Loading...
R 4245 RESOLUTION NO. 4245 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE ADJUSTING SEWER CONNECTION FEES BY THE CHANGE IN THE ENGINEERING NEWS RECORD CONSTRUCTION COST INDEX WHEREAS, the City Council adopted Ordinance 528 C.S. amending provisions of the Municipal Code regarding sewer connection fees; and WHEREAS, the City Council may by resolution establish the amount of the sewer connection fees pursuant to the above referenced Ordinance; WHEREAS, Resolution 3567 authorizes an annual adjustment in the sewer connection fees based on the changes in the annual average Engineering News Record Construction Cost Index. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo Grande hereby adopts the sewer connection fees set forth in Exhibit "A" attached hereto and incorporated herein by this reference as though set forth in full. This Resolution shall take effect sixty (60) days after its adoption. On motion of Council Member Arnold, seconded by Council Member Guthrie, and on the following roll call vote, to wit: AYES: Council Members Arnold, Guthrie, Fellows, Costello, and Mayor Ferrara NOES: None ABSENT: None the foregoing Resolution was passed and adopted this 26 day of January 2010. RESOLUTION NO. y2'{5 PAGE 2 TONY F ER , MAYOR ATTEST: / > ' l /� d� 261 /LQ KELLY W ;TM* - E, CITY CLERK APPROVED AS TO CONTENT: S VEN1 ADAMS, CITY MANAGER APPROVED AS TO FORM: TIM THY J.CARMtCtITY ATTORNEY EXHIBIT A SEWER CONNECTION FEES EFFECTIVE 3/29/10 For each connection of a building sewer to a public sewer, a connection fee shall be collected City before the permit for the connection work is issued. The amount of the fee collected is as Connection fee 2006 2007 2008 2009 ENR Index 7446 7751 7966 8310 Residential - per dwelling unit Single Family $ 871 $ 907 $ 932 $ 972 Multifamily (a) 645 672 690 720 Trailer Park/Mobile Home 715 744 764 797 Non - Residential - per water meter size (b) 5/8 inch $ 871 $ 907 $ 932 $ 972 3/4 inch 1,305 1,358 1,396 1,456 1 inch 2,178 2,268 2,331 2,431 1 1/2 inch 4,357 4,535 4,661 4,862 2 inch 6,971 7,256 7,458 7,780 3 inch 13,070 13,606 13,983 14,587 4 inch 21,784 22,676 23,305 24,312 6 inch 43,568 45,352 46,610 48,623 8 inch 87,135 90,705 93,221 97,246 10 inch 130,703 136,057 139,831 145,869 12 inch 191,698 199,550 205,085 213,941 (a) Multifamily includes duplex, triplex, apartments, and condominiums (b) For meter sizes larger than shown, connection fee determined based on the ratio of the maximum safe operating capacity of the meter to that of a 5/8 inch meter. The connection fees shall be increased each January 1 with the annual percentage increase c annual average ENR Construction Cost Index as established in the Engineering News Record publication. Adjustment Formula: Adjusted Fee = (Current Fee) x (Current Year ENR index) / (Prior Year ENR index) OFFICIAL CERTIFICATION I, KELLY WETMORE, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 4245 is a true, full, and correct copy of said Resolution passed and adopted at a Regular meeting of the City Council of the City of Arroyo Grande on the 26` day of January 2010. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 27 day of January 2010. KELLY ET /I RE, CITY CLERK