Background on Project
Overview of Alternatives
Background on Closure
Traffic Study Information
Closure Feedback
Conclusion
Project Schedule
Notification
Recommendations
Format of Presentation
2
The Brisco Road-Halcyon Road/U.S. 101 Interchange project has been underway since the late 1990s.
Caltrans’ project delivery phases include:
Phase 1 – Project Initiation
Phase 2 –
Project Approval and Environmental Document
Phase 3 – Plans, Specifications and Estimates – Project Design
Phase 4 - Construction
Currently the project is in the Project Approval and
Environmental Document (PAED) phase with three project alternatives under review:
Alternative 1,
Alternative 4C Roundabout (RAB),
and no-build.
Background on Project
3
Alternative 1 includes the following improvements:
Closes the northbound on and off-ramps at Brisco Road and US 101
Completes intersection improvements Camino Mercado and US 101
Completes
intersection improvements at Grand Ave and US 101
Completes bridge widening on Grand Ave
Alternative 4C RAB includes the following improvements:
Relocates the northbound ramps at Brisco
to West Branch Street at Rodeo Drive
Completes intersection improvements at Grace Lane and Rodeo Drive
Complete intersection improvements at Grand Ave and US 101
Background on Project
Alternatives
4
Background on Project
Alternatives 1 – Camino Mercado
5
Background on Project
Alternatives 1 – Grand Ave
6
Background on Project
Alternatives 1 - Brisco
7
On June 23, 2015, City Council directed staff to pursue a test closure of the US 101 northbound on and off-ramps at Brisco Road.
Background on Closure
8
Traffic Study (TS) Information
9
TS – Traffic Count Locations
10
TS – Volume of Traffic – NB Ramps
11
TS – Volume of Traffic
Intersections
12
TS – Volume of Traffic
Roadway Segments
13
TS – Level of Service
14
The City of Arroyo Grande Citywide traffic model and the SLOCOG regional travel demand model were used to develop Year 2035 forecast traffic volumes for this analysis.
Buildout of
the City's General Plan within 20-years produce a growth rate of approximately 18%.
Study area also serves regional traffic in addition to local traffic, the SLOCOG regional model
provides a forecasted 23% growth over the next twenty years.
This study uses a conservative 23% growth rate to develop 20-year volume projections.
Using the actual traffic counts from
this study, those counts were increased by 23% to generate forecasted trips.
TS – Forecasted Level of Service
15
16
To date, the City has received 276 contacts either by phone or email:
203 or 73.6% of contacts have been positive towards the closure;
46 or 16.7% of contacts have not been in favor
of the closure; and
27 or 10.5% of contacts have requested operational changes or recommended other project alternatives.
Closure Feedback
17
Based on available data, the closure of the US 101 at Brisco Road on and off-ramps is successful.
Communications received indicate majority support for this change.
The traffic
counts, forecasted volumes, and anticipated improvements with alternative 1 indicate that planned improvements in the work area will improve traffic flows for twenty plus years.
Three
identified intersection outside the work area of alternative 1 perform below policy levels. Those intersections are as follows:
West Branch Street at Traffic Way
West Branch Street
at East Grand Avenue
Traffic Way at Fair Oaks Avenue
Staff recommends to continue to work with our Caltrans’ partners to complete the Project Approval Environmental Document Phase.
Conclusion
18
Project Schedule
Environmental Document to Caltrans March 2016
Public Review and Public Hearing of Environmental Document in Summer 2016
Selection of a preferred alternative late summer 2016
19
The Agenda was posted in front of City Hall on Thursday, February 18, 2016.
The Agenda and staff report were posted on the City’s website on Friday, February 19, 2016.
Email notifications
were sent to all that provided comments to brisco@arroyogrande.org.
A static construction sign was placed at the intersection of West Branch Street at Brisco Road.
Press Release
was issued to provide notice of tonight's meeting.
The chamber of commerce provide the City issued Press Release via email to members.
Notification
20
It is recommended the City Council:
Receive and file an update on the Test Closure Traffic Study Results for the Brisco Road at US 101 Northbound on and off-ramp closure.
Direct staff
to research the feasibility of an extended closure beyond the 6-month time frame and through construction.
Recommendations
21
22