CC 2015-10-27_11b PP Parks Assessment and Playground Replacement
City of Arroyo Grande
Parks and Open Space
Infrastructure Assessment Report
and Replacement schedule
Parks and Open Space Infrastructure Assessment Report
and Replacement schedule
It is recommended the Parks and Recreation
Commission:
Receive and provide comments on the draft
•
Parks Infrastructure Assessment Report and
Replacement Schedule.
Recommend approval of the replacement of
•
the KingoPark playground structure.
PARKS AND OPEN SPACE SUMMARY
General Fund Supported Assets
Parks and Open Space
•
Drainage facilities
•
Buildings
•
Sidewalks
•
Roads
•
PARKS AND OPEN SPACE SUMMARY
sixteen (16) parks
•
eighteen (18) planter areas
•
eleven (11) City facility landscape areas
•
four (4) designated open-space areas
•
eight (8) greenbelts, parkways and
•
detention basins
PARKS AND OPEN SPACE ACREAGE
TOTAL DEVELOPED ACREAGE:82.70
TOTAL UNDEVEOPED ACREAGE:85.64
TOTAL CITY PARK -168.34 ACRES
MAINTAINED PROPERTY:
PARKS AND OPEN SPACE ACREAGE
PARKS AND OPEN SPACE ACREAGE
Rancho Grande Park (8 acres)
PARKS AND OPEN SPACE ACREAGE
Rancho Grande Park (8 acres)
PARKS AND OPEN SPACE ACREAGE
StrotherPark (8.14 acres)
PARKS AND OPEN SPACE ACREAGE
Elm Street Park (5 acres)
PARKS AND OPEN SPACE ACREAGE
Elm Street Park (5 acres)
PARKS AND OPEN SPACE ACREAGE
StrotherPark (8.14 acres)
PARKS AND OPEN SPACE ACREAGE
James Way Open Space (75 acres)
PARKS AND OPEN SPACE ACREAGE
James Way Open Space (2 miles of trails)
PARKS AND OPEN SPACE
ASSET REPLACMENT REPORT METHODOLGY
DETAILED SURVEY OF ALL PARK FACILITIES
PARKS AND OPEN SPACE
ASSET REPLACMENT REPORT METHODOLGY
DETAILED SURVEY OF ALL PARK FACILITIES
PARKS AND OPEN SPACE
ASSET REPLACMENT REPORT METHODOLGY
Home Repair Cost Analogy
PARKS AND OPEN SPACE
INFRASTRUCTURE ASSESSMENT REPORT
PARKS AND OPEN SPACE
INFRASTRUCTURE DETERIOATION
(Representative Photographs)
StrotherPark
PARKS AND OPEN SPACE
INFRASTRUCTURE DETERIOATION
(Representative Photographs)
Elm Street Park
PARKS AND OPEN SPACE
INFRASTRUCTURE DETERIOATION
(Representative Photographs)
James Way Open Space
PARKS AND OPEN SPACE
INFRASTRUCTURE DETERIOATION
(Representative Photographs)
Soto Sports Complex
PARKS AND OPEN SPACE
ASSET REPLACMENT SCHEDULE
PARKS AND LANDSCAPING
KINGO PARK PLAY STRUCTURE
PARKS AND LANDSCAPING
KINGO PARK PLAY STRUCTURE
Parks and Open Space Infrastructure Assessment Report
and Replacement schedule
Advantages:
Identifies Outstanding Deferred Maintenance
•
Liabilities
Provides a prioritized asset replacement
•
schedule for Parks and Open space
Provides funding amounts to compare to
•
other City of Arroyo Grande General Fund
supported asset replacement needs.
Parks and Open Space Infrastructure Assessment Report
and Replacement schedule
Disadvantages:
Currently asset replacement for parks is not
•
funded.
Park asset replacement projects compete with
•
other high priority deferred maintenance
needs such as drainage, buildings and roads.
Parks and Open Space Infrastructure Assessment Report
and Replacement schedule
Alternatives:
Approve staffs recommendation
•
Seek grants and donations for parks asset
•
replacement.
Provide Direction to staff
•
Parks and Open Space Infrastructure Assessment Report
and Replacement schedule
It is recommended the City Council:
Receive and provide comments and direction
•
on the draft Parks Infrastructure Assessment
Report and Replacement Schedule.
Allocate $25,000 from the Local Sales Tax
•
funds for the replacement of the KingoPark
playground structure.