Loading...
CC 2016-05-24_09g Well No 4 Replacement Pump and Pipe Column MEMORANDUM TO: CITY COUNCIL FROM: GEOFF ENGLISH, PUBLIC WORKS DIRECTOR BY: SHANE TAYLOR, UTILITIES MANAGER SUBJECT: CONSIDERATION TO APPROVE THE PURCHASE OF A REPLACEMENT PUMP AND PIPE COLUMN FOR WELL NO. 4 DATE: MAY 24, 2016 RECOMMENDATION: It is recommended the City Council approve the purchase of a replacement vertical turbine pump and pipe column for Well No. 4 in the amount of $22,000 from Filiponi & Thompson Drilling. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The funding for the backup pump and pipe column is budgeted in FY 2015/16, in the amount of $27,500.00. Restoration work will involve approximately 40 work hours. BACKGROUND: Well No. 4 was drilled in 1964. The pump and pipe column were replaced in 1992. During the last year the well lost production by 50%. The City received three (3) written quotes (Attachment 1) to replace the pump and pipe column. ANALYSIS OF ISSUES: Well No. 4 is part of the City’s Drinking Water Well System. The system consists of six (6) wells which pump water from the Santa Maria Groundwater Basin, and two (2) wells which pump from the Pismo Formation. Well No. 4, one of the wells that pumps from the Santa Maria Groundwater Basin, produces 500 gallons per minute. Due to the age of this well, 52 years old, the well casing will be video inspected prior to any new “down hole” equipment installation to assure the casing is still in good condition. ALTERNATIVES: The following alternatives are provided for the Council’s consideration: 1. Approve a purchase order in the amount of $22,000.00; 2. Do not approve the purchase order; 3. Modify as appropriate and approve staff’s recommendation; or 4. Provide direction to staff. Item 9.g. - Page 1 CITY COUNCIL CONSIDERATION TO APPROVE THE PURCHASE OF A REPLACEMENT PUMP AND PIPE COLUMN FOR WELL NO. 4 MAY 24, 2016 PAGE 2 ADVANTAGES: Replacement of the pump and pipe column will allow continued use of Well No. 4 to provide drinking water. DISADVANTAGES: No disadvantages have been identified. ENVIRONMENTAL REVIEW: No environmental review is required for this item. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted in front of City Hall on Thursday, May 19, 2016. The Agenda and staff report were posted on the City’s website on Friday, May 20, 2016. No public comments were received. Attachments: 1. Quotation Evaluation Summary Sheet Item 9.g. - Page 2 Po l i c y # : C - 0 0 1 / 0 0 2 CI T Y O F A R R O Y O G R A N D E QU O T A T I O N E V A L U A T I O N S U M M A R Y DATE P R E P A R E D : 5 / 1 2 / 2 0 1 6 DE P A R T M E N T : P u b l i c W o r k s PR E P A R E D B Y : G l e n d a B o n e r SU P P L I E R ’ S N A M E SU P P L I E R ’ S N A M E SUPPLIER’S NAME WR I T T E N Q U OT A T I ON S VE N D O R : Fi l i p p o n i & T h o m p s o n F i s h e r P u m p & W e l l S e r v . M & W P u m p s , I n c . VE R B A L / T E L E P HO NE Q U O T A T I O N S TE L E P H O N E : 46 6 - 1 2 7 1 34 6 - 2 4 2 2 925-1147 QU O T E D B Y : Jo h n T h o m p s o n Ro b T h o m p s o n Frank IT E M # DE S C R I P T I O N QU A N T I T Y UN I T UN I T PR I C E TO T A L PR I C E UN I T PR I C E TO T A L PR I C E UNIT PRICE TOTAL PRICE 1 P u l l p u m p , v i d e o w e l l , i n s t a l l n e w b o w l s , c o l u m n , $2 1 , 9 8 4 . 6 0 $3 0 , 9 0 4 . 0 0 $27,400.00 Tu b e & sh a f t in We l l No . 4 TO T A L Q U O T A T I O N $2 1 , 9 8 4 . 6 0 $3 0 , 9 0 4 . 0 0 $27,400.00 CA S H D I S C O U N T T E R M S F. O . B . DE L I V E R Y T I M E F R O M R E C E I P T O F O R D E R ATTACHMENT 1 Item 9.g. - Page 3 THIS PAGE INTENTIONALLY LEFT BLANK Item 9.g. - Page 4