PC R 18-2312 RESOLUTION NO. 18-2312
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF ARROYO GRANDE APPROVING
. CONDITIONAL USE PERMIT 18-004; LOCATED AT 1570
W. BRANCH STREET; APPLIED FOR BY PETER
ORRADRE
WHEREAS, the project site is an approximately 6.4-acre site located in the Regional
Commercial (RC) zoning district and currently developed with an approximately 82,600
square-foot commercial building formerly occupied by Kmart; and
WHEREAS, the project site is part of the Oak Park Plaza shopping center; and
WHEREAS, the applicant desires to expand the existing commercial structure by
approximately 4,500 square feet and split the resulting commercial space into three (3)
tenant spaces, including a fitness facility operating 24-hours per day, a grocery store larger
than 20,000 square feet and selling beer, wine, and distilled spirits, and a 50,000 square
foot retail store; and
WHEREAS, the expansion of an existing commercial building by 4,500 square feet, the
establishment of a fitness facility in the RC zoning district, the establishment of a grocery
store greater than 20,000 square feet, and the sale of beer, wine and distilled spirits
requires approval of a conditional use permit; and
WHEREAS, the applicant additionally desires to construct a fifty foot (50') freeway sign to
provide advanced notification to motorists traveling on Highway 101; and
WHEREAS, freeway signs between 20' and 50' require approval of Planned Sign
Programs; and
WHEREAS, the request was reviewed in accordance with the development review
process identified in the Municipal Code; and
WHEREAS, the Architectural Review Committee reviewed the project on August 20, 2018,
recommending approval of the project to the Planning Commission; and
WHEREAS, the Planning Commission has reviewed this project in compliance with the
California Environmental Quality Act (CEQA), the State CEQA Guidelines, and the Arroyo
Grande Rules and Procedures for Implementation of CEQA and determined that the
project is exempt per Sections 15301(e)(2), 15303(c), and 15332 of the CEQA Guidelines
regarding existing facilities, new construction, and in-fill development projects in urban
areas, respectively; and
WHEREAS, the Planning Commission of the City of Arroyo Grande has reviewed the
project at a duly noticed public hearing on September 4, 2018; and
RESOLUTION NO. 18-2312
PAGE.2
WHEREAS, the Planning Commission finds, after due study, deliberation and public
hearing, the following circumstances exist:
Conditional Use Permit Findings:
1. The proposed use is permitted within the subject district pursuant to the
provisions of this section and complies with all the applicable provision_s of
this title, the goals, and objectives of the Arroyo Grande General Plan, and
the development policies and standards of the City.
The proposed uses outlined in the recitals are permitted within the Regional
Commercial district pursuant to Section 16.36.030 of the Development Code
and the project complies with all applicable provisions of the Development
Code, the goals and objectives of the Arroyo Grande General Plan including
Policies LU12, LU12-11.3, LU12-12 and ED5-1 of the Land Use Element
and Economic Development Element, and the development policies and
standards of the City.
2. The proposed use would not impair the integrity and character of the district
in which it is to be established or located.
The proposed use will not impair the integrity and character of the district in
which it is to be established or located due to the purpose of the Regional
Commercial district being to provide for a diversity of commercial uses that
serve community and regional needs for retail and personal services, the
symbiotic nature of the proposed uses with the remainder of the Oak Park
Plaza, and the implementation of conditions of approval developed for the
project that are intended to protect the public health, safety and welfare.
3. The site is suitable for the type and intensity of use or development that is
proposed.
The site is approximately 6.4-acres and the layout of the existing Oak Park
Plaza, along with minor infrastructure modifications required as a result of
the project, is suitable for the proposed project.
4. There are adequate provisions for water, sanitation, and public utilities and
services to ensure public health and safety.
The proposed project will utilize City supplied water, sanitation, and public
utilizes and services that ensure public health and safety. Nothing in the
proposed.project is anticipated to be overly impactful to these services.
Conditions of approval developed for the project will additionally ensure
public services are minimally impacted.
5. The proposed use will not be detrimental to the public health, safety or
welfare or materially injurious to properties and improvements in the vicinity.
The proposed use will not be detrimental to the public health, safety, or
welfare due to the project being located in the existing Oak Park Plaza
RESOLUTION NO. 18-2312
PAGE 3
and the implementation of conditions of approval developed for the project
that are intended to protect the public health, safety and welfare.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of
Arroyo Grande hereby approves Conditional Use Permit 18-002 as set forth in Exhibit "B",
attached hereto and incorporated herein by this reference, with the above findings and
subject.to the conditions as set forth in Exhibit "A", attached hereto and incorporated
herein by this reference.
NOW, THEREFORE, BE IT FURTHER RESOLVED that the Planning Commission of the
City of Arroyo Grande hereby continues to a date uncertain Planned Sign Program 18-001
to allow for more complete information regarding signage to be submitted by the applicant
and allow residences within 300' of the freeway across from the project to be notified of the
project and all public hearings.
On motion by Commissioner Mack, seconded by Commissioner George, and by the
following roll call vote, to wit:
AYES: Mack, George, Fowler-Payne, Schiro
NOES: None
ABSENT: Martin
the foregoing Resolution was adopted this 4th day of September, 2018.
RESOLUTION NO: 18-2312
PAGE 4
GLENN MARTIN,
CHAIR
ATTEST:
"1), -
MATTHEW DOWNING
SECRETARY TO THE CO' ISSION
AS TO CONTENT:
_ G
T RCCLISH
COMMUNITY DEVELOPMENT DIRECTOR
RESOLUTION NO. 18-2312
PAGE 5
EXHIBIT 'A'
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 18-004
1570 W. BRANCH STREET
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
GENERAL CONDITIONS
1. This approval authorizes the expansion of an existing commercial building 'by
approximately 5,000 square feet and the demising of the resulting building into
three (3) tenant spaces, including retail, a grocer selling beer, wine, and distilled
spirits, and a fitness facility operating 24-hours per day.
2. The applicant shall ascertain and comply with all Federal, State, County and City
requirements as are applicable to this project.
.3. The applicant shall comply with all conditions of approval for Conditional Use
Permit 18-004.
4. This application shall automatically expire on September 4, 2020 unless a building•
permit is issued.
5. Development shall conform to the Regional Commercial requirements except as
otherwise approved.
6. Development shall occur in substantial conformance with the plans presented to
the Planning Commission at the meeting of September 4, 2018 and marked
Exhibit"B". •
7. The applicant shall agree to indemnify, defend, and hold harmless at his/her sole
expense any action brought against the City, its present or former agents, officers,
or employees because of the issuance of said approval, or in any way relating to
the implementation thereof, or in the alternative, to relinquish such approval. The
applicant shall reimburse the City, its agents, officers, or employees, for any court
costs and attorney's fees which the City, its agents, officers or employees may be
required by a court to pay as a result of such action. The City may, at its sole
discretion, participate at its own expense in the defense of any such action but
such participation shall not relieve applicant of his/her obligations under this
condition.
8. A copy of these conditions shall be incorporated into all construction documents.
9. At the time of application for construction permits, plans submitted shall show all
RESOLUTION NO. 18-2312
PAGE 6
development consistent with the approved site plan, floor plan, architectural
elevations and landscape plan.
10. Signage shall be subject to the requirements of Chapter 16.60 of the Development
Code. Prior to issuance of a building permit, all illegal signsshall be removed.
11. Development shall comply with Development Code Sections 16.48.070, "Fences,
Walls and Hedges"; 16.48.120, "Performance Standards"; and 16.48.130
"Screening Requirements".
12. The developer shall comply with Development Code Chapter 16.56, "Parking and
Loading Requirements". All parking spaces adjacent to a wall, fence, or property
line shall have a minimum width of 11 feet.
13. All parking areas of five or more spaces shall have an average of one-half foot-
candle illumination per square foot of parking area for visibility and security during
hours of darkness.
14. Trash enclosures shall be screened from public view with landscaping or other
appropriate screening materials, and shall be made of ah exterior finish that
complements the architectural features of the main building. The trash enclosure
area shall accommodate recycling container(s).
15. Noise resulting from construction activities shall conform to the standards set forth
in Chapter 9.16 of the Municipal Code. No construction shall occur on Sundays or
City observed holidays.
16. At the time of application for construction permits, the applicant shall provide
details on proposed exterior lighting, if applicable. The lighting plan shall include
the height, location, and intensity of all exterior lighting consistent with Section
16.48.090 of the Development Code. All lighting fixtures shall be shielded so that
neither the lamp nor the related reflector interior surface is visible from adjacent
properties. All lighting for the site shall be downward directed and shall not create
spill or glare to adjacent properties. All lighting shall be energy efficient (e.g. LED).
17. Landscaping in accordance with the approved landscaping plan shall be installed
or bonded for before final building inspection/establishment of use. A total of 110
trees are required for the shopping center (1 tree per 5 parking spaces). The
landscape and irrigation plan shall be prepared by a licensed landscape architect
subject to review and approval by the Community Development and Public Works
Departments. The landscape plan shall be in conformance with Development
Code Chapter 16.84 (Water Efficient Landscape Requirements) and shall include
the following:
'a. Tree staking, soil preparation and planting detail;
b. The use of landscaping to screen ground-mounted utility and mechanical
RESOLUTION NO. 18-2312
PAGE 7
equipment;
c. The required landscaping and improvements. This includes:
i. Deep root planters shall be included in areas where trees are within
five feet.(5') of asphalt or concrete surfaces and curbs;
ii. Water conservation practices including the use of low flow heads,
drip irrigation, mulch, gravel, drought tolerant plants;
iii. An automated irrigation system using smart controller (weather
based) technology;
iv. The selection of groundcover plant species shall include native
plants;
v. Linear planters shall be provided in parking areas;
vi. Turf areas shall be limited in accordance with Section 16.84.040 of
the Development Code.
18. All trees on the construction site to be preserved shall be protected under the
conditions of the Community Tree Ordinance which include but are not limited to:
a. No mechanical trenching within the drip line of a tree, unless approved by
the Public Works Director;
b. No storage of equipment, supplies, tools, etc., within 8' of the trunk of any
tree;
c. No grading shall occur under a trees dripline, unless approved by the Public
Works Director;
•
d. For all trees within twenty feet (20') of construction, a five foot (5') protective
fence shall be constructed a minimum of 8' from the trunk or at the dripline,
whichever distance is greater;
e. At a minimum, all pruning shall comply with the American National
Standards Institute(ANSI) A300 Pruning Standards and Best Management
Practices. An independent certified arborist, paid for by the developer and
selected by the Public Works Director, shall conduct all pruning on site. The
independent arborist shall report to the City's Arborist regarding any pruning
activities.
19. For projects approved with specific exterior building colors, the developer shall
paint a test patch on the building including all colors. The remainder of the building
may not be painted until inspected by the Community Development Department to
verify that colors are consistent with the approved color board. A 48-hour notice is
required for this inspection.
20. All new electrical panel boxes shall be installed inside the building they serve.
21. All new Fire Department Connections (FDC) shall be located near a fire hydrant,
adjacent to a fire access roadway, and screened to the maximum extent feasible.
22. All new double detector check valve assemblies shall be located directly adjacent
to or within the respective building to which they serve.
•
RESOLUTION NO. 18-2312
PAGE 8
23. All ducts, meters, air conditioning equipment and all other mechanical equipment,
whether on the ground, on the structure or elsewhere, shall be screened from
public view with materials architecturally compatible with the main structure. It is •
especially important that gas and electric meters, electric transformers, and large
water piping systems be completely screened from public view. All roof-mounted
equipment which generates noise, solid particles, odors, etc., shall cause the
objectionable material to be directed away from residential properties.
24. All conditions of this approval run with the land and shall be strictly adhered to,
within the time frames specified, and in an on-going manner for the life of the
project. Failure to comply with these conditions of approval may result in an
immediate enforcement action. If it is determined that violation(s) of these
conditions. of approval have occurred, or are occurring, this approval may be
revoked pursuant to Development Code Section 16.08.100.
25. A minimum of two (2) electric vehicle charging stations, totaling four (4) parking
spaces, shall be installed in the parking lot for the project.
26. In compliance with the 2012 Bicycle and Trails Master Plan, the property owner
shall record a pedestrian access easement, on a form approved by the City
Attorney, across the rear of the property to facilitate development of pedestrian
connectivity utilizing the existing pedestrian bridge to the adjoining hotel property
and the trail to the James Way Habitat.
BUILDING AND LIFE SAFETY DIVISION AND FIRE DEPARTMENT CONDITIONS
BUILDING CODES
27. The project shall comply with the most recent editions of the California Building
Standards Code, as adopted by the City of Arroyo Grande.
FIRE LANES
28. Prior to issuance of a certificate of occupancy, the applicant .shall post
designated fire lanes, per Section 22500.1 of the California Vehicle Code. This
includes painting, stenciling, and signage.
FIRE FLOW/FIRE HYDRANTS
29. Project shall have a fire flow in accordance with the California Fire Code.
30. Fire hydrants shall be installed, per Fire Department and Public Works Department
standards and per the California Fire Code.
RESOLUTION NO. 18-2312
PAGE 9
SECURITY KEY BOX
31. The applicant must provide an approved "security key vault" for each tenant, per
Building and Fire Department guidelines and per the California Fire Code.
FIRE SPRINKLER
32. All tenant spaces must be fully sprinklered with separate systems, per Building and
Fire Department guidelines and per the California Fire Code.
33. Provide Fire Department approved access or sprinkler-system per National Fire
Protection Association Standards. Fire sprinkler alarm and initiating devices such
as heat and smoke detectors shall be monitored by an alarm system.
ABANDONMENT/ NON-CONFORMING
34. The applicant shall show proof of properly abandoning all non-conforming items
such as septic tanks, wells, underground piping and other undesirable conditions.
DEMOLITION PERMIT/ RETAINING WALLS
35. A demolition permit must be applied for, approved and issued. All asbestos and
lead shall be verified if present and abated prior to permit issuance.
SPECIAL CONDITIONS
36. The developer shall reimburse the City for all costs associated with outside plan
checks performed at either the developer's or City's request.
ENGINEERING DIVISION AND PUBLIC WORKS DEPARTMENT CONDITIONS
GENERAL CONDITIONS
37. The developer shall sweep streets in compliance with Standard Specifications
Section 13-4.03F.
38. For work requiring engineering inspections, working hours shall comply with
Standard Specification Section 5-1.01.
39. Provide trash enclosure in compliance with Engineering Standard 9060 with
solid/rain-deflecting roof. Drain of trash enclosure to tie into the sewer interceptor
or the onsite water quality BMP.
40. Trash enclosure area(s) shall be screened from public view with landscaping'or
other appropriate screening materials, and shall be reserved exclusively for
RESOLUTION NO. 18-2312
PAGE 10 •
dumpster and recycling container storage. Interior vehicle travel ways shall be
designed to be capable of withstanding loads imposed by trash trucks.
41. All project improvements shall be designed and constructed in accordance with the
most recent version of the City of Arroyo Grande Standard Specifications and -
Engineering Standards.
42. Record Drawings ("as-built" plans) are required to be submitted prior to release of
the Faithful Performance Bond.
43. Submit as-built plans at the completion of the project or improvements as directed
by the Community Development Director in compliance with Engineering Standard
1010 Section 9.3 E. Provide One (1) set of paper prints and electronic documents
on CD or flash drive in both AutoCAD and PDF format.
44. Submit three (3) full-size paper copies and one (1) electronic PDF file of approved
improvement plans for inspection purposes during construction.
45. Preserve existing survey monuments and vertical control benchmarks in
compliance with Standard Specifications Section 5-1.26A.
IMPROVEMENT PLANS
46. Applicant shall fund outsourced plan and map check services, as required.
47. The applicant shall be responsible for obtaining an encroachment permit for all
work within a public right-of-way (City, County and/or Caltrans).
CURB, GUTTER, AND SIDEWALK
48. Install. ADA compliant facilities on the subject property where necessary or verify
that existing facilities are compliant with State and City Standards.
49. Any sections of damaged or displaced curb, gutter & sidewalk or driveway
approach shall be repaired or replaced to the satisfaction of the Public Works
Director.
50. Install ADA compliant ramps at driveway entrances on West Branch Street.
GRADING AND DRAINAGE
51. On-site storm drains shall be retrofitted with filters and VOC removal socks.
WATER
52. A new 8" Double Detector Check (DDC) backflow device per City Standard 6410
RESOLUTION NO. 18-2312
PAGE 11
is required to replace the existing 8" DDC that no longer meets Standard.
53. There is only one (1) two inch (2") water meter that services the building. It is
recommended that the applicant install two (2) new meters for the fitness facility
and grocery store. Alternatively, the applicant can install private water sub-
meters to properly divide the water bill.
54. The applicant shall relocate the existing fire hydrant in the back of the building
within the roadway to the north approximately 15' and located behind the curb.
SEWER
55. There is only one (1) sewer lateral for the building. It is recommended separate
sewer laterals be installed for the fitness facility and the grocery store. All sewer
laterals shall comply with Engineering Standard 6810.
SPECIAL CONDITIONS
56. The applicant shall reseal and restripe the parking lot.
57. The applicant shall install stop signs and exit points along West Branch Street
along the subject property only.
PUBLIC SAFETY
58. Prior to issuance of building permit, applicant to submit exterior lighting plan for
Police Department approval.
59. Prior to issuance of a certificate of occupancy, the applicant shall post
accessible parking signage, per California Building Code Section 11A and other
applicable standards.
60. Prior to issuance of a certificate of occupancy, the applicant shall install a
burglary [or robbery] alarm system per Police Department guidelines, and pay the
Police Department alarm permit application fee.
61. Prior to issuance of a certificate of occupancy, for any parking lots available to
the public located on private lots, the developer shall post private property "No
Parking" signs in accordance with the handout available from the Police
Department.
FEES AND BONDS
The applicant shall pay all applicable City fees, including the following:
62. FEES TO BE PAID PRIOR TO PLAN SUBMITTAL
•
RESOLUTION NO. 18-2312
PAGE 12
a. Plan Review Fee (Based on the current Building Division fee schedule. NOTE:
The applicant is responsible to pay all fees associated with outside plan review
consultants)
63. FEES TO BE PAID PRIOR TO ISSUANCE OF A BUILDING PERMIT
a. Water Neutralization fee, to be based on codes and rates in effect at the time
of building permit issuance, involving water connection or enlargement of an
existing connection.
b. Water Distribution fee, to be based on codes and rates in effect at the time of
building permit issuance.
c. Water Meter charge to be based on codes and rates in effect at the time of
building permit issuance.
d. Water Availability charge, to be based on codes and rates in effect at the time
of building permit issuance.
e. Traffic Impact fee, to be based on codes and rates in effect at the time of
building permit issuance.
f. Traffic Signalization fee, to be based on codes and rates in effect at the time
of building permit issuance.
g. Sewer Connection fee, to be based on codes and rates in effect at the time of
building permit issuance.
h. -South San Luis Obispo County Sanitation District Connection fee, to be
based on codes and rates in effect at the time of building permit issuance.
i. Drainage fee, to be based on codes and rates in effect at the time of building
permit issuance.
j. Park Development fee, to be based on codes and rates in effect at the time of
building permit issuance.
k. Construction Tax, to be based on codes and rates in effect at the time of
building permit issuance.
I. Alarm Fee, to be based. on codes and rates in effect at the time of building
permit issuance.
m. Strong Motion Instrumentation Program (SMIP) Fee, to be based on codes
and rates in effect at the time of building permit issuance.
n. Building Permit Fee, to be based on codes and rates in effect at the time of
building permit issuance.
ARCHITECTURAL REVIEW COMMITTEE
64. Prior to issuance of a building permit, a tree replacement plan shall be reviewed by
the Architectural Review Committee for a recommendation to the Community
Development Director.
65. Prior to issuance of a building permit, the final color and materials that takes into
consideration the potential remodel of the remainder of the center shall .be
reviewed by the Architectural Review Committee for a recommendation to the
Community Development Director.
RESOLUTION NO. 18-2312
PAGE 13
PLANNING COMMISSION
66. Prior to issuance ofa buildingpermit, the final landscape plan, including
building landscape included in plan renderings, shall be reviewed by the
Architectural Review Committee for a recommendation to the Community
Development Director.
• 67. Prior to issuance of a building permit, the complete site plan, including trash
enclosures, cart corrals, and accurate parking reductions shall be reviewed by the
Architectural Review Committee for a recommendation .to the Community
Development Director.
•
EXHIBIT "B"
• .I - - - ��. "'�`�^'----- `I `' I. - ' moi:,:; .
•
1,......,...-1,,,,..,...,.., STORE ,
-4 '•
' -a '14.7 )F ¢ l f SIGN ': `
r- s
x',;'fr ., 7,r 1 t' 44‘.:;'•.:S" -WI: 1, x --F, - 1 'tN't r V.*" t,t y x
•
t`,'"-fes -.:;---'0-,-
'. � ;y ' -F b,iE - ? i r a;z4-.,AilR• mr
• 1 ---
r � � i4 .+- r�,�
- '�r S ,` F ' _ 01 � Jit „ , .� F s r ..,,, + —. 1}� ,... ,, r^ y,, �
"1;74'N'':
yF --- 4 - ; A .,
J,5Fr'
Y.
.4 ,':' ' Ct`) t -4 ,?ww , I. '1T:. r.
PROJECT DESCRIPTION PROJECT STATISTICS PROJECT TEAM SHEET INDEX
THE STI E IIAS BEEN DEVELOPED AS A S)IOFPLJGCEI ITER WITH K-MART AS IISANCFIOP TOR PROJECT ADDRESS 1.570 W.BRANCH STREET OWNER: ORRADRE RANCH 111LE SWEET AI
SEVFRA1 DECADES.THE APPLF.A.IIT G PR FOSINC;TO ADD 4.5CX)S:-NIAFE FEET OF FLOOR AREA ARROYOORANDE.CA 268 TWIN CREEi.SOVX EASING CONDITTONS
TO THE SOUTHWESTERN CORNER OF THE FORMER:.-MART BURDWG EESPLTWG OI 87.132SCFJAPE PROJECT SITE AREA 10 ACRES SAN LUIS OBEFO.CA 93471 EXISTING AREAS AND COUNTS
FEET OVERALL THE BUILD5JGWEL BE DIVIDED Pao THREE SEPARATE TENANT SPACES OF 16 748 APN O%:-.7710,8 CONTACT: OE AND ;•IAGE CUrIOEPI AJ
SOI TAPS FEET FORA FITNESS FACMI.M.352SOUARE FEET FOR A GROCERY SIURE.AND 50.032 PETER OEUADRE COLORS AND MATERIALS AS
SQUARE I LET TOR A CP.AT TS STORE.THE T/TETTI G IU RE-PURPOSE THBU
E EDING AND DO MINIMAL ZONING: RC-REGIOIIAI COMMERCIAL PC,F.RADESISBCGICSHAI.Nf L'URDWG LLEVATC:NS ,.P
SITEDTPROVEMEI ITS TO ACCOMPANY THE FACADE REMODEL TO CREATE THE THREE TENANT OOCUPAI ICY: B2(AS-BU:LT)
SPACES. FITE OF COT 1ST RUCTA.41 V-TI(EXISTING) ARCHITECT: RPM DESIGN GROUP
EXISTING LAND USE: LANDSCAPE: 3765 S.HIGUERA ST.'
COMdUNEYCODE: ARROYO GRANDE SAN LU6 OBISPO.CA 93401
Shopping Center T+Rn.snn-,,, CROSS AREA.: 4724095E(10.845 AC.) TEU(805)513-1784
BURUNG AREA: FAX:I✓XU)5434013
VICINITY IU1 A P Pro ect Site ....i.) K'MARTBLDG ETIVELOPE 87.132 SF CONTACT:
J SHOP 6UGDi1JG q 1 I I,:VO SF PAI BLOTS-PROJECT ARCHITECT
- SHOP REDO.R2-I RSF FLOOR 12.550 51 WWES AROLA-LANDSCAPE ARCH AECT
q IND TLOOR 12,303 ST
,"�� !- 4k_ -Sliff �fyNy171, �� },. CARL'S.F.RESI 3:,00 SF
"w +'t 3�' RESIALIR 4P.0(1 SF
f.1,-,45_,,s4.-V,Fri2 $(� T-Y f I,W.,: a �0, Ar
BAM1Y. I J q F
p'';',--.;,''.':!-MV. ,�F•.:. ¢ '''''''14 TOTAL= 178,682 SI
is-y ,Q.t ,',:14-,;'*!. - './'.-,';'` l SITE BU'LDNOCOVEPAC-E:126L2/472408= 6Ae
'"i 5-.. �" ITL. 'a c 3 ,f .. .... ,•A, E.i _
. Q �Ty4 -we ='t.i - L,.. 1{ ; P.ARI.NG: •
�'':ti" :k'c E;�j::,•�'_ �'�i_,u�:'?fi^,� f `E S REQUIRED-GENERAL RETAIL/G'rM/BANY.:130.382_51/257= 5222 SPACES .
aT; =.„ +�..,,,,,,/:...,-..:..z.:.,,,... ..
:/ '•`''' F. _ -RESTAURANT:B,2V/SF(G.L:.)K 65%
' ,
Tri- F ,:',,:, t.r.•.`,. 2 mat'' =5.385_f(T'LIPUC I,F.EAI/Ilk= Sa SPACES
' ' C?L . , �;�Fti � �'�° ".�", +'3ti ` ' 2J, .' 'n ��L1410, TOTAL 576 SPACES-15%SHAPED USE
REDUCTION)= 548 SPACES a ` .v ,x . T ^ .._„ a . ,�. P� _--a
` fP w� TOTAL PROVIDED: :dl SPACES2„- V:°9" "`.c - c4'i`'*.-;`� •
iii35 Y: av _ �'.✓ . . .. _ r Y NIS.
_
SITE LANDSCAPE.COVERAGE:56.280SE/172.4(43 SF= 1191
designINE)T BRANCH STREET TENANT AND -FACADE UPDATE TITLE SHEET
rrrnIAl
group 1570 WEST BRANCH STREET,ARROYO GRANDE,CA • 1192-01-0018 JUNE 15,2018
11111
•
•
•
{.' .-;.y>;'.,,,.iq:i T"'•` >�.rra' a :r!r +,, ;f}.;.'(':yas,4' iA' a,Y.• F
..d,h:A£,rrac i-,e - .1-„<",'
«; ,3.
? au�e- ;t;. S�h'L.•+h_r,.''F' :� �'"�•-.:.� s. .,A`•,'}.: t«s.�t. „ �{,`+`'� ���;'+t. '�� olt
,..�,,. ? y tr •�, � -yy y,� >' e.. Y. .n,T eco�r• y:..a r a; ,t' ,,.,:.}- ,r } fb : °a•t. $:a_- rj, 1 • r•. ^�. f,a:�'•ax_,�, .s, r� ,,• Nr,f '.J',..'.byr'i.S _j+,.'?cv,...,.w5 - 'r•.. t'' �..>:�;- ^t.•,:' ,•z?' i'" -M ', t :c r„r.. „ �•`' f, .,{ X '1.•'-',
`'f`i:, 4:- u•!'.' 3Y"r 4,�t .'l rr 1i ' '.''r-"xR �_5_... J. `
•<\'.. • J_ •'i'.ri-: ,..,t4.rW'�`-1W. .',t,.s- . :K;.«. l�;, .r's� !?5".y �D_
_ TTS. �.
h
Yb�n -
• !t� .•.si, .'d 1,
V-'
ori'�.,Y. "s+i.", �F•� • 'Y:
.a^
rr✓.v..
J
.•o4z�yx F�s'
l:r.. .. :- - tt - _
rl
r'.'/`e y.�"�,>�,.y at>"' ��'�,,�,.`...4r:^"'I njl �4r. 'Y;: "'G.i 4�e�� nL:t•n..l%:n-LL'`".., • +.,�
?;., _.`.,, ;,C' "ry `" t` '-" c r 1•.: y ".2 $.' :.,.79 Y -.",,n�`.'4_>;,k�. "„•� _ t 4.
a •da74 _r'..''esa:�°..'li^✓ges , - �F-.7...."74.„',.,1.,.221._•.•.t,. �»f 1Va'e1•{ �"3','i+.xt4 - `T"'k'i',5 '44C,/ •.,.w'-7'. p "--.wsu ---=,"'---t-•-•"-=•.---'-- ,„..,'-'••hr r'v".T`}�C[ '.� r
'.Al.z ; D.lb x c �� "3�-^Y Qy�p i .'$. a � .:.+r ,3" :,r`€ /x' Z c N_" 'tt•�- ^'iT;Y.ir:.. 4 21
_a.. 1 sp' ' +•n+ ' 1:41!.'g�•.+a r
-r_ti'y F,,"" 4 �' ;'� ,-a:+4 , [Lt * Jv '.r'Si` TR r_Y.C/ENTRY!,'}, ''c�.'!.".,�j ��_ --.,-.--.L,,,-
rT r ji�.t!8 1. Y'/1.rT T� :�' ,�•-�Y� .�a•w+r-, :�?-. _
'tY• ri {''' �l t 1 -, ',r;' NORTHERN MOST ENTRANCE IEN1EY I(. -r-t� � ,••••-:,-,,i4..-,""-:'--- - ��� aT .iJ!. '� : �+^� �T�r'�-•`•
v,r- i��w•.G5" «G;1"1•t�, ,-4 et ''. . j .+,-,-- �^ v�� ..�' i .� ...1',7 --;:m •+�",��:•s��!"
,
• ar • -�
4'c'i , 5.x + i` J.. :k fi 7 +5 r 4,,,,--14,,,,,y1,..<..4.""C ;li;._ ..A'3' 4 ;' - , ;:_ a'J "=ted.;
. "'". *.q' r' _..' yD; t , '«. :,1. ,,t,; v O ".ya+. ,. i� � ''.v'.�v- ";tya,� S • �.•„ •r �`{�T'7 f
„a ,j''�."7" ",'jJ' .>., +k, �.w'.: • ...� `��r[:'x�f` �' yVtv,1". ��t. �s� � J�+.,1 ,nH,7.,��`y'.�'�•.. d• .r•.: r::5'ir! w'=a� ,��`1
.....1
'''''''h,:-"-'
..b . �,D�.r4' .,.. 4 � r«VrS s'-':a`.,'- `t .'',•{ �=27-7.,",-t7'..., :t r,�a,r.e•.,,,t 7,,- -•,-.',ri: 'w • _4 y.,4'.. .r...- i .t•+� yryi }a�:
't.20''' ,a. �C'?.,A � .,.y "...e. ' { ^‘.:644./. .,
.nom }':v , �s Lt {;1.t•4^ '...:.:.':4"...1P,;"'�r.' +r•'-.1%,...e4.1-..t:1-`:. � ;,':'`"'-4-......'`'t' rb"-. i'.r,- ., rye: ' ''''. -
:v. `'a a F'k,,.. 'ti!t.,,. k � "ti4•.'-4.:„ -. - � , 4�• Srz'c _..G„. - `3lil.'• -'f,,:' 's; -.;,-',':Cr-",:-.',-'.. ,-1'� .' ,r _ . ", - a • .±
,� ".Y•. ..^ ._,.__~� it ti rxi+ti j E 1,9 ?�.ti "K tJs 4 �
',.wszr.,ira.?�o-}'.`.. . ._� ',.. .- 2 r',^` ter fr- a + ism x kir w4..:-...,,,... c: --*'
IIORTH BOUPID HWY IDI VIEW -cdt�" T ,, " Ix y 4''-', MAIN VIEW OF PROPOSED BUILDING FACADE REMODEL �
iZ HrMt !,�.,(tk t17iTrS;Ii�S'" ,,,
ENTRY 2 `��
. _
`Qtric 'J .t u tidt�`a'.6 � Y 4 '„irA.1::.M�� c`r�':t v_l``... • .:1 �'"� :. a
�:.,.s. Y,rw•: ;� �mr ., '••nr'^f:h;,..1: "Sq:i;•,"..; an, 1e..4a,�ct,;2,�.,4,b§, ''':C�. ;;, ,.,;K3 ar--,- ..1, .�v,r-1,........,').-,,!,„--;04:,*-:
.i. 4 a G � ""'4 �,0 5_.,,,. `.'a y,.. „. ..,,.. !`
'' . "". :e •"�' iW• ,+ ,,:�.:Y.., iit -,-. , y;rak:-r:2' ? .,`-,,45 `re. .' ;,1 •FY -r: ,rr, .;,H �' .4;.;2s *fi..x.'' m9, _ .[*:",- .1.,
a"Q„ �.t��,{, .' .* . ,w ��;: . , I td -1 { wf .xr� t.7� u,•.•,+aar;.,_ ' p;'�-�. s- � .. �5 .rye Yt'aa-�- {. a '::Th rasap '�`f:^,.�.7s'C=` l'n\a': ,ye_,c;.r '4t.i,a t .K+:` 1 ;1�n.�'j' ''k .r r "t.^; ?'"
d `:u' e'a', { :.., i. 4: r. I,-; i-. J a M .q. ,_7;:i'W °? ,' f.r ',T E, 51a£�.. { {M�, 3{<'�}P3 .tom , -�.., i �5 5 1,}•-fi. vt•N'"..d,6.a `S. .t - + "«a1e.T,' ^.-`,�,, i ,h-, Y:1' _ '.: �.4lJa`T�La.��-An.Rx�°l...rt,y,' , .>< iad,Y3 i Y'u.+t.. S....r., ^qj.. •v'-'`"is ...,�. .�9.,. ,�,.,. s:- ! ">�A :•� rr �,nsi�£ri S;: . +:* "�,�'' S'ii�, .',C*... �iG -.�, .1 .^.K' ' .'�s�.•„. „''�,YJ;: „{,+4yi,tt:''_'&•,.., ':. .c:. .y{:-,3•,:',�;y a"'jr :,,..,:;.7 ox:-^=Y" •{,. ._c ti- ': r-1:. w _ "x_ 7 .•& ,•:.'k-•lwJ t^•S:vy. .4 ,1?`n r 3.". '':1 , h .. s 7; •+"1.':s '`fi.` •Y'e_.s 'kir.a�'.n.,., ,A,�i'c;,�� ,f1.t�,�, ;h,Syy,;,�� .;�, �ro"g� y..:,.�s"�;t, =� ,� . .fi,_,,,�,,:t;,, k`^ & y� �=E:`aP�, �;f�:," ,:�^�.€r kf '...8k-..'S',; "w i -: R y., .�Jh - ,'a,Y. At'<'''iv- .gl:'(:'vT ,:,?.s 'r.> a`t,�•' k- {AVL,.i''i.s' aT'i=.�<idi✓'' ,.. .1 .4jk.. i'�',::4 �K•rT-Au:1'f. - >,�< --,.,'„,•.,-,...,4"'-l�V,•-:-��,.-bw j^. .fl.) ..� x� .,t' �.. � }.t - r(i! J•f_ .Y''"4:yy. ...�>'�. '.;.a:` iiu .'-.-t '•.":Sc J• tz,;-`t aiPa��'" . t';:+: -d," r'q4 ..!' "1 4 ta..,x .. r�'a• �,:ek;'. � „k. ..+r^...-�,,.,�„t:,, - ,.,-Z----,--1- � °'sa .a,;,t�;•;-,.i ;" ( (, 1T y�
..;^F..%, ,r;-. ,tf ,7 5^Y FFr lt.., . "D:t dji, ' ,T 'a. `,IVi4x•
F�-T„1...' %, `�,k i',k R)� yy :Y'
,ts..L'-.`s-4,{4'a,.:.:4•,�,t- '43, :•�T,r-= '3 n., _ �� " ;t ',.- :--?.< ,,,^,•< 2...,t' l .4
YS't`. ., .4•rs�• Sr. .tt+'.,,.k^ u,?: lti^ > _ .}.:.:�-y -t;:.+!.i;;w'';' i'r`' �) r.a^.•-.',„;',.''.•,`(:. _ 'Ty,F1 c.
�. _ I,.:v!+z'r. .`;^':a- ,. -,t.. r ..r �.T•,. ..? :et• 'fid : a. ...,,,,-.,,r,: 114..;.41 .,•.-.-?, t•, - ��t',,
a"+7 .. t- S'!�;. Fr. r .JJ ..t.' F ,:�':jh''?1Qs 'i 'k:4,; .n .ti{�S� u` D..t`
{ '"i(" .]
��! �� y fIL�M- �ariM ' .'.' t>�wl.e, -.2;. y r `nc.,a= Ir�-1.7y ^}. 1���>`•Ii�V•,r y' y� �`�
i�a,e 'TD. ,-' if--r-. :•7.17% "4... L`.se::'N",:r'��a_. :=!1- ..`•1>;?.':*' •�Fc 4.'4, �f7' `CY` 4• s4'^• .1• +�
rZ- ..fir. -.... i� ..,a,-.-�.....,.,.,�tL•:. _.,,.7r-:' .:k36 rr r �-c. .a .p3�,y 'nt^ �, �F �., y*
:.,N_. ''''.2.---?..4 .,-
::' .'- `%`, EPiTRY3 hlrLJ,� c �>"' t-a :,.4-44,444:•t, E t
,.. £c,.`"..:.rc .c,•a ' 's. ,�,- a y _ r x:�i
'�...�"r�« �'e^.a'.M. +fn.++��^-°r. ^� ��: ' �'�.�^. •.�^�.�,P�Cf' YeS t � i7 ,'�. 13�,�
,�,.�s e�"- e `. _a. .. - +.ars:; .•-is:.... /" r �"..�.�,,? tZz�t" '.
' s r� ,r-- .Y: sa'w _,f T, xa..•xt1A:'i_r_-,s-:=_ T._ x! 'G .�}e..
..fir ,.,�..;e per, "'.t'. .a'..�•, 3q' jr �`i; .- -'_`.. �;,:. ++:.wd r'hv^*w'e`�+ fig"."- F `rs.t 'A. 3:'" f f `..',N,,, ,_• -i.
.r,.,,. ' - ` r .,-,, . -' :-,,• C' t-w. =>' "� ,,-;.;• ',. 1'x4.:g 1 ta=•sygi ,-*,..1„7'..-A.. i ..'..-:```_4.B 'f, n ,`'- `^,,3a 'L - -;,:,,..,i,„..-,- :.._4,1.9° "?..:D
_ Q .,.. w4r,,;
�:�,,$}+ �.�. '' +,Y. ,r r,_ � ,. <�„1�i... �",.��'i�';;-,,- R'c} .'R•v s;.^' r 2,�i` '"Y"r'� ^.;-•••. r T'". `�7�+5 �^i`.
.. , „� , .. . ,-..'�"',.,Fr�F k s;°-1:�r.:s;t,�,^3�' T�;'x.el.p�e;k: .r�'•�. ,,,.:-.i.•f�,:,x.wcri�,;; Pt a:t4 r -.4,4,4:i....4..:,1„..„,-,.:+,t,r +�W�. u, r ;.-,,,,i, :r:ts. �6a s"d` z^'�;',"<}
'.":' N a' ,a.•' _,.e+- te.;-sc, .r'\,:,,50,i,.rw.,Iii,, .x: ✓ :41, ''4', , ;w;, r':-'4. .r.. +.}, i q;1 -.-i;-;.•. i� O. ; . �a +-r..y :',.t.,,,;•_.„ ,_.,&'-.74k,' ,'a' j ;-1 '
'� ..,..�.. - ..>'•- ..s:'�y"H --i ,t�' "�"",'=i;.��,.tct`?'±�. _"a'r:'yu .3 �,S .,y.„ .�;� i`^, +n � >,.: , ,,,r! ".,-d..:,
ai,t,,•'��1a4,�,',� '�'�'t>', �"={.#.; r.:.r,<r .,k. ..,. Y'3 ,'..x.. ^5`�:<t .�. �^: 1!.c ttr-: .,acs- ,.�.^,:i'„ L : .:. "c1';.&;"'u
^;F Di�y ..•a"- ..--.` .'; ,r,0',.ytn?S:"w. :..-.2,--.,,,,,:. •..r:'.' fr:.', r4w#r.-'.t .,,'4::;.'CF'z,-' ' ,`m'.'"=r x: 'r.. ti '+. ��� 'Sip
1• .d. � .:�'-' x. ,vi•. ,M ,. 'd " =rk=. : s_. *'c` .t oue'• 6 .y;C•. "C" a.%'�" ti
it#F.��,,a'•w-• ',� .drs,+u :1 r",�v.--tl:' r�.r.� w,' �_.,.} }'.,f. °rza.:, F - �'i. t: :r, S�:�l•: •-.,:.:,+� f j ', t'M1`�.,,_ HSM¢,'. .:r
• . ' ,e f.J;,. 4 ^" >* E:r.a.. :, _',•_ •>x rub.�,.;_, Yi ;: 3 .ems ,1,,:,44:0,--N,!
Fr'=�- ',,,.o, ....- 'r�+�J��''r` - ' a;>•;q,�y.��� -• T.;�...:5^�' e+d-•:taa �,..7� !I A T' ��-J,5^}�i'� ��''':�:.-.T�.'9. .'�:Q.`/ e( - '�'
c
.rt c','1 F, r. i t' -74'•' i 4 ra"`-f.f4-`-1� � 'x: : .5a.�!�'r.,- t
e 1
.-c-M..- t .l� � 2' ,�j,'„-."�+.���'C"'�. ,t��,.,: ""^" 1 r,;,- �oD.0 S �`0,h 5.ut�::-'�s,�a :7- ?,'t.,.•,-.tiF .>�''' "�g r
1 Y.'.
a ..,.a itSc z '':pi' " .� r 3 .'•�j'
- ,.�'a n... -" :;~.a '� ? �. arty w`��,- 'a'r.
"f* �q� •,� _
--.� �: r S�6y' .° - .-9,pn'y. •26 r. '�4r':. c �,_ :�J:n:" ,,,y rr �:� Jt,'''..}a.t ,-rc, I' ,. .r h. i��y
-. y� ',^r„ff• 4,;..�..F s.-`'r;,:• _,,.a ,,.a. •rS r ,y' ,;.,R'.'^..-; u„ *t ' . 't; -, 1 T-'a--... ' f,.. 'tea' "" `n�:'Y,`;'�''; i;r;4t,'�+. .."�S'' .. 'a r.w4�'ep 'g`�^.-
.k,:yn' t**.,,Z r .:. ..7 _ dr�"':' ;�'.. ,a.. :�;:.., ..` .ftp::.
' :;? ` ;;` • .a ppr�-r'tkb't t."t""'� t : ;a„ " :'i'�T7.37# r�tr+ ' �.� D �,;iq'.•• t � `,w:,...,' ...F;t r, ,;-y.•i ,,` v;- .�a,. ,,g _ ! �,T�
'=tit �.S1 e>.*t h".:.L Z-.:. -' .t '''''L._-._''''' x:.s"' IT .z.sa.... .m HER .. .vF SITE)'""�:•. .'` .�,. i,%:' 'x>l i,j.�.rK..i ..._.a a� rr: •. ___T.:-:.. '.l:.,faT• ..;`.a�..'.�. �e~ ,zr .,.k'Y �
•
SOUTH BOUND HWY 101 VIEW ENTRY 4(UPPER SITE ACCESS C'n SOUTHERN END OF SITE) VICINITY MAP A ^
relirrrn clesigh EST BRANCH STREET TENANT AND FACADE UPDATE EXISTING CONDITIONS
group 15 WES7 BRANCH SFREEi ARROYO GRANDE CA 1i92-01-0018 JUNE is,2018
. .
e .
I
/ / /41r4s1, I
I .
// \ \ 20$pacal I •
/
/ • I
—
/ I
./
I
I
82,532 SF " ,
WF I
i • I, ,.•, . ..
,
11.100 5F Msh i
.
/ I
I .
i .+r—i' ''. ,..e, / f
c '° .e.- . (1=1.5oFoR)
I 1
<-.31' .
Ti 0 2O'PDZR) I
I
I ...n__
I1,111., — 3 = i .
I ..31pFc, 4Sç ,1 45 spaces Fe V.03 FS sp... 21 sycieFs 26 spaces ZSsl '
I --'
i
, i 12 scams — I
I 3
I — I
I .
I i I
3 t
.3-f"F.cos
r. I
3.500 SF .—
, 1
, i
7,200 SF
I 3 E
I
a a 4.800 SF
-- 1
, ,
CZEMINi
• A , . ; .,. •I .: • .••• .
CAE % -O r=40,0"124"X36"'SI IFE1)
NORF11
rAriffereV"Vdesibp WEST BRANCH STREET TENANT AND FACADE UPDATE EXISTING AREAS AND COUNTS
mtni 1 i 1,. Ilardup 15 0 WEST BRANCH S1REET ARROYO GRANDE CA , 1192-01-0018 JUNE 15,2018 A3
ONO NM En
11111
Ell111111•
• ; •
r ;
•
r
.. a+y, S �' k ,-,,,..........„--m......74,,
gni Yl '3'S trFt,
A' '>J�. F Rte'! +,
i L� 2 �,Y _.4.2'7.7......',' I., e!":4 t _,kr«:'''' 4 tTf.q. • ,�-i ref W J„M, p}��N `'i'Viti°Y, ,. }
` x '^ z` 79 ...4,..--1...--.€-.14,---,.....,,,?--,nt 0=';• -•;'•x N; J G`�.U1r"r} :;,,: f x'X'u i 7s �` x .+..t `r
,. r. �W'rw ,- z"'k v+te•1061.--yr,�".sq„ F ,,-•�." .. i t� '`' '�" •�• s ,`.Yk '-f F
•7-,
I.y„ ,.; RR ; PR RR E tp • f a I{p.
4 ( 5 Vi f . 4 a. {$
m ' ' F1TI lESS ROCERY RCTA(LAl”' _1.,m j�:t ' _•
F ,
•
y� y
� � T6,748-SF `Z.Q.�JF'2F UrVaQ .S F' ¢° --4.:.-441,
-taP iI4 irx- O k SJ .F •,
•
N rQ 4fta.'$ I pp
y5ry.+.���J' { -4-.., a t G A i.
Z.'7,01,11:':".
',q�„'y�i�F's k. �.. • I (Fj P tcil• 5 'f } e /a'
•
xt _,b, ,x - � � .x►��. .+e.MN. ..ffi�.Jfr'�t ..,,,,....A.4„,„...,.. •{" .� ,., }> ;n
I r �`F, `3 R;y'C,'4"%FS�C:. ? 'a.i t'# ,,a'n '. wry "�.S:�' �r J -�,rt�`�� fi�� Ha AF C..s r f�'t
yI t r= 0 7 ,
::.,,3-4,.th _'•tr dr �y�. °ca.' ,. 1.. �` xk, . '�.. "s i ,
} t. a Y% j 'fT f _ ,,� +"t'd•t y' � ,. +..le.'d ..0 4 Y-+..f�[i }.. '21 *
•
• �.� �,k {,�•' .�,� ! ,�.; "'. p' } �Tr„ r'- "'+07 7 s Ei `1n,
< 34;:-!,4:',Z,'. ' :' 1,iar �'� rr ;144- . ' r r Y.t z� ',1" 41 Tr d
'a. a .+.i °.a •.."....`7";„ et., I# ,
., �" F r ,�€E r.4a ;q' -`s•",.ate,'•'''4:G o%`'.',.z• a.^ ",ti;+.�r}:_2 3: L4„ „ _ t t„^`" ' . a� `•kr=:'
F yr yn ai y� N, a tr4 t x F, .
•-K'f `zs r'a -`'49a*,,' a$o); .1' �" 9'4,1 ' e• $y r �' s r..e._ k 1 P:77,,, >.{,s ".--7--,".43,' w
�. ..,,,,,,„4..4,:;-„..
x'� ''.%, `fix r,y I. > "'"r
-t-rt3 fa r°2o t t .n'i„, L' •h • -.,H •tit
T ,, r� �x Wtaa•t.,10. -.:.;',,,,� y k a # v s xn;»»€'� a, € �`w f -1r, 7 .;VA,,,,, .d.„,%,,'
s
a i -17--t UCQttf„ 104i5"r" ., ' 'r. 7#; 2.41,"4:1,4'.',,,,O',� , sx,,;:$ �X,r-` :,, lee"', ,sc ,, ,.4+, .;+ , ��f',T _-...,..,..,i,..•—•!--..:4- •
; ,, _,,, _: .,cif,=a
A _ ff' . r ,, t -.1-,.......--.00r.„,„ •s fi"'..rt„,.1 �.- ' 7:F j 'WA � � M +._• .. n.. _, '
^' •' -; "a'h4} '...,..0,:-:- a .---• ',� i y 5i- ',.i" '�" 37 n-1 1( - l 1.ter mrs. 4. r , C ,-^.0 . .,.
`t M r ` 4 K,,,td'e t. Vir,,,1-1 ,/',7.i,".� r En •. ' ti
� 1 - tt i •, - � �' f„,..;:',,t.”.$ PROPOSED NEW FREEWAY SIGNAGE CONCEPT SKETCH
t;�`iv t C ' "r% '.t��' s 4a °aLtrart, t, sCAIE: rt.ts.
# r'4 . k fir x 4, . ' .7 �" `"w? �'
9
,Ia '.k. 3.t'ri-47st'rt �`• g. ..«: >, 4,
4 • , �. a , ♦ SJ:..p, '. -k r"r` Z Jfi Cr Q yi ,y x.' J, W. •t� , '..-.:.:"1,.::;.',',',.,... .... '
a:r°4 . if:',: , . ,==',--• f-, ''' �# _ k `t., ''':-,t4- M11} '-"'+ r . .f.'. �'T ..
,,,.. sG+tta
' 1' t y t FAQ t :"...7
^`
•
r3•t atm n k-M t.'r r :.
R ,,,:"4,....;,,,,:1",,r-49" � � NI�E�ST,BI��1��•C1-1�5T1���T����., � � �'� �'" � � µ ,,. };
t, t .4:1tal'''144.:4141', A. 4,!'';',....1 .F•.6. .4f ....%'3,,',':"'"' 'EE"., ....,..,..,..„.../,•,-.4-4,1-
1.-1, t ,e 5.w
x4� IJORII l
•� 5 �'."° � �t J k •4.46.4,..".^.;,- T F, yk4 ~ w �'i`''n3 r1"w` 't �� - \ \.- • .i\
.. .. _ ..,-_-...P-...:-.` ' `si"-� <. . __. _ .. .. - SCALE: 1"=40'-lt 124 (%"SHEE7)
,�f de ign ESQ BRANCH STREET TENANT AND FACADE UPDATE SITE AND SIGNAGE CONCEPT ,Q
�� group 15 0 WEST BRANCH 51REE1 ARROYO GRANDE CA 1192-01-0018 JUNE 15,2018 a4
•
. .
. •.
3ixt.-,::t."i'kaikri.t,,:z1-41i4,--ifeiliet.A.4.. ...,-iii.giyi...: : . i.-4,...f:,,,,,•':.:
•• 16 ' •
•
.•,,, i: 0 ',',".4•••,,,•10,111,:••,•1•1''0""''.'. ,II'•••'•••/"•1,1•-'•'-'
x•• .." ''•"•-• v.Y .,,T•''Ii9•'M...-' -•- ' • • 4.'kr4 ,
. ,,,,,..,,,,,,: „..v,.,..,•„ ,•t."5.,..T.1.1",..5•.,‘.1', /':,•:••• ••;•'••'-'''.'''.1, ';'-'''.:.,-•IT.,','''''1:'''•'-'::-••':•.'t/,'-::•• ::'-t:,;21'.•-•
IV!ANA
fr'' ;•"--•- ' ''•.•'••••.A-`'•'...•'.,•.'6,T•',I•4T••• . 1'/'''/./',-7••?..
'
• 0
FINI:55.. GRIX"3"::REVV
1 1#!,4'11"
ii
„,,....,..1 .
InIAI
ACVM
' '' Arf4t,IP
P t •
; :--,I.Le..::
-
.:?v, .":"-:':.--_--. ...,-,.--,,,:....-'-,'...-- ---:i'-".2'.: -:'--..,•;.-.... ,-:....-.-:.,---.-.,--1,...-.4-..--.-- ,-,,, - .. , . ... :-r.' .•...•. .;;-•.:-,.... .:.---_-.:f'--...,
-, .--• :. ,--..--,...-,-:= ,-,.,.,''.',Th?-•,.--',.,-:',--1;-.:-,--li f c....-':-'4---L's,''',:-'-':,-:,'--',4:--"-t--•-'-'-':' ' STORE ' .
. .- . . . 41/4
.1
.
A
'- . - ' .0 ., , ..
L . • ! 0 :, -: .
."....14", .:-.'"''•:•,€)-,:•?•,:-.'-i.;•,:.,...,4„.--------- ....... -.. ., '..,.i., i SI
.. E ••-4P:444..L‘St Lai s-r- —i 44.4'.- I -
,L La,. 4, ,s.a.,-. 4 ilq 3.,,,,, _,:,......s.g......4, rf.,.4 ."•,• •••,,,..,-,;;4•••• f/.41, -........^.•••••7%,•••,,-„.. ••• 47.;Cv•••••lit.•:,'4,7?".I.T.,!1:ik,441•••,1,...:,:l.r 41.•7:. .:
• ,a Iris„,wma,....,,„ ,,e.... . ...--i,,,,- ---,r,,I-N;.„,1• . • •• • , '.•.,, 4 •.-,r,it---:....4 4V,.';-.;: ,L- ` ...110,.z.4.a.....,.
*- " -VA:...•..t.-,.v'O'•4-•.• •v,-,•-••••-',•„: • :„II --I L.E..- ''•' j'a"iLfS.4'a IP'` .4'',;'.. .7.,*-••••-----.
C• A ''s4ri-'417---;'--',1-4--•-4:1-'' !, ',A- ,41-, 4-4 A
—
-ei•-,,,„,iites.,... , i; .k.0.?'t. _..._.I 14•31•!,',' _..,,, , IVE1.v-.•„W!..j..;.;;; -:''a-•.r:•:-,*.• •00 ' -1,1J.1,....•.;71•-•,..:-.73T-_-,74--- 4-:A,...-,.-L,Z.7•T; 7.-.-A.1•1T1':• .7:7'.!.'•
'••';k4IN;' '- 'It 'E ,,,,21:3•;• tl•Vit,,,, L-%;,.•T v.77'1•7:•'• •--'.. 1 ••••-• • .' I '.- 14 .-.:::"135,._....'"7''`..•V'14.zeag-. ...1S.11,-,.1...4,,..i.„zlIff r=J.,,:arS. ..._Jr 1 W,,,ot... ijf‘2-......4::',:4,,,v,',..,-.....c..',.,...'...•.:;,..'..,... ..,. ,... .
-.,,,g-•,,i,,,,,,t, ....... 4,. ._,,p4}ji. ? .• b...,.to:LAls,..__.,•T•v.•••.-'., •
. . ,..
••`.., ,.-,'••'•••7-7•41.-.41k4''' .. '71L,... .•,74`•;-LAkt. ,....- A,
. ..
‘r Y•••4.-4T•A'-'•v.:, 1.-.N:-• ••••••••••TI••",•T Ti4I'''• •41.'T-A:. •-.•••vv••••••,,,,••••••'„.-T.• / •••• .
'-'-- ''''-' ••'4-----.10- ...,-- -A A• •• •:‘,5 4•••tr ...,•••.•,,,,Vik. • ) , .
3'411.. --.! ...T.-••••••:. ""'••••••,..ark•A•A•tA,...... „--,I , •‘''.--" "" A-4=-10-T •••••CI '• '--7.'".'7"..", -.....,4,1'J...*4•-'44,;.:3;.•' ,...:.:.--.1-'---r:'- ',' .'''''
P ""'"a' 'aV 4-`,.....'-. - 40 '•a -414 a' 414 ..a...0 ..14.-,4 - oaLL
•iocAt•; A A. .:,_..,••,,,iftf..,:.,,,iic 4,,,,i,,-4v.-:i7N,,,,,,..,14 ----A.',i4 . vl -- ' 4-,,Vwt.rt.. ..,4,..„,,_ ,,4--, -
- •------a- -;-,.....,.-1,--,:-W- - ''. r----'.`mliiuNaltl,L.,...4' .1-#::.- .:,...-,.:5-.,-2•1.-til,
..., .1-.. .....--•_...--.,,,,,,I,.,..., - .7,1E*, . •42,../ •
litiV,' ,,-,-;,..,..'r; ...Ile,--4.-,...e.,- .. c.:4" '''',.. -I• .•
.. -,..,..,1--...,...--v.Tor.- , ....4.w.-..•Lt....,..v......,--,....!....-..,,- ,
'--'..„0'A..'. ,v4...ert,A '. ,L.---- -,i 4 . ...,z..!.''' ,,% •••• .',..... / .......,,,„,,,..,, '• 5qM'A'F', ''1'-','....'''-'.'t.'L''.; . - , .P
--..,,11•2'..',..:.".,47. 1,..1;414.0,...,4L ' "1.0,,,,„...—.4.--. .... ...r.,--V,' ...:".`,.;'i"-'.."1:#-"^ "--.^4.--''-" ,. -."-,''•'''''
110'"' '•'.'•'..-. '.----.'•-•.:.-. .-....'1°`--•=---v--'7,....;-,,,,'..?..• - ; - ,.-,:42 i 4•....-.., --- • e ' ' •-•-•?....--, --..--,.. - .•,,,'. .
VIEW KEY PLAN
• •vv••••••,•••...;'
SCALE S: ITS
PROPOSED(VIEW A)EXTERIOR IMPROVEMENTS ,
L.L. ,,. L k• •v. •n•AN`f b.,AH k'::, ;,..•:I4f4,7.E•AlTA4 ,a7E.,;
• A •• 3?+' ..,,,,.1. ..-.1''',..AII:t.q..I.",T it* ..1..I".' '•t '''',,6i‘; .
W.. •,.45,4t17,....c,.. r
"zetr',, , -,,,A•-:: 4,,, 14,./.441.e.ork.Z .'....r.,,. • ` 7 ..V14V4Z'.f."4-
lgl.:54,...------,... '-..-",,-"••'-4 .144,Awr.v., •,, ,4 ,4yal., ,,,4,...5•5•„.,,,,-,c,,,,,,,v..,.•,,,,
kW....1.,..v.„,„..,_va,.4•41--grk.,.„....:,.....„ . , ••40,“., ,...,„„...-,s,,....•.,„,•,..4.„4„..7 ... sF5-,•isw:2_,,-5..,,Tp
` '''''t'''' 'C"ti'"47;:',i''''.'''',:ivt-i.v.-- -='-'-'71-vir- 1.0'''i• .'. ./s,':''','3`;:'.".,,,'.:trf ' ,'1;:ek 4',,:',1",.. -7,-;.r:1 ,,r.,.;',.,„,-!,''Cii4-,..",:;
V .
",,,16,Wype,'
,'-i!-V.:1 Mk''''f,s",1/40`--,5'443":";'Ztiv.0.4t., •%. --r.,,,Itleti it14,,,,, it;-;51.iRridA. • ii,
,,,,,,,,1...,A.;:,,,, ,,,,t,.4-4,??:t;:.i.,.-,J,,:,,, sv,-.',,4''-r7.„,3-''-'-' •' ''-' ''''",---i ',Fe' 0"1:-- ''K''"Ina.: '''''
•.-
e-•- ' -:v.-:'.."-.---Izr-: --1,',1-'''.,....2.4..tiry ,:.,,,-- ;--.- ..-A'n• -.*.0•7'... _.-._.__ _,_,.....
.,„.
,:'..._ .--'.---f•--.-----•• - - -•-,:,
' PROPOSED EXTERIOR IMPROVEMENT SUITE 341 ENTRY-(VIEW-A)
a'
•..
BRONZE ATIODIZED nAETAL
I.• iim, . =....,. ;r., . .,••• • ,,,,,..,-,,,,,! ‘....-.T.. ,, ,.. ......: . ....dt. . -' 0
r,..,9,5,,,,..... C•RN.,,,,;„.,-,PC•Or.:,..: GA C NT C•R
,E,•••,..7.144,-.T4•,...T.!f••..., v .,, •.N-,',A,T. ' '
v,Z4';/.4",*•,,..&:::,:.,'?,...,/:,...,TI /,';., •::!.
• ••-I-71- O ,....•••'''7r-r----F•2•••••- , " ^A-A.7- "• ....A.-0...y:- r4q•.6 :••," -Alrv,%=A••••••4.-4 .--i F.'•%.,1--', A•TT:-.•'••F Iv.•••v,••v•V..T. •••••••••••• ,
C'5',...r„. _ 1:1;:g0;1,,,./;01:sbErNTR::::EEL TREND ERA A•E.PIPE RAIL
BeAVABTAIAREIAT 0•4'EVA FIBER Q ,,,sw.21
..U.,. ,1•„,,,.,..., :,1,1•1,/,•• A ''; "/• , •''''
•••••••''•I'Mfr"i!!*.t"' l'EVrIETABil'Ot ''''
''• ' • •• - In',.. 1. .,1:1•'•T7A4vi,T ;•.'A'A;••.'Iv.c.,, ' v. - ." ......"..,.V•'/' k...B•••••••• "AI;-. ' atom,
‘4%, '*00140o4.
4':•-:; "7".••..--''''':''''''''''''' '1 4 ..'"'c. ,;.'`, •41''''''.' ••4.-••4•141•14„'../"..•),,T .,. ' t•J?7.4.
• . CAW BLOCK
;:•="01,E.coturAN WALLS AND DaTTRIO BASE)
''''-k 'i:"' '''''Lb.... ' • ' r---,Z.- --•-. .7'.S.7.''42Z,-' '':- "r*.-.... '....4.4.4"'"
OS
4
'.J.n''.V;, f1.. 1W LIEN 3 1,84
'"1' -"..,•'• ,' -'. ' 'Z... -7..t. .... , - --'1'44'''' 16:,41'. ' _Z., Ti,..tit,4.t,,ittt4":24-''
4444..... ....i...
L.
'••'-':t:'‘.:, ---'f-.---<---',..---:---:-, 11-e.lik, ,
ACCENT CORRUGATED METAL
"•••• • 'r...,___.1•,;,••",-44414'-',. •-"'• D; r,•••••.,„- - ,•,,,a•4,„•••ti •••kk.•--,•'A..'*•14/1T.IANT;),Ii•\TIT1/1k4- •
DOVRAII
WOPO1V GP AX
' •:...,•."..:.,i,...Z.,-an...i!......j."''-.... .....e. ,F...,..4. eg,tpot.,lidkL,S. ,,Arl.AT.'" t
LIE*11..LIMAS.,..
• P.IFIlv,n,
•••it.,ita VTA-1.::i.tar
• SMCCO
.
PET
.,..,W.:...,'"...... ....,Antag..W.,•" ---•
• ilLSCIA 110.01.
• WK.CIO.SORIS , F11111111111 1,./kE,TENJ‘BAN,,INTRT Waal
EXISTING
•
•
•
COLOR AND MATERIALS A5
. •
•
.k. -.
'1019 r m design
• WEST BRANCH STREET TENANT AND FACADE UPDATE
group. 15 0 WEST BRANCH STREET ARROYO GRANDE CA 1192-01-0018 JUNE 15,2018
•
. .
IMO IIIIIII .
Ell
•
•
s,cnE rA •
_tO4f •.! "Y`Nc •e ,! �mn I:WT?1'tTr:l...
_ .R E I, .-'.; �s .
a, 6 ; 4.v^ "a4 ..��u' i �}�' 3 S�-r ,�,-M sk.'�' -'�CS m�] -� U _
tt,i= ti.... : ,c �,.. "'_a 41.,�wP R`^ 11FItr � '�r.:.._. as ... :6_.3�:t. .�.® M®®_.. al ,.lr tit _ SH �. r,
SOUTH FLEVATION
SCALE: I/IR"=1'0"(26SHEET)
-i>T
�tiF,s{
::_l'u.l!>::.:.r A_.:....•_u......_.. u�^ '_.,..v:::r r,.---. . -....:--.z ...w..".. ..nt.. .._..t..s»..f....,i.1 ni-..-1_. -�^- .....+Cti..�. .�. ..»A..utry:%:a.z.... +-. »i x_`li'•:»sh � ..t-:.',...'. �::�.
NORTH ELEVATION
SCAN: =I'-0'124'036"SHEEP
•
FAST El FVAIION
SCALE: Inti'=I'-0"(267036'SHEET)
+_'
a r�i
'.tilt.
1 I®®
® �yq spy
- ' ' . V'i
a-.rx........2;.'ir�.'...r�:..:s....rr.rc.�..r.:.}:.:.............:7eL.7'.:�:.:�.,..�_,-......�,.-"."..�....._.:...�...c.._«.:.x.-_.-......__...�....r.»l,t.—_
WEST ELEVATION
SCALE: I/I o'=I'-0"(24Y..3F."SHEET)
•
111
' design WEST BRANCH STREET TENANT AND FACADE UPDATE BUILDING ELEVATIONS r
+wit r group 15 0 WEST BRANCH STREET ARROYO GRANDE CA 1192-01-0018 JUNE 15,2018 A 6