Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CC 2016-09-13 Supplemental No 1 Item 10a
MEMORANDUM TO: CITY COUNCIL FROM: DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SERVICES SUBJECT: SUPPLEMENTAL INFORMATION AGENDA ITEM 10.A. – SEPTEMBER 13, 2016 CITY COUNCIL MEETING Consideration of User Fee Study and Resolution Updating Operating Fees Set Forth in the Master Fee Schedule and Adding New Fees Related to Pickleball Programs, Animal Impound Services, and Licensing of Medical Marijuana Delivery Services. DATE: September 13, 2016 Attached is a revised Exhibit A to the Resolution updating the City’s Master Fee Schedule. The revised Exhibit reflects two changes: 1. Deletion of each department/division listing of hourly rates for various positions, which has been replaced by a new page 2 of the document stating that hourly rates for all City positions will be calculated and provided by the Administrative Services Department. 2. Deletion of the Massage Establishment Permit Original Application and the Massage Establishment Annual Renewal. Upon further analysis by the Police Department, these services are no longer performed by the City and are therefore recommended for removal from the Master Fee Schedule In addition, to assist the City Council in evaluating the proposed fee changes, attached is a document that shows the curre nt fees compared with the recommended fees for each service. cc: City Manager City Attorney City Clerk Public Review Binder EXHIBIT A Fees effective December 1, 2016 Issued by the Administrative Services Department CITY OF ARROYO GRANDE Fiscal Year 2016-17 MASTER FEE SCHEDULE City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 Hourly rates for all City staff positions will be calculated and provided by the Administrative Services Department. In the absence of an established fee for service, the City will recover costs based on the reasonable time and materials required to provide the service, as calculated by the Administrative Services Department EXHIBIT A 2 FY 2016-17 Fee Budget 40.00$ Financial Statements copy costs Business License Fees: (Basic fees are prorated per the application date: Jan1-Jun30, 100%; Jul1-Dec31, 50%) Basic Fee--All businesses except Specific License Fees listed below 31.00* >Per Employee, Partner, or Associate (Except those listed below)5.00 Specific License Fees: Contractor 61.00* Motels & Hotels (Basic Fee)31.00* >per room 1.00 Trailer Parks 31.00* >per space 1.00 Hospitals, Sanitariums, Rest or Nursing Homes 41.00* >per bed 3.00 Taxi Cabs 46.00* >per vehicle 15.00 Billboards 126.00* Commercial Auctions - Per Year 86.00* Commercial Auctions - Per Day of Auctioning 26.00* Circuses and similar shows (per day)70.00 + $1 SB1186 Bazaars and street fairs: >Small Bazaars (1-4 displays or exhibits) per display per every two (2) days 15.00 + $1 SB1186 >Large Bazaars (5 or more displays or exhibits) per day 70.00 + $1 SB1186 * Includes $1 per license per State law (SB 1186) Copies, per page (Black and White)0.20 Color copies Actual cost Maps--Chamber of Commerce 1.00 Utility Fees and Penalties: Renter's Deposit 180.00 New Utility Account Set Up Fee 30.00 Past Due Penalty (% of Past Due Total)0.10 Lock Cut Replacement Fee 10.00 Reconnection Fee (Reconnect by City Personnel)45.00 Unauthorized Reconnection Fee (Reconnect by non-City Personnel)65.00 Returned check fee (NSF) -Per CA Civil Code Section 1719 25.00 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 ADMINISTRATIVE SERVICES EXHIBIT A 3 FY 2016-17 Fee City Council Agenda and Minutes Subscription: City Council Agenda Only 20.00$ City Council Agenda and Minutes 35.00 City Council Meeting Audio CD $ 5.00/each City Council Meeting DVD Vendor cost Candidate Filing Fee no charge Candidate Statement actual cost Notice of Intent to Circulate Petition (EC 9202)200.00 Copies, per page (Black and White)0.20 Color copies Actual cost Copies of records sent to a commercial copier Actual cost Document Certification 10.00 Fair Political Practices Commission Forms: Statement of Economic Interests Form 700 (GC 81008).10/page Campaign Statements (GC 81008).10/page Retrieval fee for statements 5 or more years old (GC 81008)5.00/request Municipal Code (w/out binder)150.00 Municipal Code Supplement Subscription 25.00/year Notary (per signature)10.00 Transcript of City Council proceedings Actual cost Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES EXHIBIT A 4 Fee Description FY 2016-17 Fee Printing/Copying Charges: 8 1/2" x 11 (per page)0.20$ 18" x 30 (per page)3.00 24" x 36" (per page)4.00 36" x 48" (per page)5.00 Standard Plans 35.00 Land Use Map and Zoning Maps (each) 24x36 3.00 36x48 4.00 Welcome to Arroyo Grande Maps 4.00 Overtime Inspections (per hour- 2 hour min.)140.00 Map Review - Final (LLA, PM, TM 0-2 Lots)5,210.00 Each Additional Lot 124.00 Additional Map Review - After 3 2,481.00 Encroachment Permit - Minor (pod, dumpster)50.00 Encroachment Permit - Standard - per Month 619.00 Encroachment Permit - Franchise Annual 15,500.00 Certificate of Compliance 1,915.00 Certificate of Correction / Merger 693.00 Transporation Permit - each occurance 36.00 Public Improvement Plan - Plan Check (based on Engineer's estimate of construction cost): $0 - 10,000 2,285.00 $10,001 - 50,000 2,626.00 $50,001 - 100,000 3,023.00 $100,001 - 250,000 3,482.00 $250,001 - 500,000 4,842.00 $500,001 - 1.0 Million 6,315.00 Each additional $500,000 (over $1M)1,944.00 Additional Review Public Improvement Plan - Plan Check - After 3 (based on Engineer's estimate of construction cost): $0 - 10,000 554.00 $10,001 - 50,000 622.00 $50,001 - 100,000 691.00 $100,001 - 250,000 826.00 $250,001 - 500,000 1,093.00 $500,001 - 1.0 Million 1,899.00 Each additional $500,000 (over $1M)805.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 ENGINEERING EXHIBIT A 5 Fee Description FY 2016-17 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 ENGINEERING Grading / Drainage / Erosion Plan Review: 0 - 50 cy 1,132.00$ 50 cy to 100 cy 1,215.00 100 cy to 1,0000 cy 1,372.00 1,000 cy to 10,000 cy 1,529.00 10,000 cy to 100,000 cy 1,685.00 Hydraulic / Hydrology Report Review 710.00 SWPPP Review 710.00 Stormwater Control Plan Review 710.00 Inspection Agreement, including Subdivision Agreement (based on Engineer's estimate of construction cost): $0 - 10,000 662.00 $10,001 - 50,000 1,723.00 $50,001 - 100,000 3,298.00 $100,001 - 250,000 6,583.00 $250,001 - 500,000 12,662.00 $500,001 - 1.0 Million 24,567.00 Each additional $500,000 (over $1M)11,960.00 Major Project with a Contract Engineer - Actual cost of Contractor passed directly through to Applicant Major Project with a Contract Engineer - City Project Management and Administrative Charge 1,143.00 EXHIBIT A 6 FY 2016-17 Fee Development Code w/out Appendices 50.00$ Appendice 1 15.00 Appendice 2 5.00 Development Code w/Appendices 70.00 General Plan 25.00 Housing Element 2003 35.00 General Plan EIR 12.00 Design Guidelines for Historic Districts 25.00 Design Guidelines for Traffic Way/Station Way 6.00 Design Guidelines for Mixed Use Districts 30.00 East Grand Avenue Enhancement Plan 20.00 Land Use Map and Zoning Maps (each) 24 x 36 3.00 36 x 48 4.00 DVD (Planning Commission meetings)Vendor cost Audio Tape copies 10.00 Copies, per page (Black and White)0.20 Color copies Actual cost Arroyo Grande Bike Plan 26.00 Downtown Parking in lieu fee (per resolution 3994)24,000.00 Notary (per signature)10.00 Annexation - deposit (fee based on actual time at staff at hourly rates)20,000.00 Time and Materials (if project exceeds 50 hours of staff time) Appeals: CD Director to Planning Commission 333.00 Planning Commission to City Council 790.00 Certificate of Compliance 2,387.00 Conditional Use Permit: Project - Major (multi building)9,750.00 Time and Materials (if project exceeds 50 hours of staff time) Project - Minor (routine) - as det'd by CDD 4,221.00 Amendment 2,132.00 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 COMMUNITY DEVELOPMENT EXHIBIT A 7 FY 2016-17 Fee Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 COMMUNITY DEVELOPMENT Development Agreement - deposit 16,325.00$ Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Major 11,000.00 Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Minor 6,048.00 Environmental Impact Determination: Initial Study Fee 2,319.00 Negative Declaration 377.00 Mitigated Neg Dec 1,575.00 General Plan Amendment (Major)11,000.00 Time and Materials (if project exceeds 50 hours of staff time) General Plan Amendment (Minor)6,048.00 Home Occupation Permit 112.00 Lot Line Adjustment 2,260.00 Lot Merger / Reversion to Acreage 2,224.00 Mailing Label Production 276.00 Request for Meeting Continuance 314.00 Minor Use Permit - Architectural Review Major (e.g. subdivision if PUD or CUP is not concurrently processed)3,496.00 Minor (e.g. single lot)627.00 Minor Use Permit - Historic Resource Designation 1,000.00 Minor Use Permit - Large Family Day Care 381.00 Minor Use Permit - Minor Exception 679.00 Minor Use Permit - Plot Plan Review 500.00 Minor Use Permit - Temporary Use Permit 200.00 Minor Use Permit - Viewshed Review:768.00 Planned Unit Development Permit (Major)10,370.00 Time and Materials (if project exceeds 50 hours of staff time) Planned Unit Development Permit (Minor)4,962.00 Planning Commission lnterpretation or Waiver 1,230.00 Pre-Application - S.A.C.835.00 Public Art Permit 630.00 Research (deposit)150.00 Signs: Planned Sign Program 1,625.00 Administrative Sign Permit 233.00 Administrative Sign Program 915.00 Specific Plan or Amendment (deposit)16,294.00 Time and Materials (if project exceeds 50 hours of staff time) EXHIBIT A 8 FY 2016-17 Fee Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 COMMUNITY DEVELOPMENT Tentative Parcel Map (0-4 lots)6,481.00$ with Vesting (added to base fee)402.00 Amendment 3,139.00 Tentative Tract Map: 5-20 lots 10,649.00 over 20 lots 12,361.00 with Vesting (added to base fee)1,043.00 Amendment 4,675.00 Time Extension 1,745.00$ Variance 2,469.00 Zoning Compliance Letter 100.00 EXHIBIT A 9 Fee Description FY 2016-17 Fee ANIMAL CONTROL / IMPOUND Dog Impound Fee 1st Impound 20.00$ 2nd Impound 40.00 3rd Impound +60.00 Cat Impound Fee 1st Impound 20.00 2nd Impound 40.00 3rd Impound +60.00 PERMITS & LICENSES: Alarm Permit Original Application Permit Processing Fee 95.00 Annual Renewal Permit Processing Fee 45.00 False Alarm Response Fourth False Alarm within 12 months 150.00 Fifth False Alarm within 12 months 300.00 Sixth or more false alarm within 12 months (per incident)450.00 Block Party Permit Block Party Permit 25.00 Commercial Filming / Still Photography Permit Permit Processing Fee 50.00 Commercial Filming (per day)250.00 Still Photography (per day)100.00 City Staff Assigned - 4 hour minimum (if applicable)overtime rate Concealed Weapons Permit Original Application Police Department Investigation Fee 100.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Identification Card 20.00 Concealed Weapons Permit Biennial Renewal: Police Department Investigation Fee 25.00 Identification Card 20.00 Medical Marijuana Delivery Service License Application Processing Fee 600.00 Background Investigation Fees 92.00 ID Card / Vehicle Permit Fee 30.00 Medical Marijuana Delivery Service License Renewal Application Processing Fee 500.00 Background Investigation Fees 35.00 ID Card / Vehicle Permit Fee 30.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 POLICE EXHIBIT A 10 Fee Description FY 2016-17 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 POLICE Medical Marijuana Delivery Driver Permit Application Processing Fee 600.00$ Background Investigation Fees 92.00 ID Card / Vehicle Permit Fee 30.00 Medical Marijuana Delivery Driver Permit Renewal Application Processing Fee 500.00 Background Investigation Fees 92.00 ID Card / Vehicle Permit Fee 30.00 Mobile Vendor Permit Permit Processing Fee 125.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Mobile Vendor Employee Permit Permit Processing Fee 125.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Palmreader Fortune Teller Permit - Original Application Permit Processing Fee 125.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Palmreader Fortune Teller Permit - Annual Renewal Permit Renewal Processing 100.00 Palmreader Fortune Teller Establishment Permit - Original Application Permit Processing Fee 125.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Palmreader Fortune Teller Establishment Permit - Renewal Application Permit Processing Fee 100.00 Public Safety and Welfare Permit: Less than 200 Non-Commercial Event 50.00 More than 200 Non-Commercial Event 100.00 Commercial Event 125.00 Second Hand Dealer Permit Original Application Permit Processing Fee 125.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Dept of Justice & FBI Fingerprint process (DOJ passthrough fee paid by applicant)actual cost Second Hand Dealer Permit Biennial Renewal City Processing Fee 100.00 Solicitation Permit (per solicitor) Permit Processing Fee 125.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Processing Fee actual cost EXHIBIT A 11 Fee Description FY 2016-17 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 POLICE Taxi Cab Driver Permit Original Application Permit Processing Fee 125.00$ Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Taxi Cab Driver Permit Annual Renewal Annual Renewal 100.00 Tobacco Retailers License Permit Processing Fee 125.00 OTHER FEES Citation correction certification 25.00 Civil Witness Fee (Deposit)275.00 Copies, per page (Black and White).20 per page Copies - Color copies per page 5.00 Court Ordered Booking 125.00 Criminal history summary examination Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Disturbance 415PC Second Response 150.00 Third Response 300.00 Fourth Response 500.00 Emergency DUI Response -Impaired Driver Accident - Actual Time @ Staff Hourly Rates actual cost Local Records Check 15.00 Photographs per disc 25.00 Property Handling for Mailing / Shipping actual cost Replacement of lost/stolen Permits, Licenses and registration receipts 45.00 Repossessed Vehicle 15.00 Subpoena Duces Tecum Actual staff time billed at hourly rate to produce records actual cost .20 per page produced actual cost postage/shipping actual cost Custodian of Records Court Appearance $275 Vehicle Release - Impound/Stored Vehicle Release 50.00 Vehicle Release 30-day Impound Release Review 75.00 Clearance letter 45.00 EXHIBIT A 12 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Cellular/Mobile Phone, free-standing NEW 986.00$ 1,405.00$ Cellular Tower with Equipment Shelter 986.00 1,575.00 Cellular Tower Equipment Demolition 379.00 396.00 Awning (not patio cover) Tents / Canopies / Booths 103.00 154.00 172.00 313.00 Close Existing Openings 103.00 210.00 Compliance Inspections/Reinspections 191.00 258.00 Deck (with Calcs)221.00 276.00 Demolition 103.00 324.00 Demolition - MultiFamily/Commercial 103.00 324.00 Door 103.00 222.00 Fence or Wall (wood, chain link, wrought iron): >6 feet in height, 1st 100 s.f.103.00 283.00 Each additional 100 sf 78.00 103.00 Fence or Freestanding Wall (masonry / garden): City Standard, 1st 100 s.f.103.00 283.00 Each additional 100 sf 78.00 103.00 Engineered Wall, 1st 100 sf 133.00 283.00 Each additional 100 sf 108.00 103.00 Fireplace (masonry or pre-fab)103.00 204.00 Flag pole (greater than 6 feet in height)103.00 204.00 Grading (Cut and Fill): 0-50 Cubic Yards (Cut and Fill)133.00 204.00 Each Add'l 50 CY (or portion thereof)65.00 154.00 Pilaster each 10 103.00 204.00 Lighting pole (each)103.00 174.00 Stucco Applications 64.00 204.00 Retaining Wall (concrete or masonry): First 50 sf 211.00 234.00 Each additional 50 sf 186.00 133.00 Re-roofing: Composition - no tear off 84.00$ 198.00$ Other roofs (first 10 squares)84.00 198.00 Each additional 10 squares 20.00 48.00 Roof Structure Replacement 133.00 234.00 Sauna - steam 103.00 246.00 Change of Occupancy No T.I. w/ plan check & Inspection Recovery Rate 100% of Cost City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING MISC EXHIBIT A 13 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Recovery Rate 100% of Cost City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING MISC Siding: Stone and Brick Veneer (interior or exterior)84.00 246.00 All Other 64.00 246.00 Signs: Directional / Menu 211.00 246.00 Freeway sign 485.00 270.00 Ground / Roof / Projecting Signs 201.00 234.00 Wall, Illuminated 84.00 246.00 Skylight (Residential each)64.00 216.00 Skylight (Commercial) one 84.00 216.00 Spa or Hot Tub (Pre-fabricated)84.00 246.00 Stairs - per story 309.00 234.00 Storage Racks each set of plans 358.00 294.00 Temporary Utility Connection or Occupancy - 84.00 Window or Sliding Glass Door (first)211.00 234.00 Each additional 186.00 109.00 Board of Appeals 794.00$ -$ Business License Inspection 40.00 61.00 Business License Re-inspection 40.00 32.00 Product Review 597.00 - Disabled Access Compliance Inspection 119.00 79.00 Supplemental Plan Check Fee (first 1/2 hour)108.00 - Each Additional 1/2 hour (or portion thereof)98.00 - Supplemental Inspection Fee (first 1/2 hour)- 108.00 Each Additional 1/2 hour (or portion thereof)- 98.00 - 206.00 196.00 After Hours Inspection 2 hour minimum - 206.00 Each additional hour - 196.00 After Hours Plan Review 2 hour minimum 206.00 - Each additional hour 196.00 - Copies, per page (Black and White) .20 per page Color copies actual costs Emergency (Non-Scheduled) Call-Out Fee (first hour) 2 hour minimum Emergency (Non-Scheduled) Call-Out Fee (each additional hour) EXHIBIT A 14 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Fire Sprinkler Systems - New Construction: 1-50 Heads 197.00$ 215.00$ 51-100 Heads 246.00 305.00 101-200 Heads 443.00 365.00 Every 200 Heads above 200 196.00 140.00 Fire Sprinkler Systems -Tenant Improvements: 1-25 Heads 197.00 215.00 26-100 Heads 296.00 335.00 Every 100 Heads above 100 98.00 225.00 Fire Alarm System (including Sprinkler Monitor System) - New Construction: 1-50 Devices 197.00 215.00 51-100 Devices 246.00 305.00 Every 50 Devices above 100 98.00 201.00 Fire Alarm System (including Sprinkler Monitor System) - Tenant Improvements: 1-50 Devices 197.00 245.00 51-100 Devices 246.00 335.00 Every 50 Devices above 100 148.00 201.00 Other Suppression Systems: Inert Gas Systems 344.00 430.00 Dry Chemical Systems 197.00 430.00 Wet Chemical/Kitchen Hood 295.00 430.00 Foam Systems 197.00 588.00 Paint Spray Booth 442.00 638.00 Other Fire Fees: Hydrants/Underground Fire Service Plan Check 393.00 - Hydrant Flow Test (existing hydrants)- 588.00 Special Event Inspection (e.g., fairs) These are group events, when multiple booths/tents are erected Booth / Tent 52.00 56.00 Booth / Tent with Electricity 75.00 92.00 Booth / Tent with Cooking (includes Electricity)80.00 110.00 Special Event Application Review 21.00 Additional Fire related services are provided by Five Cities Fire Authority (FCFA). See the FCFA fee schedule for fees. Recovery Rate 100% of Cost City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING FIRE EXHIBIT A 15 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 ADMINISTRATIVE (BASE) FEES: Permit Issuance and Administration 101.00$ -$ MECHANICAL PERMIT FEES FAU less than 100,000 Btu/h 49.00 60.00 FAU greater than 100,000 Btu/h 49.00 91.00 Floor furnace (including vent)49.00 121.00 Suspended, wall, or floor-mounted heaters 49.00 91.00 Appliance vents not included in an appliance permit 49.00 91.00 Boiler or compressor, from 15 HP to 30 HP / absorption system from 500,000 Btu/h to 1,000,000 Btu/h.49.00 91.00 Boiler or compressor, from 30 HP to 50 HP, / absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h.98.00 121.00 Boiler or compressor, over 50 HP / absorption system over 1,750,000 Btu/h.147.00 91.00 Air-handling unit, including attached ducts.98.00 91.00 Air-handling unit over 10,000 CFM 147.00 121.00 Evaporative cooler 49.00 60.00 Ventilation fan connected to a single duct 98.00 91.00 Ventilation system (not a portion of heating or a/c system)147.00 121.00 Incinerator, residential 245.00 181.00 Commercial or Industrial-type incinerator 294.00 181.00 Misc. appliances or equipment.147.00 121.00 Stand Alone Mechanical Plan Check (hourly rate)196.00 - Other Mechanical Inspections (per hour)- 121.00 PLUMBING / GAS PERMIT FEES: Plumbing fixtures 49.00 60.00 Building sewer 98.00 91.00 Rainwater systems (per drain)49.00 60.00 Gray Water system 147.00 151.00 Private sewage disposal system 147.00 151.00 Water Heater 98.00 60.00 Industrial waste pretreatment interceptor 49.00 91.00 Water piping and/or water treating equipment (each)49.00 91.00 Repair or alteration of drainage or vent piping, each fixture 49.00 91.00 Each lawn sprinkler system on any one meter 49.00 60.00 Backflow devices each unit 98.00 60.00 Atmospheric-type vacuum breakers: 1-5 units 98.00 60.00 Atmospheric-type vacuum breakers: each unit over 5 units 98.00 60.00 Stand Alone Plumbing Plan Check (hourly rate)196.00 - Other Plumbing and Gas Inspections (per hour)- 121.00 Recovery Rate 100% of Cost City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING MPE EXHIBIT A 16 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Recovery Rate 100% of Cost City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING MPE SYSTEM FEES: Swimming Pools 147.00$ 211.00$ Outdoor Events 147.00 91.00 Electric generator and electrically-driven rides 98.00 91.00 Mechanically-driven rides/ attractions with electrical lighting 147.00 91.00 Each system of area and booth lighting 98.00 91.00 Temporary Power Service 98.00 60.00 Temporary power pole 98.00 60.00 Sub poles (each)49.00 42.00 UNIT FEES: Receptacle, Switch, and Lighting Outlets First 10 98.00 60.00 Each Additional 10 49.00 30.00 Lighting Fixtures: First 10 98.00 60.00 Each additional 10 49.00 30.00 Pole or platform-mounted lighting fixtures (each)98.00 91.00 Theatrical-type lighting fixtures or assemblies (each)98.00 121.00 Residential Appliances (each)98.00 60.00 Nonresidential Appliances 147.00 121.00 Residential appliances and self-contained, nonresidential appliances, (each)147.00 121.00 Appliances not exceeding one horsepower (HP) kilowatt (KW), or kilovolt-ampere (KVA), in rating,(each)196.00 121.00 Power Apparatus: Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus (all sizes)147.00 60.00 Signs, Outline Lighting, and Marquees: Signs, Outline Lighting, or Marquees supplied from one branch circuit (each)98.00 91.00 Additional branch circuits within the same sign, outline lighting system, or marquee (each)98.00 60.00 Service or Panel: 200 amp or less Electrical Panel (each)147.00 121.00 Over 200 amp up to 1000 amp Electrical Panel (each)245.00 151.00 Over 1000 amp Electrical Panel (each)391.00 181.00 EXHIBIT A 17 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Recovery Rate 100% of Cost City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING MPE UNIT FEES (continued): 98.00$ 91.00$ 98.00 121.00 Photovotaic Systems - each 147.00 181.00 Stand Alone Electrical Plan Check (hourly rate)196.00 - Other Electrical Inspections (per hour)- 121.00 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth Miscellaneous Apparatus, Conduits, and Conductors EXHIBIT A 18 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF 2,000 4,183$ $0.188 8,000 5,311$ $0.253 1 A-1 Assembly Group - Theaters 20,000 8,347$ $0.274 40,000 13,832$ $0.184 100,000 24,860$ $0.249 1,000 2,698$ $0.216 4,000 3,347$ $0.294 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 5,110$ $0.318 20,000 8,292$ $0.214 50,000 14,712$ $0.294 250 1,413$ $0.296 1,000 1,635$ $0.359 3 A Assembly Group - TI 2,500 2,174$ $0.392 5,000 3,155$ $0.253 12,500 5,049$ $0.404 1,000 2,698$ $0.216 4,000 3,347$ $0.294 4 A-3 Church and Religious Bldg - Complete 10,000 5,110$ $0.318 20,000 8,292$ $0.214 50,000 14,712$ $0.294 500 1,927$ $0.262 2,000 2,320$ $0.343 5 R-4 Congregate Care - Complete 5,000 3,348$ $0.372 10,000 5,210$ $0.247 25,000 8,914$ $0.357 250 1,413$ $0.296 1,000 1,635$ $0.359 6 A-3 Church and Religious Bldg - TI 2,500 2,174$ $0.392 5,000 3,155$ $0.253 12,500 5,049$ $0.404 2,000 3,254$ $0.139 8,000 4,089$ $0.191 7 E Educational Building - Complete 20,000 6,382$ $0.207 40,000 10,519$ $0.140 100,000 18,899$ $0.189 250 1,413$ $0.296 1,000 1,635$ $0.359 8 E Educational Building - TI 2,500 2,174$ $0.392 5,000 3,155$ $0.253 12,500 5,049$ $0.404 PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost EXHIBIT A 19 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 500 1,627$ $0.195 2,000 1,920$ $0.248 9 S-2 Parking Garage - Complete 5,000 2,664$ $0.270 10,000 4,012$ $0.177 25,000 6,660$ $0.266 1,000 2,698$ $0.216 4,000 3,347$ $0.294 10 R-1 Hotel Low/Mid Rise - Complete 10,000 5,110$ $0.318 20,000 8,292$ $0.214 50,000 14,712$ $0.294 1,000 1,585$ $0.093 4,000 1,863$ $0.117 11 R-1 Hotel Low/Mid Rise - Shell 10,000 2,566$ $0.127 20,000 3,840$ $0.083 50,000 6,338$ $0.127 250 1,370$ $0.277 1,000 1,578$ $0.332 12 R-1 Hotel Low/Mid Rise - TI 2,500 2,076$ $0.363 5,000 2,984$ $0.232 12,500 4,727$ $0.378 500 2,028$ $0.278 2,000 2,445$ $0.351 13 B Offices, etc. - Complete 5,000 3,499$ $0.382 10,000 5,411$ $0.250 25,000 9,157$ $0.366 1,000 1,392$ $0.071 4,000 1,606$ $0.087 14 B Offices, etc. - Shell 10,000 2,125$ $0.095 20,000 3,070$ $0.061 50,000 4,888$ $0.098 100 1,208$ $0.510 400 1,361$ $0.573 15 B Offices, etc. - TI 1,000 1,705$ $0.629 2,000 2,334$ $0.390 5,000 3,503$ $0.701 1,000 2,698$ $0.216 4,000 3,347$ $0.294 16 F Industrial Building - Complete 10,000 5,110$ $0.318 20,000 8,292$ $0.214 50,000 14,712$ $0.294 EXHIBIT A 20 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 1,000 1,841$ $0.122 4,000 2,206$ $0.158 17 F Industrial Building - Shell 10,000 3,153$ $0.172 20,000 4,868$ $0.113 50,000 8,270$ $0.165 250 1,370$ $0.277 1,000 1,578$ $0.332 18 F Industrial Building - TI 2,500 2,076$ $0.363 5,000 2,984$ $0.232 12,500 4,727$ $0.378 500 1,841$ $0.243 2,000 2,206$ $0.316 19 S-1 Repair Garage & Service St - Complete 5,000 3,153$ $0.343 10,000 4,868$ $0.227 25,000 8,270$ $0.331 500 1,285$ $0.119 2,000 1,464$ $0.139 20 S-1 Repair Garage & Service St - Shell 5,000 1,881$ $0.152 10,000 2,642$ $0.096 25,000 4,083$ $0.163 100 1,349$ $0.667 400 1,549$ $0.798 21 S-1 Repair Garage & Service St - TI 1,000 2,028$ $0.871 2,000 2,899$ $0.556 5,000 4,566$ $0.913 500 1,927$ $0.262 2,000 2,320$ $0.343 22 M Retail Sales - Complete 5,000 3,348$ $0.372 10,000 5,210$ $0.247 25,000 8,914$ $0.357 500 1,285$ $0.119 2,000 1,464$ $0.139 23 M Retail Sales - Shell 5,000 1,881$ $0.152 10,000 2,642$ $0.096 25,000 4,083$ $0.163 100 1,349$ $0.667 400 1,549$ $0.798 24 M Retail Sales - TI 1,000 2,028$ $0.871 2,000 2,899$ $0.556 5,000 4,566$ $0.913 EXHIBIT A 21 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 2,000 1,841$ $0.061 8,000 2,206$ $0.079 25 - Warehouse - Complete 20,000 3,153$ $0.086 40,000 4,868$ $0.057 100,000 8,270$ $0.083 1,000 2,698$ $0.216 4,000 3,347$ $0.294 26 I Medical/24 Hour Care - Complete 10,000 5,110$ $0.318 20,000 8,292$ $0.214 50,000 14,712$ $0.294 1,000 1,627$ $0.098 4,000 1,920$ $0.124 27 I Medical/24 Hour Care - Shell 10,000 2,664$ $0.135 20,000 4,012$ $0.088 50,000 6,660$ $0.133 100 1,542$ $0.880 400 1,806$ $1.103 28 I Medical/24Hour Care - TI 1,000 2,468$ $1.201 2,000 3,669$ $0.782 5,000 6,016$ $1.203 1,000 2,698$ $0.216 4,000 3,347$ $0.294 29 B Medical Offices - Complete 10,000 5,110$ $0.318 20,000 8,292$ $0.214 50,000 14,712$ $0.294 1,000 1,627$ $0.098 4,000 1,920$ $0.124 30 B Medical Offices - Shell 10,000 2,664$ $0.135 20,000 4,012$ $0.088 50,000 6,660$ $0.133 250 1,542$ $0.352 1,000 1,806$ $0.441 31 B Medical Offices - TI 2,500 2,468$ $0.480 5,000 3,669$ $0.313 12,500 6,016$ $0.481 500 2,055$ $0.291 2,000 2,491$ $0.384 32 - Restaurant - Complete 5,000 3,642$ $0.416 10,000 5,724$ $0.277 25,000 9,881$ $0.395 EXHIBIT A 22 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 500 1,413$ $0.148 2,000 1,635$ $0.180 33 - Restaurant - Shell 5,000 2,174$ $0.196 10,000 3,155$ $0.126 25,000 5,049$ $0.202 250 1,306$ $0.248 1,000 1,492$ $0.292 34 - Restaurant - TI 2,500 1,930$ $0.319 5,000 2,727$ $0.202 12,500 4,244$ $0.340 250 1,799$ $0.465 1,000 2,148$ $0.605 35 I-4 Day Care Facility - Complete 2,500 3,055$ $0.657 5,000 4,697$ $0.433 12,500 7,948$ $0.636 100 1,542$ $0.880 400 1,806$ $1.103 36 I-4 Day Care Facility - TI 1,000 2,468$ $1.201 2,000 3,669$ $0.782 5,000 6,016$ $1.203 500 1,670$ $0.205 2,000 1,977$ $0.261 37 H Hazardous H- Complete 5,000 2,761$ $0.284 10,000 4,183$ $0.187 25,000 6,982$ $0.279 500 2,055$ $0.291 2,000 2,491$ $0.384 38 H Hazardous H- Shell 5,000 3,642$ $0.416 10,000 5,724$ $0.277 25,000 9,881$ $0.395 100 1,542$ $0.880 400 1,806$ $1.103 39 H Hazardous H- T I 1,000 2,468$ $1.201 2,000 3,669$ $0.782 5,000 6,016$ $1.203 200 1,199$ $0.250 800 1,349$ $0.280 40 - Commercial Building - Foundation 2,000 1,685$ $0.307 4,000 2,299$ $0.190 10,000 3,439$ $0.344 EXHIBIT A 23 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 200 1,242$ $0.273 800 1,406$ $0.314 41 - Commercial Building - Addition 2,000 1,783$ $0.344 4,000 2,471$ $0.215 10,000 3,761$ $0.376 1,000 2,698$ $0.216 4,000 3,347$ $0.294 42 R-2 Apartment Building 10,000 5,110$ $0.318 20,000 8,292$ $0.214 50,000 14,712$ $0.294 1,000 2,174$ $0.123 2,000 2,297$ $0.636 64 R-3 Single-Family (custom or model)3,000 2,933$ $0.332 5,000 3,597$ $0.471 7,500 4,774$ $0.637 667 1,278$ $0.072 1,333 1,326$ $0.245 65 R-3 Single-Family - Production / Repeat 2,000 1,489$ $0.191 3,333 1,743$ $0.221 5,000 2,112$ $0.422 333 1,218$ $0.129 667 1,261$ $0.393 66 R-3 Moved Building - Residential 1,000 1,392$ $0.339 1,667 1,618$ $0.377 2,500 1,932$ $0.773 800 1,109$ $0.044 1,600 1,144$ $0.089 67 R-3 Manufactured Home - Complete 2,400 1,215$ $0.111 4,000 1,392$ $0.107 6,000 1,606$ $0.268 667 1,109$ $0.053 1,333 1,144$ $0.107 68 R-3 Prefabricated Dwelling - Complete 2,000 1,215$ $0.133 3,333 1,392$ $0.128 5,000 1,606$ $0.321 120 972$ $0.208 480 1,047$ $0.165 69 - Commercial Coach - Complete 1,200 1,166$ $0.188 2,400 1,392$ $0.094 6,000 1,732$ $0.289 EXHIBIT A 24 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 240 972$ $0.104 960 1,047$ $0.083 70 - Modular Building - Complete 2,400 1,166$ $0.094 4,800 1,392$ $0.047 12,000 1,732$ $0.144 500 994$ $0.054 2,000 1,075$ $0.047 71 - Manufactured Building - Foundation 5,000 1,215$ $0.052 10,000 1,477$ $0.028 25,000 1,893$ $0.076 167 1,109$ $0.210 333 1,144$ $0.426 72 U Residential Garage 500 1,215$ $0.531 833 1,392$ $0.514 1,250 1,606$ $1.285 40 1,028$ $0.775 160 1,121$ $0.721 73 U Pool/Spa - Standard Plan 400 1,294$ $0.800 800 1,614$ $0.448 2,000 2,151$ $1.076 200 1,542$ $0.440 800 1,806$ $0.552 74 - Commercial Building - Remodel 2,000 2,468$ $0.601 4,000 3,669$ $0.391 10,000 6,016$ $0.602 200 1,499$ $0.417 800 1,749$ $0.518 75 - Commercial Building - Repair 2,000 2,370$ $0.564 4,000 3,498$ $0.366 10,000 5,694$ $0.569 50 1,011$ $0.580 200 1,098$ $0.523 77 U Accessory Building - Commercial 500 1,255$ $0.582 1,000 1,546$ $0.317 2,500 2,022$ $0.809 50 1,011$ $0.580 200 1,098$ $0.523 78 U Commercial Carport 500 1,255$ $0.582 1,000 1,546$ $0.317 2,500 2,022$ $0.809 EXHIBIT A 25 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 167 1,278$ $0.288 333 1,326$ $0.978 79 R-3 Single-Family Residential - Addition 500 1,489$ $0.762 833 1,743$ $0.886 1,250 2,112$ $1.690 333 1,459$ $0.189 667 1,522$ $0.783 80 R-2 Multi-Family Residential - Addition 1,000 1,783$ $0.506 1,667 2,120$ $0.641 2,500 2,654$ $1.062 333 1,097$ $0.102 IRC 667 1,131$ $0.195 81 SFD Single-Family Residential - Remodel 1,000 1,196$ $0.257 1,667 1,367$ $0.244 2,500 1,570$ $0.628 667 1,224$ $0.066 1,333 1,268$ $0.200 82 R-2 Multi-Family Residential - Remodel 2,000 1,401$ $0.172 3,333 1,630$ $0.192 5,000 1,950$ $0.390 333 948$ $0.063 667 969$ $0.252 83 R-3 Residential Building - Foundation 1,000 1,053$ $0.167 1,667 1,164$ $0.209 2,500 1,338$ $0.535 83 912$ $0.204 167 929$ $0.792 84 U Accessory Building - Residential 250 995$ $0.564 417 1,089$ $0.677 625 1,230$ $1.968 133 912$ $0.128 267 929$ $0.495 85 U Residential Carport 400 995$ $0.353 667 1,089$ $0.423 1,000 1,230$ $1.230 83 912$ $0.204 167 929$ $0.792 86 U Residential Patio Cover 250 995$ $0.564 417 1,089$ $0.677 625 1,230$ $1.968 EXHIBIT A 26 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING PLAN CHECK Recovery Rate 100% of Cost 83 1,032$ $0.336 167 1,060$ $1.560 87 U Residential Balcony/Deck 250 1,190$ $0.894 417 1,339$ $1.210 625 1,591$ $2.546 83 1,002$ $0.300 167 1,027$ $1.368 88 U Residential Patio Enclosure 250 1,141$ $0.816 417 1,277$ $1.075 625 1,501$ $2.402 EXHIBIT A 27 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF 2,000 2,900$ $0.355 8,000 5,028$ $0.308 1 A-1 Assembly Group - Theaters 20,000 8,722$ $0.265 40,000 14,012$ $0.299 100,000 31,977$ $0.320 1,000 2,354$ $0.559 4,000 4,032$ $0.581 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 7,515$ $0.479 20,000 12,303$ $0.567 50,000 29,300$ $0.586 250 638$ $0.664 1,000 1,136$ $0.235 3 A Assembly Group - TI 2,500 1,489$ $0.259 5,000 2,137$ $0.231 12,500 3,869$ $0.310 1,000 1,917$ $0.440 4,000 3,236$ $0.552 4 A-3 Church and Religious Bldg - Complete 10,000 6,550$ $0.439 20,000 10,936$ $0.541 50,000 27,158$ $0.543 500 1,230$ $0.545 2,000 2,047$ $0.617 5 R-4 Congregate Care - Complete 5,000 3,898$ $0.474 10,000 6,267$ $0.619 25,000 15,550$ $0.622 250 475$ $0.484 1,000 838$ $0.193 6 A-3 Church and Religious Bldg - TI 2,500 1,128$ $0.198 5,000 1,624$ $0.192 12,500 3,065$ $0.245 2,000 2,846$ $0.347 8,000 4,928$ $0.306 7 E Educational Building - Complete 20,000 8,601$ $0.262 40,000 13,841$ $0.298 100,000 31,709$ $0.317 250 475$ $0.484 1,000 838$ $0.193 8 E Educational Building - TI 2,500 1,128$ $0.198 5,000 1,624$ $0.192 12,500 3,065$ $0.245 INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 BUILDING INSPECTION Recovery Rate 100% of Cost EXHIBIT A 28 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 500 638$ $0.332 2,000 1,136$ $0.118 9 S-2 Parking Garage - Complete 5,000 1,489$ $0.130 10,000 2,137$ $0.115 25,000 3,869$ $0.155 1,000 1,917$ $0.440 4,000 3,236$ $0.552 10 R-1 Hotel Low/Mid Rise - Complete 10,000 6,550$ $0.439 20,000 10,936$ $0.541 50,000 27,158$ $0.543 1,000 682$ $0.178 4,000 1,216$ $0.062 11 R-1 Hotel Low/Mid Rise - Shell 10,000 1,586$ $0.069 20,000 2,274$ $0.060 50,000 4,083$ $0.082 250 475$ $0.484 1,000 838$ $0.193 12 R-1 Hotel Low/Mid Rise - TI 2,500 1,128$ $0.198 5,000 1,624$ $0.192 12,500 3,065$ $0.245 500 2,136$ $1.091 2,000 3,773$ $0.700 13 B Offices, etc. - Complete 5,000 5,874$ $0.657 10,000 9,159$ $0.674 25,000 19,273$ $0.771 1,000 387$ $0.097 4,000 678$ $0.043 14 B Offices, etc. - Shell 10,000 934$ $0.042 20,000 1,351$ $0.043 50,000 2,637$ $0.053 100 281$ $0.677 400 484$ $0.358 15 B Offices, etc. - TI 1,000 699$ $0.319 2,000 1,018$ $0.366 5,000 2,115$ $0.423 1,000 1,863$ $0.425 4,000 3,137$ $0.549 16 F Industrial Building - Complete 10,000 6,429$ $0.434 20,000 10,765$ $0.538 50,000 26,890$ $0.538 1,000 450$ $0.114 4,000 793$ $0.047 17 F Industrial Building - Shell 10,000 1,073$ $0.048 20,000 1,548$ $0.047 50,000 2,945$ $0.059 EXHIBIT A 29 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 250 614$ $0.637 1,000 1,092$ $0.229 18 F Industrial Building - TI 2,500 1,435$ $0.250 5,000 2,060$ $0.225 12,500 3,748$ $0.300 500 903$ $0.365 2,000 1,450$ $0.575 19 S-1 Repair Garage & Service St - Complete 5,000 3,174$ $0.414 10,000 5,242$ $0.580 25,000 13,944$ $0.558 500 423$ $0.213 2,000 743$ $0.090 20 S-1 Repair Garage & Service St - Shell 5,000 1,013$ $0.090 10,000 1,462$ $0.090 25,000 2,811$ $0.112 100 281$ $0.677 400 484$ $0.358 21 S-1 Repair Garage & Service St - TI 1,000 699$ $0.319 2,000 1,018$ $0.366 5,000 2,115$ $0.423 500 985$ $0.409 2,000 1,599$ $0.585 22 M Retail Sales - Complete 5,000 3,355$ $0.429 10,000 5,498$ $0.590 25,000 14,345$ $0.574 500 518$ $0.266 2,000 917$ $0.102 23 M Retail Sales - Shell 5,000 1,224$ $0.107 10,000 1,761$ $0.101 25,000 3,280$ $0.131 100 281$ $0.677 400 484$ $0.358 24 M Retail Sales - TI 1,000 699$ $0.319 2,000 1,018$ $0.366 5,000 2,115$ $0.423 2,000 2,541$ $0.316 8,000 4,435$ $0.197 25 - Warehouse - Complete 20,000 6,794$ $0.179 40,000 10,368$ $0.193 100,000 21,976$ $0.220 1,000 1,917$ $0.440 4,000 3,236$ $0.552 26 I Medical/24 Hour Care - Complete 10,000 6,550$ $0.439 20,000 10,936$ $0.541 50,000 27,158$ $0.543 EXHIBIT A 30 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 1,000 477$ $0.122 4,000 843$ $0.049 27 I Medical/24 Hour Care - Shell 10,000 1,134$ $0.050 20,000 1,633$ $0.048 50,000 3,079$ $0.062 100 253$ $0.607 400 435$ $0.340 28 I Medical/24Hour Care - TI 1,000 639$ $0.293 2,000 932$ $0.350 5,000 1,981$ $0.396 1,000 1,917$ $0.440 4,000 3,236$ $0.552 29 B Medical Offices - Complete 10,000 6,550$ $0.439 20,000 10,936$ $0.541 50,000 27,158$ $0.543 1,000 491$ $0.126 4,000 868$ $0.049 30 B Medical Offices - Shell 10,000 1,164$ $0.051 20,000 1,676$ $0.049 50,000 3,146$ $0.063 250 641$ $0.667 1,000 1,141$ $0.237 31 B Medical Offices - TI 2,500 1,496$ $0.260 5,000 2,146$ $0.231 12,500 3,882$ $0.311 500 985$ $0.409 2,000 1,599$ $0.585 32 - Restaurant - Complete 5,000 3,355$ $0.429 10,000 5,498$ $0.590 25,000 14,345$ $0.574 500 436$ $0.221 2,000 768$ $0.092 33 - Restaurant - Shell 5,000 1,043$ $0.092 10,000 1,505$ $0.092 25,000 2,878$ $0.115 250 641$ $0.667 1,000 1,141$ $0.237 34 - Restaurant - TI 2,500 1,496$ $0.260 5,000 2,146$ $0.231 12,500 3,882$ $0.311 250 985$ $0.819 1,000 1,599$ $1.171 35 I-4 Day Care Facility - Complete 2,500 3,355$ $0.857 5,000 5,498$ $1.180 12,500 14,345$ $1.148 EXHIBIT A 31 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 100 226$ $0.530 400 385$ $0.322 36 I-4 Day Care Facility - TI 1,000 578$ $0.269 2,000 847$ $0.333 5,000 1,847$ $0.369 500 985$ $0.409 2,000 1,599$ $0.585 37 H Hazardous H- Complete 5,000 3,355$ $0.429 10,000 5,498$ $0.590 25,000 14,345$ $0.574 500 409$ $0.206 2,000 718$ $0.088 38 H Hazardous H- Shell 5,000 983$ $0.087 10,000 1,419$ $0.088 25,000 2,744$ $0.110 100 226$ $0.530 400 385$ $0.322 39 H Hazardous H- T I 1,000 578$ $0.269 2,000 847$ $0.333 5,000 1,847$ $0.369 200 226$ $0.265 800 385$ $0.161 40 - Commercial Building - Foundation 2,000 578$ $0.135 4,000 847$ $0.167 10,000 1,847$ $0.185 200 253$ $0.303 800 435$ $0.170 41 - Commercial Building - Addition 2,000 639$ $0.147 4,000 932$ $0.175 10,000 1,981$ $0.198 1,000 1,839$ $0.455 4,000 3,203$ $0.523 42 R-2 Apartment Building 10,000 6,339$ $0.444 20,000 10,775$ $0.498 50,000 25,719$ $0.514 1,000 1,674$ $0.996 2,000 2,670$ $1.017 43 R-3 Single-Family (custom or model) 3,000 3,687$ $0.912 5,000 5,510$ $0.746 7,500 7,374$ $0.983 667 1,054$ $0.885 1,333 1,644$ $0.864 44 R-3 Single-Family - Production / Repeat 2,000 2,220$ $0.743 3,333 3,210$ $0.684 5,000 4,350$ $0.870 EXHIBIT A 32 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 333 182$ $0.342 667 296$ $0.360 45 R-3 Moved Building - Residential 1,000 416$ $0.326 1,667 633$ $0.250 2,500 841$ $0.336 800 138$ $0.114 1,600 229$ $0.120 46 R-3 Manufactured Home - Complete 2,400 325$ $0.112 4,000 504$ $0.081 6,000 665$ $0.111 667 138$ $0.137 1,333 229$ $0.144 47 R-3 Prefabricated Dwelling - Complete 2,000 325$ $0.134 3,333 504$ $0.097 5,000 665$ $0.133 120 111$ $0.181 480 176$ $0.207 48 - Commercial Coach - Complete 1,200 325$ $0.136 2,400 488$ $0.221 6,000 1,285$ $0.214 240 111$ $0.090 960 176$ $0.103 49 - Modular Building - Complete 2,400 325$ $0.068 4,800 488$ $0.111 12,000 1,285$ $0.107 500 111$ $0.043 2,000 176$ $0.050 50 - Manufactured Building - Foundation 5,000 325$ $0.033 10,000 488$ $0.053 25,000 1,285$ $0.051 167 223$ $0.816 333 359$ $0.846 51 U Residential Garage 500 500$ $0.762 833 754$ $0.602 1,250 1,005$ $0.804 40 215$ $1.250 160 365$ $0.788 52 U Pool/Spa - Standard Plan 400 554$ $0.648 800 813$ $0.818 2,000 1,794$ $0.897 200 420$ $0.530 800 738$ $0.224 53 - Commercial Building - Remodel 2,000 1,007$ $0.224 4,000 1,454$ $0.224 10,000 2,798$ $0.280 EXHIBIT A 33 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 200 420$ $0.530 800 738$ $0.224 54 - Commercial Building - Repair 2,000 1,007$ $0.224 4,000 1,454$ $0.224 10,000 2,798$ $0.280 50 133$ $0.553 200 216$ $0.523 55 U Accessory Building - Commercial 500 373$ $0.368 1,000 557$ $0.557 2,500 1,392$ $0.557 50 163$ $0.713 200 270$ $0.567 56 U Commercial Carport 500 440$ $0.422 1,000 651$ $0.592 2,500 1,539$ $0.616 167 267$ $0.960 333 427$ $0.984 57 R-3 Single-Family Residential - Addition 500 591$ $0.876 833 883$ $0.715 1,250 1,181$ $0.945 333 704$ $1.197 667 1,103$ $1.179 58 R-2 Multi-Family Residential - Addition 1,000 1,496$ $1.020 1,667 2,176$ $0.919 2,500 2,942$ $1.177 333 252$ $0.459 667 405$ $0.465 59 R-3 Single-Family Residential - Remodel 1,000 560$ $0.420 1,667 840$ $0.340 2,500 1,123$ $0.449 667 363$ $0.320 1,333 576$ $0.321 60 R-2 Multi-Family Residential - Remodel 2,000 790$ $0.283 3,333 1,167$ $0.241 5,000 1,569$ $0.314 333 223$ $0.408 667 359$ $0.423 61 R-3 Residential Building - Foundation 1,000 500$ $0.381 1,667 754$ $0.301 2,500 1,005$ $0.402 83 153$ $1.176 167 251$ $1.248 62 U Accessory Building - Residential 250 355$ $1.152 417 547$ $0.850 625 724$ $1.158 EXHIBIT A 34 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 133 138$ $0.683 267 229$ $0.720 63 U Residential Carport 400 325$ $0.671 667 504$ $0.483 1,000 665$ $0.665 83 138$ $1.092 167 229$ $1.152 64 U Residential Patio Cover 250 325$ $1.074 417 504$ $0.773 625 665$ $1.064 83 138$ $1.092 167 229$ $1.152 65 U Residential Balcony/Deck 250 325$ $1.074 417 504$ $0.773 625 665$ $1.064 83 138$ $1.092 167 229$ $1.152 66 U Residential Patio Enclosure 250 325$ $1.074 417 504$ $0.773 625 665$ $1.064 EXHIBIT A 35 FY 2016-17 Copies, per page (Black and White)0.20$ Park Facility Use Fees: Strother Park-Large Barbecue 75.00 Strother Park-Security Deposit 30.00 Strother Park-Small Barbecue 40.00 Strother Park-Wedding Reception 155.00 Strother Park-Security 1,2,3 70.00 Elm Street Park-Barbecue 75.00 Elm Street Park-Security Deposit 30.00 Rancho Grande Park - Large BBQ 75.00 Rancho Grande Park - Small BBQ (areas 2 and 3)40.00 Strother Park Deposit 30.00 Kingo Park 40.00 Kingo Park Deposit 30.00 Rotary Bandstand Fees: Rent 75.00 Deposit 30.00 Soto Sports Complex Use Fees: Campbell Field Rental Fee 15.00 Campbell Field Rental Fee (with lights)35.00 Pilg Field Rental Fee 15.00 Pilg Field Rental Fee (with lights)35.00 Santos Field Rental Fee 15.00 Volunteer Field Rental Fee 15.00 Volunteer Field with Lights Rental 35.00 Ikeda Field Rental 15.00 Ikeda Field with Lights Rental 35.00 Porter Field Rental Fee 20.00 Porter Field with Lights Rental 40.00 Tennis Court Rental-1 Hour 10.00 Tennis Courts - 4 Rental 100.00 Pickleball Club - Annual Fee 95.00 Food Booth Rental Fee (Soto)35.00 Food Vendor Space Rental Fee 10% of Gross Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 RECREATION SERVICES EXHIBIT A 36 FY 2016-17 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 RECREATION SERVICES Soto Sports Complex Use Fees (continued): Meeting Room Rental Fee (Jaycee room)20.00$ Field Prep Fees (except Porter)20.00 Field Prep Fees - Porter 35.00 Tournament Sch. & Coordin Fee 65.00 Tournament CLEANING / SECURITY Deposit Fee 260.00 Tournament Staff Attendant - HOURLY FEE 15.00 Soto Sports Complex Use Fees - APPROVED YOUTH GROUPS: Field Rental (practice and league games) - each field - hourly 2.00 Concession Stand Fee - Buildings - hourly 5.00 Concession Stand Fee - Mobile - hourly 3.00 Non-resident - per participant 2.00 Woman's Club Use Fees: Non-Resident Fee 50.00 Partial day rental - Mon - Thurs, after 5 pm per hr 50.00 Full day rental - Friday, Saturday, or Sunday 550.00 Second day rental - Friday, Saturday or Sunday 275.00 Security Deposit (No Alcohol/No Band)400.00 Security Deposit (with Alcohol)1,000.00 Building Supervision Fee per hr 12.00 Rental Fee (on-going users): Non-profit groups/Service clubs/Youth groups: (20 or less attendees)per hr 3.00 (21 - 50 attendees)"4.00 (51 or more attendees)"5.00 Groups with reciprocal services "3.00 Private groups or clubs:per hr (20 or less attendees)"8.00 (21 - 50 attendees)"9.00 (51 or more attendees)"10.00 Groups with reciprocal services "5.00 For-profit groups per hr 25.00 Custodial Fee (special event rentals only)100.00 Reservation Cancellation Fees: If cancelled 30 days or more ahead of event 100.00 If cancelled less than 30 days ahead of event 200.00 EXHIBIT A 37 FY 2016-17 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 RECREATION SERVICES Woman's Club Use Fees (continued): Amenities Fees: Chairs per chair 0.25$ Tables per table 1.00 Community Garden Deposit 25.00 Community Garden Plot per 6 months 36.00 Elm Street Community Center Use Fees: Rental Fee per hr 30.00 Rental Fee - full day 175.00 Building Supervision Fee per hr 10.00 Security deposit 150.00 Adult Sport League Fees: Adult Softball 435.00 Adult Basketball 365.00 Non-Resident Fee 8.00 Seasonal Playground Programs: Annual Registration Fee 15.00 Playground-Elm Street (Winter/Spring/Summer)per day 23.00 half day 11.50 Late pickup (after 4:15)10.00 Pre-School Fees: Annual Registration Fee 15.00 Play & Learn-Tues & Thur.per hr 4.20 Play & Learn-Mon, Wed & Fri."4.20 Kindergartens in Training "4.20 Summer Play & Learn "4.20 Late Pick-up Fees: First late pick-up per child 5.00 Second late pick-up "10.00 Third late pick-up "20.00 Children In Motion Program: Children In Motion Annual Registration 25.00$ Branch School - Mornings 5 Days Per Week per 4 wks 97.50 4 Days Per Week "84.00 3 Days Per Week "67.50 2 Days Per Week "48.00 EXHIBIT A 38 FY 2016-17 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 RECREATION SERVICES Children In Motion Fees (continued): Branch School - Afternoons 5 Days Per Week per 4 wks 178.75 4 Days Per Week "154.00 3 Days Per Week "123.75 2 Days Per Week "88.00 Extra Day - Branch School Morning per day 6.50 Afternoon "12.75 Late Start Monday per day 2.25 Kindercare - Branch School 5 Days Per Week per 4 wks 195.00 4 Days Per Week "168.00 3 Days Per Week "135.00 2 Days Per Week "96.00 Extra Day per day 12.75 Ocean View School - Mornings 5 Days Per Week per 4 wks 97.50$ 4 Days Per Week "84.00 3 Days Per Week "67.50 2 Days Per Week "48.00 Ocean View School - Afternoons 5 Days Per Week per 4 wks 195.00 4 Days Per Week "168.00 3 Days Per Week "135.00 2 Days Per Week "96.00 Extra Day - Ocean View School Morning per day 6.50 Afternoon "12.75 Late Start Monday per day 2.25 Elm Community Center - Mornings 5 Days Per Week per 4 wks 276.25 4 Days Per Week "238.00 3 Days Per Week "191.25 2 Days Per Week "136.00 Elm Community Center - Afternoons Care Plan A 5 Days Per Week per 4 wks 195.00 4 Days Per Week "168.00 3 Days Per Week "135.00 2 Days Per Week "96.00 EXHIBIT A 39 FY 2016-17 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 RECREATION SERVICES Children In Motion Fees (continued): Elm Community Center - Afternoons Care Plan B 5 Days Per Week per 4 wks 373.75 4 Days Per Week "322.00 3 Days Per Week "258.75 2 Days Per Week "184.00 Extra Day - Elm Community Center Morning per day 15.00$ Care Plan A (12:15 pm - 3:15 pm)"12.75 Care Plan B (12:15 pm - 6:00 pm)"24.50 Winter/Spring/Summer -Full Day 5 Days Per Week per week 150.00 4 Days Per Week "128.00 3 Days Per Week "102.00 Minimum Days (teacher work day/early release) Regular day of attendance per day 9.75 Non-regular day of attendance "16.50 Late Pick-up Fees: Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00 Pickup 6:01 - 6:15 pm per child 10.00 Pickup 6:16 - 6:30 pm "20.00 Pickup 6:31 - 6:45 pm "30.00 EXHIBIT A 40 FY 2016-17 LABOR COSTS (per hour): DURING REGULAR WORK HOURS: Full Time employee 59.30$ Part Time employee 22.20 AFTER REGULAR WORK HOURS: Full Time employee 88.95 Part Time employee 33.30 MINIMUM CALL-OUT RATE 2 hours at 1.5 times billing rate EQUIPMENT BILLING RATE (per hour) Pickup Truck 17.00 Service Truck 42.00 Backhoe 43.00 CAT Generator 82.00 Loader 50.00 6" Pump 23.00 Dump/Flat Bed Truck (5-7 yds)36.00 Sewer/Vacuum/Jet Truck 125.00 Chipper 44.00 Concrete Saw 10.00 Air Compressor 17.00 5-Ton Roller 30.00 MATERIAL COST: (cost plus tax) Concrete (per yard)125.00 Sand (per ton)25.00 Class II Base (per ton)30.00 A/C (per ton)100.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2016-17 PUBLIC WORKS SERVICES Fee Description EXHIBIT A 41 COMPARISON OF CURRENT FEES TO RECOMMENDED FEES Current Fee FY 2016-17 Fee Budget 40.00$ 40.00$ Financial Statements copy costs copy costs Business License Fees: (Basic fees are prorated per the application date: Jan1-Jun30, 100%; Jul1-Dec31, 50%) Basic Fee--All businesses except Specific License Fees listed 31.00*31.00* >Per Employee, Partner, or Associate (Except those listed below)5.00 5.00 Specific License Fees: Contractor 61.00*61.00* Motels & Hotels (Basic Fee)31.00*31.00* >per room 1.00 1.00 Trailer Parks 31.00*31.00* >per space 1.00 1.00 Hospitals, Sanitariums, Rest or Nursing Homes 41.00*41.00* >per bed 3.00 3.00 Taxi Cabs 46.00*46.00* >per vehicle 15.00 15.00 Billboards 126.00*126.00* Commercial Auctions - Per Year 86.00*86.00* Commercial Auctions - Per Day of Auctioning 26.00*26.00* Circuses and similar shows (per day)70.00 70.00 + $1 SB1186 Bazaars and street fairs: >Small Bazaars (1-4 displays or exhibits) per display per every two (2) days 15.00 15.00 + $1 SB1186 >Large Bazaars (5 or more displays or exhibits) per day 70.00 70.00 + $1 SB1186 * Includes $1 per license per State law (SB 1186) Copies, per page (Black and White)0.20 0.20 Color copies Actual cost Actual cost Maps--Chamber of Commerce 1.00 1.00 Utility Fees and Penalties: Renter's Deposit 180.00 180.00 New Utility Account Set Up Fee 30.00 30.00 Past Due Penalty (% of Past Due Total)0.10 0.10 Lock Cut Replacement Fee 10.00 10.00 Reconnection Fee (Reconnect by City Personnel)45.00 45.00 Unauthorized Reconnection Fee (Reconnect by non-City Personnel)65.00 65.00 Returned check fee (NSF) -Per CA Civil Code Section 1719 25.00 25.00 Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES ADMINISTRATIVE SERVICES Current Fee FY 2016-17 Fee City Council Agenda and Minutes Subscription: City Council Agenda Only 20.00$ 20.00$ City Council Agenda and Minutes 35.00 35.00 City Council Meeting Audio CD $ 5.00/each $ 5.00/each City Council Meeting DVD Vendor cost Vendor cost Candidate Filing Fee no charge no charge Candidate Statement actual cost actual cost Notice of Intent to Circulate Petition (EC 9202)200.00 200.00 Copies, per page (Black and White)0.20 0.20 Color copies Actual cost Actual cost Copies of records sent to a commercial copier Actual cost Actual cost Document Certification 10.00 10.00 Fair Political Practices Commission Forms: Statement of Economic Interests Form 700 (GC 81008).10/page .10/page Campaign Statements (GC 81008).10/page .10/page Retrieval fee for statements 5 or more years old (GC 81008)5.00/request 5.00/request Municipal Code (w/out binder)150.00 150.00 Municipal Code Supplement Subscription 25.00/year 25.00/year Notary (per signature)10.00 10.00 Transcript of City Council proceedings Actual cost Actual cost Fee Description City of Arroyo Grande CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES COMPARISON OF CURRENT TO PROPOSED FEES Fee Description Current Fee FY 2016-17 Fee Printing/Copying Charges: 8 1/2" x 11 (per page)0.20$ 0.20$ 18" x 30 (per page)3.00 3.00 24" x 36" (per page)4.00 4.00 36" x 48" (per page)5.00 5.00 Standard Plans 35.00 35.00 Land Use Map and Zoning Maps (each) 24x36 3.00 3.00 36x48 4.00 4.00 Welcome to Arroyo Grande Maps 4.00 4.00 Overtime Inspections (per hour- 2 hour min.)145.00 140.00 Map Review - Final (LLA, PM, TM 0-2 Lots)2,983.00 5,210.00 Each Additional Lot 23.00 124.00 Additional Map Review - After 3 2,983.00 2,481.00 Encroachment Permit - Minor (pod, dumpster)250.00 50.00 Encroachment Permit - Standard - per Month 250.00 619.00 Encroachment Permit - Franchise Annual 5,750.00 15,500.00 Certificate of Compliance 332.00 1,915.00 Certificate of Correction / Merger 184.00 693.00 Transporation Permit - each occurance 64.00 36.00 Public Improvement Plan - Plan Check (based on Engineer's estimate of construction cost): $0 - 10,000 100.00 2,285.00 $10,001 - 50,000 500.00 2,626.00 $50,001 - 100,000 1,000.00 3,023.00 $100,001 - 250,000 1,750.00 3,482.00 $250,001 - 500,000 3,000.00 4,842.00 $500,001 - 1.0 Million 5,500.00 6,315.00 Each additional $500,000 (over $1M)3,000.00 1,944.00 Additional Review Public Improvement Plan - Plan Check - After 3 (based on Engineer's estimate of construction cost): $0 - 10,000 33.00 554.00 $10,001 - 50,000 167.00 622.00 $50,001 - 100,000 333.00 691.00 $100,001 - 250,000 583.00 826.00 $250,001 - 500,000 1,000.00 1,093.00 $500,001 - 1.0 Million 1,833.00 1,899.00 Each additional $500,000 (over $1M)1,000.00 805.00 City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES ENGINEERING Fee Description Current Fee FY 2016-17 Fee City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES ENGINEERING Grading / Drainage / Erosion Plan Review: 0 - 50 cy -$ 1,132.00$ 50 cy to 100 cy 314.00 1,215.00 100 cy to 1,0000 cy 375.00 1,372.00 1,000 cy to 10,000 cy 458.00 1,529.00 10,000 cy to 100,000 cy 586.00 1,685.00 Hydraulic / Hydrology Report Review 400.00 710.00 SWPPP Review 400.00 710.00 Stormwater Control Plan Review 400.00 710.00 Inspection Agreement, including Subdivision Agreement (based on Engineer's estimate of construction cost): $0 - 10,000 430.00 662.00 $10,001 - 50,000 2,150.00 1,723.00 $50,001 - 100,000 4,300.00 3,298.00 $100,001 - 250,000 10,750.00 6,583.00 $250,001 - 500,000 21,500.00 12,662.00 $500,001 - 1.0 Million 38,000.00 24,567.00 Each additional $500,000 (over $1M)21,500.00 11,960.00 Major Project with a Contract Engineer - Actual cost of Contractor passed directly through to Applicant Major Project with a Contract Engineer - City Project Management and Administrative Charge 1,143.00 Current Fee FY 2016-17 Fee Development Code w/out Appendices 50.00$ 50.00$ Appendice 1 15.00 15.00 Appendice 2 5.00 5.00 Development Code w/Appendices 70.00 70.00 General Plan 25.00 25.00 Housing Element 2003 35.00 35.00 General Plan EIR 12.00 12.00 Design Guidelines for Historic Districts 25.00 25.00 Design Guidelines for Traffic Way/Station Way 6.00 6.00 Design Guidelines for Mixed Use Districts 30.00 30.00 East Grand Avenue Enhancement Plan 20.00 20.00 Land Use Map and Zoning Maps (each) 24 x 36 3.00 3.00 36 x 48 4.00 4.00 DVD (Planning Commission meetings)Vendor cost Vendor cost Audio Tape copies 10.00 10.00 Copies, per page (Black and White)0.20 0.20 Color copies Actual cost Actual cost Arroyo Grande Bike Plan 26.00 26.00 Downtown Parking in lieu fee (per resolution 3994)24,000.00 24,000.00 Notary (per signature)10.00 10.00 Annexation - deposit (fee based on actual time at staff at hourly rates)20,000.00 Time and Materials (if project exceeds 50 hours of staff time) Appeals: CD Director to Planning Commission 263.00 333.00 Planning Commission to City Council 263.00 790.00 Certificate of Compliance 788.00 2,387.00 Conditional Use Permit: Project - Major (multi building)7,352.00 9,750.00 Time and Materials (if project exceeds 50 hours of staff time) Project - Minor (routine) - as det'd by CDD 3,623.00 4,221.00 Amendment 945.00 2,132.00 Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES COMMUNITY DEVELOPMENT Current Fee FY 2016-17 Fee Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES COMMUNITY DEVELOPMENT Development Agreement - deposit 3,151.00$ 16,325.00$ Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Major 4,201.00 11,000.00 Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Minor 2,100.00 6,048.00 Environmental Impact Determination: Initial Study Fee 990.00 2,319.00 Negative Declaration 210.00 377.00 Mitigated Neg Dec 832.00 1,575.00 General Plan Amendment (Major)7,352.00 11,000.00 Time and Materials (if project exceeds 50 hours of staff time) General Plan Amendment (Minor)1,785.00 6,048.00 Home Occupation Permit 84.00 112.00 Lot Line Adjustment 1,260.00 2,260.00 Lot Merger / Reversion to Acreage 1,050.00 2,224.00 Mailing Label Production 105.00 276.00 Request for Meeting Continuance 168.00 314.00 Minor Use Permit - Architectural Review Major (e.g. subdivision if PUD or CUP is not concurrently processed)630.00 3,496.00 Minor (e.g. single lot)315.00 627.00 Minor Use Permit - Historic Resource Designation 200.00 1,000.00 Minor Use Permit - Large Family Day Care 200.00 381.00 Minor Use Permit - Minor Exception 424.00 679.00 Minor Use Permit - Plot Plan Review 420.00 500.00 Minor Use Permit - Temporary Use Permit 158.00 200.00 Minor Use Permit - Viewshed Review:596.00 768.00 Planned Unit Development Permit (Major)7,352.00 10,370.00 Time and Materials (if project exceeds 50 hours of staff time) Planned Unit Development Permit (Minor)3,623.00 4,962.00 Planning Commission lnterpretation or Waiver 525.00 1,230.00 Pre-Application - S.A.C.263.00 835.00 Public Art Permit 630.00 630.00 Research (deposit)84.00 150.00 Signs: Planned Sign Program 630.00 1,625.00 Administrative Sign Permit 105.00 233.00 Administrative Sign Program 263.00 915.00 Specific Plan or Amendment (deposit)7,352.00 16,294.00 Time and Materials (if project exceeds 50 hours of staff time) Current Fee FY 2016-17 Fee Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES COMMUNITY DEVELOPMENT Tentative Parcel Map (0-4 lots)1,349.00$ 6,481.00$ with Vesting (added to base fee)402.00 402.00 Amendment 1,996.00 3,139.00 Tentative Tract Map: 5-20 lots 3954 + 100 per lot 10,649.00 over 20 lots 5,954.00 12,361.00 with Vesting (added to base fee)1,043.00 1,043.00 Amendment 1,996.00 4,675.00 Time Extension 760.00$ 1,745.00$ Variance 1,349.00 2,469.00 Zoning Compliance Letter 63.00 100.00 Fee Description Current Fee FY 2016-17 Fee ANIMAL CONTROL / IMPOUND Dog Impound Fee 1st Impound 20.00$ 2nd Impound 40.00 3rd Impound +60.00 Cat Impound Fee 1st Impound 20.00 2nd Impound 40.00 3rd Impound +60.00 PERMITS & LICENSES: Alarm Permit Original Application Permit Processing Fee 95.00 95.00 Annual Renewal Permit Processing Fee 31.00 45.00 False Alarm Response Fourth False Alarm within 12 months 72.00 150.00 Fifth False Alarm within 12 months 107.00 300.00 Sixth or more false alarm within 12 months (per incident)143.00 450.00 Block Party Permit Block Party Permit - 25.00 Commercial Filming / Still Photography Permit Permit Processing Fee 50.00 Commercial Filming (per day)244.00 250.00 Still Photography (per day)244.00 100.00 City Staff Assigned - 4 hour minimum (if applicable)overtime rate Concealed Weapons Permit Original Application Police Department Investigation Fee 259.00 100.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost actual cost Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00 Identification Card 20.00 Concealed Weapons Permit Biennial Renewal: Police Department Investigation Fee 147.00 25.00 Identification Card 20.00 Medical Marijuana Delivery Service License Application Processing Fee 600.00 Background Investigation Fees 92.00 ID Card / Vehicle Permit Fee 30.00 Medical Marijuana Delivery Service License Renewal Application Processing Fee 500.00 Background Investigation Fees 35.00 ID Card / Vehicle Permit Fee 30.00 City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES POLICE Fee Description Current Fee FY 2016-17 Fee City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES POLICE Medical Marijuana Delivery Driver Permit Application Processing Fee 600.00$ Background Investigation Fees 92.00 ID Card / Vehicle Permit Fee 30.00 Medical Marijuana Delivery Driver Permit Renewal Application Processing Fee 500.00 Background Investigation Fees 92.00 ID Card / Vehicle Permit Fee 30.00 Mobile Vendor Permit Permit Processing Fee 63.00 125.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00 Dept of Justice & FBI Fingerprint Process actual cost actual cost Mobile Vendor Employee Permit Permit Processing Fee 63.00 125.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00 Dept of Justice & FBI Fingerprint Process actual cost actual cost Palmreader Fortune Teller Permit - Original Application Permit Processing Fee 164.00 125.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost actual cost Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00 Palmreader Fortune Teller Permit - Annual Renewal Permit Renewal Processing 137.00 100.00 Palmreader Fortune Teller Establishment Permit - Original Application Permit Processing Fee 298.00 125.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost actual cost Palmreader Fortune Teller Establishment Permit - Renewal Permit Processing Fee 189.00 100.00 Public Safety and Welfare Permit: Less than 200 Non-Commercial Event 90.00 50.00 More than 200 Non-Commercial Event 142.00 100.00 Commercial Event 630.00 - 945.00 125.00 Second Hand Dealer Permit Original Application Permit Processing Fee 115.00 125.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00 Dept of Justice & FBI Fingerprint process (DOJ passthrough fee paid by actual cost actual cost Second Hand Dealer Permit Biennial Renewal City Processing Fee 58.00 100.00 Solicitation Permit (per solicitor) Permit Processing Fee 65.00 125.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00 Dept of Justice & FBI Fingerprint Processing Fee actual cost actual cost Fee Description Current Fee FY 2016-17 Fee City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES POLICE Taxi Cab Driver Permit Original Application Permit Processing Fee 212.00$ 125.00$ Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00 Dept of Justice & FBI Fingerprint Process actual cost actual cost Taxi Cab Driver Permit Annual Renewal Annual Renewal 37.00 100.00 Tobacco Retailers License Permit Processing Fee 218.00 125.00 OTHER FEES Citation correction certification 20.00 25.00 Civil Witness Fee (Deposit)158.00 275.00 Copies, per page (Black and White).20 per page .20 per page Copies - Color copies per page 5.00 5.00 Court Ordered Booking 125.00 Criminal history summary examination 31 - 111 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00 Dept of Justice & FBI Fingerprint Process actual cost actual cost Disturbance 415PC Second Response 53.00 150.00 Third Response 53.00 300.00 Fourth Response 53.00 500.00 Emergency DUI Response -Impaired Driver Accident - Actual Time @ Staff Hourly Rates actual cost actual cost Local Records Check 31.00 15.00 Photographs per disc 21.00 25.00 Property Handling for Mailing / Shipping 34.00 actual cost Replacement of lost/stolen Permits, Licenses and registration receipts 10.00 45.00 Repossessed Vehicle 15.00 15.00 Subpoena Duces Tecum Actual staff time billed at hourly rate to produce records actual cost actual cost .20 per page produced actual cost actual cost postage/shipping actual cost actual cost Custodian of Records Court Appearance $275 Vehicle Release - Impound/Stored Vehicle Release 36 - 62 50.00 Vehicle Release 30-day Impound Release Review 36 - 62 75.00 Clearance letter 27.00 45.00 Fee Description Plan Check Fee Current Inspection Fee Current Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Cellular/Mobile Phone, free-standing NEW 718.00$ 1,168.00$ 986.00$ 1,405.00$ Cellular Tower with Equipment Shelter 718.00 1,306.00 986.00 1,575.00 Cellular Tower Equipment Demolition 379.00 396.00 Awning (not patio cover) Tents / Canopies / Booths 83.00 129.00 103.00 154.00 135.00 259.00 172.00 313.00 Close Existing Openings 83.00 176.00 103.00 210.00 Compliance Inspections/Reinspections 151.00 216.00 191.00 258.00 Deck (with Calcs)173.00 234.00 221.00 276.00 Demolition 83.00 272.00 103.00 324.00 Demolition - MultiFamily/Commercial 83.00 272.00 103.00 324.00 Door 83.00 186.00 103.00 222.00 Fence or Wall (wood, chain link, wrought iron): >6 feet in height, 1st 100 s.f.83.00 234.00 103.00 283.00 Each additional 100 sf 60.00 83.00 78.00 103.00 Fence or Freestanding Wall (masonry / garden): City Standard, 1st 100 s.f.83.00 234.00 103.00 283.00 Each additional 100 sf 60.00 83.00 78.00 103.00 Engineered Wall, 1st 100 sf 105.00 234.00 133.00 283.00 Each additional 100 sf 83.00 83.00 108.00 103.00 Fireplace (masonry or pre-fab)83.00 171.00 103.00 204.00 Flag pole (greater than 6 feet in height)83.00 171.00 103.00 204.00 Grading (Cut and Fill): 0-50 Cubic Yards (Cut and Fill)105.00 171.00 133.00 204.00 Each Add'l 50 CY (or portion thereof)143.00 171.00 65.00 154.00 Pilaster each 10 83.00 171.00 103.00 204.00 Lighting pole (each)83.00 148.00 103.00 174.00 Stucco Applications 52.00 171.00 64.00 204.00 Retaining Wall (concrete or masonry): First 50 sf 166.00 196.00 211.00 234.00 Each additional 50 sf 144.00 108.00 186.00 133.00 Re-roofing: Composition - no tear off 65.00$ 166.00$ 84.00$ 198.00$ Other roofs (first 10 squares)65.00 166.00 84.00 198.00 Each additional 10 squares 15.00 40.00 20.00 48.00 Roof Structure Replacement 101.00 196.00 133.00 234.00 Sauna - steam 80.00 206.00 103.00 246.00 Change of Occupancy No T.I. w/ plan check & Inspection Recovery Rate 100% of Cost City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING MISC Fee Description Plan Check Fee Current Inspection Fee Current Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Recovery Rate 100% of Cost City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING MISC Siding: Stone and Brick Veneer (interior or exterior)65.00 206.00 84.00 246.00 All Other 50.00 206.00 64.00 246.00 Signs: Directional / Menu 160.00 206.00 211.00 246.00 Freeway sign 364.00 226.00 485.00 270.00 Ground / Roof / Projecting Signs 152.00 196.00 201.00 234.00 Wall, Illuminated 65.00 206.00 84.00 246.00 Skylight (Residential each)50.00 181.00 64.00 216.00 Skylight (Commercial) one 65.00 181.00 84.00 216.00 Spa or Hot Tub (Pre-fabricated)65.00 206.00 84.00 246.00 Stairs - per story 233.00 196.00 309.00 234.00 Storage Racks each set of plans 269.00 246.00 358.00 294.00 Temporary Utility Connection or Occupancy -70.00 - 84.00 Window or Sliding Glass Door (first)160.00 196.00 211.00 234.00 Each additional 138.00 88.00 186.00 109.00 Board of Appeals 631.00$ $ -794.00$ -$ Business License Inspection 33.00 48.00 40.00 61.00 Business License Re-inspection 33.00 25.00 40.00 32.00 Product Review 446.00 -597.00 - Disabled Access Compliance Inspection 93.00 63.00 119.00 79.00 Supplemental Plan Check Fee (first 1/2 hour)146.00 -108.00 - Each Additional 1/2 hour (or portion thereof)73.00 -98.00 - Supplemental Inspection Fee (first 1/2 hour)-126.00 - 108.00 Each Additional 1/2 hour (or portion thereof)-63.00 - 98.00 -302.00 - 206.00 196.00 After Hours Inspection 2 hour minimum -189.00 - 206.00 Each additional hour -126.00 - 196.00 After Hours Plan Review 2 hour minimum 291.00 -206.00 - Each additional hour 146.00 -196.00 - Copies, per page (Black and White) .20 per page Color copies actual costs Emergency (Non-Scheduled) Call-Out Fee (first hour) 2 hour minimum Emergency (Non-Scheduled) Call-Out Fee (each additional hour) Fee Description Plan Check Fee Current Inspection Fee Current Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Fire Sprinkler Systems - New Construction: 1-50 Heads 157.00$ 160.00$ 197.00$ 215.00$ 51-100 Heads 195.00 235.00 246.00 305.00 101-200 Heads 353.00 285.00 443.00 365.00 Every 200 Heads above 200 239.00 160.00 196.00 140.00 Fire Sprinkler Systems -Tenant Improvements: 1-25 Heads 120.00 160.00 197.00 215.00 26-100 Heads 233.00 235.00 296.00 335.00 Every 100 Heads above 100 195.00 210.00 98.00 225.00 Fire Alarm System (including Sprinkler Monitor System) - New Construction: 1-50 Devices 157.00 160.00 197.00 215.00 51-100 Devices 233.00 235.00 246.00 305.00 Every 50 Devices above 100 157.00 210.00 98.00 201.00 Fire Alarm System (including Sprinkler Monitor System) - Tenant Improvements: 1-50 Devices 157.00 160.00 197.00 245.00 51-100 Devices 233.00 235.00 246.00 335.00 Every 50 Devices above 100 157.00 210.00 148.00 201.00 Other Suppression Systems: Inert Gas Systems 157.00 160.00 344.00 430.00 Dry Chemical Systems 195.00 134.00 197.00 430.00 Wet Chemical/Kitchen Hood 195.00 210.00 295.00 430.00 Foam Systems 195.00 285.00 197.00 588.00 Paint Spray Booth 347.00 235.00 442.00 638.00 Other Fire Fees: Hydrants/Underground Fire Service Plan Check 233.00 134.00 393.00 - Hydrant Flow Test (existing hydrants)44.00 15.00 - 588.00 Special Event Inspection (e.g., fairs) These are group events, when multiple booths/tents are erected Booth / Tent 28.00 52.00 56.00 Booth / Tent with Electricity 28.00 75.00 92.00 Booth / Tent with Cooking (includes Electricity)28.00 80.00 110.00 Special Event Application Review 21.00 Additional Fire related services are provided by Five Cities Fire Authority (FCFA). See the FCFA fee schedule for fees. Recovery Rate 100% of Cost City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING FIRE Fee Description Plan Check Fee Current Inspection Fee Current Plan Check Fee FY 16-17 Inspection Fee FY 16-17 ADMINISTRATIVE (BASE) FEES: Permit Issuance and Administration 88.00$ -$ 101.00$ -$ MECHANICAL PERMIT FEES FAU less than 100,000 Btu/h 38.00 50.00 49.00 60.00 FAU greater than 100,000 Btu/h 38.00 75.00 49.00 91.00 Floor furnace (including vent)38.00 100.00 49.00 121.00 Suspended, wall, or floor-mounted heaters 38.00 75.00 49.00 91.00 Appliance vents not included in an appliance permit 38.00 75.00 49.00 91.00 Boiler or compressor, from 15 HP to 30 HP / 38.00 75.00 absorption system from 500,000 Btu/h to 1,000,000 Btu/h.38.00 100.00 49.00 91.00 Boiler or compressor, from 30 HP to 50 HP, /76.00 100.00 absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h.76.00 100.00 98.00 121.00 Boiler or compressor, over 50 HP /113.00 75.00 absorption system over 1,750,000 Btu/h.113.00 75.00 147.00 91.00 Air-handling unit, including attached ducts.76.00 75.00 98.00 91.00 Air-handling unit over 10,000 CFM 113.00 100.00 147.00 121.00 Evaporative cooler 38.00 50.00 49.00 60.00 Ventilation fan connected to a single duct 76.00 75.00 98.00 91.00 Ventilation system (not a portion of heating or a/c system)113.00 100.00 147.00 121.00 Incinerator, residential 189.00 151.00 245.00 181.00 Commercial or Industrial-type incinerator 227.00 151.00 294.00 181.00 Misc. appliances or equipment.113.00 100.00 147.00 121.00 Stand Alone Mechanical Plan Check (hourly rate)151.00 -196.00 - Other Mechanical Inspections (per hour)-100.00 - 121.00 PLUMBING / GAS PERMIT FEES: Plumbing fixtures 38.00 50.00 49.00 60.00 Building sewer 76.00 75.00 98.00 91.00 Rainwater systems (per drain)38.00 50.00 49.00 60.00 Gray Water system 147.00 151.00 Private sewage disposal system 113.00 126.00 147.00 151.00 Water Heater 76.00 50.00 98.00 60.00 Industrial waste pretreatment interceptor 38.00 75.00 49.00 91.00 Water piping and/or water treating equipment 38.00 75.00 49.00 91.00 Repair or alteration of drainage or vent piping, each fixture 38.00 75.00 49.00 91.00 Each lawn sprinkler system on any one meter 38.00 -49.00 60.00 Backflow devices each unit 76.00 50.00 98.00 60.00 Atmospheric-type vacuum breakers: 1-5 units 76.00 50.00 98.00 60.00 Atmospheric-type vacuum breakers: each unit over 5 units 76.00 50.00 98.00 60.00 Stand Alone Plumbing Plan Check (hourly rate)151.00 -196.00 - Other Plumbing and Gas Inspections (per -100.00 - 121.00 Recovery Rate 100% of Cost City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING MPE Fee Description Plan Check Fee Current Inspection Fee Current Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Recovery Rate 100% of Cost City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING MPE SYSTEM FEES: Swimming Pools 113.00$ 176.00$ 147.00$ 211.00$ Outdoor Events 113.00 75.00 147.00 91.00 Electric generator and electrically-driven rides 76.00 75.00 98.00 91.00 Mechanically-driven rides/ attractions with 113.00 75.00 147.00 91.00 Each system of area and booth lighting 76.00 75.00 98.00 91.00 Temporary Power Service 76.00 50.00 98.00 60.00 Temporary power pole 76.00 50.00 98.00 60.00 Sub poles (each)38.00 35.00 49.00 42.00 UNIT FEES: Receptacle, Switch, and Lighting Outlets First 10 76.00 50.00 98.00 60.00 Each Additional 10 76.00 50.00 49.00 30.00 Lighting Fixtures: First 10 76.00 75.00 98.00 60.00 Each additional 10 38.00 75.00 49.00 30.00 Pole or platform-mounted lighting fixtures 76.00 75.00 98.00 91.00 Theatrical-type lighting fixtures or assemblies 76.00 100.00 98.00 121.00 Residential Appliances (each)76.00 50.00 98.00 60.00 Nonresidential Appliances 113.00 100.00 147.00 121.00 Residential appliances and self-contained, nonresidential appliances, (each)113.00 100.00 147.00 121.00 Appliances not exceeding one horsepower kilowatt (KW), or kilovolt-ampere (KVA), in rating,(each)151.00 100.00 196.00 121.00 Power Apparatus: Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus (all sizes)113.00 50.00 147.00 60.00 Signs, Outline Lighting, and Marquees: Signs, Outline Lighting, or Marquees supplied from one branch circuit (each)76.00 75.00 98.00 91.00 Additional branch circuits within the same sign, outline lighting system, or marquee (each)76.00 50.00 98.00 60.00 Service or Panel: 200 amp or less Electrical Panel (each)113.00 100.00 147.00 121.00 Over 200 amp up to 1000 amp Electrical Panel 189.00 126.00 245.00 151.00 Over 1000 amp Electrical Panel (each)302.00 151.00 391.00 181.00 Fee Description Plan Check Fee Current Inspection Fee Current Plan Check Fee FY 16-17 Inspection Fee FY 16-17 Recovery Rate 100% of Cost City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING MPE UNIT FEES (continued): 76.00$ 75.00$ 98.00$ 91.00$ 76.00 100.00 98.00 121.00 Photovotaic Systems - each 113.00 151.00 147.00 181.00 Stand Alone Electrical Plan Check (hourly rate)151.00 196.00 - Other Electrical Inspections (per hour)100.00 - 121.00 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth Miscellaneous Apparatus, Conduits, and Conductors Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF 2,000 2,859$ 4,183$ $0.188 8,000 3,752$ 5,311$ $0.253 1 A-1 Assembly Group - Theaters 20,000 5,973$ 8,347$ $0.274 40,000 10,006$ 13,832$ $0.184 100,000 17,861$ 24,860$ $0.249 1,000 1,646$ 2,698$ $0.216 4,000 2,161$ 3,347$ $0.294 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 3,440$ 5,110$ $0.318 20,000 5,763$ 8,292$ $0.214 50,000 10,287$ 14,712$ $0.294 250 561$ 1,413$ $0.296 1,000 736$ 1,635$ $0.359 3 A Assembly Group - TI 2,500 1,172$ 2,174$ $0.392 5,000 1,963$ 3,155$ $0.253 12,500 3,504$ 5,049$ $0.404 1,000 1,646$ 2,698$ $0.216 4,000 2,161$ 3,347$ $0.294 4 A-3 Church and Religious Bldg - Complete 10,000 3,440$ 5,110$ $0.318 20,000 5,763$ 8,292$ $0.214 50,000 10,287$ 14,712$ $0.294 500 995$ 1,927$ $0.262 2,000 1,306$ 2,320$ $0.343 5 R-4 Congregate Care - Complete 5,000 2,079$ 3,348$ $0.372 10,000 3,483$ 5,210$ $0.247 25,000 6,217$ 8,914$ $0.357 250 561$ 1,413$ $0.296 1,000 736$ 1,635$ $0.359 6 A-3 Church and Religious Bldg - TI 2,500 1,172$ 2,174$ $0.392 5,000 1,963$ 3,155$ $0.253 12,500 3,504$ 5,049$ $0.404 2,000 2,117$ 3,254$ $0.139 8,000 2,778$ 4,089$ $0.191 7 E Educational Building - Complete 20,000 4,423$ 6,382$ $0.207 40,000 7,410$ 10,519$ $0.140 100,000 13,227$ 18,899$ $0.189 250 561$ 1,413$ $0.296 1,000 736$ 1,635$ $0.359 8 E Educational Building - TI 2,500 1,172$ 2,174$ $0.392 5,000 1,963$ 3,155$ $0.253 12,500 3,504$ 5,049$ $0.404 PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 500 742$ 1,627$ $0.195 2,000 974$ 1,920$ $0.248 9 S-2 Parking Garage - Complete 5,000 1,550$ 2,664$ $0.270 10,000 2,596$ 4,012$ $0.177 25,000 4,634$ 6,660$ $0.266 1,000 1,646$ 2,698$ $0.216 4,000 2,161$ 3,347$ $0.294 10 R-1 Hotel Low/Mid Rise - Complete 10,000 3,440$ 5,110$ $0.318 20,000 5,763$ 8,292$ $0.214 50,000 10,287$ 14,712$ $0.294 1,000 706$ 1,585$ $0.093 4,000 926$ 1,863$ $0.117 11 R-1 Hotel Low/Mid Rise - Shell 10,000 1,474$ 2,566$ $0.127 20,000 2,470$ 3,840$ $0.083 50,000 4,408$ 6,338$ $0.127 250 525$ 1,370$ $0.277 1,000 689$ 1,578$ $0.332 12 R-1 Hotel Low/Mid Rise - TI 2,500 1,096$ 2,076$ $0.363 5,000 1,836$ 2,984$ $0.232 12,500 3,278$ 4,727$ $0.378 500 1,058$ 2,028$ $0.278 2,000 1,389$ 2,445$ $0.351 13 B Offices, etc. - Complete 5,000 2,211$ 3,499$ $0.382 10,000 3,705$ 5,411$ $0.250 25,000 6,612$ 9,157$ $0.366 1,000 543$ 1,392$ $0.071 4,000 712$ 1,606$ $0.087 14 B Offices, etc. - Shell 10,000 1,134$ 2,125$ $0.095 20,000 1,900$ 3,070$ $0.061 50,000 3,391$ 4,888$ $0.098 100 387$ 1,208$ $0.510 400 508$ 1,361$ $0.573 15 B Offices, etc. - TI 1,000 809$ 1,705$ $0.629 2,000 1,355$ 2,334$ $0.390 5,000 2,419$ 3,503$ $0.701 1,000 1,646$ 2,698$ $0.216 4,000 2,161$ 3,347$ $0.294 16 F Industrial Building - Complete 10,000 3,440$ 5,110$ $0.318 20,000 5,763$ 8,292$ $0.214 50,000 10,287$ 14,712$ $0.294 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 1,000 923$ 1,841$ $0.122 4,000 1,211$ 2,206$ $0.158 17 F Industrial Building - Shell 10,000 1,928$ 3,153$ $0.172 20,000 3,230$ 4,868$ $0.113 50,000 5,765$ 8,270$ $0.165 250 525$ 1,370$ $0.277 1,000 689$ 1,578$ $0.332 18 F Industrial Building - TI 2,500 1,096$ 2,076$ $0.363 5,000 1,836$ 2,984$ $0.232 12,500 3,278$ 4,727$ $0.378 500 923$ 1,841$ $0.243 2,000 1,211$ 2,206$ $0.316 19 S-1 Repair Garage & Service St - Complete 5,000 1,928$ 3,153$ $0.343 10,000 3,230$ 4,868$ $0.227 25,000 5,765$ 8,270$ $0.331 500 452$ 1,285$ $0.119 2,000 594$ 1,464$ $0.139 20 S-1 Repair Garage & Service St - Shell 5,000 945$ 1,881$ $0.152 10,000 1,583$ 2,642$ $0.096 25,000 2,826$ 4,083$ $0.163 100 507$ 1,349$ $0.667 400 665$ 1,549$ $0.798 21 S-1 Repair Garage & Service St - TI 1,000 1,058$ 2,028$ $0.871 2,000 1,773$ 2,899$ $0.556 5,000 3,165$ 4,566$ $0.913 500 995$ 1,927$ $0.262 2,000 1,306$ 2,320$ $0.343 22 M Retail Sales - Complete 5,000 2,079$ 3,348$ $0.372 10,000 3,483$ 5,210$ $0.247 25,000 6,217$ 8,914$ $0.357 500 452$ 1,285$ $0.119 2,000 594$ 1,464$ $0.139 23 M Retail Sales - Shell 5,000 945$ 1,881$ $0.152 10,000 1,583$ 2,642$ $0.096 25,000 2,826$ 4,083$ $0.163 100 507$ 1,349$ $0.667 400 665$ 1,549$ $0.798 24 M Retail Sales - TI 1,000 1,058$ 2,028$ $0.871 2,000 1,773$ 2,899$ $0.556 5,000 3,165$ 4,566$ $0.913 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 2,000 923$ 1,841$ $0.061 8,000 1,211$ 2,206$ $0.079 25 - Warehouse - Complete 20,000 1,928$ 3,153$ $0.086 40,000 3,230$ 4,868$ $0.057 100,000 5,765$ 8,270$ $0.083 1,000 1,646$ 2,698$ $0.216 4,000 2,161$ 3,347$ $0.294 26 I Medical/24 Hour Care - Complete 10,000 3,440$ 5,110$ $0.318 20,000 5,763$ 8,292$ $0.214 50,000 10,287$ 14,712$ $0.294 1,000 742$ 1,627$ $0.098 4,000 974$ 1,920$ $0.124 27 I Medical/24 Hour Care - Shell 10,000 1,550$ 2,664$ $0.135 20,000 2,596$ 4,012$ $0.088 50,000 4,634$ 6,660$ $0.133 100 669$ 1,542$ $0.880 400 879$ 1,806$ $1.103 28 I Medical/24Hour Care - TI 1,000 1,399$ 2,468$ $1.201 2,000 2,343$ 3,669$ $0.782 5,000 4,182$ 6,016$ $1.203 1,000 1,646$ 2,698$ $0.216 4,000 2,161$ 3,347$ $0.294 29 B Medical Offices - Complete 10,000 3,440$ 5,110$ $0.318 20,000 5,763$ 8,292$ $0.214 50,000 10,287$ 14,712$ $0.294 1,000 742$ 1,627$ $0.098 4,000 974$ 1,920$ $0.124 30 B Medical Offices - Shell 10,000 1,550$ 2,664$ $0.135 20,000 2,596$ 4,012$ $0.088 50,000 4,634$ 6,660$ $0.133 250 669$ 1,542$ $0.352 1,000 879$ 1,806$ $0.441 31 B Medical Offices - TI 2,500 1,399$ 2,468$ $0.480 5,000 2,343$ 3,669$ $0.313 12,500 4,182$ 6,016$ $0.481 500 1,104$ 2,055$ $0.291 2,000 1,449$ 2,491$ $0.384 32 - Restaurant - Complete 5,000 2,306$ 3,642$ $0.416 10,000 3,863$ 5,724$ $0.277 25,000 6,896$ 9,881$ $0.395 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 500 561$ 1,413$ $0.148 2,000 736$ 1,635$ $0.180 33 - Restaurant - Shell 5,000 1,172$ 2,174$ $0.196 10,000 1,963$ 3,155$ $0.126 25,000 3,504$ 5,049$ $0.202 250 470$ 1,306$ $0.248 1,000 617$ 1,492$ $0.292 34 - Restaurant - TI 2,500 983$ 1,930$ $0.319 5,000 1,646$ 2,727$ $0.202 12,500 2,939$ 4,244$ $0.340 250 886$ 1,799$ $0.465 1,000 1,164$ 2,148$ $0.605 35 I-4 Day Care Facility - Complete 2,500 1,852$ 3,055$ $0.657 5,000 3,103$ 4,697$ $0.433 12,500 5,539$ 7,948$ $0.636 100 669$ 1,542$ $0.880 400 879$ 1,806$ $1.103 36 I-4 Day Care Facility - TI 1,000 1,399$ 2,468$ $1.201 2,000 2,343$ 3,669$ $0.782 5,000 4,182$ 6,016$ $1.203 500 778$ 1,670$ $0.205 2,000 1,021$ 1,977$ $0.261 37 H Hazardous H- Complete 5,000 1,625$ 2,761$ $0.284 10,000 2,723$ 4,183$ $0.187 25,000 4,861$ 6,982$ $0.279 500 1,104$ 2,055$ $0.291 2,000 1,449$ 2,491$ $0.384 38 H Hazardous H- Shell 5,000 2,306$ 3,642$ $0.416 10,000 3,863$ 5,724$ $0.277 25,000 6,896$ 9,881$ $0.395 100 669$ 1,542$ $0.880 400 879$ 1,806$ $1.103 39 H Hazardous H- T I 1,000 1,399$ 2,468$ $1.201 2,000 2,343$ 3,669$ $0.782 5,000 4,182$ 6,016$ $1.203 200 380$ 1,199$ $0.250 800 499$ 1,349$ $0.280 40 - Commercial Building - Foundation 2,000 794$ 1,685$ $0.307 4,000 1,330$ 2,299$ $0.190 10,000 2,373$ 3,439$ $0.344 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 200 416$ 1,242$ $0.273 800 546$ 1,406$ $0.314 41 - Commercial Building - Addition 2,000 869$ 1,783$ $0.344 4,000 1,456$ 2,471$ $0.215 10,000 2,599$ 3,761$ $0.376 1,000 1,646$ 2,698$ $0.216 4,000 2,161$ 3,347$ $0.294 42 R-2 Apartment Building 10,000 3,440$ 5,110$ $0.318 20,000 5,763$ 8,292$ $0.214 50,000 10,287$ 14,712$ $0.294 1,000 1,172$ 2,174$ $0.123 2,000 1,269$ 2,297$ $0.636 64 R-3 Single-Family (custom or model)3,000 1,761$ 2,933$ $0.332 5,000 2,287$ 3,597$ $0.471 7,500 3,207$ 4,774$ $0.637 667 427$ 1,278$ $0.072 1,333 463$ 1,326$ $0.245 65 R-3 Single-Family - Production / Repeat 2,000 642$ 1,489$ $0.191 3,333 834$ 1,743$ $0.221 5,000 1,170$ 2,112$ $0.422 333 377$ 1,218$ $0.129 667 409$ 1,261$ $0.393 66 R-3 Moved Building - Residential 1,000 567$ 1,392$ $0.339 1,667 736$ 1,618$ $0.377 2,500 1,032$ 1,932$ $0.773 800 287$ 1,109$ $0.044 1,600 310$ 1,144$ $0.089 67 R-3 Manufactured Home - Complete 2,400 431$ 1,215$ $0.111 4,000 559$ 1,392$ $0.107 6,000 784$ 1,606$ $0.268 667 287$ 1,109$ $0.053 1,333 310$ 1,144$ $0.107 68 R-3 Prefabricated Dwelling - Complete 2,000 431$ 1,215$ $0.133 3,333 559$ 1,392$ $0.128 5,000 784$ 1,606$ $0.321 120 188$ 972$ $0.208 480 247$ 1,047$ $0.165 69 - Commercial Coach - Complete 1,200 393$ 1,166$ $0.188 2,400 658$ 1,392$ $0.094 6,000 1,175$ 1,732$ $0.289 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 240 188$ 972$ $0.104 960 247$ 1,047$ $0.083 70 - Modular Building - Complete 2,400 393$ 1,166$ $0.094 4,800 658$ 1,392$ $0.047 12,000 1,175$ 1,732$ $0.144 500 206$ 994$ $0.054 2,000 271$ 1,075$ $0.047 71 - Manufactured Building - Foundation 5,000 431$ 1,215$ $0.052 10,000 722$ 1,477$ $0.028 25,000 1,288$ 1,893$ $0.076 167 287$ 1,109$ $0.210 333 310$ 1,144$ $0.426 72 U Residential Garage 500 431$ 1,215$ $0.531 833 559$ 1,392$ $0.514 1,250 784$ 1,606$ $1.285 40 235$ 1,028$ $0.775 160 309$ 1,121$ $0.721 73 U Pool/Spa - Standard Plan 400 491$ 1,294$ $0.800 800 823$ 1,614$ $0.448 2,000 1,469$ 2,151$ $1.076 200 669$ 1,542$ $0.440 800 879$ 1,806$ $0.552 74 - Commercial Building - Remodel 2,000 1,399$ 2,468$ $0.601 4,000 2,343$ 3,669$ $0.391 10,000 4,182$ 6,016$ $0.602 200 633$ 1,499$ $0.417 800 831$ 1,749$ $0.518 75 - Commercial Building - Repair 2,000 1,323$ 2,370$ $0.564 4,000 2,216$ 3,498$ $0.366 10,000 3,956$ 5,694$ $0.569 50 221$ 1,011$ $0.580 200 290$ 1,098$ $0.523 77 U Accessory Building - Commercial 500 461$ 1,255$ $0.582 1,000 772$ 1,546$ $0.317 2,500 1,378$ 2,022$ $0.809 50 221$ 1,011$ $0.580 200 290$ 1,098$ $0.523 78 U Commercial Carport 500 461$ 1,255$ $0.582 1,000 772$ 1,546$ $0.317 2,500 1,378$ 2,022$ $0.809 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 167 427$ 1,278$ $0.288 333 463$ 1,326$ $0.978 79 R-3 Single-Family Residential - Addition 500 642$ 1,489$ $0.762 833 834$ 1,743$ $0.886 1,250 1,170$ 2,112$ $1.690 333 578$ 1,459$ $0.189 667 627$ 1,522$ $0.783 80 R-2 Multi-Family Residential - Addition 1,000 869$ 1,783$ $0.506 1,667 1,129$ 2,120$ $0.641 2,500 1,583$ 2,654$ $1.062 333 277$ 1,097$ $0.102 IRC 667 300$ 1,131$ $0.195 81 SFD Single-Family Residential - Remodel 1,000 416$ 1,196$ $0.257 1,667 540$ 1,367$ $0.244 2,500 757$ 1,570$ $0.628 667 382$ 1,224$ $0.066 1,333 414$ 1,268$ $0.200 82 R-2 Multi-Family Residential - Remodel 2,000 574$ 1,401$ $0.172 3,333 746$ 1,630$ $0.192 5,000 1,046$ 1,950$ $0.390 333 307$ 948$ $0.063 667 332$ 969$ $0.252 83 R-3 Residential Building - Foundation 1,000 461$ 1,053$ $0.167 1,667 599$ 1,164$ $0.209 2,500 839$ 1,338$ $0.535 83 277$ 912$ $0.204 167 300$ 929$ $0.792 84 U Accessory Building - Residential 250 416$ 995$ $0.564 417 540$ 1,089$ $0.677 625 757$ 1,230$ $1.968 133 277$ 912$ $0.128 267 300$ 929$ $0.495 85 U Residential Carport 400 416$ 995$ $0.353 667 540$ 1,089$ $0.423 1,000 757$ 1,230$ $1.230 83 277$ 912$ $0.204 167 300$ 929$ $0.792 86 U Residential Patio Cover 250 416$ 995$ $0.564 417 540$ 1,089$ $0.677 625 757$ 1,230$ $1.968 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Cost Each Additional SF PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING PLAN CHECK Recovery Rate 100% of Cost 83 277$ 1,032$ $0.336 167 300$ 1,060$ $1.560 87 U Residential Balcony/Deck 250 416$ 1,190$ $0.894 417 540$ 1,339$ $1.210 625 757$ 1,591$ $2.546 83 277$ 1,002$ $0.300 167 300$ 1,027$ $1.368 88 U Residential Patio Enclosure 250 416$ 1,141$ $0.816 417 540$ 1,277$ $1.075 625 757$ 1,501$ $2.402 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF 2,000 2,612$ 2,900$ $0.355 8,000 4,613$ 5,028$ $0.308 1 A-1 Assembly Group - Theaters 20,000 7,090$ 8,722$ $0.265 40,000 10,988$ 14,012$ $0.299 100,000 22,927$ 31,977$ $0.320 1,000 2,242$ 2,354$ $0.559 4,000 3,960$ 4,032$ $0.581 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 6,086$ 7,515$ $0.479 20,000 9,432$ 12,303$ $0.567 50,000 19,680$ 29,300$ $0.586 250 456$ 638$ $0.664 1,000 805$ 1,136$ $0.235 3 A Assembly Group - TI 2,500 1,237$ 1,489$ $0.259 5,000 1,917$ 2,137$ $0.231 12,500 4,000$ 3,869$ $0.310 1,000 1,946$ 1,917$ $0.440 4,000 3,437$ 3,236$ $0.552 4 A-3 Church and Religious Bldg - Complete 10,000 5,283$ 6,550$ $0.439 20,000 8,187$ 10,936$ $0.541 50,000 17,082$ 27,158$ $0.543 500 1,167$ 1,230$ $0.545 2,000 2,062$ 2,047$ $0.617 5 R-4 Congregate Care - Complete 5,000 3,169$ 3,898$ $0.474 10,000 4,911$ 6,267$ $0.619 25,000 10,248$ 15,550$ $0.622 250 345$ 475$ $0.484 1,000 609$ 838$ $0.193 6 A-3 Church and Religious Bldg - TI 2,500 936$ 1,128$ $0.198 5,000 1,450$ 1,624$ $0.192 12,500 3,026$ 3,065$ $0.245 2,000 2,575$ 2,846$ $0.347 8,000 4,548$ 4,928$ $0.306 7 E Educational Building - Complete 20,000 6,990$ 8,601$ $0.262 40,000 10,833$ 13,841$ $0.298 100,000 22,603$ 31,709$ $0.317 250 345$ 475$ $0.484 1,000 609$ 838$ $0.193 8 E Educational Building - TI 2,500 936$ 1,128$ $0.198 5,000 1,450$ 1,624$ $0.192 12,500 3,026$ 3,065$ $0.245 INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES BUILDING INSPECTION Recovery Rate 100% of Cost Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 500 456$ 638$ $0.332 2,000 805$ 1,136$ $0.118 9 S-2 Parking Garage - Complete 5,000 1,237$ 1,489$ $0.130 10,000 1,917$ 2,137$ $0.115 25,000 4,000$ 3,869$ $0.155 1,000 1,946$ 1,917$ $0.440 4,000 3,437$ 3,236$ $0.552 10 R-1 Hotel Low/Mid Rise - Complete 10,000 5,283$ 6,550$ $0.439 20,000 8,187$ 10,936$ $0.541 50,000 17,082$ 27,158$ $0.543 1,000 485$ 682$ $0.178 4,000 857$ 1,216$ $0.062 11 R-1 Hotel Low/Mid Rise - Shell 10,000 1,317$ 1,586$ $0.069 20,000 2,041$ 2,274$ $0.060 50,000 4,259$ 4,083$ $0.082 250 345$ 475$ $0.484 1,000 609$ 838$ $0.193 12 R-1 Hotel Low/Mid Rise - TI 2,500 936$ 1,128$ $0.198 5,000 1,450$ 1,624$ $0.192 12,500 3,026$ 3,065$ $0.245 500 1,769$ 2,136$ $1.091 2,000 3,125$ 3,773$ $0.700 13 B Offices, etc. - Complete 5,000 4,803$ 5,874$ $0.657 10,000 7,444$ 9,159$ $0.674 25,000 15,533$ 19,273$ $0.771 1,000 285$ 387$ $0.097 4,000 504$ 678$ $0.043 14 B Offices, etc. - Shell 10,000 775$ 934$ $0.042 20,000 1,201$ 1,351$ $0.043 50,000 2,506$ 2,637$ $0.053 100 213$ 281$ $0.677 400 377$ 484$ $0.358 15 B Offices, etc. - TI 1,000 579$ 699$ $0.319 2,000 898$ 1,018$ $0.366 5,000 1,873$ 2,115$ $0.423 1,000 1,909$ 1,863$ $0.425 4,000 3,372$ 3,137$ $0.549 16 F Industrial Building - Complete 10,000 5,182$ 6,429$ $0.434 20,000 8,031$ 10,765$ $0.538 50,000 16,758$ 26,890$ $0.538 1,000 328$ 450$ $0.114 4,000 579$ 793$ $0.047 17 F Industrial Building - Shell 10,000 890$ 1,073$ $0.048 20,000 1,380$ 1,548$ $0.047 50,000 2,879$ 2,945$ $0.059 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 250 439$ 614$ $0.637 1,000 775$ 1,092$ $0.229 18 F Industrial Building - TI 2,500 1,192$ 1,435$ $0.250 5,000 1,847$ 2,060$ $0.225 12,500 3,854$ 3,748$ $0.300 500 945$ 903$ $0.365 2,000 1,670$ 1,450$ $0.575 19 S-1 Repair Garage & Service St - Complete 5,000 2,566$ 3,174$ $0.414 10,000 3,978$ 5,242$ $0.580 25,000 8,299$ 13,944$ $0.558 500 310$ 423$ $0.213 2,000 547$ 743$ $0.090 20 S-1 Repair Garage & Service St - Shell 5,000 840$ 1,013$ $0.090 10,000 1,302$ 1,462$ $0.090 25,000 2,717$ 2,811$ $0.112 100 213$ 281$ $0.677 400 377$ 484$ $0.358 21 S-1 Repair Garage & Service St - TI 1,000 579$ 699$ $0.319 2,000 898$ 1,018$ $0.366 5,000 1,873$ 2,115$ $0.423 500 1,001$ 985$ $0.409 2,000 1,768$ 1,599$ $0.585 22 M Retail Sales - Complete 5,000 2,717$ 3,355$ $0.429 10,000 4,211$ 5,498$ $0.590 25,000 8,786$ 14,345$ $0.574 500 374$ 518$ $0.266 2,000 661$ 917$ $0.102 23 M Retail Sales - Shell 5,000 1,016$ 1,224$ $0.107 10,000 1,575$ 1,761$ $0.101 25,000 3,285$ 3,280$ $0.131 100 213$ 281$ $0.677 400 377$ 484$ $0.358 24 M Retail Sales - TI 1,000 579$ 699$ $0.319 2,000 898$ 1,018$ $0.366 5,000 1,873$ 2,115$ $0.423 2,000 2,055$ 2,541$ $0.316 8,000 3,630$ 4,435$ $0.197 25 - Warehouse - Complete 20,000 5,579$ 6,794$ $0.179 40,000 8,646$ 10,368$ $0.193 100,000 18,041$ 21,976$ $0.220 1,000 1,946$ 1,917$ $0.440 4,000 3,437$ 3,236$ $0.552 26 I Medical/24 Hour Care - Complete 10,000 5,283$ 6,550$ $0.439 20,000 8,187$ 10,936$ $0.541 50,000 17,082$ 27,158$ $0.543 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 1,000 347$ 477$ $0.122 4,000 612$ 843$ $0.049 27 I Medical/24 Hour Care - Shell 10,000 941$ 1,134$ $0.050 20,000 1,458$ 1,633$ $0.048 50,000 3,042$ 3,079$ $0.062 100 195$ 253$ $0.607 400 344$ 435$ $0.340 28 I Medical/24Hour Care - TI 1,000 529$ 639$ $0.293 2,000 820$ 932$ $0.350 5,000 1,710$ 1,981$ $0.396 1,000 1,946$ 1,917$ $0.440 4,000 3,437$ 3,236$ $0.552 29 B Medical Offices - Complete 10,000 5,283$ 6,550$ $0.439 20,000 8,187$ 10,936$ $0.541 50,000 17,082$ 27,158$ $0.543 1,000 356$ 491$ $0.126 4,000 628$ 868$ $0.049 30 B Medical Offices - Shell 10,000 966$ 1,164$ $0.051 20,000 1,497$ 1,676$ $0.049 50,000 3,123$ 3,146$ $0.063 250 457$ 641$ $0.667 1,000 808$ 1,141$ $0.237 31 B Medical Offices - TI 2,500 1,242$ 1,496$ $0.260 5,000 1,925$ 2,146$ $0.231 12,500 4,016$ 3,882$ $0.311 500 1,001$ 985$ $0.409 2,000 1,768$ 1,599$ $0.585 32 - Restaurant - Complete 5,000 2,717$ 3,355$ $0.429 10,000 4,211$ 5,498$ $0.590 25,000 8,786$ 14,345$ $0.574 500 319$ 436$ $0.221 2,000 563$ 768$ $0.092 33 - Restaurant - Shell 5,000 865$ 1,043$ $0.092 10,000 1,341$ 1,505$ $0.092 25,000 2,798$ 2,878$ $0.115 250 457$ 641$ $0.667 1,000 808$ 1,141$ $0.237 34 - Restaurant - TI 2,500 1,242$ 1,496$ $0.260 5,000 1,925$ 2,146$ $0.231 12,500 4,016$ 3,882$ $0.311 250 1,001$ 985$ $0.819 1,000 1,768$ 1,599$ $1.171 35 I-4 Day Care Facility - Complete 2,500 2,717$ 3,355$ $0.857 5,000 4,211$ 5,498$ $1.180 12,500 8,786$ 14,345$ $1.148 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 100 176$ 226$ $0.530 400 311$ 385$ $0.322 36 I-4 Day Care Facility - TI 1,000 479$ 578$ $0.269 2,000 742$ 847$ $0.333 5,000 1,548$ 1,847$ $0.369 500 1,001$ 985$ $0.409 2,000 1,768$ 1,599$ $0.585 37 H Hazardous H- Complete 5,000 2,717$ 3,355$ $0.429 10,000 4,211$ 5,498$ $0.590 25,000 8,786$ 14,345$ $0.574 500 300$ 409$ $0.206 2,000 530$ 718$ $0.088 38 H Hazardous H- Shell 5,000 815$ 983$ $0.087 10,000 1,263$ 1,419$ $0.088 25,000 2,636$ 2,744$ $0.110 100 176$ 226$ $0.530 400 311$ 385$ $0.322 39 H Hazardous H- T I 1,000 479$ 578$ $0.269 2,000 742$ 847$ $0.333 5,000 1,548$ 1,847$ $0.369 200 176$ 226$ $0.265 800 311$ 385$ $0.161 40 - Commercial Building - Foundation 2,000 479$ 578$ $0.135 4,000 742$ 847$ $0.167 10,000 1,548$ 1,847$ $0.185 200 195$ 253$ $0.303 800 344$ 435$ $0.170 41 - Commercial Building - Addition 2,000 529$ 639$ $0.147 4,000 820$ 932$ $0.175 10,000 1,710$ 1,981$ $0.198 1,000 1,876$ 1,839$ $0.455 4,000 3,313$ 3,203$ $0.523 42 R-2 Apartment Building 10,000 5,092$ 6,339$ $0.444 20,000 7,892$ 10,775$ $0.498 50,000 16,467$ 25,719$ $0.514 1,000 1,388$ 1,674$ $0.996 2,000 2,214$ 2,670$ $1.017 43 R-3 Single-Family (custom or model) 3,000 3,059$ 3,687$ $0.912 5,000 4,580$ 5,510$ $0.746 7,500 6,125$ 7,374$ $0.983 667 837$ 1,054$ $0.885 1,333 1,335$ 1,644$ $0.864 44 R-3 Single-Family - Production / Repeat 2,000 1,844$ 2,220$ $0.743 3,333 2,761$ 3,210$ $0.684 5,000 3,693$ 4,350$ $0.870 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 333 156$ 182$ $0.342 667 248$ 296$ $0.360 45 R-3 Moved Building - Residential 1,000 343$ 416$ $0.326 1,667 514$ 633$ $0.250 2,500 687$ 841$ $0.336 800 122$ 138$ $0.114 1,600 194$ 229$ $0.120 46 R-3 Manufactured Home - Complete 2,400 268$ 325$ $0.112 4,000 401$ 504$ $0.081 6,000 536$ 665$ $0.111 667 122$ 138$ $0.137 1,333 194$ 229$ $0.144 47 R-3 Prefabricated Dwelling - Complete 2,000 268$ 325$ $0.134 3,333 401$ 504$ $0.097 5,000 536$ 665$ $0.133 120 99$ 111$ $0.181 480 174$ 176$ $0.207 48 - Commercial Coach - Complete 1,200 268$ 325$ $0.136 2,400 415$ 488$ $0.221 6,000 866$ 1,285$ $0.214 240 99$ 111$ $0.090 960 174$ 176$ $0.103 49 - Modular Building - Complete 2,400 268$ 325$ $0.068 4,800 415$ 488$ $0.111 12,000 866$ 1,285$ $0.107 500 99$ 111$ $0.043 2,000 174$ 176$ $0.050 50 - Manufactured Building - Foundation 5,000 268$ 325$ $0.033 10,000 415$ 488$ $0.053 25,000 866$ 1,285$ $0.051 167 188$ 223$ $0.816 333 299$ 359$ $0.846 51 U Residential Garage 500 413$ 500$ $0.762 833 619$ 754$ $0.602 1,250 828$ 1,005$ $0.804 40 169$ 215$ $1.250 160 298$ 365$ $0.788 52 U Pool/Spa - Standard Plan 400 459$ 554$ $0.648 800 711$ 813$ $0.818 2,000 1,483$ 1,794$ $0.897 200 308$ 420$ $0.530 800 543$ 738$ $0.224 53 - Commercial Building - Remodel 2,000 835$ 1,007$ $0.224 4,000 1,294$ 1,454$ $0.224 10,000 2,701$ 2,798$ $0.280 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 200 308$ 420$ $0.530 800 543$ 738$ $0.224 54 - Commercial Building - Repair 2,000 835$ 1,007$ $0.224 4,000 1,294$ 1,454$ $0.224 10,000 2,701$ 2,798$ $0.280 50 213$ 133$ $0.553 200 377$ 216$ $0.523 55 U Accessory Building - Commercial 500 579$ 373$ $0.368 1,000 898$ 557$ $0.557 2,500 1,873$ 1,392$ $0.557 50 113$ 163$ $0.713 200 200$ 270$ $0.567 56 U Commercial Carport 500 308$ 440$ $0.422 1,000 477$ 651$ $0.592 2,500 996$ 1,539$ $0.616 167 134$ 267$ $0.960 333 236$ 427$ $0.984 57 R-3 Single-Family Residential - Addition 500 363$ 591$ $0.876 833 563$ 883$ $0.715 1,250 1,175$ 1,181$ $0.945 333 222$ 704$ $1.197 667 354$ 1,103$ $1.179 58 R-2 Multi-Family Residential - Addition 1,000 489$ 1,496$ $1.020 1,667 732$ 2,176$ $0.919 2,500 979$ 2,942$ $1.177 333 563$ 252$ $0.459 667 899$ 405$ $0.465 59 R-3 Single-Family Residential - Remodel 1,000 1,242$ 560$ $0.420 1,667 1,859$ 840$ $0.340 2,500 2,486$ 1,123$ $0.449 667 210$ 363$ $0.320 1,333 336$ 576$ $0.321 60 R-2 Multi-Family Residential - Remodel 2,000 464$ 790$ $0.283 3,333 694$ 1,167$ $0.241 5,000 928$ 1,569$ $0.314 333 188$ 223$ $0.408 667 299$ 359$ $0.423 61 R-3 Residential Building - Foundation 1,000 413$ 500$ $0.381 1,667 619$ 754$ $0.301 2,500 828$ 1,005$ $0.402 83 133$ 153$ $1.176 167 212$ 251$ $1.248 62 U Accessory Building - Residential 250 293$ 355$ $1.152 417 439$ 547$ $0.850 625 587$ 724$ $1.158 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Current Fee Base Fee FY 16-17 Each Additional SF INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Recovery Rate 100% of Cost 133 122$ 138$ $0.683 267 194$ 229$ $0.720 63 U Residential Carport 400 268$ 325$ $0.671 667 401$ 504$ $0.483 1,000 536$ 665$ $0.665 83 122$ 138$ $1.092 167 194$ 229$ $1.152 64 U Residential Patio Cover 250 268$ 325$ $1.074 417 401$ 504$ $0.773 625 536$ 665$ $1.064 83 122$ 138$ $1.092 167 194$ 229$ $1.152 65 U Residential Balcony/Deck 250 268$ 325$ $1.074 417 401$ 504$ $0.773 625 536$ 665$ $1.064 83 122$ 138$ $1.092 167 194$ 229$ $1.152 66 U Residential Patio Enclosure 250 268$ 325$ $1.074 417 401$ 504$ $0.773 625 536$ 665$ $1.064 Current Fees FY 2016-17 Copies, per page (Black and White)0.20$ 0.20$ Park Facility Use Fees: Strother Park-Large Barbecue 75.00 75.00 Strother Park-Security Deposit 30.00 30.00 Strother Park-Small Barbecue 40.00 40.00 Strother Park-Wedding Reception 155.00 155.00 Strother Park-Security 1,2,3 70.00 70.00 Elm Street Park-Barbecue 75.00 75.00 Elm Street Park-Security Deposit 30.00 30.00 Rancho Grande Park - Large BBQ 75.00 75.00 Rancho Grande Park - Small BBQ (areas 2 and 3)40.00 40.00 Strother Park Deposit 30.00 30.00 Kingo Park 40.00 40.00 Kingo Park Deposit 30.00 30.00 Rotary Bandstand Fees: Rent 75.00 75.00 Deposit 30.00 30.00 Soto Sports Complex Use Fees: Campbell Field Rental Fee 15.00 15.00 Campbell Field Rental Fee (with lights)35.00 35.00 Pilg Field Rental Fee 15.00 15.00 Pilg Field Rental Fee (with lights)35.00 35.00 Santos Field Rental Fee 15.00 15.00 Volunteer Field Rental Fee 15.00 15.00 Volunteer Field with Lights Rental 35.00 35.00 Ikeda Field Rental 15.00 15.00 Ikeda Field with Lights Rental 35.00 35.00 Porter Field Rental Fee 20.00 20.00 Porter Field with Lights Rental 40.00 40.00 Tennis Court Rental-1 Hour 10.00 10.00 Tennis Courts - 4 Rental 100.00 100.00 Pickleball Club - Annual Fee 95.00 Food Booth Rental Fee (Soto)35.00 35.00 Food Vendor Space Rental Fee 10% of Gross Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES RECREATION SERVICES Current Fees FY 2016-17 Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES RECREATION SERVICES Soto Sports Complex Use Fees (continued): Meeting Room Rental Fee (Jaycee room)20.00$ 20.00$ Field Prep Fees (except Porter)20.00 20.00 Field Prep Fees - Porter 35.00 35.00 Tournament Sch. & Coordin Fee 65.00 65.00 Tournament CLEANING / SECURITY Deposit Fee 260.00 260.00 Tournament Staff Attendant - HOURLY FEE 15.00 Soto Sports Complex Use Fees - APPROVED YOUTH GROUPS: Field Rental (practice and league games) - each field - hourly 2.00 Concession Stand Fee - Buildings - hourly 5.00 Concession Stand Fee - Mobile - hourly 3.00 Non-resident - per participant 2.00 Woman's Club Use Fees: Non-Resident Fee 50.00 50.00 Partial day rental - Mon - Thurs, after 5 pm per hr 50.00 50.00 Full day rental - Friday, Saturday, or Sunday 450.00 550.00 Second day rental - Friday, Saturday or Sunday 275.00 275.00 Security Deposit (No Alcohol/No Band)400.00 400.00 Security Deposit (with Alcohol)750.00 1,000.00 Building Supervision Fee per hr 10.00 12.00 Rental Fee (on-going users): Non-profit groups/Service clubs/Youth groups: (20 or less attendees)per hr 3.00 3.00 (21 - 50 attendees)"4.00 4.00 (51 or more attendees)"5.00 5.00 Groups with reciprocal services "3.00 3.00 Private groups or clubs:per hr (20 or less attendees)"8.00 8.00 (21 - 50 attendees)"9.00 9.00 (51 or more attendees)"10.00 10.00 Groups with reciprocal services "5.00 5.00 For-profit groups per hr 25.00 25.00 Custodial Fee (special event rentals only)80.00 100.00 Reservation Cancellation Fees: If cancelled 30 days or more ahead of event 100.00 100.00 If cancelled less than 30 days ahead of event 200.00 200.00 Current Fees FY 2016-17 Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES RECREATION SERVICES Woman's Club Use Fees (continued): Amenities Fees: Chairs per chair 0.25$ 0.25$ Tables per table 1.00 1.00 Community Garden Deposit 25.00 25.00 Community Garden Plot per 6 months 18.00 36.00 Elm Street Community Center Use Fees: Rental Fee per hr 30.00 30.00 Rental Fee - full day 175.00 175.00 Building Supervision Fee per hr 10.00 10.00 Security deposit 150.00 150.00 Adult Sport League Fees: Adult Softball 435.00 435.00 Adult Basketball 365.00 365.00 Non-Resident Fee 8.00 8.00 Seasonal Playground Programs: Annual Registration Fee 15.00 15.00 Playground-Elm Street (Winter/Spring/Summer)per day 23.00 23.00 half day 11.50 11.50 Late pickup (after 4:15)10.00 10.00 Pre-School Fees: Annual Registration Fee 15.00 15.00 Play & Learn-Tues & Thur.per hr 4.20 4.20 Play & Learn-Mon, Wed & Fri."4.20 4.20 Kindergartens in Training "4.20 4.20 Summer Play & Learn "4.20 4.20 Late Pick-up Fees: First late pick-up per child 5.00 5.00 Second late pick-up "10.00 10.00 Third late pick-up "20.00 20.00 Children In Motion Program: Children In Motion Annual Registration 25.00$ 25.00$ Branch School - Mornings 5 Days Per Week per 4 wks 97.50 97.50 4 Days Per Week "84.00 84.00 3 Days Per Week "67.50 67.50 2 Days Per Week "48.00 48.00 Current Fees FY 2016-17 Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES RECREATION SERVICES Children In Motion Fees (continued): Branch School - Afternoons 5 Days Per Week per 4 wks 178.75 178.75 4 Days Per Week "154.00 154.00 3 Days Per Week "123.75 123.75 2 Days Per Week "88.00 88.00 Extra Day - Branch School Morning per day 6.50 6.50 Afternoon "12.75 12.75 Late Start Monday per day 2.25 2.25 Kindercare - Branch School 5 Days Per Week per 4 wks 195.00 195.00 4 Days Per Week "168.00 168.00 3 Days Per Week "135.00 135.00 2 Days Per Week "96.00 96.00 Extra Day per day 12.75 12.75 Ocean View School - Mornings 5 Days Per Week per 4 wks 97.50$ 97.50$ 4 Days Per Week "84.00 84.00 3 Days Per Week "67.50 67.50 2 Days Per Week "48.00 48.00 Ocean View School - Afternoons 5 Days Per Week per 4 wks 195.00 195.00 4 Days Per Week "168.00 168.00 3 Days Per Week "135.00 135.00 2 Days Per Week "96.00 96.00 Extra Day - Ocean View School Morning per day 6.50 6.50 Afternoon "12.75 12.75 Late Start Monday per day 2.25 2.25 Elm Community Center - Mornings 5 Days Per Week per 4 wks 276.25 276.25 4 Days Per Week "238.00 238.00 3 Days Per Week "191.25 191.25 2 Days Per Week "136.00 136.00 Elm Community Center - Afternoons Care Plan A 5 Days Per Week per 4 wks 195.00 195.00 4 Days Per Week "168.00 168.00 3 Days Per Week "135.00 135.00 2 Days Per Week "96.00 96.00 Current Fees FY 2016-17 Fee Description City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES RECREATION SERVICES Children In Motion Fees (continued): Elm Community Center - Afternoons Care Plan B 5 Days Per Week per 4 wks 373.75 373.75 4 Days Per Week "322.00 322.00 3 Days Per Week "258.75 258.75 2 Days Per Week "184.00 184.00 Extra Day - Elm Community Center Morning per day 15.00$ 15.00$ Care Plan A (12:15 pm - 3:15 pm)"12.75 12.75 Care Plan B (12:15 pm - 6:00 pm)"24.50 24.50 Winter/Spring/Summer -Full Day 5 Days Per Week per week 150.00 150.00 4 Days Per Week "128.00 128.00 3 Days Per Week "102.00 102.00 Minimum Days (teacher work day/early release) Regular day of attendance per day 9.75 9.75 Non-regular day of attendance "16.50 16.50 Late Pick-up Fees: Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00 Pickup 6:01 - 6:15 pm per child 10.00 10.00 Pickup 6:16 - 6:30 pm "20.00 20.00 Pickup 6:31 - 6:45 pm "30.00 30.00 Current Fees FY 2016-17 LABOR COSTS (per hour): DURING REGULAR WORK HOURS: Full Time employee 52.92$ 59.30$ Part Time employee 21.03 22.20 AFTER REGULAR WORK HOURS: Full Time employee 79.38 88.95 Part Time employee 31.55 33.30 MINIMUM CALL-OUT RATE 2 hours at 1.5 times billing rate EQUIPMENT BILLING RATE (per hour) Pickup Truck 17.00 17.00 Service Truck 42.00 42.00 Backhoe 43.00 43.00 CAT Generator 82.00 82.00 Loader 88.00 50.00 6" Pump 23.00 23.00 Dump/Flat Bed Truck (5-7 yds)36.00 36.00 Sewer/Vacuum/Jet Truck 125.00 125.00 Chipper 40.00 44.00 Concrete Saw 13.00 10.00 Air Compressor 27.00 17.00 5-Ton Roller 34.00 30.00 MATERIAL COST: (cost plus tax) Concrete (per yard)121.00 125.00 Sand (per ton)17.00 25.00 Class II Base (per ton)20.00 30.00 A/C (per ton)97.00 100.00 City of Arroyo Grande COMPARISON OF CURRENT TO PROPOSED FEES PUBLIC WORKS SERVICES Fee Description