CC 2016-03-22_09j Revised Scope_SSLOCSD Recycled Water Study MEMORANDUM TO: CITY COUNCIL FROM: TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF A REVISED SCOPE OF WORK FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT RECYCLED WATER PLANNING FACILITIES STUDY DATE: MARCH 22, 2016 RECOMMENDATION: It is recommended that the City Council approve a revised scope of work for the South San Luis Obispo County Sanitary District (SSLOCSD) recycled water planning facilities study (RWPFS). IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: Expenditures associated with the City’s participation to match grant funds for the Water Recycling Facilities Planning Grant from the State Water Resources Control Board with the South San Luis Obispo County Sanitation District (SSLOCSD) include $40,877 and are budgeted in the Water Fund. The revised scope of work does not impact the budget for the project. Staff resources will continue to be required for participation in ongoing regional efforts. Addressing water supply is one of the City’s priorities identified in the Critical Needs Action Plan. BACKGROUND: In 2014, the Council directed staff to pursue the following goals:  Meet the City’s future projected water demand of its buildout population by:  Meeting the reduction in per capita use as prescribed in the Water Conservation Act of 2009;  Proceeding with work necessary to develop a recycled water project that can be used to prevent seawater intrusion in order to provide long- range protection of the City’s groundwater supply; and  Ensure water use efficiency and drought protection through regional conjunctive use, storage and management of surface and groundwater supplies. Additionally, in 2014, the Council supported the NCMA Technical Group’s Strategic Plan that provides a framework for identifying common water resource planning goals and objectives and to establish a 10-year work plan for implementation of those efforts, including pursuing recycled water options. In November 2014, the Regional Recycled Water Strategic Plan (RRWSP) was completed that was one component of an update to the SLO Integrated Regional Water Management Plan (IRWMP), and was funded by a Round 2 IRWM Regional Planning Item 9.j. - Page 1 CITY COUNCIL CONSIDERATION OF A REVISED SCOPE OF WORK FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT RECYCLED WATER PLANNING FACILITIES STUDY MARCH 22, 2016 PAGE 2 Grant from the California Department of Water Resources (DWR) (See Attachment 1 for the Executive Study). According to the study, the SSLOCSD has the largest volume of effluent considered in the RRWSP and the largest opportunities for large-scale reuse; however, landscape irrigation projects are expensive ($3,000+/af) and the more cost effective reuse opportunities – agricultural irrigation, industrial reuse, groundwater recharge, seawater intrusion barrier, and surface water augmentation –require institutional, legal, outreach, and financial planning to be feasible. In May of 2015, an Integrated Regional Water Management (IRWM) Plan planning grant funded a groundwater basin characterization study of the Santa Maria Groundwater Basin. The objectives of the overall study were to compile previous studies and data, develop a lithologic database and prepare geologic cross-sections, perform and analyze pumping tests, and evaluate several key hydrogeologic issues for the study area. It is primarily intended to be a basis for future studies related to a Salt and Nutrient Management Plan and the development of a numerical groundwater model. Also in 2015, two specific recycled water studies have indicated potential regional projects. The first is the City of Pismo Beach’s recently completed Recycled Water Facilities Planning Study. The second is the SSLOCSD/City of Arroyo Grande grant funded study evaluating a Satellite Water Resource Recovery Facility (SWRRF), potentially located along one of the upstream trunk lines that conveys Arroyo Grande’s wastewater to the regional Wastewater Treatment Plant. The State Water Resources Control Board is funding approximately 50% of the project cost ($75,000) with the remaining costs split evenly between the SSLOCSD and the City of Arroyo Grande. On June 23, 2015, the Council directed staff to continue collaboration and participation in each of the regional recycled water projects. In November 2015, the Council heard a status report on both of the recycled water project efforts. The City of Pismo Beach has split their project into phases including preparation of the necessary environmental documents and preliminary design for an on-site and off-site Regional Groundwater Sustainability (RGS) Program using water from their waste water treatment plan. To aid in developing regional partnerships, the City of Pismo Beach held a regional stakeholder meeting with neighboring agencies to begin developing a framework for the project that will provide equitable water supply benefit for all of the participants. For the SSLOCSD/AG project, the first task was an Investment Analysis intended to determine the economic feasibility of the proposed SWRRF. The Investment Analysis Technical Memorandum (TM) identified possible SWWRF treatment and beneficial reuse alternatives with corresponding cost estimates and potential costs savings for the District’s Wastewater Treatment Plant Redundancy Project and included comparisons against other potential supplemental water supply alternatives. Based on the results of Item 9.j. - Page 2 CITY COUNCIL CONSIDERATION OF A REVISED SCOPE OF WORK FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT RECYCLED WATER PLANNING FACILITIES STUDY MARCH 22, 2016 PAGE 3 the Investment Analysis and the competiveness of the SWRRF alternatives with other potential supplemental supplies, the Council recommended an alternative to evaluate the construction of an offsite tertiary or advanced water treatment facility close to the WWTP that could treat its effluent for use as agriculture irrigation or groundwater recharge. This facility could be located outside of the Coastal Zone, Tsunami Inundation Zone and the Arroyo Grande Creek 100-YR Flood Plain, but could take advantage of the existing primary and secondary treatment facilities at the WWTP. Additionally, this facility could be potentially expanded to receive effluent from the Pismo Beach WWTP and realize potential unit costs savings associated with larger capacity facilities. ANALYSIS OF ISSUES: At the request of SSLOCSD and the City Council, Water Systems Consulting (WSC) prepared the attached updated scope of work to utilize the remaining grant funding to evaluate the potential for two possible recycled water alternatives. These alternatives include: upgrades at the existing Wastewater Treatment Plant (WWTP) to provide water for agriculture irrigation and/or groundwater recharge; and construction of an off-site Advanced Treatment Facility to provide water for groundwater recharge. According to the State Water Board, as long as a recycled water study was pursued, there would be no need to amend the grant application. The updated scope of work provides the District and the City with an engineering and economic evaluation of the potential for advanced treatment upgrades at the existing WWTP and at an offsite location. The findings from this analysis and along with input received from the Coastal Commission will provide the District and the City with the necessary information to help identify the preferred alternative for a future recycled water program. The revised scope will also aid in discussions relating to the Pismo project that has also been recently re- scoped to consider an offsite alternative. Considerations of offsite alternatives, which provide the potential for a regional facility, have been incorporated into each study to allow for continued collaboration amongst the participating agencies and the identification of the optimal recycled water solution for the region. ALTERNATIVES: The following alternatives are provided for the Council’s consideration: 1. Approve participation with a revised scope for the South San Luis Obispo County Sanitary District (SSLOCSD) recycled water project; 2. Provide staff other direction. ADVANTAGES: The recycled water projects are potentially viable options to protecting and augmenting existing water supplies. Item 9.j. - Page 3 CITY COUNCIL CONSIDERATION OF A REVISED SCOPE OF WORK FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT RECYCLED WATER PLANNING FACILITIES STUDY MARCH 22, 2016 PAGE 4 DISADVANTAGES: No disadvantages have been identified. ENVIRONMENTAL REVIEW: No environmental review is required for this item. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted in front of City Hall on Thursday, March 17, 2016. The Agenda and staff report were posted on the City’s website on Friday, March 18, 2016. No public comments were received. Attachments: 1. Revised Scope of Work SSLOCSD Recycled Water Facilities Planning Study Item 9.j. - Page 4 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 SSLOCSD RECYCLED WATER FACILITIES PLANNING STUDY RE-SCOPING The following is an updated scope of work, fee, and schedule for the South San Luis Obispo County Sanitation District (SSLOCSD) Recycled Water Facilities Planning Study (RWFPS). The original scope of work, developed by the SSLOCSD and the City of Arroyo Grande (City), evaluated potential opportunities for a Satellite Water Resource Recovery Facility (SWWRF) including an Investment Analysis (i.e. a preliminary evaluation) of the SWRRF concept. The Investment Analysis determined that the SWRRF concept was not cost effective and consequently the SSLOCSD and the City requested that the remaining budget for the RWFPS be utilized to evaluate alternate recycled water options. At the request of the SSLOCSD and the City, WSC prepared the following updated scope of work to utilize remaining grant funding to evaluate the potential for two prospective recycled water alternatives. These alternatives include: Advanced Treatment Facility upgrades at the existing SSLOCSD Wastewater Treatment Plant (WWTP) to provide water for agriculture irrigation and/or groundwater recharge; and an Offsite Advanced Treatment Facility to treat secondary effluent from the SSLOCSD WWTP and provide additional water to recharge the Santa Maria Groundwater Basin. Re-scoping the RWFPS to include these two alternatives will allow the SSLOCSD and the City to evaluate the potential for advanced treatment upgrades at both the existing WWTP and at an offsite location. This analysis, combined with anticipated feedback from permitting agencies (the Coastal Commission, the Regional Water Quality Control Board (RWQCB), and other regulatory agencies) regarding the SSLOCSD’s ability to obtain permits for infrastructure upgrades at the existing WWTP, will help the SSLOCSD and its member agencies (i.e. City of Arroyo Grande, Grover Beach and the Oceano Community Services District) identify the best path forward for developing a SSLOCSD recycled water program to improve water supply reliability for Southern San Luis Obispo County. Task 2 - Recycled Water Facilities Planning Study 2.1 Project Management Project Administration 2.1.1.1 Project schedule Prepare project schedule and update as-required based upon actual progress and SSLOCSD direction. Submit revised schedules to the SSLOCSD as necessary. 2.1.1.2 Progress reports Prepare progress reports to be submitted with each monthly invoice. The reports will include: 1) summary of activities accomplished in the current month; 2) outstanding information and/or coordination needs; and 3) schedule updates. Deliverable: WSC will provide a preliminary project schedule at the Kickoff Meeting and will provide updated project schedules as-needed throughout the project. WSC will provide monthly progress reports with project invoices. ATTACHMENT 1 Item 9.j. - Page 5 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 Kickoff Meeting  It is assumed that there will be no Kick-off Meeting for the Re-scoping. Workshops 2.1.3.1 Workshop #1: Conceptual Alternatives Development (1) Plan, schedule and lead a workshop with SSLOCSD, member agencies and regional stakeholder agency staff to review proposed recycled water alternatives, including use type, treatment, storage, and distribution. The workshop is anticipated to include the following topics: (a) Review water supplies and characteristics (Task 2.3) (b) Review wastewater characteristics and facilities (Task 2.4) (c) Review treatment requirements (Task 2.5) (d) Review recycled water market/opportunities (Task 2.6) (e) Review legal, permitting and environmental criteria (Task 2.7) (f) Review planning and design assumptions (Task 2.8.1) (g) Develop two (2) conceptual recycled water alternatives: one onsite; and one offsite recycled water alternative (h) Develop non-recycled water alternative (2) Budget is based on a 3-hour workshop attended by WSC’s Principal, Associate Engineer I and Assistant Engineer. 2.1.3.2 Workshop #2: Alternatives Evaluation and Screening (1) Coordinate a workshop with SSLOCSD, member agencies and regional stakeholder agency staff to evaluate and screen each of the conceptual alternatives developed in Workshop #1, and to develop/select a preferred alternative for treatment, storage and distribution. (2) Develop screening/evaluation criteria for the conceptual alternatives, including: (a) Cost (capital, O&M, NPV, EAC and $/AF) (b) Water supply benefits (c) Water quality considerations (d) Flexibility, expandability (e) Sequencing/phasing/schedule considerations (f) Consistency with project goals/objectives (3) Evaluate and compare the conceptual alternatives by applying the selected screening/evaluation criteria Item 9.j. - Page 6 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 (4) Select the preferred project alternative, which may combine aspects/components of more than one conceptual alternative (5) Budget is based on a 3-hour workshop attended by WSC’s Principal, Associate Engineer I and Assistant Engineer. Deliverable: WSC will provide agenda and meeting materials at least three (3) working days prior to each workshop and will provide summary notes with action items within three (3) working days following the meeting. Deliverable Review Meetings 2.1.4.1 Deliverable Review Meeting #1: Draft Recycled Water Facilities Planning Study (1) Plan, schedule and lead a meeting to review the draft recycled water facilities planning study (2) Budget is based on a 2-hour meeting attended by WSC’s Principal, Associate Engineer I, and Assistant Engineer. 2.1.4.2 Deliverable Review Meeting #2: Final Draft Recycled Water Facilities Planning Study (1) Plan, schedule and lead a meeting to review the final draft recycled water facilities planning study (2) Budget is based on a 2-hour meeting attended by WSC’s Principal, Associate Engineer I, and Assistant Engineer. Deliverable: WSC will provide agenda and meeting materials at least three (3) working days prior to the meeting and will provide notes with action items within three (3) working days following the meeting. 2.2 Background Study Area  Prepare a summary of the Study Area that includes: (1) Narrative description of the Study Area (2) Descriptive maps and diagrams showing vicinity, jurisdictional boundaries, proposed annexation areas, regional topography/geography, groundwater basin boundaries, hydrologic features, and current and projected land use. Goals and Objectives  Summarize goals and objectives defined during the Kickoff Meeting. 2.3 Water Supplies and Characteristics Water supply characteristics  Summarize current and projected water supplies for the member agencies based on 2010 Urban Water Management Plans (2010 UWMPs) and NCMA Technical Group (TG) Annual Reports. Item 9.j. - Page 7 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016  For each water supply source, summarize: (1) Source characteristics (2) Capacities of existing facilities (3) Wholesale agencies and delivery mechanisms (4) Fixed and variable costs (5) Management considerations including reliability (6) Water quality considerations  Water Pricing - Summarize the current water rate structures for the member agencies and any planned or upcoming rate increases. Water Demand Characteristics  Summarize current and projected water demand from 2010 UWMPs and NCMA TG Annual Reports. 2.4 Wastewater Characteristics and Facilities Existing Facilities  Describe existing wastewater treatment plant facilities including capacity, current flows, description of treatment processes and design criteria. It is assumed that this information will be readily available from previous documents.  Summarize the SSLOCSD’s existing waste discharge requirements  Characterize current and projected future influent flows. It is assumed that flow projection estimates will be available from previous studies.  Characterize current effluent water quality including any seasonal variation  Summarize source(s) of industrial or other problem constituents (including high-TDS infiltration) and control measures  Summarize current wastewater flow variations including peaking factors for maximum month (MM), maximum day (MD), peak hour wet weather flow (PHWWF)  Describe existing recycling including users, quantities, and contractual and pricing arrangements (none expected)  Summarize existing rights to use of treated effluent after discharge (none expected) Item 9.j. - Page 8 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 Future Facilities  Outline expected future waste discharge requirements, based on conversations with the SSLOCSD, member agency and regional stakeholder agency staff, review of the Basin Plan, and meetings with SSLOCSD, member agencies and regional stakeholder agency staff and the Regional Water Quality Control Board. In evaluating advanced treatment facilities, it will be assumed that the Redundancy Project will be completed and that information on anticipated treated effluent quality will be provided by the Redundancy Project consultant.  Describe plans for new wastewater treatment facilities to achieve regulatory compliance 2.5 Treatment Requirements Recycled Water Quality Requirements  Describe required water qualities and/or treatment requirements for each category of potential recycled water use. It is assumed that the RWFPS will only include on Title 22 unrestricted irrigation and groundwater recharge and extraction.  Describe regulatory requirements for recycled water including Title 22 unrestricted irrigation, and groundwater recharge  Describe Basin Plan requirements for recycled water use  Describe water quality related requirements of the RWQCB to protect surface or ground water from problems resulting from recycled water  Describe operational and on-site requirements for recycled water (such as backflow prevention, buffer zones, etc.) 2.6 Recycled Water Market/Opportunities Update Market Analysis  Obtain and review information on potential recycled water customers. The market analysis for the RWFPS will focus on potential agriculture irrigation customers in close proximity to the existing SSLOCSD WWTP and potential potable reuse customers from an Indirect Potable Reuse groundwater recharge and extraction system. Estimates of potential agriculture demand will be obtained from the Regional Recycled Water Strategic Plan, NCMA Annual Reports and other recent relevant documents. Estimates of potential opportunities for groundwater recharge and extraction will be obtained from the Pismo Beach Recycled Water Facilities Planning Study, the Pismo Beach Regional Groundwater Sustainability Project (RGSP), and the upcoming Oceano Community Services District Groundwater Recharge Study (Recharge Study).  Describe validation and market analysis methodology. For each identified user or category of potential user, summarize type of use, expected annual use, peak use, estimated internal capital investment required (on-site conversion costs), needed water cost savings, desire to use recycled water, date of possible initial use of recycled water, present and future source(s) of water and quality of use, quality and reliability needs and wastewater disposal methods. Item 9.j. - Page 9 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 Preliminary Market Assurances  Contact a representative sample of potential future recycled water users and obtain preliminary market assurances. It is anticipated that WSC would develop a plan to identify potential agricultural customers and utilize analysis from the RGSP and the Recharge Study of potential groundwater recharge locations to determine the regional demand for recycled water. It is assumed that the SSLOCSD and the member agencies will assist in contacting and evaluating interested potential users of recycled water for agricultural irrigation.  Develop map of proposed service area based on results of market assessment. 2.7 Legal, Permitting and Environmental Criteria Tentative Water Recycled Requirements of RWQCB  Contact RWQCB to obtain preliminary requirements for development of a recycled water treatment, conveyance, recharge and/or distribution systems for agriculture irrigation. Permitting Requirements  Identify and summarize the probable permitting requirements for implementing recycled water projects. Utilize previously completed recycled water studies as the basis for developing the summary of probable permitting requirements.  It is assumed that the SSLOCSD, member agencies and regional stakeholder agency staff will take the lead in coordinating with the RWQCB. Water Rights Considerations  Summarize potential water rights impacts that the development of the recycled water program could have on the NCMA Agencies. It is assumed that findings from the RGSP will be leveraged to evaluate potential water rights considerations for the SSLOCSD and it member agencies Environmental Documentation Requirements (CEQA)  Research and summarize the necessary environmental documentation requirements to implement a recycled water program. 2.8 Project Alternatives Analysis Planning and Design Assumptions  Develop relevant planning and design assumptions and criteria that will be used when evaluating project alternatives. These assumptions should include: (1) System flow and pressure criteria (2) Peak delivery criteria (3) Storage criteria (4) Cost basis: key assumptions; cost index; cost escalation and contingency factors; discount rate; evaluation term for present worth analysis; etc. (5) Planning period Item 9.j. - Page 10 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 (6) Conceptual infrastructure design criteria Conceptual Alternatives Development  Develop representative conceptual treatment and conveyance facilities as required for each of the following recycled water alternatives: (1) Full Advanced Treatment at the existing WWTP to produce water for agriculture irrigation (tertiary treated only) and/or groundwater recharge and extraction (advanced purified water) (a) Analysis of the required recycled water upgrades and beneficial use opportunities will be based on findings from previously completed studies (e.g. Regional Recycled Water Strategic Plan; Water Recycling Update Report; etc.) (2) Full Advanced Treatment at an Offsite Facility to produce water for groundwater recharge and extraction (advanced purified water) (a) Analyze a potential offsite Advanced Treatment Facility to treat effluent from the existing SSLOCSD WWTP and provide water for groundwater recharge and extraction. This evaluation will focus on the potential for a stand-alone SSLOCSD facility, but will consider the option of a combined offsite Advanced Treatment Facility to treat flows from SSLOCSD and Pismo Beach.  Each conceptual alternative will include: (1) Narrative description including summary of required treatment processes and conveyance infrastructure and summary of pros, cons and/or key considerations (2) Simplified process flow diagram (3) Conceptual location and layout (4) Preliminary estimates of capital and O&M cost, net present value, equivalent annual cost, and cost per acre-foot of supply  Hydrogeological Evaluation (1) Analyze the potential facility requirements (i.e. inject wells, percolation ponds, production wells, monitoring wells) and beneficial use yields (AFY of potable water) for a groundwater recharge and extraction program for SSLOCSD and its member agencies. It is assumed that this analysis will leverage findings from the Pismo Beach Recycled Water Facilities Planning Study and the RGSP and incorporate analysis from the Recharge Study. This study does not include scope for additional hydrogeologic evaluation. Non-recycled Water Alternative  Review the following previously completed studies to identify a preferred non-recycled water supply alternative: (1) 2010 Urban Water Management Plan (WSC, 2011) (2) Lopez Lake Spillway Raise Project (Stetson 2012) Item 9.j. - Page 11 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 (3) Desalination Water Supply Study (Wallace 2006) (4) City of Arroyo Grande Water Supply Alternative Study (Wallace 2004) (5) South San Luis Obispo County Desalination Funding Study (Wallace 2008) (6) Coastal Branch Capacity Assessment (WSC 2011) (7) DCPP Desalination Hydraulic Feasibility Study (WSC 2015) (8) Other relevant water supply studies  Summarize existing estimates, when available, for capital and O&M cost, net present value, equivalent annual cost, and cost per acre-foot of the non-recycled water supply based on previously completed studies. Water Conservation/Reduction Analysis  Summarize the member agencies’ current and future plans for water conservation. WSC will utilize 2010 UWMPs, NCMA TG reports, and other available resources as the basis for a water conservation summary. No Project Alternative  Evaluate the no project alternative and include in alternatives analysis. Conceptual Alternatives Analysis  Summarize the outcome from Workshop #2 including: (1) Screening/evaluation criteria (2) Results from the screening/evaluation (3) Preferred conceptual alternatives 2.9 Recommended Facilities Project Plan Preferred Alternative  Develop preliminary design criteria and refined pipeline routes for the preferred alternative  Prepare updated maps, figures, process flow diagram(s), and layouts to reflect the preferred treatment, distribution and storage alternatives  Update cost estimates based on final configuration and considering expected time of construction  Prepare list of all potential users, quantity of recycled water use, peak demand and commitments obtained to-date  Compare reliability of the recycled water facilities to the user requirements  Summarize on-site improvements required including cost  Prepare a schedule for the implementation of the recycled water project that includes design and construction of the treatment plant upgrades and construction of the distribution system infrastructure. Provide phasing considerations/recommendations in the preferred project plan. Item 9.j. - Page 12 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 2.10 Stakeholder Involvement Stakeholder Outreach  Conduct stakeholder meetings to coordinate project objectives, elements, etc. Document stakeholder outreach efforts.  Budget based on three (3) 1-hr meetings attended by WSC’s Principal and Associate Engineer I. Public Outreach  Provide project updates at public meetings as requested by the SSLOCSD, including preparation of an explanatory presentation and/or graphics presenting the analysis and/or conclusions contained within the Recycled Water Facilities Planning Study.  Document public outreach efforts.  Budget based on two (2) 1-hr meetings attended by WSC’s Principal and Associate Engineer I. 2.11 Implementation Plan Coordination and Governance  Determine needed agreements and ordinances for implementing a preferred alternative recycled water system.  Evaluate recycled water mandatory use ordinances and provide SSLOCSD with recommended course of action.  Prepare a draft user contract for connecting customers. Construction Financing Plan and Revenue Program  Prepare funding plan that outlines sources and timing of funds for design and construction.  Summarize pricing policy recommendations for recycled water  Evaluate costs that can be allocated to water pollution control and/or water supply reliability  Develop criteria and annual projections for: (1) Water prices for each user or category of users (2) Recycled water used by each user (3) Annual costs (required revenue) of recycling project (4) Allocation of costs to users (5) Unit costs to serve each user or category of users (6) Sensitivity analysis assuming portion of potential users fail to use recycled water Detailed Schedule  Develop a detailed schedule for the implementation of the recycled water project that includes design and construction, critical milestones from the financing and revenue program and on-site customer improvements. Item 9.j. - Page 13 SSLOCSD Scope of Work Recycled Water Facilities Planning Study Re-Scoping 2/24/2016 2.12 Prepare Recycled Water Facilities Planning Study Prepare Draft Recycled Water Facilities Planning Study  Prepare draft Executive Summary and compile draft report including title page(s), acknowledgements, table of contents, list of figures, list of tables, draft chapters, reference list and appendices. Deliverable: Draft Recycled Water Facilities Planning Study Final Draft Recycled Water Facilities Planning Study  Prepare Final Draft Recycled Water Facilities Planning Study based on comments received from the SSLOCSD and any identified stakeholders on the draft Recycled Water Facilities Planning Study Deliverable: Final Draft Recycled Water Facilities Planning Study Final Recycled Water Facilities Planning Study  Prepare Final Recycled Water Facilities Planning Study based on comments received from the SSLOCSD on the Final Draft Recycled Water Facilities Planning Study. Deliverable: Final Recycled Water Facilities Planning Study Deliverable Summary Task Deliverable Description Format/Copies Due Date 2.1.1 Project Schedule Emailed PDF and 11x17 hardcopies for all meeting attendees At Kickoff Meeting and revised as- needed 2.1.2 Kickoff Meeting Agenda and Minutes Emailed PDF See project schedule 2.1.3 Workshops #1 and #2 Agenda and Minutes Emailed PDF See project schedule 2.1.4 Deliverable Review Meetings #1 and #2 Agenda and Minutes Emailed PDF See project schedule 2.12.1 Draft Recycled Water Facilities Planning Study Emailed PDF and four (4) hardcopies See project schedule 2.12.2 Final Draft Recycled Water Facilities Planning Study Emailed PDF and four (4) hardcopies See project schedule 2.12.3 Final Recycled Water Facilities Planning Study Emailed PDF and four (4) hardcopies See project schedule Item 9.j. - Page 14 Conceptual Alternatives Development Recycled Water Facilities Planning Study SSLOCSD Recycled Water Project Schedule Outline March 8, 2016 Alternatives Analysis Draft Recycled Water Facilities Planning Study Approved Scope April 2016May 2016June 2016 September 2016August 2016July 2016 Final Recycled Water Facilities Planning Study Preferred Recycled Water Alternative is Identified Coastal Commission Input Received Coastal Commission Coordination Item 9.j. - Page 15 THIS PAGE INTENTIONALLY LEFT BLANK Item 9.j. - Page 16