CC 2017-11-14_10b Operating Fees_Citywide Master Fee Schedule
MEMORANDUM
TO: CITY COUNCIL
FROM: DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SERVICES
SUBJECT: CONSIDERATION OF A RESOLUTION UPDATING OPERATING FEES
SET FORTH IN THE MASTER FEE SCHEDULE
DATE: NOVEMBER 14, 2017
SUMMARY OF ACTION:
Increase fees paid by users of City services to reflect increased costs to provide the
service.
IMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
Implementation of the increased fees is projected to generate approximately $45,000 -
$50,000 in revenue for the remainder of the fiscal year and $100,000 - $120,000
annually thereafter.
RECOMMENDATION:
It is recommended the City Council: Adopt a Resolution updating operating fees set
forth in the Master Fee Schedule, effective January 15, 2018.
BACKGROUND:
On September 13, 2016, the City Council received the results of a comprehensive study
that calculated the cost of providing a variety of city services. At that time, the City
Council adopted Resolution No. 4758, which provided that the Master Fee Schedule
would be updated annually by modifying the adopted value up or down in conformance
with the annual change in the City’s budgeted labor costs. The factor for adjustment of
the fees shall be calculated and established each year by the Director of Administrative
Services. In addition, phased increases of Planning fees shall be implemented at 5%
per year for four years, until an overall cost recovery level of 75% is achieved for
Planning related fee activities.
ANALYSIS OF ISSUES:
The Director of Administrative Services has calculated the overall increase in labor
costs, and therefore the factor for adjusting these fees, as 6.27%. The additional 5% for
Item 10.b. - Page 1
CITY COUNCIL
CONSIDERATION OF A RESOLUTION UPDATING OPERATING FEES SET FORTH IN
THE MASTER FEE SCHEDULE
NOVEMBER 14, 2017
PAGE 2
Planning related fees will increase these by 11.27%. There is a minimum 60 day
waiting period between the adoption of new development project fees and when the
new fees can take effect, therefore, it is recommended that the effective date for the
updated Master Fee Schedule be Monday, January 15, 2018.
ALTERNATIVES:
The following alternatives are provided for the Council’s consideration:
1. Adopt a Resolution increasing the operating fees in the Master Fee Schedule as
presented;
2. Do not adopt the Resolution; or
3. Provide direction to staff.
ADVANTAGES:
Approving the recommended increases will allow the City to maximize revenue by
recovering more of the estimated cost of providing the service and reduce the subsidy
borne by the General Fund.
DISADVANTAGES:
The disadvantage of the recommendation is that it will result in fee increases.
ENVIRONMENTAL REVIEW:
No environmental review is required for this item.
PUBLIC NOTIFICATION AND COMMENTS:
The Agenda was posted at City Hall and on the City’s website in accordance with
Government Code Section 54954.2.
Item 10.b. - Page 2
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ARROYO GRANDE UPDATING OPERATING FEES
SET FORTH IN THE MASTER FEE SCHEDULE
WHEREAS, the City of Arroyo Grande (“City”) is empowered to impose reasonable
fees, rates and charges for municipal services. California Government Code Section
66000 et seq. authorizes the City to adopt fees for municipal services, provided such
fees do not exceed the cost to the City for providing the services; and
WHEREAS, in January 2015 the City retained Wohlford Consulting to conduct a User
(operating) Fee Study for City services. The User Fee Study is on file with the City
Administrative Services Department and is incorporated by this reference; and
WHEREAS, operating fees are intended to be paid by persons utilizing the program or
service and to reimburse the City for the actual cost of said program or service; and
WHEREAS, the City has established a proposed Master Fee Schedule based on the
User Fee Study, which includes fees related to planning, building, engineering, police,
recreation, and public works charges; and
WHEREAS, the City Council has considered the question of whether or not to adjust or
establish User (operating) Fees for City services to reflect the estimated amount that is
required to recover the actual cost to the City of providing such services; and
WHEREAS, the City Council adopted a methodology to annually update fees in order to
reflect the change in the actual cost to the City of providing services and reduce the
subsidy of the General Fund for planning related services; and
WHEREAS, the amount of the fees do not exceed the cost of providing the City
services; and
WHEREAS, pursuant to Government Code Sections 66016, data indicating the amount
of cost, or estimated cost, required to provide the service for which the fees are levied
and the revenue sources anticipated to provide the service, including General Fund
revenues, was made available for public review at least ten days prior to the date of this
meeting; and
WHEREAS, after conducting a duly noticed public hearing and satisfying all applicable
provisions of California Government Code Sections 66016 and 66018, the City Council
considered all verbal and written presentations that were made regarding the proposed
fees.
NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo
Grande as follows:
Item 10.b. - Page 3
RESOLUTION NO.
PAGE 2
1. The schedule of fees entitled “Master Fee Schedule” in Exhibit A attached hereto
and incorporated herein by this reference as though set forth in full, is hereby
adopted.
2. Fees shall be adjusted annually by modifying the adopted value up or down in
conformance with the annual change in the City’s budgeted labor costs. The
factor for the adjustment of the fees shall be calculated and established each
year by the Director of Administrative Services.
3. Additional phased increases of Planning fees shall be implemented at 5% per
year for three years, until an overall cost recovery level of 75% is achieved for
Planning related fee activities.
BE IT FURTHER RESOLVED by the City Council that this Resolution shall be effective
January 15, 2018.
On motion of Council Member ______, seconded by Council Member ________, and by
the following roll call vote, to wit:
AYES:
NOES:
ABSENT:
the foregoing Resolution was passed and adopted this ____ day of ______, 2017.
Item 10.b. - Page 4
RESOLUTION NO.
PAGE 3
___________________________________
JIM HILL, MAYOR
ATTEST:
___
KELLY WETMORE, CITY CLERK
APPROVED AS TO CONTENT:
___________________________________
JAMES A. BERGMAN, CITY MANAGER
APPROVED AS TO FORM:
___________________________________
HEATHER WHITHAM, CITY ATTORNEY
Item 10.b. - Page 5
Fees effective January 15, 2018
Issued by the Administrative Services Department
CITY OF ARROYO GRANDE
Fiscal Year 2017-18
MASTER FEE SCHEDULE
EXHIBIT A
Item 10.b. - Page 6
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
Hourly rates for all City staff positions will be calculated and provided by the Administrative Services
Department.
In the absence of an established fee for service, the City will recover costs based on the reasonable time and
materials required to provide the service, as calculated by the Administrative Services Department
EXHIBIT A
Item 10.b. - Page 7
FY 2017-18
Fee
Budget 40.00$
Financial Statements copy costs
Business License Fees:
(Basic fees are prorated per the application date: Jan 1-Jun 30, 100%; Jul 1-
Dec 31, 50%)
Basic Fee--All businesses except Specific License Fees listed below 34.00*
>Per Employee, Partner, or Associate (Except those listed below)5.00
Specific License Fees:
Contractor 64.00*
Motels & Hotels (Basic Fee)34.00*
>per room 1.00
Trailer Parks 34.00*
>per space 1.00
Hospitals, Sanitariums, Rest or Nursing Homes 44.00*
>per bed 3.00
Taxi Cabs 49.00*
>per vehicle 15.00
Billboards 129.00*
Commercial Auctions - Per Year 89.00*
Commercial Auctions - Per Day of Auctioning 29.00*
Circuses and similar shows (per day)70.00 + $4 State Fee
Bazaars and street fairs:
>Small Bazaars (1-4 displays or exhibits) per display per every two (2) days 15.00 + $4 State Fee
>Large Bazaars (5 or more displays or exhibits) per day 70.00 + $4 State Fee
* Includes $4 per license per State law (AB 1379)
Copies, per page (Black and White)0.20
Color copies Actual cost
Maps--Chamber of Commerce 1.00
Utility Fees and Penalties:
Renter's Deposit 180.00
New Utility Account Set Up Fee 30.00
Past Due Penalty (% of Past Due Total)0.10
Lock Cut Replacement Fee 10.00
Reconnection Fee (Reconnect by City Personnel)45.00
Unauthorized Reconnection Fee (Reconnect by non-City Personnel)65.00
Returned check fee (NSF) -Per CA Civil Code Section 1719 25.00
Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
ADMINISTRATIVE SERVICES
EXHIBIT A
Item 10.b. - Page 8
FY 2017-18 Fee
City Council Agenda and Minutes Subscription by mail:
City Council Agenda Only 20.00$
City Council Agenda and Minutes 35.00
City Council Meeting Audio CD $ 5.00/each
City Council Meeting DVD Vendor cost
Candidate Filing Fee no charge
Candidate Statement actual cost
Notice of Intent to Circulate Petition (EC 9202)200.00
Copies, per page (Black and White)0.20
Color copies Actual cost
Copies of records sent to a commercial copier Actual cost
Document Certification 10.00
Fair Political Practices Commission Forms:
Statement of Economic Interests Form 700 (GC 81008).10/page
Campaign Statements (GC 81008).10/page
Retrieval fee for statements 5 or more years old (GC 81008)5.00/request
Municipal Code (w/out binder)150.00
Municipal Code Supplement Subscription 25.00/year
Notary (per signature)15.00
Transcript of City Council proceedings Actual cost
Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES
EXHIBIT A
Item 10.b. - Page 9
Fee Description FY 2017-18 Fee
Printing/Copying Charges:
8 1/2" x 11 (per page)0.20$
18" x 30 (per page)3.00
24" x 36" (per page)4.00
36" x 48" (per page)5.00
Standard Plans 35.00
Land Use Map and Zoning Maps (each)
24x36 3.00
36x48 4.00
Welcome to Arroyo Grande Maps 4.00
Overtime Inspections (per hour- 2 hour min.)149.00
Map Review - Final (LLA, PM, TM 0-2 Lots)5,537.00
Each Additional Lot 132.00
Additional Map Review - After 3 2,637.00
Encroachment Permit - Minor (pod, dumpster)53.00
Encroachment Permit - Standard - per Month 658.00
Encroachment Permit - Franchise Annual 16,472.00
Certificate of Compliance 2,035.00
Certificate of Correction / Merger 736.00
Transporation Permit - each occurance 38.00
Public Improvement Plan - Plan Check (based on Engineer's estimate of construction
cost):
$0 - 10,000 2,428.00
$10,001 - 50,000 2,791.00
$50,001 - 100,000 3,213.00
$100,001 - 250,000 3,700.00
$250,001 - 500,000 5,146.00
$500,001 - 1.0 Million 6,711.00
Each additional $500,000 (over $1M)2,066.00
Additional Review Public Improvement Plan - Plan Check - After 3 (based on Engineer's
estimate of construction cost):
$0 - 10,000 589.00
$10,001 - 50,000 661.00
$50,001 - 100,000 734.00
$100,001 - 250,000 878.00
$250,001 - 500,000 1,162.00
$500,001 - 1.0 Million 2,018.00
Each additional $500,000 (over $1M)855.00
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
ENGINEERING
EXHIBIT A
Item 10.b. - Page 10
Fee Description FY 2017-18 Fee
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
ENGINEERING
Grading / Drainage / Erosion Plan Review:
0 - 50 cy 1,203.00$
50 cy to 100 cy 1,291.00
100 cy to 1,0000 cy 1,458.00
1,000 cy to 10,000 cy 1,625.00
10,000 cy to 100,000 cy 1,791.00
-
Hydraulic / Hydrology Report Review 755.00
SWPPP Review 755.00
Stormwater Control Plan Review 755.00
Inspection Agreement, including Subdivision Agreement (based on Engineer's estimate of
construction cost):
$0 - 10,000 704.00
$10,001 - 50,000 1,831.00
$50,001 - 100,000 3,505.00
$100,001 - 250,000 6,996.00
$250,001 - 500,000 13,456.00
$500,001 - 1.0 Million 26,107.00
Each additional $500,000 (over $1M)12,710.00
Major Project with a Contract Engineer - Actual cost of Contractor passed directly through
to Applicant
Major Project with a Contract Engineer - City Project Management and Administrative
Charge 1,215.00
EXHIBIT A
Item 10.b. - Page 11
FY 2017-18 Fee
COPY FEES
Development Code w/out Appendices 50.00$
Appendix 1 15.00
Appendix 2 5.00
Development Code w/Appendices 70.00
General Plan 25.00
Housing Element 2003 35.00
General Plan EIR 12.00
Design Guidelines for Historic Districts 25.00
Design Guidelines for Traffic Way/Station Way 6.00
Design Guidelines for Mixed Use Districts 30.00
East Grand Avenue Enhancement Plan 20.00
Land Use Map and Zoning Maps (each)
24 x 36 3.00
36 x 48 4.00
DVD (Planning Commission meetings)Vendor cost
Audio recording copies 5.00
Copies, per page (Black and White)0.20
Color copies Actual cost
Arroyo Grande Bike Plan 26.00
IN-LIEU FEES
Downtown Parking in lieu fee (per resolution 3994)24,000.00
PROCESSING FEES
Notary (per signature)15.00
Annexation - deposit (fee based on actual time at staff at hourly rates)20,000.00
Time and Materials (if project exceeds 50 hours of staff time)
Appeals:
CD Director to Planning Commission 371.00
Planning Commission to City Council 879.00
Certificate of Compliance 2,656.00
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
COMMUNITY DEVELOPMENT
Fee Description
EXHIBIT A
Item 10.b. - Page 12
FY 2017-18 Fee
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
COMMUNITY DEVELOPMENT
Fee Description
Conditional Use Permit:
Project - Major (multi building)10,849.00
Time and Materials (if project exceeds 50 hours of staff time)
Project - Minor (routine) - as det'd by CDD 4,697.00
Amendment 2,372.00
Development Agreement - deposit 18,165.00$
Time and Materials (if project exceeds 50 hours of staff time)
Dev. Code Amendment - Major 12,240.00
Time and Materials (if project exceeds 50 hours of staff time)
Dev. Code Amendment - Minor 6,730.00
Environmental Impact Determination:
Initial Study Fee 2,580.00
Negative Declaration 419.00
Mitigated Neg Dec 1,753.00
General Plan Amendment (Major)12,240.00
Time and Materials (if project exceeds 50 hours of staff time)
General Plan Amendment (Minor)6,730.00
Home Occupation Permit 125.00
Lot Line Adjustment 2,515.00
Lot Merger / Reversion to Acreage 2,475.00
Mailing Label Production 307.00
Request for Meeting Continuance 349.00
Minor Use Permit - Architectural Review
Major (e.g. subdivision if PUD or CUP is not concurrently processed)3,890.00
Minor (e.g. single lot)698.00
Minor Use Permit - Historic Resource Designation 1,113.00
Minor Use Permit - Large Family Day Care 424.00
Minor Use Permit - Minor Exception 756.00
Minor Use Permit - Plot Plan Review 556.00
Minor Use Permit - Temporary Use Permit 223.00
Minor Use Permit - Viewshed Review:855.00
EXHIBIT A
Item 10.b. - Page 13
FY 2017-18 Fee
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
COMMUNITY DEVELOPMENT
Fee Description
Planned Unit Development Permit (Major)11,539.00
Time and Materials (if project exceeds 50 hours of staff time)
Planned Unit Development Permit (Minor)5,521.00
Planning Commission lnterpretation or Waiver 1,369.00
Pre-Application 929.00
Public Art Permit 701.00
Research (deposit)167.00
Signs:
Planned Sign Program 1,808.00
Administrative Sign Permit 259.00
Administrative Sign Program 1,018.00 -
Specific Plan or Amendment (deposit)18,130.00
Time and Materials (if project exceeds 50 hours of staff time)-
Tentative Parcel Map (0-4 lots)7,211.00$
with Vesting (added to base fee)447.00
Amendment 3,493.00 -
Tentative Tract Map:
5-20 lots 11,849.00
over 20 lots 13,754.00
with Vesting (added to base fee)1,161.00
Amendment 5,202.00 -
Time Extension 1,942.00
Variance 2,747.00
Zoning Compliance Letter 111.00
EXHIBIT A
Item 10.b. - Page 14
Fee Description FY 2017-18 Fee
ANIMAL CONTROL / IMPOUND
Dog Impound Fee
1st Impound 21.00$
2nd Impound 43.00
3rd Impound +64.00 -
Cat Impound Fee
1st Impound 21.00
2nd Impound 43.00
3rd Impound +64.00
PERMITS & LICENSES:
Alarm Permit
Original Application Permit Processing Fee 101.00
Annual Renewal Permit Processing Fee 48.00
False Alarm Response
Fourth False Alarm within 12 months 159.00
Fifth False Alarm within 12 months 319.00
Sixth or more false alarm within 12 months (per incident)478.00 -
Block Party Permit
Block Party Permit 27.00
Commercial Filming / Still Photography Permit
Permit Processing Fee 53.00
Commercial Filming (per day)266.00
Still Photography (per day)106.00
City Staff Assigned - 4 hour minimum (if applicable)overtime rate
Concealed Weapons Permit Original Application
Police Department Investigation Fee 106.00
Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00
Identification Card 21.00
Concealed Weapons Permit Biennial Renewal:
Police Department Investigation Fee 27.00
Identification Card 21.00
Medical Marijuana Delivery Service License
Application Processing Fee 638.00
Background Investigation Fees 98.00
ID Card / Vehicle Permit Fee 32.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00
Dept of Justice & FBI Fingerprint Process actual cost-
Medical Marijuana Delivery Service License Renewal
Application Processing Fee 531.00
Background Investigation Fees 37.00
ID Card / Vehicle Permit Fee 32.00
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
POLICE
EXHIBIT A
Item 10.b. - Page 15
Fee Description FY 2017-18 Fee
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
POLICE
Medical Marijuana Delivery Driver Permit
Application Processing Fee 638.00$
Background Investigation Fees 98.00
ID Card / Vehicle Permit Fee 32.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00
Dept of Justice & FBI Fingerprint Process actual cost-
Medical Marijuana Delivery Driver Permit Renewal
Application Processing Fee 531.00
Background Investigation Fees 98.00
ID Card / Vehicle Permit Fee 32.00
Mobile Vendor Permit
Permit Processing Fee 133.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00
Dept of Justice & FBI Fingerprint Process actual cost
Mobile Vendor Employee Permit
Permit Processing Fee 133.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00
Dept of Justice & FBI Fingerprint Process actual cost
Palmreader Fortune Teller Permit - Original Application
Permit Processing Fee 133.00
Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00
Palmreader Fortune Teller Permit - Annual Renewal
Permit Renewal Processing 106.00 -
Palmreader Fortune Teller Establishment Permit - Original Application
Permit Processing Fee 133.00
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00
Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost
Palmreader Fortune Teller Establishment Permit - Renewal Application
Permit Processing Fee 106.00
Public Safety and Welfare Permit:
Less than 200 Non-Commercial Event 53.00
More than 200 Non-Commercial Event 106.00
Commercial Event 133.00
Second Hand Dealer Permit Original Application
Permit Processing Fee 133.00
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00
Dept of Justice & FBI Fingerprint process (DOJ passthrough fee paid by applicant)actual cost
Second Hand Dealer Permit Biennial Renewal
City Processing Fee 106.00 -
EXHIBIT A
Item 10.b. - Page 16
Fee Description FY 2017-18 Fee
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
POLICE
Solicitation Permit (per solicitor)
Permit Processing Fee 133.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00
Dept of Justice & FBI Fingerprint Processing Fee actual cost
Taxi Cab Driver Permit Original Application
Permit Processing Fee 133.00$
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00
Dept of Justice & FBI Fingerprint Process actual cost
Taxi Cab Driver Permit Annual Renewal
Annual Renewal 106.00
Tobacco Retailers License
Permit Processing Fee 133.00
OTHER FEES
Citation correction certification 27.00
Civil Witness Fee (Deposit)275.00
Copies, per page (Black and White).20 per page
Copies - Color copies per page 5.00
Court Ordered Booking 133.00
Criminal history summary examination
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00
Dept of Justice & FBI Fingerprint Process actual cost
Disturbance 415PC
Second Response 159.00
Third Response 319.00
Fourth Response 531.00
Emergency DUI Response -Impaired Driver Accident - Actual Time @ Staff Hourly Rates actual cost
Local Records Check 16.00
Photographs
per disc 25.00
Property Handling for Mailing / Shipping actual cost
Replacement of lost/stolen Permits, Licenses and registration receipts 48.00
Repossessed Vehicle 16.00
Subpoena Duces Tecum
Actual staff time billed at hourly rate to produce records actual cost
.20 per page produced actual cost
postage/shipping actual cost
Custodian of Records Court Appearance $275
Vehicle Release - Impound/Stored Vehicle Release 53.00
Vehicle Release 30-day Impound Release Review 80.00
Clearance letter 48.00
EXHIBIT A
Item 10.b. - Page 17
Fee Description
Plan Check Fee
FY 17-18
Inspection Fee
FY 17-18
Cellular/Mobile Phone, free-standing NEW 1,048.00$ 1,493.00$
Cellular Tower with Equipment Shelter 1,048.00 1,674.00
Cellular Tower Equipment Demolition 403.00 421.00
Awning (not patio cover) Tents / Canopies / Booths 109.00 164.00
183.00 333.00
Close Existing Openings 109.00 223.00
Compliance Inspections/Reinspections 203.00 274.00
Deck (with Calcs)235.00 293.00
Demolition 109.00 344.00
Demolition - MultiFamily/Commercial 109.00 344.00
Door 109.00 236.00
Fence or Wall (wood, chain link, wrought iron):
>6 feet in height, 1st 100 s.f.109.00 301.00
Each additional 100 sf 83.00 109.00
Fence or Freestanding Wall (masonry / garden):
City Standard, 1st 100 s.f.109.00 301.00
Each additional 100 sf 83.00 109.00
Engineered Wall, 1st 100 sf 141.00 301.00
Each additional 100 sf 115.00 109.00
Fireplace (masonry or pre-fab)109.00 217.00
Flag pole (greater than 6 feet in height)109.00 217.00
Grading (Cut and Fill):
0-50 Cubic Yards (Cut and Fill)141.00 217.00
Each Add'l 50 CY (or portion thereof)69.00 164.00
Pilaster each 10 109.00 217.00
Lighting pole (each)109.00 185.00
Stucco Applications 68.00 217.00
Retaining Wall (concrete or masonry):
First 50 sf 224.00 249.00
Each additional 50 sf 198.00 141.00
Re-roofing:
Composition - no tear off 89.00 210.00
Other roofs (first 10 squares)89.00 210.00
Each additional 10 squares 21.00 51.00
Roof Structure Replacement 141.00 249.00
Sauna - steam 109.00 261.00
Change of Occupancy No T.I. w/ plan check & Inspection
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING MISC
Recovery Rate 100% of Cost
EXHIBIT A
Item 10.b. - Page 18
Fee Description
Plan Check Fee
FY 17-18
Inspection Fee
FY 17-18
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING MISC
Recovery Rate 100% of Cost
Siding:
Stone and Brick Veneer (interior or exterior)89.00$ 261.00$
All Other 68.00 261.00
Signs:
Directional / Menu 224.00 261.00
Freeway sign 515.00 287.00
Ground / Roof / Projecting Signs 214.00 249.00
Wall, Illuminated 89.00 261.00
Skylight (Residential each)68.00 230.00
Skylight (Commercial) one 89.00 230.00
Spa or Hot Tub (Pre-fabricated)89.00 261.00
Stairs - per story 328.00 249.00
Storage Racks each set of plans 380.00 312.00
Temporary Utility Connection or Occupancy - 89.00
Window or Sliding Glass Door (first)224.00 249.00
Each additional 198.00 116.00
Board of Appeals 844.00 -
Business License Inspection 43.00 65.00
Business License Re-inspection 43.00 34.00
Product Review 634.00 -
Disabled Access Compliance Inspection 126.00 84.00
Supplemental Plan Check Fee (first 1/2 hour)115.00 -
Each Additional 1/2 hour (or portion thereof)104.00 -
Supplemental Inspection Fee (first 1/2 hour)- 115.00
Each Additional 1/2 hour (or portion thereof)- 104.00
- 219.00
- 208.00
After Hours Inspection 2 hour minimum - 219.00
Each additional hour - 208.00
After Hours Plan Review 2 hour minimum 219.00 -
Each additional hour 208.00 -
Copies, per page (Black and White) .20 per page
Color copies actual costs
Emergency (Non-Scheduled) Call-Out Fee (first hour) 2 hour
minimum
Emergency (Non-Scheduled) Call-Out Fee (each additional hour)
EXHIBIT A
Item 10.b. - Page 19
Fee Description
Plan Check Fee
FY 17-18
Inspection Fee
FY 17-18
Fire Sprinkler Systems - New Construction:
1-50 Heads 209.00$ 228.00$
51-100 Heads 261.00 324.00
101-200 Heads 471.00 388.00
Every 200 Heads above 200 208.00 149.00
Fire Sprinkler Systems -Tenant Improvements:
1-25 Heads 209.00 228.00
26-100 Heads 315.00 356.00
Every 100 Heads above 100 104.00 239.00
Fire Alarm System (including Sprinkler Monitor System) - New Construction:
1-50 Devices 209.00 228.00
51-100 Devices 261.00 324.00
Every 50 Devices above 100 104.00 214.00
Fire Alarm System (including Sprinkler Monitor System) - Tenant Improvements:
1-50 Devices 209.00 260.00
51-100 Devices 261.00 356.00
Every 50 Devices above 100 157.00 214.00
Other Suppression Systems:
Inert Gas Systems 366.00 457.00
Dry Chemical Systems 209.00 457.00
Wet Chemical/Kitchen Hood 313.00 457.00
Foam Systems 209.00 625.00
Paint Spray Booth 470.00 678.00
Other Fire Fees:
Hydrants/Underground Fire Service Plan Check 418.00 -
Hydrant Flow Test (existing hydrants)- 625.00
Special Event Inspection (e.g., fairs) These are group events, when multiple booths/tents are erected
Booth / Tent 55.00 60.00
Booth / Tent with Electricity 80.00 98.00
Booth / Tent with Cooking (includes Electricity)85.00 117.00 - -
Special Event Application Review - 22.00
Additional Fire related services are provided by Five Cities
Fire Authority (FCFA). See the FCFA fee schedule for fees.
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING FIRE
Recovery Rate 100% of Cost
EXHIBIT A
Item 10.b. - Page 20
Fee Description
Plan Check Fee
FY 16-17
Inspection Fee
FY 16-17
ADMINISTRATIVE (BASE) FEES:
Permit Issuance and Administration 107.00$ -$
MECHANICAL PERMIT FEES - -
FAU less than 100,000 Btu/h 52.00 64.00
FAU greater than 100,000 Btu/h 52.00 97.00
Floor furnace (including vent)52.00 129.00
Suspended, wall, or floor-mounted heaters 52.00 97.00
Appliance vents not included in an appliance permit 52.00 97.00
Boiler or compressor, from 15 HP to 30 HP /
absorption system from 500,000 Btu/h to 1,000,000 Btu/h.52.00 97.00
Boiler or compressor, from 30 HP to 50 HP, /
absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h.104.00 129.00
Boiler or compressor, over 50 HP /
absorption system over 1,750,000 Btu/h.156.00 97.00
Air-handling unit, including attached ducts.104.00 97.00
Air-handling unit over 10,000 CFM 156.00 129.00
Evaporative cooler 52.00 64.00
Ventilation fan connected to a single duct 104.00 97.00
Ventilation system (not a portion of heating or a/c system)156.00 129.00
Incinerator, residential 260.00 192.00
Commercial or Industrial-type incinerator 312.00 192.00
Misc. appliances or equipment.156.00 129.00
Stand Alone Mechanical Plan Check (hourly rate)208.00 -
Other Mechanical Inspections (per hour)- 129.00
PLUMBING / GAS PERMIT FEES:
Plumbing fixtures 52.00 64.00
Building sewer 104.00 97.00
Rainwater systems (per drain)52.00 64.00
Gray Water system 156.00 160.00
Private sewage disposal system 156.00 160.00
Water Heater 104.00 64.00
Industrial waste pretreatment interceptor 52.00 97.00
Water piping and/or water treating equipment (each)52.00 97.00
Repair or alteration of drainage or vent piping, each fixture 52.00 97.00
Each lawn sprinkler system on any one meter 52.00 64.00
Backflow devices each unit 104.00 64.00
Atmospheric-type vacuum breakers: 1-5 units 104.00 64.00
Atmospheric-type vacuum breakers: each unit over 5 units 104.00 64.00
Stand Alone Plumbing Plan Check (hourly rate)208.00 -
Other Plumbing and Gas Inspections (per hour)- 129.00
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING MPE
Recovery Rate 100% of Cost
EXHIBIT A
Item 10.b. - Page 21
Fee Description
Plan Check Fee
FY 16-17
Inspection Fee
FY 16-17
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING MPE
Recovery Rate 100% of Cost
SYSTEM FEES:
Swimming Pools 156.00$ 224.00$
Outdoor Events 156.00 97.00
Electric generator and electrically-driven rides 104.00 97.00
Mechanically-driven rides/ attractions with electrical lighting 156.00 97.00
Each system of area and booth lighting 104.00 97.00
Temporary Power Service 104.00 64.00
Temporary power pole 104.00 64.00
Sub poles (each)52.00 45.00
UNIT FEES:
Receptacle, Switch, and Lighting Outlets
First 10 104.00 64.00
Each Additional 10 52.00 32.00
Lighting Fixtures:
First 10 104.00 64.00
Each additional 10 52.00 32.00
Pole or platform-mounted lighting fixtures (each)104.00 97.00
Theatrical-type lighting fixtures or assemblies (each)104.00 129.00
Residential Appliances (each)104.00 64.00
Nonresidential Appliances 156.00 129.00
Residential appliances and self-contained, nonresidential appliances,
(each)156.00 129.00
Appliances not exceeding one horsepower (HP)
kilowatt (KW), or kilovolt-ampere (KVA), in rating,(each)208.00 129.00
Power Apparatus:
Motors, generators, transformers, rectifiers,
synchronous converters, capacitors, industrial heating, air
conditioners
and heat pumps, cooking or baking equipment, and other apparatus
(all sizes)156.00 64.00
Signs, Outline Lighting, and Marquees:
Signs, Outline Lighting, or Marquees supplied from one branch circuit
(each)104.00 97.00
Additional branch circuits within the same sign,
outline lighting system, or marquee (each)104.00 64.00
Service or Panel:
200 amp or less Electrical Panel (each)156.00 129.00
Over 200 amp up to 1000 amp Electrical Panel (each)260.00 160.00
Over 1000 amp Electrical Panel (each)416.00 192.00
EXHIBIT A
Item 10.b. - Page 22
Fee Description
Plan Check Fee
FY 16-17
Inspection Fee
FY 16-17
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING MPE
Recovery Rate 100% of Cost
UNIT FEES (continued):
104.00$ 97.00$
104.00 129.00
Photovotaic Systems - each 156.00 192.00
Stand Alone Electrical Plan Check (hourly rate)208.00 -
Other Electrical Inspections (per hour)- 129.00
Electrical apparatus, conduits, and conductors for which a permit is
required, but for which no fee is herein set forth
Miscellaneous Apparatus, Conduits, and Conductors
EXHIBIT A
Item 10.b. - Page 23
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
2,000 4,445$ $0.200
8,000 5,644$ $0.269
1 A-1 Assembly Group - Theaters 20,000 8,870$ $0.291
40,000 14,699$ $0.195
100,000 26,419$ $0.264
1,000 2,867$ $0.230
4,000 3,557$ $0.312
2 A-2 Assembly Group: Restaurants, nightclubs 10,000 5,430$ $0.338
20,000 8,812$ $0.227
50,000 15,634$ $0.313
250 1,502$ $0.315
1,000 1,738$ $0.382
3 A Assembly Group - TI 2,500 2,310$ $0.417
5,000 3,353$ $0.268
12,500 5,366$ $0.429
1,000 2,867$ $0.230
4,000 3,557$ $0.312
4 A-3 Church and Religious Bldg - Complete 10,000 5,430$ $0.338
20,000 8,812$ $0.227
50,000 15,634$ $0.313
500 2,048$ $0.278
2,000 2,465$ $0.364
5 R-4 Congregate Care - Complete 5,000 3,558$ $0.396
10,000 5,537$ $0.262
25,000 9,473$ $0.379
250 1,502$ $0.315
1,000 1,738$ $0.382
6 A-3 Church and Religious Bldg - TI 2,500 2,310$ $0.417
5,000 3,353$ $0.268
12,500 5,366$ $0.429
2,000 3,458$ $0.148
8,000 4,345$ $0.203
7 E Educational Building - Complete 20,000 6,782$ $0.220
40,000 11,179$ $0.148
100,000 20,084$ $0.201
250 1,502$ $0.315
1,000 1,738$ $0.382
8 E Educational Building - TI 2,500 2,310$ $0.417
5,000 3,353$ $0.268
12,500 5,366$ $0.429
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
EXHIBIT A
Item 10.b. - Page 24
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
500 1,729$ $0.208
2,000 2,040$ $0.264
9 S-2 Parking Garage - Complete 5,000 2,831$ $0.287
10,000 4,264$ $0.188
25,000 7,078$ $0.283
1,000 2,867$ $0.230
4,000 3,557$ $0.312
10 R-1 Hotel Low/Mid Rise - Complete 10,000 5,430$ $0.338
20,000 8,812$ $0.227
50,000 15,634$ $0.313
1,000 1,684$ $0.098
4,000 1,980$ $0.125
11 R-1 Hotel Low/Mid Rise - Shell 10,000 2,727$ $0.135
20,000 4,081$ $0.088
50,000 6,735$ $0.135
250 1,456$ $0.295
1,000 1,677$ $0.353
12 R-1 Hotel Low/Mid Rise - TI 2,500 2,206$ $0.386
5,000 3,171$ $0.247
12,500 5,023$ $0.402
500 2,155$ $0.295
2,000 2,598$ $0.373
13 B Offices, etc. - Complete 5,000 3,718$ $0.406
10,000 5,750$ $0.265
25,000 9,731$ $0.389
1,000 1,479$ $0.076
4,000 1,707$ $0.092
14 B Offices, etc. - Shell 10,000 2,258$ $0.100
20,000 3,262$ $0.064
50,000 5,194$ $0.104
100 1,284$ $0.542
400 1,446$ $0.609
15 B Offices, etc. - TI 1,000 1,812$ $0.668
2,000 2,480$ $0.414
5,000 3,723$ $0.745
1,000 2,867$ $0.230
4,000 3,557$ $0.312
16 F Industrial Building - Complete 10,000 5,430$ $0.338
20,000 8,812$ $0.227
50,000 15,634$ $0.313
EXHIBIT A
Item 10.b. - Page 25
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
1,000 1,956$ $0.129
4,000 2,344$ $0.168
17 F Industrial Building - Shell 10,000 3,351$ $0.182
20,000 5,173$ $0.121
50,000 8,789$ $0.176
250 1,456$ $0.295
1,000 1,677$ $0.353
18 F Industrial Building - TI 2,500 2,206$ $0.386
5,000 3,171$ $0.247
12,500 5,023$ $0.402
500 1,956$ $0.259
2,000 2,344$ $0.335
19 S-1 Repair Garage & Service St - Complete 5,000 3,351$ $0.365
10,000 5,173$ $0.241
25,000 8,789$ $0.352
500 1,366$ $0.127
2,000 1,556$ $0.148
20 S-1 Repair Garage & Service St - Shell 5,000 1,999$ $0.162
10,000 2,808$ $0.102
25,000 4,339$ $0.174
100 1,434$ $0.708
400 1,646$ $0.848
21 S-1 Repair Garage & Service St - TI 1,000 2,155$ $0.926
2,000 3,081$ $0.591
5,000 4,852$ $0.970
500 2,048$ $0.278
2,000 2,465$ $0.364
22 M Retail Sales - Complete 5,000 3,558$ $0.396
10,000 5,537$ $0.262
25,000 9,473$ $0.379
500 1,366$ $0.127
2,000 1,556$ $0.148
23 M Retail Sales - Shell 5,000 1,999$ $0.162
10,000 2,808$ $0.102
25,000 4,339$ $0.174
100 1,434$ $0.708
400 1,646$ $0.848
24 M Retail Sales - TI 1,000 2,155$ $0.926
2,000 3,081$ $0.591
5,000 4,852$ $0.970
EXHIBIT A
Item 10.b. - Page 26
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
2,000 1,956$ $0.065
8,000 2,344$ $0.084
25 - Warehouse - Complete 20,000 3,351$ $0.091
40,000 5,173$ $0.060
100,000 8,789$ $0.088
1,000 2,867$ $0.230
4,000 3,557$ $0.312
26 I Medical/24 Hour Care - Complete 10,000 5,430$ $0.338
20,000 8,812$ $0.227
50,000 15,634$ $0.313
1,000 1,729$ $0.104
4,000 2,040$ $0.132
27 I Medical/24 Hour Care - Shell 10,000 2,831$ $0.143
20,000 4,264$ $0.094
50,000 7,078$ $0.142
100 1,639$ $0.935
400 1,919$ $1.173
28 I Medical/24Hour Care - TI 1,000 2,623$ $1.276
2,000 3,899$ $0.831
5,000 6,393$ $1.279
1,000 2,867$ $0.230
4,000 3,557$ $0.312
29 B Medical Offices - Complete 10,000 5,430$ $0.338
20,000 8,812$ $0.227
50,000 15,634$ $0.313
1,000 1,729$ $0.104
4,000 2,040$ $0.132
30 B Medical Offices - Shell 10,000 2,831$ $0.143
20,000 4,264$ $0.094
50,000 7,078$ $0.142
250 1,639$ $0.374
1,000 1,919$ $0.469
31 B Medical Offices - TI 2,500 2,623$ $0.511
5,000 3,899$ $0.333
12,500 6,393$ $0.511
500 2,184$ $0.309
2,000 2,647$ $0.408
32 - Restaurant - Complete 5,000 3,870$ $0.443
10,000 6,083$ $0.295
25,000 10,501$ $0.420
EXHIBIT A
Item 10.b. - Page 27
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
500 1,502$ $0.157
2,000 1,738$ $0.191
33 - Restaurant - Shell 5,000 2,310$ $0.209
10,000 3,353$ $0.134
25,000 5,366$ $0.215
250 1,388$ $0.264
1,000 1,586$ $0.310
34 - Restaurant - TI 2,500 2,051$ $0.339
5,000 2,898$ $0.215
12,500 4,510$ $0.361
250 1,912$ $0.495
1,000 2,283$ $0.643
35 I-4 Day Care Facility - Complete 2,500 3,247$ $0.698
5,000 4,992$ $0.461
12,500 8,446$ $0.676
100 1,639$ $0.935
400 1,919$ $1.173
36 I-4 Day Care Facility - TI 1,000 2,623$ $1.276
2,000 3,899$ $0.831
5,000 6,393$ $1.279
500 1,775$ $0.218
2,000 2,101$ $0.278
37 H Hazardous H- Complete 5,000 2,934$ $0.302
10,000 4,445$ $0.198
25,000 7,420$ $0.297
500 2,184$ $0.309
2,000 2,647$ $0.408
38 H Hazardous H- Shell 5,000 3,870$ $0.443
10,000 6,083$ $0.295
25,000 10,501$ $0.420
100 1,639$ $0.935
400 1,919$ $1.173
39 H Hazardous H- T I 1,000 2,623$ $1.276
2,000 3,899$ $0.831
5,000 6,393$ $1.279
200 1,274$ $0.266
800 1,434$ $0.298
40 - Commercial Building - Foundation 2,000 1,791$ $0.326
4,000 2,443$ $0.202
10,000 3,655$ $0.365
EXHIBIT A
Item 10.b. - Page 28
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
200 1,320$ $0.290
800 1,494$ $0.334
41 - Commercial Building - Addition 2,000 1,895$ $0.366
4,000 2,626$ $0.228
10,000 3,997$ $0.400
1,000 2,867$ $0.230
4,000 3,557$ $0.312
42 R-2 Apartment Building 10,000 5,430$ $0.338
20,000 8,812$ $0.227
50,000 15,634$ $0.313
1,000 2,310$ $0.131
2,000 2,441$ $0.676
43 R-3 Single-Family (custom or model)3,000 3,117$ $0.353
5,000 3,823$ $0.500
7,500 5,073$ $0.676
667 1,358$ $0.077
1,333 1,409$ $0.260
44 R-3 Single-Family - Production / Repeat 2,000 1,582$ $0.202
3,333 1,852$ $0.235
5,000 2,244$ $0.449
333 1,294$ $0.137
667 1,340$ $0.418
45 R-3 Moved Building - Residential 1,000 1,479$ $0.360
1,667 1,719$ $0.400
2,500 2,053$ $0.821
800 1,179$ $0.046
1,600 1,216$ $0.094
46 R-3 Manufactured Home - Complete 2,400 1,291$ $0.118
4,000 1,479$ $0.114
6,000 1,707$ $0.284
667 1,179$ $0.056
1,333 1,216$ $0.113
47 R-3 Prefabricated Dwelling - Complete 2,000 1,291$ $0.141
3,333 1,479$ $0.136
5,000 1,707$ $0.341
120 1,033$ $0.221
480 1,113$ $0.176
48 - Commercial Coach - Complete 1,200 1,239$ $0.200
2,400 1,479$ $0.100
6,000 1,841$ $0.307
EXHIBIT A
Item 10.b. - Page 29
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
240 1,033$ $0.111
960 1,113$ $0.088
49 - Modular Building - Complete 2,400 1,239$ $0.100
4,800 1,479$ $0.050
12,000 1,841$ $0.153
500 1,056$ $0.057
2,000 1,142$ $0.050
50 - Manufactured Building - Foundation 5,000 1,291$ $0.056
10,000 1,570$ $0.029
25,000 2,012$ $0.080
167 1,179$ $0.223
333 1,216$ $0.453
51 U Residential Garage 500 1,291$ $0.564
833 1,479$ $0.546
1,250 1,707$ $1.365
40 1,092$ $0.824
160 1,191$ $0.766
52 U Pool/Spa - Standard Plan 400 1,375$ $0.850
800 1,715$ $0.476
2,000 2,286$ $1.143
200 1,639$ $0.468
800 1,919$ $0.586
53 - Commercial Building - Remodel 2,000 2,623$ $0.638
4,000 3,899$ $0.416
10,000 6,393$ $0.639
200 1,593$ $0.443
800 1,859$ $0.550
54 - Commercial Building - Repair 2,000 2,519$ $0.599
4,000 3,717$ $0.389
10,000 6,051$ $0.605
50 1,074$ $0.616
200 1,167$ $0.556
55 U Accessory Building - Commercial 500 1,334$ $0.618
1,000 1,643$ $0.337
2,500 2,149$ $0.860
50 1,074$ $0.616
200 1,167$ $0.556
56 U Commercial Carport 500 1,334$ $0.618
1,000 1,643$ $0.337
2,500 2,149$ $0.860
EXHIBIT A
Item 10.b. - Page 30
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
167 1,358$ $0.306
333 1,409$ $1.039
57 R-3 Single-Family Residential - Addition 500 1,582$ $0.810
833 1,852$ $0.941
1,250 2,244$ $1.796
333 1,550$ $0.201
667 1,617$ $0.832
58 R-2 Multi-Family Residential - Addition 1,000 1,895$ $0.537
1,667 2,253$ $0.681
2,500 2,820$ $1.128
333 1,166$ $0.108
667 1,202$ $0.207
59 R-3 Single-Family Residential - Remodel 1,000 1,271$ $0.273
1,667 1,453$ $0.259
2,500 1,668$ $0.667
667 1,301$ $0.070
1,333 1,348$ $0.212
60 R-2 Multi-Family Residential - Remodel 2,000 1,489$ $0.183
3,333 1,732$ $0.204
5,000 2,072$ $0.414
333 1,007$ $0.067
667 1,030$ $0.268
61 R-3 Residential Building - Foundation 1,000 1,119$ $0.177
1,667 1,237$ $0.222
2,500 1,422$ $0.569
83 969$ $0.217
167 987$ $0.842
62 U Accessory Building - Residential 250 1,057$ $0.599
417 1,157$ $0.719
625 1,307$ $2.091
133 969$ $0.135
267 987$ $0.526
63 U Residential Carport 400 1,057$ $0.375
667 1,157$ $0.450
1,000 1,307$ $1.307
83 969$ $0.217
167 987$ $0.842
64 U Residential Patio Cover 250 1,057$ $0.599
417 1,157$ $0.719
625 1,307$ $2.091
EXHIBIT A
Item 10.b. - Page 31
Note:All fees include MPE plan checks.
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee FY
17-18
Each
Additional
SF
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING PLAN CHECK
Recovery Rate 100% of Cost
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
83 1,097$ $0.357
167 1,126$ $1.658
65 U Residential Balcony/Deck 250 1,265$ $0.950
417 1,423$ $1.285
625 1,691$ $2.705
83 1,065$ $0.319
167 1,091$ $1.454
66 U Residential Patio Enclosure 250 1,213$ $0.867
417 1,357$ $1.143
625 1,595$ $2.552
EXHIBIT A
Item 10.b. - Page 32
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
2,000 3,082$ $0.377
8,000 5,343$ $0.327
1 A-1 Assembly Group - Theaters 20,000 9,269$ $0.281
40,000 14,891$ $0.318 100,000 33,982$ $0.340
1,000 2,502$ $0.594
4,000 4,285$ $0.617
2 A-2 Assembly Group: Restaurants, nightclubs 10,000 7,986$ $0.509
20,000 13,074$ $0.602 50,000 31,137$ $0.623
250 678$ $0.706
1,000 1,207$ $0.250
3 A Assembly Group - TI 2,500 1,582$ $0.275
5,000 2,271$ $0.245 12,500 4,112$ $0.329
1,000 2,037$ $0.467
4,000 3,439$ $0.587
4 A-3 Church and Religious Bldg - Complete 10,000 6,961$ $0.466
20,000 11,622$ $0.575 50,000 28,861$ $0.577
500 1,307$ $0.579
2,000 2,175$ $0.656
5 R-4 Congregate Care - Complete 5,000 4,142$ $0.504
10,000 6,660$ $0.658
25,000 16,525$ $0.661
250 505$ $0.514
1,000 891$ $0.205
6 A-3 Church and Religious Bldg - TI 2,500 1,199$ $0.211
5,000 1,726$ $0.204 12,500 3,257$ $0.261
2,000 3,024$ $0.369
8,000 5,237$ $0.325
7 E Educational Building - Complete 20,000 9,140$ $0.278
40,000 14,709$ $0.316
100,000 33,697$ $0.337
250 505$ $0.514
1,000 891$ $0.205
8 E Educational Building - TI 2,500 1,199$ $0.211
5,000 1,726$ $0.204 12,500 3,257$ $0.261
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
EXHIBIT A
Item 10.b. - Page 33
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
500 678$ $0.353
2,000 1,207$ $0.125
9 S-2 Parking Garage - Complete 5,000 1,582$ $0.138
10,000 2,271$ $0.123 25,000 4,112$ $0.164
1,000 2,037$ $0.467
4,000 3,439$ $0.587
10 R-1 Hotel Low/Mid Rise - Complete 10,000 6,961$ $0.466
20,000 11,622$ $0.575 50,000 28,861$ $0.577
1,000 725$ $0.189
4,000 1,292$ $0.066
11 R-1 Hotel Low/Mid Rise - Shell 10,000 1,685$ $0.073
20,000 2,417$ $0.064 50,000 4,339$ $0.087
250 505$ $0.514
1,000 891$ $0.205
12 R-1 Hotel Low/Mid Rise - TI 2,500 1,199$ $0.211
5,000 1,726$ $0.204 12,500 3,257$ $0.261
500 2,270$ $1.160
2,000 4,010$ $0.744
13 B Offices, etc. - Complete 5,000 6,242$ $0.698
10,000 9,733$ $0.717 25,000 20,481$ $0.819
1,000 411$ $0.103
4,000 721$ $0.045
14 B Offices, etc. - Shell 10,000 993$ $0.044
20,000 1,436$ $0.046
50,000 2,802$ $0.056
100 299$ $0.719
400 514$ $0.381
15 B Offices, etc. - TI 1,000 743$ $0.339
2,000 1,082$ $0.389 5,000 2,248$ $0.450
1,000 1,980$ $0.451
4,000 3,334$ $0.583
16 F Industrial Building - Complete 10,000 6,832$ $0.461
20,000 11,440$ $0.571
50,000 28,576$ $0.572
1,000 478$ $0.121
4,000 843$ $0.050
17 F Industrial Building - Shell 10,000 1,140$ $0.050
20,000 1,645$ $0.049 50,000 3,130$ $0.063
EXHIBIT A
Item 10.b. - Page 34
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
250 652$ $0.677
1,000 1,160$ $0.243
18 F Industrial Building - TI 2,500 1,525$ $0.266
5,000 2,189$ $0.239 12,500 3,983$ $0.319
500 960$ $0.388
2,000 1,541$ $0.611
19 S-1 Repair Garage & Service St - Complete 5,000 3,373$ $0.440
10,000 5,571$ $0.617 25,000 14,818$ $0.593
500 450$ $0.227
2,000 790$ $0.096
20 S-1 Repair Garage & Service St - Shell 5,000 1,077$ $0.095
10,000 1,554$ $0.096 25,000 2,987$ $0.119
100 299$ $0.719
400 514$ $0.381
21 S-1 Repair Garage & Service St - TI 1,000 743$ $0.339
2,000 1,082$ $0.389 5,000 2,248$ $0.450
500 1,047$ $0.435
2,000 1,699$ $0.622
22 M Retail Sales - Complete 5,000 3,565$ $0.455
10,000 5,843$ $0.627 25,000 15,244$ $0.610
500 550$ $0.283
2,000 974$ $0.109
23 M Retail Sales - Shell 5,000 1,301$ $0.114
10,000 1,871$ $0.108
25,000 3,486$ $0.139
100 299$ $0.719
400 514$ $0.381
24 M Retail Sales - TI 1,000 743$ $0.339
2,000 1,082$ $0.389 5,000 2,248$ $0.450
2,000 2,700$ $0.335
8,000 4,713$ $0.209
25 - Warehouse - Complete 20,000 7,220$ $0.190
40,000 11,018$ $0.206
100,000 23,354$ $0.234
1,000 2,037$ $0.467
4,000 3,439$ $0.587
26 I Medical/24 Hour Care - Complete 10,000 6,961$ $0.466
20,000 11,622$ $0.575 50,000 28,861$ $0.577
EXHIBIT A
Item 10.b. - Page 35
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
1,000 507$ $0.130
4,000 896$ $0.052
27 I Medical/24 Hour Care - Shell 10,000 1,205$ $0.053
20,000 1,735$ $0.051 50,000 3,272$ $0.065
100 269$ $0.645
400 462$ $0.361
28 I Medical/24Hour Care - TI 1,000 679$ $0.311
2,000 990$ $0.372 5,000 2,105$ $0.421
1,000 2,037$ $0.467
4,000 3,439$ $0.587
29 B Medical Offices - Complete 10,000 6,961$ $0.466
20,000 11,622$ $0.575 50,000 28,861$ $0.577
1,000 522$ $0.134
4,000 922$ $0.052
30 B Medical Offices - Shell 10,000 1,237$ $0.054
20,000 1,781$ $0.052 50,000 3,343$ $0.067
250 681$ $0.708
1,000 1,213$ $0.252
31 B Medical Offices - TI 2,500 1,590$ $0.276
5,000 2,281$ $0.246 12,500 4,125$ $0.330
500 1,047$ $0.435
2,000 1,699$ $0.622
32 - Restaurant - Complete 5,000 3,565$ $0.455
10,000 5,843$ $0.627
25,000 15,244$ $0.610
500 463$ $0.235
2,000 816$ $0.097
33 - Restaurant - Shell 5,000 1,108$ $0.098
10,000 1,599$ $0.097 25,000 3,058$ $0.122
250 681$ $0.708
1,000 1,213$ $0.252
34 - Restaurant - TI 2,500 1,590$ $0.276
5,000 2,281$ $0.246
12,500 4,125$ $0.330
250 1,047$ $0.870
1,000 1,699$ $1.244
35 I-4 Day Care Facility - Complete 2,500 3,565$ $0.911
5,000 5,843$ $1.254 12,500 15,244$ $1.220
EXHIBIT A
Item 10.b. - Page 36
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
100 240$ $0.563
400 409$ $0.342
36 I-4 Day Care Facility - TI 1,000 614$ $0.286
2,000 900$ $0.354 5,000 1,963$ $0.393
500 1,047$ $0.435
2,000 1,699$ $0.622
37 H Hazardous H- Complete 5,000 3,565$ $0.455
10,000 5,843$ $0.627 25,000 15,244$ $0.610
500 435$ $0.219
2,000 763$ $0.094
38 H Hazardous H- Shell 5,000 1,045$ $0.093
10,000 1,508$ $0.094 25,000 2,916$ $0.117
100 240$ $0.563
400 409$ $0.342
39 H Hazardous H- T I 1,000 614$ $0.286
2,000 900$ $0.354 5,000 1,963$ $0.393
200 240$ $0.282
800 409$ $0.171
40 - Commercial Building - Foundation 2,000 614$ $0.143
4,000 900$ $0.177 10,000 1,963$ $0.196
200 269$ $0.322
800 462$ $0.181
41 - Commercial Building - Addition 2,000 679$ $0.156
4,000 990$ $0.186
10,000 2,105$ $0.211
1,000 1,954$ $0.483
4,000 3,404$ $0.555
42 R-2 Apartment Building 10,000 6,736$ $0.471
20,000 11,451$ $0.529 50,000 27,332$ $0.547
1,000 1,779$ $1.058
2,000 2,837$ $1.081
43 R-3 Single-Family (custom or model) 3,000 3,918$ $0.969
5,000 5,855$ $0.792
7,500 7,836$ $1.045
667 1,120$ $0.940
1,333 1,747$ $0.918
44 R-3 Single-Family - Production / Repeat 2,000 2,359$ $0.789
3,333 3,411$ $0.727 5,000 4,623$ $0.925
EXHIBIT A
Item 10.b. - Page 37
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
333 193$ $0.363
667 315$ $0.383
45 R-3 Moved Building - Residential 1,000 442$ $0.346
1,667 673$ $0.265 2,500 894$ $0.357
800 147$ $0.121
1,600 243$ $0.128
46 R-3 Manufactured Home - Complete 2,400 345$ $0.119
4,000 536$ $0.086 6,000 707$ $0.118
667 147$ $0.145
1,333 243$ $0.153
47 R-3 Prefabricated Dwelling - Complete 2,000 345$ $0.143
3,333 536$ $0.103 5,000 707$ $0.141
120 118$ $0.192
480 187$ $0.220
48 - Commercial Coach - Complete 1,200 345$ $0.144
2,400 519$ $0.235 6,000 1,366$ $0.228
240 118$ $0.096
960 187$ $0.110
49 - Modular Building - Complete 2,400 345$ $0.072
4,800 519$ $0.118 12,000 1,366$ $0.114
500 118$ $0.046
2,000 187$ $0.053
50 - Manufactured Building - Foundation 5,000 345$ $0.035
10,000 519$ $0.056
25,000 1,366$ $0.055
167 237$ $0.867
333 382$ $0.899
51 U Residential Garage 500 531$ $0.810
833 801$ $0.640 1,250 1,068$ $0.854
40 228$ $1.328
160 388$ $0.837
52 U Pool/Spa - Standard Plan 400 589$ $0.688
800 864$ $0.869
2,000 1,906$ $0.953
200 446$ $0.563
800 784$ $0.238
53 - Commercial Building - Remodel 2,000 1,070$ $0.238
4,000 1,545$ $0.238 10,000 2,973$ $0.297
EXHIBIT A
Item 10.b. - Page 38
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
200 446$ $0.563
800 784$ $0.238
54 - Commercial Building - Repair 2,000 1,070$ $0.238
4,000 1,545$ $0.238 10,000 2,973$ $0.297
50 141$ $0.588
200 230$ $0.556
55 U Accessory Building - Commercial 500 396$ $0.391
1,000 592$ $0.592 2,500 1,479$ $0.592
50 173$ $0.758
200 287$ $0.602
56 U Commercial Carport 500 468$ $0.448
1,000 692$ $0.629 2,500 1,635$ $0.654
167 284$ $1.020
333 454$ $1.046
57 R-3 Single-Family Residential - Addition 500 628$ $0.931
833 938$ $0.760 1,250 1,255$ $1.004
333 748$ $1.272
667 1,172$ $1.253
58 R-2 Multi-Family Residential - Addition 1,000 1,590$ $1.084
1,667 2,312$ $0.977 2,500 3,126$ $1.251
333 268$ $0.488
667 430$ $0.494
59 R-3 Single-Family Residential - Remodel 1,000 595$ $0.446
1,667 893$ $0.361
2,500 1,193$ $0.477
667 386$ $0.340
1,333 612$ $0.341
60 R-2 Multi-Family Residential - Remodel 2,000 840$ $0.300
3,333 1,240$ $0.256 5,000 1,667$ $0.333
333 237$ $0.434
667 382$ $0.450
61 R-3 Residential Building - Foundation 1,000 531$ $0.405
1,667 801$ $0.320
2,500 1,068$ $0.427
83 163$ $1.250
167 267$ $1.326
62 U Accessory Building - Residential 250 377$ $1.224
417 581$ $0.903 625 769$ $1.231
EXHIBIT A
Item 10.b. - Page 39
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square
feet)
Base Fee FY
17-18
Each
Additional
SF
BUILDING INSPECTION
Recovery Rate 100% of Cost
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
133 147$ $0.725
267 243$ $0.765
63 U Residential Carport 400 345$ $0.713
667 536$ $0.513 1,000 707$ $0.707
83 147$ $1.160
167 243$ $1.224
64 U Residential Patio Cover 250 345$ $1.141
417 536$ $0.821 625 707$ $1.131
83 147$ $1.160
167 243$ $1.224
65 U Residential Balcony/Deck 250 345$ $1.141
417 536$ $0.821 625 707$ $1.131
83 147$ $1.160
167 243$ $1.224
66 U Residential Patio Enclosure 250 345$ $1.141
417 536$ $0.821 625 707$ $1.131
EXHIBIT A
Item 10.b. - Page 40
FY 2017-18
Copies, per page (Black and White)0.20$
Park Facility Use Fees:
Strother Park-Large Barbecue per use 80.00
Strother Park-Security Deposit per use 30.00
Strother Park-Small Barbecue per use 45.00
Strother Park-Wedding Reception per use 165.00
Strother Park-Security 1,2,3 per use 75.00
Elm Street Park-Barbecue per use 80.00
Elm Street Park-Security Deposit per use 30.00
Rancho Grande Park - Large BBQ per use 80.00
Rancho Grande Park - Small BBQ (areas 2 and 3)per use 45.00
Strother Park Deposit per use 30.00
Kingo Park per use 45.00
Kingo Park Deposit per use 30.00
Rotary Bandstand Fees:
Rent per use 80.00
Deposit per use 30.00
Soto Sports Complex Use Fees:
Campbell Field Rental Fee per hour 16.00
Campbell Field Rental Fee (with lights)per hour 37.00
Pilg Field Rental Fee per hour 16.00
Pilg Field Rental Fee (with lights)per hour 37.00
Santos Field Rental Fee per hour 16.00
Volunteer Field Rental Fee per hour 16.00
Volunteer Field with Lights Rental per hour 37.00
Ikeda Field Rental per hour 16.00
Ikeda Field with Lights Rental per hour 37.00
Porter Field Rental Fee per hour 21.00
Porter Field with Lights Rental per hour 43.00
Tennis Court Rental-1 court per hour 11.00
Tennis Courts - 4 courts per day 106.00
Pickleball Club - Annual Fee 100.00
Food Booth Rental Fee (Soto)per day 40.00
Food Vendor Space Rental Fee 10% of Gross
Meeting Room Rental Fee (Jaycee room)per day 21.00
Field Prep Fees (except Porter)per prep 21.00
Field Prep Fees - Porter per prep 37.00
Tournament Sch. & Coordination Fee per tournament 69.00
Tournament cleaning / security Deposit 276.00
Tournament Staff Attendant per hour 16.00
Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
RECREATION SERVICES
EXHIBIT A
Item 10.b. - Page 41
FY 2017-18 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
RECREATION SERVICES
Soto Sports Complex Use Fees - APPROVED YOUTH GROUPS:
Field Rental (practice and league games) - each field per hour 2.00
Concession Stand Fee - Buildings per hour 5.00
Concession Stand Fee - Mobile per hour 3.00
Non-resident - per participant 2.00
Woman's Club Use Fees:
Non-Resident Fee 53.00
Partial day rental - Mon - Fri per hour 53.00
Full day rental - Friday, Saturday, or Sunday 584.00
Second day rental - Friday, Saturday or Sunday 292.00
Security Deposit (No Alcohol/No Band)400.00
Security Deposit (with Alcohol)1,000.00
Building Supervision Fee per hour 16.00
Rental Fee (on-going users):
Non-profit groups/Service clubs/Youth groups:
(20 or less attendees)per hour 3.00
(21 - 50 attendees)"4.00
(51 or more attendees)"5.00
Groups with reciprocal services "3.00
Private groups or clubs:per hour
(20 or less attendees)"9.00
(21 - 50 attendees)"10.00
(51 or more attendees)"11.00
Groups with reciprocal services "5.00
Custodial Fee (special event rentals only)100.00
Reservation Cancellation Fees:
If cancelled 30 days or more ahead of event 100.00
If cancelled less than 30 days ahead of event 200.00
Amenities Fees:
Chairs per chair 0.25$
Tables per table 1.00
Community Garden Deposit 25.00
Community Garden Plot per 6 months 36.00
Elm Street Community Center Use Fees:
Rental Fee per hour 32.00
Rental Fee - full day per day 186.00
Building Supervision Fee per hour 16.00
Security deposit 150.00
EXHIBIT A
Item 10.b. - Page 42
FY 2017-18 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
RECREATION SERVICES
Adult Sport League Fees:
Adult Softball 460.00
Adult Basketball 390.00
Non-Resident Fee 8.00
Seasonal Playground Programs:
Annual Registration Fee per child 15.00
Playground-Elm Street (Winter/Spring/Summer)per day 24.00
half day 12.00
Late pickup (after 4:15)10.00
Pre-School Fees:
Annual Registration Fee per child 15.00
Play & Learn-Tues & Thur.per hour 4.50
Play & Learn-Mon, Wed & Fri."4.50
Kindergartens in Training "4.50
Summer Play & Learn "4.50
Late Pick-up Fees:
First late pick-up per child 5.00
Second late pick-up "10.00
Third late pick-up "20.00
Children In Motion Program:
Children In Motion Annual Registration per child 25.00$
Branch School - Mornings
5 Days Per Week per 4 wks 105.00
4 Days Per Week "90.00
3 Days Per Week "72.00
2 Days Per Week "51.00
Branch School - Afternoons
5 Days Per Week per 4 wks 192.50
4 Days Per Week "165.00
3 Days Per Week "132.00
2 Days Per Week "93.50
Extra Day - Branch School
Morning per day 7.00
Afternoon "13.25
Late Start Monday per day 2.75
EXHIBIT A
Item 10.b. - Page 43
FY 2017-18 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
RECREATION SERVICES
Children In Motion Fees (continued):
Kindercare - Branch School
5 Days Per Week per 4 wks 210.00
4 Days Per Week "180.00
3 Days Per Week "144.00
2 Days Per Week "102.00
Extra Day per day 13.25
Ocean View School - Mornings
5 Days Per Week per 4 wks 105.00$
4 Days Per Week "90.00
3 Days Per Week "72.00
2 Days Per Week "51.00
Ocean View School - Afternoons
5 Days Per Week per 4 wks 210.00
4 Days Per Week "180.00
3 Days Per Week "144.00
2 Days Per Week "102.00
Extra Day - Ocean View School
Morning per day 7.00
Afternoon "13.25
Late Start Monday per day 2.75
Elm Community Center - Mornings
5 Days Per Week per 4 wks 297.50
4 Days Per Week "255.00
3 Days Per Week "204.00
2 Days Per Week "144.50
Elm Community Center - Afternoons Care Plan A
5 Days Per Week per 4 wks 210.00
4 Days Per Week "180.00
3 Days Per Week "144.00
2 Days Per Week "102.00
Elm Community Center - Afternoons Care Plan B
5 Days Per Week per 4 wks 402.50
4 Days Per Week "345.00
3 Days Per Week "276.00
2 Days Per Week "195.50
EXHIBIT A
Item 10.b. - Page 44
FY 2017-18 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
RECREATION SERVICES
Children In Motion Fees (continued):
Extra Day - Elm Community Center
Morning per day 16.00$
Care Plan A (12:15 pm - 3:15 pm)"13.50
Care Plan B (12:15 pm - 6:00 pm)"25.75
Winter/Spring/Summer - Full Day
5 Days Per Week per week 160.00
4 Days Per Week "136.00
3 Days Per Week "108.00
Winter/Spring/Summer - Half Day per day 18.00
Minimum Days (teacher work day/early release)
Regular day of attendance per day 10.50
Non-regular day of attendance "18.50
Late Pick-up Fees:
Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00
Pickup 6:01 - 6:10 pm per child 10.00
Pickup 6:11 - 6:20 pm "20.00
Pickup 6:21 - 6:30 pm "30.00
Pickup after 6:31 "60.00
EXHIBIT A
Item 10.b. - Page 45
FY 2017-18
LABOR COSTS (per hour):
DURING REGULAR WORK HOURS:
Full Time employee 63.02$
Part Time employee 23.59
AFTER REGULAR WORK HOURS:
Full Time employee 94.53
Part Time employee 35.39
MINIMUM CALL-OUT RATE 2 hours at 1.5 times billing rate
EQUIPMENT BILLING RATE (per hour)
Pickup Truck 17.00
Service Truck 42.00
Backhoe 43.00
CAT Generator 82.00
Loader 50.00
6" Pump 23.00
Dump/Flat Bed Truck (5-7 yds)36.00
Sewer/Vacuum/Jet Truck 125.00
Chipper 44.00
Concrete Saw 10.00
Air Compressor 17.00
5-Ton Roller 30.00
Mini Excavator 60.00
Skid Steer 50.00
MATERIAL COST: (cost plus tax)
Concrete (per yard)125.00
Sand (per ton)25.00
Class II Base (per ton)30.00
A/C (per ton)100.00
Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2017-18
PUBLIC WORKS SERVICES
EXHIBIT A
Item 10.b. - Page 46