Overview
Council Goal Setting Process
Taking stock of where we are
Departmental presentations
Council feedback
Community comments
Additional comments
Next steps
2
1. Council Goal Setting Process
June 13, 2016: Taking stock of where we are; laying the groundwork for Council goal setting.
Opportunities for Public input to the Council: by attending goal setting meetings and by email to:
agcity@arroyogrande.org
Collecting input from City Council
June 27, 2016: Council goal setting
3
2. Taking stock of where we are
Midway through the 2015-2017 Biennial Budget
General Fund relies upon $250K of reserves as short-term measure to balance the budget while economic development activities are being implemented
Priority on preparing an assessment of our critical infrastructure; other needs
(2) year time period focused on obtaining, analyzing and presenting information so that Council can make thoughtful, data-driven decisions for the 2017-19 Budget
4
Timeline: what we’ve done so far
June 2015 Adopt 2015-17 Biennial Budget
Sept 2015 Increased economic development activity
Oct 2015 Infrastructure report: Parks
Jan 2016 Infrastructure report: Buildings
April 2016 Revenue Plan
June 2016 Council goal setting process (6/13 & 6/27)
5
Timeline: more input to come
July 2016 Governor’s budget: gas tax revenues
Summer 2016 Infrastructure reports: drainage, sidewalks, information technology, equipment/vehicles
Summer 2016 Economic development plan
Aug 2016 User fee study implementation
Nov 2016 Election: SLOCOG measure
Jan 2017 Compensation/classification study
Jan - Feb 2017 Preparations for 2017-19 Biennial Budget
June 2017 Adopt 2017-19 Biennial Budget
6
Critical Needs Action Plan and Citywide Goals (FY 2015-17 Biennial Budget)
Refocused comprehensive Economic Development Plan
Complete design and pursue approval of State and Federal funding for the Brisco Road Interchange project.
Fully fund and construct the pavement management program to establish and maintain a schedule of improving all streets in the City on a 7-year cycle.
Continue an escalated sidewalk repair program.
7
Critical Needs Action Plan and Citywide Goals
Address the Recreation Department’s facility needs.
Implement recommendations to address the City’s water needs through a combination of conservation measures, potential recycling efforts and additional water supply that may become available.
Develop a long-range financial plan with a focus on ensuring operational effectiveness and revenue generation opportunities to help ensure long-term fiscal sustainability.
8
Citywide Revenues
9
Citywide Expenditures
10
11
12
3. Department Presentations
13
City Manager’s Office
Accomplishments
Initiated Financial Sustainability Plan consisting of: Revenue Plan (completed), Economic Development Plan (in process/ underway), and Expenditure Analysis/ Control Plan (in process).
Economic Development: initial research and planning; meeting with developers, business and property owners; draft economic development plan; partnership with other organizations for
small business workshops; measures to streamline entitlements process.
Community outreach: presentations to the Chamber, business organizations and service groups; “Coffee with the City Manager” Program.
14
City Manager’s Office
Accomplishments
Oversight for water-related projects including drought response, recycled water and water conservation
Initiated interdepartmental committees/ activities on safety in the workplace, special events and economic development
Developing/emerging issues as directed by Council (medical marijuana, styrofoam, Council Operations, etc.).
15
City Manager’s Office
Current
Financial Sustainability Plan: Economic Development and Expenditure Analysis/ Control
Enhance public outreach, engagement and transparency
Long-range planning for community water needs
Major Capital Project oversight
Identify funding needs for infrastructure
Review of Administrative Policies and Procedures
16
City Manager’s Office
Anticipated Projects
Financial Sustainability Plan: Economic Development and Expenditure Analysis/ Control
Enhance public outreach, engagement and transparency
Long-range planning for community water needs
Major Capital Project oversight
Identify funding needs for infrastructure
Review of Administrative Policies and Procedures
Reformatting budget
17
City Manager’s Office/ Citywide
Trends
Service level expectations of community
Highly engaged citizenry
Increased dependence on community groups and volunteers
Increased demand to use and to keep up with technology
Recruitment and retention of employees
Unfunded State and Federal mandates
Reduction in State funding
Positive business environment, increase in development
18
City Manager’s Office/ Citywide
Unmet Needs
Long-term financial sustainability
Recruitment and retention
Adequate staffing (structure and number) to meet the expectations of the Community and increased regulatory requirements
Need to increase use of and keep up with technology
Infrastructure/ equipment maintenance and replacement
19
Administrative Services
Accomplishments
Water Conservation Implementation – baseline adjustments, warning/penalty letters, updating billing software, expanded duties of Adjustment Board, etc.
GASB 68 and 71 Implementation
Processed 25 New Employees
Affordable Care Act Implementation including offering/enrolling eligible part-time employees, tracking eligibility, issuing 1095 forms
20
Administrative Services
Accomplishments (cont.)
Preparation of 2015-16 Mid-Year Budget Update
Prepared RFP’s, selected consultants and kicked off User Fee Study and Development Impact Fee Study
Prepared CAFR, State Controller Reports, Maintenance of Effort Reports and other financial information as required
Completed Banking Services Transition, including merchant services and credit cards
21
Administrative Services
Accomplishments (cont.)
Completed In-house Water and Sewer Rate Study Update
Completed City Revenue Plan and Presentation
SEIU Reopener for equity issues
Implemented Sick Leave Policy for part-time employees to comply with new State law (AB 1522)
22
Administrative Services
Current Projects
User fee study
Development impact fee study
2016-17 Budget Update
Water conservation program changes
Water/Sewer rate increase – Prop 218 process and public hearing
23
Administrative Services
Current Projects (cont.)
Recruitment of Accounting Manager position
POA Negotiations
FCFA/IAFF Negotiations
Property acquisitions – LePoint parking lot properties
Property disposals – Faeh and Pearwood
Credit card policy update
OpenGov launch
Completion of CJPIA LossCAP evaluation issues
24
Administrative Services
Anticipated Projects
Financial Sustainability Plan
Reformatting 2017-19 Budget document
Cash handling policy update
Purchasing policy update
Defeasing of bonds
Brisco financing
25
Administrative Services
Anticipated Projects (cont.)
CitizenServe expansion – citizen access portal for paying/renewing licenses
RFP for Utility billing printing/mailing services and online payment portal
Complete written safety policies
HR Administrative policy updates
Revamp Safety Committee
26
Administrative Services
Trends
Aging workforce – retirement and recruitments will occupy a lot of Human Resource’s time
Training new supervisors on HR issues
Increasing regulatory/reporting requirements – new GASB pronouncements, Affordable Care Act compliance, etc.
Transparency in government financial information
Technology advancements - Obsolete financial management software, cloud-based applications, electronic banking, online recruitment and HR reporting software
27
Administrative Services
Unmet Needs
Unfunded liabilities, deferred vehicle and equipment replacements, infrastructure maintenance and replacement
Organizational structure assessment – Do we have an appropriate workforce size, structured appropriately for long term success?
Recruitment/retention – Achieving appropriate classification and compensation of employees (are the pay and benefits adequate and appropriate for the job duties/responsibilities assigned)
Proactive risk management opportunities
28
Community Development
Accomplishments
Over 100,000 sq. ft. of new commercial/hotel space: Courtland and E. Grand, Fair Oaks Medical Office; Branch Street Inn, Arroyo Grande Shopping Center, Paulding Court mixed-use office
building, and a retail warehouse on E. Grand Ave.
Significant Remodels: Arroyo Grande Shopping Center with (8) construction phases enabling stores to stay open and new stores to open during development, commercial center on E. Grand
near Alpine, and the Chevron Station.
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
29
Community Development
Accomplishments (cont.)
Commercial businesses that have opened or expanded: Villa Cantina, Marcella's, and the Mason Bar and Restaurant.
Housing projects completed or under construction: the Pike and Elm rental units, the Heights at Vista Del Mar and the 12-unit tract on Huasna Rd.
Projects in process: E. Cherry Ave. Specific Plan including a 100-room hotel, (58) single family residences, and a cultural component (EIR complete).
Completed analysis for target opportunity sites, including those for Hotels and Commercial/Mixed Use development.
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
30
Community Development
Accomplishments (cont.)
On target to issue over (500) Building permits
Implemented online one-day plan check for solar installations
Numerous project stakeholder groups for significant projects including the Bridge St. Bridge project, E. Branch Streetscape, and Halcyon Rd. Complete Street project, and community meetings
for events as needed
Expanded training opportunities for Commissions and Committees
Restructured Department filling Planning Manager and part-time Planning Permit Technician positions
Completed significant update of City Engineering Standards
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
31
Community Development
Accomplishments (cont.)
Brisco Rd./Halcyon Road Interchange project: all requested information submitted to Caltrans for review and comment
Submitted extension of Brisco temporary closure with requested traffic study information to Caltrans.
Recycled Water: Coordinated (2) viable project options for South County to work toward a single regional project. Draft study for the Sanitation District will be completed July/August.
Bridge St. Bridge - Draft Environmental document complete. (2) viable design alternatives progressing.
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
32
Community Development
Accomplishments (cont.)
Adopted Housing Element Update
Draft Circulation Element completed
Adopted State Model Water Efficient Landscaping Ordinance
Administered successful Cash 4 Grass program
Adopted regulations on medical marijuana to retain local control
Adopted regulations to ban Polystyrene
Adopted Neighborhood Traffic Calming Guidelines
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
33
Community Development
Current Projects
Continue development of (2) street infrastructure projects: E. Branch Streetscape and Halcyon Road Complete Streets Project
Process Cherry Avenue Specific Plan through entitlement
Facilitate current development projects through construction, including Courtland, Medical Office Building, and Branch Street Inn
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
34
Community Development
Current Projects (cont.)
Implement Citizen Access Portal for enhanced visitor center information
Brisco Road/Halcyon Road Interchange Project: alternate selection and project design
Recycled Water: continue work with agency partners to bring forward final alternative selection and proceed to design
Circulation Element Update: final draft and environmental document
Parking Study -surveys developed, survey areas identified, awaiting deployment
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
35
Community Development
Current Projects (cont.)
Continue water conservation and drought work
ADA Transition Plan
Work collaboratively with other departments to complete User Fee/Development Impact Fee Studies (Admin. Services): Storm water Program (Public Works): and Special Event Ordinance (Police)
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
36
Community Development
Anticipated Projects
Conduct RFP process for East Grand Avenue Master Plan Project
Develop Economic Strategy and Implementation Plan including development of marketing materials for potential new businesses; invite investment to address primary opportunity sites; and
other measures.
Comprehensive sign ordinance update
Begin Land Use Element Update and Recreation Element Update
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
37
Community Development
Anticipated Projects (cont.)
Enhance electronic file storage and reduce physical storage needs
Increase maps/GIS information
Reduce plan check times by increasing over the counter permits, increase use of outside contracts for plan check, add counter kiosk.
Streamline business license application process
Simplify sign application process
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
38
Community Development
Trends
Ongoing drought conditions
Significant reductions in transportation infrastructure funding
Increased development activity; permit processing for dormant projects previously entitled, including the Creekside project in the Village and Tract 1998.
Additional staff time required to meet State mandates for storm water and water conservation
EC –
FC – HE and EDU updates – Concept Phase = Bridge St. Bridge, Fair Oaks, Halcyon corridor grant, E. Branch St. scape)
BCC – SAC/ARC running at 2x month
39
Community Development
Unmet Needs
Congestion issues including E. Branch and W. Branch near the Grande Ave. interchange.
Recycled Water Costs
Traffic Way Bridge – significant unfunded replacement project
Additional staff hours to support increased front counter activity
General Plan Update: a comprehensive General Plan update would cost $300,000 to $500,000. The current budget allocates $120,000 in FY 2016-17 to complete the Circulation and Environmental
document and begin work on Land Use Elements of the General Plan only.
Also utilize our Boards, Commissions and Committees (e.g. Traffic for neighborhood circ issues)
Builidng, Engineering and Plannning
Water Conservation – cash 4 grass, irrigation contollers, tracking,…
SW – annual rpt
GIS –
Hist Res - designations, Mills Act
NS – hoarding, blocked drainage ways, signage
HE –
CAP –
Green Bldg –
FM – counter
40
Community Development
Unmet Needs (cont.)
State storm water mandates are diverting staff from other priorities and consequently impacting ongoing workload. Storm water compliance specialist and/or an in-house storm water construction
inspector needed.
City vehicle for City Hall staff
Replacement of Building Department vehicle
Also utilize our Boards, Commissions and Committees (e.g. Traffic for neighborhood circ issues)
Builidng, Engineering and Plannning
Water Conservation – cash 4 grass, irrigation contollers, tracking,…
SW – annual rpt
GIS –
Hist Res - designations, Mills Act
NS – hoarding, blocked drainage ways, signage
HE –
CAP –
Green Bldg –
FM – counter
41
Fire
Accomplishments
Revised Automatic Aid Agreement
Initiated Strategic Planning process
Ordered replacement Fire Engine
Full Cost Recovery - Strike Team Assignments
Submitted grant for SCBA replacement
42
Fire
Accomplishments (cont.)
Increased collaborative emergency planning
Awarded grants for Equipment
FCFA “FIV Dispatch” app and new website readied for release
“Friends of the Five Cities Fire Authority”
501(c)(3) letter of incorporation approved
Reduced fleet of support vehicles
43
Fire
Anticipated Projects
Keep our communities safe and prepared
Complete and publish Strategic Plan
Maintain adequate staffing levels
Increase Community Outreach & Education
Support Board – potential JPA revisions
Master Fee Schedule – Consistency between partners
Explore grant opportunities
44
Increasing service calls drive “demand” and “capacity” constraints (simultaneous calls).
Calls for Service
2011 - 3012
2012 - 3311
2013 - 3366
2014 - 3481
2015 - 3679
Fire
Trends
45
Three (3) fully depreciated Type I Engines
One (1) fully depreciated Type III Engine
Current Budget was increased - 110% expended
FY 2016/2017 Budget increased $25K ($100K Total)
Fire
Trends (cont.)
I realize this information has been presented repeatedly – but this information is critical.
The 2015/2016 budget was increased by $18K to $75K. Due to the age and significant maintenance needs of the fleet, this line item was 110% expended by May, forcing management to restrict
other expenditures in other needed programs to maintain cost offsets.
FCFA has developed a forecasted tool of “routine” maintenace needs (tires, brakes, DOT inspections, oil samples, etc.), but the numbers listed below the three rigs pictured as “big ticket”
repairs that approach 50% of the full year budget. Management would prefer not making these investments if possible.
Another replacement engine would have a dramatic effect on maintenance costs; most likely providing an opportunity to reduce this budgeted cost.
46
Fire
Trends (cont.)
A very basic graph…
The red curve is maintenance costs
The black horizontal line is the life cycle of a fire engine.
The intersection point is approximately 15-20 years from date of purchase, and is labeled as the “Point of Diminishing Return.”
Maintenance investment in a fully depreciated asset results in the yellow zone….an inefficient use of taxpayers dollars.
We need a second engine.
47
Fire
Trends (cont.) - Staffing
Staffing levels remain constrained.
As with other departments, recruiting candidates from outside of the area is very challenging due to compensation and the cost of real estate.
This graph is based on data and indicates the decline and related challenge of maintaining a firefighter program comprised of part time employees. This position is critical in terms
of patient care, fire attack, patient extrication from a vehicle accident, and special rescue.
Like other fire departments are considering (CAL FIRE), FCFA will be forced to plan for a transition from a part time program (evolved from the day of the volunteer fire department),
to a full time / career position.
48
Fire
Unmet Needs
Equipment and Vehicle Replacement Funding
Apparatus
Extrication Equipment
SCBA
Technology and Communications
Personal Protective Equipment
Maintain adequate staffing required to meet service expectations
49
Legislative and Information Services - City Clerk Division
Accomplishments
Coordinated biennial ethics training for elected and appointed officials
Developed and distributed RFP for Design of Audio/Visual & Cablecasting Upgrades in Council Chambers
Responded to 112 public records requests year-to-date
Coordinated annual records destruction pursuant to Citywide Retention Schedule
Coordinated website content management system training for designated employees
50
Legislative and Information Services - City Clerk Division
Accomplishments (cont.)
Coordinated and distributed one Municipal Code Supplement (8 Ordinances codified)
Distributed and processed Annual Statement of Economic Interest forms for over 70 filers
Processed City Council and Successor Agency Oversight Board documents (agendas, deeds, contracts, agreements, resolutions, ordinances, minutes, notarizations, proclamations and Mayor’s
commendations)
Processed (11) liability claims
Conducted (9) bid openings
51
Legislative and Information Services –
City Clerk Division
Current Projects
Upgrade cablecasting and audio/visual equipment in the Council Chambers
Prepare for the 2016 General Municipal Election (Nomination Period opens July 18)
Prepare required election documents for a November 2016 ballot measure relating to the purchase of State water
Coordinate Candidate Orientation for City Council candidates
Complete revision and update of the Citywide Records Retention Schedule
Conduct biennial review and update of the Conflict of Interest Code
52
Legislative and Information Services - City Clerk Division
Anticipated Projects
Conduct Commissioners Orientation (2017)
Develop recommendation for centralized permanent records storage
53
Legislative and Information Services -City Clerk Division
Trends
Increase in public information activities (i.e., use of social media, online access to public records, etc.)
Increase in digital scanning of records
Increase in number of public records requests
Need to conduct annual updates to the Citywide records retention schedule to reflect changes in law and to incorporate new records
54
Legislative and Information Services - City Clerk Division
Unmet Needs
Long-term centralized records storage area for permanent paper records to eliminate need to search and retrieve off-site records stored in multiple locations
Administrative staff support due to staffing reductions in City Manager’s Office and City Clerk Division as a result of Citywide reorganizations over past 10 years
55
Legislative and Information Services -
Information Technology Division Accomplishments
Recruited and filled IT Specialist position
Upgraded City server environment from Windows Server 2003 to Windows Server 2012
Implemented enterprise wireless internet access at City Hall and Council Chambers and created associated usage policy
Coordinated IT infrastructure for new Corp Yard building
Created Disaster Recovery (DR) site at Police Department
56
Legislative and Information Services -
Information Technology Division Accomplishments (cont.)
Designed and implemented a new IT ticketing and help desk solution
Installed additional broadband (internet) connection and established redundancy and quality of service protocols for the City IT environment
57
Legislative and Information Services -
Information Technology Division
Current Projects
Implement Shoretel phone Emergency Alerting System
Upgrade MS Office Suite
Continue updating IT policies and create new policies for new IT systems
Install and configure a dedicated GIS server
58
Legislative and Information Services - Information Technology Division
Anticipated Projects
Facilitate development of a Citywide IT Master Plan
Update network infrastructure connecting Five Cities Fire Authority facilities
Assist with recommendations for replacement of antiquated phone system at Five Cities Fire Authority
Increase network storage capacity for City, Police, and Five Cities Fire Authority environments
Install a new firewall at City Hall to replace aging systems at City Hall and the Police Department
Expand wireless access to other City facilities
59
Legislative and Information Services - Information Technology Division
Trends
Increased reliance and demand on internet for access to IT resources
Increased requests for wireless access to the internet and specific network resources
Increased network file storage utilization
Increased cyber security vulnerabilities associated with Internet, email, and mobile device usage
Implementation of new and upgraded technology at Five Cities Fire Authority
60
Legislative and Information Services - Information Technology Division
Unmet Needs
Fiber/copper network infrastructure to support FCFA facilities
Wi-Fi access throughout the City organization
61
Police
Accomplishments
Relocated Police Department into a reconstructed police facility, including significant technology upgrades, repurposing of space and expansion of the safety and security of the staff
and public
Installed state of the art interview room audio/video recording system that ensures integrity of the interview process
Completed installation of (2) additional communications repeater locations in the City for enhanced public safety communications
62
Police
Accomplishments (cont.)
Expanded the microwave network between City facility sites to provide a backbone for expanded use of the Blue Watch public video surveillance program
Relocated Emergency Operations Center (EOC) to the Police Department and enhanced functionality of the EOC
Developed a formal “Crime Analysis” function within the Police Department to better direct staff and provide information to the public
63
Police
Accomplishments (cont.)
Restructured the crime reporting process to increase officer time on the street and improve the accuracy of crime information; added full-time Records Clerk
Re-engineered the recruitment process to provide for rapid response, sponsorships and evaluation of “fit” to determine success
Expanded emergency radio communications systems into Public Works, Police and Fire departments
Provided safety training to all City Hall and Recreation Department staff, including instruction and scenario reenactments.
64
Police
Current Projects
Recruitment and Retention:
Currently have (2) Police Officer vacancies with candidates in the hiring process. Actively recruiting so that a list can be developed for any future vacancies anticipated.
Staff Development:
Currently training and mentoring a Commander, (2) Sergeants, (3) Senior Police Officers and (2) Police Officers in field training.
Technology:
Designing City-wide employee safety “Lockdown Button” notification system with Information Technology (CIO Solutions)
Installation of a City-wide voter-repeater public safety communications component that is designed to eliminate radio transmission “dead spots”. (COPS Funded)
65
Police
Current Projects (cont.)
Fleet and Equipment:
Developing specifications for patrol fleet replacement vehicles and equipment (lease turnover due in fall of 2016)
Other Community Projects:
Developing “Next Generation” Neighborhood Watch Program
Developing “Operation Car Watch,” theft prevention and awareness program
66
Police
Anticipated Projects
Working with regional law enforcement partners on next generation records management software design
Beginning the design process on dispatch back-up communications center as part of the contract communications design plan (COPS Funded)
Beginning design process for next generation in-car technology, including body camera integration
67
Police
Trends
Ongoing recruitment and retention issues
Development of succession planning opportunities
Increased demand for Neighborhood Services (Code Enforcement) program
Continuing technology advancements
Enhancement of Crime Analysis function and “Predictive Policing” strategies to make the best use of police officer staffing
68
Police
Unmet Needs
Expand the Neighborhood Services Program from (2) part-time technicians to (1) full-time and (1) part-time to meet the growing needs. This includes potential medical marijuana permitting
and enforcement, Styrofoam, and other probable code violations.
Re-introduce part-time parking enforcement position to provide uniform parking enforcement in the Village
Provide funding for an Administrative Sergeant position to provide career development and succession planning for future command officers.
69
Public Works
Accomplishments
Drought Team Response to State Water Conservation Mandate (conservation efforts, baseline adjustment processing, water school, etc.)
Completed Asset Evaluations and Replacement schedules for the following assets, Parks, Buildings and Drainage infrastructure
In-house Nitrification reduction project
Crown Terrace Sewer Replacement
Reservoir No. 5 Recoating
2015 Sewer Lining Project
Reservoir No. 3 cleaning and painting
70
Public Works
Accomplishments (cont.)
City-owned landscape area water conservation projects
Fire reduction project in Via La Barranca canyon
Police Department relocation
James Way habitat trail Improvements
New tree list, Tree City Program, numerous tree evaluations
Auto shop renovation
Air Resources Board certification for compliance with dispensing gasoline and diesel at City Corp Yard
Air Pollution Control District heavy-duty vehicle compliance
Swinging Bridge Repairs
71
Public Works
Accomplishments (cont.)
Car Corral ADA, Parking Lot and Drainage Improvement Project
2015 Concrete Repair Project
2015 Street Resurfacing Project
2015 Street Repair and Brisco Road Overlay
Platino/Oro Storm Drain Improvements and replacement of an ADA concrete ramp
Corporation Yard Administration Building construction
Kingo Park Play Structure Replacement
Soto Complex ADA Improvements - Phase II
72
Public Works- Current Projects
CAPITAL PROJECTS
Heritage Square Park Restroom Project
Oak Park Blvd./W. Branch/101 Traffic Signal
Oak Park Blvd. Rehabilitation
Oak Park Blvd. Curb Ramps
Le Point Area Water Main Upgrades
Alpine Street Waterline Replacement Project
Council Chambers Restroom and AV Improvements
2016 Street Repairs & Resurfacing
ADA Ramps at Midblock Crosswalks (CDBG)
73
Public Works- Current Projects (cont.)
CAPITAL PROJECTS (Continued)
Corporation Yard Upgrade - Phase II
Water Well #11 Facilities
2016 Sewer Lining (AG Creek Sewer Rehabilitation - Include spill segment)
Corporation Yard Storm-water Improvements
Women's Club Building Kitchen Renovation
City Hall Restroom Counter Safety Improvement Project - Phase II
E Grand Ave Sidewalk Improvement (US 101)
Galvanized Water Service Replacements
74
Public Works - Current Projects (cont.)
PLANS AND OPERATIONS
Urban Water Management Plan- 2015 Update
Revised Governor’s Water Conservation Executive Order
Secure new Sanitary Sewer Management Plan; Fats, Oils and Grease Program consultant
Prepare Sanitary Sewer Collection System S.O.P.’s
Prepare and implement Traffic Sign Reflectivity Policy
Water Quality Control Board- Year 3 NPDES Permit requirements
Pavement Management Plan Update
Create Draft Sidewalk Replacement Program
Comprehensive Asset Replacement Report
75
Public Works
Anticipated Projects
Update Drainage Master Plan
Prepare draft Soto Sports Complex Field Use Policy
Village area Removable Bollard project
Prepare draft Facility Master Plan
Open Channel Drainage Maintenance Permitting
Safety Program development – Loss CAP projects
Develop Recreation Department Facility Plan
76
Public Works - Trends
Ongoing drought conditions requiring significant time demands on water conservation and water supply matters
Un-funded State and Federal Mandates
Storm water, Sanitary Sewer, Water, ADA and Emissions.
Reduction in Gas Tax Funding adversely affecting road maintenance funding.
Increased training requirements and standards at all levels
Routine maintenance tasks suffering due to other demands on Public Works staff and reduced post-recession staffing levels
Water Fund revenue reduction due to water conservation
77
Public Works - Trends (cont.)
Increased reliance on volunteers and community groups
Move to electronic/ GIS-based work systems
Documentation requirements necessitate increased reliability on technology and Computerized Maintenance Management Systems
All levels of staff must be proficient with technology
Heavy load of significant Capital Improvement projects stretching staff
Increased development review and processing time with rebounding economy and increased development
78
Public Works- Unmet Needs
Potential for Supplemental Water Supply need in 2018
Deferred maintenance: significant backlog of drainage, roads, parks and building repairs
Infrastructure Area Total Depreciation Annual set-aside
Parks and Open Space $ 4,881,775 $ 209,907
Buildings $ 4,684,874 $ 121,588
Drainage $32,116,707 $ 238,107
Roads To be determined
Sidewalks To be determined
79
Public Works - Unmet Needs (cont.)
Elm Street Recreation Center Repairs and Renovation
Sidewalk Repair back-log
ADA improvements
Street Tree Maintenance
NPDES Storm water Compliance requirements
Low staffing levels continue to impact ability to keep up with routine maintenance and repair needs; (4) additional maintenance staff required
80
Recreation
Accomplishments
Hired Volunteer Coordinator
Introduced (2) new family-oriented special events that are revenue neutral.
Attracted (4) new youth and adult tournaments to Soto Sports Complex this summer. Will generate $4,000 - $5,000 in direct revenue to the City and indirect revenue of $150,000 - $200,000
to area business community.
Introduced new Adopt-A-Park program to partner with individuals, groups and businesses to enhance park and facility maintenance.
Will complete 3rd consecutive fiscal year with $700,000+ in revenue generated through program fees.
Addition of several activities targeted to senior population
81
Recreation
Current Projects
Conversion of tennis court #5 to a permanent Pickleball Court
Upgrade of Woman’s Club Community Center Kitchen
Rollout of Volunteer Program to the community
82
Recreation
Anticipated Projects
Develop Recreation Department Facility Plan
Woman’s Club Kitchen project
Promotion of Adopt-A-Park Program
Update Department web pages
Organization and rollout of Sports Complex Banner Advertising Program
83
Recreation
Trends
Increased need for programming for growing senior population due to baby boomer retirements
Identifying new funding methods
84
Recreation
Unmet Needs
Recreation Department Facility Plan, including planning and funding for upgrade or replacement of the Elm Street Community Center/Recreation Services offices
85
Citywide Challenges
Long-term financial sustainability
Recruitment and retention
Adequate staffing (structure and number) to meet the expectations of the Community and increased regulatory requirements
Need to increase use of and keep up with technology
Infrastructure/ equipment maintenance and replacement
86
4. Council Comments
5. Community Comments
6. Additional Comments
87
7. Next Steps
Opportunities for public input: by email to City at agcity@arroyogrande.org or by attending meeting
Council Goal Setting:
Monday, June 27 6:00 pm
Council Chambers
88