Loading...
CC 2017-11-14_10b Operating Fees_Citywide Master Fee Schedule MEMORANDUM TO: CITY COUNCIL FROM: DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SERVICES SUBJECT: CONSIDERATION OF A RESOLUTION UPDATING OPERATING FEES SET FORTH IN THE MASTER FEE SCHEDULE DATE: NOVEMBER 14, 2017 SUMMARY OF ACTION: Increase fees paid by users of City services to reflect increased costs to provide the service. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: Implementation of the increased fees is projected to generate approximately $45,000 - $50,000 in revenue for the remainder of the fiscal year and $100,000 - $120,000 annually thereafter. RECOMMENDATION: It is recommended the City Council: Adopt a Resolution updating operating fees set forth in the Master Fee Schedule, effective January 15, 2018. BACKGROUND: On September 13, 2016, the City Council received the results of a comprehensive study that calculated the cost of providing a variety of city services. At that time, the City Council adopted Resolution No. 4758, which provided that the Master Fee Schedule would be updated annually by modifying the adopted value up or down in conformance with the annual change in the City’s budgeted labor costs. The factor for adjustment of the fees shall be calculated and established each year by the Director of Administrative Services. In addition, phased increases of Planning fees shall be implemented at 5% per year for four years, until an overall cost recovery level of 75% is achieved for Planning related fee activities. ANALYSIS OF ISSUES: The Director of Administrative Services has calculated the overall increase in labor costs, and therefore the factor for adjusting these fees, as 6.27%. The additional 5% for Item 10.b. - Page 1 CITY COUNCIL CONSIDERATION OF A RESOLUTION UPDATING OPERATING FEES SET FORTH IN THE MASTER FEE SCHEDULE NOVEMBER 14, 2017 PAGE 2 Planning related fees will increase these by 11.27%. There is a minimum 60 day waiting period between the adoption of new development project fees and when the new fees can take effect, therefore, it is recommended that the effective date for the updated Master Fee Schedule be Monday, January 15, 2018. ALTERNATIVES: The following alternatives are provided for the Council’s consideration: 1. Adopt a Resolution increasing the operating fees in the Master Fee Schedule as presented; 2. Do not adopt the Resolution; or 3. Provide direction to staff. ADVANTAGES: Approving the recommended increases will allow the City to maximize revenue by recovering more of the estimated cost of providing the service and reduce the subsidy borne by the General Fund. DISADVANTAGES: The disadvantage of the recommendation is that it will result in fee increases. ENVIRONMENTAL REVIEW: No environmental review is required for this item. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted at City Hall and on the City’s website in accordance with Government Code Section 54954.2. Item 10.b. - Page 2 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE UPDATING OPERATING FEES SET FORTH IN THE MASTER FEE SCHEDULE WHEREAS, the City of Arroyo Grande (“City”) is empowered to impose reasonable fees, rates and charges for municipal services. California Government Code Section 66000 et seq. authorizes the City to adopt fees for municipal services, provided such fees do not exceed the cost to the City for providing the services; and WHEREAS, in January 2015 the City retained Wohlford Consulting to conduct a User (operating) Fee Study for City services. The User Fee Study is on file with the City Administrative Services Department and is incorporated by this reference; and WHEREAS, operating fees are intended to be paid by persons utilizing the program or service and to reimburse the City for the actual cost of said program or service; and WHEREAS, the City has established a proposed Master Fee Schedule based on the User Fee Study, which includes fees related to planning, building, engineering, police, recreation, and public works charges; and WHEREAS, the City Council has considered the question of whether or not to adjust or establish User (operating) Fees for City services to reflect the estimated amount that is required to recover the actual cost to the City of providing such services; and WHEREAS, the City Council adopted a methodology to annually update fees in order to reflect the change in the actual cost to the City of providing services and reduce the subsidy of the General Fund for planning related services; and WHEREAS, the amount of the fees do not exceed the cost of providing the City services; and WHEREAS, pursuant to Government Code Sections 66016, data indicating the amount of cost, or estimated cost, required to provide the service for which the fees are levied and the revenue sources anticipated to provide the service, including General Fund revenues, was made available for public review at least ten days prior to the date of this meeting; and WHEREAS, after conducting a duly noticed public hearing and satisfying all applicable provisions of California Government Code Sections 66016 and 66018, the City Council considered all verbal and written presentations that were made regarding the proposed fees. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo Grande as follows: Item 10.b. - Page 3 RESOLUTION NO. PAGE 2 1. The schedule of fees entitled “Master Fee Schedule” in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full, is hereby adopted. 2. Fees shall be adjusted annually by modifying the adopted value up or down in conformance with the annual change in the City’s budgeted labor costs. The factor for the adjustment of the fees shall be calculated and established each year by the Director of Administrative Services. 3. Additional phased increases of Planning fees shall be implemented at 5% per year for three years, until an overall cost recovery level of 75% is achieved for Planning related fee activities. BE IT FURTHER RESOLVED by the City Council that this Resolution shall be effective January 15, 2018. On motion of Council Member ______, seconded by Council Member ________, and by the following roll call vote, to wit: AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this ____ day of ______, 2017. Item 10.b. - Page 4 RESOLUTION NO. PAGE 3 ___________________________________ JIM HILL, MAYOR ATTEST: ___ KELLY WETMORE, CITY CLERK APPROVED AS TO CONTENT: ___________________________________ JAMES A. BERGMAN, CITY MANAGER APPROVED AS TO FORM: ___________________________________ HEATHER WHITHAM, CITY ATTORNEY Item 10.b. - Page 5 Fees effective January 15, 2018 Issued by the Administrative Services Department CITY OF ARROYO GRANDE Fiscal Year 2017-18 MASTER FEE SCHEDULE EXHIBIT A Item 10.b. - Page 6 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 Hourly rates for all City staff positions will be calculated and provided by the Administrative Services Department. In the absence of an established fee for service, the City will recover costs based on the reasonable time and materials required to provide the service, as calculated by the Administrative Services Department EXHIBIT A Item 10.b. - Page 7 FY 2017-18 Fee Budget 40.00$ Financial Statements copy costs Business License Fees: (Basic fees are prorated per the application date: Jan 1-Jun 30, 100%; Jul 1- Dec 31, 50%) Basic Fee--All businesses except Specific License Fees listed below 34.00* >Per Employee, Partner, or Associate (Except those listed below)5.00 Specific License Fees: Contractor 64.00* Motels & Hotels (Basic Fee)34.00* >per room 1.00 Trailer Parks 34.00* >per space 1.00 Hospitals, Sanitariums, Rest or Nursing Homes 44.00* >per bed 3.00 Taxi Cabs 49.00* >per vehicle 15.00 Billboards 129.00* Commercial Auctions - Per Year 89.00* Commercial Auctions - Per Day of Auctioning 29.00* Circuses and similar shows (per day)70.00 + $4 State Fee Bazaars and street fairs: >Small Bazaars (1-4 displays or exhibits) per display per every two (2) days 15.00 + $4 State Fee >Large Bazaars (5 or more displays or exhibits) per day 70.00 + $4 State Fee * Includes $4 per license per State law (AB 1379) Copies, per page (Black and White)0.20 Color copies Actual cost Maps--Chamber of Commerce 1.00 Utility Fees and Penalties: Renter's Deposit 180.00 New Utility Account Set Up Fee 30.00 Past Due Penalty (% of Past Due Total)0.10 Lock Cut Replacement Fee 10.00 Reconnection Fee (Reconnect by City Personnel)45.00 Unauthorized Reconnection Fee (Reconnect by non-City Personnel)65.00 Returned check fee (NSF) -Per CA Civil Code Section 1719 25.00 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 ADMINISTRATIVE SERVICES EXHIBIT A Item 10.b. - Page 8 FY 2017-18 Fee City Council Agenda and Minutes Subscription by mail: City Council Agenda Only 20.00$ City Council Agenda and Minutes 35.00 City Council Meeting Audio CD $ 5.00/each City Council Meeting DVD Vendor cost Candidate Filing Fee no charge Candidate Statement actual cost Notice of Intent to Circulate Petition (EC 9202)200.00 Copies, per page (Black and White)0.20 Color copies Actual cost Copies of records sent to a commercial copier Actual cost Document Certification 10.00 Fair Political Practices Commission Forms: Statement of Economic Interests Form 700 (GC 81008).10/page Campaign Statements (GC 81008).10/page Retrieval fee for statements 5 or more years old (GC 81008)5.00/request Municipal Code (w/out binder)150.00 Municipal Code Supplement Subscription 25.00/year Notary (per signature)15.00 Transcript of City Council proceedings Actual cost Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES EXHIBIT A Item 10.b. - Page 9 Fee Description FY 2017-18 Fee Printing/Copying Charges: 8 1/2" x 11 (per page)0.20$ 18" x 30 (per page)3.00 24" x 36" (per page)4.00 36" x 48" (per page)5.00 Standard Plans 35.00 Land Use Map and Zoning Maps (each) 24x36 3.00 36x48 4.00 Welcome to Arroyo Grande Maps 4.00 Overtime Inspections (per hour- 2 hour min.)149.00 Map Review - Final (LLA, PM, TM 0-2 Lots)5,537.00 Each Additional Lot 132.00 Additional Map Review - After 3 2,637.00 Encroachment Permit - Minor (pod, dumpster)53.00 Encroachment Permit - Standard - per Month 658.00 Encroachment Permit - Franchise Annual 16,472.00 Certificate of Compliance 2,035.00 Certificate of Correction / Merger 736.00 Transporation Permit - each occurance 38.00 Public Improvement Plan - Plan Check (based on Engineer's estimate of construction cost): $0 - 10,000 2,428.00 $10,001 - 50,000 2,791.00 $50,001 - 100,000 3,213.00 $100,001 - 250,000 3,700.00 $250,001 - 500,000 5,146.00 $500,001 - 1.0 Million 6,711.00 Each additional $500,000 (over $1M)2,066.00 Additional Review Public Improvement Plan - Plan Check - After 3 (based on Engineer's estimate of construction cost): $0 - 10,000 589.00 $10,001 - 50,000 661.00 $50,001 - 100,000 734.00 $100,001 - 250,000 878.00 $250,001 - 500,000 1,162.00 $500,001 - 1.0 Million 2,018.00 Each additional $500,000 (over $1M)855.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 ENGINEERING EXHIBIT A Item 10.b. - Page 10 Fee Description FY 2017-18 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 ENGINEERING Grading / Drainage / Erosion Plan Review: 0 - 50 cy 1,203.00$ 50 cy to 100 cy 1,291.00 100 cy to 1,0000 cy 1,458.00 1,000 cy to 10,000 cy 1,625.00 10,000 cy to 100,000 cy 1,791.00 - Hydraulic / Hydrology Report Review 755.00 SWPPP Review 755.00 Stormwater Control Plan Review 755.00 Inspection Agreement, including Subdivision Agreement (based on Engineer's estimate of construction cost): $0 - 10,000 704.00 $10,001 - 50,000 1,831.00 $50,001 - 100,000 3,505.00 $100,001 - 250,000 6,996.00 $250,001 - 500,000 13,456.00 $500,001 - 1.0 Million 26,107.00 Each additional $500,000 (over $1M)12,710.00 Major Project with a Contract Engineer - Actual cost of Contractor passed directly through to Applicant Major Project with a Contract Engineer - City Project Management and Administrative Charge 1,215.00 EXHIBIT A Item 10.b. - Page 11 FY 2017-18 Fee COPY FEES Development Code w/out Appendices 50.00$ Appendix 1 15.00 Appendix 2 5.00 Development Code w/Appendices 70.00 General Plan 25.00 Housing Element 2003 35.00 General Plan EIR 12.00 Design Guidelines for Historic Districts 25.00 Design Guidelines for Traffic Way/Station Way 6.00 Design Guidelines for Mixed Use Districts 30.00 East Grand Avenue Enhancement Plan 20.00 Land Use Map and Zoning Maps (each) 24 x 36 3.00 36 x 48 4.00 DVD (Planning Commission meetings)Vendor cost Audio recording copies 5.00 Copies, per page (Black and White)0.20 Color copies Actual cost Arroyo Grande Bike Plan 26.00 IN-LIEU FEES Downtown Parking in lieu fee (per resolution 3994)24,000.00 PROCESSING FEES Notary (per signature)15.00 Annexation - deposit (fee based on actual time at staff at hourly rates)20,000.00 Time and Materials (if project exceeds 50 hours of staff time) Appeals: CD Director to Planning Commission 371.00 Planning Commission to City Council 879.00 Certificate of Compliance 2,656.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 COMMUNITY DEVELOPMENT Fee Description EXHIBIT A Item 10.b. - Page 12 FY 2017-18 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 COMMUNITY DEVELOPMENT Fee Description Conditional Use Permit: Project - Major (multi building)10,849.00 Time and Materials (if project exceeds 50 hours of staff time) Project - Minor (routine) - as det'd by CDD 4,697.00 Amendment 2,372.00 Development Agreement - deposit 18,165.00$ Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Major 12,240.00 Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Minor 6,730.00 Environmental Impact Determination: Initial Study Fee 2,580.00 Negative Declaration 419.00 Mitigated Neg Dec 1,753.00 General Plan Amendment (Major)12,240.00 Time and Materials (if project exceeds 50 hours of staff time) General Plan Amendment (Minor)6,730.00 Home Occupation Permit 125.00 Lot Line Adjustment 2,515.00 Lot Merger / Reversion to Acreage 2,475.00 Mailing Label Production 307.00 Request for Meeting Continuance 349.00 Minor Use Permit - Architectural Review Major (e.g. subdivision if PUD or CUP is not concurrently processed)3,890.00 Minor (e.g. single lot)698.00 Minor Use Permit - Historic Resource Designation 1,113.00 Minor Use Permit - Large Family Day Care 424.00 Minor Use Permit - Minor Exception 756.00 Minor Use Permit - Plot Plan Review 556.00 Minor Use Permit - Temporary Use Permit 223.00 Minor Use Permit - Viewshed Review:855.00 EXHIBIT A Item 10.b. - Page 13 FY 2017-18 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 COMMUNITY DEVELOPMENT Fee Description Planned Unit Development Permit (Major)11,539.00 Time and Materials (if project exceeds 50 hours of staff time) Planned Unit Development Permit (Minor)5,521.00 Planning Commission lnterpretation or Waiver 1,369.00 Pre-Application 929.00 Public Art Permit 701.00 Research (deposit)167.00 Signs: Planned Sign Program 1,808.00 Administrative Sign Permit 259.00 Administrative Sign Program 1,018.00 - Specific Plan or Amendment (deposit)18,130.00 Time and Materials (if project exceeds 50 hours of staff time)- Tentative Parcel Map (0-4 lots)7,211.00$ with Vesting (added to base fee)447.00 Amendment 3,493.00 - Tentative Tract Map: 5-20 lots 11,849.00 over 20 lots 13,754.00 with Vesting (added to base fee)1,161.00 Amendment 5,202.00 - Time Extension 1,942.00 Variance 2,747.00 Zoning Compliance Letter 111.00 EXHIBIT A Item 10.b. - Page 14 Fee Description FY 2017-18 Fee ANIMAL CONTROL / IMPOUND Dog Impound Fee 1st Impound 21.00$ 2nd Impound 43.00 3rd Impound +64.00 - Cat Impound Fee 1st Impound 21.00 2nd Impound 43.00 3rd Impound +64.00 PERMITS & LICENSES: Alarm Permit Original Application Permit Processing Fee 101.00 Annual Renewal Permit Processing Fee 48.00 False Alarm Response Fourth False Alarm within 12 months 159.00 Fifth False Alarm within 12 months 319.00 Sixth or more false alarm within 12 months (per incident)478.00 - Block Party Permit Block Party Permit 27.00 Commercial Filming / Still Photography Permit Permit Processing Fee 53.00 Commercial Filming (per day)266.00 Still Photography (per day)106.00 City Staff Assigned - 4 hour minimum (if applicable)overtime rate Concealed Weapons Permit Original Application Police Department Investigation Fee 106.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Identification Card 21.00 Concealed Weapons Permit Biennial Renewal: Police Department Investigation Fee 27.00 Identification Card 21.00 Medical Marijuana Delivery Service License Application Processing Fee 638.00 Background Investigation Fees 98.00 ID Card / Vehicle Permit Fee 32.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost- Medical Marijuana Delivery Service License Renewal Application Processing Fee 531.00 Background Investigation Fees 37.00 ID Card / Vehicle Permit Fee 32.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 POLICE EXHIBIT A Item 10.b. - Page 15 Fee Description FY 2017-18 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 POLICE Medical Marijuana Delivery Driver Permit Application Processing Fee 638.00$ Background Investigation Fees 98.00 ID Card / Vehicle Permit Fee 32.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost- Medical Marijuana Delivery Driver Permit Renewal Application Processing Fee 531.00 Background Investigation Fees 98.00 ID Card / Vehicle Permit Fee 32.00 Mobile Vendor Permit Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Mobile Vendor Employee Permit Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Palmreader Fortune Teller Permit - Original Application Permit Processing Fee 133.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Palmreader Fortune Teller Permit - Annual Renewal Permit Renewal Processing 106.00 - Palmreader Fortune Teller Establishment Permit - Original Application Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Palmreader Fortune Teller Establishment Permit - Renewal Application Permit Processing Fee 106.00 Public Safety and Welfare Permit: Less than 200 Non-Commercial Event 53.00 More than 200 Non-Commercial Event 106.00 Commercial Event 133.00 Second Hand Dealer Permit Original Application Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Dept of Justice & FBI Fingerprint process (DOJ passthrough fee paid by applicant)actual cost Second Hand Dealer Permit Biennial Renewal City Processing Fee 106.00 - EXHIBIT A Item 10.b. - Page 16 Fee Description FY 2017-18 Fee City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 POLICE Solicitation Permit (per solicitor) Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Processing Fee actual cost Taxi Cab Driver Permit Original Application Permit Processing Fee 133.00$ Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Taxi Cab Driver Permit Annual Renewal Annual Renewal 106.00 Tobacco Retailers License Permit Processing Fee 133.00 OTHER FEES Citation correction certification 27.00 Civil Witness Fee (Deposit)275.00 Copies, per page (Black and White).20 per page Copies - Color copies per page 5.00 Court Ordered Booking 133.00 Criminal history summary examination Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Disturbance 415PC Second Response 159.00 Third Response 319.00 Fourth Response 531.00 Emergency DUI Response -Impaired Driver Accident - Actual Time @ Staff Hourly Rates actual cost Local Records Check 16.00 Photographs per disc 25.00 Property Handling for Mailing / Shipping actual cost Replacement of lost/stolen Permits, Licenses and registration receipts 48.00 Repossessed Vehicle 16.00 Subpoena Duces Tecum Actual staff time billed at hourly rate to produce records actual cost .20 per page produced actual cost postage/shipping actual cost Custodian of Records Court Appearance $275 Vehicle Release - Impound/Stored Vehicle Release 53.00 Vehicle Release 30-day Impound Release Review 80.00 Clearance letter 48.00 EXHIBIT A Item 10.b. - Page 17 Fee Description Plan Check Fee FY 17-18 Inspection Fee FY 17-18 Cellular/Mobile Phone, free-standing NEW 1,048.00$ 1,493.00$ Cellular Tower with Equipment Shelter 1,048.00 1,674.00 Cellular Tower Equipment Demolition 403.00 421.00 Awning (not patio cover) Tents / Canopies / Booths 109.00 164.00 183.00 333.00 Close Existing Openings 109.00 223.00 Compliance Inspections/Reinspections 203.00 274.00 Deck (with Calcs)235.00 293.00 Demolition 109.00 344.00 Demolition - MultiFamily/Commercial 109.00 344.00 Door 109.00 236.00 Fence or Wall (wood, chain link, wrought iron): >6 feet in height, 1st 100 s.f.109.00 301.00 Each additional 100 sf 83.00 109.00 Fence or Freestanding Wall (masonry / garden): City Standard, 1st 100 s.f.109.00 301.00 Each additional 100 sf 83.00 109.00 Engineered Wall, 1st 100 sf 141.00 301.00 Each additional 100 sf 115.00 109.00 Fireplace (masonry or pre-fab)109.00 217.00 Flag pole (greater than 6 feet in height)109.00 217.00 Grading (Cut and Fill): 0-50 Cubic Yards (Cut and Fill)141.00 217.00 Each Add'l 50 CY (or portion thereof)69.00 164.00 Pilaster each 10 109.00 217.00 Lighting pole (each)109.00 185.00 Stucco Applications 68.00 217.00 Retaining Wall (concrete or masonry): First 50 sf 224.00 249.00 Each additional 50 sf 198.00 141.00 Re-roofing: Composition - no tear off 89.00 210.00 Other roofs (first 10 squares)89.00 210.00 Each additional 10 squares 21.00 51.00 Roof Structure Replacement 141.00 249.00 Sauna - steam 109.00 261.00 Change of Occupancy No T.I. w/ plan check & Inspection City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MISC Recovery Rate 100% of Cost EXHIBIT A Item 10.b. - Page 18 Fee Description Plan Check Fee FY 17-18 Inspection Fee FY 17-18 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MISC Recovery Rate 100% of Cost Siding: Stone and Brick Veneer (interior or exterior)89.00$ 261.00$ All Other 68.00 261.00 Signs: Directional / Menu 224.00 261.00 Freeway sign 515.00 287.00 Ground / Roof / Projecting Signs 214.00 249.00 Wall, Illuminated 89.00 261.00 Skylight (Residential each)68.00 230.00 Skylight (Commercial) one 89.00 230.00 Spa or Hot Tub (Pre-fabricated)89.00 261.00 Stairs - per story 328.00 249.00 Storage Racks each set of plans 380.00 312.00 Temporary Utility Connection or Occupancy - 89.00 Window or Sliding Glass Door (first)224.00 249.00 Each additional 198.00 116.00 Board of Appeals 844.00 - Business License Inspection 43.00 65.00 Business License Re-inspection 43.00 34.00 Product Review 634.00 - Disabled Access Compliance Inspection 126.00 84.00 Supplemental Plan Check Fee (first 1/2 hour)115.00 - Each Additional 1/2 hour (or portion thereof)104.00 - Supplemental Inspection Fee (first 1/2 hour)- 115.00 Each Additional 1/2 hour (or portion thereof)- 104.00 - 219.00 - 208.00 After Hours Inspection 2 hour minimum - 219.00 Each additional hour - 208.00 After Hours Plan Review 2 hour minimum 219.00 - Each additional hour 208.00 - Copies, per page (Black and White) .20 per page Color copies actual costs Emergency (Non-Scheduled) Call-Out Fee (first hour) 2 hour minimum Emergency (Non-Scheduled) Call-Out Fee (each additional hour) EXHIBIT A Item 10.b. - Page 19 Fee Description Plan Check Fee FY 17-18 Inspection Fee FY 17-18 Fire Sprinkler Systems - New Construction: 1-50 Heads 209.00$ 228.00$ 51-100 Heads 261.00 324.00 101-200 Heads 471.00 388.00 Every 200 Heads above 200 208.00 149.00 Fire Sprinkler Systems -Tenant Improvements: 1-25 Heads 209.00 228.00 26-100 Heads 315.00 356.00 Every 100 Heads above 100 104.00 239.00 Fire Alarm System (including Sprinkler Monitor System) - New Construction: 1-50 Devices 209.00 228.00 51-100 Devices 261.00 324.00 Every 50 Devices above 100 104.00 214.00 Fire Alarm System (including Sprinkler Monitor System) - Tenant Improvements: 1-50 Devices 209.00 260.00 51-100 Devices 261.00 356.00 Every 50 Devices above 100 157.00 214.00 Other Suppression Systems: Inert Gas Systems 366.00 457.00 Dry Chemical Systems 209.00 457.00 Wet Chemical/Kitchen Hood 313.00 457.00 Foam Systems 209.00 625.00 Paint Spray Booth 470.00 678.00 Other Fire Fees: Hydrants/Underground Fire Service Plan Check 418.00 - Hydrant Flow Test (existing hydrants)- 625.00 Special Event Inspection (e.g., fairs) These are group events, when multiple booths/tents are erected Booth / Tent 55.00 60.00 Booth / Tent with Electricity 80.00 98.00 Booth / Tent with Cooking (includes Electricity)85.00 117.00 - - Special Event Application Review - 22.00 Additional Fire related services are provided by Five Cities Fire Authority (FCFA). See the FCFA fee schedule for fees. City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING FIRE Recovery Rate 100% of Cost EXHIBIT A Item 10.b. - Page 20 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 ADMINISTRATIVE (BASE) FEES: Permit Issuance and Administration 107.00$ -$ MECHANICAL PERMIT FEES - - FAU less than 100,000 Btu/h 52.00 64.00 FAU greater than 100,000 Btu/h 52.00 97.00 Floor furnace (including vent)52.00 129.00 Suspended, wall, or floor-mounted heaters 52.00 97.00 Appliance vents not included in an appliance permit 52.00 97.00 Boiler or compressor, from 15 HP to 30 HP / absorption system from 500,000 Btu/h to 1,000,000 Btu/h.52.00 97.00 Boiler or compressor, from 30 HP to 50 HP, / absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h.104.00 129.00 Boiler or compressor, over 50 HP / absorption system over 1,750,000 Btu/h.156.00 97.00 Air-handling unit, including attached ducts.104.00 97.00 Air-handling unit over 10,000 CFM 156.00 129.00 Evaporative cooler 52.00 64.00 Ventilation fan connected to a single duct 104.00 97.00 Ventilation system (not a portion of heating or a/c system)156.00 129.00 Incinerator, residential 260.00 192.00 Commercial or Industrial-type incinerator 312.00 192.00 Misc. appliances or equipment.156.00 129.00 Stand Alone Mechanical Plan Check (hourly rate)208.00 - Other Mechanical Inspections (per hour)- 129.00 PLUMBING / GAS PERMIT FEES: Plumbing fixtures 52.00 64.00 Building sewer 104.00 97.00 Rainwater systems (per drain)52.00 64.00 Gray Water system 156.00 160.00 Private sewage disposal system 156.00 160.00 Water Heater 104.00 64.00 Industrial waste pretreatment interceptor 52.00 97.00 Water piping and/or water treating equipment (each)52.00 97.00 Repair or alteration of drainage or vent piping, each fixture 52.00 97.00 Each lawn sprinkler system on any one meter 52.00 64.00 Backflow devices each unit 104.00 64.00 Atmospheric-type vacuum breakers: 1-5 units 104.00 64.00 Atmospheric-type vacuum breakers: each unit over 5 units 104.00 64.00 Stand Alone Plumbing Plan Check (hourly rate)208.00 - Other Plumbing and Gas Inspections (per hour)- 129.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MPE Recovery Rate 100% of Cost EXHIBIT A Item 10.b. - Page 21 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MPE Recovery Rate 100% of Cost SYSTEM FEES: Swimming Pools 156.00$ 224.00$ Outdoor Events 156.00 97.00 Electric generator and electrically-driven rides 104.00 97.00 Mechanically-driven rides/ attractions with electrical lighting 156.00 97.00 Each system of area and booth lighting 104.00 97.00 Temporary Power Service 104.00 64.00 Temporary power pole 104.00 64.00 Sub poles (each)52.00 45.00 UNIT FEES: Receptacle, Switch, and Lighting Outlets First 10 104.00 64.00 Each Additional 10 52.00 32.00 Lighting Fixtures: First 10 104.00 64.00 Each additional 10 52.00 32.00 Pole or platform-mounted lighting fixtures (each)104.00 97.00 Theatrical-type lighting fixtures or assemblies (each)104.00 129.00 Residential Appliances (each)104.00 64.00 Nonresidential Appliances 156.00 129.00 Residential appliances and self-contained, nonresidential appliances, (each)156.00 129.00 Appliances not exceeding one horsepower (HP) kilowatt (KW), or kilovolt-ampere (KVA), in rating,(each)208.00 129.00 Power Apparatus: Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus (all sizes)156.00 64.00 Signs, Outline Lighting, and Marquees: Signs, Outline Lighting, or Marquees supplied from one branch circuit (each)104.00 97.00 Additional branch circuits within the same sign, outline lighting system, or marquee (each)104.00 64.00 Service or Panel: 200 amp or less Electrical Panel (each)156.00 129.00 Over 200 amp up to 1000 amp Electrical Panel (each)260.00 160.00 Over 1000 amp Electrical Panel (each)416.00 192.00 EXHIBIT A Item 10.b. - Page 22 Fee Description Plan Check Fee FY 16-17 Inspection Fee FY 16-17 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MPE Recovery Rate 100% of Cost UNIT FEES (continued): 104.00$ 97.00$ 104.00 129.00 Photovotaic Systems - each 156.00 192.00 Stand Alone Electrical Plan Check (hourly rate)208.00 - Other Electrical Inspections (per hour)- 129.00 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth Miscellaneous Apparatus, Conduits, and Conductors EXHIBIT A Item 10.b. - Page 23 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF 2,000 4,445$ $0.200 8,000 5,644$ $0.269 1 A-1 Assembly Group - Theaters 20,000 8,870$ $0.291 40,000 14,699$ $0.195 100,000 26,419$ $0.264 1,000 2,867$ $0.230 4,000 3,557$ $0.312 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 5,430$ $0.338 20,000 8,812$ $0.227 50,000 15,634$ $0.313 250 1,502$ $0.315 1,000 1,738$ $0.382 3 A Assembly Group - TI 2,500 2,310$ $0.417 5,000 3,353$ $0.268 12,500 5,366$ $0.429 1,000 2,867$ $0.230 4,000 3,557$ $0.312 4 A-3 Church and Religious Bldg - Complete 10,000 5,430$ $0.338 20,000 8,812$ $0.227 50,000 15,634$ $0.313 500 2,048$ $0.278 2,000 2,465$ $0.364 5 R-4 Congregate Care - Complete 5,000 3,558$ $0.396 10,000 5,537$ $0.262 25,000 9,473$ $0.379 250 1,502$ $0.315 1,000 1,738$ $0.382 6 A-3 Church and Religious Bldg - TI 2,500 2,310$ $0.417 5,000 3,353$ $0.268 12,500 5,366$ $0.429 2,000 3,458$ $0.148 8,000 4,345$ $0.203 7 E Educational Building - Complete 20,000 6,782$ $0.220 40,000 11,179$ $0.148 100,000 20,084$ $0.201 250 1,502$ $0.315 1,000 1,738$ $0.382 8 E Educational Building - TI 2,500 2,310$ $0.417 5,000 3,353$ $0.268 12,500 5,366$ $0.429 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION EXHIBIT A Item 10.b. - Page 24 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 500 1,729$ $0.208 2,000 2,040$ $0.264 9 S-2 Parking Garage - Complete 5,000 2,831$ $0.287 10,000 4,264$ $0.188 25,000 7,078$ $0.283 1,000 2,867$ $0.230 4,000 3,557$ $0.312 10 R-1 Hotel Low/Mid Rise - Complete 10,000 5,430$ $0.338 20,000 8,812$ $0.227 50,000 15,634$ $0.313 1,000 1,684$ $0.098 4,000 1,980$ $0.125 11 R-1 Hotel Low/Mid Rise - Shell 10,000 2,727$ $0.135 20,000 4,081$ $0.088 50,000 6,735$ $0.135 250 1,456$ $0.295 1,000 1,677$ $0.353 12 R-1 Hotel Low/Mid Rise - TI 2,500 2,206$ $0.386 5,000 3,171$ $0.247 12,500 5,023$ $0.402 500 2,155$ $0.295 2,000 2,598$ $0.373 13 B Offices, etc. - Complete 5,000 3,718$ $0.406 10,000 5,750$ $0.265 25,000 9,731$ $0.389 1,000 1,479$ $0.076 4,000 1,707$ $0.092 14 B Offices, etc. - Shell 10,000 2,258$ $0.100 20,000 3,262$ $0.064 50,000 5,194$ $0.104 100 1,284$ $0.542 400 1,446$ $0.609 15 B Offices, etc. - TI 1,000 1,812$ $0.668 2,000 2,480$ $0.414 5,000 3,723$ $0.745 1,000 2,867$ $0.230 4,000 3,557$ $0.312 16 F Industrial Building - Complete 10,000 5,430$ $0.338 20,000 8,812$ $0.227 50,000 15,634$ $0.313 EXHIBIT A Item 10.b. - Page 25 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 1,000 1,956$ $0.129 4,000 2,344$ $0.168 17 F Industrial Building - Shell 10,000 3,351$ $0.182 20,000 5,173$ $0.121 50,000 8,789$ $0.176 250 1,456$ $0.295 1,000 1,677$ $0.353 18 F Industrial Building - TI 2,500 2,206$ $0.386 5,000 3,171$ $0.247 12,500 5,023$ $0.402 500 1,956$ $0.259 2,000 2,344$ $0.335 19 S-1 Repair Garage & Service St - Complete 5,000 3,351$ $0.365 10,000 5,173$ $0.241 25,000 8,789$ $0.352 500 1,366$ $0.127 2,000 1,556$ $0.148 20 S-1 Repair Garage & Service St - Shell 5,000 1,999$ $0.162 10,000 2,808$ $0.102 25,000 4,339$ $0.174 100 1,434$ $0.708 400 1,646$ $0.848 21 S-1 Repair Garage & Service St - TI 1,000 2,155$ $0.926 2,000 3,081$ $0.591 5,000 4,852$ $0.970 500 2,048$ $0.278 2,000 2,465$ $0.364 22 M Retail Sales - Complete 5,000 3,558$ $0.396 10,000 5,537$ $0.262 25,000 9,473$ $0.379 500 1,366$ $0.127 2,000 1,556$ $0.148 23 M Retail Sales - Shell 5,000 1,999$ $0.162 10,000 2,808$ $0.102 25,000 4,339$ $0.174 100 1,434$ $0.708 400 1,646$ $0.848 24 M Retail Sales - TI 1,000 2,155$ $0.926 2,000 3,081$ $0.591 5,000 4,852$ $0.970 EXHIBIT A Item 10.b. - Page 26 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 2,000 1,956$ $0.065 8,000 2,344$ $0.084 25 - Warehouse - Complete 20,000 3,351$ $0.091 40,000 5,173$ $0.060 100,000 8,789$ $0.088 1,000 2,867$ $0.230 4,000 3,557$ $0.312 26 I Medical/24 Hour Care - Complete 10,000 5,430$ $0.338 20,000 8,812$ $0.227 50,000 15,634$ $0.313 1,000 1,729$ $0.104 4,000 2,040$ $0.132 27 I Medical/24 Hour Care - Shell 10,000 2,831$ $0.143 20,000 4,264$ $0.094 50,000 7,078$ $0.142 100 1,639$ $0.935 400 1,919$ $1.173 28 I Medical/24Hour Care - TI 1,000 2,623$ $1.276 2,000 3,899$ $0.831 5,000 6,393$ $1.279 1,000 2,867$ $0.230 4,000 3,557$ $0.312 29 B Medical Offices - Complete 10,000 5,430$ $0.338 20,000 8,812$ $0.227 50,000 15,634$ $0.313 1,000 1,729$ $0.104 4,000 2,040$ $0.132 30 B Medical Offices - Shell 10,000 2,831$ $0.143 20,000 4,264$ $0.094 50,000 7,078$ $0.142 250 1,639$ $0.374 1,000 1,919$ $0.469 31 B Medical Offices - TI 2,500 2,623$ $0.511 5,000 3,899$ $0.333 12,500 6,393$ $0.511 500 2,184$ $0.309 2,000 2,647$ $0.408 32 - Restaurant - Complete 5,000 3,870$ $0.443 10,000 6,083$ $0.295 25,000 10,501$ $0.420 EXHIBIT A Item 10.b. - Page 27 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 500 1,502$ $0.157 2,000 1,738$ $0.191 33 - Restaurant - Shell 5,000 2,310$ $0.209 10,000 3,353$ $0.134 25,000 5,366$ $0.215 250 1,388$ $0.264 1,000 1,586$ $0.310 34 - Restaurant - TI 2,500 2,051$ $0.339 5,000 2,898$ $0.215 12,500 4,510$ $0.361 250 1,912$ $0.495 1,000 2,283$ $0.643 35 I-4 Day Care Facility - Complete 2,500 3,247$ $0.698 5,000 4,992$ $0.461 12,500 8,446$ $0.676 100 1,639$ $0.935 400 1,919$ $1.173 36 I-4 Day Care Facility - TI 1,000 2,623$ $1.276 2,000 3,899$ $0.831 5,000 6,393$ $1.279 500 1,775$ $0.218 2,000 2,101$ $0.278 37 H Hazardous H- Complete 5,000 2,934$ $0.302 10,000 4,445$ $0.198 25,000 7,420$ $0.297 500 2,184$ $0.309 2,000 2,647$ $0.408 38 H Hazardous H- Shell 5,000 3,870$ $0.443 10,000 6,083$ $0.295 25,000 10,501$ $0.420 100 1,639$ $0.935 400 1,919$ $1.173 39 H Hazardous H- T I 1,000 2,623$ $1.276 2,000 3,899$ $0.831 5,000 6,393$ $1.279 200 1,274$ $0.266 800 1,434$ $0.298 40 - Commercial Building - Foundation 2,000 1,791$ $0.326 4,000 2,443$ $0.202 10,000 3,655$ $0.365 EXHIBIT A Item 10.b. - Page 28 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 200 1,320$ $0.290 800 1,494$ $0.334 41 - Commercial Building - Addition 2,000 1,895$ $0.366 4,000 2,626$ $0.228 10,000 3,997$ $0.400 1,000 2,867$ $0.230 4,000 3,557$ $0.312 42 R-2 Apartment Building 10,000 5,430$ $0.338 20,000 8,812$ $0.227 50,000 15,634$ $0.313 1,000 2,310$ $0.131 2,000 2,441$ $0.676 43 R-3 Single-Family (custom or model)3,000 3,117$ $0.353 5,000 3,823$ $0.500 7,500 5,073$ $0.676 667 1,358$ $0.077 1,333 1,409$ $0.260 44 R-3 Single-Family - Production / Repeat 2,000 1,582$ $0.202 3,333 1,852$ $0.235 5,000 2,244$ $0.449 333 1,294$ $0.137 667 1,340$ $0.418 45 R-3 Moved Building - Residential 1,000 1,479$ $0.360 1,667 1,719$ $0.400 2,500 2,053$ $0.821 800 1,179$ $0.046 1,600 1,216$ $0.094 46 R-3 Manufactured Home - Complete 2,400 1,291$ $0.118 4,000 1,479$ $0.114 6,000 1,707$ $0.284 667 1,179$ $0.056 1,333 1,216$ $0.113 47 R-3 Prefabricated Dwelling - Complete 2,000 1,291$ $0.141 3,333 1,479$ $0.136 5,000 1,707$ $0.341 120 1,033$ $0.221 480 1,113$ $0.176 48 - Commercial Coach - Complete 1,200 1,239$ $0.200 2,400 1,479$ $0.100 6,000 1,841$ $0.307 EXHIBIT A Item 10.b. - Page 29 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 240 1,033$ $0.111 960 1,113$ $0.088 49 - Modular Building - Complete 2,400 1,239$ $0.100 4,800 1,479$ $0.050 12,000 1,841$ $0.153 500 1,056$ $0.057 2,000 1,142$ $0.050 50 - Manufactured Building - Foundation 5,000 1,291$ $0.056 10,000 1,570$ $0.029 25,000 2,012$ $0.080 167 1,179$ $0.223 333 1,216$ $0.453 51 U Residential Garage 500 1,291$ $0.564 833 1,479$ $0.546 1,250 1,707$ $1.365 40 1,092$ $0.824 160 1,191$ $0.766 52 U Pool/Spa - Standard Plan 400 1,375$ $0.850 800 1,715$ $0.476 2,000 2,286$ $1.143 200 1,639$ $0.468 800 1,919$ $0.586 53 - Commercial Building - Remodel 2,000 2,623$ $0.638 4,000 3,899$ $0.416 10,000 6,393$ $0.639 200 1,593$ $0.443 800 1,859$ $0.550 54 - Commercial Building - Repair 2,000 2,519$ $0.599 4,000 3,717$ $0.389 10,000 6,051$ $0.605 50 1,074$ $0.616 200 1,167$ $0.556 55 U Accessory Building - Commercial 500 1,334$ $0.618 1,000 1,643$ $0.337 2,500 2,149$ $0.860 50 1,074$ $0.616 200 1,167$ $0.556 56 U Commercial Carport 500 1,334$ $0.618 1,000 1,643$ $0.337 2,500 2,149$ $0.860 EXHIBIT A Item 10.b. - Page 30 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 167 1,358$ $0.306 333 1,409$ $1.039 57 R-3 Single-Family Residential - Addition 500 1,582$ $0.810 833 1,852$ $0.941 1,250 2,244$ $1.796 333 1,550$ $0.201 667 1,617$ $0.832 58 R-2 Multi-Family Residential - Addition 1,000 1,895$ $0.537 1,667 2,253$ $0.681 2,500 2,820$ $1.128 333 1,166$ $0.108 667 1,202$ $0.207 59 R-3 Single-Family Residential - Remodel 1,000 1,271$ $0.273 1,667 1,453$ $0.259 2,500 1,668$ $0.667 667 1,301$ $0.070 1,333 1,348$ $0.212 60 R-2 Multi-Family Residential - Remodel 2,000 1,489$ $0.183 3,333 1,732$ $0.204 5,000 2,072$ $0.414 333 1,007$ $0.067 667 1,030$ $0.268 61 R-3 Residential Building - Foundation 1,000 1,119$ $0.177 1,667 1,237$ $0.222 2,500 1,422$ $0.569 83 969$ $0.217 167 987$ $0.842 62 U Accessory Building - Residential 250 1,057$ $0.599 417 1,157$ $0.719 625 1,307$ $2.091 133 969$ $0.135 267 987$ $0.526 63 U Residential Carport 400 1,057$ $0.375 667 1,157$ $0.450 1,000 1,307$ $1.307 83 969$ $0.217 167 987$ $0.842 64 U Residential Patio Cover 250 1,057$ $0.599 417 1,157$ $0.719 625 1,307$ $2.091 EXHIBIT A Item 10.b. - Page 31 Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100% of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 83 1,097$ $0.357 167 1,126$ $1.658 65 U Residential Balcony/Deck 250 1,265$ $0.950 417 1,423$ $1.285 625 1,691$ $2.705 83 1,065$ $0.319 167 1,091$ $1.454 66 U Residential Patio Enclosure 250 1,213$ $0.867 417 1,357$ $1.143 625 1,595$ $2.552 EXHIBIT A Item 10.b. - Page 32 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF 2,000 3,082$ $0.377 8,000 5,343$ $0.327 1 A-1 Assembly Group - Theaters 20,000 9,269$ $0.281 40,000 14,891$ $0.318 100,000 33,982$ $0.340 1,000 2,502$ $0.594 4,000 4,285$ $0.617 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 7,986$ $0.509 20,000 13,074$ $0.602 50,000 31,137$ $0.623 250 678$ $0.706 1,000 1,207$ $0.250 3 A Assembly Group - TI 2,500 1,582$ $0.275 5,000 2,271$ $0.245 12,500 4,112$ $0.329 1,000 2,037$ $0.467 4,000 3,439$ $0.587 4 A-3 Church and Religious Bldg - Complete 10,000 6,961$ $0.466 20,000 11,622$ $0.575 50,000 28,861$ $0.577 500 1,307$ $0.579 2,000 2,175$ $0.656 5 R-4 Congregate Care - Complete 5,000 4,142$ $0.504 10,000 6,660$ $0.658 25,000 16,525$ $0.661 250 505$ $0.514 1,000 891$ $0.205 6 A-3 Church and Religious Bldg - TI 2,500 1,199$ $0.211 5,000 1,726$ $0.204 12,500 3,257$ $0.261 2,000 3,024$ $0.369 8,000 5,237$ $0.325 7 E Educational Building - Complete 20,000 9,140$ $0.278 40,000 14,709$ $0.316 100,000 33,697$ $0.337 250 505$ $0.514 1,000 891$ $0.205 8 E Educational Building - TI 2,500 1,199$ $0.211 5,000 1,726$ $0.204 12,500 3,257$ $0.261 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION EXHIBIT A Item 10.b. - Page 33 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 500 678$ $0.353 2,000 1,207$ $0.125 9 S-2 Parking Garage - Complete 5,000 1,582$ $0.138 10,000 2,271$ $0.123 25,000 4,112$ $0.164 1,000 2,037$ $0.467 4,000 3,439$ $0.587 10 R-1 Hotel Low/Mid Rise - Complete 10,000 6,961$ $0.466 20,000 11,622$ $0.575 50,000 28,861$ $0.577 1,000 725$ $0.189 4,000 1,292$ $0.066 11 R-1 Hotel Low/Mid Rise - Shell 10,000 1,685$ $0.073 20,000 2,417$ $0.064 50,000 4,339$ $0.087 250 505$ $0.514 1,000 891$ $0.205 12 R-1 Hotel Low/Mid Rise - TI 2,500 1,199$ $0.211 5,000 1,726$ $0.204 12,500 3,257$ $0.261 500 2,270$ $1.160 2,000 4,010$ $0.744 13 B Offices, etc. - Complete 5,000 6,242$ $0.698 10,000 9,733$ $0.717 25,000 20,481$ $0.819 1,000 411$ $0.103 4,000 721$ $0.045 14 B Offices, etc. - Shell 10,000 993$ $0.044 20,000 1,436$ $0.046 50,000 2,802$ $0.056 100 299$ $0.719 400 514$ $0.381 15 B Offices, etc. - TI 1,000 743$ $0.339 2,000 1,082$ $0.389 5,000 2,248$ $0.450 1,000 1,980$ $0.451 4,000 3,334$ $0.583 16 F Industrial Building - Complete 10,000 6,832$ $0.461 20,000 11,440$ $0.571 50,000 28,576$ $0.572 1,000 478$ $0.121 4,000 843$ $0.050 17 F Industrial Building - Shell 10,000 1,140$ $0.050 20,000 1,645$ $0.049 50,000 3,130$ $0.063 EXHIBIT A Item 10.b. - Page 34 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 250 652$ $0.677 1,000 1,160$ $0.243 18 F Industrial Building - TI 2,500 1,525$ $0.266 5,000 2,189$ $0.239 12,500 3,983$ $0.319 500 960$ $0.388 2,000 1,541$ $0.611 19 S-1 Repair Garage & Service St - Complete 5,000 3,373$ $0.440 10,000 5,571$ $0.617 25,000 14,818$ $0.593 500 450$ $0.227 2,000 790$ $0.096 20 S-1 Repair Garage & Service St - Shell 5,000 1,077$ $0.095 10,000 1,554$ $0.096 25,000 2,987$ $0.119 100 299$ $0.719 400 514$ $0.381 21 S-1 Repair Garage & Service St - TI 1,000 743$ $0.339 2,000 1,082$ $0.389 5,000 2,248$ $0.450 500 1,047$ $0.435 2,000 1,699$ $0.622 22 M Retail Sales - Complete 5,000 3,565$ $0.455 10,000 5,843$ $0.627 25,000 15,244$ $0.610 500 550$ $0.283 2,000 974$ $0.109 23 M Retail Sales - Shell 5,000 1,301$ $0.114 10,000 1,871$ $0.108 25,000 3,486$ $0.139 100 299$ $0.719 400 514$ $0.381 24 M Retail Sales - TI 1,000 743$ $0.339 2,000 1,082$ $0.389 5,000 2,248$ $0.450 2,000 2,700$ $0.335 8,000 4,713$ $0.209 25 - Warehouse - Complete 20,000 7,220$ $0.190 40,000 11,018$ $0.206 100,000 23,354$ $0.234 1,000 2,037$ $0.467 4,000 3,439$ $0.587 26 I Medical/24 Hour Care - Complete 10,000 6,961$ $0.466 20,000 11,622$ $0.575 50,000 28,861$ $0.577 EXHIBIT A Item 10.b. - Page 35 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 1,000 507$ $0.130 4,000 896$ $0.052 27 I Medical/24 Hour Care - Shell 10,000 1,205$ $0.053 20,000 1,735$ $0.051 50,000 3,272$ $0.065 100 269$ $0.645 400 462$ $0.361 28 I Medical/24Hour Care - TI 1,000 679$ $0.311 2,000 990$ $0.372 5,000 2,105$ $0.421 1,000 2,037$ $0.467 4,000 3,439$ $0.587 29 B Medical Offices - Complete 10,000 6,961$ $0.466 20,000 11,622$ $0.575 50,000 28,861$ $0.577 1,000 522$ $0.134 4,000 922$ $0.052 30 B Medical Offices - Shell 10,000 1,237$ $0.054 20,000 1,781$ $0.052 50,000 3,343$ $0.067 250 681$ $0.708 1,000 1,213$ $0.252 31 B Medical Offices - TI 2,500 1,590$ $0.276 5,000 2,281$ $0.246 12,500 4,125$ $0.330 500 1,047$ $0.435 2,000 1,699$ $0.622 32 - Restaurant - Complete 5,000 3,565$ $0.455 10,000 5,843$ $0.627 25,000 15,244$ $0.610 500 463$ $0.235 2,000 816$ $0.097 33 - Restaurant - Shell 5,000 1,108$ $0.098 10,000 1,599$ $0.097 25,000 3,058$ $0.122 250 681$ $0.708 1,000 1,213$ $0.252 34 - Restaurant - TI 2,500 1,590$ $0.276 5,000 2,281$ $0.246 12,500 4,125$ $0.330 250 1,047$ $0.870 1,000 1,699$ $1.244 35 I-4 Day Care Facility - Complete 2,500 3,565$ $0.911 5,000 5,843$ $1.254 12,500 15,244$ $1.220 EXHIBIT A Item 10.b. - Page 36 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 100 240$ $0.563 400 409$ $0.342 36 I-4 Day Care Facility - TI 1,000 614$ $0.286 2,000 900$ $0.354 5,000 1,963$ $0.393 500 1,047$ $0.435 2,000 1,699$ $0.622 37 H Hazardous H- Complete 5,000 3,565$ $0.455 10,000 5,843$ $0.627 25,000 15,244$ $0.610 500 435$ $0.219 2,000 763$ $0.094 38 H Hazardous H- Shell 5,000 1,045$ $0.093 10,000 1,508$ $0.094 25,000 2,916$ $0.117 100 240$ $0.563 400 409$ $0.342 39 H Hazardous H- T I 1,000 614$ $0.286 2,000 900$ $0.354 5,000 1,963$ $0.393 200 240$ $0.282 800 409$ $0.171 40 - Commercial Building - Foundation 2,000 614$ $0.143 4,000 900$ $0.177 10,000 1,963$ $0.196 200 269$ $0.322 800 462$ $0.181 41 - Commercial Building - Addition 2,000 679$ $0.156 4,000 990$ $0.186 10,000 2,105$ $0.211 1,000 1,954$ $0.483 4,000 3,404$ $0.555 42 R-2 Apartment Building 10,000 6,736$ $0.471 20,000 11,451$ $0.529 50,000 27,332$ $0.547 1,000 1,779$ $1.058 2,000 2,837$ $1.081 43 R-3 Single-Family (custom or model) 3,000 3,918$ $0.969 5,000 5,855$ $0.792 7,500 7,836$ $1.045 667 1,120$ $0.940 1,333 1,747$ $0.918 44 R-3 Single-Family - Production / Repeat 2,000 2,359$ $0.789 3,333 3,411$ $0.727 5,000 4,623$ $0.925 EXHIBIT A Item 10.b. - Page 37 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 333 193$ $0.363 667 315$ $0.383 45 R-3 Moved Building - Residential 1,000 442$ $0.346 1,667 673$ $0.265 2,500 894$ $0.357 800 147$ $0.121 1,600 243$ $0.128 46 R-3 Manufactured Home - Complete 2,400 345$ $0.119 4,000 536$ $0.086 6,000 707$ $0.118 667 147$ $0.145 1,333 243$ $0.153 47 R-3 Prefabricated Dwelling - Complete 2,000 345$ $0.143 3,333 536$ $0.103 5,000 707$ $0.141 120 118$ $0.192 480 187$ $0.220 48 - Commercial Coach - Complete 1,200 345$ $0.144 2,400 519$ $0.235 6,000 1,366$ $0.228 240 118$ $0.096 960 187$ $0.110 49 - Modular Building - Complete 2,400 345$ $0.072 4,800 519$ $0.118 12,000 1,366$ $0.114 500 118$ $0.046 2,000 187$ $0.053 50 - Manufactured Building - Foundation 5,000 345$ $0.035 10,000 519$ $0.056 25,000 1,366$ $0.055 167 237$ $0.867 333 382$ $0.899 51 U Residential Garage 500 531$ $0.810 833 801$ $0.640 1,250 1,068$ $0.854 40 228$ $1.328 160 388$ $0.837 52 U Pool/Spa - Standard Plan 400 589$ $0.688 800 864$ $0.869 2,000 1,906$ $0.953 200 446$ $0.563 800 784$ $0.238 53 - Commercial Building - Remodel 2,000 1,070$ $0.238 4,000 1,545$ $0.238 10,000 2,973$ $0.297 EXHIBIT A Item 10.b. - Page 38 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 200 446$ $0.563 800 784$ $0.238 54 - Commercial Building - Repair 2,000 1,070$ $0.238 4,000 1,545$ $0.238 10,000 2,973$ $0.297 50 141$ $0.588 200 230$ $0.556 55 U Accessory Building - Commercial 500 396$ $0.391 1,000 592$ $0.592 2,500 1,479$ $0.592 50 173$ $0.758 200 287$ $0.602 56 U Commercial Carport 500 468$ $0.448 1,000 692$ $0.629 2,500 1,635$ $0.654 167 284$ $1.020 333 454$ $1.046 57 R-3 Single-Family Residential - Addition 500 628$ $0.931 833 938$ $0.760 1,250 1,255$ $1.004 333 748$ $1.272 667 1,172$ $1.253 58 R-2 Multi-Family Residential - Addition 1,000 1,590$ $1.084 1,667 2,312$ $0.977 2,500 3,126$ $1.251 333 268$ $0.488 667 430$ $0.494 59 R-3 Single-Family Residential - Remodel 1,000 595$ $0.446 1,667 893$ $0.361 2,500 1,193$ $0.477 667 386$ $0.340 1,333 612$ $0.341 60 R-2 Multi-Family Residential - Remodel 2,000 840$ $0.300 3,333 1,240$ $0.256 5,000 1,667$ $0.333 333 237$ $0.434 667 382$ $0.450 61 R-3 Residential Building - Foundation 1,000 531$ $0.405 1,667 801$ $0.320 2,500 1,068$ $0.427 83 163$ $1.250 167 267$ $1.326 62 U Accessory Building - Residential 250 377$ $1.224 417 581$ $0.903 625 769$ $1.231 EXHIBIT A Item 10.b. - Page 39 Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 17-18 Each Additional SF BUILDING INSPECTION Recovery Rate 100% of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION 133 147$ $0.725 267 243$ $0.765 63 U Residential Carport 400 345$ $0.713 667 536$ $0.513 1,000 707$ $0.707 83 147$ $1.160 167 243$ $1.224 64 U Residential Patio Cover 250 345$ $1.141 417 536$ $0.821 625 707$ $1.131 83 147$ $1.160 167 243$ $1.224 65 U Residential Balcony/Deck 250 345$ $1.141 417 536$ $0.821 625 707$ $1.131 83 147$ $1.160 167 243$ $1.224 66 U Residential Patio Enclosure 250 345$ $1.141 417 536$ $0.821 625 707$ $1.131 EXHIBIT A Item 10.b. - Page 40 FY 2017-18 Copies, per page (Black and White)0.20$ Park Facility Use Fees: Strother Park-Large Barbecue per use 80.00 Strother Park-Security Deposit per use 30.00 Strother Park-Small Barbecue per use 45.00 Strother Park-Wedding Reception per use 165.00 Strother Park-Security 1,2,3 per use 75.00 Elm Street Park-Barbecue per use 80.00 Elm Street Park-Security Deposit per use 30.00 Rancho Grande Park - Large BBQ per use 80.00 Rancho Grande Park - Small BBQ (areas 2 and 3)per use 45.00 Strother Park Deposit per use 30.00 Kingo Park per use 45.00 Kingo Park Deposit per use 30.00 Rotary Bandstand Fees: Rent per use 80.00 Deposit per use 30.00 Soto Sports Complex Use Fees: Campbell Field Rental Fee per hour 16.00 Campbell Field Rental Fee (with lights)per hour 37.00 Pilg Field Rental Fee per hour 16.00 Pilg Field Rental Fee (with lights)per hour 37.00 Santos Field Rental Fee per hour 16.00 Volunteer Field Rental Fee per hour 16.00 Volunteer Field with Lights Rental per hour 37.00 Ikeda Field Rental per hour 16.00 Ikeda Field with Lights Rental per hour 37.00 Porter Field Rental Fee per hour 21.00 Porter Field with Lights Rental per hour 43.00 Tennis Court Rental-1 court per hour 11.00 Tennis Courts - 4 courts per day 106.00 Pickleball Club - Annual Fee 100.00 Food Booth Rental Fee (Soto)per day 40.00 Food Vendor Space Rental Fee 10% of Gross Meeting Room Rental Fee (Jaycee room)per day 21.00 Field Prep Fees (except Porter)per prep 21.00 Field Prep Fees - Porter per prep 37.00 Tournament Sch. & Coordination Fee per tournament 69.00 Tournament cleaning / security Deposit 276.00 Tournament Staff Attendant per hour 16.00 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES EXHIBIT A Item 10.b. - Page 41 FY 2017-18 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Soto Sports Complex Use Fees - APPROVED YOUTH GROUPS: Field Rental (practice and league games) - each field per hour 2.00 Concession Stand Fee - Buildings per hour 5.00 Concession Stand Fee - Mobile per hour 3.00 Non-resident - per participant 2.00 Woman's Club Use Fees: Non-Resident Fee 53.00 Partial day rental - Mon - Fri per hour 53.00 Full day rental - Friday, Saturday, or Sunday 584.00 Second day rental - Friday, Saturday or Sunday 292.00 Security Deposit (No Alcohol/No Band)400.00 Security Deposit (with Alcohol)1,000.00 Building Supervision Fee per hour 16.00 Rental Fee (on-going users): Non-profit groups/Service clubs/Youth groups: (20 or less attendees)per hour 3.00 (21 - 50 attendees)"4.00 (51 or more attendees)"5.00 Groups with reciprocal services "3.00 Private groups or clubs:per hour (20 or less attendees)"9.00 (21 - 50 attendees)"10.00 (51 or more attendees)"11.00 Groups with reciprocal services "5.00 Custodial Fee (special event rentals only)100.00 Reservation Cancellation Fees: If cancelled 30 days or more ahead of event 100.00 If cancelled less than 30 days ahead of event 200.00 Amenities Fees: Chairs per chair 0.25$ Tables per table 1.00 Community Garden Deposit 25.00 Community Garden Plot per 6 months 36.00 Elm Street Community Center Use Fees: Rental Fee per hour 32.00 Rental Fee - full day per day 186.00 Building Supervision Fee per hour 16.00 Security deposit 150.00 EXHIBIT A Item 10.b. - Page 42 FY 2017-18 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Adult Sport League Fees: Adult Softball 460.00 Adult Basketball 390.00 Non-Resident Fee 8.00 Seasonal Playground Programs: Annual Registration Fee per child 15.00 Playground-Elm Street (Winter/Spring/Summer)per day 24.00 half day 12.00 Late pickup (after 4:15)10.00 Pre-School Fees: Annual Registration Fee per child 15.00 Play & Learn-Tues & Thur.per hour 4.50 Play & Learn-Mon, Wed & Fri."4.50 Kindergartens in Training "4.50 Summer Play & Learn "4.50 Late Pick-up Fees: First late pick-up per child 5.00 Second late pick-up "10.00 Third late pick-up "20.00 Children In Motion Program: Children In Motion Annual Registration per child 25.00$ Branch School - Mornings 5 Days Per Week per 4 wks 105.00 4 Days Per Week "90.00 3 Days Per Week "72.00 2 Days Per Week "51.00 Branch School - Afternoons 5 Days Per Week per 4 wks 192.50 4 Days Per Week "165.00 3 Days Per Week "132.00 2 Days Per Week "93.50 Extra Day - Branch School Morning per day 7.00 Afternoon "13.25 Late Start Monday per day 2.75 EXHIBIT A Item 10.b. - Page 43 FY 2017-18 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Children In Motion Fees (continued): Kindercare - Branch School 5 Days Per Week per 4 wks 210.00 4 Days Per Week "180.00 3 Days Per Week "144.00 2 Days Per Week "102.00 Extra Day per day 13.25 Ocean View School - Mornings 5 Days Per Week per 4 wks 105.00$ 4 Days Per Week "90.00 3 Days Per Week "72.00 2 Days Per Week "51.00 Ocean View School - Afternoons 5 Days Per Week per 4 wks 210.00 4 Days Per Week "180.00 3 Days Per Week "144.00 2 Days Per Week "102.00 Extra Day - Ocean View School Morning per day 7.00 Afternoon "13.25 Late Start Monday per day 2.75 Elm Community Center - Mornings 5 Days Per Week per 4 wks 297.50 4 Days Per Week "255.00 3 Days Per Week "204.00 2 Days Per Week "144.50 Elm Community Center - Afternoons Care Plan A 5 Days Per Week per 4 wks 210.00 4 Days Per Week "180.00 3 Days Per Week "144.00 2 Days Per Week "102.00 Elm Community Center - Afternoons Care Plan B 5 Days Per Week per 4 wks 402.50 4 Days Per Week "345.00 3 Days Per Week "276.00 2 Days Per Week "195.50 EXHIBIT A Item 10.b. - Page 44 FY 2017-18 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Children In Motion Fees (continued): Extra Day - Elm Community Center Morning per day 16.00$ Care Plan A (12:15 pm - 3:15 pm)"13.50 Care Plan B (12:15 pm - 6:00 pm)"25.75 Winter/Spring/Summer - Full Day 5 Days Per Week per week 160.00 4 Days Per Week "136.00 3 Days Per Week "108.00 Winter/Spring/Summer - Half Day per day 18.00 Minimum Days (teacher work day/early release) Regular day of attendance per day 10.50 Non-regular day of attendance "18.50 Late Pick-up Fees: Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00 Pickup 6:01 - 6:10 pm per child 10.00 Pickup 6:11 - 6:20 pm "20.00 Pickup 6:21 - 6:30 pm "30.00 Pickup after 6:31 "60.00 EXHIBIT A Item 10.b. - Page 45 FY 2017-18 LABOR COSTS (per hour): DURING REGULAR WORK HOURS: Full Time employee 63.02$ Part Time employee 23.59 AFTER REGULAR WORK HOURS: Full Time employee 94.53 Part Time employee 35.39 MINIMUM CALL-OUT RATE 2 hours at 1.5 times billing rate EQUIPMENT BILLING RATE (per hour) Pickup Truck 17.00 Service Truck 42.00 Backhoe 43.00 CAT Generator 82.00 Loader 50.00 6" Pump 23.00 Dump/Flat Bed Truck (5-7 yds)36.00 Sewer/Vacuum/Jet Truck 125.00 Chipper 44.00 Concrete Saw 10.00 Air Compressor 17.00 5-Ton Roller 30.00 Mini Excavator 60.00 Skid Steer 50.00 MATERIAL COST: (cost plus tax) Concrete (per yard)125.00 Sand (per ton)25.00 Class II Base (per ton)30.00 A/C (per ton)100.00 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 PUBLIC WORKS SERVICES EXHIBIT A Item 10.b. - Page 46