Loading...
R 4651 RESOLUTION NO. 4651 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE APPROVING AMENDED CONDITIONAL USE PERMIT CASE NO. 15-001, VARIANCE CASE NO. 15-001, AND LOT MERGER CASE NO. 15-001 FOR THE CONSTRUCTION OF AN APPROXIMATELY 55,000 SQUARE-FOOT, 70-BED ASSISTED LIVING/MEMORY CARE FACILITY AND SIXTEEN (16) UNIT INDEPENDENT LIVING FACILITY; LOCATED AT THE OAK PARK PROFESSIONAL PLAZA (APNs 007-771-053, -062, AND -076); APPLIED FOR BY RUSS SHEPPEL WHEREAS, on January 28, 2014, the City Council adopted Resolution No. 4565 approving Conditional Use Permit 12-002, Variance 12-004 and Amended Vesting Tentative Tract Map 12-001 for the subdivision of 1.8 acres into ten (10) lots and authorizing the development of an approximately 55,000 square-foot, 69-bed assisted living/memory care facility and eight (8) townhomes on real property, located at 880 Oak Park Blvd., Arroyo Grande, CA (the "subject property"); and WHEREAS, Russ Sheppel (the "applicant") has submitted new applications to amend the entitled project for a 55,000 square-foot, 70-bed facility with 44 beds proposed for assisted living use and 26 beds proposed for Alzheimer's care use and a sixteen (16) unit independent living facility; and WHEREAS, the City Council has reviewed the project in compliance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the Arroyo Grande Rules and Procedures for Implementation of CEQA and based on the initial study and findings has determined that the Mitigated Negative Declaration previously adopted through Resolution No. 4565, as supplemented by an Addendum will mitigate all project impacts to a less than significant level; and WHEREAS, the City Council of the City of Arroyo Grande has reviewed and considered the project at a duly noticed public hearing in accordance with the Development Code of the City of Arroyo Grande on March 24, 2015, at which time all interested persons were given the opportunity to be heard; and WHEREAS, the City Council finds, after due study, deliberation and public hearing, the following circumstances exist: Conditional Use Permit Findings: 1. The proposed use is permitted within the subject district pursuant to the provisions of this section and complies with all the applicable provisions of this title, the goals, and objectives of the Arroyo Grande General Plan, and the development policies and standards of the City. RESOLUTION NO. 4651 PAGE 2 The proposed assisted living facility and memory care facility as well as independent living is allowed in the Office Mixed-Use (OMU) zoning district per section 16.36.030 of the Municipal code and is consistent with development standards for the OMU zoning district per Municipal Code Section 16.36.020.H with concurrent approval of a variance for creek setback reduction from fifty feet (50') to thirty-two feet (32)' and a lot merger. 2. The proposed use would not impair the integrity and character of the district in which it is to be established or located. The proposed assisted living and memory care facility as well as independent living facility would not impair the integrity or character of the Office Mixed-Use zoning district, as it is consistent with the stated purposes of the OMU zoning district per Municipal Code Section 16.36.020.H. 3. The site is suitable for the type and intensity of use or development that is proposed. The site is 1.8 acres in area in a mixed-use development, which is permitted in the Office Mixed-Use zoning district and meets applicable development standards, excepting maximum building size, which was previously approved by Conditional Use Permit 12-002 and the minimum creek setback allowed by Variance 15-001. 4. There are adequate provisions for water, sanitation, and public utilities and services to ensure public health and safety. Adequate capacity for water, sanitation and public utilities and services exist to serve the project; therefore, public health and safety will not be impacted. 5. The proposed use will not be detrimental to the public health, safety or welfare or materially injurious to properties and improvements in the vicinity. Impacts associated with the proposed use have been adequately mitigated to ensure the use will not be detrimental to the public health, safety or welfare nor will it be materially injurious to properties and improvements in the vicinity. RESOLUTION NO. 4651 PAGE 3 Variance Findings: 1. That strict or literal interpretation and enforcement of the specified regulation would result in practical difficulty or unnecessary hardship not otherwise shared by others within the surrounding area. The strict enforcement of the fifty foot (50) creek setback would require the complete redesign of the facility and cause further parking and access impacts, resulting in a practical difficulty or unnecessary hardship not otherwise shared by others within the surrounding area. Additionally, due to narrowness of the site combined with the extensive creek setback, extensive vertical improvements- beyond thirty -five feet (35) are required to gain usable square- footage for the project and provide a more open feel within the 'units. 2. That there are exceptional or extraordinary circumstances or conditions applicable to the property involved or to the intended use of the property that do not apply generally to other properties classified in the same zone. The very narrow shape of the property makes imposition of a fifty foot (50) setback from the top of creek bank an extraordinary condition that does not generally apply to other properties in the Office Mixed -Use (OMU) zoning district. 3. That strict or literal interpretation and enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties classified in the same zone. Strict enforcement of the fifty foot (50) creek setback would deprive the applicant of privileges enjoyed by owners of other properties in the _Office Mixed -Use (OMU) zoning district due to the narrowness of the property. 4. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same zone. The granting of the variance will not constitute a grant of special privilege, as few properties within the OMU zone are impacted by lot narrowness and large creek setback requirements as the subject property. 5. That the granting of the variance will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. RESOLUTION NO. 4651 PAGE 4 The granting of the variance will not be detrimental to the public health, safety or welfare, nor will it be materially injurious to properties or improvements in the vicinity as the building will be constructed in accordance will all applicable California Codes and additional impacts associated with the proposed use have been adequately mitigated to ensure this. 6. That the granting of a variance is consistent with the objectives and policies of the General Plan and the intent of this title. The granting of the variance is consistent with the objectives and polices of the General Plan (Land Use Element LU5, LU5 -1, LU5 -3, and LU5 -11) and the intent of the Development Code (Section 16.44.050.A). Lot Merger Findings: 1. Merged lots should comply wherever feasible with the minimum lot size, lot width, and lot depth requirements of the zoning district in which it is located. The proposed project would merge three (3) lots into one (1) and the new lot would be conforming to the OMU zoning district development standards for size, lot width, and lot depth. 2. Adequate access and placement of easements shall be provided. Access to the single lot resulting from the lot merger would be maintained from James Way. Required CEQA Findings: 1. The City of Arroyo Grande had previously prepared an initial study pursuant to Section 15063 of the Guidelines of the California Environmental Quality Act (CEQA), for Conditional Use Permit 12 -002, Variance 12 -004, and Amended Vesting Tentative Tract Map 12 -001. 2. Based on the initial study, a Mitigated Negative Declaration was prepared and adopted by the City Council on January 28, 2014. A copy of the Mitigated Negative Declaration and related materials is located at City Hall in the Community Development Department. 3. After holding a public hearing pursuant to State and City Codes, and considering an Addendum to the adopted Mitigated Negative Declaration, the City Council finds that there is no substantial evidence of any significant adverse effect, either individually or cumulatively on wildlife RESOLUTION NO. 4651 PAGE 5 resources as defined by Section 711.2 of the Fish and Game Code or on the habitat upon which the wildlife depends as a result of development of this project. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Arroyo Grande has considered the Addendum to the adopted Mitigated Negative Declaration and hereby approves Amended Conditional Use Permit 15 -001, Variance 15 -001, and Lot Merger 15 -001, as presented to the City Council on March 24, 2015, and as shown in Exhibit "B ", attached hereto and incorporated herein by this reference, with the above findings and subject to the conditions as set forth in Exhibit "A ", attached hereto and incorporated herein by this reference. BE IT FURTHER RESOLVED that this Resolution shall supersede Resolution No. 4565, except as regards to the Mitigated Negative Declaration adopted thereby. On motion by Council Member Brown, seconded by Council Member Guthrie, and by the following roll call vote, to wit: AYES: Council Members Brown, Guthrie, Harmon, Barneich, and Mayor Hill NOES: None ABSENT: None the foregoing Resolution was adopted this 24th day of March, 2015. RESOLUTION NO. x{551 PAGE 6 . 1 JIM HILL, MAYOR TTEST: KEL WET ORE, CITY CLERK AS TO CONTENT: ALL, INTERIM CITY MANAGER APPROVED AS TO FORM: r TIM( ?THY J. C , CITY ATTORNEY RESOLUTION NO. 4651 PAGE 7 EXHIBIT `A' CONDITIONS OF APPROVAL AMENDED CONDITIONAL USE PERMIT 15-001, VARIANCE 15-001, AND LOT MERGER 15-001 APNs 007-771-053, -062, AND -076 The approval authorizes the merger of a three (3) lots into one (1) 1.8-acre lot, and development of a 55,000 square-foot, 70-bed residential care facility and sixteen (16) unit independent living facility. Also approved is a reduction of creek setback requirements to thirty-two feet (32') from the top of creek bank and a maximum building height of 37' 7". COMMUNITY DEVELOPMENT DEPARTMENT GENERAL CONDITIONS: 1. The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project. 2. The applicant shall comply with all conditions of approval for Amended Conditional Use Permit 15-001, Variance 15-001, and Lot Merger 15-001. 3. This approval shall automatically expire on March 24, 2017 unless the lot merger is recorded or an extension is granted pursuant to section 16.12.140 of the Development Code. 4. The applicant shall agree to indemnify and defend at his/her sole expense any action brought against the City, its present or former agents, officers, or employees because of the issuance of said approval, or in any way relating to the implementation thereof, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations under this condition. 5. Development shall occur in substantial conformance with the plans presented to the City Council at the meeting of March 24, 2015. 6. Development shall conform to the Office Mixed-Use (OMU) zoning district standards except as otherwise approved. 7. All conditions of approval and mitigation measures for the project shall be included in construction drawings. RESOLUTION NO. 4651 PAGE 8 SPECIAL CONDITIONS: 8. The lot merger shall show an irrevocable offer to dedicate the 32' creek setback area to the City. 9. The lot merger shall show an irrevocable offer to dedicate the pedestrian path to the City. 10. Prior to the issuance of a building permit, the applicant shall record a new, non - exclusive pedestrian trail easement that coincides with the project plans. This easement instrument shall be to the satisfaction of the City Attorney. The applicant shall submit construction plans for the pedestrian trail for review and approval by the Community Development and Public Works Departments. 11. Prior to the issuance of a building permit, the applicant shall design a complete pedestrian trail from James Way to the pedestrian bridge, to the satisfaction of the Community Development Director. 12. Prior to issuing a certificate of occupancy, the developer shall install the pedestrian trail on the subject property in accordance with the approved construction plans. 13. Prior to issuing a certificate of occupancy, the developer shall enter into a maintenance agreement for the pedestrian trail on behalf of the City to the satisfaction of the City Attorney. 14. The pedestrian trail shall connect the public sidewalk on James Way by means of an ADA ramp and stairs. 15. Only native riparian plants shall be planted within the 32' creek setback area. Detailed planting plans shall be submitted in advance of or concurrent with improvement plans. 16. Signs shall be posted prohibiting the use of herbicides or other toxic substances potentially harmful to creek habitat. 17. No lighting other than that approved on the care facility shall be installed adjacent to the creek. 18. The applicant shall submit documentation submitted to the U.S. Army Corps of Engineers to satisfy requirements outlined in the "Wetland Mitigation Plan" and creek setback reduction prior to improvement plan review. 19. The project shall provide bicycle parking in a location acceptable to the Community Development Director. 20. Fencing shall be installed along the pedestrian creek path that does not prohibit migration of fauna between the path and riparian area. RESOLUTION NO. 4651 PAGE 9 21. All impact trees shall be a minimum 36" box in size, or of a size acceptable to the Community Development Director. 22. The applicant shall demonstrate to the satisfaction of the City Engineer that the turning radiuses within the project site, including access from James Way, can accommodate a range of vehicles from large trucks and buses, to cars, or the project shall return to the City Council for additional review and modification. 23. The applicant shall verify access agreement includes all necessary parties (medical offices, fitness center, and hotel). 24. The applicant shall demonstrate to the satisfaction of the Fire Chief that the turning radiuses within the project site can, including access from James Way, accommodate the Fire apparatus. 25. Any modification to the conceptual plans that is determined not to be in substantial conformance shall be reviewed by the Architectural Review Committee and approved by the Community Development Director. 26. The developer shall comply with Development Code Chapter 16.20, "Land Divisions ". 27. The developer shall comply with Development Code Chapter 16.64, "Dedications, Fees and Reservations ". 28. Double detector check valve assemblies shall be located directly adjacent to or within the respective building to which they serve. 29. All fire department connections shall be located near a fire hydrant, adjacent to a Fire access roadway, away from the public right -of -way, incorporated into the design of the site, and screened to the maximum extent feasible. 30. All electrical panels shall be architectural integrated into the buildings. ARCHITECTURAL REVIEW COMMITTEE CONDITIONS 31. The lower sign to identify the Plaza shall be retitled, removed or relocated, or a new sign shall be placed at the top entrance near Oak Park Boulevard to indicate the professional center and /or fitness club. 32. The applicant shall comply with recommendations by the Army Corps of Engineers regarding creek setback reduction. 33. The project shall maintain the 37'7" building height limit previously approved. 34. Preliminary plant materials and layout are acceptable and the final planting plan shall be reviewed by City staff for conformance with the preliminary plan. RESOLUTION NO. 4651 PAGE 10 ENGINEERING DIVISION CONDITIONS: GENERAL CONDITIONS 35. Perform construction activities during normal business hours (Monday through Friday, 7 A.M. to 5 P.M., and Saturday from 10 A.M. to 5 P.M. within enclosed structures). The developer or contractor shall refrain from performing any work other than site maintenance outside of these hours, unless an emergency arises or approved by the Community Development Director. The City may hold the developer or contractor responsible for any expenses incurred by the City due to work outside of these hours. 36. Prior to the issuance of a grading permit, the developer shall submit one (1) copy of the final project- specific Storm Water Pollution Prevention Plan (SWPPP) consistent with the Regional Water Quality Control Board (RWQCB) requirements and shall comply with RWQCB Construction General Permit and Post Construction Requirements. 37. A grease interceptor shall be required for the proposed care center. 38. The applicant shall provide and include on the plans trash enclosures that screen visibility of trash facilities to the satisfaction of the Community Development Director. 39. Applicant shall limit project access to James Way. Two driveway access points on James Way exist. The most westerly (upper) driveway shall be signed and striped to limit access to ingress only. The most easterly (lower) driveway shall be signed and striped to allow ingress and egress. The most easterly driveway shall be aligned with driveway on Northerly side of James Way. Any deviation from described access will require review and approval by the Traffic Commission. NOISE 40. All residential units shall be designed to mitigate impacts from non - residential project noise, in compliance with the City's noise regulations. IMPROVEMENT PLANS 41. All project improvements shall be designed and constructed in accordance with the City of Arroyo Grande Standard Drawings and Specifications. 42. The Developer shall submit three (3) full -size paper copies and one (1) full -size mylar copy of approved improvement plans for inspection purposes during construction. RESOLUTION NO. 4651 PAGE 11 43. The Developer shall submit as -built plans at the completion of the project or improvements as directed by the Community Development Director. As- builts shall be submitted on mylar as well as electronically. Electronic as- builts shall be provided both in AutoCAD and PDF format. 44. The following Improvement plans shall be prepared by a registered Civil Engineer and approved by the Community Development Department: a. Grading, drainage and erosion control, b. Street paving, curb, gutter and sidewalk, C. Public utilities, d. Water and sewer, e. Landscaping and irrigation, f. Any other improvements as required by the Community Development Director. 45. The site plan shall include the following: a. The location and size of all existing and proposed water, sewer, and storm drainage facilities within the project site and abutting streets or alleys. b. The location, quantity and size of all existing and proposed sewer laterals. C. The location, size and orientation of all trash enclosures. d. All existing and proposed parcel lines and easements crossing the property. e. The location and dimension of all existing and proposed paved areas. f. The location of all existing and proposed public or private utilities. g. The location of all proposed low impact development storm water facilities. 46. Improvement plans shall include plan and profile of existing and proposed on and off -site utilities and retaining walls. 47. Landscape and irrigation plans are required within the public right of way. The Public Works Director shall approve the irrigation plan. 48. Non - potable water is available at the City Corporation Yard. The City of Arroyo Grande does not allow the use of hydrant meters. 49. Lots using fire sprinklers shall have individual service connections. A fire sprinkler engineer shall determine the size of the water meters. RESOLUTION NO. 4651 PAGE 12 50. Utilities to this project have been stubbed out with the prior mixed -use project. The developer shall be required to use these existing stubbed out utilities on James Way. No work shall be permitted on James Way for these utilities. 51. The applicant shall pay a water neutralization fee for each new residential unit. SEWER 52. All sewer mains or laterals crossing or parallel to public water facilities shall be constructed in accordance with the Standard Plans. 53. Sewer to this project has been stubbed out with the prior mixed -use project. The applicant shall utilize these utilities and shall not be permitted to do work on James Way. 54. The Developer shall obtain approval from the South County Sanitation District for the development's impact to District facilities prior to building permit issuance. 55. The Developer shall mitigate lift station #1 CIP force main replacement. PUBLIC UTILITIES 56. The Developer shall underground all existing and new public utilities in accordance with Section 16.68.050 of the Development Code. 57. Prior to approving any building permit within the project for occupancy, all public utilities shall be operational. STREETS 58. No work shall be permitted on James Way. CURB, GUTTER, AND SIDEWALK 59. The Developer shall utilize saw cuts for all repairs made in curb, gutter, and sidewalk. 60. The Developer shall install ADA compliant facilities where necessary. Ramps on James Way shall be brought up to the City and State standards including the ramp at the intersection of James Way and Oak Park Blvd. Decorative crosswalks shall be installed across driveway aprons along James Way. 61. The Developer shall install tree wells for all trees planted adjacent to curb, gutter and sidewalk to prevent damage due to root- growth. Root barriers are to be installed on the sidewalk side of tree wells per City standards. RESOLUTION NO. 4651 PAGE 13 62. Any sections of damaged or displaced curb, gutter & sidewalk or driveway approach shall be repaired or replaced to the satisfaction of the Public Works Director GRADING X63. The Developer shall perform all grading in conformance with the City Grading Ordinance including setback for cut or fills. 64. The Developer shall submit a preliminary soils report prepared by a registered Civil Engineer and supported by adequate test borings. All earthwork design and grading shall be performed in accordance with the approved soils report. 65. The Developer shall submit all retaining wall calculations for review and approval by the Community Development Director for walls not constructed per City standards. 66. Existing 24" CMP pipe behind the building shall be removed and replaced with 24" HDPE pipe that has a smooth interior with integral bell and spigot or approved equal as determined by the Public Works Director. 67. The Developer shall provide outlet structure for Meadow Creek storm drain. A stormceptor and or clarifier for storm drain leading to Meadow Creek shall be required. Post Construction Requirements Regional Water Quality Control Board, Stormwater Control Plan, Operations and Maintenance Plan, and Annual Stormwater Control Facilities Maintenance 68. The Developer shall develop, implement and provide the City a: a. Stormwater Control Plan that clearly provides engineering analysis of all Water Quality Treatment, Runoff Retention, and Peak Flow Management Controls. b. Operations and Maintenance Plan and Maintenance Agreements that clearly establish responsibility for all Water Quality Treatment, Runoff Retention, and Peak Flow Management controls. C. Annual Maintenance Notification indicating that all Water Quality Treatment, Runoff Retention, and Peak Flow Management controls have been maintained and are functioning as designed. All reports must be completed by either a Registered Civil Engineer or Qualified Stormwater Pollution Prevention Plan Developer (QSD). RESOLUTION NO. 4651 PAGE 14 69. Prior to any Permit — Stormwater Control Plan. The Stormwater Control Plan must include, at minimum: a. Contents 1. Project information including project name; application number; location; parcel numbers; applicant contact information; land use information; site area; existing, new, and replaced impervious area, and applicable PCR requirements and exceptions. 2. Narrative analysis or description of site features and conditions, and opportunities and constraints for stormwater control. 3. Narrative description of site design characteristics that protect natural resources including endangered species habitat, protected vegetation, and archaeological resources, and preserve natural drainage features, minimize imperviousness, and disperse runoff from impervious areas. 4. Tabulation of proposed pervious and impervious DMAs, showing self- treating areas, self- retaining areas, areas draining to self - retaining areas, and areas tributary to each LID facility. 5. Proposed sizes, including supporting calculations, for each LID facility. 6. Narrative description of each DMA and explanation of how runoff is routed from each impervious DMA to a self- retaining DMA or LID facility. 7. Description of site activities and potential sources of pollutants. 8. Table of pollutant sources identified from the list in Appendix A and for each source, the source control measure(s) used to reduce pollutants to the maximum extent practicable. 9. Description of signage for bioretention facilities. 10. General maintenance requirements for bioretention facilities and site design features. 11. Means by which facility maintenance will be financed and implemented in perpetuity. 12. Statement accepting responsibility for interim operation & maintenance of facilities. b. Exhibits 1. Existing natural hydrologic features (depressions, watercourses, relatively undisturbed areas) and significant natural resources. 2. Proposed design features and surface treatments used to minimize imperviousness and reduce runoff. 3. Existing and proposed site drainage network and connections to drainage off -site. 4. Entire site divided into separate Drainage Management Areas (DMAs). Each DMA has a unique identifier and is characterized as self- retaining (zero- discharge), self- treating, or draining to a LID facility. 5. Proposed locations and footprints of LID facilities. RESOLUTION NO. 4651 PAGE 15 71. Prior to Occupancy - Maintenance Agreement. The Applicant shall provide a signed statement accepting responsibility for the Operations and Maintenance of the installed Storm Water Control Measures. The Applicant shall include written conditions in the sales, lease agreements, deed, CCRs, HOA or any other legally enforceable mechanism that require the assumed responsibility for the Operations and Maintenance of Stormwater Control Facilities. Additionally, the signed statement shall include the following information: a. Stormwater Control Measures Report Number. b. The location and address of Storm Water Control Facilities. C. Completion dates of the following milestones: 1. Construction; 2. Field verification of Stormwater Control Facilities; 3. Final Project approval /occupancy. d. Party responsible for O &M. e. Source of funding for O &M. f. Statement indicating the Storm Water Control Facilities are Maintained as required in the Operations and Maintenance Plan and facilities continues to function as designed or have been repaired or replaced. g. Statement describing any vector or nuisance problems. 72. Annual - Maintenance Notification. The Owner /Applicant shall provide a signed statement notifying the City of all maintenance of the installed Storm Water Control Measures. Additionally, the signed statement shall include the following information: a. Stormwater Control Measures Report Number; b. The location and address of Storm Water Control Facilities; C. Completion date of the maintenance activities; d. Party responsible for O &M; e. Source of funding for O &M; 6. Potential pollutant source areas, including loading docks, food service areas, refuse areas, outdoor processes and storage, vehicle cleaning, repair or maintenance, fuel dispensing, equipment washing, etc. 70. Prior to Final Approval - Operations and Maintenance Plan. The Operations and Maintenance Plan must include, at minimum: a. Stormwater Control Measures report number. b. A site map identifying all Stormwater Control Measures requiring Operations and Maintenance practices to function as designed. C. Operations and Maintenance Procedures for each structural stormwater control measure including, but not limited to, Low Impact Design facilities, retention and detention basins, and manufactured or propriety devices operations and maintenance. d. Short-and long -term maintenance requirements, recommended frequency of maintenance, and estimated cost for maintenance. 71. Prior to Occupancy - Maintenance Agreement. The Applicant shall provide a signed statement accepting responsibility for the Operations and Maintenance of the installed Storm Water Control Measures. The Applicant shall include written conditions in the sales, lease agreements, deed, CCRs, HOA or any other legally enforceable mechanism that require the assumed responsibility for the Operations and Maintenance of Stormwater Control Facilities. Additionally, the signed statement shall include the following information: a. Stormwater Control Measures Report Number. b. The location and address of Storm Water Control Facilities. C. Completion dates of the following milestones: 1. Construction; 2. Field verification of Stormwater Control Facilities; 3. Final Project approval /occupancy. d. Party responsible for O &M. e. Source of funding for O &M. f. Statement indicating the Storm Water Control Facilities are Maintained as required in the Operations and Maintenance Plan and facilities continues to function as designed or have been repaired or replaced. g. Statement describing any vector or nuisance problems. 72. Annual - Maintenance Notification. The Owner /Applicant shall provide a signed statement notifying the City of all maintenance of the installed Storm Water Control Measures. Additionally, the signed statement shall include the following information: a. Stormwater Control Measures Report Number; b. The location and address of Storm Water Control Facilities; C. Completion date of the maintenance activities; d. Party responsible for O &M; e. Source of funding for O &M; RESOLUTION NO. 4651 PAGE 16 f. Statement indicating the Storm Water Control Facilities are Maintained as required in the Operations and Maintenance Plan and facilities continues to function as designed or have been repaired or replaced; g. Statement describing any vector or nuisance problems. DRAINAGE 73. All on -site and off -site drainage facilities shall be designed to accommodate a 100 - year storm flow. The applicant shall provide detailed drainage calculations indicating that increased run -off can be accommodated by existing facilities and /or provide on -site retention basins, to the satisfaction of the Director of Community Development. 74. The project is in Drainage Zone C. Infiltration basins will be required so that peak storm flows do not exceed the existing Oak Park Blvd basin capacity. 75. Infiltration basins shall be designed based on soil tests. Infiltration tests shall include a minimum of 2 borings 15 feet below the finished basin floor. Additional borings or tests may be required if the analysis or soil conditions are inconclusive. 76. All drainage facilities shall be in accordance with the Drainage Master Plan. 77. The applicant shall provide on -site storm water retardation facilities designed and constructed to Public Works and Community Development requirements, and the following: a. The facilities shall be designed to reduce the peak flow rate from a post - development 100 year storm. b. The 100 year basin outflow shall not exceed the pre - development flow. C. The 100 year basin outflow shall be limited to a level which does not cause the capacity of existing downstream drainage facilities to be exceeded. d. The basin design shall include freeboard equal to 20 percent of the basin depth, to a minimum of 12 inches. e. The basin shall be fully constructed and functional prior to occupancy for any building permit within the project. f. The basin shall be maintained by the City. The applicant shall enter into an agreement to fund the maintenance of the basin. The funding agreement shall be approved by the City Attorney and shall be recorded. g. The basin design shall include landscaping and irrigation. h. The basin shall be fenced around the perimeter. Fencing shall be subject to the review and approval of the Community Development Director and the Public Works Director. i. Provide secondary overflow spillway for detention basin. RESOLUTION NO. 4651 PAGE 17 78. The applicant shall submit an engineering study regarding flooding related to the project site as directed by the Director of Public Works. Any portions of the site subject to flooding from a 100 -year storm shall be shown on the plans and shall be noted as a building restriction. 79. Storm drain inlets, both public and private, will be required to be stenciled with the warning: "Drains to Creek" or other appropriate advice as directed by the City. 80. The project shall comply with the Regional Water Quality Control Board Low Impact Development requirements. Currently the City is utilizing Guidelines that include calculations by the applicant of the additional stormwater runoff that will be generated by their project. With that information the applicant will develop a plan for handling on -site drainage including a determination of how much runoff it may be possible to percolate, or store for irrigation purposes, or otherwise use on site. Stormwater runoff that cannot be retained on site for percolation or use must be treated through the use of bioswales and then directed into the appropriate drainage system described in the Drainage Master Plan. EDICATIONS AND EASEMEN 81. Reciprocal access and maintenance agreement will be required for the proposed project and the adjacent businesses using the existing parking area. 82. All existing underlying lot lines shall be merged. 83. All easements, abandonments, or similar documents to be recorded as a document separate from a map, shall be prepared by the applicant on 8 1/2 x 11 City standard forms, and shall include legal descriptions, sketches, closure calculations, and a current preliminary title report. The applicant shall be responsible for all required fees, including any additional required City processing. 84. A Public Utility Easement (PUE) shall be reserved a minimum 6 feet wide adjacent to all street right -of -ways. The PUE shall be wider where necessary for the installation or maintenance of the public utility vaults, pads, or similar facilities. 85. The property owner shall be responsible for maintaining the creek path and vegetation until the offer of dedication is accepted by the City. PERMITS 86. Obtain an encroachment permit prior to performing any of the following: a. Performing work in the City right of way, b. Staging work in the City right of way, C. Stockpiling material in the City right of way, RESOLUTION NO. 4651 PAGE 18 d. Storing equipment in the City right of way. 87. Obtain a grading permit prior to commencement of any grading operations on site. FEES 88. Pay all required City fees at the time they are due. 89. Fees to be paid prior to plan approval: a. Plan check for grading plans based on an approved earthwork estimate. b. Plan check for improvement plans based on an approved construction cost estimate. C. Permit Fee for grading plans based on an approved earthwork estimate. d. Map check for tentative tract map based on the engineer's cost estimate. e. Inspection fee of subdivision or public works construction plans based on an approved construction cost estimate. 90. Impact fees for Lift Station #1 force main replacement shall be as determined by the Public Works Director. PROCEDURE FOR PROTESTING FEES, DEDICATIONS, RESERVATIONS OR EXACTIONS: (A)Any party may protest the imposition of any fees, dedications, reservations, or other exactions imposed on a development project, for the purpose of defraying all or a portion of the cost of public facilities related to the development project by meeting both of the following requirements: (1) Tendering any required payment in full or providing satisfactory evidence of arrangements to pay the fee when due or ensure performance of the conditions necessary to meet the requirements of the imposition. (2) Serving written notice on the City Council, which notice shall contain all of the following information: (a) A statement that the required payment is tendered or will be tendered when due, or that any conditions which have been imposed are provided for or satisfied, under protest. (b) A statement informing the City Council of the factual elements of the dispute and the legal theory forming the basis for the protest. (B) A protest filed pursuant to subdivision (A) shall be filed at the time of the approval or conditional approval of the development or within 90 days after the RESOLUTION NO. 4661 PAGE 19 date of the imposition of the fees, dedications, reservations, or other exactions to be imposed on a development project. (C) Any party who files a protest pursuant to subdivision (A) may file an action to attack, review, set aside, void, or annul the imposition of the fees, dedications reservations, or other exactions imposed on a development project by a local agency within 180 days after the delivery of the notice. (D) Approval or conditional approval of a development occurs, for the purposes of this section, when the tentative map, tentative parcel map, or parcel map is approved or conditionally approved or when the parcel map is recorded if a tentative map or tentative parcel map is not required. (E) The imposition of fees, dedications, reservations, or other exactions occurs, for the purposes of this section, when they are imposed or levied on a specific development. AGREEMENTS 91. Inspection Agreement: Prior to approval of an improvement plan, the applicant shall enter into an agreement with the City for inspection of the required improvements. 92. Subdivision Improvement Agreement: The applicant shall enter into an agreement for the completion and guarantee of improvements required. The agreement shall be on a form acceptable to the City. 93. Covenants, Conditions, and Restrictions: The subdivider shall prepare project CC &Rs for maintenance and repair of all privately owned improvements. The CC &Rs shall be subject to the review and approval of the City Attorney and the Director of Public Works. IMPROVEMENT SECURITIES 94. All improvement securities shall be of a form as set forth in Development Code Section 16.68.090, Improvement Securities. 95. Submit an engineer's estimate of quantities for public improvements for review by the Community Development Director. 96. Provide financial security for the following, to be based upon a construction cost estimate approved by the Community Development Director: a. Faithful Performance: 100% of the approved estimated cost of all subdivision improvements, RESOLUTION NO. 4651 PAGE 20 b. Labor and Materials: 50% of the approved estimated cost of all subdivision improvements C. One Year Guarantee: 10% of the approved estimated cost of all subdivision improvements. This bond is required prior to acceptance of the subdivision improvements. d. Monumentation: 100% of the estimated cost of setting survey monuments. This financial security may be waived if the developer's surveyor submits to the Director of Public Works a letter assuring that all monumentation has been set. _ PRIOR TO ISSUING A CERTIFICATE OF OCCUPANCY 97. All utilities shall be operational. 98. All essential project improvements shall be constructed prior to occupancy. Non- essential improvements, guaranteed by an agreement and financial securities, may be constructed after occupancy as directed by the Community Development Director. 99. Prior to the final 10% of occupancies for the project are issued, all improvements shall be fully constructed and accepted by the City. BUILDING AND LIFE SAFETY DIVISION AND FIVE CITIES FIRE AUTHORITY CONDITIONS: 100. All buildings shall comply with the latest adopted California Codes. 101. The applicant shall pay all applicable development impact fees prior to the issuance of a building permit. 102. At least one (1) covered passenger loading zone complying with Section 11 B- 503 of the California Building Code shall be provided at an accessible entrance to licensed medical care and licensed long -term care facilities where the period of stay may exceed twenty -four hours. 103. The project shall provide complete compliance with State and Federal disabled access requirements. Per S.B. 1025, 10% of the primary entry levels of multistoried dwelling units must comply with the HCD's accessibility provisions. 104. The applicant shall show all setback areas for the lot on the lot merger prior to recordation. 105. The creek side of the care facility building is adjacent to wildland where the opportunity for conflagration exists. The building shall be built following the Wildland Urban Interface requirements of the CBC Chapter 7A. RESOLUTION NO. 4651 PAGE 21 106. The developer shall provide a Fire Department turnaround or provide access through the hotel site subject to approval by the Fire Chief. FIRE LANES 107. Prior to issuance of a certificate of occupancy, the applicant shall post designated fire lanes, per Section 22500.1 of the California Vehicle Code. 108. All fire lanes must be posted and enforced, per Police Department and Five Cities Fire Authority guidelines. 109. In accordance with the California Fire Code, appendix D105, buildings or portions of buildings exceeding 30 feet in height above the lowest level of fire department vehicle access shall be provided with approved fire apparatus access roads capable of accommodating fire department aerial apparatus. The width of these roadways shall be 26 feet exclusive of shoulders, in the immediate vicinity of any building or portion of building more than 30 feet in height. At least one of these aerial access roadways shall be located a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. FIRE FLOW /FIRE HYDRANTS 110. Project shall have afire flow based on the California Fire Code Appendix III -A. 111. Prior to bringing combustibles on site, fire hydrants shall be installed per Five Cities Fire Authority and Public Works Department standards. Locations shall be approved by the Fire Chief. 112. The developer shall provide a fire hydrant on the James Way end of the property at the location where the existing 8 inch ACP water main was to be abandoned. The Double Detector Check Valve Assembly (DDCVA) and Fire Department Connection (FDC) shall be located on the James Way side of the building. FIRE SPRINKLERS 113. Prior to Occupancy, all buildings must be fully sprinklered per Building and Fire Department guidelines. 114. The project shall provide Five Cities Fire Authority approved access and sprinkler system per National Fire Protection Association Standards 13d or 13R as appropriate. 115. Any covered parking areas must be fire sprinklered and sized to allow the passage of a fire apparatus 20 feet in width with 13 feet 6 inch minimum head clearance. RESOLUTION NO. 4651 PAGE 22 ABANDON MENT /NON- CON FORM IN 116. Prior to issuance of a grading permit or building permit, whichever occurs first, the applicant shall show proof of properly abandoning all non - conforming items such as septic tanks, wells, underground piping and other undesirable conditions. OTHER APPROVALS 117. The project shall comply with Federal and local flood management policies. 118. Any review costs generated by outside consultants shall be paid by the applicant. MITIGATION MEASURES A negative declaration with mitigation measures has been adopted for this project. The following mitigation measures shall be implemented as conditions of approval and shall be monitored by the appropriate City department or responsible agency. The applicant shall be responsible for verification in writing by the monitoring department or agency that the mitigation measures have been implemented. MITIGATION MEASURES: MM 1 -1: The applicant shall submit a lighting plan verifying that all exterior lighting for the development is directed downward and does not create spill or glare to adjacent properties and riparian habitat. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — CDD; Police Dept. Timing: Prior to issuance of Building Permit MM III -1: Based on the recommendation by the APCD, the applicant shall demonstrate how the construction phase impacts will be below the level of significance as identified in the APCD's CEQA Handbook prior to grading permit issuance and at least three months before construction activities are to begin. MM III -2: The following standard mitigation measures for construction equipment shall be implemented to reduce the ROG, NOx, and diesel particulate matter (DPM) emissions during construction of the project: a. Maintain all construction equipment in proper tune according to manufacturer's specifications; b. Fuel all off -road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel (non -taxed version suitable for use off- road); c. Use diesel construction equipment meeting ARB's Tier 2 certified engines or cleaner off -road heavy -duty diesel engines, and comply with the State Off -Road Regulation; RESOLUTION NO. 4651 PAGE 23 d. Use on -road heavy -duty trucks that meet the ARB's 2007 or cleaner certification standard for on -road heavy -duty diesel engines, and comply with the State On -Road Regulation; e. Construction or trucking companies with_ fleets that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g. captive or NOx exempt area fleets) may be eligible by proving alternative compliance; f. All on- and off -road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit; g. Diesel idling within 1,000 feet of sensitive receptors is not permitted; h. Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors; i. Electrify equipment when feasible; j. Substitute gasoline - powered in place of diesel - powered equipment, where feasible; and k. Use alternatively fueled construction equipment on -site where feasible, such as compressed natural gas (CNG), liquefied natural gas (LNG), propane or biodiesel. MM III -3: Prior to any construction activities at the site, the project proponent shall ensure that a geologic evaluation is conducted to determine if Naturally Occurring Asbestos (NOA) is present within the area that will be disturbed. If NOA is not present, an exemption request must be filed with the APCD. If NOA is found at the site, the applicant must comply with all requirements outlined in the Asbestos Air Toxins Control Measure (ATCM) regulated by the California Air Resources Board (ARB) and may require development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety Program for approval by the APCD. MM III -4: Prior to any demolition activities or the removal or relocation of utility pipelines at the site, if necessary, the project proponent shall notify the APCD to ensure the activities occur in accordance with the requirements stipulated in the National Emission Standard for Hazardous Air Pollutants (NESHAP). MM III -5: The following mitigation measures shall be implemented during construction to manage fugitive dust emissions such that they do not exceed the APCD 20% opacity limit (APCD Rule 401) or prompt nuisance violations (APCD Rule 402): a. Reduce the amount of the disturbed area where possible; b. Use of water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency will be required whenever wind speeds exceed 15 mph. Reclaimed (non - potable) water shall be used whenever possible; c. All dirt stockpile areas should be sprayed daily as needed; RESOLUTION NO. 4651 PAGE 24 d. Permanent dust control measures identified in the approved project revegetation and landscape plans shall be implemented as soon as possible, following completion of any soil disturbing activities; e. Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with a fast germinating, non - invasive, grass seed and watered until vegetation is established; f. All disturbed soil areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the APCD; g. All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible. In addition, building pads shall be laid as soon as possible after grading unless seeding o soil binders are used; h. Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the construction site; i. All trucks hauling dirt, sand, soil or other loose materials shall be covered or shall maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114; j. Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site; k. Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water shall be used where feasible; I. All PM10 mitigation measures required shall be shown on grading and building plans; and m. The contractor or building shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the APCD Compliance Divisions prior to the start of any grading, earthwork or demolition. MM III -6: Prior to any construction activities on the site, the project proponent shall contact the APCD Engineering Division to obtain all necessary permits for portable equipment used during the construction and operational phases of the project. Typical equipment requiring a permit includes, but is not limited to, the following: • Diesel engines; • Portable generators and equipment with engines that are 50 horsepower or greater; • Electrical generation plants or the use of standby generators; and • Portable plants (e.g. aggregate plant, asphalt batch plant, concrete batch plant, etc. RESOLUTION NO. 4661 PAGE 25 MM III -7: Proposed truck routes shall be evaluated and selected to ensure routing patterns have the least impact to residential dwellings and other sensitive receptors, such as schools, parks, daycare centers, nursing homes, and hospitals. MM III -8: The project proponent shall coordinate with and obtain all necessary equipment and operation permits that are required by APCD. Typical equipment requiring such permits includes, but is not limited to, the following: • Portable generators and equipment with engines that are 50 hp or greater; • Electrical generation plants or the use of standby generators; • Boilers; • Internal combustion engines; • Sterilization unit(s) using ethylene oxide and incinerator(s); and • Cogeneration facilities. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Public Works Dept., Building Division, Engineering Division Timing: Prior to issuance of Grading Permit and during construction MM IV -1: The applicant shall revegetate the 0.18 -acre mitigation area as outlined in the "Wetland Mitigation Plan" prepared by the Morro Group, Inc., dated May 21, 2002. Any plants that do not survive shall be replaced in kind and monitored until established. Temporary irrigation shall be provided for all planting areas for three (3) years or until plants are established. An independent consultant specializing in biological resources shall be hired by the City and paid for by the applicant to monitor the mitigation for a minimum of five (5) years. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — CDD; ACOE Timing: Installation of plant material shall occur before issuance of a Certificate of Occupancy. Monitoring of plants shall occur for at least 5 years. MM IV -2: The applicant shall consult and coordinate with the Regional Water Quality Control Board (RWQCB) and the United States Corps of Engineers (USACE) regarding the project. The applicant shall obtain all permits required for the construction, operation, or mitigation of the project. If permits are not required, the applicant shall provide written verification as such from the appropriate agency. RESOLUTION NO. 4651 PAGE 26 Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — CDD; ACOE; RWQCB Timing: Prior to issuance of a Building Permit MM IV -3: The applicant shall obtain compliance with Section 1602 of the California Fish and Game Code (Streambed Alteration Agreements) in the form of a completed Streambed Alteration Agreement or written documentation from the CDFG that no agreement would be required. Should an agreement be required, the applicant shall implement all the terms and conditions of the agreement to the satisfaction of the CDFG. The CDFG Streambed Alteration Agreement process encourages applicants to demonstrate that the proposed project has been designed and will be implemented in a manner that avoids and minimizes impacts on riparian habitat and the stream zone. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — CDD; CDFG Timing: Prior to any work being performed in the creek area MM IV -4: All non - native plant species shall be eliminated from the 35' wide creek setback area. MM IV -5: The developer shall record an irrevocable offer of dedication open space agreement and thirty -five foot (35') creek easement on the property measured from top of bank. No structures shall occur within the 35' creek setback area, in accordance with Section 16.44.050 of the Municipal Code. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — CDD Timing: Prior to issuance of a Certificate of Occupancy MM IV -6: Siltation /sedimentation control measures shall be implemented along the entire eastern property boundary prior to site construction. Such control measures shall include sediment fences and /or hay bales placed into the crux of the bank of Meadow Creek. Erosion /sediment control barricades shall be placed around the perimeter of each construction zone with the potential to drain to Meadow Creek. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: Prior to issuance of a Grading Permit RESOLUTION NO. 4651 PAGE 27 MM IV -7: Soil shall not be stockpiled in areas located near the eastern property margin adjacent to Meadow Creek, or in areas that have potential to drain to Meadow Creek. Stockpiled soil should be properly covered at all times to avoid wind and water erosion, and consequent siltation to Meadow Creek. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: During grading activities MM IV -8: No heavy equipment shall be allowed within the Meadow Creek corridor. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: During grading activities and project construction MM V -1: If a potentially significant cultural resource is encountered during subsurface earthwork activities, all construction activities within a 100 -foot radius of the find shall cease until a qualified archaeologist determines whether the uncovered resource requires further study. A standard inadvertent discovery clause shall be included in every grading and construction contract to inform contractors of this requirement. Any previously undiscovered resources found during construction shall be recorded on appropriate California Department of Parks and Recreation (DPR) forms and evaluated for significance in terms of California Environmental Quality Act criteria by a qualified archaeologist. Potentially significant cultural resources consist of, but are not limited to, stone, bone, glass, ceramic, wood, or shell artifacts; fossils; or features including hearths, structural remains, or historic dumpsites. If the resource is determined significant under CEQA, the qualified archaeologist shall prepare and implement a research design and archaeological data recovery plan that will capture those categories of data for which the site is significant. The archaeologist shall also perform appropriate technical analysis, prepare a comprehensive report, and file it with the appropriate Information Center and provide for the permanent curation of the recovered materials. MM V -2: If human remains are encountered during earth - disturbing activities, all work in the adjacent area shall stop immediately and the San Luis Obispo County Coroner's office shall be notified immediately. If the remains_ are determined to be Native American in origin, the Native American Heritage Commission shall be notified and will identify the Most Likely Descendent, who will be consulted for recommendations for treatment of the discovered remains. RESOLUTION NO. 4651 PAGE 28 Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: Prior to issuance of a grading permit and during grading activities MM VIA: All construction plans shall incorporate the recommendations of the soils engineering report prepared for the project site by Earth Systems Pacific dated October 30, 2006. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: Prior to issuance of a Grading Permit MM VII -1: All construction plans shall reflect the following GHG- reducing measures where applicable. Prior to issuance of building permits, the applicant shall submit impact reduction calculations based on these measures to the APCD for review and approval, incorporating the following measures: • Incorporate outdoor electrical outlets to encourage the use of electric appliances and tools. • Provide shade tree planting in parking lots to reduce evaporative emissions from parked vehicles. Design should provide 50% tree coverage within 10 years of construction using low ROG emitting, low maintenance native drought resistant trees. • Provide conduit for future fueling of electric vehicles (one space in parking area). • No residential wood burning appliances. • Provide employee lockers and showers. One shower and 5 lockers for every 25 employees are recommended. • Trusses for south - facing portions of roofs shall be designed to handle dead weight loads of standard solar- heated water and photovoltaic panels. Roof design shall include sufficient south - facing roof surface, based on structures size and use, to accommodate adequate solar panels. For south facing roof pitches, the closest standard roof pitch to the ideal average solar exposure shall be used. • Increase the building energy rating by 20% above Title 24 requirements. Measures used to reach the 20% rating cannot be double counted. • Plant drought tolerant, native shade trees along southern exposures of buildings to reduce energy used to cool buildings in summer. • Utilize green building materials (materials which are resource efficient, recycled, and sustainable) available locally if possible. • Install high efficiency heating and cooling systems. RESOLUTION NO. 4651 PAGE 29 • Design building to include roof overhangs that are sufficient to block the high summer sun, but not the lower winter sun, from penetrating south facing windows (passive solar design). • Utilize high efficiency gas or solar water heaters. • Utilize built -in energy efficient appliances (i.e. Energy Star®). • Utilize double -paned windows. • Utilize low energy street lights (i.e.-sodium). • Utilize energy efficient interior lighting. • Install energy- reducing programmable thermostats. • Use roofing material with a solar reflectance values meeting the EPA/DOE Energy Star® rating to reduce summer cooling needs. • Eliminate high water consumption landscape (e.g., plants and lawns) in residential design. Use native plants that do not require watering and are low ROG emitting. • Provide on -site bicycle parking both short term (racks) and long term (lockers, or a locked room with standard racks and access limited to bicyclist only) to meet peak season maximum demand. One bike rack space per 10 vehicle /employee space is recommended. • Require the installation of electrical hookups at loading docks and the connection of trucks equipped with electrical hookups to eliminate the need to operate diesel - powered TRUs at the loading docks. • Provide storage space in garage for bicycle and bicycle trailers, or covered racks / lockers to service the residential units. Responsible Party: Developer Monitoring Agency: City of Arroyo Division; APCD Timing: Prior to issuance Building Permit Grande — CDD; Building of a Grading Permit or MM IX -1: A Stormwater Pollution Prevention Plan ( SWPPP) shall be developed and implemented in consultation with the City, Regional Water Quality Control Board (RWQCB), and other regulatory agencies. The SWPPP shall include BMPs to reduce potential impacts to surface water quality through the construction and life of the project. The SWPPP shall adhere to the following requirements: • The SWPPP shall include measures to avoid creating contaminants, minimize the release of contaminants, and water quality control measures to minimize contaminants from entering surface water or percolating into the ground. • The water quality control measures shall address both construction and operations periods. • Fluvial erosion and water pollution related to construction shall be controlled by a construction water pollution control program that shall be RESOLUTION NO. 4661 PAGE 30 filled with the appropriate agency and kept current throughout any site development phase. • The water pollution prevention program shall include BMPs, as appropriate, given the specific circumstances of the site and project. • The SWPPP shall be submitted for review and approval to the RWQCB. • A spill prevention and countermeasure plan shall be incorporated into the SWPPP. • Designation of equipment and supply staging and storage areas at least 150 feet from the outside edge of the Meadow Creek 35 -foot setback area. All vehicle parking, routine equipment maintenance, fueling, minor repair, etc., and soil and material stockpile, shall be done only in the designated staging area. • Major vehicle /equipment maintenance, repair, and equipment washing shall be performed off site. • A wet and dry spill cleanup plan that specifies reporting requirements and immediate clean up to ensure no residual soil, surface water or groundwater contamination would remain after clean up. • Designating concrete mixer washout areas at least 100 feet from the outside edge of the Meadow Creek 35 -foot setback with the use of appropriate containment or reuse practices. • A temporary and excess fill stockpile and disposal plan that ensures that no detrimental affects to receiving waters would result. • Requiring all grading and application of concrete, asphalt, etc. to occur during the dry season from April 15 to October 15. • Required site preparation and erosion control BMPs for any work that may need to be completed after October 15. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department; RWQCB Timing: Prior to issuance of a Grading Permit MM IX -2: To reduce erosion hazards due to construction activities, grading shall be minimized and project applicants shall use runoff and sediment control structures, and /or establish a permanent plant cover on side slopes following construction. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: Prior to issuance of a Grading Permit MM IX -3: Erosion control and bank stabilization measures shall be implemented to ensure that the creek bank does not erode. In addition, alternative bank protection methods, such as restoration of native vegetation, root wads, or other RESOLUTION NO. 4651 PAGE 31 bioengineering methods of stabilization, shall be used whenever possible. In order to reduce long -term effects of soil compaction and changes in topography, construction vehicles and personnel shall not enter the low flow channel and wet areas. Construction mats and other devices shall be used whenever possible to reduce impacts associated with soil compaction. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: During construction MM IX -4: All temporary fill placed during project construction shall be removed at project completion and the area restored to approximate pre - project contours and topography. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: Prior to issuance of a Certificate of Occupancy MM IX -5: No construction debris or materials shall be allowed to enter the creek bed, either directly or indirectly. Stockpiles shall be kept far enough from the banks of the active channel and protected to prevent materials from entering the creek bed. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Engineering Division; Public Works Department Timing: During Construction MM IX -6: The following water quality BMPs shall be incorporated into the project: • Run -off Control. Maintain post - development peak runoff rate and average volume of runoff at levels that are similar to pre - development levels. • Labeling and Maintenance of Storm Drain Facilities. Label new and existing storm drain inlets with "No Dumping — Drains to Ocean" to alert the public to the destination of stormwater and to prevent direct discharge of pollutants into the storm drain. • Common Area Litter Control. Implement a trash management and litter control program to prevent litter and debris from being carried to water bodies or the storm drain system. • Food Service Facilities. Design the food service facility to have a sink or other area for cleaning floor mats, containers, and equipments that is connected to a grease interceptor prior to discharging to the sanitary RESOLUTION NO. 4651 PAGE 32 sewer system. The cleaning area shall be large enough to clean the largest mat or piece of equipment to be cleaned. • Refuse Areas. Trash compactors, enclosures and dumpster areas shall be covered and protected from roof and surface drainage. Install a self - contained drainage system that discharges to the sanitary sewer if water cannot be diverted from the areas. • Outdoor Storage Controls. Oils, fuels, solvents, coolants, and other chemicals stored outdoors must be in containers and protected from drainage by secondary containment structures such as berms, liners, vaults or roof covers and /or drain to the sanitary sewer system. Bulk materials stored outdoors must also be protected from drainage with berms and covers. Process equipment stored outdoors must be inspected for proper function and leaks, stored on impermeable surfaces and covered. Implement a regular program of sweeping and litter control and develop a spill cleanup plan for storage areas. • Cleaning, Maintenance and Processing Controls. Areas used for washing, steam cleaning, maintenance, and repair or processing must have impermeable surfaces and containment berms, roof covers, recycled water wash facility, and discharge to the sanitary sewer. Discharges to the sanitary sewer may require pretreatment systems and /or approval of an industrial waste discharge permit. • Street/parking lot Sweeping: Implement a program to regularly sweep streets, sidewalks and parking lots to prevent the accumulation of litter and debris. Debris resulting from pressure washing should be trapped and collected to prevent entry into the storm drain system. Washwater containing any cleaning agent or degreaser should be collected and discharged to the sanitary sewer. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — CDD; Engineering Division; Building Division Timing: Prior to issuance of a Building Permit MM XII -1: Construction activities shall be restricted to the hours of 8 a.m. and 6 p.m. Monday through Friday. No construction shall occur on Saturday or Sunday. Equipment maintenance and servicing shall be confined to the same hours. To the greatest extent possible, grading and construction activities should occur during the middle of the day to minimize the potential for disturbance of neighboring noise sensitive uses. MM XII -2: All construction equipment utilizing internal combustion engines shall be required to have mufflers that are in good condition. Stationary noise sources shall be located at least 300 feet from occupied dwelling units unless noise reducing engine housing enclosures or noise screens are provided by the contractor. RESOLUTION NO. 4651 PAGE 33 MM XII -3: Equipment mobilization areas, water tanks, and equipment storage areas shall be placed in a central location as far from existing residences as feasible. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — CDD; Engineering Division; Public Works Department Timing: During construction MM XIV -1: The applicant shall pay the mandated Lucia Mar Unified School District impact fee. Responsible Party: Developer Monitoring Agency: City of Arroyo Grande — Building Division; Lucia Mar Unified School District Timing: Prior to issuance of a Building Permit Meadow Cre ek Assisted Living, MemorY Care & Independent Living 8 8 0 O a k P a r k B l v d , Arroyo Grande , CA ELIBERTY 1306 JOHNSONAVEN AVENUE SAN LUIS OBISPO, CA 93401 SAN 805:547,2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA C O V E R S H 03/02/2015 E E T A0.0 Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California C O V E R S H 03/02/2015 E E T A0.0 Meadow Cre ek Assisted Living, Memory Care &Independent Living 8 80 Oak Park B l v d, Arroyo Grande CA PROJECT DIRECTORY DEVELOPMENT TEAM LIBERTY HEALTH 3480 SOUTH HIGUERA STREET, SUITE 130 SAN LUIS OBISPO, CA 93401 ATTN RUSS SHEPPEL & RYAN PETETIT PHONE (925) 552 -7804 (RUSS) RUSS SHEPPEL'S EMAIL rsheppel @yahoo.com RYAN PETETIT'S EMAIL ryan @pbcompanies.co ARCHITECT ARRIS STUDIO ARCHITECTS 1306 JOHNSON AVE SAN LUIS OBISPO, CA 93401 ATTN STEVE RIGOR PHONE (805) 547 -2240 ext 112 EMAIL srigor @arils- studio.com CIVIL ENGINEER AXIS ENGINEERING GROUP 3480 SOUTH HIGUERA STREET, SUITE 130 SAN LUIS OBISPO, CA 93401 ATTN GREGG HOVERSTEN PHONE (805) 440 -3800 EMAIL greggh001 @sbcglobal.net LANDSCAPE ARCHITECT FIRMA 187 TANK FARM ROAD, SUITE 230 SAN LUIS OBISPO, CA 93401 ATTN DAVID FOOTE PHONE (805) 781 -9800 EMAIL david @firmaconsultants.com SITE STATISTICS ADDRESS: ASSESSOR PARCEL NUMBER PARCELS TRACT NO. SITE AREA: ZONING EXISTING USE: PROPOSED USE: PROPOSED OCCUPANCY: PROPOSED CONSTRUCTION TYPE: PROPOSED SPRINKLERS: PROPOSED NUMBER OF STORIES: ALLOWABLE BUILDING HEIGHT PROPOSED BUILDING HEIGHT: PROJECT STATISTICS 880 OAK PARK ROAD 007 - 771 - 053,062 A -31, P.M. 47 & 3 -32, P.M. 31 2713 (52,185 SF) 1.2 ACRES MU -PD 1.1 VACANT LOT /PARKING LOT ASSISTED LIVING FACILITY R -2.1 V -A YES 2 + BASEMENT 45-0" +/- 39' -0" BUILDING STATISTICS: ASSISTED LIVING & MEMORY CARE PROPOSED BUILDING AREA: BASEMENT 17,669 SF FIRST FLOOR 18,593 SF SECOND FLOOR 18,115 SF TOTAL PROPOSED BUILDING AREA 54,377 SF UNIT MIX: PROPOSED BUILDING AREA: PARKING REQUIRED - ASSISTED CARE FACILITY: FIRST FLOOR 3,595 SF UNITNAME UNIT TYPE BEDS QTY AREA ISFI TOTALSF 1 -BED ASSISTED LIVING: 1 -BED 1 42 563 23,646 STUDIO ASSISTED LIVING: STUDIO 1 2 342 684 PRIVATE ALZHEIMER: 1 BED 1 20 299 5,980 PRIVATE ALZHEIMER: 1 BED +STUDIO 1 6 389 2,334 TOTAL 70 70 24 SPACES 32,644 SF BUILDING STATISTICS: INDEPENDENT LIVING - PHASE 2 PROPOSED BUILDING AREA: PARKING REQUIRED - ASSISTED CARE FACILITY: FIRST FLOOR 3,595 SF LAUNDRY /MAINTENANCE /STORAGE 3,175SF LOBBY /STAIR /ELEVATOR 420 SF SECOND FLOOR 6,410 SF CIRCULATION 1,194 SF 1- BEDROOM UNITS (8 AT 652 SF) 5,216 SF THIRD FLOOR 6,060 SF CIRCULATION 844 SF 1- BEDROOM UNITS (8 AT 652 SF) 5,216 SF TOTAL PROPOSED BUILDING AREA 16,065 SF PARKING STATISTICS - REQUIRED PARKING REQUIRED - ASSISTED CARE FACILITY: ROOMS 70 BEDS x 1/3 BEDS 24 SPACES STAFF SPACES LARGEST SHIFT: 20 EMPLOYEES /2 10 SPACES TOTAL PARKING REQUIRED 34 SPACES PARKING REQUIRED - INDEPENDENT LIVING: 16 UNITS I BEDROOM UNITS @ I SPACE /UNIT 16 SPACES TOTAL PARKING REQUIRED 16 SPACES TOTAL PARKING REQUIRED FOR NEW PROJECT 50 SPACES 10% SHARED PARKING REDUCTION -5 SPACES TOTAL PARKING REQUIRED FOR NEW PROJECT 45 SPACES PARKING STATISTICS - EXISTING EXISTING PARKING PROVIDED: KENNEDY CLUB FITNESS 58 SPACES SHEPPEL 1 MEDICAL OFFICES 22 SPACES SHEPPEL 2 MEDICAL OFFICES 22 SPACES SHARED PARKING 24 SPACES TOTAL EXISTING PARKING PROVIDED 126 SPACES PARKING STATISTICS - PROPOSED PROPOSED PARKING (ASSISTED & INDEPENDENT LIVING) PROPOSED PROJECT PARKING: 26 SPACES PROPOSED SHARED PARKING 23 SPACES TOTAL PARKING PROVIDED FOR NEW PROJECT 49 SPACES PROPOSED PARKING SHARED WITH BUNNELL 18 SPACES TOTAL NEW PARKING 67 SPACES PARKING STATISTICS - OVERALL THIS PROJECT PROPOSES COMPLIMENTARY USES ALLOWING FOR SHARED PARKING. FOR EXAMPLE, THE MEDICAL OFFICES TYPICALLY OPERATE FROM 8:30 AM TO 5 P.M. AND ARE CLOSED ON WEEKENDS. THIS CORRESPONDS TO KENNEDY'S PEAK USAGE TIME FROM 5 AM TO 7 AM & 5 PM TO 9 PM ON WEEKDAYS AND WEEKENDS. EXISTING PARKING 126 SPACES PROPOSED PROJECT PARKING: 48 SPACES PROPOSED PARKING SHARED WITH BUNNELL 18 SPACES TOTAL ON -SITE PARKING 193 SPACES DRAWING INDEX A0.0 COVER SHEET A0.1 PROJECT DATA A1.0 PREVIOUSLY APPROVED SITE PLAN Al.l PROPOSED MODIFIED SITE PLAN A1.2 TRUCK TURNING STUDY A1.3 ACCESS EASEMENT EXHIBIT A1.4 LANDSCAPE AREA CALCULATIONS A1.5 PARKING ANALYSIS: EXISTING SITE PLAN A1.6 PARKING ANALYSIS: PROPOSED SITE PLAN A2.0 CONCEPTUAL SITE & BASEMENT PLAN A2.1 CONCEPTUAL SITE & FIRST FLOOR PLAN A2.2 CONCEPTUAL SECOND FLOOR PLAN A2.3 CONCEPTUAL UNIT PLANS A3.0 CONCEPTUAL PERSPECTIVES - CARE FACILITY A3.1 CONCEPTUAL PERSPECTIVES - CREEK WALK A3.2 CONCEPTUAL PERSPECTIVES - CREEK WALK A3.3 CONCEPTUAL PERSPECTIVES - INDEPENDENT LIVING A3.4 CONCEPTUAL PERSPECTIVES - INDEPENDENT LIVING A4.0 CONCEPTUAL ELEVATIONS - CARE FACILITY A4.1 CONCEPTUAL ELEVATIONS - CARE FACILITY A4.2 ENLARGED CONCEPTUAL ELEVATIONS - CARE FACILITY A4.3 ENLARGED CONCEPTUAL ELEVATIONS - CARE FACILITY A4.4 CONCEPTUAL ELEVATIONS - INDEPENDENT LIVING A4.5 CONCEPTUAL ELEVATIONS - INDEPENDENT LIVING A5.0 CONCEPTUAL SITE SECTION A5.1 CONCEPTUAL SITE SECTIONS A5.2 CONCEPTUAL SITE SECTIONS L1.0 CONCEPTUAL LANDSCAPE PLAN L2.0 CONCEPTUAL L.I.D. FEATURES VICINITY MAP NORM CI ITC ELIBERTY SAN JOHNSON AVENUE CA UE SAN LUIS OBISPO. CA 93401 905:547.2240 ARRIS-STUDIO.COM H EALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA 03/02/2015 P R O J E C T D A T A A0.1 PROJECT DESCRIPTION THIS PROJECT CONSISTS OF TWO BUILDINGS, BUILT OVER TWO SEPARATE PHASES, AND ASSOCIATED PARKING LOCATED AT 880 OAK PARK WAY IN ARROYO GRANDE, CA. THE MAIN BUILDING, AND FIRST PHASE, IS THE ASSISTED LIVING AND MEMORY CARE FACILITY WHILE THE SECOND BUILDING, WHICH WAS ONCE AN 8 -UNIT RESIDENTIAL PROJECT, IS NOW 16 UNITS OF INDEPENDENT LIVING, BUILT DURING THE SECOND PHASE. THESE TWO BUILDINGS NOW COMPLIMENT EACH OTHER AND ALLOW THE OWNER TO EXPAND THE SERVICES PROVIDED TO ITS RESIDENTS. RESIDENTS WILL HAVE THE ABILITY TO TRANSITION FROM THE INDEPENDENT LIVING TO ASSISTED CARE WITHOUT LEAVING THE SITE. PHASE 1, THE ASSISTED LIVING & MEMORY CARE FACILITY PROPOSES A REVISION TO THE EXISTING APPROVED PROJECT FROM A MULTI - FAMILY RESIDENTIAL PROJECT TO A NON - SKILLED NURSING FACILITY TO CARE FOR SENIORS AND ALZHEIMERS PATIENTS. PHASE 2, THE INDEPENDENT LIVING PORTION OF THE PROJECT REVISES THE APPROVED 8 UNIT BUILDING. THESE UNITS WILL BE APARTMENT LIKE HOUSE FOR EXCLUSIVE USE TO RESIDENTS OVER THE AGE OF 65 AND WILL WORK IN CONJUNCTION WITH THE CARE FACILITY. SCOPE OF PROJECT INCLUDES: • REVISE PREVIOUSLY APPROVED PROJECT TO ALLOW FOR THE ASSISTED LIVING FACILITY AND INDEPENDENT LIVING. • RE- CONFIGURE THE PARKING LOT TO ALLOW FOR MORE PARKING OVERALL. THIS IS A MIXED USE CENTER SO THE PARKING WILL BE SHARED AMONGST THE DIFFERENT USES. • PROTECT THE EXISTING FIRE DEPARTMENT ACCESS FROM JAMES WAY TO ADJACENT PROJECT. • PROTECT THE EXISTING EASEMENTS FROM THE ADJACENT HOTEL THROUGH THIS PROPERTY TO JAMES WAY Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California 03/02/2015 P R O J E C T D A T A A0.1 DO NOT ENTER EMERGENCY VEHICLES ONLY MAX. HEIGHT = 13' -6" I ALL OTHERS EXIT LEFT O EXIT \ EXIT O EXIT THROUGH HOTELFOR HOTEL GUESTS ONLY ALL OTHERS EXIT TO JAMES WAY REFLECTORIZED SIGN OF PORCELAIN ENAMELED STEEL w/2 -318" GALV. STEEL BOLTS FASTENED THRU PIPE. I" BLACK LETTERS ON WHITE BACKGROUND DIRECTIONAL SIGNS EXISTING HOTEL -------------- OAK PARK ROAD nrrrtvvw Ivr vl onlvrt w�.n nvl� � I PER PLANNING MEETING 02/21/2006 PREVIOUSLY APPROVED SITE PLAN 1 I I I IEXISTING CHURCH I I I I I I I D� I rn I Nc c I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I II II I III I 1� I� ELIBERTY SAN LUIS BO PO, CAVE SAN LUIS OBISPO. CA 93401 9005:547,2240 ARRIS- STUDIO:COM PARKING FOR SHEPPEL 1 HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA 22 DESIGNATED PARKING SPACES j� i F c F m n EXISTING PARKING TO REMAIN PARKING FOR SHEPPEL 1 SHEPPELL 1 22 DESIGNATED PARKING SPACES j� PARKING FOR SHEPPE 2 KENNEDY FITNESS 22 DESIGNATED PARKING SPACES 11-11 (20 STANDARD 2 ACCESSIBLE) TOTAL EXISTING PARKING FOR KENNEDY NEW PARKING 58 DESIGNATED SPACES MULTI - FAMILY PARKING FOR ASSISTED LIVING 26 DESIGNATED PARKING SPACES 11 STANDARD 2 ACCESSIBLE 13 SHARED WITH HOTEL - SEE BELOW PARKING FOR MULTI- FAMILY 26 SPACES 20 DESIGNATE PARKING SPACES 20 SPACES (8 SINGLE GARAGES 12 DRIVEWAYS /GUESTS) j� NON - DESIGNATED SPACES 192 SPACES 44 PARKING SPACES 11-11 (41 STANDARD 3 ACCESSIBLE) EXISTING ACCESS EASEMENT TO REMAIN WITH MINOR ALTERATIONS EMERGENCY ACCESS EASEMENT TO PROVIDE FOR REQUESTED DIRECT ACCESS SHARED PARKING WITH HOTEL 13 SPACES SHARED WITH ASSISTED LIVING 3,690 S.F. FOR NIGHT USE ONLY STATISTICS EXISTING PARKING TO REMAIN Assisted Living, Memory Care and Ind e p e n d c,, t I.i c i n g Arroyo Grande, California SHEPPELL 1 22 SPACES SHEPPELL 2 22 SPACES KENNEDY FITNESS 58 SPACES NON - DESIGNATED 24 SPACES TOTAL EXISTING 126 SPACES NEW PARKING MULTI - FAMILY 20 SPACES GARAGE 8SPACES DRIVEWAY 8 SPACES GUEST 4 SPACES ASSISTED LIVING 26 SPACES NON - DESIGNATED 20 SPACES TOTAL NEW PARKING 66 SPACES TOTAL PARKING 192 SPACES Meadow Creek Assisted Living, Memory Care and Ind e p e n d c,, t I.i c i n g Arroyo Grande, California PREVIOUSLY APPROVED S I T E P L A N 01/26/2015 TRUENORTH o= E TS SCALE: 1" = 60' -0" 24x36 SHEET SCALE: 1" = 30' -0" A1.0 LID DRAINAGE FEATURES IN ORDER TO PROTECT THE NATURAL RESOURCES THAT ABUTS OUR PROJECT. OUR CONCEPT PROVIDE BREAKS IN THE CURB LINE THAT WOULD ALLOW WATER TO SHEET FLOW ACROSS THE PAVING AND ENTER INTO A LANDSCAPED AREA THAT WOULD HAVE A MIX OF DRAINAGE MATERIAL AND NATIVE PLANTINGS. THIS WOULD ALLOW WATER TO BE CLEANSED NATURALLY PRIOR TO ENTERING THE WATER TABLE AND RE- CHARGING THE GROUNDWATER LEVELS. NATIVE LANDSCAPING PARKING LOT L.I.D. CONCEPTS OAK PARK ROAD LOW IMPACT DEVELOPMENT OPEN SPACE DRAINAGE FEATURE APPROVED TOP OF BANK LOCATION PER PLANNING MEETING 02/21/2006 PROPOSED SITE PLAN L Arris 1306 JOHNSON AVENUE S AN LUIS OBISPO. CA 93401 IBM 47.2240 ARRIS- STUDIO.COM Creek MEDICAL Arroyo Grande, California L E G E N D OFFICE PARKING FOR SHEPPEL 1 MEDICAL 22 DESIGNATED PARKING SPACES s PARKING FOR SHEPPEL 2 OFFICE I a I (20 STANDARD 2 ACCESSIBLE) SHEPPEL 2 PARKING FOR KENNEDY CHURCH 58 DESIGNATED SPACES PARKING FOR ASSISTED LIVING I 26 DESIGNATED PARKING SPACES (24 STANDARD 2 ACCESSIBLE) I j� NON - DESIGNATED SPACES 12 (44 STANDARD 3 ACCESSIBLE) � I KENNEDY HOTEL ACCESS EASEMENT i — CLUB FITNESS STRAIGHTENED TO ALLOW FOR TRUCK ACCESS - - - - -- 2 18 NON - DESIGNATED SHARED SPACES — --------- 14 I I EXISTING «- I HOTEL ' I SHEPPELL 1 22 SPACES 6 B 7 - -------------- NON - DESIGNATED 25 SPACES tt TOTAL EXISTING 127 SPACES I NEW PARKING MEADOW CREEK ASSISTED LIVING 26 SPACES I j I NON - DESIGNATED 40 SPACES INDEPENDENT LIVING TOTAL NEW PARKING 66 SPACES I I I I I I I I I I I I I I I I I � I I I I I I I I I I I I I I I I � I TOTAL PARKING 193 SPACES PHASE 2 — 1 TRASH I 1- fV TRASH 1 I 24 I EADOW CREEK CARE FACILITY I �t7 6 ISSISTED LIVING & MEMORY CARE 1 1 -- -------------- -- •---------- I - - - -- - -- --- -- - ASSIST - - -- - - -- - -- I 1 o <� b. N AL HEIMER M FINI PATIO o M - -- GARDEN LOW IMPACT DEVELOPMENT OPEN SPACE DRAINAGE FEATURE APPROVED TOP OF BANK LOCATION PER PLANNING MEETING 02/21/2006 PROPOSED SITE PLAN L Arris 1306 JOHNSON AVENUE S AN LUIS OBISPO. CA 93401 IBM 47.2240 ARRIS- STUDIO.COM Creek LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA 7 Arroyo Grande, California Meadow Creek 7 Arroyo Grande, California L E G E N D PARKING FOR SHEPPEL 1 01/26/2015 22 DESIGNATED PARKING SPACES I PARKING FOR SHEPPEL 2 22 DESIGNATED PARKING SPACES I (20 STANDARD 2 ACCESSIBLE) I E X I S T I N G PARKING FOR KENNEDY CHURCH 58 DESIGNATED SPACES PARKING FOR ASSISTED LIVING I 26 DESIGNATED PARKING SPACES (24 STANDARD 2 ACCESSIBLE) I j� NON - DESIGNATED SPACES 47 PARKING SPACES (44 STANDARD 3 ACCESSIBLE) � I HOTEL ACCESS EASEMENT 1 I MODIFIED ACCESS EASEMENT, 1 STRAIGHTENED TO ALLOW FOR TRUCK ACCESS II I j SHARED PARKING WITH HOTEL 18 NON - DESIGNATED SHARED SPACES I I (17 STANDARD 1 ACCESSIBLE) v 1 STATISTICS II m EXISTING PARKING TO REMAIN N I SHEPPELL 1 22 SPACES I i SHEPPELL 2 22 SPACES KENNEDY FITNESS 58 SPACES NON - DESIGNATED 25 SPACES II i D TOTAL EXISTING 127 SPACES I NEW PARKING I I ASSISTED LIVING 26 SPACES I j I NON - DESIGNATED 40 SPACES I I TOTAL NEW PARKING 66 SPACES I I I I I I I I I I I I I I I I I � I I I I I I I I I I I I I I I I � I TOTAL PARKING 193 SPACES Meadow Creek Assisted Living, LNleroory Care a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California PROPOSED SITE PLAN 01/26/2015 TRUE NORTH 11 xJ17SHEET SCALE: I" = 60' -0" 24x36 SHEET SCALE: 1" = 30' -0" A 1 0 ■ EXISTING HOTEL OPEN SPACE PREVIOUSLY APPROVED TRUCK TURNING STUDY EXISTING HOTEL MEADOW CREEK INDEPENDENT LIVING PHASE 2 KENNEDY CLUB FITNESS I -- li I DEC - - - - -- _ � TRASH I I - ---------- --------- i MI ADOW CREEK CARE FACILITY I A SISTED LIVING & MEMORY CARE I I ---- - - - - ----------- ------- I -- - - - - -- ---- - - - - -- ------------ OPEN SPACE PROPOSED TRUCK TURNING STUDY II I I I �ANUARY TRUCK TURNING RADIUS AS APPROVED PLANNING COMMISSION ON 7TH, 2014 I I I I I I I i I TRUCK TURNING RADIUS IMPROVED I OVER PREVIOUSLY APPROVED PLAN WITH STRAIGHT DIRECT ACCESS D I I � I I rn I V1 I c I I G I I I I I I ELIBERTY 1 96ioHNSONAVENUE SIS OBISPO, CA 93401 8AN LU05472240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGU ERA ST. SUITE 130 SAN LUIS OBISPO, CA Arroyo Grande, California TRUCK TURNING STUDY Meadow Creek Assisted Living, Memory Care a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California TRUCK TURNING STUDY 01/26/2015 TRUE NORTH I 1 xJ17cSHEET SCALE: I "= 60' -0" 2406 SHEET SCALE: 1" = 30' -0" A1.2 E X I S T I N G - - - - - - - - - H 0 T E L ----------- 1i M AOOW C�RE V K UqTl- A ILY --------------- ---------------------- - ----------- ---- TRASH DARKER COLOR INDICATES AREA OF CONCERN MEADOW CREEK CARE FACILITY ASSISTED [IVING & MEMORY CARE M ............ ----------------------------------------- ----------- ....... . ............ ------------------------------------ -------------------- ----------------------- .............. .............. ------------ OPEN SPACE PREVIOUSLY APPROVED ACCESS EASEMENT EXHIBIT KENNEDY CLUB FITNESS E X I S T I N G I - ---------------- H O T E L MEADOW CREEK INDEPENDENT LIVING PHASE2 Z TRASH ------------------------ -- - II - -- — — - -- - - - - -r - - - - - - - - - - - -- - - TRASH I > MI ADOW CREEK CARE FACILITY Sri ST ED LIVING & MEMORY CARE I M ------------- - ------ -------------- --------- -- ------------------------------------ --------- — — -- — -- — -- OPEN SPACE PROPOSED ACCESS EASEMENT EXHIBIT NO BUILDING ENCROACHMENT & PARKING PRESERVED orris STUDIO ARCHITECTS 1'26�JOHNSON AV'N J ` S= IS OBISPO, CA 93401 A'R" sTD'o co 1111111 A 1-1 Alll%'� LIBERTY H E A LT H 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA L E G E N D ACCESS EASEMENT 28' NON - EXCLUSIVE ACCESS EASEMENT APPURTENANT To PARCEL A, 31 PM 47 AND PARCELS 1, 2 & 3, 32 PM 31 ACCESS EASEMENT 25' NON - EXCLUSIVE ACCESS EASEMENT FROM CASA GRANDE ASSOC. TO LEO ROSENGARTH ACCESS EASEMENT 25' NON - EXCLUSIVE ACCESS EASEMENT FROM CASA GRANDE ASSOC. TO LEO ROSENGARTH Meadow Creek' Assisted Living, Memory Car a n d I n d e p e n d e n t L i v i n g - Arroyo Grande, California 01/26/2015 ACCESS EASEMENT TRUE NORTH EXHIBIT 11 x17 SH EET SC ALE: I "= 60' -0" 24x36 SHEET SCALE: 1 30'-0 A1.3 PREVIOUSLY APPROVED LANDSCAPE AREAS EXISTING HOTEL I TRASH� I I I MEADOW CREEK INDEPENDENT LIVING PHASE 2 I -- KENNEDY I II CLUB FITNESS I I I TRASH I I I I M ADOW CREEK CARE FACILITY A SISTED LIVING 84 MEMORY CARE I I PROPOSED LANDSCAPE AREAS I I D M IN I I I I > I M Vf I I D 1 I Arris STUDIO ARCHITECTS SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM A s s i s t e d L i v i n g, Memory Car c a n d I n d e p e n d e n t L i v i n g LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA STATISTICS PREVIOUS LANDSCAPE CALCULATIONS ASSISTED LIVING 10,700 S.F. MULTI - FAMILY 4,295 S.F. TOTAL LANDSCAPE AREA 14,995 S.F. PROPOSED LANDSCAPE CALCULATIONS ASSISTED LIVING 10,425 S.F. INDEPENDENT LIVING 4,200 S.F. TOTAL LANDSCAPE AREA 14,625 S.F. TOTAL DIFFERENCE 370 S.F. LESS Meadow Creek A s s i s t e d L i v i n g, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California LANDSCAPED AREA TRUE R TRUE NTH T H CALCULATIONS 0 5 11x17 SHEET SCALE: 1 "= 60' -0" A ■ 24x36 SHEET SCALE: 1" = 30' -0" OAK PARK ROAD 12 MEDICAL OFFICE MEDICAL I SHEPPELI OFFICE I SHEPPEL 2 _ I 9 ® — KENNEDY - CLUB FITNESS 13 _ 10 - -- EXISTING - HOTEL 8 SPACES TO BE REMOVED - - - - - -- I - 16 I — 14T — 'EXISTING DIRT AREA , I r% 21 -- _� --- - -- \�-- — - - — cc - �&------------- - -- �L-� I "- J;L----- --- + 19 SPACES TO BE REMOVED TRASH I I I I I I I I ZEXISTING DIRT AREA I I I I I I I I -- -- -- -- �- -- -- -- -- -- -- ' OPEN SPACE PARKING ANALYSIS: EXISTING SITE PLAN I� I I I I I IEXISTING CHURCH I I I I I I I t... I D m IN I � II I I I I I I I I I I I I I F StUDI 'IIS 0 ARCHITECTS SAN J0HNSO AVENUE PO. CA CA 93401 SAN LUIS OBISPO, SM 47,2240 ARRIS- STUDIO.COM Assisted Living, LNlernory Care a n d I n d e p e n d e n t L i v i n g LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA PARKING ANALYSIS EXISTING SITE PLAN PARKING CALCULATIONS TOTAL EXISTING 146 SPACES F-1 To BE REMOVED 27 SPACES REMAINING 119 SPACES Meadow Creek Assisted Living, LNlernory Care a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California PARKING ANALYSIS EXISTING SITE PLAN 03/02/2015 TRUENORTH 11 xJ17SHEET SCALE: I" = 60' -0" 24x36 SHEET SCALE: 1" = 30' -0" A1.5 MEDICAL OFFICE SHEPPEL 2 p O 9 b b 13 EXISTING HOTEL I � TRASH I = la 4- -I- u� 7TT 9I I I I 1511 II MEADOW CREEK INDEPENDENT LIVING PHASE 2 OAK PARK ROAD ti 126 P° 16 I' 11< 14 AA C1'11 e' A 1 KENNEDY CLUB FITNESS I I I EADOW CREEK CARE FACILITY SSISTED LIVING & MEMORY CARE - - - - - -- --- - - - - -- - - -- OPEN SPACE PARKING ANALYSIS: PROPOSED SITE PLAN ELIBERTY 197 JOHNSON AVENUE SAN LU IS OBISPO. CA 93401 605:547.2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA V1 '' i TOTAL EXISTING 119 SPACES TRUEN2015 TRUE NORTH I i 27 SPACES I � I ❑REPLACEMENT THESE REPLACE THE SPACES THAT WERE ON MR. SHEPPEL'S I PROPERTY & WERE REMOVED FOR THIS PROJECT. THIS GETS I I I THE PROJECT BACK TO THE NUMBER OF EXISTING SPACES INEW SPACES 29 SPACES THESE SPACES FACILITY AND I DEPENDENT LY CARE INDEPENDENT LIVING DEVELOPMENTS r I I I EADOW CREEK CARE FACILITY SSISTED LIVING & MEMORY CARE - - - - - -- --- - - - - -- - - -- OPEN SPACE PARKING ANALYSIS: PROPOSED SITE PLAN ELIBERTY 197 JOHNSON AVENUE SAN LU IS OBISPO. CA 93401 605:547.2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA V1 I I I I I IEXISTING CHURCH I I I I I I I I t... I D I 'T' I PARKING CALCULATIONS V1 PARKING ANALYSIS PROPOSED SITE PLAN TOTAL EXISTING 119 SPACES TRUEN2015 TRUE NORTH 11 x517 SHEET SCALE: 1" = 60' -0" 24x36 SHEET SCALE: 1 " = 30' -0" D 27 SPACES I � I ❑REPLACEMENT THESE REPLACE THE SPACES THAT WERE ON MR. SHEPPEL'S I PROPERTY & WERE REMOVED FOR THIS PROJECT. THIS GETS I I I THE PROJECT BACK TO THE NUMBER OF EXISTING SPACES INEW SPACES 29 SPACES THESE SPACES FACILITY AND I DEPENDENT LY CARE INDEPENDENT LIVING DEVELOPMENTS TOTAL SHARED PARKING 175 SPACES ®NEW HOTEL SPACES 18 SPACES THESE SPACES SHALL BE DEDICATED TO THE ADJACENT HOTEL TOTAL PARKING ON SITE 193 SPACES Meadow Creek Assisted Living, Memory Care a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California PARKING ANALYSIS PROPOSED SITE PLAN TRUEN2015 TRUE NORTH 11 x517 SHEET SCALE: 1" = 60' -0" 24x36 SHEET SCALE: 1 " = 30' -0" A1.6 I I , I I I I I I I-- -- --------- ------ II / LOBBY / I LAUNDRY, MAINTENANCE & STORAGE / PHASE 2 / N 20 °1504' E 185.00' AINING WALL FOR LIGHT WELL F- RETAINING WALL FOR LIGHT WELL CONCEPTUAL SITE & BASEMENT PLAN I I I II I 91 I � I I I 1 Arras STUDID ARCHITECTS JOHNSO AVENUE SAN LUIS OBISPO PO, CA CA 93401 SAN e05547,240 ARRIS STUDIO.COM Assisted L i v i n g, M e m o r y Car c a n d I n d e p e n d e n t L i v i n g ELEC L E G E N aw I 1 2 3 4 5 6 7 g 9 LAUND. 10 11 12 KITCHEN MEMORY CARE SUITES I II i I o MECH UNIT TYPE A -2 W I � MEMORY CARE - SINGLES I II UNIT TYPE B -1 I I >- DOOR D UNIT TYPE B -2 :ACCORDION I ALZHEIMER ASSISTED LIVING - SINGLES i, m I H ALZHEIMER E DINING 26 25 24 23 22 21 20 T 19 18 ACTIVITY 17 16 15 14 13 I I OFFICE I I L ¢_ ___________o__ ___ __o_____.___.._o.....n q_____ — __4a____.P _____o___ ______ _o____________ 'I p - 17 ¢____________ o__ _________________o______.___._n I STAIIRS &ELEVATOR I I �1 I RESTROOMS I I I I I — ALZHEIMER I , I -1 PATIO I I 1 M -- GARDEN a I �1 I Z WALKWAY, PATIOS AND DECKS ASSISTED LIVING - I – – PHASE 2: 1- BEDROOM UNIT GARDEN — - -- -- — -- -- — -- N 20 °15'04" E 178.00' — — -- -- -- -- -- -- - -= N 20 °15'04" E 257.00' — L.I.D. FILTRATION FENCE AT PROPERTY LINE SINGLES 20 UNITS I SUITES 6 UNITS I I ICI FEATURE MEANDERING MULTI - PURPOSE LINE OF DECK /BUILDING ABOVE APPROVED TOP OF BANK LOCATION DG PATH THRU NATURE PRESERVE GATE IN FENCE PER PLANNING MEETING 02/21/2006 BY APPLICANT — OPEN SPACE — — CONCEPTUAL SITE & BASEMENT PLAN I I I II I 91 I � I I I 1 Arras STUDID ARCHITECTS JOHNSO AVENUE SAN LUIS OBISPO PO, CA CA 93401 SAN e05547,240 ARRIS STUDIO.COM Assisted L i v i n g, M e m o r y Car c a n d I n d e p e n d e n t L i v i n g LIBERTY H EALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA L E G E N I I 1t I 1 Assisted L i v i n g, M e m o r y Car c a n d I n d e p e n d e n t L i v i n g I L E G E N I I 1t CONCEPTUAL SITE & 01UEN.115 TRUE NORTH BASEMENT PLAN 11x17 SHEET SCALE: I "= 40' -0" A2.0 24x36 SHEET SCALE: 1" = 20' -0" UNIT TYPE A -1 I I 1 � MEMORY CARE SUITES I II i I I UNIT TYPE A -2 l MEMORY CARE - SINGLES I II UNIT TYPE B -1 I I ASSISTED LIVING - SUITES D UNIT TYPE B -2 zj I ASSISTED LIVING - SINGLES i, m I H I E UNIT TYPE B -3 ASSISTED LIVING - DOUBLES I J� ACTIVITY 'I E] CIRCULATION I STAIIRS &ELEVATOR I I �1 I RESTROOMS I I I I I OFFICE I , I -1 SERVICE AREAS I I 1 UTILITY, KITCHEN &OTHER SERVICE AREAS N a1 OUTDOOR SPACES I �1 I Z WALKWAY, PATIOS AND DECKS I INDEPENDENT LIVING UNIT I – – PHASE 2: 1- BEDROOM UNIT ROOM COUNT INDEPENDENT LIVING 0 UNITS MEMORY CARE 26 UNITS I SINGLES 20 UNITS I SUITES 6 UNITS I I ICI Meadow Creek Assisted L i v i n g, M e m o r y Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California CONCEPTUAL SITE & 01UEN.115 TRUE NORTH BASEMENT PLAN 11x17 SHEET SCALE: I "= 40' -0" A2.0 24x36 SHEET SCALE: 1" = 20' -0" / - -- OPEN SPACE — CONCEPTUAL SITE & FIRST FLOOR PLAN I � I I I III I I I I I I I I I I I I I I I I I I I I I I it I I I I I I I I D I I I I I T I I I I I 1 L I I � D ELIBERTY SAN JOHNSON AVENUE CA UE SAN LUIS OBISPO. CA 93401 905:547,2240 ARRIS- STUDIO.COM H EALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA UNIT TYPE A -2 MEMORY CARE - SINGLES L E G E N D LM UNIT TYPE A -1 MEMORY CARE - SUITES Arroyo Grande, California UNIT TYPE A -2 MEMORY CARE - SINGLES UNIT TYPE B -1 ASSISTED LIVING - SUITES EUNIT TYPE B -2 ASSISTED LIVING - SINGLES UNIT TYPE B -3 ASSISTED LIVING - DOUBLES ACTIVITY E] CIRCULATION STAIIRS & ELEVATOR RESTROOMS E] OFFICE E] SERVICE AREAS UTILITY, KITCHEN &OTHER SERVICE AREAS E] OUTDOOR SPACES WALKWAY, PATIOS AND DECKS E] INDEPENDENT LIVING UNIT PHASE 2: 1- BEDROOM UNIT ROOM COUNT INDEPENDENT LIVING 8 UNITS ASSISTED LIVING 19 UNITS SINGLES 1 UNITS SUITES 18 UNITS Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California CONCEPTUAL SITE & TRUEN2015 TRUE NORTH FIRST FLOOR PLAN 11 x 17 SHEET SCALE: 1 "= 40' -0" A2.1 24x36 SHEET SCALE: 1" = 20' -0" CONCEPTUAL SECOND FLOOR PLAN Arris STUDIO ARCHITECTS SAN JOHNSON AVENUE CA UE SAN LUIS OBISPO. CA 93401 905:547,2240 ARRIS- STUDIO.COM UNIT TYPE A -1 MEMORY CARE - SUITES LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA UNIT TYPE A -2 MEMORY CARE - SINGLES L E G E N D LM UNIT TYPE A -1 MEMORY CARE - SUITES Arroyo Grande, California UNIT TYPE A -2 MEMORY CARE - SINGLES UNIT TYPE B -1 ASSISTED LIVING - SUITES EUNIT TYPE B -2 ASSISTED LIVING - SINGLES E] UNIT TYPE B -3 ASSISTED LIVING - DOUBLES E] ACTIVITY E] CIRCULATION STAIIRS & ELEVATOR �_M; RESTROOMS E] OFFICE E] SERVICE AREAS UTILITY, KITCHEN &OTHER SERVICE AREAS E] OUTDOOR SPACES WALKWAY, PATIOS AND DECKS E] INDEPENDENT LIVING UNIT PHASE 2: 1- BEDROOM UNIT ROOM COUNT INDEPENDENT LIVING 8 UNITS ASSISTED LIVING 25 UNITS SINGLES 1 UNITS SUITES 24 UNITS Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California C O N 01/26 C E P T U A L 2015 TRUE NORTH SECOND FLOOR PLAN 11x17 SHEET SCALE: 1— 40' -0" A2.2 24x36 SHEET SCALE: 1" = 20' -0" 14' -0" EALZHEIMER: PRIVATE STUDIO UNIT TYPE A -1 299 S.F. Irl Wei ASSISTED UNIT TYPE B -1 LIVING: STUDIO 342 S.F CONCEPTUAL UNIT PLANS_ 23' -0" BEDROOM LIVING l - - -- � LINE OF SOFFIT BATHROOM W.I.C. ALZHEIMER_ PRIVATE 1 BED + LIVING UNIT TYPE: A -2 389 S.F. 0 00 ASSISTED LIVING: 1 BED + LIVING UNIT TYPE: B -2 563 S.F. ELIBERTY SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 805:547.2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA ')7'-A E INDEPENDENT LIVING - PHASE 2 652 S.F. Meadow Creek Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 U N I T P L A N SA 11 x17 SHEET SCALE: 1/8 " =1' -0" AL.3 24x36 SHEET SCALE: 114" = 1' -0" TRUE NORTH VIEW LEGEND AERIAL PERSPECTIVE LOOKING AT FRONT ENTRY CONCEPTUAL PERSPECTIVES - CARE FACILITY Arris STUDIO ARCHITECTS SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Meadow Creek Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 P E R S P E C T I V E S 11x17 SHEET SCALE: 1— 40' -0" A-3.0 24x36 SHEET SCALE: 1" = 20' -0" PERSPECTIVE LOOKING FROM JAMES WAY TOWARDS CREEK WALK CONCEPTUAL PERSPECTIVES - CREEK WALK r r 9 rj q � L VIEW LEGEND m VIEW TRUE NORTH Arris SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 P E R S P E C T I V E S 7A- 3.1 PERSPECTIVE LOOKING TOWARDS JAMES WAY CONCEPTUAL PERSPECTIVES - CREEK WALK TRUE NORTH LX arras SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g LIBERTY -H H E A L 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Meadow Creek Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 P E R S P E C T I V E S A -3.2 NO- VIEW LEGEND D 3 D TRUE NORTH -r PERSPECTIVE LOOKING ALONG FRONT FROM CARE FACILITY CONCEPTUAL PERSPECTIVES - INDEPENDENT LIVING Arris STUDIO ARCHITECTS SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g LIBERTY H EALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Meadow Creek Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 P E R S P E C T I V E S A -3.3 NO- VIEW LEGEND D 3 D TRUE NORTH PERSPECTIVE LOOKING ALONG REAR FROM PARKING LOT CONCEPTUAL PERSPECTIVES - INDEPENDENT LIVING Arris �' °' °�'�5 � SANJOHNSON AVENUE SAN LUIS OBISPO, CA 93401 3M 47,ss40 ARRIS- STUDIO.COM LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Meadow Creek Assisted Living, Memory Care a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 03/02/2015 P E R S P E C T I V E S A -3.4 T+.03 3—.'-4" T.O. ROOF WEST ELEVATION (FRONT) U ill Wall A KEY PLAN +26-6" E *B TRUE NORTH SEE (I) ON SHEET A4'2 +41' -2 "� �v B NORTH ELEVATION (FACING JAMES WAY) D CONCEPTUAL EXTERIOR ELEVATIONS - CARE FACILITY It 0' -0" FIRST FLOOR F.F. ELIBERTY SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Meadow Creek Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 EL E V A T I O N S 11x17 SHEET SCALE: 1- 40' -0" A 4.0 24x36 SHEET SCALE: 1" = 20' -0" SEE T ON SHEET A4.3 EAST ELEVATION (REAR) U D� 1 1 �' r 1C.' I C I � I KEY PLAN t C TRUE NORTH SOUTH ELEVATION v CONCEPTUAL EXTERIOR ELEVATIONS - CARE FACILITY Arris STUDIO ARCHITECTS SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Meadow Creek Assisted Living, Memory Car c a n d Ind e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 EL E V A T I O N S 11x17 SHEET SCALE: 1- 40' -0" A-4.1 24x36 SHEET SCALE: 1" = 20' -0" 41' -2" T.O. CUPOLA 0 34' -2" T.O. ROOF 33' -4" T.O. ROOF 010' -0" 6-8" 14' -0" 0SECOND FLOOR FINISH FLOOR 08' -0" F01` RST FLOOR FINISH FLOOR I ENLARGED ELEVATION @ PORTE COCHERE / MAIN ENTRY ENLARGED EXTERIOR ELEVATIONS - CARE FACILITY LIGHTWEIGHT CONCRETE ROOF TILE CEMENT FIBER SHINGLES OR SIDING CEMENT FIBER TRIM - 8" EXTERIOR CEMENT PLASTER CEMENT FIBER TRIM - 4" CEMENT FIBER LAP SIDING CEMENT PLASTER TRIM BAND EXTERIOR CEMENT PLASTER CEMENT FIBER TRIM - 4" ALUMINUM DOOR & WINDOWS ELDORADO STONE RIVER ROCK KEY PLAN IN ELIBERTY SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA I -------------------- - - -- � E Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, I -------------------- - - -- � I 1 11 m II f I I r TRUE NORTH Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California E N L A R G E D 01/26/2015 EL E V A T I O N S 11x17 SHEET SCALE: 1— 40' -0" 24x36 SHEET SCALE: 1" = 20' -0" A-4.2 WOOD FASCIA Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g WOOD OUTLOOKER - Nk' E N L A R G E D 01/26/2015 EL E V A T I O N S 11x17 SHEET SCALE: 1 "= 40' -0" A 4.3 24x36 SHEET SCALE: 1" = 20' -0" SHED ROOF AWNING EXTERIOR CEMENT PLASTER TRIM EXTERIOR CEMENT PLASTER CEMENT FIBER TRIM 01 CEMENT FIBER - LAP SIDING METAL RAILING EXTERIOR CEMENT PLASTER CEMENT FIBER TRIM ALUMINUM WINDOWS i * ■ lam- ENLARGED ELEVATION @REAR DECK r f T - w 41'-2" r ENLARGED EXTERIOR ELEVATIONS - CARE FACILITY =1 4- - 1.I W-1.+�2rt? ar I I arras A� STUDIO ARCHITECTS SA JOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 805547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g LIBERTY _H H E A L 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA California 33' -4" LIGHTWEIGHT CONCRETE ROOF TILE CEMENT FIBER SHINGLES OR SIDING PAINTED HALF ROUND GUTTERS WOOD OUTLOOKERS CEMENT FIBER - LAP SIDING 14' -0" SECOND FLOOR FINISH FLOOR EXTERIOR CEMENT PLASTER ALUMINUM WINDOW 4" PLASTER TRIM CEMENT FIBER TRIM - BOARD & BATTEN 0' -0" AL FIRST FLOOR FINISH FLOOR CEMENT PLASTER TRIM BAND (10'- $ EXTERIOR CEMENT PLASTER B.O. OVERHANG Ih T.O. STONE BASE STONE BASE - ELDORADO STONE RIVER ROCK w/ PRECAST CONC. CAP 12' -0" (0' 0 ") $ BASEMENT FINISH FLOOR KEY PLAN F TRUE NORTH Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California E N L A R G E D 01/26/2015 EL E V A T I O N S 11x17 SHEET SCALE: 1 "= 40' -0" A 4.3 24x36 SHEET SCALE: 1" = 20' -0" WOOD OUTLOOKERS CEMENT FIBER SHINGLES OR SIDING — LIGHTWEIGHT CONCRETE ROOF TILE 12 3.5 F----.d - -. WEST ELEVATION (FRONT) A CEMENT FIBER TRIM ALUMINUM DOOR & WINDOWS — EXTERIOR CEMENT PLASTER --7\ DECORATIVE SERVICE DOOR DSCAPED RECESS NORTH ELEVATION (RIGHT SIDE) D CONCEPTUAL EXTERIOR ELEVATIONS - INDEPENDENT LIVING +31' -2" T.O ROOF +16-0'. 5-0" FINISH FLOOR 0' -0" ✓ATOR LOBBY , -IT. o STUDIO R S JOHNSON AVENUE SAN LUIS OBISPO, CA 93401 905:547,2240 ARRII .... STUDIO.COM Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g LIBERTY H EALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA KEY PLAN E TRUE NORTH Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 01/26/2015 EL E V A T I O N S L4xI7 SHEET SCALE: = 20' -0" A-4.4 24x36 SHEET SCALE: 1" = 10' -0" MOUNTAIN LEDGE EAST ELEVATION (REAR) C SOUTH ELEVATION (LEFT SIDE) v CONCEPTUAL EXTERIOR ELEVATIONS - INDEPENDENT LIVING Arris STUDIO ARCHITECTS SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 905:547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v is n d I n d e p e n d e n t ng LIBERTY HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA C =1PL---j D� l 1 I KEY PLAN TRUE NORTH Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v is n d I n d e p e n d e n t ng Arroyo Grande, California C O N C E P T U A L 01/26/2015 EL E V A T I O N S 11 x17 SHEET SCALE: 1-20'-0" A 4 SSHEET SCALE: A 4 5 24x36 SHEET SCALE: 1" = 10' -0" CARE FACILITY I I � PROPERTY LINE TOP OF BANK PROPOSED PEDESTRIAN TRAIL--\ j I I CENTER OF CREEK ,J I I SITE SECTION B TYPICAL SECTION SHOWING LIGHT WELL LIGHT WELL DASHED OUTLINE OF SHEPPEL 1 (MEDICAL OFFICE) b APPROXIMATE HEIGHT OF EXISTING ROOF (SHEPPEL 2) SHEPPEL 2 (MEDICAL OFFICE) I I cy INDEPENDENT LIVING DASHED OUTLINE OF KENNEDY CLUB FITNESS CARE FACILITY _ ....... ....... .................................. ............................... .......�: ... .: :�............................: 1.......� I I PROPERTY LINE I I I LINE OF EXISTING I TOP OF BANK i GRADE @ PARKING LOT PROPOSED PEDESTRIAN TRAIL I I I CENTER OF CREEK I -- I I I I I I I SITE SECTION A ~ PROPOSED CONCEPTUAL SITE SECTION 7EXISTING GRADE SITE SECTION A -------- - - - - -- SHEPPEL 2 INDEPENDENT LIVING ECTION B SITE SECTION B .J SITE — . „ SECTION A RETAINING WALL OAK PARK SHEPPEL 1 ,�> _ -- KENNEDY FITNESS r=sp f--I AG CARE T 4— D rn N I D < I I I I I I I I I I I TRUE NORTH I Sorris T ° °'UAR °RRE °TS 1306 JOHNSONAVENUE SAN LU IS OBISPO. CA 93401 805:547,2240 ARRIS- STUDIO.COM Assisted Living, Memory Car c a n d Ind e p e n d e n t L t v i n g LIBERTY H EALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA PROPERTY LINE SIDEWALK OAK PARK I� EXISTING RETAINING WALL I Meadow Creek Assisted Living, Memory Car c a n d Ind e p e n d e n t L t v i n g Arroyo Grande, California C O N C E P T U A L 02/20/2015 S I T E S E C T I O N 11 x17 SHEET SCA 11 "= 40' -0" A-5 0 24x36 SHEET SCALE: 1" = 20' -0" PROPERTY LINE I I 2� FINISH FLR 103.00' 1ST FINISH FLR 89.00'' T.O. 2N2 FLOOR DASH LINE INDICATES FINISH GRADE AT DRIVE AISLE 1ST FLOOR --------- - - - - -- - - - -- BASEMENT SITE SECTION C PREVIOUSLY APPROVED PROPERTY LINE 1 2N —D FINISH FLR I C i nj nn' BASEMENT Amod 77.00' SITE SECTION C L.► PROPOSED CONCEPTUAL SITE SECTIONS T.O. Sl 122.33 I o> I No M (� ■ r It ■����r■i�11r ■ ■�� ■��r ■ ■l..s I •• OF TRUE .. KEY PLAN .� JAMES WAY JAMES WAY D I M N I D � I I ELIBERTY SAJOHNSON AVENUE SAN AN LUIS OBISPO, CA 93401 9001 47,2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California Meadow Creek Assisted Living, Memory Car c a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L 02/20/2015 S I T E S E C T I O N �'24.1'1 SHEET SCAL�120. A 5 SHEET SCAL ST — . — . - - T.O. STRUCTURE 123.83' 1LT FINISH FLR GA AGE 99,50' GARAGE F.S. - - -- 90.25' 'DASH LINE INDICATES FINISH GRADE AT DRIVE AISLE 0 SITE SECTION D PREVIOUSLY APPROVED 2ND FLOOR M I 1ST FLOOR BASEMENT _-- - - - - -- DASH LINE INDICATES FINISH GRADE AT DRIVE AISLE SITE SECTION D 1./ PROPOSED CONCEPTUAL SITE SECTIONS SITE SECTION D C s� AG CARE I I I ° I TOP OF BAN I I I I I KEY PLAN TRUE NORTH ELIBERTY 197 JOHNSON AVENUE SAN LU IS OBISPO. CA 93401 805:547,2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA RETAINING WALL C O N C E P T U A L S I T E S E C T I O N 02/20/2015 OAK PARK 1 1x17 SHEET SCALE: 1 "= 40' -0" 24x36 SHEET SCALE: 1" = 20' -0" T.O. STRUCTURE 122.12' SHEPPEL 1 2N —D FINISH FLR SHEPPEL 2 I I 105.45' D M 1ST FINISH FLR a o KENNEDY LOBBYFINISH4 L I 89.00' — FITNESS y BASEMENT 84.25' INDEPENDENT I I I I LIVING I SITE SECTION D C s� AG CARE I I I ° I TOP OF BAN I I I I I KEY PLAN TRUE NORTH ELIBERTY 197 JOHNSON AVENUE SAN LU IS OBISPO. CA 93401 805:547,2240 ARRIS- STUDIO.COM HEALTH 3480 S. HIGUERA ST. SUITE 130 SAN LUIS OBISPO, CA Arroyo Grande, California Meadow Creek Assisted Living, Memory Care a n d I n d e p e n d e n t L i v i n g Arroyo Grande, California C O N C E P T U A L S I T E S E C T I O N 02/20/2015 1 1x17 SHEET SCALE: 1 "= 40' -0" 24x36 SHEET SCALE: 1" = 20' -0" A 5.2 111 Preliminary Plant Materials List Broad Leaf Evergreen Trees WUCOLS Rating Drought - tolerant Screen Shrubs Jacaranda mimosifolia /Jacaranda M W Ceanothus spp. /California Lilac Melaleuca quinquenervia /Cajeput Tree L Photinia fraseri /(no common name) Tristania conferta /Brisbane Box L Rosmarinus officinalis /Rosemary Deciduous Trees Acer platanoides /Norway Maple Tree M Platanus acerifolia /London Plane Tree M Fraxinus oxycarpa 'Raywood' /Raywood Ash Tree M Pyrus calleryana /'Bradford' Ornamental Pear M 0 Accent Trees Arbutus 'Marina' /Strawberry Tree L Vft Cassia leptophylla /Golden Medallion Tree L Lagerstroemia indica /Crape Myrtle L Drought Tolerant Sceen Shrubs (e.g. Ceanothus, Heteromeles, Ph( LID - Bioswale See Page L2.0 Top of Bar Ril (e. Set (e.g. Quercus agrifolia) WUCOLS Rating Spreading Ground Cover WUCOLS Rating L Ea Baccharis pilularis 'Twin Peaks' /Dwarf Coyote Brush L M Ceanothus 'Yankee Point' /California Lilac L L Cistus salvifolia /Sageleaf Rockrose L Lavandula 'Mundstead' /Lavender L Accent Shrubs, Grasses, and Succulent Calamagrastus 'Karl Foerster' /Feather Reed Grass L Rosmarinus officinalis /Rosemary L Phormium tenax `Atropurpurea' /New Zealand Flax L Senecio mandraliscae /(no common name) L Agave attenuata /Foxtail Agave L Shrubs (shady locations) Clivia miniata /Kaffir Lily M Loropetalum chinense /Fringe Flower L Drought Tolerant Shrubs (sunny locations and color borders) Callistemon 'Little John' /Dwarf Bottlebrush L Lavandula spp. /Lavender L Phormium tenax 'Maori Queen'/ New Zealand Flax L Raphiolepis indica /Indian Hawthorn L Native Riparian Corridor Evergreen Trees Quercus agrifolia /California Live Oak Deciduous Trees Aesculus californica /California Buckeye Platanus racemosa /California Sycamore Populus fremontii /Cottonwood Shrubs Arctostaphylos "Howard McMinn " / Manzanita Ceanothus 'Centennial' /California Lilac Plants along the edges of City See images on Page L2.0 walking trail Landscape Concept Plan Meadow Creek Assisted Care Housing Project Arroyo Grande, CA VL VL M M V L VL L L L Existing Parking Lot Trees Deciduous Trees (e.g. Acer, Pyrus, Fraxinus) Shrubs and Groundcovers (Shade) e.g. Clivia, Loropetalum) - City Trail through a Riparian Corridor Shrubs and Groundcovers �e.e,. MrUtostaphylos, Rhamnus) See images on Page L2.0 Scale: 1 " = 60' -0" 0 30 60 120 NORTH firma landscape architects lannrn --.env ronmenta studies Meadow Creek Assisted Living, Memory Care a n d M u I t i- F a m i t y Arroyo Grande, LIBERTY HEALTH S T u D i o 3480 S. HIGUERA ST. ARCH IT.r fs SUITE 130 SAN LUIS OBISPO, CA firma landscape architects lannrn --.env ronmenta studies Meadow Creek Assisted Living, Memory Care a n d M u I t i- F a m i t y Arroyo Grande, California CONCEPTUAL LANDSCAPE PLAN L1.0 File Name: Firma AG Assit 21436 Last Date Modified: 12/01/14 Water Conservation Notes Planting and irrigation shall be designed to conserve water The following factors have been incorporated to improve success of the Droiect landscaoe: • Irrigation system to be a fully automatic underground system utilizing either low- precipitation spray heads, bub- blers, or drip emitters, or a combination thereof. Irrigation hydrozones shall be separated with control valves and controller staions into compatible zones. • Plant materials are selected for their compatibility to climatic and site conditions, resistance to wind, and drought tolerance. All planters shall be mulched with a 2" minimum layer of organic mulch throughout. LID Best Management Practices BMPs- have been used throughout the landscape to increase stormwater infiltration and reduce stormwater runoff. • Foundation Planting • Drought Tolerant Landscaping, • Soil Preparation and Mulch, • Low Volume, Drip Irrigation Design ' i tolerant r • Plant materials proposed shall be grouped into distinct hydrozones utilizing plants with similar water needs. • Water needs of plant material proposed have been evaluated utilizing the WUCOLS Project (Water Use Classification of Landscape Species) prepared by the University of California Cooperative extension, February 1992. All plant materials proposed are selected for low to moderate water needs in this climate. See Sheet L -1 for Plant List. LIBERTY HEALTH S T u D 1 0 3480 S. HIGUERA ST. ARCHITECTS SUITE 130 13D6 JOHNSON AVENUE `ANLU` °o CA 1111 SAN LUIS OBISPO, CA 11 s,uoioARCH -1 Native Riparian Corridor Enhancement Use of Native Planting Native plants have been selected for their compatibil- ity to climatic and site conditions, resistance to wind, and drought tolerance. Conserve Natural Areas and Preserve native vegetation, soils, and drainage patterns to allow for natural infiltration and treatment of stormwater. LID-Infiltration Riparian k. VAN Native do Meadow Creek Assisted Living, a n d 1\1 a] t i- Memory Care F a m i l }, Arroyo Grande, California CONCEPTUAL LANDSCAPE PLAN L2.0 OFFICIAL CERTIFICATION I, KELLY WETMORE, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 4651 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 24th day of March, 2015. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 26th day of March, 2015. `l KELLY ET RE, CITY CLERK