Loading...
CC 2019-04-23_08i SB 1 Project Selection for FY 2019-20 MEMORANDUM TO: CITY COUNCIL FROM: BILL ROBESON, PUBLIC WORKS DIRECTOR SHANNON ESENWEIN, ADMINISTRATIVE SERVICES DIRECTOR BY: JILL MCPEEK, CAPITAL IMPROVEMENT PROJECT MANAGER SUBJECT: CONSIDERATION OF A RESOLUTION TO ADOPT PROJECTS TO BE FUNDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB1) FUNDING FOR FISCAL YEAR 2019-20 DATE: APRIL 23, 2019 SUMMARY OF ACTION: Adopting the Resolution enables the City to be eligible for Senate Bill 1 (SB1) funding. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The City’s allocation of SB1 funding for FY 2019-20 is estimated to be $296,473. This additional Gas Tax funding will be utilized to maintain the City’s street system. With this allocation, the City’s total gas tax funding is $780,392. RECOMMENDATION: It is recommended the City Council: 1. Adopt a Resolution adopting a list of projects to be funded by SB1 in Fiscal Year 2019-20; and; 2. Authorize the Director of Administrative Services to submit the list of projects to the California Transportation Commission (CTC). BACKGROUND: On April 28, 2017, the Governor signed SB1, known as the Road Repair and Accountability Act of 2017. SB1 increases gasoline and diesel taxes and vehicle registration fees to address deferred maintenance on the state highway system and the local street and road system. These additional taxes are deposited by the State Controller into the Road Maintenance and Rehabilitation Account (RMRA). A portion of this funding is apportioned by formula to eligible cities and counties, including Arroyo Grande, pursuant to California Streets and Highways Code Section (SHC) 2032(h) and are to be used for basic road maintenance, rehabilitation, and critical safety projects on the local streets and roads system. Item 8.i. - Page 1 CITY COUNCIL CONSIDERATION OF A RESOLUTION TO ADOPT PROJECTS TO BE FUNDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB1) FUNDING FOR FISCAL YEAR 2019-20 APRIL 23, 2019 PAGE 2 Since SB1 emphasizes accountability and transparency in transportation funding, programming and use of the new funds is contingent on recipient cities and counties providing annual project reporting. Per SHC 2034(a)(1) prior to receiving any RMRA funding, cities and counties must submit a list of projects, adopted by Resolution, to be funded with the RMRA funds. SHC Section 2030(b) provides a number of example projects and uses for RMRA funding that include, but are not limited to, the following:  Road Maintenance and Rehabilitation  Safety Projects  Railroad Grade Separations  Complete Streets Components (including active transportation purposes, pedestrian and bicycle safety projects, transit facilities, and drainage and stormwater capture projects in conjunction with any other allowable project)  Traffic Control Devices  Matching funds to state or federal funds for projects under this subdivision Pursuant to SHC Section 2037, a city or county may spend its apportionment of RMRA funds on transportation priorities other than those outlined in SHC Section 2030 if the city’s or county’s average Pavement Condition Index (PCI) meets or exceeds 80. The City of Arroyo Grande’s current PCI is estimated to be 65. Based on the above, the City of Arroyo Grande can use its SB1 funds for general street maintenance or for specific projects. In the current fiscal year, the SB1 funding was used for a specific capital project, digout repairs on James Way and digout repairs/overlay of Garden Street. This was recommended to the Council due to the possible repeal of SB1 in 2018 as it would be less impactful to cut a specific project than to reduce the City’s in- house street maintenance program. ANALYSIS OF ISSUES: The City maintains its 67 miles of streets through two components: the in-house street crew that provides daily efforts to keep streets from declining and capital projects to provide long term maintenance. The State has provided an estimate for the amount of FY 2019-20 RMRA funding available to the City of Arroyo Grande as $296,473. It is recommended that these RMRA funds again be used to augment the City’s pavement management program for upcoming roadway rehabilitation projects on James Way and West Branch Street as opposed to allocating the funds to the City’s in-house street maintenance program. Item 8.i. - Page 2 CITY COUNCIL CONSIDERATION OF A RESOLUTION TO ADOPT PROJECTS TO BE FUNDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB1) FUNDING FOR FISCAL YEAR 2019-20 APRIL 23, 2019 PAGE 3 In accordance with Streets and Highway Code Section 2036, the City must maintain its existing commitment of local funds for street purposes to remain eligible for allocations of RMRA funds. This commitment is generally referred to as Maintenance of Effort (MOE). In order to receive these funds, each year the City must expend from its General Fund for street purposes an amount not less than the annual average of General Fund expenditures during fiscal years FY 2009-10, FY 2010-11 and FY 2011-12, as reported to the State Controller’s Office, pursuant to Streets and Highway Code Section 2151. For the City of Arroyo Grande, the amount of annual expenditures that must be spent from the General Fund for street purposes is $1,431,971. SHC 2034(a)(1) details the requirement that cities and counties must comply with when submitting its list of proposed projects to the CTC to be funded with RMRA funds each fiscal year. The requirements include: 1. The proposed projects must be adopted by Resolution by the City Council at a regular public meeting; 2. A description and the location of the work; 3. A proposed schedule for completion; and 4. The estimated useful life of the improvement ALTERNATIVES: The following alternatives are provided for the Council’s consideration: 1. Approve staff’s recommendations; 2. Do not approve staff’s recommendations and request further information; 3. Modify staff’s recommendation and approve; or 4. Provide direction to staff. ADVANTAGES: Submitting a list of projects will allow the City to receive RMRA funds. The projects will help to protect the City’s investment in its roadway system and maintain the roadways before they deteriorate beyond routine maintenance. DISADVANTAGES: There will be traffic inconveniences to the traveling public during construction. Staff will monitor the traffic control to conform to the requirements of the Municipal Uniform Traffic Control Devices manual (MUTCD) to mitigate any negative effects. City inspectors will be at the site during all phases of the operations to make adjustments for isolated instances (driveway access, etc.). Item 8.i. - Page 3 CITY COUNCIL CONSIDERATION OF A RESOLUTION TO ADOPT PROJECTS TO BE FUNDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB1) FUNDING FOR FISCAL YEAR 2019-20 APRIL 23, 2019 PAGE 4 ENVIRONMENTAL REVIEW: The filing of the project list for the RMRA funds is not a project under the California Environmental Quality Act (CEQA) as it causes no change to the environment. The pavement rehabilitation projects that use the RMRA funds will undergo environmental review for conformance to CEQA as part of its project development. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted at City Hall and on the City’s website in accordance with Government Code Section 54954.2. Item 8.i. - Page 4 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2019-20 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the City will receive an estimated $296,473 in RMRA funding in Fiscal Year 2019- 20 from SB1; and WHEREAS, this is the third year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and WHEREAS, the City used its Pavement Management System and collaboration of the City’s various Departments to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and WHEREAS, the funding from SB1 will help the City maintain and rehabilitate its approximately 66 miles of streets/road throughout the City this year and numerous similar projects into the future; and WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City’s streets and roads are in an at-risk condition and this revenue will help the City to maintain the overall quality of its road system and will help to keep the City’s streets and roads from falling into a poor condition; and Item 8.i. - Page 5 RESOLUTION NO. PAGE 2 WHEREAS, the SB1 project list and overall investment in local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Arroyo Grande hereby: 1. Finds that the foregoing recitals are true and correct. 2. The following list of proposed projects will be funded in-part or solely with fiscal year 2019- 20 Road Maintenance and Rehabilitation Account revenues: FY 2019-20 List of Projects Project Title: James Way Project Location: Oak Park Blvd to Tally Ho Road Estimated Useful Project Life: 10-15 Years Proposed Schedule for Completion: Summer 2019 Project Description: Pavement overlay and curb ramps Project Title: West Branch Street Project Location: Oak Park Blvd to East Grand Avenue Estimated Useful Project Life: 10 Years Proposed Schedule for Completion: Fall 2019 Project Description: Pavement repairs On motion of Council Member , seconded by Council Member , and on the following roll call vote, to wit: AYES: NOES: ABSENT: The foregoing Resolution was passed and adopted this 23rd day of April, 2019. Item 8.i. - Page 6 RESOLUTION NO. PAGE 3 ___________________________________ KRISTEN BARNEICH, MAYOR PRO TEM ATTEST: ________________________________________ KELLY WETMORE, CITY CLERK APPROVED AS TO CONTENT: ________________________________________ JAMES A. BERGMAN, CITY MANAGER APPROVED AS TO FORM: ________________________________________ HEATHER K. WHITHAM, CITY ATTORNEY Item 8.i. - Page 7 THIS PAGE INTENTIONALLY LEFT BLANK Item 8.i. - Page 8