Loading...
R 4826 RESOLUTION NO. 4826 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE UPDATING OPERATING FEES SET FORTH IN THE MASTER FEE SCHEDULE WHEREAS, the City of Arroyo Grande ("City") is empowered to impose reasonable fees, rates and charges for municipal services. California Government Code Section 66000 et seq. authorizes the City to adopt fees for municipal services, provided such fees do not exceed the cost to the City for providing the services; and WHEREAS, in January 2015 the City retained Wohlford Consulting to conduct a User (operating) Fee Study for City services. The User Fee Study is on file with the City Administrative Services Department and is incorporated by this reference; and WHEREAS, operating fees are intended to be paid by persons utilizing the program or service and to reimburse the City for the actual cost of said program or service; and WHEREAS, the City has established a proposed Master Fee Schedule based on the User Fee Study, which includes fees related to planning, building, engineering, police, recreation, and public works charges; and WHEREAS, the City Council has considered the question of whether or not to adjust or establish User (operating) Fees for City services to reflect the estimated amount that is required to recover the actual cost to the City of providing such services; and WHEREAS, the City Council adopted a methodology to annually update fees in order to reflect the change in the actual cost to the City of providing services and reduce the subsidy of the General Fund for planning related services; and WHEREAS, the amount of the fees do not exceed the cost of providing the City services; and WHEREAS, pursuant to Government Code Sections 66016, data indicating the amount of cost, or estimated cost, required to provide the service for which the fees are levied and the revenue sources anticipated to provide the service, including General Fund revenues, was made available for public review at least ten days prior to the date of this meeting; and WHEREAS, after conducting a duly noticed public hearing and satisfying all applicable provisions of California Government Code Sections 66016 and 66018, the City Council considered all verbal and written presentations that were made regarding the proposed fees. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo Grande as follows: RESOLUTION NO. 4826 PAGE 2 1. The schedule of fees entitled "Master Fee Schedule" in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full, is hereby adopted. 2. Fees shall be adjusted annually by modifying the adopted value up or down in conformance with the annual change in the City's budgeted labor costs. The factor for the adjustment of the fees shall be calculated and established each year by the Director of Administrative Services. 3. Additional phased increases of Planning fees shall be implemented 'at 5% per year for three years, until an overall cost recovery level of 75% is achieved for Planning related fee activities. BE IT FURTHER RESOLVED by the City Council that this Resolution shall be effective January 15, 2018. On motion of Council Member Ray, seconded by Council Member Brown, and by the following roll call vote, to wit: AYES: Council Members Ray, Brown, Harmon, and Barneich NOES: None ABSENT: Mayor Hill the foregoing Resolution was passed and adopted this 14th day of November, 2017. RESOLUTION NO. 7874 PAGE 3 , // JI ILL, MAYOR ATTEST: , , / ab, &tete-, KELLY ET ORE, CI CLERK APPROVED AS TO CONTENT: lab- JA ' �'�_1i■=ia:: MAN, CITY MANAGER APPROVED AS TO FORM: fc� EATHER WHITHAM, CITY ATTORNEY EXHIBIT A CITY OF ARROYO GRANDE 4z CITY OF P�ROYO GRAND CALIFORNIA/5 MASTER FEE SCHEDULE Fiscal Year 2017-18 Fees effective January 15.2018 Issued by the Administrative Services Department EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 Hourly rates for all City staff positions will be calculated and provided by the Administrative Services Department. In the absence of an established fee for service,the City will recover costs based on the reasonable time and materials required to provide the service, as calculated by the Administrative Services Department 1 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 ADMINISTRATIVE SERVICES FY 2017-18 Fee Description Fee Budget $ 40.00 Financial Statements copy costs Business License Fees: (Basic fees are prorated per the application date: Jan 1-Jun 30, 100%;Jul 1- Dec 31, 50%) Basic Fee—All businesses except Specific License Fees listed below 34.00* >Per Employee, Partner, or Associate(Except those listed below) 5.00 Specific License Fees: Contractor 64.00* Motels&Hotels(Basic Fee) 34.00* >per room 1.00 Trailer Parks 34.00* >per space 1.00 Hospitals, Sanitariums, Rest or Nursing Homes 44.00* >per bed 3.00 Taxi Cabs 49.00* >per vehicle 15.00 Billboards 129.00* Commercial Auctions-Per Year 89.00* Commercial Auctions-Per Day of Auctioning 29.00* Circuses and similar shows(per day) 70.00 +$4 State Fee Bazaars and street fairs: >Small Bazaars(1-4 displays or exhibits)per display per every two(2)days 15.00 +$4 State Fee >Large Bazaars(5 or more displays or exhibits) per day 70.00 +$4 State Fee *Includes$4 per license per State law(AB 1379) Copies,per page(Black and White) 0.20 Color copies Actual cost Maps—Chamber of Commerce 1.00 Utility Fees and Penalties: Renter's Deposit 180.00 New Utility Account Set Up Fee 30.00 Past Due Penalty(%of Past Due Total) 0.10 Lock Cut Replacement Fee 10.00 Reconnection Fee(Reconnect by City Personnel) 45.00 Unauthorized Reconnection Fee(Reconnect by non-City Personnel) 65.00 Returned check fee(NSF)-Per CA Civil Code Section 1719 25.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES Fee Description FY 2017-18 Fee City Council Agenda and Minutes Subscription by mail: City Council Agenda Only $ 20.00 City Council Agenda and Minutes 35.00 City Council Meeting Audio CD $ 5.00/each City Council Meeting DVD Vendor cost Candidate Filing Fee no charge Candidate Statement actual cost Notice of Intent to Circulate Petition(EC 9202) 200.00 Copies,per page(Black and White) 0.20 Color copies Actual cost Copies of records sent to a commercial copier Actual cost Document Certification 10.00 Fair Political Practices Commission Forms: Statement of Economic Interests Form 700(GC 81008) .10/page Campaign Statements(GC 81008) .10/page Retrieval fee for statements 5 or more years old (GC 81008) 5.00/request Municipal Code(w/out binder) 150.00 Municipal Code Supplement Subscription 25.00/year Notary(per signature) 15.00 Transcript of City Council proceedings Actual cost EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 ENGINEERING Fee Description FY 2017-18 Fee Printing/Copying Charges: 8 1/2"x 11 (per page) $ 0.20 18"x 30(per page) 3.00 24"x 36"(per page) 4.00 36"x 48"(per page) 5.00 Standard Plans 35.00 Land Use Map and Zoning Maps(each) 24x36 3.00 36x48 4.00 Welcome to Arroyo Grande Maps 4.00 Overtime Inspections(per hour-2 hour min.) 149.00 Map Review-Final(LLA, PM,TM 0-2 Lots) 5,537.00 Each Additional Lot 132.00 Additional Map Review-After 3 2,637.00 Encroachment Permit-Minor(pod,dumpster) 53.00 Encroachment Permit-Standard-per Month 658.00 Encroachment Permit-Franchise Annual 16,472.00 Certificate of Compliance 2,035.00 Certificate of Correction/Merger 736.00 Transporation Permit-each occurance 38.00 Public Improvement Plan-Plan Check(based on Engineer's estimate of construction cost): $0-10,000 2,428.00 $10,001 -50,000 2,791.00 $50,001 -100,000 3,213.00 $100,001 -250,000 $250,001 -500,000 3,700.005,146.00 $500,001 -1.0 Million 6,711.00 Each additional$500,000(over$1 M) 2,066.00 Additional Review Public Improvement Plan-Plan Check-After 3(based on Engineer's estimate of construction cost): $0-10,000 589.00 $10,001 -50,000 661.00 $50,001 -100,000 734.00 $100,001 -250,000 878.00 $250,001 -500,000 1,162.00 $500,001 -1.0 Million 2,018.00 Each additional$500,000(over$1 M) 855.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 ENGINEERING Fee Description FY 2017-18 Fee Grading/Drainage/Erosion Plan Review: 0-50cY $ 1,203.00 50 cy to 100 cy 1,291.00 100 cyto 1,0000 cy 1,458.00 1,000 cy to 10,000 cy 1,625.00 10,000 cy to 100,000 cy 1,791.00 Hydraulic/Hydrology Report Review 755.00 SWPPP Review 755.00 Stormwater Control Plan Review 755.00 Inspection Agreement, including Subdivision Agreement(based on Engineer's estimate of construction cost): $0-10,000 $10,001 -50,000 704.001 $50,001 -100,000 ,505.00 3 $100,001 -250,000 6,996.00 6,996.00 $250,001 -500,000 $500,001 -1.0 Million 6,4407.00 26,107.00 Each additional$500,000(over$1M) 12 710.00 Major Project with a Contract Engineer-Actual cost of Contractor passed directly through to Applicant Major Project with a Contract Engineer-City Project Management and Administrative Charge 1,215.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 COMMUNITY DEVELOPMENT Fee Description FY 2017-18 Fee COPY FEES Development Code w/out Appendices $ 50.00 Appendix 1 15.00 Appendix 2 5.00 Development Code w/Appendices 70.00 General Plan 25.00 Housing Element 2003 35.00 General Plan EIR 12.00 Design Guidelines for Historic Districts 25.00 Design Guidelines for Traffic Way/Station Way 6.00 Design Guidelines for Mixed Use Districts 30.00 East Grand Avenue Enhancement Plan 20.00 Land Use Map and Zoning Maps(each) 24 x 36 3.00 36 x 48 4.00 DVD(Planning Commission meetings) Vendor cost Audio recording copies 5.00 Copies,per page(Black and White) 0.20 Color copies Actual cost Arroyo Grande Bike Plan 26.00 IN-LIEU FEES Downtown Parking in lieu fee(per resolution 3994) 24,000.00 PROCESSING FEES Notary(per signature) 15.00 Annexation-deposit(fee based on actual time at staff at hourly rates) 20,000.00 Time and Materials(if project exceeds 50 hours of staff time) Appeals: CD Director to Planning Commission 371.00 Planning Commission to City Council 879.00 Certificate of Compliance 2,656.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 COMMUNITY DEVELOPMENT Fee Description FY 2017-18 Fee Conditional Use Permit: Project-Major(multi building) 10,849.00 Time and Materials(if project exceeds 50 hours of staff time) Project-Minor(routine)-as det'd by CDD 4,697.00 Amendment 2,372.00 Development Agreement-deposit $ 18,165.00 Time and Materials(if project exceeds 50 hours of staff time) Dev.Code Amendment-Major 12,240.00 Time and Materials(if project exceeds 50 hours of staff time) Dev.Code Amendment-Minor 6,730.00 Environmental Impact Determination: Initial Study Fee 2,580.00 Negative Declaration 419.00 Mitigated Neg Dec 1,753.00 General Plan Amendment(Major) 12,240.00 Time and Materials(if project exceeds 50 hours of staff time) General Plan Amendment(Minor) 6,730.00 Home Occupation Permit 125.00 Lot Line Adjustment 2,515.00 Lot Merger/Reversion to Acreage 2,475.00 Mailing Label Production 307.00 Request for Meeting Continuance 349.00 Minor Use Permit-Architectural Review Major(e.g. subdivision if PUD or CUP is not concurrently processed) 3,890.00 Minor(e.g. single lot) 698.00 Minor Use Permit-Historic Resource Designation 1,113.00 Minor Use Permit-Large Family Day Care 424.00 Minor Use Permit-Minor Exception 756.00 Minor Use Permit-Plot Plan Review 556.00 Minor Use Permit-Temporary Use Permit 223.00 Minor Use Permit-Viewshed Review: 855.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 COMMUNITY DEVELOPMENT Fee Description FY 2017-18 Fee Planned Unit Development Permit(Major) 11,539.00 Time and Materials(if project exceeds 50 hours of staff time) Planned Unit Development Permit(Minor) 5,521.00 Planning Commission Interpretation or Waiver 1,369.00 Pre-Application 929.00 Public Art Permit 701.00 Research(deposit) 167.00 Signs: Planned Sign Program 1,808.00 Administrative Sign Permit 259.00 Administrative Sign Program 1,018.00 Specific Plan or Amendment(deposit) 18,130.00 Time and Materials(if project exceeds 50 hours of staff time) Tentative Parcel Map(0-4 lots) $ 7,211 00 with Vesting (added to base fee) 447.00 Amendment 3,493.00 Tentative Tract Map: 5-20 lots 11,849.00 over 20 lots 13,754.00 with Vesting(added to base fee) 1,161.00 Amendment 5,202.00 Time Extension 1,942.00 Variance 2,747.00 Zoning Compliance Letter 111.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 POLICE Fee Description I FY 2017-18 Fee ANIMAL CONTROL/IMPOUND Dog Impound Fee 1st Impound $ 21.00 2nd Impound 43.00 3rd Impound+ 64.00 Cat Impound Fee 1st Impound 21.00 2nd Impound 43.00 3rd Impound+ 64.00 PERMITS&LICENSES: Alarm Permit Original Application Permit Processing Fee 101.00 Annual Renewal Permit Processing Fee 48.00 False Alarm Response Fourth False Alarm within 12 months 159.00 Fifth False Alarm within 12 months 319.00 Sixth or more false alarm within 12 months(per incident) 478.00 Block Party Permit Block Party Permit 27.00 Commercial Filming/Still Photography Permit Permit Processing Fee 53.00 Commercial Filming(per day) 266.00 Still Photography(per day) 106.00 City Staff Assigned-4 hour minimum (if applicable) overtime rate Concealed Weapons Permit Original Application Police Department Investigation Fee 106.00 Dept of Justice&FBI fingerprint process(DOJ passthrough fee paid by applicant) actual cost Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 Identification Card 21.00 Concealed Weapons Permit Biennial Renewal: Police Department Investigation Fee 27.00 Identification Card 21.00 Medical Marijuana Delivery Service License Application Processing Fee 638.00 Background Investigation Fees 98.00 ID Card/Vehicle Permit Fee 32.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 Dept of Justice&FBI Fingerprint Process actual cost Medical Marijuana Delivery Service License Renewal Application Processing Fee 531.00 Background Investigation Fees 37.00 ID Card/Vehicle Permit Fee 32.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 POLICE Fee Description I FY 2017-18 Fee Medical Marijuana Delivery Driver Permit Application Processing Fee $ 638.00 Background Investigation Fees 98.00 ID Card/Vehicle Permit Fee 32.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 Dept of Justice&FBI Fingerprint Process actual cost Medical Marijuana Delivery Driver Permit Renewal Application Processing Fee 531.00 Background Investigation Fees 98.00 ID Card/Vehicle Permit Fee 32.00 Mobile Vendor Permit Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 Dept of Justice&FBI Fingerprint Process actual cost Mobile Vendor Employee Permit Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 Dept of Justice&FBI Fingerprint Process actual cost Palmreader Fortune Teller Permit-Original Application Permit Processing Fee 133.00 Dept of Justice&FBI fingerprint process(DOJ passthrough fee paid by applicant) actual cost Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 Palmreader Fortune Teller Permit-Annual Renewal Permit Renewal Processing 106.00 Palmreader Fortune Teller Establishment Permit-Original Application Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 Dept of Justice&FBI fingerprint process(DOJ passthrough fee paid by applicant) actual cost Palmreader Fortune Teller Establishment Permit-Renewal Application Permit Processing Fee 106.00 Public Safety and Welfare Permit: Less than 200 Non-Commercial Event 53.00 More than 200 Non-Commercial Event 106.00 Commercial Event 133.00 Second Hand Dealer Permit Original Application Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 Dept of Justice&FBI Fingerprint process(DOJ passthrough fee paid by applicant) actual cost Second Hand Dealer Permit Biennial Renewal City Processing Fee 106.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 POLICE IFee Description I FY 2017-18 Feel Solicitation Permit(per solicitor) Permit Processing Fee 133.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 Dept of Justice&FBI Fingerprint Processing Fee actual cost Taxi Cab Driver Permit Original Application Permit Processing Fee $ 133.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 Dept of Justice&FBI Fingerprint Process actual cost Taxi Cab Driver Permit Annual Renewal Annual Renewal 106.00 Tobacco Retailers License Permit Processing Fee 133.00 OTHER FEES Citation correction certification 27.00 Civil Witness Fee(Deposit) 275.00 Copies, per page(Black and White) .20 per page Copies-Color copies per page 5.00 Court Ordered Booking 133.00 Criminal history summary examination Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 Dept of Justice&FBI Fingerprint Process actual cost Disturbance 415PC Second Response 159.00 Third Response 319.00 Fourth Response 531.00 Emergency DUI Response-Impaired Driver Accident -Actual Time @ Staff Hourly Rates actual cost Local Records Check 16.00 Photographs per disc 25.00 Property Handling for Mailing/Shipping actual cost Replacement of lost/stolen Permits, Licenses and registration receipts 48.00 Repossessed Vehicle 16.00 Subpoena Duces Tecum Actual staff time billed at hourly rate to produce records actual cost .20 per page produced actual cost postage/shipping actual cost Custodian of Records Court Appearance $275 Vehicle Release-Impound/Stored Vehicle Release 53.00 Vehicle Release 30-day Impound Release Review 80.00 Clearance letter 48.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MISC Recovery Rate 100%of Cost Plan Check Fee Inspection Fee Fee Description FY 17-18 FY 17-18 Cellular/Mobile Phone,free-standing NEW $ 1,048.00 $ 1,493.00 Cellular Tower with Equipment Shelter 1,048.00 1,674.00 Cellular Tower Equipment Demolition 403.00 421.00 Awning(not patio cover)Tents/Canopies/Booths 109.00 164.00 Change of Occupancy No T.I.w/plan check&Inspection 183.00 333.00 Close Existing Openings 109.00 223.00 Compliance Inspections/Reinspections 203.00 274.00 Deck(with Calcs) 235.00 293.00 Demolition 109.00 344.00 Demolition-MultiFamily/Commercial 109.00 344.00 Door 109.00 236.00 Fence or Wall(wood, chain link,wrought iron): >6 feet in height, 1st 100 s.f. 109.00 301.00 Each additional 100 sf 83.00 109.00 Fence or Freestanding Wall(masonry/garden): City Standard, 1st 100 s.f. 109.00 301.00 Each additional 100 sf 83.00 109.00 Engineered Wall, 1st 100 sf 141.00 301.00 Each additional 100 sf 115.00 109.00 Fireplace(masonry or pre-fab) 109.00 217.00 Flag pole(greater than 6 feet in height) 109.00 217.00 Grading(Cut and Fill): 0-50 Cubic Yards (Cut and Fill) 141.00 217.00 Each Add'I 50 CY(or portion thereof) 69.00 164.00 Pilaster each 10 109.00 217.00 Lighting pole(each) 109.00 185.00 Stucco Applications 68.00 217.00 Retaining Wall(concrete or masonry): First 50 sf 224.00 249.00 Each additional 50 sf 198.00 141.00 Re-roofing: Composition-no tear off 89.00 210.00 Other roofs(first 10 squares) 89.00 210.00 Each additional 10 squares 21.00 51.00 Roof Structure Replacement 141.00 249.00 Sauna-steam 109.00 261.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MISC Recovery Rate 100%of Cost Plan Check Fee Inspection Fee Fee Description FY 17-18 FY 17-18 Siding: Stone and Brick Veneer(interior or exterior) $ 89.00 $ 261.00 All Other 68.00 261.00 Signs: Directional/Menu 224.00 261.00 Freeway sign 515.00 287.00 Ground/Roof/Projecting Signs 214.00 249.00 Wall, Illuminated 89.00 261.00 Skylight(Residential each) 68.00 230.00 Skylight(Commercial)one 89.00 230.00 Spa or Hot Tub(Pre-fabricated) 89.00 261.00 Stairs-per story 328.00 249.00 Storage Racks each set of plans 380.00 312.00 Temporary Utility Connection or Occupancy - 89.00 Window or Sliding Glass Door(first) 224.00 249.00 Each additional 198.00 116.00 Board of Appeals 844.00 - Business License Inspection 43.00 65.00 Business License Re-inspection 43.00 34.00 Product Review 634.00 - Disabled Access Compliance Inspection 126.00 84.00 Supplemental Plan Check Fee(first 1/2 hour) 115.00 - Each Additional 1/2 hour(or portion thereof) 104.00 - Supplemental Inspection Fee(first 1/2 hour) - 115.00 Each Additional 1/2 hour(or portion thereof) - 104.00 Emergency(Non-Scheduled)Call-Out Fee(first hour)2 hour minimum - 219.00 Emergency(Non-Scheduled)Call-Out Fee(each additional hour) - 208.00 After Hours Inspection 2 hour minimum - 219.00 Each additional hour - 208.00 After Hours Plan Review 2 hour minimum 219.00 - Each additional hour 208.00 - Copies, per page(Black and White) .20 per page Color copies actual costs EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING FIRE Recovery Rate 100%of Cost Plan Check Fee Inspection Fee Fee Description FY 17-18 FY 17-18 Fire Sprinkler Systems-New Construction: 1-50 Heads $ 209.00 $ 228.00 51-100 Heads 261.00 324.00 101-200 Heads 471.00 388.00 Every 200 Heads above 200 208.00 149.00 Fire Sprinkler Systems-Tenant Improvements: 1-25 Heads 209.00 228.00 26-100 Heads 315.00 356.00 Every 100 Heads above 100 104.00 239.00 Fire Alarm System (including Sprinkler Monitor System)-New Construction: 1-50 Devices 209.00 228.00 51-100 Devices 261.00 324.00 Every 50 Devices above 100 104.00 214.00 Fire Alarm System (including Sprinkler Monitor System)-Tenant Improvements: 1-50 Devices 209.00 260.00 51-100 Devices 261.00 356.00 Every 50 Devices above 100 157.00 214.00 Other Suppression Systems: Inert Gas Systems 366.00 457.00 Dry Chemical Systems 209.00 457.00 Wet Chemical/Kitchen Hood 313.00 457.00 Foam Systems 209.00 625.00 Paint Spray Booth 470.00 678.00 Other Fire Fees: Hydrants/Underground Fire Service Plan Check 418.00 - Hydrant Flow Test(existing hydrants) - 625.00 Special Event Inspection(e.g.,fairs)These are group events,when multiple booths/tents are erected Booth/Tent 55.00 60.00 Booth/Tent with Electricity 80.00 98.00 Booth/Tent with Cooking (includes Electricity) 85.00 117.00 Special Event Application Review - 22.00 Additional Fire related services are provided by Five Cities Fire Authority(FCFA).See the FCFA fee schedule for fees. EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MPE Recovery Rate 100%of Cost Plan Check Fee Inspection Fee Fee Description FY 16-17 FY 16-17 ADMINISTRATIVE(BASE) FEES: Permit Issuance and Administration $ 107.00 $ - MECHANICAL PERMIT FEES - - FAU less than 100,000 Btu/h 52.00 64.00 FAU greater than 100,000 Btu/h 52.00 97.00 Floor furnace(including vent) 52.00 129.00 Suspended,wall, or floor-mounted heaters 52.00 97.00 Appliance vents not included in an appliance permit 52.00 97.00 Boiler or compressor,from 15 HP to 30 HP/ absorption system from 500,000 Btu/h to 1,000,000 Btu/h. 52.00 97.00 Boiler or compressor,from 30 HP to 50 HP,/ absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h. 104.00 129.00 Boiler or compressor, over 50 HP/ absorption system over 1,750,000 Btu/h. 156.00 97.00 Air-handling unit, including attached ducts. 104.00 97.00 Air-handling unit over 10,000 CFM 156.00 129.00 Evaporative cooler 52.00 64.00 Ventilation fan connected to a single duct 104.00 97.00 Ventilation system(not a portion of heating or a/c system) 156.00 129.00 Incinerator, residential 260.00 192.00 Commercial or Industrial-type incinerator 312.00 192.00 Misc.appliances or equipment. 156.00 129.00 Stand Alone Mechanical Plan Check(hourly rate) 208.00 - Other Mechanical Inspections(per hour) - 129.00 PLUMBING/GAS PERMIT FEES: Plumbing fixtures 52.00 64.00 Building sewer 104.00 97.00 Rainwater systems(per drain) 52.00 64.00 Gray Water system 156.00 160.00 Private sewage disposal system 156.00 160.00 Water Heater 104.00 64.00 Industrial waste pretreatment interceptor 52.00 97.00 Water piping and/or water treating equipment(each) 52.00 97.00 Repair or alteration of drainage or vent piping, each fixture 52.00 97.00 Each lawn sprinkler system on any one meter 52.00 64.00 Backflow devices each unit 104.00 64.00 Atmospheric-type vacuum breakers: 1-5 units 104.00 64.00 Atmospheric-type vacuum breakers:each unit over 5 units 104.00 64.00 Stand Alone Plumbing Plan Check(hourly rate) 208.00 - Other Plumbing and Gas Inspections(per hour) - 129.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MPE Recovery Rate 100%of Cost Plan Check Fee Inspection Fee Fee Description FY 16-17 FY 16-17 SYSTEM FEES: Swimming Pools $ 156.00 $ 224.00 • Outdoor Events 156.00 97.00 Electric generator and electrically-driven rides 104.00 97.00 Mechanically-driven rides/attractions with electrical lighting 156.00 97.00 Each system of area and booth lighting 104.00 97.00 Temporary Power Service 104.00 64.00 Temporary power pole 104.00 64.00 Sub poles(each) 52.00 45.00 UNIT FEES: Receptacle, Switch, and Lighting Outlets First 10 104.00 64.00 Each Additional 10 52.00 32.00 Lighting Fixtures: First 10 104.00 64.00 Each additional 10 52.00 32.00 Pole or platform-mounted lighting fixtures(each) 104.00 97.00 Theatrical-type lighting fixtures or assemblies(each) 104.00 129.00 Residential Appliances(each) 104.00 64.00 Nonresidential Appliances 156.00 129.00 Residential appliances and self-contained, nonresidential appliances, (each) 156.00 129.00 Appliances not exceeding one horsepower(HP) kilowatt(KW), or kilovolt-ampere(KVA), in rating,(each) 208.00 129.00 Power Apparatus: Motors, generators,transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus (all sizes) 156.00 64.00 Signs, Outline Lighting, and Marquees: Signs, Outline Lighting, or Marquees supplied from one branch circuit (each) 104.00 97.00 Additional branch circuits within the same sign, outline lighting system, or marquee(each) 104.00 64.00 Service or Panel: 200 amp or less Electrical Panel(each) 156.00 129.00 Over 200 amp up to 1000 amp Electrical Panel(each) 260.00 160.00 Over 1000 amp Electrical Panel(each) 416.00 192.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING MPE Recovery Rate 100%of Cost Plan Check Fee Inspection Fee Fee Description FY 16-17 FY 16-17 UNIT FEES(continued): Miscellaneous Apparatus, Conduits, and Conductors $ 104.00 $ 97.00 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth 104.00 129.00 Photovotaic Systems-each 156.00 192.00 Stand Alone Electrical Plan Check(hourly rate) 208.00 - Other Electrical Inspections(per hour) - 129.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional # Type Occupancy (square feet) 17-18 SF 2,000 $ 4,445 $0.200 8,000 $ 5,644 $0.269 1 A-1 Assembly Group-Theaters 20,000 $ 8,870 $0.291 40,000 $ 14,699 $0.195 100,000 $ 26,419 $0.264 1,000 $ 2,867 $0.230 4,000 $ 3,557 $0.312 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 $ 5,430 $0.338 20,000 $ 8,812 $0.227 50,000 $ 15,634 $0.313 250 $ 1,502 $0.315 1,000 $ 1,738 $0.382 3 A Assembly Group-TI 2,500 $ 2,310 $0.417 5,000 $ 3,353 $0.268 12,500 $ 5,366 $0.429 1,000 $ 2,867 $0.230 4,000 $ 3,557 $0.312 4 A-3 Church and Religious Bldg-Complete 10,000 $ 5,430 $0.338 20,000 $ 8,812 $0.227 50,000 $ 15,634 $0.313 500 $ 2,048 $0.278 2,000 $ 2,465 $0.364 5 R-4 Congregate Care-Complete 5,000 $ 3,558 $0.396 10,000 $ 5,537 $0.262 25,000 $ 9,473 $0.379 250 $ 1,502 $0.315 1,000 $ 1,738 $0.382 6 A-3 Church and Religious Bldg-TI 2,500 $ 2,310 $0.417 5,000 $ 3,353 $0.268 12,500 $ 5,366 $0.429 2,000 $ 3,458 $0.148 8,000 $ 4,345 $0.203 7 E Educational Building-Complete 20,000 $ 6,782 $0.220 40,000 $ 11,179 $0.148 100,000 $ 20,084 $0.201 250 $ 1,502 $0.315 1,000 $ 1,738 $0.382 8 E Educational Building-TI 2,500 $ 2,310 $0.417 5,000 $ 3,353 $0.268 12,500 $ 5,366 $0.429 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional Type Occupancy (square feet) 17-18 SF 500 $ 1,729 $0.208 2,000 $ 2,040 $0.264 9 S-2 Parking Garage-Complete 5,000 $ 2,831 $0.287 10,000 $ 4,264 $0.188 25,000 $ 7,078 $0.283 1,000 $ 2,867 $0.230 4,000 $ 3,557 $0.312 10 R-1 Hotel Low/Mid Rise-Complete 10,000 $ 5,430 $0.338 20,000 $ 8,812 $0.227 50,000 $ 15,634 $0.313 1,000 $ 1,684 $0.098 4,000 $ 1,980 $0.125 11 R-1 Hotel Low/Mid Rise-Shell 10,000 $ 2,727 $0.135 20,000 $ 4,081 $0.088 50,000 $ 6,735 $0.135 250 $ 1,456 $0.295 1,000 $ 1,677 $0.353 12 R-1 Hotel Low/Mid Rise-TI 2,500 $ 2,206 $0.386 5,000 $ 3,171 $0.247 12,500 $ 5,023 $0.402 500 $ 2,155 $0.295 2,000 $ 2,598 $0.373 13 B Offices, etc. -Complete 5,000 $ 3,718 $0.406 10,000 $ 5,750 $0.265 25,000 $ 9,731 $0.389 1,000 $ 1,479 $0.076 4,000 $ 1,707 $0.092 14 B Offices, etc. -Shell 10,000 $ 2,258 $0.100 20,000 $ 3,262 $0.064 50,000 $ 5,194 $0.104 100 $ 1,284 $0.542 400 $ 1,446 $0.609 15 B Offices, etc.-TI 1,000 $ 1,812 $0.668 2,000 $ 2,480 $0.414 5,000 $ 3,723 $0.745 1,000 $ 2,867 $0.230 4,000 $ 3,557 $0.312 16 F Industrial Building-Complete 10,000 $ 5,430 $0.338 20,000 $ 8,812 $0.227 50,000 $ 15,634 $0.313 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional # Type Occupancy (square feet) 17-18 SF 1,000 $ 1,956 $0.129 4,000 $ 2,344 $0.168 17 F Industrial Building-Shell 10,000 $ 3,351 $0.182 20,000 $ 5,173 $0.121 50,000 $ 8,789 $0.176 250 $ 1,456 $0.295 1,000 $ 1,677 $0.353 18 F Industrial Building-TI 2,500 $ 2,206 $0.386 5,000 $ 3,171 $0.247 12,500 $ 5,023 $0.402 500 $ 1,956 $0.259 2,000 $ 2,344 $0.335 19 S-1 Repair Garage&Service St-Complete 5,000 $ 3,351 $0.365 10,000 $ 5,173 $0.241 25,000 $ 8,789 $0.352 500 $ 1,366 $0.127 2,000 $ 1,556 $0.148 20 S-1 Repair Garage&Service St-Shell 5,000 $ 1,999 $0.162 10,000 $ 2,808 $0.102 25,000 $ 4,339 $0.174 100 $ 1,434 $0.708 400 $ 1,646 $0.848 21 S-1 Repair Garage&Service St-TI 1,000 $ 2,155 $0.926 2,000 $ 3,081 $0.591 5,000 $ 4,852 $0.970 500 $ 2,048 $0.278 2,000 $ 2,465 $0.364 22 M Retail Sales-Complete 5,000 $ 3,558 $0.396 10,000 $ 5,537 $0.262 25,000 $ 9,473 $0.379 500 $ 1,366 $0.127 2,000 $ 1,556 $0.148 23 M Retail Sales-Shell 5,000 $ 1,999 $0.162 10,000 $ 2,808 $0.102 25,000 $ 4,339 $0.174 100 $ 1,434 $0.708 400 $ 1,646 $0.848 24 M Retail Sales-TI 1,000 $ 2,155 $0.926 2,000 $ 3,081 $0.591 5,000 $ 4,852 $0.970 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost I PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional Type Occupancy (square feet) 17-18 SF 2,000 $ 1,956 $0.065 8,000 $ 2,344 $0.084 25 - Warehouse-Complete 20,000 $ 3,351 $0.091 40,000 $ 5,173 $0.060 100,000 $ 8,789 $0.088 1,000 $ 2,867 $0.230 4,000 $ 3,557 $0.312 26 I Medical24 Hour Care-Complete 10,000 $ 5,430 $0.338 20,000 $ 8,812 $0.227 50,000 $ 15,634 $0.313 1,000 $ 1,729 $0.104 4,000 $ 2,040 $0.132 27 I Medical24 Hour Care-Shell 10,000 $ 2,831 $0.143 20,000 $ 4,264 $0.094 50,000 $ 7,078 $0.142 100 $ 1,639 $0.935 400 $ 1,919 $1.173 28 I Medical/24Hour Care-TI 1,000 $ 2,623 $1.276 2,000 $ 3,899 $0.831 5,000 $ 6,393 $1.279 1,000 $ 2,867 $0.230 4,000 $ 3,557 $0.312 29 B Medical Offices-Complete 10,000 $ 5,430 $0.338 20,000 $ 8,812 $0.227 50,000 $ 15,634 $0.313 1,000 $ 1,729 $0.104 4,000 $ 2,040 $0.132 30 B Medical Offices-Shell 10,000 $ 2,831 $0.143 20,000 $ 4,264 $0.094 50,000 $ 7,078 $0.142 250 $ 1,639 $0.374 1,000 $ 1,919 $0.469 31 B Medical Offices-TI 2,500 $ 2,623 $0.511 5,000 $ 3,899 $0.333 12,500 $ 6,393 $0.511 500 $ 2,184 $0.309 2,000 $ 2,647 $0.408 32 - Restaurant-Complete 5,000 $ 3,870 $0.443 10,000 $ 6,083 $0.295 25,000 $ 10,501 $0.420 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost I PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional # Type Occupancy (square feet) 17-18 SF 500 $ 1,502 $0.157 2,000 $ 1,738 $0.191 33 - Restaurant-Shell 5,000 $ 2,310 $0.209 10,000 $ 3,353 $0.134 25,000 $ 5,366 $0.215 250 $ 1,388 $0.264 1,000 $ 1,586 $0.310 34 - Restaurant-TI 2,500 $ 2,051 $0.339 5,000 $ 2,898 $0.215 12,500 $ 4,510 $0.361 250 $ 1,912 $0.495 1,000 $ 2,283 $0.643 35 1-4 Day Care Facility-Complete 2,500 $ 3,247 $0.698 5,000 $ 4,992 $0.461 12,500 $ 8,446 $0.676 100 $ 1,639 $0.935 400 $ 1,919 $1.173 36 1-4 Day Care Facility-TI 1,000 $ 2,623 $1.276 2,000 $ 3,899 $0.831 5,000 $ 6,393 $1.279 500 $ 1,775 $0.218 2,000 $ 2,101 $0.278 37 H Hazardous H-Complete 5,000 $ 2,934 $0.302 10,000 $ 4,445 $0.198 25,000 $ 7,420 $0.297 500 $ 2,184 $0.309 2,000 $ 2,647 $0.408 38 H Hazardous H-Shell 5,000 $ 3,870 $0.443 10,000 $ 6,083 $0.295 25,000 $ 10,501 $0.420 100 $ 1,639 $0.935 400 $ 1,919 $1.173 39 H Hazardous H-T I 1,000 $ 2,623 $1.276 2,000 $ 3,899 $0.831 5,000 $ 6,393 $1.279 200 $ 1,274 $0.266 800 $ 1,434 $0.298 40 - Commercial Building-Foundation 2,000 $ 1,791 $0.326 4,000 $ 2,443 $0.202 10,000 $ 3,655 $0.365 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost I PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional # Type Occupancy (square feet) 17-18 SF 200 $ 1,320 $0.290 800 $ 1,494 $0.334 41 - Commercial Building-Addition 2,000 $ 1,895 $0.366 4,000 $ 2,626 $0.228 10,000 $ 3,997 $0.400 1,000 $ 2,867 $0.230 4,000 $ 3,557 $0.312 42 R-2 Apartment Building 10,000 $ 5,430 $0.338 20,000 $ 8,812 $0.227 50,000 $ 15,634 $0.313 1,000 $ 2,310 $0.131 2,000 $ 2,441 $0.676 43 R-3 Single-Family(custom or model) 3,000 $ 3,117 $0.353 5,000 $ 3,823 $0.500 7,500 $ 5,073 $0.676 667 $ 1,358 $0.077 1,333 $ 1,409 $0.260 44 R-3 Single-Family-Production/Repeat 2,000 $ 1,582 $0.202 3,333 $ 1,852 $0.235 5,000 $ 2,244 $0.449 333 $ 1,294 $0.137 667 $ 1,340 $0.418 45 R-3 Moved Building-Residential 1,000 $ 1,479 $0.360 1,667 $ 1,719 $0.400 2,500 $ 2,053 $0.821 800 $ 1,179 $0.046 1,600 $ 1,216 $0.094 46 R-3 Manufactured Home-Complete 2,400 $ 1,291 $0.118 4,000 $ 1,479 $0.114 6,000 $ 1,707 $0.284 667 $ 1,179 $0.056 1,333 $ 1,216 $0.113 47 R-3 Prefabricated Dwelling-Complete 2,000 $ 1,291 $0.141 3,333 $ 1,479 $0.136 5,000 $ 1,707 $0.341 120 $ 1,033 $0.221 480 $ 1,113 $0.176 48 - Commercial Coach-Complete 1,200 $ 1,239 $0.200 2,400 $ 1,479 $0.100 6,000 $ 1,841 $0.307 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost I PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional Type Occupancy (square feet) 17-18 SF 240 $ 1,033 $0.111 960 $ 1,113 $0.088 49 - Modular Building-Complete 2,400 $ 1,239 $0.100 4,800 $ 1,479 $0.050 12,000 $ 1,841 $0.153 500 $ 1,056 $0.057 2,000 $ 1,142 $0.050 50 - Manufactured Building-Foundation 5,000 $ 1,291 $0.056 10,000 $ 1,570 $0.029 25,000 $ 2,012 $0.080 167 $ 1,179 $0.223 333 $ 1,216 $0.453 51 U Residential Garage 500 $ 1,291 $0.564_ 833 $ 1,479 $0.546 1,250 $ 1,707 $1.365 40 $ 1,092 $0.824 160 $ 1,191 $0.766 52 U Pool/Spa-Standard Plan 400 $ 1,375 $0.850 800 $ 1,715 $0.476 2,000 $ 2,286 $1.143 200 $ 1,639 $0.468 800 $ 1,919 $0.586 53 - Commercial Building-Remodel 2,000 $ 2,623 $0.638 4,000 $ 3,899 $0.416 10,000 $ 6,393 $0.639 200 $ 1,593 $0.443 800 $ 1,859 $0.550 54 - Commercial Building-Repair 2,000 $ 2,519 $0.599 4,000 $ 3,717 $0.389 10,000 $ 6,051 $0.605 • 50 $ 1,074 $0.616 200 $ 1,167 $0.556 55 U Accessory Building-Commercial 500 $ 1,334 $0.618 1,000 $ 1,643 $0.337 2,500 $ 2,149 $0.860 50 $ 1,074 $0.616 200 $ 1,167 $0.556 56 U Commercial Carport 500 $ 1,334 $0.618 1,000 $ 1,643 $0.337 2,500 $ 2,149 $0.860 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional # Type Occupancy (square feet) 17-18 SF 167 $ 1,358 $0.306 333 $ 1,409 $1.039 57 R-3 Single-Family Residential-Addition 500 $ 1,582 $0.810 833 $ 1,852 $0.941 1,250 $ 2,244 $1.796 333 $ 1,550 $0.201 667 $ 1,617 $0.832 58 R-2 Multi-Family Residential-Addition 1,000 $ 1,895 $0.537 1,667 $ 2,253 $0.681 2,500 $ 2,820 $1.128 333 $ 1,166 $0.108 667 $ 1,202 $0.207 59 R-3 Single-Family Residential-Remodel 1,000 $ 1,271 $0.273 1,667 $ 1,453 $0.259 2,500 $ 1,668 $0.667 667 $ 1,301 $0.070 1,333 $ 1,348 $0.212 60 R-2 Multi-Family Residential-Remodel 2,000 $ 1,489 $0.183 3,333 $ 1,732 $0.204 5,000 $ 2,072 $0.414 333 $ 1,007 $0.067 667 $ 1,030 $0.268 61 R-3 Residential Building-Foundation 1,000 $ 1,119 $0.177 1,667 $ 1,237 $0.222 2,500 $ 1,422 $0.569 83 $ 969 $0.217 167 $ 987 $0.842 62 U Accessory Building-Residential 250 $ 1,057 $0.599 417 $ 1,157 $0.719 625 $ 1,307 $2.091 133 $ 969 $0.135 267 $ 987 $0.526 63 U Residential Carport 400 $ 1,057 $0.375 667 $ 1,157 $0.450 1,000 $ 1,307 $1.307 83 $ 969 $0.217 167 $ 987 $0.842 64 U Residential Patio Cover 250 $ 1,057 $0.599 417 $ 1,157 $0.719 625 $ 1,307 $2.091 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING PLAN CHECK Recovery Rate 100%of Cost PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION Note: All fees include MPE plan checks. CBC (ICC) Each Fee Use Size Basis Base Fee FY Additional # Type Occupancy (square feet) 17-18 SF 83 $ 1,097 $0.357 167 $ 1,126 $1.658 65 U Residential Balcony/Deck 250 $ 1,265 $0.950 417 $ 1,423 $1.285 625 $ 1,691 $2.705 83 $ 1,065 $0.319 167 $ 1,091 $1.454 66 U Residential Patio Enclosure 250 $ 1,213 $0.867 417 $ 1,357 $1.143 625 $ 1,595 $2.552 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF 2,000 $ 3,082 $0.377 8,000 $ 5,343 $0.327 1 A-1 Assembly Group-Theaters 20,000 $ 9,269 $0.281 40,000 $ 14,891 $0.318 100,000 $ 33,982 $0.340 1,000 $ 2,502 $0.594 4,000 $ 4,285 $0.617 2 A-2 Assembly Group: Restaurants, nightclubs 10,000 $ 7,986 $0.509 20,000 $ 13,074 $0.602 50,000 $ 31,137 $0.623 250 $ 678 $0.706 1,000 $ 1,207 $0.250 3 A Assembly Group-TI 2,500 $ 1,582 $0.275 5,000 $ 2,271 $0.245 12,500 $ 4,112 $0.329 1,000 $ 2,037 $0.467 4,000 $ 3,439 $0.587 4 A-3 Church and Religious Bldg-Complete 10,000 $ 6,961 $0.466 20,000 $ 11,622 $0.575 50,000 $ 28,861 $0.577 500 $ 1,307 $0.579 2,000 $ 2,175 $0.656 5 R-4 Congregate Care-Complete 5,000 $ 4,142 $0.504 10,000 $ 6,660 $0.658 25,000 $ 16,525 $0.661 250 $ 505 $0.514 1,000 $ 891 $0.205 6 A-3 Church and Religious Bldg-TI 2,500 $ 1,199 $0.211 5,000 $ 1,726 $0.204 12,500 $ 3,257 $0.261 2,000 $ 3,024 $0.369 8,000 $ 5,237 $0.325 7 E Educational Building-Complete 20,000 $ 9,140 $0.278 40,000 $ 14,709 $0.316 100,000 $ 33,697 $0.337 250 $ 505 $0.514 1,000 $ 891 $0.205 8 E Educational Building-TI 2,500 $ 1,199 $0.211 5,000 $ 1,726 $0.204 12,500 $ 3,257 $0.261 EXHIBIT A BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF 500 $ 678 $0.353 2,000 $ 1,207 $0.125 9 S-2 Parking Garage-Complete 5,000 $ 1,582 $0.138 10,000 $ 2,271 $0.123 25,000 $ 4,112 $0.164 1,000 $ 2,037 $0.467 4,000 $ 3,439 $0.587 10 R-1 Hotel Low/Mid Rise-Complete 10,000 $ 6,961 $0.466 20,000 $ 11,622 $0.575 50,000 $ 28,861 $0.577 1,000 $ 725 $0.189 4,000 $ 1,292 $0.066 11 R-1 Hotel Low/Mid Rise-Shell 10,000 $ 1,685 $0.073 20,000 $ 2,417 $0.064 50,000 $ 4,339 $0.087 250 $ 505 $0.514 1,000 $ 891 $0.205 12 R-1 Hotel Low/Mid Rise-TI 2,500 $ 1,199 $0.211 5,000 $ 1,726 $0.204 12,500 $ 3,257 $0.261 500 $ 2,270 $1.160 2,000 $ 4,010 $0.744 13 B Offices, etc.-Complete 5,000 $ 6,242 $0.698 10,000 $ 9,733 $0.717 25,000 $ 20,481 $0.819 1,000 $ 411 $0.103 4,000 $ 721 $0.045 14 B Offices, etc. -Shell 10,000 $ 993 $0.044 20,000 $ 1,436 $0.046 50,000 $ 2,802 $0.056 100 $ 299 $0.719 400 $ 514 $0.381 15 B Offices, etc. -TI 1,000 $ 743 $0.339 2,000 $ 1,082 $0.389 5,000 $ 2,248 $0.450 1,000 $ 1,980 $0.451 4,000 $ 3,334 $0.583 16 F Industrial Building-Complete 10,000 $ 6,832 $0.461 20,000 $ 11,440 $0.571 50,000 $ 28,576 $0.572 1,000 $ 478 $0.121 4,000 $ 843 $0.050 17 F Industrial Building-Shell 10,000 $ 1,140 $0.050 20,000 $ 1,645 $0.049 50,000 $ 3,130 $0.063 EXHIBIT A BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF 250 $ 652 $0.677 1,000 $ 1,160 $0.243 18 F Industrial Building-TI 2,500 $ 1,525 $0.266 5,000 $ 2,189 $0.239 12,500 $ 3,983 $0.319 500 $ 960 $0.388 2,000 $ 1,541 $0.611 19 S-1 Repair Garage&Service St-Complete 5,000 $ 3,373 $0.440 10,000 $ 5,571 $0.617 _ 25,000 $ 14,818 $0.593 500 $ 450 $0.227 2,000 $ 790 $0.096 20 S-1 Repair Garage&Service St-Shell 5,000 $ 1,077 $0.095 10,000 $ 1,554 $0.096 25,000 $ 2,987 $0.119 100 $ 299 $0.719 400 $ 514 $0.381 21 S-1 Repair Garage&Service St-TI 1,000 $ 743 $0.339 2,000 $ 1,082 $0.389 5,000 $ 2,248 $0.450 500 $ 1,047 $0.435 2,000 $ 1,699 $0.622 22 M Retail Sales-Complete 5,000 $ 3,565 $0.455 10,000 $ 5,843 $0.627 25,000 $ 15,244 $0.610 500 $ 550 $0.283 2,000 $ 974 $0.109 23 M Retail Sales-Shell 5,000 $ 1,301 $0.114 10,000 $ 1,871 $0.108 25,000 _ $ 3,486 $0.139 100 $ 299 $0.719 400 $ 514 $0.381 24 M Retail Sales-TI 1,000 $ 743 $0.339 2,000 $ 1,082 $0.389 5,000 $ 2,248 $0.450 2,000 $ 2,700 $0.335 8,000 $ 4,713 $0.209 25 - Warehouse-Complete 20,000 $ 7,220 $0.190 40,000 $ 11,018 $0.206 100,000 $ 23,354 $0.234 1,000 $ 2,037 $0.467 4,000 $ 3,439 $0.587 26 I Medica1/24 Hour Care-Complete 10,000 $ 6,961 $0.466 20,000 $ 11,622 $0.575 50,000 $ 28,861 $0.577 EXHIBIT A BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF 1,000 $ 507 $0.130 4,000 $ 896 $0.052 27 I MedicaI24 Hour Care-Shell 10,000 $ 1,205 $0.053 20,000 $ 1,735 $0.051 50,000 $ 3,272 $0.065 100 $ 269 $0.645 400 $ 462 $0.361 28 I Medical/24Hour Care-Tl 1,000 $ 679 $0.311 2,000 $ 990 $0.372 5,000 $ 2,105 $0.421 1,000 $ 2,037 $0.467 4,000 $ 3,439 $0.587 29 B Medical Offices-Complete 10,000 $ 6,961 $0.466 20,000 $ 11,622 $0.575 50,000 $ 28,861 $0.577 1,000 $ 522 $0.134 4,000 $ 922 $0.052 30 B Medical Offices-Shell 10,000 $ 1,237 $0.054 20,000 $ 1,781 $0.052 50,000 $ 3,343 $0.067 250 $ 681 $0.708 1,000 $ 1,213 $0.252 31 B Medical Offices-TI 2,500 $ 1,590 $0.276 5,000 $ 2,281 $0.246 12,500 $ 4,125 $0.330 500 $ 1,047 $0.435 2,000 $ 1,699 $0.622 32 - Restaurant-Complete 5,000 $ 3,565 $0.455 10,000 $ 5,843 $0.627 25,000 $ 15,244 $0.610 500 $ 463 $0.235 2,000 $ 816 $0.097 33 - Restaurant-Shell 5,000 $ 1,108 $0.098 10,000 $ 1,599 $0.097 25,000 $ 3,058 $0.122 250 $ 681 $0.708 1,000 $ 1,213 $0.252 34 - Restaurant-TI 2,500 $ 1,590 $0.276 5,000 $ 2,281 $0.246 12,500 $ 4,125 $0.330 I I 250 $ 1,047 $0.870 1,000 $ 1,699 $1.244 35 1-4 Day Care Facility-Complete 2,500 $ 3,565 $0.911 5,000 $ 5,843 $1.254 12,500 $ 15,244 $1.220 EXHIBIT A BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF TIJ $ 240 $0.563 400 $ 409 $0.342 36 1-4 Day Care Facility-TI 1,000 $ 614 $0.286 2,000 $ 900 $0.354 5,000 $ 1,963 $0.393 500 $ 1,047 $0.435 2,000 $ 1,699 $0.622 37 H Hazardous H-Complete 5,000 $ 3,565 $0.455 10,000 $ 5,843 $0.627 25,000 $ 15,244 $0.610 500 $ 435 $0.219 2,000 $ 763 $0.094 38 H Hazardous H-Shell 5,000 $ 1,045 $0.093 10,000 $ 1,508 $0.094 25,000 $ 2,916 $0.117 100 $ 240 $0.563 400 $ 409 $0.342 39 H Hazardous H-T I 1,000 $ 614 $0.286 2,000 $ 900 $0.354 5,000 $ 1,963 $0.393 200 $ 240 $0.282 800 $ 409 $0.171 40 - Commercial Building-Foundation 2,000 $ 614 $0.143 4,000 $ 900 $0.177 10,000 $ 1,963 $0.196 200 $ 269 $0.322 800 $ 462 $0.181 41 - Commercial Building-Addition 2,000 $ 679 $0.156 4,000 $ 990 $0.186 10,000 $ 2,105 $0.211 1,000 $ 1,954 $0.483 4,000 $ 3,404 $0.555 42 R-2 Apartment Building 10,000 $ 6,736 $0.471 20,000 $ 11,451 $0.529 50,000 $ 27,332 $0.547 1,000 $ 1,779 $1.058 2,000 $ 2,837 $1.081 43 R-3 Single-Family(custom or model) 3,000 $ 3,918 $0.969 5,000 $ 5,855 $0.792 7,500 $ 7,836 $1.045 667 $ 1,120 $0.940 1,333 $ 1,747 $0.918 44 R-3 Single-Family-Production/Repeat 2,000 $ 2,359 $0.789 3,333 $ 3,411 $0.727 5,000 $ 4,623 $0.925 EXHIBIT A BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF 333 $ 193 $0.363 667 $ 315 $0.383 45 R-3 Moved Building-Residential 1,000 $ 442 $0.346 1,667 $ 673 $0.265 2,500 $ 894 $0.357 800 147 $0.121 1,600 $ 243 $0.128 46 R-3 Manufactured Home-Complete 2,400 $ 345 $0.119 4,000 $ 536 $0.086 6,000 $ 707 $0.118 667 $ 147 $0.145 1,333 $ 243 $0.153 47 R-3 Prefabricated Dwelling-Complete 2,000 $ 345 $0.143 3,333 $ 536 $0.103 5,000 $ 707 $0.141 120 ' $ 118 $0.192 480 $ 187 $0.220 48 - Commercial Coach-Complete 1,200 $ 345 $0.144 2,400 $ 519 $0.235 6,000 $ 1,366 $0.228 240 $ 118 $0.096 960 $ 187 $0.110 49 - Modular Building-Complete 2,400 $ 345 $0.072 4,800 $ 519 $0.118 12,000 $ 1,366 $0.114 500 $ 118 $0.046 2,000 $ 187 $0.053 50 - Manufactured Building-Foundation 5,000 $ 345 $0.035 10,000 $ 519 $0.056 25,000 $ 1,366 $0.055 167 $ 237 $0.867 333 $ 382 $0.899 51 U Residential Garage 500 $ 531 $0.810 833 $ 801 $0.640 1,250 $ 1,068 $0.854 40 $ 228 $1.328 160 $ 388 $0.837 52 U Pool/Spa-Standard Plan 400 $ 589 $0.688 800 $ 864 $0.869 2,000 $ 1,906 $0.953 200 $ 446 0.563 800 $ 784 $0.238 53 - Commercial Building-Remodel 2,000 $ 1,070 $0.238 4,000 $ 1,545 $0.238 10,000 $ 2,973 $0.297 EXHIBIT A BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF 200 $ 446 $0.563 800 $ 784 $0.238 54 - Commercial Building-Repair 2,000 $ 1,070 $0.238 4,000 $ 1,545 $0.238 10,000 $ 2,973 $0.297 50 $ 141 $0.588 200 $ 230 $0.556 55 U Accessory Building-Commercial 500 $ 396 $0.391 1,000 $ 592 $0.592 2,500 $ 1,479 $0.592 50 $ 173 $0.758 200 $ 287 $0.602 56 U Commercial Carport 500 $ 468 $0.448 1,000 $ 692 $0.629 2,500 $ 1,635 $0.654 167 $ 284 $1.020 333 $ 454 $1.046 57 R-3 Single-Family Residential-Addition 500 $ 628 $0.931 833 $ 938 $0.760 1,250 $ 1,255 $1.004 333 $ 748 $1.272 667 $ 1,172 $1.253 58 R-2 Multi-Family Residential-Addition 1,000 $ 1,590 $1.084 1,667 $ 2,312 $0.977 2,500 $ 3,126 $1.251 333 $ 268 $0.488 667 $ 430 $0.494 59 R-3 Single-Family Residential-Remodel 1,000 $ 595 $0.446 1,667 $ 893 $0.361 2,500 $ 1,193 $0.477 667 $ 386 $0.340 1,333 $ 612 $0.341 60 R-2 Multi-Family Residential-Remodel 2,000 $ 840 $0.300 3,333 $ 1,240 $0.256 5,000 $ 1,667 $0.333 333 $ 237 $0.434 667 $ 382 $0.450 61 R-3 Residential Building-Foundation 1,000 $ 531 $0.405 1,667 $ 801 $0.320 2,500— $ 1,068 $0.427 83 $ 163 $1.250 167 $ 267 $1.326 62 U Accessory Building-Residential 250 $ 377 $1.224 417 $ 581 $0.903 625 $ 769 $1.231 EXHIBIT A BUILDING INSPECTION Recovery Rate 100%of Cost INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Size Basis Each Fee Use (square Base Fee FY Additional # Type Occupancy feet) 17-18 SF 133 $ 147 $0.725 267 $ 243 $0.765 63 U Residential Carport 400 $ 345 $0.713 667 $ 536 $0.513 1,000 $ 707 $0.707 83 $ 147 $1.160 167 $ 243 $1.224 64 U Residential Patio Cover 250 $ 345 $1.141 417 $ 536 $0.821 _ 625 $ 707 $1.131 83 $ 147 $1.160 167 $ 243 $1.224 65 U Residential Balcony/Deck 250 $ 345 $1.141 417 $ 536 $0.821 625 $ 707 $1.131 83 $ 147 $1.160 167 $ 243 $1.224 66 U Residential Patio Enclosure 250 $ 345 $1.141 417 $ 536 $0.821 625 $ 707 $1.131 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Fee Description FY 2017-18 Copies,per page(Black and White) $ 0.20 Park Facility Use Fees: Strother Park-Large Barbecue per use 80.00 Strother Park-Security Deposit per use 30.00 Strother Park-Small Barbecue per use 45.00 Strother Park-Wedding Reception per use 165.00 Strother Park-Security 1,2,3 per use 75.00 Elm Street Park-Barbecue per use 80.00 Elm Street Park-Security Deposit per use 30.00 Rancho Grande Park-Large BBQ per use 80.00 Rancho Grande Park-Small BBQ (areas 2 and 3) per use 45.00 Strother Park Deposit per use 30.00 Kingo Park per use 45.00 Kingo Park Deposit per use 30.00 Rotary Bandstand Fees: Rent per use 80.00 Deposit per use 30.00 Soto Sports Complex Use Fees: Campbell Field Rental Fee per hour 16.00 Campbell Field Rental Fee(with lights) per hour 37.00 Pilg Field Rental Fee per hour 16.00 Pilg Field Rental Fee(with lights) per hour 37.00 Santos Field Rental Fee per hour 16.00 Volunteer Field Rental Fee per hour 16.00 Volunteer Field with Lights Rental per hour 37.00 Ikeda Field Rental per hour 16.00 Ikeda Field with Lights Rental per hour 37.00 Porter Field Rental Fee per hour 21.00 Porter Field with Lights Rental per hour 43.00 Tennis Court Rental-1 court per hour 11.00 Tennis Courts-4 courts per day 106.00 Pickleball Club-Annual Fee 100.00 Food Booth Rental Fee(Soto) per day 40.00 Food Vendor Space Rental Fee 10%of Gross Meeting Room Rental Fee(Jaycee room) per day 21.00 Field Prep Fees(except Porter) per prep 21.00 Field Prep Fees-Porter per prep 37.00 Tournament Sch. &Coordination Fee per tournament 69.00 Tournament cleaning/security Deposit 276.00 Tournament Staff Attendant per hour 16.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Fee Description FY 2017-18 Soto Sports Complex Use Fees-APPROVED YOUTH GROUPS: Field Rental(practice and league games)-each field per hour 2.00 Concession Stand Fee-Buildings per hour 5.00 Concession Stand Fee-Mobile per hour 3.00 Non-resident-per participant 2.00 Woman's Club Use Fees: Non-Resident Fee 53.00 Partial day rental-Mon-Fri per hour 53.00 Full day rental-Friday, Saturday,or Sunday 584.00 Second day rental-Friday, Saturday or Sunday 292.00 Security Deposit(No Alcohol/No Band) 400.00 Security Deposit(with Alcohol) 1,000.00 Building Supervision Fee per hour 16.00 Rental Fee(on-going users): Non-profit groups/Service clubs/Youth groups: (20 or less attendees) per hour 3.00 (21 -50 attendees) n 4.00 (51 or more attendees) 5.00 Groups with reciprocal services 3.00 Private groups or clubs: per hour (20 or less attendees) 9.00 (21 -50 attendees) 10.00 (51 or more attendees) 11.00 Groups with reciprocal services 5.00 Custodial Fee(special event rentals only) 100.00 Reservation Cancellation Fees: If cancelled 30 days or more ahead of event 100.00 If cancelled less than 30 days ahead of event 200.00 Amenities Fees: Chairs per chair $ 0.25 Tables per table 1.00 Community Garden Deposit 25.00 Community Garden Plot per 6 months 36.00 Elm Street Community Center Use Fees: Rental Fee per hour 32.00 Rental Fee-full day per day 186.00 Building Supervision Fee per hour 16.00 Security deposit 150.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Fee Description FY 2017-18 Adult Sport League Fees: Adult Softball 460.00 Adult Basketball 390.00 Non-Resident Fee 8.00 Seasonal Playground Programs: Annual Registration Fee per child 15.00 Playground-Elm Street(Winter/Spring/Summer) per day 24.00 half day 12.00 Late pickup(after 4:15) 10.00 Pre-School Fees: Annual Registration Fee per child 15.00 Play&Leam-Tues&Thur. per hour 4.50 Play&Leam-Mon,Wed&Fri. 4.50 Kindergartens in Training 4.50 Summer Play&Learn 4.50 Late Pick-up Fees: First late pick-up per child 5.00 Second late pick-up 10.00 Third late pick-up n 20.00 Children In Motion Program: Children In Motion Annual Registration per child $ 25.00 Branch School-Mornings 5 Days Per Week per 4 wks 105.00 4 Days Per Week 90.00 3 Days Per Week n 72.00 2 Days Per Week n 51.00 Branch School-Afternoons 5 Days Per Week per 4 wks 192.50 4 Days Per Week 165.00 3 Days Per Week 132.00 2 Days Per Week 93.50 Extra Day-Branch School Morning per day 7.00 Afternoon 13.25 Late Start Monday per day 2.75 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Fee Description FY 2017-18 Children In Motion Fees(continued): Kindercare-Branch School 5 Days Per Week per 4 wks 210.00 4 Days Per Week 180.00 3 Days Per Week 144.00 2 Days Per Week 102.00 Extra Day per day 13.25 Ocean View School-Mornings 5 Days Per Week per 4 wks $ 105.00 4 Days Per Week 90.00 3 Days Per Week " 72.00 2 Days Per Week " 51.00 Ocean View School-Afternoons 5 Days Per Week per 4 wks 210.00 4 Days Per Week " 180.00 3 Days Per Week " 144.00 2 Days Per Week 102.00 Extra Day-Ocean View School Morning per day 7.00 Afternoon " 13.25 Late Start Monday per day 2.75 Elm Community Center-Mornings 5 Days Per Week per 4 wks 297.50 4 Days Per Week 255.00 3 Days Per Week " 204.00 2 Days Per Week 144.50 Elm Community Center-Afternoons Care Plan A 5 Days Per Week per 4 wks 210.00 4 Days Per Week 180.00 3 Days Per Week 144.00 2 Days Per Week 102.00 Elm Community Center-Afternoons Care Plan B 5 Days Per Week per 4 wks 402.50 4 Days Per Week 345.00 3 Days Per Week 276.00 2 Days Per Week 195.50 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 RECREATION SERVICES Fee Description FY 2017-18 Children In Motion Fees(continued): Extra Day-Elm Community Center Morning per day $ 16.00 Care Plan A(12:15 pm-3:15 pm) 13.50 Care Plan B(12:15 pm-6:00 pm) 25.75 Winter/Spring/Summer-Full Day 5 Days Per Week per week 160.00 4 Days Per Week 136.00 3 Days Per Week 108.00 Winter/Spring/Summer-Half Day per day 18.00 Minimum Days(teacher work day/early release) Regular day of attendance per day 10.50 Non-regular day of attendance " 18.50 Late Pick-up Fees: Children in Motion is open until 6:00 pm.Additional fees apply for children picked up after 6:00 Pickup 6:01 -6:10 pm per child 10.00 Pickup 6:11 -6:20 pm 20.00 Pickup 6:21 -6:30 pm 30.00 Pickup after 6:31 " 60.00 EXHIBIT A City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2017-18 PUBLIC WORKS SERVICES IFee Description FY 2017-18 I LABOR COSTS(per hour): DURING REGULAR WORK HOURS: Full Time employee $ 63.02 Part Time employee 23.59 AFTER REGULAR WORK HOURS: Full Time employee 94.53 Part Time employee 35.39 MINIMUM CALL-OUT RATE 2 hours at 1.5 times billing rate EQUIPMENT BILLING RATE(per hour) Pickup Truck 17.00 Service Truck 42.00 Backhoe 43.00 CAT Generator 82.00 Loader 50.00 6"Pump 23.00 Dump/Flat Bed Truck(5-7 yds) 36.00 SewerNacuum/Jet Truck 125.00 Chipper 44.00 Concrete Saw 10.00 Air Compressor 17.00 5-Ton Roller 30.00 Mini Excavator 60.00 Skid Steer 50.00 MATERIAL COST: (cost plus tax) Concrete(per yard) 125.00 Sand(per ton) 25.00 Class II Base(per ton) 30.00 A/C (per ton) 100.00 OFFICIAL CERTIFICATION . I, KELLY WETMORE, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State o_f California, do hereby certify under penalty of perjury, that the attached Resolution No. 4826 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 14th day of November, 2017. . WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 20th day of November, 2017. KELLY ETr� ORE, CITY CLERK I •