CC 2016-01-12_12b Govt Buildings Assessment Report MEMORANDUM TO: CITY COUNCIL FROM: GEOFF ENGLISH, PUBLIC WORKS DIRECTOR BY: RON SIMPSON, PUBLIC WORKS SUPERVISOR SUBJECT: GOVERNMENT BUILDINGS INFRASTRUCTURE ASSESSMENT REPORT AND BUILDING REPAIR SCHEDULE DATE: JANUARY 12, 2016 RECOMMENDATION: It is recommended the City Council receive and provide comments and direction on the draft Government Building Infrastructure Assessment Report and Repair Schedule. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: No financial impact at this time. Information assembled in this report will prioritize funding requests for the development of future budget recommendations. BACKGROUND: During the development of the Fiscal Year 2015-2017 Biennial Budget, the Public Works Department submitted a budget request for $25,000 from the City’s Sales Tax Fund to cover the cost for unspecified equipment and infrastructure replacement and repairs for Government Buildings. The line item request was titled Various Facility Upgrades. In past budget cycles, the Public Works Department has made similar budget requests which were then subsequently used to complete needed and/or urgent building repairs or equipment replacements. At the special City Council Budget hearing for Capital Improvement Projects and Non-General Fund Programs held on May 12, 2015, the Council did not approve this and other unspecified budget requests and directed City staff to return with a list of specific requests. In addition, the City Council did not approve funding of similar unspecified equipment and infrastructure replacement and repair budget requests for parks, storm water, ADA improvements and drainage facilities. As a result of this direction, staff initiated an effort to inventory and assess the condition of the City’s General Fund supported infrastructure and assets in the following general categories:  Parks, Landscaping and Open Space  Government Buildings  Drainage Facilities  Sidewalks and Pedestrian bridges Item 12.b. - Page 1 CITY COUNCIL GOVERNMENT BUILDINGS INFRASTRUCTURE ASSESSMENT REPORT AND BUILDING REPAIR SCHEDULE JANUARY 12, 2016 PAGE 2 On October 27, 2015, staff presented the first of the infrastructure assessment reports to the City Council. That assessment report included all aspects of the City’s Parks, Landscaping and Open Space system, including but not limited to fencing, concrete pathways, parking lots, lights, and playground structures. The following are general findings of the Parks, Landscaping and Open Space infrastructure assessment report:  Approximate value of existing infrastructure and improvements: $ 4,900,000  Approximate annual depreciation and replacement costs: $ 210,000 Additionally, staff prepared a draft Asset Replacement Schedule for Parks and Open Space facilities. The Asset Replacement Schedule will assist with the guidance of future budgeting efforts. A similar replacement schedule will be prepared for the four general asset areas listed above. The intent is to provide the Council with comparative lists of asset replacement projects that can be weighed for priority purposes. The infrastructure assessment report for Government Buildings will focus on building “systems” such as: roofing systems, heating and ventilation systems, flooring systems, electrical systems, etc. Similar assessment reports and lifetime replacement schedules are being prepared for City drainage facilities and sidewalks and pedestrian bridge facilities. ANALYSIS OF ISSUES: The City of Arroyo Grande owns and maintains ten (10) public buildings, five public restrooms and multiple out-buildings such as water booster pump stations, well houses and storage buildings. For the purposes of this assessment, only the ten City’s General Fund supported building which represent approximately 66,322 square feet. Address Site Description Sq Feet # Stories Year Built 214 E. BRANCH ST. HISTORIC CITY HALL 3,878 1 1920 215 E. BRANCH ST. COUNCIL CHAMBERS 3,158 1 1950 300 E BRANCH STREET CITY HALL BUILDING 6,501 2 1984 200 N. HALYCON RD POLICE DEPT 7,036 1 1960 200 N HALCYON POLICE DEPT STORAGE 600 1 2015 140 TRAFFIC WAY FIRE STATION 13,000 2 1981 1375 ASH ST. CORP YARD - BLDG. A 4,800 1 1966 1375 ASH ST. CORP YARD - BLDG. C (Vehicle Storage) 7,000 1 1966 1375 ASH ST. CORP YARD - BLDG. B 5,672 1 1966 1375 ASH ST. CORP YARD - BLDG. D (new Admin Bldg.) 2,000 1 2015 211 VERNON ST. WOMEN'S CLUB BUILDING 4,773 1 1970 1221 ASH ST ELMS STREET RECREATION CENTER BDLG 5,600 1 1970 1275 ASH ST SOTO SPORTS OFFICE BUILDING 2,304 1 1979 Item 12.b. - Page 2 CITY COUNCIL GOVERNMENT BUILDINGS INFRASTRUCTURE ASSESSMENT REPORT AND BUILDING REPAIR SCHEDULE JANUARY 12, 2016 PAGE 3 A complete list of the General Fund supported Government Buildings is attached. (Attachment #1) The government buildings infrastructure inventory and assessment was completed by Public Works Supervisor Ron Simpson with the assistance of local Architect Kyle Harris. Kyle Harris has extensive experience with the evaluation of government buildings for the purposes of identifying replacement costs and a building systems life expectancy. The replacement costs used in this report were based on recommendations from Kyle Harris, recent building repair project costs and actual quotations from contractors. Despite these efforts for reliable and exact data, the intent of this infrastructure inventory and assessment was only to provide an approximate estimate of the amount of annual deprecation to the City’s Government buildings. The general intent of this exercise was to quantify and recognize the outstanding liabilities and costs associated with the ownership and maintenance of the City’s buildings. A separate assessment of each of the general building “systems” was conducted for each of the City’s buildings and then combined into a summary spreadsheet which is attached. (Attachment #2). For example, staff measured the roofing material on each of the City’s buildings and determined the type and square footage of the roofing material. Staff then estimated the replacement cost per square foot in today’s dollars, to replace all of the roofing materials on all of the buildings. Based on the estimated replacement cost for the roofing material on all of the City’s buildings, the total approximate replacement cost is $549,000. Based on the expected lifetime for the roofing material on all City buildings, the annual deferred maintenance “set-aside” is estimated at $13,550. Using this methodology, staff determined that the replacement value for all building systems in the City’s General Fund supported buildings infrastructure is approximately $4.7 million. In addition to determining the replacement value, staff estimated the life expectancy of each the building systems in the City’s General Fund supported buildings. This lifetime expectancy was based on several factors including industry standards and actual experience with each asset. Generally, the City of Arroyo Grande realizes a longer life expectancy for most of its infrastructure than the stated industry standard. Using this conservative lifespan, staff calculated the annual depreciation cost for each building system. The total annual estimated depreciation and replacement set- aside is approximately $121,000. The purpose of going through this exercise is to simply recognize that there is a depreciation cost that the City is currently not funding. Also, for the purposes of this report, the Elm Street Recreation Center building was not included as staff does not consider the repair of this building to be a recommended Item 12.b. - Page 3 CITY COUNCIL GOVERNMENT BUILDINGS INFRASTRUCTURE ASSESSMENT REPORT AND BUILDING REPAIR SCHEDULE JANUARY 12, 2016 PAGE 4 course of action; and instead recommends the demolition and replacement of the entire building structure. Funding has been programmed in the five-year Capital Improvement Program for the Elm Street Recreation Center building replacement project. In addition to the infrastructure assessment report, staff prepared a list of priority ranked Government Building Repair and Replacement Schedule. (Attachment #3) This replacement schedule is intended to provide recommendations for specific equipment and infrastructure to consider for funding in future budget cycles. Staff is not recommending funding at this time for any specific building projects, but will use this prioritized list to provide recommendations to the City Council during budget development in the next fiscal cycle. The current budget allocation for contractual services in the Government Building Division for equipment and minor infrastructure repair is $20,000. This amount covers the cost for minor repairs and replacement equipment such as plumbing repairs, air conditioning unit servicing, window replacements, etc. This replacement budget is not intended to cover the expenses for replacement of major building assets and repairs such as large scale flooring or roofing replacements, HVAC unit replacements, etc. The City does not currently have an asset replacement fund or “set aside” funds to cover depreciation of building infrastructure. ENVIRONMENTAL REVIEW: Not applicable. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted in front of City Hall on Thursday, January 7, 2016 and the Agenda and staff report were posted on the City’s website on Friday, January 8, 2016. ATTACHMENTS: 1. List of Government Buildings 2. Government Buildings Infrastructure Assessment Report 3. Draft Government Buildings Repair and Replacement Schedule Item 12.b. - Page 4 City of Arroyo Grande Government Buildings list GOVERNMENT BUILDINGS Address Site Description Sq Feet # Stories Year Built 214 E. BRANCH ST. HISTORIC CITY HALL 3,878 1 1920 215 E. BRANCH ST. COUNCIL CHAMBERS 3,158 1 1950 300 E BRANCH STREET CITY HALL BUILDING 6,501 2 1984 200 N. HALYCON RD POLICE DEPT 7,036 1 1960 200 N HALCYON POLICE DEPT STORAGE 600 1 2015 140 TRAFFIC WAY FIRE STATION 13,000 2 1981 1375 ASH ST. CORP YARD - BLDG. A 4,800 1 1966 1375 ASH ST. CORP YARD - BLDG. C (Vehicle Storage) 7,000 1 1966 1375 ASH ST. CORP YARD - BLDG. B 5,672 1 1966 1375 ASH ST. CORP YARD - BLDG. D (new Admin Bldg.) 2,000 1 2015 211 VERNON ST. WOMEN'S CLUB BUILDING 4,773 1 1970 1221 ASH ST ELMS STREET RECREATION CENTER BDLG 5,600 1 1970 1275 ASH ST SOTO SPORTS OFFICE BUILDING 2,304 1 1979 Square Footage Sub-total 66,322 PUBLIC RESTROOMS Address Site Description Sq Feet # Stories Year Built 105 SHORT ST PUBLIC REST-ROOMS BLDG 389 1 1275 ASH ST REST-ROOMS BUILDING 398 1 1986 500 JAMES WAY RANCHO GRANDE PARK PUBLIC RESTROOMS BLDG. 300 1 1150 HUASNA RD STROTHER PARK REST-ROOM 398 1 LE POINT ST HOOSEGOW BUILDING 170 1 c.1910 ATTACHMENT 1 Item 12.b. - Page 5 Item 12.b. - Page 6 CITY OF ARROYO GRANDE GOVERNMENT BUILDING REPAIR AND REPLACEMENT SCHEDULE PRIORITY LOCATION ITEM COST FY 1 Council Chambers Roofing material replacement 40,000.00$ 2 Council Chambers Plumbing retrofit 15,000.00$ 3 City Hall Roofing material replacement 65,000.00$ 4 City Hall Rain gutter replacement 15,000.00$ 5 City Hall IT wall insullation project 15,000.00$ 6 Corporation Yard Roofing material replacement 46,000.00$ 7 Ash Street Restroom Roofing material replacement 25,000.00$ 8 Old City Hall Electrical system upgrade 15,000.00$ 9 Old City Hall HVAC Unit replacement 9,000.00$ 10 Women's Club Building Exterior painting 30,000.00$ 11 Women's Club Building Rain gutter replacement 15,000.00$ 12 Women's Club Building Interior lighting upgrade 40,000.00$ 13 Women's Club Building Flooring replacement 40,000.00$ 14 City Hall Interior painting 30,000.00$ 15 Old City Hall Roofing material replacement 23,000.00$ 16 Stother Park Restroom painting 6,000.00$ 17 Soto Complex Jaycee Building Roofing material replacement 20,000.00$ 18 Stother Park Roofing material replacement 25,000.00$ 19 City Hall Flooring replacement 35,000.00$ 20 Rancho Grande Park Restroom painting 3,000.00$ 21 Rancho Grande Park Roofing material replacement 15,000.00$ -$ 527,000.00$ ATTACHMENT 3 Item 12.b. - Page 7 THIS PAGE INTENTIONALLY LEFT BLANK Item 12.b. - Page 8