management. The Mangano Site will provide for the storm water management and treatment of the Access Easement Area since that is a functional part of the circulation system for the two sites. The JCC Site will provide for the balance of its detention and treatment needs for the balance of its site. 41 ENERGY CONSERVATION The project will comply with a minimum "Tier 1" energy efficiency rating, meaning that energy performance will be at least 15 percent better than state and local standards, Option packages will also offered for those wishing to meet higher tier standards. Finally, For those wishing solar photovoltaic systems, a "zero down" lease program will be offered through a third party vendor. 4.3 NIGHT SKY/GLARE The overall lighting concept is to provide exterior lighting that is compatible with the ar- chitectural and landscape design, and not create a nuisance for adjacent and nearby properties. All lighting itin the project shall comply with the lighting standards promulgated by the Inter- national ark-Sky Association/Illu minating Engineer's Society Model Lighting r ina ce. In addi- tion,the project includes the following guidelines and standards: 1. Illumination of streets and public spaces energy-efficient LED fixtures. 2. Avoidance of lare on private property by limiting the glare or light from fixtures that im- pact private property,to .5 foot-candies. . Minimize illumination towards the sky and on adjacent properties by using "cutoff' or re- cessed exterior residential light fixtures. East Cherry Avenue Specific Plan Page 23 of 2 Revised Pre-Application Review Draft Item 11.1b. - Page 37 PARKS AND OPEN SPACE The project will take advantage of the adjacent drainage and open s ace tot the south as an amenity and provide private and public open space to meet City requirements. Setbacks to the drainage will be required, and a street will be stubbed to the open s ace to the south to pro- vide vistas to this natural area. Table 2 summarizes the public and private open space that will be provided. This open s ace® per City definitions,will include all yard areas on the individual lots, patios and balconies, and useable parks and e space. The Linear Park will provide for the central opens ace feature in the development. A perspective illustration oft is amenity is shown in Figure 13. INFRASTRUCTURE MASTER PLAN 5.1 SEWER Sewer lines are currently in Cherry and are of adequate size to accommodate the project. Figure 14 shows the infrastructure master plan and a schematic plan for the sewer service. 5.2 WATER Water lines are currently in Cherry and are of adequate size to accommodate the project. Figure 14 shows the infrastructure master plan and a schematic plan for the sewer service. The city's water supply is provided primarily by surface water supplies which delivers 90 percent of the daily volume of 2.7 million gallons. Average local residential water use is approximately 250® 300 gallons per day per household. Project water demand from the project is estimated 16,800 gallon per day, or approximately 6.1 million gallons per year, or approximately 1.6 acre feet per year. At the city's current ten percent groundwater utilization, approximately 0.6 million gallons of the project's water will be drawn from roundwater, compared to the 11.5 million gal.- Ions to 19 million gallons drawn for currently agricultural operations. Conversion to a residential use will reduce the overall impact and the impact on water resources in general. Figure 11 shows the schematic water plan. Water resources and facilities are considered to be adequate to sup- port the project. East Cherry Avenue Specific Plan Page 24 of 32 Revised Pre-Application Review draft Item 11.b. - Page 38 rn M a M � T 4Y9 C3, P— V1 �. E CL m dj �• dj 12 lo � CVO CA'} � � I 0 OL vi CR OJ U as C7� .. CL rL C 0 i Lj J 611 i� a'' tf"A lO � 4L a; — , CL CLI ai IL m 4r E RY5 47 R � Vktl � C QJ [y�i CI QGJ I "'y 6✓ � _ """, rm cs ca L. lu W East Cherry Avenue Specific Plan Page 25 of 32 Revised Pre-Application Review Draft j r ruulV �� Figure 13 Linear Park Concept Illustration East Cherry Avenue Specific Plan Page 26 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 40 5.3 STORM DRAINAGE The proposed storm drainage facilities are shown on the Infrastructure Master Plan in Figure 14. This system includes improvement of the drainage Swale on the south side of the pro- ject to safely and efficiently carry the offsite storm water, and a 0.25-acre park/pond, and the Linear Park that are designed to meet the Water Board's 2-year storm criteria. The Linear Park will be improved with a combination of shallow surface swales and an underground storage and treatment pipe. Because of the porosity of the underlying soils, landscape parkways and front yard areas will be used for rain gardens, and the principal function of the formal storm drainage system will be to accommodate street and access road runoff. INFRASTRUCTURE FINANCING AND MAINTENANCE Under the provisions of California State Law,there are three primary legislative instru- ments(service/funding options)that may be utilized to provide and fund the ongoing mainte- nance and operation of improvements and facilities constructed and installed in the Specific Plan. These three service/funding options include: • The use of one or more Community Associations or Homeowner Association (collectively referred to in this document as "HOAs"),this would include a neighborhood HOA to ad- dress development specific and/or site specific common area improvements,facilities and activities. • Assessment districts which are authorized under state statutes or may be established un- der the provisions of the City's Charter and are commonly used throughout the state to fund the maintenance and operation of public improvements.The legislative authority and provisions for various assessment districts are dependent on the type of improve- ments and services to be provided and the statutes that govern those districts.The im- provements authorized under each statute are rather specific and to address the mainte- nance of all improvements within the Specific Plan, more than one set of legislative stat- utes would be required (more than one assessment district). Maintenance districts may be established by ordinance.that combines the attributes and procedures of these various state statutes under a single district thereby reducing the need for multiple districts. East Cherry Avenue Specific Plan Page 27 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 41 • Community Facilities Districts(CFDs) are used throughout the state to finance a wide range of improvements and services including, but not limited to: ongoing maintenance of many public improvements; funding of capital costs associated with the construction and installation of public infrastructure; and funding for public safety enhancements re- sulting from new development such as additional police and/or fire personnel,services and equipment.The legislative authority and provisions for CFDs can be found in the,Cali- fornia Government Code and the levy on properties is identified as a special tax which treated differently from an assessment under the provisions of the California Constitution. Each of these three service/funding options may be utilized solely as the approach to ad- dress the ongoing maintenance and operation of improvements and facilities within the Project. The City may also utilize a combination of these approaches as development occurs within the Specific Plan. For example,the City might initially utilize a CFD to address the more regional im- provements such as drainage facilities and road improvements, but then implement an assess- ment district or HOA to address tract or neighborhood specific improvements such as internal landscaping, lighting,greenbelts or common area improvements and facilities. Homeowners Associations are often used to maintain some of the facilities like those pro- posed for the project and are authorized under Davis-Stirling Common Interest Development Act of 1985. This act is codified under Section 1350 et seq of the Civil Code.The act allows associa- tions to manage the "common area" of a "common interest development". A common interest development includes a community apartment project, a condominium project, a planned devel- opment (defined as development having common area that is owned either by an association or in common by the owners, or a development without common area that has the power to place a lien on individual properties to ensure payment of assessments), or a stock cooperative. All of the common area and non-common area is held in private hands and is not public right of way or property. The "common area"that the association is authorized to maintain includes the entire common interest development, less the separate interests or properties that are owned individu- ally. This "common area" is normally composed of community open space, club houses, recrea- tional facilities, internal landscaping and parking areas, but may also include a beneficial and/or fractional interest in a life estate, an estate for years, and easement for the exclusive use of a fa- cility, or reciprocal easement rights appurtenant to the separate interests. An association can East Cherry Avenue Specific Plan Page 28 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 42 also pay for public services or utilities that are billed to master meters or joint accounts for ser- vices such as trash collection,water, power and sewer. However, an association cannot pay for the maintenance of property interests that are not held exclusively by the association. Further, the State Bureau of Real Estate (BRE) regulates how HOAs maintain such common areas. In ap- plying its own guidelines and state statures they seek to limit HOA responsibilities to those items that are of"special benefit"to the lot owners, in much the same way as the assessment district mechanism described above. BRE discourages the usage of HOAs to maintain improvement that are of general community benefit so as not to burden particular homeowners with taxes and as- sessments that are not shared by others who benefit from the improvements. Because it is intended to be used to maintain private property interests that are held in com- mon by separate private property owners in a common interest development,there are corre- sponding governance and management procedures. They are governed by a board of directors elected from the individual property owners, and the management is provided by full-time staff, part time staff, or by a professional property management company. Since the HOA is to main- tain private property,the City has little control over the level of maintenance, unless there is a public health or safety issue that would authorize them to intervene. HOAs must be operated under the specific, and complex procedural rules set forth in the Davis-Stirling Act. This Act puts very onerous obligations on HOA's and their boards on every- thing from notice requirements for meetings to limitations on HOA's abilities to enforce liens and penalties, many of which are not compatible with the efficient levy of assessments and actual col- lection of revenues. For example, under Civil Code Section 1367.4, an HOA cannot use its lien power to foreclose on delinquent assessments of less than $1,800 or assessments that are more than 12 months delinquent. Based on the above, an HOA has limited ability to maintain facilities that it does not exclu- sively own. The mixed use nature of the Specific Plan also limits the ability to use an HOA for maintenance. BRE in approving the HOA structure and dues,will seek to give the HOA fairly ex- clusive and unilateral control of the governing organization. Non residential beneficiaries of the common area (general public for the park, adjacent property owners for other facilities, may par- ticipate, but only through "Joint Use Agreements" where they may regular financial contributions to the HOA for their share of maintenance, but do not participate in the budgeting and decision making. Usage of an HOA is more problematic for maintenance of public right of way improve- East Cherry Avenue Specific Plan Page 29 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 43 ments since these areas are not "common areas" under the law, and there is no fraction of these improvements that are separately owned by the HOA or its members. Therefore, maintenance of streets, parkways, public park areas, etc. is generally not possible under an HOA structure. There are many practical long-term difficulties with using HOAs for maintenance. While the CC&Rs and other organizing documents may set out the maintenance standards that are ex- pected, public facilities or offsite facilities will probably not be maintained and operated in the manner initially contemplated because implementation relies on the voluntary actions of home- owners and property owners. Unfortunately,all too often those homeowners and property owners are not willing to take those voluntary actions, and it is difficult to find people who will actually agree to serve on boards of directors for regular homeowners associations where they are needed to maintain improvements that are specific to their subdivision only. As a result, many boards become inactive or nonexistent. This problem is magnified where the improve- ments are not actually owned by the individual lot owners,where there is significant general community benefits from the improvements, and where the improvements are not direly appur- tenant to the individual properties. Eventually,the drainage improvements and the street land- scaping would not be kept up and then the City would have to step in. While the City, as a third party beneficiary under the CC&Rs, could theoretically go after each of the homeowners for their share of the maintenance cost, it would not be practical for the City to sue hundreds of property owners for recovery of their expenses. Finally there are significant financial disincentives to use an HOA. The BRE's requirements generally mean that there is a minimum $35-$50 per month assessment for each unit just for non-operational administrative and overhead expenses. Typical overhead costs for other struc- tures such as a CFD or LLD are one-tenth this amount. Based on the above,Table 3 shows the planned method of maintenance of the various fa- cilities. East Cherry Avenue Specific Plan Page 30 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 44 Table 3 Infrastructure Maintenance Plan Adjacent CFD/LLD Lot Owner City Improvement Interior Public Streets X East Cherry Avenue X IPublic Sewer and Water X Storm Drainage in Public Streets X - ------ ------------ Drainage Easement Improvements X Access Easement to Luana Street X Parkway Landscaping X Linear Park X Park/Pond X Property Fences and Walls X Alleys X Sidewalks X Street Lights and IntractSignage X East Cherry Avenue Specific Plan Page 31 of 32 Revised Pre-Application Review Draft Item 11.b. - Page 45 t, o, I r a i u wad. gm V i Figure Infrastructure Muster Plan East Cherry venue Specific Plan Page 32 of 32 Revised Pre-Application Review Draft Item l l.b. - Page 46 Appendix A Response to Staff Comments Item 11.b. - Page 47 PRE 14-001 Andy Mangano May 7,2014 Page 2 May 7, 2014 Andy Mangano 735 Tank Farm Road San Luis Obispo, CA 93401 Subiect: Pre-Application No. 14-001; Review of proposed Specific Plan and 56 lot residential subdivision for property located on East Cherry Ave. Dear Mr. Mangano: Based on City staff,review of the above-referenced proposal, the City has assembled the below comments, recommendations and draft conditions. These items are based on an initial review. Conditions may be added or changed in the future in response to changes to the proposed project, additional information submitted, and additional information that is obtained from required studies and the review process. It is hoped that this information will help guide you in preparing the formal submittal package and ultimately save time during that process. Please contact me at 473-5425 if you have any questions. Sincerely, Kelly Heffernon, AICP Associate Planner c: Randy Russom Steve Adams, City Manager Geoff English, Public Works Director Teresa McClish, Community Development Director Carmen Leyva, Associate Engineer Mike Hubert, Fire Chief John Hurst, Chief Building Inspector Item 11.b. - Page 48 PRE 14-001 Andy Mangano May 7,2014 Page 3 COMMUNITY DEVELOPMENT DEPARTMENT Planning Division 1. Applications required include a General Plan Amendment, Specific Plan and Tract Map. Checklists for these applications are attached. A lot line adjustment is not necessary with the Tract Map, but could be processed concurrently if there are other reasons for the adjustment (e.g. financing). Although a Planned Unit Development (PUD) is not required, the City intends to use the PUD standards as a guide for reviewing this project. Response: The Specific Plan will contain all of the elements normally required of the PUD. We understand that the City desires to use many of the PUD development standards and criteria for this project. 2. In addition to the application fees for the applications indicated above, application processing fees shall be charged on a time and materials basis. Response. Understood. 3. The City may require the adjacent 0.62-acre parcel located west of the project site to be included in the Specific Plan to coordinate potential improvements of this property. Response: We understand that the primary purpose of this will be to establish a common road geometry and landscape approach for the Traffic Way commercial property, the subject property and the Ikeda Property. No onsite design is anticipated for the Ikeda and Traffic Way properties. 4. The City supports the use of the Village Design Guidelines for developing project residential design standards. Response. Noted and agreed. 5. Per Development Code Section 16.56.060, indicate where the project can accommodate 28 guest parking spaces. Response: The revised plan includes a total of 59 dwelling units which will generate a need for 30 guest parking spaces. A total of 70 on-street guest parking spaces will be provided as follows: LF of Frontage LF/S ace Total Spaces Cherry Avenue Frontage 695 25 28 Alley Interior Streets One Side 500 25 20 Front Load Interior Streets 9000 45 22 Total 70 6. Per Development Code Section 16.32.050, please provide open space based on the table below. The table should be used as a minimum standard; the City would like to see additional common open space amenities. It is encouraged that the detention basin serve as usable open space during the dry season. Item 11.b. - Page 49 PRE 14-001 Andy Mangano May 7,2014 Page 4 Table 16.32.050-C Open Sp Requirements for Planned Unit Developments General General General General Requirement Requirement Re uirement R uirement. Private Open 100-224 225-499 500-999 +1000 Space a(average s.f. per lot Common Open 35% 30% 10% 0% Space (minimum %of project area) Usable Open 35% 40% 45% 45% Spacea(minimum of project area a See Section 16.04.070 for"Open Space"definitions. Response: The Specific Plan defines the amount of common open space, useable open space and private open space generally in conformance with the above standard. Table 96.32.050 specifies that with the proposed lot sizes and proposed percent coverage that there is a requirement for 45% open space The proposed development standards will result in approximately 54.4 percent qualified open space,including 34.4 percent in private onsite open space and 20 percent in common open space. See Table 3 of the Revised Pre-application Review Draft. 7. The project is subject to Development Code Section 16.44.050 — Floodplain management and creek protection. Per subsection (D)(a)(iii), show a minimum setback of twenty-five feet (25')from top of bank of the Newsom Springs drainage channel. Response: Total setback of 25 feet from the top of bank is now specified. 8. Due to concerns regarding multiple access points to E. Cherry Ave., on-street parking for existing residents along E. Cherry Ave., open space and adequate drainage, staff recommends redesigning the street and lot layout as follows(see attached rough sketch): a. Relocate the street such that it abuts the drainage channel setback area instead of residential backyards. This will allow more opportunity for public use of a creek trail and open space amenity, provides easier access for channel maintenance, and avoids having an area of potential safety concern. b. Design the street system to eliminate individual parcel driveways on E. Cherry Ave. Response: Placing an additional public street next to the open space is infeasible and will substantially increase the amount of impervious surface and the project will no longer comply with the LID requirements. East Cherry Avenue has been redesigned to eliminate direct driveway access. Other LID measures have been included for compliance. 9. Indicate how all common facilities will be maintained, including all parkways. Response. All common area facilities will be in the public right of way and will be maintained by a Landscaping and Lighting District, CFD, or equal. Maintained areas will include all of those areas identified as"common open space': Using this tool will enable the park and parkway facilities to be easily open to the public. Bureau of Real Estate regulations require that HOAs NOT be used for the maintenance of facilities Item 11.b. - Page 50 PRE 14-001 Andy Mangano May 7,2014 Page 5 that are of general community benefit and are not of exclusive use and benefit to the neighborhood. 10. Re-label adjacent street on plan to be accurately identified as East Cherry Avenue rather than Cherry Lane. Response. Corrected as requested. 11. Signage shall be subject to the requirements of Chapter 16.60 of the Development Code, and shall also include striping and signing for all MUTCD. Response. Noted and agreed unless specified otherwise in the Speck Plan as a special development standard. 12. Development shall comply with Development Code Sections 16.48.070, "Fences, Walls and Hedges'; 16.48.120, "Performance Standards"; and 16.48.130"Screening Requirements". Response: Noted and agreed unless specified otherwise in the Specific Plan as a special development standard. 13. Setbacks, lot coverage, and floor area ratios shall be as shown on the development plans. Response: These are shown on Table 1 and the respective figures. 14. Trash enclosures shall be screened from public view with landscaping or other appropriate screening materials, and shall be made of an exterior finish that complements the architectural features of the main building. The trash enclosure area shall accommodate recycling container(s). Response: It is anticipated that these will be stored in the side area of the garage or behind yard fences. 15. Final design and location of any trash enclosure(s) shall be reviewed by the Architectural Review Committee and approved by the Community Development Director. Response. No trash enclosures are planned. 16. Noise resulting from construction and operational activities shall conform to the standards set forth in Chapter 9.16 of the Municipal Code. Construction activities shall be restricted to the hours of 7 AM and 5 PM Monday through Friday, unless stricter time constraints are imposed. No construction shall occur on Saturday or Sunday. Response: Noted and agreed. 17.At the time of application for construction permits, the applicant shall provide details on any proposed exterior lighting, if applicable. The lighting plan shall include the height, location, and intensity of all exterior lighting consistent with Section 16.48.090 of the Development Code. All lighting fixtures shall be shielded so that neither the lamp nor the related reflector interior surface is visible from adjacent properties. All lighting for the site shall be downward directed and shall not create spill or glare to adjacent properties. All lighting shall be energy efficient (e.g. LED).The lighting plan shall be reviewed and approved by the Community Development Director and the Police Department. Item 11.b. - Page 51 PRE 14-001 Andy Mangano May 7,2014 Page 6 Response: All lighting will comply with the City's night sky ordinance. 18.All new construction shall utilize fixtures and designs that minimize water and energy usage. Such fixtures shall include, but are not limited to, low flow showerheads, water saving toilets, instant water heaters and hot water recirculating systems. Water conserving designs,and fixtures shall be installed prior to final occupancy. Response: The project will conform to state and local water and energy conservation building code requirements. 19. Landscaping in accordance with the approved landscaping plan shall be installed or bonded for before final building inspection/establishment of use. The landscape and irrigation plan shall be prepared by a licensed landscape architect subject to review and approval by the Community Development and Public Works Departments. The landscape plan shall be in conformance with Development Code Chapter 16.84 (Water Efficient Landscape Requirements) and shall include the following: a. Tree staking, soil preparation and planting detail; b. The use of landscaping to screen ground-mounted utility and mechanical equipment; c. The required landscaping and improvements. This includes: i. Deep root planters shall be included in areas where trees are within five feet (5')of asphalt or concrete surfaces and curbs; ii. Water conservation practices including the use of low flow heads, drip irrigation, mulch, gravel, drought tolerant plants. iii. An automated irrigation system using smart controller(weather based) technology. iv. The selection of groundcover plant species shall include native plants. V. Linear planters shall be provided in parking areas. ' vi. Turf areas shall be limited in accordance with Section 16.84.040 of the Development Code. Response: The project will comply with Water Efficient Landscape Requirements. 20.Any Fire Department Connections (FDC) shall be located near a fire hydrant, adjacent to a fire access roadway, away from the public right-of-way, incorporated into the design of the site, and screened to the maximum extent feasible. Response. Applicable f►re code requirements are for a NFPA 13 system that will be supplied by the domestic water supply. No FDCs are anticipated. 21. The developer shall comply with Development Code Chapter 16.80 "Inclusionary Affordable Housing Requirements". Response: The project will comply with these requirements. Engineering Division 22. The proposed stormwater easement shall not be lined with any imperious material. Per the recently adopted State Water Resources Control Board stormwater regulations, all drainage facilities shall be designed to infiltrate stormwater on site. It is strongly encouraged to reconfigure the easement area (i.e. reduced slopes)to serve as an open space amenity•and Item 11.b. - Page 52 PRE 14-001 Andy Mangano May 7,2014 Page 7 better facilitate stormwater infiltration. The bioswale area should be shown outside of the dripline of existing trees and sloped areas(reference 8(a) above). Response: The lining of Nelson Creek has been eliminated. Further, additional pervious surfaces have been added through the inclusion of a 25' wide linear parkway,and elimination of the common drives along Cherry Avenue. 23. Provide a drainage analysis for purpose of sizing the proposed detention basin for the specific plan area. Response: The revised specific plan documents the projected drainage flows from the project These can be accommodated with the size of the park pond and the drainage swales(parkways along the interior streets and Cherry Avenue. 24. Per Municipal Code Section 146.68, indicate how the overall specific plan project area will meet the City's post construction stormwater requirements(see attachment). Response: Sections 4.1 and 5.3 of the Specific Plan contain this information. 25.As per Development Code Section 16.84.040 (turf limitations for new construction and rehabilitated landscapes), vegetation in the proposed parkways shall be limited. The - parkways maybe used as a small detention basin for each of the lots to comply with LID requirements.Turf in parkways is prohibited. Response: Sections 4.1 and 5.3 of the Specific Plan contain this information. 26. All common landscaped areas shall be consistent with Development Code Section 16.84.050(landscape and irrigation system design and information requirements). Response: The project will comply with Water Efficient Landscape Requirements. 27. Provide off-site sidewalk connectivity to existing sidewalk located to the east of the project site on E. Cherry Ave. Response: Understood and agreed. 28. Submit a traffic study that includes project impacts to the intersection of E. Cherry Ave. and Traffic Way. The traffic study shall also include recommendations on through access to Launa Lane, and truck counts for determination of traffic index. Response. A traffic study will be provided. Will this be independently ordered by the City or provided by Mangano Homes? 29.Address the following drainage issues/concerns: a. Inspect and if necessary repair existing 24" RCP on the southwest side of the development. b. Address potential maintenance requirements of v-ditch drainage easement. c. Address drainage from the hillside behind wall. d. Address maintenance requirements for the detention basin. Response: Agreed and understood. 30. Loop the water line from Launa Lane(6"). Abandon the 4"water line to E. Cherry Ave. Item 11.b. - Page 53 PRE 14-001 Andy Mangano May 7,2014 Page 8 Response: Public improvement plans will be adjusted for this purpose. 31. Provide right-of-way for vehicle/road access to Launa Lane. Response: Emergency access is provided. Ikeda property to provide equivalent 25' emergency access easement 32. All proposed emergency accesses shall include a twenty foot(20)wide paved surface. Response: Emergency access is provided. Ikeda property to provide equivalent 25' emergency access easement 33. Show potential alignment of emergency access to the south where there is a more practical grade(refer to item 8(b)). Response: Full road access is provided at westerly most feasible location. 34. Abandon all on-site wells. Response: Agreed and understood. 35. The applicant shall work with South San Luis Obispo County Sanitation District to model the existing sewer main on E. Cherry Avenue to determine if necessary capacity exists or expansion is necessary. Response. This will be provided as part of the engineering analysis. 36. The developer shall comply with Development Code Chapter 16.20"Land Divisions". 37. The developer shall comply with Development Code Chapter 16.64 "Dedications, Fees and Reservations." 38. The developer shall comply with Development Code Chapter 16.68"Improvements". Response:Agreed. 39. The applicant shall submit Covenants, Conditions and Restrictions (CC&R's) that are administered by a subdivision homeowners' association, formed by the applicant for the area within the subdivision. The CC&R's shall be reviewed and approved by the City Attorney and recorded prior to or concurrently with the final map. At a minimum, the CC&R's shall: a. Provide for maintenance of the driveways, common areas, sewer lines, drainage and LID facilities, parkways,fences, walls and other facilities; b. Given the proposed small lot sizes, prohibit additional density, second units, and significant additions over 200 square feet; c. Require garages to be kept clear for parking cars at all times; and d. Inform residents of the water conservation requirements placed on this project. Response: Individual fences, walls, driveways, on each lot will be maintained by individual property owners. Maintenance of the streets, parkways, linear parks, the drainage easement, and the park pond will be by a Landscaping and Lighting District or a CFD. It is impractical and expensive to have an HOA maintain these facilities. CCRs will be provided that provide the additional use regulations referenced in this comment See comments in Revised Pre-Application Review Draft. Item 11.b. - Page 54 PRE 14-001 Andy Mangano May 7,2014 Page 9 40. The developer shall be responsible during construction for cleaning City streets, curbs, gutters and sidewalks of dirt tracked from the project site. The flushing of dirt or debris to storm drain or sanitary sewer facilities shall not be permitted. 'The cleaning shall be done after each day's work or as directed by the Director of Public Works, the Community Development Director or his/her representative. Response. The developer will develop a comprehensive erosion control and stornwater quality plan that includes include the items referenced in this comment, as well as other onsite erosion control provisions. 41. Perform construction activities during normal business hours (Monday through Friday, 7 A.M. to 5 P.M.)for noise and inspection purposes. The developer or contractor shall refrain from performing any work other than site maintenance outside of these hours, unless an emergency arises or approved by the Community Development Director. The City may hold the developer or contractor responsible for any expenses incurred by the City due to work outside of these hours. Response: See response to comment 96. 42. All residential units shall be designed to mitigate impacts from non-residential project noise, in compliance with the City's noise regulations. Response. Units fronting on Cherry Avenue and abutting the commercial site will contain structural mitigation measures, if necessary, to mitigate impacts from potential noise form adjoining commercial and traffic noise sources to ensure compliance with City interior noise level standards. 43. All project improvements shall be designed and constructed in accordance with the City of Arroyo Grande Standard Drawings and Specifications. Response. Agreed. 44. Submit as-built plans at the completion of the project or improvements as directed by the Community Development Director. One (1) set of mylar prints and an electronic version on CD in AutoCAD format shall be required. 45. Submit three (3) full-size paper copies and one (1) full-size mylar copy of approved improvement plans for inspection purposes during construction. 46. Record Drawings ("as-built" plans) are required to be submitted prior to release of the Faithful Performance Bond. 47. Improvement plans (including the following)shall be prepared by a registered Civil Engineer or qualified specialist licensed in the State of California and approved by the Public Works or Community Development Department: a. Full Specific Plan E. Cherry Ave.frontage. b. Grading, drainage and erosion control. c. Street paving, curb, gutter and sidewalk. d. Public utilities. e. Water and sewer. f. Landscaping and irrigation. g. Other improvements as required by the Community Development Director. h. (NOTE: All plan sheets must include City standard title blocks). i. Long term maintenance agreement for all drainage facilities. 48. The site plan shall include the following: a. The location and size of all existing and proposed water, sewer, and storm drainage facilities within the project site and abutting streets or alleys. Item 11.b. - Page 55 PRE 14-001 Andy Mangano May 7,2014 Page 10 b. The location, size and orientation of all trash enclosures. c. All existing and proposed parcel lines and easements crossing the property. d. The location and dimension of all existing and proposed paved areas. e. The location of all existing and proposed public or private utilities. f. Driveway aprons. g. On-street parking spaces. 49. Landscape and irrigation plans are required within the public right-of-way, and shall be approved by the Public Works-Director. 50. Improvement plans shall include plan and profile of existing and proposed streets, utilities, retaining walls and any proposed bioswales. 51. Submit all retaining wall calculations for review and approval by the Community Development Director for walls not constructed per City standards. 52. Prior to approval of an improvement plan the applicant shall enter into an agreement with the City for inspection of the required improvements. 53. All street repairs shall be constructed to City standards. 54. Overlay, slurry seal, or fog seal any roads dedicated to the City prior to acceptance by the City may be required as directed by the Public Works Director. Response. Items 44-54, agreed. 55. Street structural sections shall be determined by an R-Value soil test, but shall not be less than 3"of asphalt and 6"of Class II AB. Provide a TI of 6 or better. 56. Streets that shall be designated as local streets shall adhere to the following design standards: a. 30'street width from curb to curb. b. 8'wide parking isle on one side of the street. c. 5'wide concrete sidewalks with concrete curb and gutter on both sides of the street. d. 6'wide parkways on both sides of the street. e. 52'wide right-of-way. f. 25 mile per hour design speed. Response. Local streets have been redesigned to provide 28 curb to curb including two 10-foot travel lanes, and a parking lane, a 5-foot sidewalk and a 6 foot parkway strip. 57. Streets that shall be designated as collector streets (E. Cherry Ave.) shall adhere to the following design standards: a. 40'street width from curb to curb. b. 5'wide bike lanes. c. 8' wide parking isle on north side of street only (on-street parking intended for existing residents). d. 6'wide concrete sidewalk on north side. e. 5'wide concrete sidewalk and 6'wide parkway on project side. f. Concrete curb and gutter on both sides of the street. g. 57'wide right-of-way. h. 35 mile per hour design speed. Response: The Cherry Avenue curb to curb dimension complies with this. Street cross sections will be modified to provide for 5 foot sidewalk. 58.As an option, provide a design alternative with parking on the south side of E. Cherry Ave. (with no individual lots accessing E. Cherry Ave.) Item 11.b. - Page 56 PRE 14-001 Andy Mangano May 7,2014 Page 11 Response: See revised site plan. No units facing Cherry Avenue will have direct vehicle access. 59. Install ADA compliant facilities in accordance with State and City Standards. Response: Revised to show appropriate cross walks and ADA facilities at the project entry and the interior street T intersections. 60. Install tree wells with root barriers for all trees planted adjacent to curb, gutter and sidewalk to prevent damage due to root growth. Consider tree wells that accommodate LID requirements. Response. Tree wells will be installed per City standard. LID requirements can be better met through additional parkway landscaping, pervious driveway pavers and other requirements. 61. The property owner shall offer for dedication to the public the right-of-way for the proposed street(s). Response: Agreed. It is proposed that these streets also be maintained by a landscaping and lighting district. 62. The subdivider shall enter into a subdivision agreement for the completion and guarantee of improvements required. The subdivision agreement shall be on a form acceptable to the City. Response: Agreed. 63. The developer shall submit one (1) electronic and one (1) paper copy of the final project- specific Storm Water Pollution Prevention Plan (SWPPP) or a Water Quality Control Plan (WQCP) consistent with the San Luis Obispo Regional Water Quality Control Board (RWCB) requirements. 64. All grading shall be performed in accordance with the City Grading Ordinance. 65. Submit a soils report for the project shall be prepared by a registered Civil Engineer and supported by adequate test borings. All earthwork design and grading shall be performed in accordance with the approved soils report. 66. Infiltration basins shall be designed based on soil tests. Infiltration test shall include a minimum of 2 borings 15 feet below the finished basin floor. Additional borings or tests may be required if the analysis or soil conditions are inconclusive. 67. The applicant shall submit an engineering study regarding flooding related to the project site. The study shall be approved by the City Engineer. 68. All water mains shall be looped to prevent dead ends. The Public Works Director must grant permission to dead end water mains. 69. The applicant shall extend the public water main to adequately serve the project across the property frontage. 70. Each parcel shall have separate water meters. 71. Non-potable water is available at the Soto Sports Complex. The City of Arroyo Grande does not allow the use of hydrant meters. 72. Lots using fire sprinklers shall have individual service connections. A fire sprinkler engineer shall determine the size of the water meters. Response: Items 63-72,agreed. 73. The applicant shall extend the sewer main to adequately serve the project across the Item 11.b. - Page 57 PRE 14-001 Andy Mangano May 7,2014 Page 12 property frontage.All new sewer mains shall be a minimum diameter of 8". Response: There is an existing sanitary sewer main across the frontage of the project 74.All sewer laterals within the public right-of-way must have a minimum slope of 2%. Response: Agreed. 75. Each parcel shall be provided a separate sewer lateral. Laterals shall be sized for the appropriate use, minimum 4". Response: Agreed. 76. All sewer mains or laterals crossing or parallel to public water facilities shall be constructed in accordance with City standards. Response: Agreed. 77. The developer shall comply with Development Code Section 16.68.050 regarding the undergrounding of utilities. Response: Agreed. 78. Public Improvement plans/Final Map/Parcel Map shall be submitted to the public utility companies for review and approval. Utility comments shall be forwarded to the Director of Public Works for approval. Response: Agreed. 79. Street lights shall be placed 200' — 250' apart on streets 40' or less in width. On streets greater than 40' in width, a street lighting plan shall be designed and submitted to the Community Development Director for approval. Response:Agreed. 80. The applicant shall pay all applicable City fees, including the following: FEES TO BE PAID PRIOR TO PLAN SUBMITTAL: a._ Map check fee for Tract Map. C. Plan check for grading plans. (Based on an approved earthwork estimate) d._ Plan check for improvement plans. (Based on an approved construction cost estimate) e._ Permit Fee for grading plans. (Based on an approved earthwork estimate) f._ Inspection Fee of subdivision or public works construction plans. (Based on an approved construction cost estimate) g._ Plan Review Fee (Based on the current Building Division fee schedule) FEES TO BE PAID PRIOR TO ISSUANCE OF A BUILDING PERMIT: a. Water Neutralization fee, to be based on codes and rates in effect at the time Item 11.b. - Page 58 PRE 14-001 Andy Mangano May 7,2014 Page 13 of building permit issuance, involving water connection or enlargement of an existing connection. b. Water Distribution fee, to be based on codes and rates in effect at the time of building permit issuance, in accordance with Municipal Code Section 13.04.030. c. Water Meter charge to be based on codes and rates in effect at the time of building permit issuance, in accordance with Municipal Code 6-7.22. d. Water Availability charge, to be based on codes and rates in effect at the time of building permit issuance, in accordance with- (not correct). e. Traffic Impact fee, to be based on codes and rates in effect at the time of building permit issuance, in accordance with Ord. 461 C.S., Res. 3021. f. Traffic Signalization fee, to be based on codes and rates in effect at the time of building permit issuance, in accordance with Ord. 346 C.S., Res. 1955. g. Sewer Connection fee, to be based on codes and.rates in effect at the time of building permit issuance, in accordance with Municipal Code Section 13.12.190. h. South San Luis Obispo County Sanitation District Connection fee in accordance with Municipal Code Section 13.12.180. i. Drainage fee, as required by the area drainage plan for the area being developed. j. Park Development fee, the developer shall pay the current parks development fee for each unit approved for construction (credit shall be provided for existing houses), to be based on codes and rates in effect at the time of building permit issuance in accordance with Ord. 313 C.S. k. Park Improvement fee, the developer shall pay the current park improvement fee,for each lot approved, in accordance with City Ordinance 313 C.S. I. Construction Tax, the applicant shall pay a construction tax pursuant to Section 3-3.501 of the Arroyo Grande Municipal Code. m. Alarm Fee, to be based on codes and rates in effect at the time of development in accordance with Ord. 435 C.S. n. Strong Motion Instrumentation Program (SMIP) Fee, to be based on codes and rates in effect at the time of development in accordance with State mandate. o. Building Permit Fee, to be based on codes and rates in effect at the time of development in accordance with Title 8 of the Municipal Code. 81. Erosion Control - Prior to issuance of the grading or building permit, all new residential construction requires posting of a $1,200.00 performance bond for erosion control and damage to the public right-of-way. This bond is refundable upon successful completion of the work, less expenses incurred by the City in maintaining and/or restoring the site. Response: Agreed. 82. The applicant shall provide bonds or other financial security for the following. All bonds or security shall be in a form acceptable to the City, and shall be provided prior to recording of the map, unless noted otherwise. The minimum term for Improvement securities shall be equal to the term of the subdivision agreement. a._ Faithful Performance, 100% of the approved estimated cost of all subdivision improvements. b._ Labor and Materials, 50% of the approved estimated cost of all subdivision improvements. C. One Year Guarantee, 10% of the approved estimated cost of all Item 11.b. - Page 59 PRE 14-001 Andy Mangano May 7,2014 Page 14 subdivision improvements. This bond is required prior to acceptance of the subdivision improvements. d._ Monumentation, 100%of the estimated cost of setting survey monuments. e._ Tax Certificate, In accordance with Section 9-15.130 of the Development Code, the applicant shall furnish a certificate from the tax collector's office indicating that there are no unpaid taxes or special assessments ag6inst the property f._ Accessory Structures, the applicant shall remove or bond for removal of all accessory structures not sharing a parcel with a residence. g._ Curb cuts, the applicant shall construct or bond for construction of individual curb cuts and paved driveways for parcels. Response: Agreed. Building Division 83.All indoor plumbing shall include water saving features. 84. The project shall comply with the most recent editions of the California State Fire and Building Codes and the International Building and Fire Codes as adopted by the City of Arroyo Grande. 85. The project shall be in compliance with all handicapped accessibility Building Code requirements. Any handicapped parking shall be posted per Building Code and Police Department requirements. 86. Prior to issuance of a certificate of occupancy,the applicant shall post designated fire lanes, per Section 22500.1 of the California Vehicle Code. 87. All fire lanes must be posted and enforced, per Police Department and Fire Department guidelines. 88. Project shall have a fire flow as per the California Fire Code. 89. Fire hydrants shall be installed, per Fire Department and. Public Works Department standards and per the California Fire Code. 90.All buildings must be fully sprinklered per Building and Fire Department guidelines and per the California Fire Code. 91. Provide Fire Department approved access or sprinkler-system per National Fire Protection Association Standards. 92. The applicant shall show proof of properly abandoning all non-conforming items such as septic tanks, wells, underground piping and other undesirable conditions. Response: Construction on the project will comply with the applicable building codes at the time of development. Item 11.b. - Page 60 %r ATTACHMENT 2 rim r u r � I III �r W z !A1 Ul / f / uj ge LLJ AA LL, 170 J R � � I n i II r r �� �..!!!0 / l�'%/// / it y ��l I 7 /? r/ ��� uj r/ / N CO pt a s cL r 0 � r W e CD cl) c i W C7 "a z x Cl) ,, � �;�LY��S C5 .e. ♦J Y ug � � '..1 1/1 C6 W Ull TZ iiij i W Q W co M CO 2R,run a G w IL Z. � LIJ qj Q > +rs cn �Y a L d LL LL u i% THIS PAGE INTENTIONALLY LEFT BLANK Item 11.b. - Page 64