CC 2014-06-10_08.l. Award Contract 2014 Summer Concrete Repairs p.RR O YO
INCORPORATED 9Z
V 0 rn
it JULY ,o, 1911 MEMORANDUM
C�t1FORN`P
TO: CITY COUNCIL
FROM: GEOFF ENGLISH, PUBLIC WORKS DIRECTOCR-791e��
BY: MIKE LINN, ASSISTANT CITY ENGINEER
SUBJECT: CONSIDERATION OF AN AWARD OF CONTRACT TO V. LOPEZ JR.
AND SONS FOR CONSTRUCTION OF THE 2014 SUMMER
CONCRETE REPAIR AND VIA LA BARRANCA DRAINAGE
IMPROVEMENTS PROJECT, PW 2014-11
DATE: JUNE 10, 2014
RECOMMENDATION:
It is recommended the City Council:
1. Award a contract for construction of the 2014 Summer Concrete Repair Project
and Via La Barranca Drainage Improvements to V. Lopez Jr. and Sons in the
amount of $90,288;
2. Authorize the City Manager to approve change orders for 20% of the contract
amount, $18,058, for additional work and unanticipated costs during the
construction phase of the project (total construction costs = $90,288 + $18,058 =
$108,346); and
3. Direct the City Clerk to file a Notice of Exemption.
IMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
The following Capital Improvement Program FY 2014-15 funds are proposed for the
project (amounts include a 20% contingency):
Miscellaneous Concrete (Sched. A, C thru K) $28,876
Pavement Management (Sched. B — Via La Barranca Drainage) $79,400
Total Funding $108,276
BACKGROUND:
The City has established a goal of eliminating all trip and fall hazards located on City
right of way within the next few years. The project scope of work involves the
replacement of curb, gutter, sidewalk, and driveway approach segments along Bennett
Avenue, Woodland Drive, Fair Oaks Avenue, Farroll Avenue, and Avenida de Diamante
that have experienced damage from adjacent trees. Each site is unique, but the
Item 8.1. - Page 1
CITY COUNCIL
CONSIDERATION OF AN AWARD OF CONTRACT TO V. LOPEZ JR. & SONS FOR CONSTRUCTION
OF THE 2014 SUMMER CONCRETE REPAIR AND VIA LA BARRANCA DRAINAGE
IMPROVEMENTS PROJECT, PW 2014-11
JUNE 10, 2014
PAGE 2
general scope of work involves selective demolition of concrete and asphalt, inspection
of the tree roots by the City Arborist, root pruning, and the replacement of concrete
sidewalk, driveway approaches, and curb and gutter to return the area to its original
condition. Tree removal and replacement is necessary at three specific locations. The
work requires coordination to ensure that disruptions to the streets are minimized. The
scope of work also includes drainage improvements along Via La Barranca and the
repair of a residential driveway apron on Montego Street. This project will be the fifth
over the last three years to systematically address damaged concrete sidewalk and
driveway approach segments for various locations throughout the City.
ANALYSIS OF ISSUES:
Sidewalk improvements are one of the priorities identified in the City's Critical Needs
Action Plan. In particular, City staff has received a number of complaints from the
public regarding sidewalks in this area.
On May 29, 2014, five bids were opened for the 2014 Summer Concrete Repair Project.
The lowest bid, from V. Lopez Jr. and Sons, was in the amount of $90,288. Staff has
determined the bid to be responsive and recommends the award of a construction
contract to V. Lopez Jr. and Sons.
The contract time is 30 calendar days. Work is expected to begin in early July.
ALTERNATIVES:
The following alternatives are provided for the Council's consideration:
1. Approve staff's recommendations to award a construction contract to the lowest
responsive bidder,
2. Do not award a construction contract for the project at this time; or
3. Provide direction to staff.
ADVANTAGES:
The project will reduce the number of trip and fall hazards along selected streets,
address complaints from the public and improve access for individuals with disabilities.
DISADVANTAGES:
No disadvantages were identified at this time.
ENVIRONMENTAL REVIEW:
The project is categorically exempt from CEQA pursuant to Guidelines Section
15301(c).
Item 8.1. - Page 2
I
CITY COUNCIL
CONSIDERATION OF AN AWARD OF CONTRACT TO V. LOPEZ JR. & SONS FOR CONSTRUCTION
OF THE 2014 SUMMER CONCRETE REPAIR AND VIA LA BARRANCA DRAINAGE
IMPROVEMENTS PROJECT, PW 2014-11
JUNE 10, 2014
PAGE 3
PUBLIC NOTIFICATION AND COMMENTS:
The agenda was posted on Thursday, June 5, 2014. The agenda and staff report was
posted on the City's website on Friday, June 6, 2014. No public comments were
received as of the time of preparation of this report.
Attachment:
1. Bid Tabulations
2. Notice of Exemption
Item 8.1. - Page 3
ATTACHMENT 1
CITY OF
.. •
=.� • CITY OF ARROYO GRANDE
BID OPENING LOG SHEET
' J ICALIFORN A
DEADLINE: TUESDAY, MAY 28, 2014 - 2:00 PM
PROJECT NAME: 2014 SUMMER CONCRETE REPAIR PROJECT
PROJECT NO. PW 2014-11
ARCHITECT'S ESTIMATE: $125,000
SUBMITTED TOTAL
Pacific Coast Excavation $104,200.00
Santa Maria, CA
JJ Fisher Construction, Inc. $98,224.00
Arroyo Grande, CA
V. Lopez Jr. & Sons $90,288.00
Santa Maria, CA
R. Burke corporation $145,350.00
San Luis Obispo, CA
CalPortland Construction $141,085.00
Santa Maria, CA
Kitty No ,Deputy City Clerk
c: Director of Community Development
Director of Public Works
Assistant City Engineer
City Manager
Item 8.1. - Page 4
Attachment No. 2
Notice of Exemption
To: Office of Planning and Research From: (Public Agency) City of Arroyo Grande
1440 Tenth Street, Room 121 300 East Branch Street
Sacramento, CA 95814 Arroyo Grande, CA 93420
9 County Clerk
County of San Luis Obispo
County Government Center
San Luis Obispo, CA 93408
Project Title: 2014 Summer Concrete Repair Project, PW 2014-11
Project Location - Specific: Various locations along Bennett Avenue, Woodland Drive, Fair Oaks
Avenue, Farroll Avenue, and Avenida de Diamante
Project Location -City: Arroyo Grande Project Location -County: San Luis Obispo
Description of Project: Replacement of damaged concrete sidewalk, curb and putter, and driveway
approach segments that were damaged by adjacent street trees
Name of Public Agency Approving Project: City of Arroyo Grande—Public Works Department
Name of Person or Agency Carrying Out Project: Geoff English
Exempt Status: (check one)
• Ministerial (Section 12080(b)(1); 15268);
• Declared Emergency (Sec. 21080(b)(3); 15269(a));
• Emergency Project(Sec. 21080(b)(4); 15269(b)(c));
• Categorical Exemption. State type and section number: Section 15301(c)
• Statutory Exemptions. State code number:
Reasons Why Project Is Exempt: Demolish/Replace damaged concrete segments in same location
Lead Agency
Contact Person: Michael Linn, P.E. Area Code/Telephone/Extension: (805) 473-5444
If filed by Applicant:
1. Attach a certified document of exemption finding.
2. Has a Notice of Exemption been filed by the public agency approving the project? 9 Yes ❑ No
Signature: Date:
Geoff English
Public Works Director
0 Signed by Lead Agency ❑ Date received for filing at OPR:
❑ Signed by Applicant
Item 8.1. - Page 5