CC 2019-06-25_09b Resolution Updating Operating Fees
MEMORANDUM
TO: CITY COUNCIL
FROM: SHANNON ESENWEIN, DIRECTOR OF ADMINISTRATIVE SERVICES
BY: NICOLE VALENTINE, ACCOUNTING MANAGER
SUBJECT: CONSIDERATION OF A RESOLUTION UPDATING OPERATING FEES
SET FORTH IN THE MASTER FEE SCHEDULE
DATE: JUNE 25, 2019
SUMMARY OF ACTION:
Increase fees paid by users of City services to reflect increased costs to provide the
service.
IMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
Implementation of the increased fees is projected to generate approximately $225,000 to
$250,000 annually, assuming activity levels are consistent with projections.
RECOMMENDATION:
It is recommended the City Council adopt a Resolution updating operating fees set forth
in the Master Fee Schedule, effective August 26, 2019.
BACKGROUND:
On September 13, 2016, the City Council received the results of a comprehensive study
that calculated the cost of providing a variety of City services. At that time, the City Council
adopted Resolution No. 4758, which provided that the Master Fee Schedule would be
updated annually by modifying the adopted value up or down in conformance with the
annual change in the City’s budgeted labor costs. The factor for adjustment of the fees
will be calculated and established each year by the Director of Administrative Services.
In addition, phased increases of Planning fees would be implemented at 5% per year for
four years, until an overall cost recovery level of 75% is achieved for Planning related fee
activities.
On April 24, 2018, the City Council reviewed the City’s fiscal situation and recommended
budget balancing strategies for the 2018-20 Biennial Budget. Discussed in that report
were recommended revenue enhancement strategies that increased the overall cost
recovery goal for Planning fees to 80% and accelerated the time frame to achieve the
goal. In addition, Recreation fees were proposed that would increase the cost recovery
Item 9.b. - Page 1
CITY COUNCIL
CONSIDERATION OF A RESOLUTION UPDATING OPERATING FEES SET FORTH IN
THE MASTER FEE SCHEDULE
JUNE 25, 2019
PAGE 2
target to 100% of direct costs for the Recreation Services Department. With the adoption
of the Biennial Budget, the City Council directed staff to undertake the follow-up actions
necessary to implement the budget balancing strategies identified. One such action is
updating the fee schedule.
On February 12, 2019, as a reaction to changes in State law, the City Council adopted
an Ordinance adding Sidewalk Vending to the Municipal Code. The application fee for
Sidewalk Vendor Permits has been added to the Police portion of the Master Fee
Schedule.
ANALYSIS OF ISSUES:
As requested by City Council, staff reviewed Recreation revenue to determine the impact
of raising Recreation fees for Fiscal Year 2018-19. Staff anticipated that there would be
a reduction in use of recreation services due to the increased cost of services. Staff
reviewed the revenues received through May of FY 2018-19 and determined that
recreation revenues are approximately 6% higher than original budget projections.
The Administrative Services Department has calculated the overall increase in labor
costs, and therefore the factor for adjusting most fees, as 3.0%. Direction was given at
the April 24, 2018 Council meeting to accelerate the time frame for Planning fees to reach
80% cost recovery by increasing fees by 15% in FY 18-19 and 15% in FY 19-20. In a
continued effort to have Recreation fees at 100% cost recovery, certain Recreation fees
are increasing by 9% to account for the increase in minimum wage. There is a minimum
60-day waiting period between the approval of certain new fees and when the new fees
can take effect; therefore, it is recommended that the effective date for the updated Master
Fee Schedule be Monday, August 26, 2019.
ALTERNATIVES:
The following alternatives are provided for the Council’s consideration:
1. Adopt a Resolution increasing the operating fees in the Master Fee Schedule as
presented;
2. Do not adopt the Resolution; or
3. Provide direction to staff.
ADVANTAGES:
Approving the recommended increases will allow the City to maximize revenue by
recovering the estimated cost of providing the service and reduce the subsidy borne by
the General Fund.
DISADVANTAGES:
The disadvantage of the recommendation is that it will result in fee increases.
Item 9.b. - Page 2
CITY COUNCIL
CONSIDERATION OF A RESOLUTION UPDATING OPERATING FEES SET FORTH IN
THE MASTER FEE SCHEDULE
JUNE 25, 2019
PAGE 3
ENVIRONMENTAL REVIEW:
No environmental review is required for this item.
PUBLIC NOTIFICATION AND COMMENTS:
A Notice of Public Hearing was published in The Tribune on Friday, June 14, 2019. The
Agenda was posted at City Hall and on the City’s website in accordance with Government
Code Section 54954.2.
Item 9.b. - Page 3
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ARROYO GRANDE UPDATING OPERATING FEES SET
FORTH IN THE MASTER FEE SCHEDULE
WHEREAS, in January 2015 the City of Arroyo Grande retained Wohlford Consulting to
conduct a User (operating) Fee Study for City services; and
WHEREAS, operating fees are intended to be paid by persons utilizing the program or
service and to reimburse the City for the actual cost of said program or service; and
WHEREAS, the City has established a proposed Master Fee Schedule based on the User
Fee Study, which includes fees related to planning, building, engineering, police,
recreation, and public works charges; and
WHEREAS, the City Council has considered the question of whether or not to adjust or
establish User (operating) Fees for City services to reflect the estimated amount that is
required to recover the actual cost to the City of providing such services; and
WHEREAS, the City Council adopted a methodology to annually update fees in order to
reflect the change in the actual cost to the City of providing services and reduce the
subsidy of the General Fund for planning related services; and
WHEREAS, the amount of the fees does not exceed the cost of providing the City
services; and
WHEREAS, at a duly noticed public meeting, the City Council considered all verbal and
written presentations that were made regarding the proposed fees; and
WHEREAS, at least ten days prior to the public meeting, the City made available to the
public data indicating the amount of cost, or estimated cost required to provide the
services for which the fee or service charge is levied and the revenue sources anticipated
to provide the service, including General Fund revenues.
NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo Grande
as follows:
1. The schedule of fees entitled “Master Fee Schedule” in Exhibit A attached hereto
and incorporated herein by this reference as though set forth in full, is hereby
adopted.
2. Fees shall be adjusted annually by modifying the adopted value up or down in
conformance with the annual change in the City’s budgeted labor costs. The factor
for the adjustment of the fees shall be calculated and established each year by the
Director of Administrative Services.
Item 9.b. - Page 4
RESOLUTION NO.
PAGE 2
3. Additional phased increases of Planning fees shall be implemented at 15% per
year for two years, until an overall cost recovery level of 80% is achieved for
Planning related fee activities.
BE IT FURTHER RESOLVED by the City Council that this Resolution shall be effective
August 26, 2019.
On motion of Council Member ______, seconded by Council Member ________, and by
the following roll call vote, to wit:
AYES:
NOES:
ABSENT:
the foregoing Resolution was passed and adopted this ____ day of ______, 2019.
Item 9.b. - Page 5
RESOLUTION NO.
PAGE 3
___________________________________
CAREN RAY, MAYOR
ATTEST:
___
JESSICA MATSON, DEPUTY CITY CLERK
APPROVED AS TO CONTENT:
___________________________________
JAMES A. BERGMAN, CITY MANAGER
APPROVED AS TO FORM:
___________________________________
HEATHER WHITHAM, CITY ATTORNEY
Item 9.b. - Page 6
Issued by the Administrative Services Department
CITY OF ARROYO GRANDE
Fiscal Year 2019-20
MASTER FEE SCHEDULE
Fees effective August 26, 2019
Exhibit A
Item 9.b. - Page 7
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2019-20
Hourly rates for all City staff positions will be calculated and provided by the Administrative Services
Department.
In the absence of an established fee for service, the City will recover costs based on the reasonable time and
materials required to provide the service, as calculated by the Administrative Services Department
Item 9.b. - Page 8
FY 2019-20 Fee
Budget 40.00$
Financial Statements copy costs
Business License Fees:
(Basic fees are prorated per the application date: Jan 1-Jun 30, 100%; Jul 1-Dec
31, 50%)
Basic Fee--All businesses except Specific License Fees listed below 34.00*
>Per Employee, Partner, or Associate (Except those listed below)5.00
Specific License Fees:
Contractor 64.00*
Motels & Hotels (Basic Fee)34.00*
>per room 1.00
Trailer Parks 34.00*
>per space 1.00
Hospitals, Sanitariums, Rest or Nursing Homes 44.00*
>per bed 3.00
Taxi Cabs 49.00*
>per vehicle 15.00
Billboards 129.00*
Commercial Auctions - Per Year 89.00*
Commercial Auctions - Per Day of Auctioning 29.00*
Circuses and similar shows (per day)70.00 + $4 State Fee
Bazaars and street fairs:
>Small Bazaars (1-4 displays or exhibits) per display per every two (2) days 15.00 + $4 State Fee
>Large Bazaars (5 or more displays or exhibits) per day 70.00 + $4 State Fee
* Includes $4 per license per State law (AB 1379)
Copies, per page (Black and White)0.20
Color copies Actual cost
Maps--Chamber of Commerce 1.00
Utility Fees and Penalties:
Renter's Deposit 180.00
New Utility Account Set Up Fee 40.00
Past Due Penalty (% of Past Due Total)10%
Lock Cut Replacement Fee 15.00
Reconnection Fee (Reconnect by City Personnel)90.00
Unauthorized Reconnection Fee (Reconnect by non-City Personnel)180.00
Returned check fee (NSF) -Per CA Civil Code Section 1719 25.00
Fee Description
City of Arroyo Grande
ADMINISTRATIVE SERVICES
Fiscal Year 2019-20
MASTER FEE SCHEDULE
No change compared to FY 2018-19 Fees
Item 9.b. - Page 9
FY 2019-20 Fee
City Council Meeting Audio CD 5.00/each
City Council Meeting DVD Vendor cost
Candidate Filing Fee no charge
Candidate Statement actual cost
Notice of Intent to Circulate Petition (EC 9202)200.00
Copies, per page (Black and White)0.20
Color copies Actual cost
Copies of records sent to a commercial copier Actual cost
Document Certification 10.00
Fair Political Practices Commission Forms:
Statement of Economic Interests Form 700 (GC 81008)0.10/page
Campaign Statements (GC 81008)0.10/page
Retrieval fee for statements 5 or more years old (GC 81008)5.00/request
Notary (per signature)15.00
Fee Description
CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
No change compared to FY 2018-19 Fees
Item 9.b. - Page 10
Fee Description
FY 2018-19
Fee
FY 2019-20
Fee
Printing/Copying Charges:
8 1/2" x 11 (per page)0.20$ 0.20$
18" x 30 (per page)3.00 3.00
24" x 36" (per page)4.00 4.00
36" x 48" (per page)5.00 5.00
Standard Plans 35.00 35.00
Land Use Map and Zoning Maps (each)
24x36 3.00 3.00
36x48 4.00 4.00
Overtime Inspections (per hour- 2 hour min.)153.00 158.00
Map Review - Final (LLA, PM, TM 0-2 Lots)5,703.00 5,874.00
Each Additional Lot 136.00 140.00
Additional Map Review - After 3 2,716.00 2,797.00
Encroachment Permit - Minor (pod, dumpster)55.00 57.00
Encroachment Permit - Standard - per Month 678.00 698.00
Encroachment Permit - Franchise Annual 16,966.00 17,475.00
Certificate of Compliance 2,096.00 2,159.00
Certificate of Correction / Merger 758.00 781.00
Transporation Permit - each occurrence 39.00 40.00
Public Improvement Plan - Plan Check (based on Engineer's
estimate of construction cost):
$0 - 10,000 2,501.00 2,576.00
$10,001 - 50,000 2,875.00 2,961.00
$50,001 - 100,000 3,309.00 3,408.00
$100,001 - 250,000 3,811.00 3,925.00
$250,001 - 500,000 5,300.00 5,459.00
$500,001 - 1.0 Million 6,912.00 7,119.00
Each additional $500,000 (over $1M)2,128.00 2,192.00
Additional Review Public Improvement Plan - Plan Check -
After 3 (based on Engineer's estimate of construction cost):
$0 - 10,000 607.00 625.00
$10,001 - 50,000 681.00 701.00
$50,001 - 100,000 756.00 779.00
$100,001 - 250,000 904.00 931.00
$250,001 - 500,000 1,197.00 1,233.00
$500,001 - 1.0 Million 2,079.00 2,141.00
Each additional $500,000 (over $1M)881.00 907.00
ENGINEERING
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Item 9.b. - Page 11
Fee Description
FY 2018-19
Fee
FY 2019-20
Fee
ENGINEERING
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Grading / Drainage / Erosion Plan Review:
0 - 50 cy 1,239.00$ 1,276.00$
50 cy to 100 cy 1,330.00 1,370.00
100 cy to 1,0000 cy 1,502.00 1,547.00
1,000 cy to 10,000 cy 1,674.00 1,724.00
10,000 cy to 100,000 cy 1,845.00 1,900.00
Hydraulic / Hydrology Report Review 778.00 801.00
SWPPP Review 778.00 801.00
Stormwater Control Plan Review 778.00 801.00
Inspection Agreement, including Subdivision Agreement
(based on Engineer's estimate of construction cost):
$0 - 10,000 725.00 747.00
$10,001 - 50,000 1,886.00 1,943.00
$50,001 - 100,000 3,610.00 3,718.00
$100,001 - 250,000 7,206.00 7,422.00
$250,001 - 500,000 13,860.00 14,276.00
$500,001 - 1.0 Million 26,890.00 27,697.00
Each additional $500,000 (over $1M)13,091.00 13,484.00
Major Project with a Contract Engineer - Actual cost of
Contractor passed directly through to Applicant
Major Project with a Contract Engineer - City Project
Management and Administrative Charge 1,251.00 1,289.00
Item 9.b. - Page 12
FY 2018-19
Fee
FY 2019-20
Fee
COPY FEES
Development Code w/out Appendices 50.00$ 50.00$
Appendix 1 15.00 15.00
Appendix 2 5.00 5.00
Development Code w/Appendices 70.00 70.00
General Plan 25.00 25.00
Housing Element 2003 35.00 35.00
General Plan EIR 12.00 12.00
Design Guidelines for Historic Districts 25.00 25.00
Design Guidelines for Traffic Way/Station Way 6.00 6.00
Design Guidelines for Mixed Use Districts 30.00 30.00
East Grand Avenue Enhancement Plan 20.00 20.00
Land Use Map and Zoning Maps (each)
24 x 36 3.00 3.00
36 x 48 4.00 4.00
DVD (Planning Commission meetings)Vendor cost Vendor cost
Audio recording copies 5.00 5.00
Copies, per page (Black and White)0.20 0.20
Color copies Actual cost Actual cost
Arroyo Grande Bike Plan 26.00 26.00
IN-LIEU FEES
Downtown Parking in lieu fee (per resolution 3994)24,000.00 24,000.00
Affordable Housing in lieu fee 1%5%
PROCESSING FEES
Notary (per signature)15.00 15.00
Annexation - deposit (fee based on actual time at staff at hourly rates)20,000.00 20,000.00
Time and Materials (if project exceeds 50 hours of staff time)
Appeals:
CD Director to Planning Commission 427.00 491.00
Planning Commission to City Council 1,011.00 1,163.00
Certificate of Compliance 3,054.00 3,512.00
Fee Description
COMMUNITY DEVELOPMENT
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Item 9.b. - Page 13
FY 2018-19
Fee
FY 2019-20
Fee Fee Description
COMMUNITY DEVELOPMENT
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Conditional Use Permit:
Project - Major (multi building)12,476.00$ 14,347.00$
Time and Materials (if project exceeds 50 hours of staff time)
Project - Minor (routine) - as det'd by CDD 5,402.00 6,212.00
Amendment 2,728.00 3,137.00
Development Agreement - deposit 20,890.00 24,024.00
Time and Materials (if project exceeds 50 hours of staff time)
Dev. Code Amendment - Major 14,076.00 16,187.00
Time and Materials (if project exceeds 50 hours of staff time)
Dev. Code Amendment - Minor 7,740.00 8,901.00
Environmental Impact Determination:
Initial Study Fee 2,967.00 3,412.00
Negative Declaration (in addition to Initial Study Fee)482.00 554.00
Mitigated Neg Dec (in addition to Initial Study Fee)2,016.00 2,318.00
General Plan Amendment (Major)14,076.00 16,187.00
Time and Materials (if project exceeds 50 hours of staff time)
General Plan Amendment (Minor)7,740.00 8,901.00
Home Occupation Permit 144.00 166.00
Lot Line Adjustment 2,892.00 3,326.00
Lot Merger / Reversion to Acreage 2,846.00 3,273.00
Mailing Label Production 353.00 406.00
Request for Meeting Continuance 401.00 461.00
Minor Use Permit - Architectural Review
Major (e.g. subdivision if PUD or CUP is not concurrently processed)4,474.00 5,145.00
Minor (e.g. single lot)803.00 923.00
Minor Use Permit - Historic Resource Designation 1,280.00 1,472.00
Minor Use Permit - Large Family Day Care 488.00 561.00
Minor Use Permit - Minor Exception 869.00 999.00
Minor Use Permit - Plot Plan Review 639.00 735.00
Minor Use Permit - Temporary Use Permit 256.00 294.00
Minor Use Permit - Viewshed Review:983.00 1,130.00
Item 9.b. - Page 14
FY 2018-19
Fee
FY 2019-20
Fee Fee Description
COMMUNITY DEVELOPMENT
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Planned Unit Development Permit (Major)13,270.00$ 15,261.00$
Time and Materials (if project exceeds 50 hours of staff time)
Planned Unit Development Permit (Minor)6,349.00 7,301.00
Planning Commission lnterpretation or Waiver 1,574.00 1,810.00
Pre-Application 1,068.00 1,228.00
Public Art Permit 806.00 927.00
Research (deposit)192.00 221.00
Signs:
Planned Sign Program 2,079.00 2,391.00
Administrative Sign Permit 298.00 343.00
Administrative Sign Program 1,171.00 1,347.00
Specific Plan or Amendment (deposit)20,850.00 23,978.00
Time and Materials (if project exceeds 50 hours of staff time)
Tentative Parcel Map (0-4 lots)8,293.00 9,537.00
with Vesting (added to base fee)514.00 591.00
Amendment 4,017.00 4,620.00
Tentative Tract Map:
5-20 lots 13,626.00 15,670.00
over 20 lots 15,817.00 18,190.00
with Vesting (added to base fee)1,335.00 1,535.00
Amendment 5,982.00 6,879.00
Time Extension 2,233.00 2,568.00
Variance 3,159.00 3,633.00
Zoning Compliance Letter 128.00 147.00
Item 9.b. - Page 15
Fee Description FY 2018-19 Fee FY 2019-20 Fee
ANIMAL CONTROL / IMPOUND
Dog Impound Fee
1st Impound 22.00$ 23.00$
2nd Impound 44.00 45.00
3rd Impound +66.00 68.00
Cat Impound Fee
1st Impound 22.00 23.00
2nd Impound 44.00 45.00
3rd Impound +66.00 68.00
PERMITS & LICENSES:
Alarm Permit
Original Application Permit Processing Fee 104.00 107.00
Annual Renewal Permit Processing Fee 49.00 50.00
False Alarm Response
Fourth False Alarm within 12 months 164.00 169.00
Fifth False Alarm within 12 months 329.00 339.00
Sixth or more false alarm within 12 months (per incident)492.00 507.00
Block Party Permit
Block Party Permit 28.00 29.00
Cannabis Delivery Service License
Application Processing Fee 657.00 677.00
Background Investigation Fees 101.00 104.00
ID Card / Vehicle Permit Fee 33.00 34.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00
Dept of Justice & FBI Fingerprint Process actual cost actual cost
Cannabis Delivery Service License Renewal
Application Processing Fee 547.00 563.00
Background Investigation Fees 38.00 39.00
ID Card / Vehicle Permit Fee 33.00 34.00
Cannabis Delivery Driver Permit
Application Processing Fee 657.00 677.00
Background Investigation Fees 101.00 104.00
ID Card / Vehicle Permit Fee 33.00 34.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00
Dept of Justice & FBI Fingerprint Process actual cost actual cost
Cannabis Delivery Driver Permit Renewal
Application Processing Fee 547.00 563.00
Background Investigation Fees 101.00 104.00
ID Card / Vehicle Permit Fee 33.00 34.00
Commercial Filming / Still Photography Permit
Permit Processing Fee 55.00 57.00
Commercial Filming (per day)274.00 282.00
Still Photography (per day)109.00 112.00
City Staff Assigned - 4 hour minimum (if applicable)overtime rate overtime rate
POLICE
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Item 9.b. - Page 16
Fee Description FY 2018-19 Fee FY 2019-20 Fee
POLICE
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Concealed Weapons Permit Original Application
Police Department Investigation Fee 109.00$ 112.00$
Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)93.00 93.00
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00
Identification Card 22.00 23.00
Concealed Weapons Permit Biennial Renewal:
Police Department Investigation Fee 28.00 29.00
Dept of Justice Renewal Fee (DOJ passthrough fee paid by applicant)52.00 52.00
Identification Card 22.00 23.00
Mobile Vendor Permit
Permit Processing Fee 137.00 141.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00
Dept of Justice & FBI Fingerprint Process actual cost actual cost
Mobile Vendor Employee Permit
Permit Processing Fee 137.00 141.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00
Dept of Justice & FBI Fingerprint Process actual cost actual cost
Sidewalk Vending Permit
Permit Processing Fee 280.00
Palmreader Fortune Teller Permit - Original Application
Permit Processing Fee 137.00 141.00
Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost actual cost
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00
Palmreader Fortune Teller Permit - Annual Renewal
Permit Renewal Processing 109.00 112.00
Palmreader Fortune Teller Establishment Permit - Original Application
Permit Processing Fee 137.00 141.00
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00
Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost actual cost
Palmreader Fortune Teller Establishment Permit - Renewal Application
Permit Processing Fee 109.00 112.00
Public Safety and Welfare Permit:
Less than 200 Non-Commercial Event 55.00 57.00
More than 200 Non-Commercial Event 109.00 112.00
Commercial Event 137.00 141.00
Second Hand Dealer Permit Original Application
Permit Processing Fee 137.00 141.00
Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 25.00
Dept of Justice & FBI Fingerprint process (DOJ passthrough fee paid by applicant)actual cost actual cost
Second Hand Dealer Permit Biennial Renewal
City Processing Fee 109.00 112.00
Item 9.b. - Page 17
Fee Description FY 2018-19 Fee FY 2019-20 Fee
POLICE
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Solicitation Permit (per solicitor)
Permit Processing Fee 137.00$ 141.00$
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00
Dept of Justice & FBI Fingerprint Processing Fee actual cost actual cost
Taxi Cab Driver Permit Original Application
Permit Processing Fee 137.00 141.00
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00
Dept of Justice & FBI Fingerprint Process actual cost actual cost
Taxi Cab Driver Permit Annual Renewal
Annual Renewal 109.00 112.00
Tobacco Retailers License
Permit Processing Fee 137.00 141.00
OTHER FEES
Citation correction certification 28.00 29.00
Civil Witness Fee (Deposit)275.00 275.00
Copies, per page (Black and White).20 per page .20 per page
Copies - Color copies per page 5.00 5.00
Court Ordered Booking 137.00 141.00
Criminal history summary examination
Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 25.00
Dept of Justice & FBI Fingerprint Process actual cost actual cost
Disturbance 415PC
Second Response 164.00 169.00
Third Response 329.00 339.00
Fourth Response 547.00 563.00
Emergency DUI Response -Impaired Driver Accident - Actual Time @ Staff Hourly
Rates actual cost actual cost
Local Records Check 16.00 16.00
Photographs
per disc 25.00 25.00
Property Handling for Mailing / Shipping actual cost actual cost
Replacement of lost/stolen Permits, Licenses and registration receipts 49.00 50.00
Repossessed Vehicle (per GC 41612)15.00 15.00
Subpoena Duces Tecum
Production of Records for Subpoena deuces Tecum 15.00 15.00
.20 per page produced actual cost actual cost
postage/shipping actual cost actual cost
Custodian of Records Court Appearance 275.00 275.00
Vehicle Release - Impound/Stored Vehicle Release 55.00 57.00
Vehicle Release 30-day Impound Release Review 82.00 84.00
Clearance letter 49.00 50.00
Item 9.b. - Page 18
Fee Description
Plan Check
Fee FY 18-19
Inspection Fee
FY 18-19
Plan Check
Fee FY 19-20
Inspection Fee
FY 19-20
Cellular/Mobile Phone, free-standing NEW 1,079.00$ 1,538.00$ 1,111.00$ 1,584.00$
Cellular Tower with Equipment Shelter 1,079.00 1,724.00 1,111.00 1,776.00
Cellular Tower Equipment Demolition 415.00 434.00 427.00 447.00
Awning (not patio cover) Tents / Canopies / Booths 112.00 169.00 115.00 174.00
188.00 343.00 194.00 353.00
Close Existing Openings 112.00 230.00 115.00 237.00
Compliance Inspections/Reinspections 209.00 282.00 215.00 290.00
Deck (with Calcs)242.00 302.00 249.00 311.00
Demolition 112.00 354.00 115.00 365.00
Demolition - MultiFamily/Commercial 112.00 354.00 115.00 365.00
Door 112.00 243.00 115.00 250.00
Fence or Wall (wood, chain link, wrought iron):
>6 feet in height, 1st 100 s.f.112.00 310.00 115.00 319.00
Each additional 100 sf 85.00 112.00 88.00 115.00
Fence or Freestanding Wall (masonry / garden):
City Standard, 1st 100 s.f.112.00 310.00 115.00 319.00
Each additional 100 sf 85.00 112.00 88.00 115.00
Engineered Wall, 1st 100 sf 145.00 310.00 149.00 319.00
Each additional 100 sf 118.00 112.00 122.00 115.00
Fireplace (masonry or pre-fab)112.00 224.00 115.00 231.00
Flag pole (greater than 6 feet in height)112.00 224.00 115.00 231.00
Grading (Cut and Fill):
0-50 Cubic Yards (Cut and Fill)145.00 224.00 149.00 231.00
Each Add'l 50 CY (or portion thereof)71.00 169.00 73.00 174.00
Pilaster each 10 112.00 224.00 115.00 231.00
Lighting pole (each)112.00 191.00 115.00 197.00
Stucco Applications 70.00 224.00 72.00 231.00
Retaining Wall (concrete or masonry):
First 50 sf 231.00 256.00 238.00 264.00
Each additional 50 sf 204.00 145.00 210.00 149.00
Re-roofing:
Composition - no tear off 92.00 216.00 95.00 222.00
Other roofs (first 10 squares)92.00 216.00 95.00 222.00
Each additional 10 squares 22.00 53.00 23.00 55.00
Roof Structure Replacement 145.00 256.00 149.00 264.00
Sauna - steam 112.00 269.00 115.00 277.00
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Change of Occupancy No T.I. w/ plan check &
Inspection
BUILDING MISC
Item 9.b. - Page 19
Fee Description
Plan Check
Fee FY 18-19
Inspection Fee
FY 18-19
Plan Check
Fee FY 19-20
Inspection Fee
FY 19-20
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
BUILDING MISC
Siding:
Stone and Brick Veneer (interior or exterior)92.00$ 269.00$ 95.00$ 277.00$
All Other 70.00 269.00 72.00 277.00
Signs:
Directional / Menu 231.00 269.00 238.00 277.00
Freeway sign 530.00 296.00 546.00 305.00
Ground / Roof / Projecting Signs 220.00 256.00 227.00 264.00
Wall, Illuminated 92.00 269.00 95.00 277.00
Skylight (Residential each)70.00 237.00 72.00 244.00
Skylight (Commercial) one 92.00 237.00 95.00 244.00
Spa or Hot Tub (Pre-fabricated)92.00 269.00 95.00 277.00
Stairs - per story 338.00 256.00 348.00 264.00
Storage Racks each set of plans 391.00 321.00 403.00 331.00
Temporary Utility Connection or Occupancy - 92.00 - 95.00
Window or Sliding Glass Door (first)231.00 256.00 238.00 264.00
Each additional 204.00 119.00 210.00 123.00
Board of Appeals 869.00 - 895.00 -
Business License Inspection 44.00 67.00 45.00 69.00
Business License Re-inspection 44.00 35.00 45.00 36.00
Product Review 653.00 - 673.00 -
Disabled Access Compliance Inspection 130.00 87.00 134.00 90.00
Supplemental Plan Check Fee (first 1/2 hour)118.00 - 122.00 -
Each Additional 1/2 hour (or portion thereof)107.00 - 110.00 -
Supplemental Inspection Fee (first 1/2 hour)- 118.00 - 122.00
Each Additional 1/2 hour (or portion thereof)- 107.00 - 110.00
- 226.00 - 233.00
Each additional hour - 214.00 - 220.00
After Hours Inspection 2 hour minimum - 226.00 - 233.00
Each additional hour - 214.00 - 220.00
After Hours Plan Review 2 hour minimum 226.00 - 233.00 -
Each additional hour 214.00 - 220.00 -
Copies, per page (Black and White) 0.20 per page
Color copies actual costs
Emergency (Non-Scheduled) Call-Out Fee (first
hour) 2 hour minimum
Item 9.b. - Page 20
Fee Description
Plan Check
Fee FY 18-19
Inspection
Fee FY 18-19
Plan Check
Fee FY 19-20
Inspection
Fee FY 19-20
Fire Sprinkler Systems - New Construction:
1-50 Heads 215.00$ 235.00$ 221.00$ 242.00$
51-100 Heads 269.00 334.00 277.00 344.00
101-200 Heads 485.00 400.00 500.00 412.00
Every 200 Heads above 200 214.00 153.00 220.00 158.00
Fire Sprinkler Systems -Tenant Improvements:
1-25 Heads 215.00 235.00 221.00 242.00
26-100 Heads 324.00 367.00 334.00 378.00
Every 100 Heads above 100 107.00 246.00 110.00 253.00
Fire Alarm System (including Sprinkler Monitor System) - New Construction:
1-50 Devices 215.00 235.00 221.00 242.00
51-100 Devices 269.00 334.00 277.00 344.00
Every 50 Devices above 100 107.00 220.00 110.00 227.00
Fire Alarm System (including Sprinkler Monitor System) - Tenant Improvements:
1-50 Devices 215.00 268.00 221.00 276.00
51-100 Devices 269.00 367.00 277.00 378.00
Every 50 Devices above 100 162.00 220.00 167.00 227.00
Other Suppression Systems:
Inert Gas Systems 377.00 471.00 388.00 485.00
Dry Chemical Systems 215.00 471.00 221.00 485.00
Wet Chemical/Kitchen Hood 322.00 471.00 332.00 485.00
Foam Systems 215.00 644.00 221.00 663.00
Paint Spray Booth 484.00 698.00 499.00 719.00
Other Fire Fees:
Hydrants/Underground Fire Service Plan Check 431.00 - 444.00 -
Hydrant Flow Test (existing hydrants)- 644.00 - 663.00
Special Event Inspection (e.g., fairs) These are group events, when multiple booths/tents are erected
Booth / Tent 57.00 62.00 59.00 64.00
Booth / Tent with Electricity 82.00 101.00 84.00 104.00
Booth / Tent with Cooking (includes Electricity)88.00 121.00 91.00 125.00
Special Event Application Review - 23.00 - 24.00
Additional Fire related services are provided by Five Cities Fire Authority (FCFA). See the FCFA fee
schedule for fees.
City of Arroyo Grande
BUILDING FIRE
Fiscal Year 2019-20
MASTER FEE SCHEDULE
Item 9.b. - Page 21
Fee Description
Plan Check
Fee FY 18-19
Inspection
Fee FY 18-19
Plan Check
Fee FY 19-20
Inspection
Fee FY 19-20
ADMINISTRATIVE (BASE) FEES:
Permit Issuance and Administration 110.00$ -$ 113.00$ -$
MECHANICAL PERMIT FEES
FAU less than 100,000 Btu/h 54.00 66.00 56.00 68.00
FAU greater than 100,000 Btu/h 54.00 100.00 56.00 103.00
Floor furnace (including vent)54.00 133.00 56.00 137.00
Suspended, wall, or floor-mounted heaters 54.00 100.00 56.00 103.00
Appliance vents not included in an appliance permit 54.00 100.00 56.00 103.00
Boiler or compressor, from 15 HP to 30 HP / absorption
system from 1,000,000 Btu/h to 1,750,000 Btu/h.54.00 100.00 56.00 103.00
Boiler or compressor, from 30 HP to 50 HP / absorption
system from 1,000,000 Btu/h to 1,750,000 Btu/h.107.00 133.00 110.00 137.00
Boiler or compressor, over 50 HP /
absorption system over 1,750,000 Btu/h.161.00 100.00 166.00 103.00
Air-handling unit, including attached ducts.107.00 100.00 110.00 103.00
Air-handling unit over 10,000 CFM 161.00 133.00 166.00 137.00
Evaporative cooler 54.00 66.00 56.00 68.00
Ventilation fan connected to a single duct 107.00 100.00 110.00 103.00
Ventilation system (not a portion of heating or a/c system)161.00 133.00 166.00 137.00
Incinerator, residential 268.00 198.00 276.00 204.00
Commercial or Industrial-type incinerator 321.00 198.00 331.00 204.00
Misc. appliances or equipment.161.00 133.00 166.00 137.00
Stand Alone Mechanical Plan Check (hourly rate)214.00 - 220.00 -
Other Mechanical Inspections (per hour)- 133.00 - 137.00
PLUMBING / GAS PERMIT FEES:
Plumbing fixtures 54.00 66.00 56.00 68.00
Building sewer 107.00 100.00 110.00 103.00
Rainwater systems (per drain)54.00 66.00 56.00 68.00
Gray Water system 161.00 165.00 166.00 170.00
Private sewage disposal system 161.00 165.00 166.00 170.00
Water Heater 107.00 66.00 110.00 68.00
Industrial waste pretreatment interceptor 54.00 100.00 56.00 103.00
Water piping and/or water treating equipment (each)54.00 100.00 56.00 103.00
Repair or alteration of drainage or vent piping, each fixture 54.00 100.00 56.00 103.00
Each lawn sprinkler system on any one meter 54.00 66.00 56.00 68.00
Backflow devices each unit 107.00 66.00 110.00 68.00
Atmospheric-type vacuum breakers: 1-5 units 107.00 66.00 110.00 68.00
Atmospheric-type vacuum breakers: each unit over 5 units 107.00 66.00 110.00 68.00
Stand Alone Plumbing Plan Check (hourly rate)214.00 - 220.00 -
Other Plumbing and Gas Inspections (per hour)- 133.00 - 137.00
MASTER FEE SCHEDULE
City of Arroyo Grande
BUILDING MPE
Fiscal Year 2019-20
Item 9.b. - Page 22
Fee Description
Plan Check
Fee FY 18-19
Inspection
Fee FY 18-19
Plan Check
Fee FY 19-20
Inspection
Fee FY 19-20
MASTER FEE SCHEDULE
City of Arroyo Grande
BUILDING MPE
Fiscal Year 2019-20
SYSTEM FEES:
Swimming Pools 161.00$ 231.00$ 166.00$ 238.00$
Outdoor Events 161.00 100.00 166.00 103.00
Electric generator and electrically-driven rides 107.00 100.00 110.00 103.00
Mechanically-driven rides/ attractions with electrical lighting 161.00 100.00 166.00 103.00
Each system of area and booth lighting 107.00 100.00 110.00 103.00
Temporary Power Service 107.00 66.00 110.00 68.00
Temporary power pole 107.00 66.00 110.00 68.00
Sub poles (each)54.00 46.00 56.00 47.00
UNIT FEES:
Receptacle, Switch, and Lighting Outlets
First 10 107.00 66.00 110.00 68.00
Each Additional 10 54.00 33.00 56.00 34.00
Lighting Fixtures:
First 10 107.00 66.00 110.00 68.00
Each additional 10 54.00 33.00 56.00 34.00
Pole or platform-mounted lighting fixtures (each)107.00 100.00 110.00 103.00
Theatrical-type lighting fixtures or assemblies (each)107.00 133.00 110.00 137.00
Residential Appliances (each)107.00 66.00 110.00 68.00
Nonresidential Appliances 161.00 133.00 166.00 137.00
Residential appliances and self-contained, nonresidential
appliances, (each)161.00 133.00 166.00 137.00
Appliances not exceeding one horsepower (HP)
kilowatt (KW), or kilovolt-ampere (KVA), in rating,(each)214.00 133.00 220.00 137.00
Power Apparatus:
Motors, generators, transformers, rectifiers,
synchronous converters, capacitors, industrial heating, air
conditioners
and heat pumps, cooking or baking equipment, and other
apparatus (all sizes)161.00 66.00 166.00 68.00
Signs, Outline Lighting, and Marquees:
Signs, Outline Lighting, or Marquees supplied from one
branch circuit (each)107.00 100.00 110.00 103.00
Additional branch circuits within the same sign,
outline lighting system, or marquee (each)107.00 66.00 110.00 68.00
Service or Panel:
200 amp or less Electrical Panel (each)161.00 133.00 166.00 137.00
Over 200 amp up to 1000 amp Electrical Panel (each)268.00 165.00 276.00 170.00
Over 1000 amp Electrical Panel (each)428.00 198.00 441.00 204.00
Item 9.b. - Page 23
Fee Description
Plan Check
Fee FY 18-19
Inspection
Fee FY 18-19
Plan Check
Fee FY 19-20
Inspection
Fee FY 19-20
MASTER FEE SCHEDULE
City of Arroyo Grande
BUILDING MPE
Fiscal Year 2019-20
UNIT FEES (continued):
107.00$ 100.00$ 110.00$ 103.00$
107.00 133.00 110.00 137.00
Photovotaic Systems - each 161.00 198.00 166.00 204.00
Stand Alone Electrical Plan Check (hourly rate)214.00 - 220.00 -
Other Electrical Inspections (per hour)- 133.00 - 137.00
Electrical apparatus, conduits, and conductors for which a
permit is required, but for which no fee is herein set forth
Miscellaneous Apparatus, Conduits, and Conductors
Item 9.b. - Page 24
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
2,000 4,579$ 0.206$ 4,716$ 0.212$
8,000 5,813$ 0.277$ 5,988$ 0.285$
1 A-1 20,000 9,136$ 0.300$ 9,411$ 0.309$
40,000 15,140$ 0.201$ 15,594$ 0.207$
100,000 27,211$ 0.272$ 28,028$ 0.280$
1,000 2,953$ 0.237$ 3,042$ 0.244$
4,000 3,664$ 0.322$ 3,773$ 0.331$
2 A-2 10,000 5,593$ 0.348$ 5,761$ 0.359$
20,000 9,076$ 0.234$ 9,349$ 0.241$
50,000 16,103$ 0.322$ 16,587$ 0.332$
250 1,547$ 0.324$ 1,593$ 0.334$
1,000 1,790$ 0.393$ 1,843$ 0.405$
3 A 2,500 2,380$ 0.430$ 2,451$ 0.442$
5,000 3,453$ 0.276$ 3,557$ 0.285$
12,500 5,527$ 0.442$ 5,692$ 0.455$
1,000 2,953$ 0.237$ 3,042$ 0.244$
4,000 3,664$ 0.322$ 3,773$ 0.331$
4 A-3 10,000 5,593$ 0.348$ 5,761$ 0.359$
20,000 9,076$ 0.234$ 9,349$ 0.241$
50,000 16,103$ 0.322$ 16,587$ 0.332$
500 2,109$ 0.287$ 2,173$ 0.295$
2,000 2,539$ 0.375$ 2,616$ 0.386$
5 R-4 5,000 3,665$ 0.408$ 3,775$ 0.420$
10,000 5,703$ 0.270$ 5,874$ 0.278$
25,000 9,757$ 0.390$ 10,050$ 0.402$
250 1,547$ 0.324$ 1,593$ 0.334$
1,000 1,790$ 0.393$ 1,843$ 0.405$
6 A-3 2,500 2,380$ 0.430$ 2,451$ 0.442$
5,000 3,453$ 0.276$ 3,557$ 0.285$
12,500 5,527$ 0.442$ 5,692$ 0.455$
2,000 3,562$ 0.152$ 3,669$ 0.157$
8,000 4,476$ 0.209$ 4,610$ 0.215$
7 E 20,000 6,986$ 0.226$ 7,195$ 0.233$
40,000 11,514$ 0.153$ 11,859$ 0.157$
100,000 20,686$ 0.207$ 21,307$ 0.213$
250 1,547$ 0.324$ 1,593$ 0.334$
1,000 1,790$ 0.393$ 1,843$ 0.405$
8 E 2,500 2,380$ 0.430$ 2,451$ 0.442$
5,000 3,453$ 0.276$ 3,557$ 0.285$
12,500 5,527$ 0.442$ 5,692$ 0.455$
Educational Building - TI
Educational Building - Complete
Assembly Group - Theaters
Assembly Group - Restaurants,
nightclubs
Church and Religious Bldg - TI
Congregate Care - Complete
Church and Religious Bldg -
Complete
Assembly Group - TI
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
Item 9.b. - Page 25
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
500 1,781$ 0.214$ 1,834$ 0.220$
2,000 2,102$ 0.271$ 2,165$ 0.280$
9 S-2 5,000 2,916$ 0.295$ 3,003$ 0.304$
10,000 4,391$ 0.193$ 4,523$ 0.199$
25,000 7,290$ 0.292$ 7,509$ 0.300$
1,000 2,953$ 0.237$ 3,042$ 0.244$
4,000 3,664$ 0.322$ 3,773$ 0.331$
10 R-1 10,000 5,593$ 0.348$ 5,761$ 0.359$
20,000 9,076$ 0.234$ 9,349$ 0.241$
50,000 16,103$ 0.322$ 16,587$ 0.332$
1,000 1,735$ 0.101$ 1,787$ 0.104$
4,000 2,039$ 0.128$ 2,100$ 0.132$
11 R-1 10,000 2,809$ 0.139$ 2,893$ 0.144$
20,000 4,203$ 0.091$ 4,329$ 0.094$
50,000 6,937$ 0.139$ 7,146$ 0.143$
250 1,500$ 0.304$ 1,545$ 0.313$
1,000 1,727$ 0.363$ 1,779$ 0.374$
12 R-1 2,500 2,272$ 0.398$ 2,341$ 0.409$
5,000 3,266$ 0.254$ 3,364$ 0.262$
12,500 5,174$ 0.414$ 5,329$ 0.426$
500 2,220$ 0.304$ 2,286$ 0.313$
2,000 2,676$ 0.385$ 2,757$ 0.396$
13 B 5,000 3,830$ 0.419$ 3,945$ 0.431$
10,000 5,923$ 0.273$ 6,100$ 0.282$
25,000 10,023$ 0.401$ 10,324$ 0.413$
1,000 1,524$ 0.078$ 1,569$ 0.080$
4,000 1,758$ 0.095$ 1,811$ 0.098$
14 B 10,000 2,326$ 0.103$ 2,396$ 0.107$
20,000 3,360$ 0.066$ 3,461$ 0.068$
50,000 5,350$ 0.107$ 5,511$ 0.110$
100 1,322$ 0.558$ 1,362$ 0.575$
400 1,490$ 0.628$ 1,534$ 0.646$
15 B 1,000 1,866$ 0.688$ 1,922$ 0.709$
2,000 2,555$ 0.427$ 2,631$ 0.439$
5,000 3,834$ 0.767$ 3,949$ 0.790$
1,000 2,953$ 0.237$ 3,042$ 0.244$
4,000 3,664$ 0.322$ 3,773$ 0.331$
16 F 10,000 5,593$ 0.348$ 5,761$ 0.359$
20,000 9,076$ 0.234$ 9,349$ 0.241$
50,000 16,103$ 0.322$ 16,587$ 0.332$
Parking Garage - Complete
Industrial Building - Complete
Offices, etc. - TI
Offices, etc. - Shell
Offices, etc. - Complete
Hotel Low/Mid Rise - TI
Hotel Low/Mid Rise - Shell
Hotel Low/Mid Rise - Complete
Item 9.b. - Page 26
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
1,000 2,015$ 0.133$ 2,076$ 0.137$
4,000 2,415$ 0.173$ 2,487$ 0.178$
17 F 10,000 3,451$ 0.188$ 3,555$ 0.193$
20,000 5,328$ 0.124$ 5,488$ 0.128$
50,000 9,052$ 0.181$ 9,324$ 0.186$
250 1,500$ 0.304$ 1,545$ 0.313$
1,000 1,727$ 0.363$ 1,779$ 0.374$
18 F 2,500 2,272$ 0.398$ 2,341$ 0.409$
5,000 3,266$ 0.254$ 3,364$ 0.262$
12,500 5,174$ 0.414$ 5,329$ 0.426$
500 2,015$ 0.266$ 2,076$ 0.274$
2,000 2,415$ 0.346$ 2,487$ 0.356$
19 S-1 5,000 3,451$ 0.375$ 3,555$ 0.387$
10,000 5,328$ 0.248$ 5,488$ 0.256$
25,000 9,052$ 0.362$ 9,324$ 0.373$
500 1,407$ 0.131$ 1,449$ 0.135$
2,000 1,602$ 0.152$ 1,651$ 0.157$
20 S-1 5,000 2,059$ 0.167$ 2,121$ 0.172$
10,000 2,892$ 0.105$ 2,979$ 0.108$
25,000 4,469$ 0.179$ 4,603$ 0.184$
100 1,477$ 0.730$ 1,521$ 0.752$
400 1,696$ 0.874$ 1,746$ 0.900$
21 S-1 1,000 2,220$ 0.953$ 2,286$ 0.982$
2,000 3,173$ 0.608$ 3,268$ 0.626$
5,000 4,998$ 1.000$ 5,148$ 1.030$
500 2,109$ 0.287$ 2,173$ 0.295$
2,000 2,539$ 0.375$ 2,616$ 0.386$
22 M 5,000 3,665$ 0.408$ 3,775$ 0.420$
10,000 5,703$ 0.270$ 5,874$ 0.278$
25,000 9,757$ 0.390$ 10,050$ 0.402$
500 1,407$ 0.131$ 1,449$ 0.135$
2,000 1,602$ 0.152$ 1,651$ 0.157$
23 M 5,000 2,059$ 0.167$ 2,121$ 0.172$
10,000 2,892$ 0.105$ 2,979$ 0.108$
25,000 4,469$ 0.179$ 4,603$ 0.184$
100 1,477$ 0.730$ 1,521$ 0.752$
400 1,696$ 0.874$ 1,746$ 0.900$
24 M 1,000 2,220$ 0.953$ 2,286$ 0.982$
2,000 3,173$ 0.608$ 3,268$ 0.626$
5,000 4,998$ 1.000$ 5,148$ 1.030$
Retail Sales - TI
Retail Sales - Shell
Retail Sales - Complete
Repair Garage & Service St - TI
Repair Garage & Service St - Shell
Repair Garage & Service St -
Complete
Industrial Building - TI
Industrial Building - Shell
Item 9.b. - Page 27
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
2,000 2,015$ 0.067$ 2,076$ 0.069$
8,000 2,415$ 0.086$ 2,487$ 0.089$
25 - 20,000 3,451$ 0.094$ 3,555$ 0.097$
40,000 5,328$ 0.062$ 5,488$ 0.064$
100,000 9,052$ 0.091$ 9,324$ 0.093$
1,000 2,953$ 0.237$ 3,042$ 0.244$
4,000 3,664$ 0.322$ 3,773$ 0.331$
26 I 10,000 5,593$ 0.348$ 5,761$ 0.359$
20,000 9,076$ 0.234$ 9,349$ 0.241$
50,000 16,103$ 0.322$ 16,587$ 0.332$
1,000 1,781$ 0.107$ 1,834$ 0.110$
4,000 2,102$ 0.136$ 2,165$ 0.140$
27 I 10,000 2,916$ 0.148$ 3,003$ 0.152$
20,000 4,391$ 0.097$ 4,523$ 0.100$
50,000 7,290$ 0.146$ 7,509$ 0.150$
100 1,688$ 0.963$ 1,738$ 0.992$
400 1,977$ 1.208$ 2,036$ 1.244$
28 I 1,000 2,701$ 1.315$ 2,782$ 1.354$
2,000 4,016$ 0.856$ 4,136$ 0.882$
5,000 6,585$ 1.317$ 6,783$ 1.357$
1,000 2,953$ 0.237$ 3,042$ 0.244$
4,000 3,664$ 0.322$ 3,773$ 0.331$
29 B 10,000 5,593$ 0.348$ 5,761$ 0.359$
20,000 9,076$ 0.234$ 9,349$ 0.241$
50,000 16,103$ 0.322$ 16,587$ 0.332$
1,000 1,781$ 0.107$ 1,834$ 0.110$
4,000 2,102$ 0.136$ 2,165$ 0.140$
30 B 10,000 2,916$ 0.148$ 3,003$ 0.152$
20,000 4,391$ 0.097$ 4,523$ 0.100$
50,000 7,290$ 0.146$ 7,509$ 0.150$
250 1,688$ 0.385$ 1,738$ 0.397$
1,000 1,977$ 0.483$ 2,036$ 0.498$
31 B 2,500 2,701$ 0.526$ 2,782$ 0.542$
5,000 4,016$ 0.343$ 4,136$ 0.353$
12,500 6,585$ 0.527$ 6,783$ 0.543$
500 2,249$ 0.318$ 2,317$ 0.328$
2,000 2,727$ 0.420$ 2,808$ 0.433$
32 - 5,000 3,986$ 0.456$ 4,106$ 0.469$
10,000 6,265$ 0.303$ 6,453$ 0.312$
25,000 10,816$ 0.433$ 11,140$ 0.446$
Medical/24 Hour Care - Shell
Medical/24 Hour Care - Complete
Warehouse - Complete
Restaurant - Complete
Medical Offices - TI
Medical Offices - Shell
Medical Offices - Complete
Medical/24Hour Care - TI
Item 9.b. - Page 28
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
500 1,547$ 0.162$ 1,593$ 0.167$
2,000 1,790$ 0.197$ 1,843$ 0.203$
33 - 5,000 2,380$ 0.215$ 2,451$ 0.221$
10,000 3,453$ 0.138$ 3,557$ 0.142$
25,000 5,527$ 0.221$ 5,692$ 0.228$
250 1,430$ 0.271$ 1,472$ 0.280$
1,000 1,633$ 0.320$ 1,682$ 0.329$
34 - 2,500 2,113$ 0.349$ 2,176$ 0.359$
5,000 2,985$ 0.221$ 3,074$ 0.228$
12,500 4,645$ 0.372$ 4,785$ 0.383$
250 1,969$ 0.509$ 2,028$ 0.525$
1,000 2,351$ 0.662$ 2,422$ 0.682$
35 I-4 2,500 3,344$ 0.719$ 3,444$ 0.740$
5,000 5,141$ 0.474$ 5,295$ 0.489$
12,500 8,700$ 0.696$ 8,961$ 0.717$
100 1,688$ 0.963$ 1,738$ 0.992$
400 1,977$ 1.208$ 2,036$ 1.244$
36 I-4 1,000 2,701$ 1.315$ 2,782$ 1.354$
2,000 4,016$ 0.856$ 4,136$ 0.882$
5,000 6,585$ 1.317$ 6,783$ 1.357$
500 1,828$ 0.224$ 1,883$ 0.231$
2,000 2,164$ 0.286$ 2,229$ 0.295$
37 H 5,000 3,022$ 0.311$ 3,113$ 0.321$
10,000 4,579$ 0.204$ 4,716$ 0.210$
25,000 7,642$ 0.306$ 7,872$ 0.315$
500 2,249$ 0.318$ 2,317$ 0.328$
2,000 2,727$ 0.420$ 2,808$ 0.433$
38 H 5,000 3,986$ 0.456$ 4,106$ 0.469$
10,000 6,265$ 0.303$ 6,453$ 0.312$
25,000 10,816$ 0.433$ 11,140$ 0.446$
100 1,688$ 0.963$ 1,738$ 0.992$
400 1,977$ 1.208$ 2,036$ 1.244$
39 H 1,000 2,701$ 1.315$ 2,782$ 1.354$
2,000 4,016$ 0.856$ 4,136$ 0.882$
5,000 6,585$ 1.317$ 6,783$ 1.357$
200 1,312$ 0.274$ 1,352$ 0.282$
800 1,477$ 0.306$ 1,521$ 0.316$
40 - 2,000 1,844$ 0.336$ 1,900$ 0.346$
4,000 2,516$ 0.208$ 2,592$ 0.214$
10,000 3,764$ 0.376$ 3,877$ 0.388$
Commercial Building - Foundation
Hazardous H - T I
Hazardous H - Shell
Hazardous H - Complete
Day Care Facility - TI
Day Care Facility - Complete
Restaurant - TI
Restaurant - Shell
Item 9.b. - Page 29
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
200 1,359$ 0.299$ 1,400$ 0.308$
800 1,539$ 0.344$ 1,585$ 0.354$
41 - 2,000 1,952$ 0.377$ 2,010$ 0.388$
4,000 2,705$ 0.235$ 2,786$ 0.242$
10,000 4,117$ 0.412$ 4,240$ 0.424$
1,000 2,953$ 0.237$ 3,042$ 0.244$
4,000 3,664$ 0.322$ 3,773$ 0.331$
42 R-2 10,000 5,593$ 0.348$ 5,761$ 0.359$
20,000 9,076$ 0.234$ 9,349$ 0.241$
50,000 16,103$ 0.322$ 16,587$ 0.332$
1,000 2,380$ 0.135$ 2,451$ 0.139$
2,000 2,514$ 0.696$ 2,590$ 0.717$
43 R-3 3,000 3,210$ 0.363$ 3,307$ 0.374$
5,000 3,937$ 0.515$ 4,055$ 0.531$
7,500 5,226$ 0.697$ 5,382$ 0.718$
667 1,399$ 0.079$ 1,441$ 0.081$
1,333 1,451$ 0.268$ 1,495$ 0.276$
44 R-3 2,000 1,630$ 0.209$ 1,679$ 0.215$
3,333 1,908$ 0.242$ 1,965$ 0.250$
5,000 2,312$ 0.462$ 2,381$ 0.476$
333 1,333$ 0.141$ 1,373$ 0.145$
667 1,380$ 0.430$ 1,422$ 0.443$
45 R-3 1,000 1,524$ 0.371$ 1,569$ 0.382$
1,667 1,771$ 0.412$ 1,824$ 0.425$
2,500 2,115$ 0.846$ 2,178$ 0.871$
800 1,214$ 0.048$ 1,250$ 0.049$
1,600 1,252$ 0.097$ 1,290$ 0.100$
46 R-3 2,400 1,330$ 0.121$ 1,370$ 0.125$
4,000 1,524$ 0.117$ 1,569$ 0.121$
6,000 1,758$ 0.293$ 1,811$ 0.302$
667 1,214$ 0.057$ 1,250$ 0.059$
1,333 1,252$ 0.117$ 1,290$ 0.120$
47 R-3 2,000 1,330$ 0.145$ 1,370$ 0.150$
3,333 1,524$ 0.141$ 1,569$ 0.145$
5,000 1,758$ 0.352$ 1,811$ 0.362$
120 1,064$ 0.228$ 1,096$ 0.235$
480 1,146$ 0.181$ 1,180$ 0.186$
48 - 1,200 1,276$ 0.206$ 1,315$ 0.212$
2,400 1,524$ 0.103$ 1,569$ 0.106$
6,000 1,896$ 0.316$ 1,953$ 0.325$
Commercial Coach - Complete
Prefabricated Dwelling - Complete
Manufactured Home - Complete
Moved Building - Residential
Single-Family - Production/Repeat
Single-Family (custom or model)
Apartment Building
Commercial Building - Addition
Item 9.b. - Page 30
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
240 1,064$ 0.114$ 1,096$ 0.117$
960 1,146$ 0.090$ 1,180$ 0.093$
49 - 2,400 1,276$ 0.103$ 1,315$ 0.106$
4,800 1,524$ 0.052$ 1,569$ 0.053$
12,000 1,896$ 0.158$ 1,953$ 0.163$
500 1,088$ 0.059$ 1,121$ 0.061$
2,000 1,177$ 0.051$ 1,212$ 0.053$
50 - 5,000 1,330$ 0.057$ 1,370$ 0.059$
10,000 1,617$ 0.030$ 1,665$ 0.031$
25,000 2,072$ 0.083$ 2,134$ 0.085$
167 1,214$ 0.230$ 1,250$ 0.237$
333 1,252$ 0.466$ 1,290$ 0.480$
51 U 500 1,330$ 0.581$ 1,370$ 0.599$
833 1,524$ 0.562$ 1,569$ 0.579$
1,250 1,758$ 1.406$ 1,811$ 1.449$
40 1,125$ 0.848$ 1,159$ 0.874$
160 1,227$ 0.789$ 1,264$ 0.813$
52 U 400 1,416$ 0.876$ 1,459$ 0.902$
800 1,767$ 0.490$ 1,820$ 0.505$
2,000 2,354$ 1.177$ 2,425$ 1.213$
200 1,688$ 0.482$ 1,738$ 0.496$
800 1,977$ 0.604$ 2,036$ 0.622$
53 - 2,000 2,701$ 0.657$ 2,782$ 0.677$
4,000 4,016$ 0.428$ 4,136$ 0.441$
10,000 6,585$ 0.658$ 6,783$ 0.678$
200 1,641$ 0.456$ 1,690$ 0.470$
800 1,914$ 0.566$ 1,972$ 0.583$
54 - 2,000 2,594$ 0.617$ 2,672$ 0.636$
4,000 3,829$ 0.401$ 3,944$ 0.413$
10,000 6,233$ 0.623$ 6,420$ 0.642$
50 1,107$ 0.635$ 1,140$ 0.654$
200 1,202$ 0.573$ 1,238$ 0.590$
55 U 500 1,374$ 0.637$ 1,415$ 0.656$
1,000 1,692$ 0.347$ 1,743$ 0.358$
2,500 2,213$ 0.885$ 2,280$ 0.912$
50 1,107$ 0.635$ 1,140$ 0.654$
200 1,202$ 0.573$ 1,238$ 0.590$
56 U 500 1,374$ 0.637$ 1,415$ 0.656$
1,000 1,692$ 0.347$ 1,743$ 0.358$
2,500 2,213$ 0.885$ 2,280$ 0.912$
Pool/Spa - Standard Plan
Commercial Carport
Accessory Building - Commercial
Commercial Building - Repair
Commercial Building - Remodel
Residential Garage
Manufactured Building -
Foundation
Modular Building - Complete
Item 9.b. - Page 31
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
167 1,399$ 0.315$ 1,441$ 0.325$
333 1,451$ 1.071$ 1,495$ 1.103$
57 R-3 500 1,630$ 0.834$ 1,679$ 0.859$
833 1,908$ 0.969$ 1,965$ 0.998$
1,250 2,312$ 1.849$ 2,381$ 1.905$
333 1,597$ 0.207$ 1,645$ 0.213$
667 1,666$ 0.857$ 1,716$ 0.883$
58 R-2 1,000 1,952$ 0.553$ 2,010$ 0.570$
1,667 2,321$ 0.701$ 2,390$ 0.722$
2,500 2,905$ 1.162$ 2,992$ 1.197$
333 1,201$ 0.112$ 1,237$ 0.115$
667 1,238$ 0.213$ 1,275$ 0.220$
59 R-3 1,000 1,309$ 0.281$ 1,348$ 0.289$
1,667 1,496$ 0.267$ 1,541$ 0.275$
2,500 1,718$ 0.687$ 1,770$ 0.708$
667 1,340$ 0.072$ 1,380$ 0.074$
1,333 1,388$ 0.218$ 1,430$ 0.225$
60 R-2 2,000 1,534$ 0.188$ 1,580$ 0.194$
3,333 1,784$ 0.210$ 1,838$ 0.216$
5,000 2,134$ 0.427$ 2,198$ 0.440$
333 1,038$ 0.069$ 1,069$ 0.071$
667 1,061$ 0.276$ 1,092$ 0.284$
61 R-3 1,000 1,153$ 0.182$ 1,187$ 0.188$
1,667 1,274$ 0.229$ 1,312$ 0.235$
2,500 1,465$ 0.586$ 1,508$ 0.603$
83 998$ 0.223$ 1,028$ 0.230$
167 1,017$ 0.867$ 1,047$ 0.893$
62 U 250 1,089$ 0.617$ 1,122$ 0.636$
417 1,192$ 0.741$ 1,228$ 0.763$
625 1,346$ 2.154$ 1,387$ 2.219$
133 998$ 0.140$ 1,028$ 0.144$
267 1,017$ 0.542$ 1,047$ 0.558$
63 U 400 1,089$ 0.386$ 1,122$ 0.397$
667 1,192$ 0.463$ 1,228$ 0.477$
1,000 1,346$ 1.346$ 1,387$ 1.387$
83 998$ 0.223$ 1,028$ 0.230$
167 1,017$ 0.867$ 1,047$ 0.893$
64 U 250 1,089$ 0.617$ 1,122$ 0.636$
417 1,192$ 0.741$ 1,228$ 0.763$
625 1,346$ 2.154$ 1,387$ 2.219$
Residential Patio Cover
Residential Carport
Accessory Building - Residential
Residential Building - Foundation
Multi-Family Residential - Remodel
Single-Family Residential -
Remodel
Multi-Family Residential - Addition
Single-Family Residential -
Addition
Item 9.b. - Page 32
Note:All fees include MPE plan checks.
Fee #
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 19-20
Each
Additional
SF FY 19-20
City of Arroyo Grande
PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING PLAN CHECK
Fiscal Year 2019-20
MASTER FEE SCHEDULE
83 1,130$ 0.368$ 1,163$ 0.379$
167 1,160$ 1.708$ 1,195$ 1.759$
65 U 250 1,303$ 0.979$ 1,342$ 1.008$
417 1,466$ 1.324$ 1,510$ 1.364$
625 1,741$ 2.786$ 1,794$ 2.870$
83 1,097$ 0.328$ 1,130$ 0.338$
167 1,124$ 1.497$ 1,158$ 1.542$
66 U 250 1,249$ 0.893$ 1,286$ 0.920$
417 1,398$ 1.177$ 1,440$ 1.212$
625 1,643$ 2.629$ 1,692$ 2.708$
Residential Patio Enclosure
Residential Balcony/Deck
Item 9.b. - Page 33
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
2,000 3,174$ 0.388$ 3,270$ 0.400$
8,000 5,504$ 0.337$ 5,669$ 0.347$
1 A-1 20,000 9,547$ 0.290$ 9,833$ 0.298$
40,000 15,337$ 0.328$ 15,797$ 0.338$
100,000 35,001$ 0.350$ 36,051$ 0.361$
1,000 2,577$ 0.612$ 2,654$ 0.631$
4,000 4,413$ 0.635$ 4,546$ 0.654$
2 A-2 10,000 8,226$ 0.524$ 8,473$ 0.540$
20,000 13,467$ 0.620$ 13,871$ 0.639$
50,000 32,071$ 0.641$ 33,033$ 0.661$
250 698$ 0.727$ 719$ 0.749$
1,000 1,243$ 0.258$ 1,281$ 0.265$
3 A 2,500 1,630$ 0.284$ 1,679$ 0.292$
5,000 2,339$ 0.253$ 2,409$ 0.260$
12,500 4,235$ 0.339$ 4,362$ 0.349$
1,000 2,098$ 0.481$ 2,161$ 0.496$
4,000 3,542$ 0.605$ 3,648$ 0.623$
4 A-3 10,000 7,170$ 0.480$ 7,385$ 0.494$
20,000 11,970$ 0.592$ 12,329$ 0.610$
50,000 29,727$ 0.595$ 30,618$ 0.612$
500 1,346$ 0.596$ 1,387$ 0.614$
2,000 2,241$ 0.675$ 2,308$ 0.696$
5 R-4 5,000 4,267$ 0.519$ 4,395$ 0.534$
10,000 6,860$ 0.677$ 7,066$ 0.698$
25,000 17,021$ 0.681$ 17,531$ 0.701$
250 520$ 0.530$ 536$ 0.546$
1,000 917$ 0.212$ 945$ 0.218$
6 A-3 2,500 1,235$ 0.217$ 1,272$ 0.224$
5,000 1,778$ 0.210$ 1,831$ 0.217$
12,500 3,355$ 0.268$ 3,456$ 0.276$
2,000 3,115$ 0.380$ 3,209$ 0.391$
8,000 5,394$ 0.335$ 5,556$ 0.345$
7 E 20,000 9,414$ 0.287$ 9,697$ 0.295$
40,000 15,150$ 0.326$ 15,605$ 0.336$
100,000 34,708$ 0.347$ 35,749$ 0.357$
250 520$ 0.530$ 536$ 0.546$
1,000 917$ 0.212$ 945$ 0.218$
8 E 2,500 1,235$ 0.217$ 1,272$ 0.224$
5,000 1,778$ 0.210$ 1,831$ 0.217$
12,500 3,355$ 0.268$ 3,456$ 0.276$
Church and Religious Bldg -
Complete
Assembly Group - TI
Assembly Group: Restaurants,
nightclubs
Assembly Group - Theaters
Educational Building - TI
Educational Building - Complete
Church and Religious Bldg - TI
Congregate Care - Complete
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
Item 9.b. - Page 34
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
500 698$ 0.363$ 719$ 0.374$
2,000 1,243$ 0.129$ 1,281$ 0.133$
9 S-2 5,000 1,630$ 0.142$ 1,679$ 0.146$
10,000 2,339$ 0.126$ 2,409$ 0.130$
25,000 4,235$ 0.169$ 4,362$ 0.174$
1,000 2,098$ 0.481$ 2,161$ 0.496$
4,000 3,542$ 0.605$ 3,648$ 0.623$
10 R-1 10,000 7,170$ 0.480$ 7,385$ 0.494$
20,000 11,970$ 0.592$ 12,329$ 0.610$
50,000 29,727$ 0.595$ 30,618$ 0.612$
1,000 747$ 0.195$ 769$ 0.201$
4,000 1,331$ 0.068$ 1,371$ 0.070$
11 R-1 10,000 1,736$ 0.075$ 1,788$ 0.078$
20,000 2,489$ 0.066$ 2,564$ 0.068$
50,000 4,469$ 0.089$ 4,603$ 0.092$
250 520$ 0.530$ 536$ 0.546$
1,000 917$ 0.212$ 945$ 0.218$
12 R-1 2,500 1,235$ 0.217$ 1,272$ 0.224$
5,000 1,778$ 0.210$ 1,831$ 0.217$
12,500 3,355$ 0.268$ 3,456$ 0.276$
500 2,338$ 1.195$ 2,408$ 1.230$
2,000 4,130$ 0.767$ 4,254$ 0.790$
13 B 5,000 6,430$ 0.719$ 6,622$ 0.741$
10,000 10,025$ 0.738$ 10,326$ 0.760$
25,000 21,096$ 0.844$ 21,729$ 0.869$
1,000 424$ 0.106$ 436$ 0.109$
4,000 742$ 0.047$ 764$ 0.048$
14 B 10,000 1,022$ 0.046$ 1,053$ 0.047$
20,000 1,479$ 0.047$ 1,523$ 0.048$
50,000 2,886$ 0.058$ 2,973$ 0.059$
100 308$ 0.741$ 317$ 0.763$
400 530$ 0.392$ 546$ 0.404$
15 B 1,000 765$ 0.349$ 788$ 0.360$
2,000 1,114$ 0.400$ 1,148$ 0.412$
5,000 2,315$ 0.463$ 2,384$ 0.477$
1,000 2,039$ 0.465$ 2,100$ 0.479$
4,000 3,434$ 0.601$ 3,537$ 0.619$
16 F 10,000 7,037$ 0.475$ 7,248$ 0.489$
20,000 11,783$ 0.588$ 12,137$ 0.606$
50,000 29,433$ 0.589$ 30,316$ 0.606$
Hotel Low/Mid Rise - TI
Hotel Low/Mid Rise - Shell
Hotel Low/Mid Rise - Complete
Industrial Building - Complete
Offices, etc. - TI
Offices, etc. - Shell
Offices, etc. - Complete
Parking Garage - Complete
Item 9.b. - Page 35
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
1,000 493$ 0.125$ 507$ 0.129$
4,000 868$ 0.051$ 894$ 0.053$
17 F 10,000 1,174$ 0.052$ 1,210$ 0.054$
20,000 1,694$ 0.051$ 1,745$ 0.053$
50,000 3,224$ 0.064$ 3,320$ 0.066$
250 672$ 0.698$ 692$ 0.719$
1,000 1,195$ 0.250$ 1,231$ 0.258$
18 F 2,500 1,571$ 0.274$ 1,618$ 0.282$
5,000 2,255$ 0.246$ 2,322$ 0.254$
12,500 4,102$ 0.328$ 4,226$ 0.338$
500 988$ 0.399$ 1,018$ 0.411$
2,000 1,587$ 0.629$ 1,635$ 0.648$
19 S-1 5,000 3,474$ 0.453$ 3,578$ 0.466$
10,000 5,738$ 0.635$ 5,910$ 0.654$
25,000 15,263$ 0.611$ 15,721$ 0.629$
500 463$ 0.234$ 477$ 0.241$
2,000 813$ 0.099$ 838$ 0.101$
20 S-1 5,000 1,109$ 0.098$ 1,142$ 0.101$
10,000 1,600$ 0.098$ 1,648$ 0.101$
25,000 3,077$ 0.123$ 3,169$ 0.127$
100 308$ 0.741$ 317$ 0.763$
400 530$ 0.392$ 546$ 0.404$
21 S-1 1,000 765$ 0.349$ 788$ 0.360$
2,000 1,114$ 0.400$ 1,148$ 0.412$
5,000 2,315$ 0.463$ 2,384$ 0.477$
500 1,078$ 0.448$ 1,111$ 0.461$
2,000 1,750$ 0.641$ 1,803$ 0.660$
22 M 5,000 3,672$ 0.469$ 3,782$ 0.483$
10,000 6,018$ 0.646$ 6,199$ 0.665$
25,000 15,702$ 0.628$ 16,173$ 0.647$
500 567$ 0.291$ 584$ 0.300$
2,000 1,004$ 0.112$ 1,034$ 0.115$
23 M 5,000 1,340$ 0.118$ 1,380$ 0.121$
10,000 1,928$ 0.111$ 1,985$ 0.114$
25,000 3,590$ 0.144$ 3,698$ 0.148$
100 308$ 0.741$ 317$ 0.763$
400 530$ 0.392$ 546$ 0.404$
24 M 1,000 765$ 0.349$ 788$ 0.360$
2,000 1,114$ 0.400$ 1,148$ 0.412$
5,000 2,315$ 0.463$ 2,384$ 0.477$
Retail Sales - TI
Retail Sales - Shell
Retail Sales - Complete
Repair Garage & Service St - TI
Repair Garage & Service St -
Shell
Repair Garage & Service St -
Complete
Industrial Building - TI
Industrial Building - Shell
Item 9.b. - Page 36
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
2,000 2,781$ 0.346$ 2,865$ 0.356$
8,000 4,854$ 0.215$ 5,000$ 0.222$
25 - 20,000 7,437$ 0.196$ 7,660$ 0.201$
40,000 11,349$ 0.212$ 11,689$ 0.218$
100,000 24,055$ 0.241$ 24,776$ 0.248$
1,000 2,098$ 0.481$ 2,161$ 0.496$
4,000 3,542$ 0.605$ 3,648$ 0.623$
26 I 10,000 7,170$ 0.480$ 7,385$ 0.494$
20,000 11,970$ 0.592$ 12,329$ 0.610$
50,000 29,727$ 0.595$ 30,618$ 0.612$
1,000 522$ 0.134$ 538$ 0.138$
4,000 923$ 0.053$ 950$ 0.055$
27 I 10,000 1,241$ 0.055$ 1,278$ 0.056$
20,000 1,787$ 0.053$ 1,841$ 0.054$
50,000 3,370$ 0.067$ 3,471$ 0.069$
100 277$ 0.664$ 285$ 0.684$
400 476$ 0.372$ 490$ 0.383$
28 I 1,000 699$ 0.321$ 720$ 0.330$
2,000 1,020$ 0.383$ 1,051$ 0.394$
5,000 2,168$ 0.434$ 2,233$ 0.447$
1,000 2,098$ 0.481$ 2,161$ 0.496$
4,000 3,542$ 0.605$ 3,648$ 0.623$
29 B 10,000 7,170$ 0.480$ 7,385$ 0.494$
20,000 11,970$ 0.592$ 12,329$ 0.610$
50,000 29,727$ 0.595$ 30,618$ 0.612$
1,000 537$ 0.138$ 554$ 0.142$
4,000 950$ 0.054$ 979$ 0.056$
30 B 10,000 1,274$ 0.056$ 1,312$ 0.058$
20,000 1,835$ 0.054$ 1,890$ 0.055$
50,000 3,444$ 0.069$ 3,547$ 0.071$
250 702$ 0.730$ 723$ 0.752$
1,000 1,249$ 0.259$ 1,286$ 0.267$
31 B 2,500 1,637$ 0.285$ 1,687$ 0.293$
5,000 2,349$ 0.253$ 2,419$ 0.261$
12,500 4,249$ 0.340$ 4,377$ 0.350$
500 1,078$ 0.448$ 1,111$ 0.461$
2,000 1,750$ 0.641$ 1,803$ 0.660$
32 - 5,000 3,672$ 0.469$ 3,782$ 0.483$
10,000 6,018$ 0.646$ 6,199$ 0.665$
25,000 15,702$ 0.628$ 16,173$ 0.647$
Medical/24 Hour Care - Shell
Medical/24 Hour Care -
Complete
Warehouse - Complete
Restaurant - Complete
Medical Offices - TI
Medical Offices - Shell
Medical Offices - Complete
Medical/24Hour Care - TI
Item 9.b. - Page 37
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
500 477$ 0.242$ 492$ 0.250$
2,000 841$ 0.100$ 866$ 0.103$
33 - 5,000 1,142$ 0.101$ 1,176$ 0.104$
10,000 1,647$ 0.100$ 1,697$ 0.103$
25,000 3,150$ 0.126$ 3,245$ 0.130$
250 702$ 0.730$ 723$ 0.752$
1,000 1,249$ 0.259$ 1,286$ 0.267$
34 - 2,500 1,637$ 0.285$ 1,687$ 0.293$
5,000 2,349$ 0.253$ 2,419$ 0.261$
12,500 4,249$ 0.340$ 4,377$ 0.350$
250 1,078$ 0.896$ 1,111$ 0.923$
1,000 1,750$ 1.281$ 1,803$ 1.320$
35 I-4 2,500 3,672$ 0.938$ 3,782$ 0.966$
5,000 6,018$ 1.291$ 6,199$ 1.330$
12,500 15,702$ 1.256$ 16,173$ 1.294$
100 247$ 0.580$ 255$ 0.598$
400 421$ 0.352$ 434$ 0.363$
36 I-4 1,000 633$ 0.294$ 652$ 0.303$
2,000 927$ 0.365$ 955$ 0.376$
5,000 2,022$ 0.404$ 2,082$ 0.416$
500 1,078$ 0.448$ 1,111$ 0.461$
2,000 1,750$ 0.641$ 1,803$ 0.660$
37 H 5,000 3,672$ 0.469$ 3,782$ 0.483$
10,000 6,018$ 0.646$ 6,199$ 0.665$
25,000 15,702$ 0.628$ 16,173$ 0.647$
500 448$ 0.225$ 461$ 0.232$
2,000 786$ 0.097$ 809$ 0.100$
38 H 5,000 1,076$ 0.095$ 1,108$ 0.098$
10,000 1,553$ 0.097$ 1,600$ 0.100$
25,000 3,004$ 0.120$ 3,094$ 0.124$
100 247$ 0.580$ 255$ 0.598$
400 421$ 0.352$ 434$ 0.363$
39 H 1,000 633$ 0.294$ 652$ 0.303$
2,000 927$ 0.365$ 955$ 0.376$
5,000 2,022$ 0.404$ 2,082$ 0.416$
200 247$ 0.290$ 255$ 0.299$
800 421$ 0.176$ 434$ 0.181$
40 - 2,000 633$ 0.147$ 652$ 0.152$
4,000 927$ 0.182$ 955$ 0.188$
10,000 2,022$ 0.202$ 2,082$ 0.208$
Commercial Building -
Foundation
Hazardous H- T I
Hazardous H - Shell
Hazardous H - Complete
Day Care Facility - TI
Day Care Facility - Complete
Restaurant - TI
Restaurant - Shell
Item 9.b. - Page 38
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
200 277$ 0.332$ 285$ 0.342$
800 476$ 0.186$ 490$ 0.192$
41 - 2,000 699$ 0.160$ 720$ 0.165$
4,000 1,020$ 0.191$ 1,051$ 0.197$
10,000 2,168$ 0.217$ 2,233$ 0.223$
1,000 2,013$ 0.498$ 2,073$ 0.513$
4,000 3,506$ 0.572$ 3,611$ 0.589$
42 R-2 10,000 6,939$ 0.486$ 7,147$ 0.500$
20,000 11,794$ 0.545$ 12,148$ 0.562$
50,000 28,152$ 0.563$ 28,996$ 0.580$
1,000 1,832$ 1.090$ 1,887$ 1.123$
2,000 2,923$ 1.113$ 3,010$ 1.147$
43 R-3 3,000 4,036$ 0.998$ 4,157$ 1.028$
5,000 6,031$ 0.816$ 6,212$ 0.841$
7,500 8,071$ 1.076$ 8,314$ 1.108$
667 1,154$ 0.969$ 1,188$ 0.998$
1,333 1,799$ 0.946$ 1,853$ 0.974$
44 R-3 2,000 2,430$ 0.813$ 2,503$ 0.837$
3,333 3,514$ 0.749$ 3,619$ 0.771$
5,000 4,761$ 0.952$ 4,904$ 0.981$
333 199$ 0.374$ 205$ 0.386$
667 324$ 0.394$ 334$ 0.406$
45 R-3 1,000 455$ 0.356$ 469$ 0.367$
1,667 693$ 0.273$ 714$ 0.281$
2,500 921$ 0.368$ 948$ 0.379$
800 151$ 0.125$ 156$ 0.128$
1,600 251$ 0.131$ 258$ 0.135$
46 R-3 2,400 356$ 0.122$ 366$ 0.126$
4,000 552$ 0.088$ 568$ 0.091$
6,000 728$ 0.121$ 750$ 0.125$
667 151$ 0.149$ 156$ 0.154$
1,333 251$ 0.158$ 258$ 0.162$
47 R-3 2,000 356$ 0.147$ 366$ 0.151$
3,333 552$ 0.106$ 568$ 0.109$
5,000 728$ 0.146$ 750$ 0.150$
120 121$ 0.198$ 125$ 0.204$
480 193$ 0.227$ 198$ 0.233$
48 - 1,200 356$ 0.149$ 366$ 0.153$
2,400 534$ 0.242$ 550$ 0.250$
6,000 1,407$ 0.234$ 1,449$ 0.241$
Moved Building - Residential
Single-Family - Production /
Repeat
Single-Family (custom or model)
Apartment Building
Commercial Coach - Complete
Prefabricated Dwelling -
Complete
Manufactured Home - Complete
Commercial Building - Addition
Item 9.b. - Page 39
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
240 121$ 0.099$ 125$ 0.102$
960 193$ 0.113$ 198$ 0.117$
49 - 2,400 356$ 0.074$ 366$ 0.077$
4,800 534$ 0.121$ 550$ 0.125$
12,000 1,407$ 0.117$ 1,449$ 0.121$
500 121$ 0.047$ 125$ 0.049$
2,000 193$ 0.054$ 198$ 0.056$
50 - 5,000 356$ 0.036$ 366$ 0.037$
10,000 534$ 0.058$ 550$ 0.060$
25,000 1,407$ 0.056$ 1,449$ 0.058$
167 244$ 0.893$ 251$ 0.920$
333 393$ 0.926$ 405$ 0.954$
51 U 500 547$ 0.834$ 564$ 0.859$
833 825$ 0.659$ 850$ 0.679$
1,250 1,100$ 0.880$ 1,133$ 0.906$
40 235$ 1.368$ 242$ 1.409$
160 400$ 0.862$ 412$ 0.888$
52 U 400 606$ 0.709$ 625$ 0.730$
800 890$ 0.895$ 917$ 0.922$
2,000 1,964$ 0.982$ 2,023$ 1.011$
200 460$ 0.580$ 474$ 0.598$
800 808$ 0.245$ 832$ 0.253$
53 - 2,000 1,102$ 0.245$ 1,135$ 0.252$
4,000 1,592$ 0.245$ 1,639$ 0.253$
10,000 3,063$ 0.306$ 3,155$ 0.315$
200 460$ 0.580$ 474$ 0.598$
800 808$ 0.245$ 832$ 0.253$
54 - 2,000 1,102$ 0.245$ 1,135$ 0.252$
4,000 1,592$ 0.245$ 1,639$ 0.253$
10,000 3,063$ 0.306$ 3,155$ 0.315$
50 146$ 0.606$ 150$ 0.624$
200 236$ 0.573$ 244$ 0.590$
55 U 500 408$ 0.403$ 421$ 0.415$
1,000 610$ 0.609$ 628$ 0.628$
2,500 1,524$ 0.609$ 1,569$ 0.628$
50 178$ 0.781$ 184$ 0.804$
200 296$ 0.620$ 304$ 0.639$
56 U 500 482$ 0.462$ 496$ 0.476$
1,000 713$ 0.648$ 734$ 0.667$
2,500 1,685$ 0.674$ 1,735$ 0.694$
Pool/Spa - Standard Plan
Commercial Carport
Accessory Building -
Commercial
Commercial Building - Repair
Commercial Building - Remodel
Residential Garage
Manufactured Building -
Foundation
Modular Building - Complete
Item 9.b. - Page 40
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
167 292$ 1.051$ 301$ 1.082$
333 467$ 1.077$ 481$ 1.109$
57 R-3 500 647$ 0.959$ 666$ 0.988$
833 967$ 0.783$ 996$ 0.806$
1,250 1,293$ 1.034$ 1,331$ 1.065$
333 771$ 1.310$ 794$ 1.350$
667 1,207$ 1.291$ 1,244$ 1.329$
58 R-2 1,000 1,637$ 1.116$ 1,687$ 1.150$
1,667 2,382$ 1.006$ 2,453$ 1.036$
2,500 3,220$ 1.288$ 3,317$ 1.327$
333 276$ 0.502$ 284$ 0.517$
667 443$ 0.509$ 457$ 0.524$
59 R-3 1,000 613$ 0.460$ 631$ 0.474$
1,667 919$ 0.372$ 947$ 0.383$
2,500 1,229$ 0.492$ 1,266$ 0.506$
667 397$ 0.350$ 409$ 0.360$
1,333 630$ 0.351$ 649$ 0.362$
60 R-2 2,000 865$ 0.309$ 891$ 0.319$
3,333 1,277$ 0.264$ 1,316$ 0.272$
5,000 1,717$ 0.343$ 1,769$ 0.354$
333 244$ 0.447$ 251$ 0.460$
667 393$ 0.463$ 405$ 0.477$
61 R-3 1,000 547$ 0.417$ 564$ 0.430$
1,667 825$ 0.330$ 850$ 0.340$
2,500 1,100$ 0.440$ 1,133$ 0.453$
83 167$ 1.287$ 172$ 1.326$
167 275$ 1.366$ 283$ 1.407$
62 U 250 389$ 1.261$ 400$ 1.299$
417 599$ 0.930$ 617$ 0.958$
625 792$ 1.268$ 816$ 1.306$
133 151$ 0.747$ 156$ 0.769$
267 251$ 0.788$ 258$ 0.812$
63 U 400 356$ 0.735$ 366$ 0.757$
667 552$ 0.529$ 568$ 0.545$
1,000 728$ 0.728$ 750$ 0.750$
83 151$ 1.195$ 156$ 1.231$
167 251$ 1.261$ 258$ 1.299$
64 U 250 356$ 1.176$ 366$ 1.211$
417 552$ 0.846$ 568$ 0.871$
625 728$ 1.165$ 750$ 1.200$
Residential Patio Cover
Residential Carport
Accessory Building - Residential
Residential Building -
Foundation
Multi-Family Residential -
Remodel
Single-Family Residential -
Remodel
Multi-Family Residential -
Addition
Single-Family Residential -
Addition
Item 9.b. - Page 41
Fee
#
CBC
(ICC)
Use
Type Occupancy
Size Basis
(square feet)
Base Fee
FY 18-19
Each
Additional
SF FY 18-19
Base Fee
FY 18-19
Each
Additional
SF FY 19-20
City of Arroyo Grande
INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION
BUILDING INSPECTION
Fiscal Year 2019-20
MASTER FEE SCHEDULE
83 151$ 1.195$ 156$ 1.231$
167 251$ 1.261$ 258$ 1.299$
65 U 250 356$ 1.176$ 366$ 1.211$
417 552$ 0.846$ 568$ 0.871$
625 728$ 1.165$ 750$ 1.200$
83 151$ 1.195$ 156$ 1.231$
167 251$ 1.261$ 258$ 1.299$
66 U 250 356$ 1.176$ 366$ 1.211$
417 552$ 0.846$ 568$ 0.871$
625 728$ 1.165$ 750$ 1.200$
Residential Patio Enclosure
Residential Balcony/Deck
Item 9.b. - Page 42
FY 2018-19 FY 2019-20
Copies, per page (Black and White)0.20$ 0.20$
Park Facility Use Fees:
Park Event Fee (over 80 people)per use 248.00 255.00
Bounce House per use 25.00 26.00
Strother Park-Large Barbecue per use 100.00 103.00
Strother Park-Security Deposit per use 50.00 50.00
Strother Park-Small Barbecue per use 56.00 58.00
Strother Park-Security 1,2,3 per use 100.00 100.00
Strother Park Deposit per use 50.00 50.00
Elm Street Park-Barbecue per use 100.00 103.00
Elm Street Park-Security Deposit per use 50.00 50.00
Rancho Grande Park - Large BBQ per use 100.00 103.00
Rancho Grande Park - Small BBQ (areas 2 and 3)per use 56.00 58.00
Kingo Park per use 56.00 58.00
Kingo Park Deposit per use 50.00 50.00
Rotary Bandstand Fees:
Rent per use 120.00 124.00
Deposit per use 50.00 50.00
Soto Sports Complex Use Fees:
Campbell Field Rental Fee per hour 20.00 21.00
Campbell Field Rental Fee (with lights)per hour 46.00 47.00
Pilg Field Rental Fee per hour 20.00 21.00
Pilg Field Rental Fee (with lights)per hour 46.00 47.00
Santos Field Rental Fee per hour 20.00 21.00
Volunteer Field Rental Fee per hour 20.00 21.00
Volunteer Field with Lights Rental per hour 46.00 47.00
Ikeda Field Rental per hour 20.00 21.00
Ikeda Field with Lights Rental per hour 46.00 47.00
Porter Field Rental Fee per hour 26.00 27.00
Porter Field with Lights Rental per hour 54.00 56.00
Tennis Court Rental-1 court per hour 12.00 12.00
Tennis Courts - 4 courts per day 117.00 121.00
Pickleball Club - Annual Fee 110.00 110.00
Food Booth Rental Fee (Soto)per day 200.00 200.00
Food Vendor Space Rental Fee 15% of Gross 15% of Gross
Cleaning Deposit per use 325.00 325.00
Meeting Room Rental Fee (Jaycee room)per day 26.00 27.00
Field Prep Fees (except Porter)per prep 61.00 63.00
Field Prep Fees - Porter per prep 91.00 94.00
Tournament Sch. & Coordination Fee per tournament 86.00 89.00
Tournament Non-Refundable Booking Fee 293.00 302.00
Tournament Staff Attendant per hour 24.00 25.00
Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2019-20
RECREATION SERVICES
Item 9.b. - Page 43
FY 2018-19 FY 2019-20 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2019-20
RECREATION SERVICES
Soto Sports Complex Use Fees - APPROVED YOUTH GROUPS:
Field Rental (practice and league games) - each field per hour 3.00$ 3.00$
Concession Stand Fee - Buildings per hour 6.00 6.00
Concession Stand Fee - Mobile per hour 4.00 4.00
Non-resident - per participant 3.00 3.00
Fundraiser Event Fee 200.00 200.00
Woman's Club Use Fees:
Non-Resident Fee Mon-Thur, before 5 pm per hour 66.00 68.00
Partial day rental - Mon - Thurs, after 5 pm per hour 66.00 68.00
Full day rental - Friday, Saturday, or Sunday 730.00 752.00
Second day rental - Friday, Saturday or Sunday 365.00 376.00
Security Deposit (No Alcohol/No Band)400.00 400.00
Security Deposit (with Alcohol)1,000.00 1,000.00
Building Supervision Fee per hour 24.00 25.00
Rental Fee (on-going users):
Non-profit groups/Service clubs/Youth groups:
(20 or less attendees)per hour 4.00 4.00
(21 - 50 attendees)"5.00 5.00
(51 or more attendees)"6.00 6.00
Groups with reciprocal services "4.00 4.00
Private groups or clubs:per hour
(20 or less attendees)"13.00 13.00
(21 - 50 attendees)"15.00 15.00
(51 or more attendees)"16.00 16.00
Groups with reciprocal services "7.00 7.00
For-profit groups per hour 35.00 36.00
Custodial Fee (special event rentals only)150.00 150.00
Reservation Cancellation Fees:
If cancelled 30 days or more ahead of event 100.00 100.00
If cancelled less than 30 days ahead of event 200.00 200.00
Amenities Fees:
Chairs per chair 0.50 1.00
Tables per table 1.50 2.00
Audio/Visual system use per day 50.00 52.00
Community Garden Deposit 50.00 50.00
Community Garden Plot per 6 months 45.00 45.00
Item 9.b. - Page 44
FY 2018-19 FY 2019-20 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2019-20
RECREATION SERVICES
Mark M. Millis Community Center (formerly Elm Street Community Center) Use Fees:
Rental Fee per hour 40.00$ 41.00$
Rental Fee - full day per day 205.00 211.00
Building Supervision Fee per hour 24.00 25.00
Security deposit 200.00 200.00
Adult Sport League Fees:
Adult Softball 500.00 515.00
Adult Basketball 425.00 438.00
Non-Resident Fee 10.00 10.00
Pre-School Fees:
Annual Registration Fee per child 25.00 25.00
Play & Learn-Tues & Thur.per hour 6.00 6.00
Play & Learn-Mon, Wed & Fri."6.00 6.00
Kindergartens in Training "6.00 6.00
Summer Play & Learn "6.00 6.00
Late Pick-up Fees:
First late pick-up per child 5.00 5.00
Second late pick-up "10.00 10.00
Third late pick-up "20.00 20.00
Children In Motion Program:
Children In Motion Annual Registration per child 25.00 25.00
Branch School - Mornings
5 Days Per Week per 4 wks 131.00 143.00
4 Days Per Week "113.00 121.00
3 Days Per Week "90.00 97.00
2 Days Per Week "64.00 68.00
Branch School - Afternoons
5 Days Per Week per 4 wks 241.00 261.00
4 Days Per Week "206.00 223.00
3 Days Per Week "165.00 178.00
2 Days Per Week "117.00 125.00
Extra Day - Branch School
Morning per day 10.00 10.00
Afternoon "17.00 17.00
Late Start Monday per day 5.00 5.00
Item 9.b. - Page 45
FY 2018-19 FY 2019-20 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2019-20
RECREATION SERVICES
Children In Motion Fees (continued):
Kindercare - Branch School
5 Days Per Week per 4 wks 263.00$ 285.00$
4 Days Per Week "225.00 243.00
3 Days Per Week "180.00 194.00
2 Days Per Week "127.00 137.00
Extra Day per day 17.00 19.00
Ocean View School - Mornings
5 Days Per Week per 4 wks 131.00 143.00
4 Days Per Week "113.00 121.00
3 Days Per Week "90.00 97.00
2 Days Per Week "64.00 68.00
Ocean View School - Afternoons
5 Days Per Week per 4 wks 263.00 285.00
4 Days Per Week "225.00 243.00
3 Days Per Week "180.00 194.00
2 Days Per Week "127.00 137.00
Extra Day - Ocean View School
Morning per day 10.00 10.00
Afternoon "16.50 19.00
Late Start Monday per day 5.00 5.00
Mark M. Millis Community Center (formerly Elm Community Center) - Mornings
5 Days Per Week per 4 wks 372.00 N/A
4 Days Per Week "319.00 N/A
3 Days Per Week "255.00 N/A
2 Days Per Week "181.00 N/A
Mark M. Millis Community Center (formerly Elm Community Center) - Afternoons Care Plan A
5 Days Per Week per 4 wks 263.00 166.00
4 Days Per Week "225.00 142.00
3 Days Per Week "180.00 113.00
2 Days Per Week "127.00 80.00
Mark M. Millis Community Center (formerly Elm Community Center) - Afternoons Care Plan B
5 Days Per Week per 4 wks 504.00 428.00
4 Days Per Week "431.00 364.00
3 Days Per Week "345.00 291.00
2 Days Per Week "244.00 205.00
Extra Day - Mark M. Millis Community Center (formerly Elm Community Center)
Morning per day 20.00 N/A
Care Plan A (12:15 pm - 3:15 pm)"17.00 N/A
Care Plan B (12:15 pm - 6:00 pm)"33.00 N/A
Item 9.b. - Page 46
FY 2018-19 FY 2019-20 Fee Description
City of Arroyo Grande
MASTER FEE SCHEDULE
Fiscal Year 2019-20
RECREATION SERVICES
Winter/Spring/Summer - Full Day
5 Days Per Week per week 200.00$ 215.00$
4 Days Per Week "170.00 182.00
3 Days Per Week "135.00 151.00
Minimum Days (teacher work day/early release)
Regular day of attendance per day 13.00 13.00
Non-regular day of attendance "23.00 23.00
Children In Motion Fees (continued):
Late Pick-up Fees:
Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00
Pickup 6:01 - 6:15 pm per child 10.00 10.00
Pickup 6:16 - 6:30 pm "20.00 20.00
Pickup 6:31 - 6:45 pm "30.00 30.00
Item 9.b. - Page 47
FY 2018-19 FY 2019-20
LABOR COSTS (per hour):
DURING REGULAR WORK HOURS:
Full Time employee 67.29$ 74.41$
Part Time employee 23.95 24.58
AFTER REGULAR WORK HOURS:
Full Time employee 100.94 111.61
Part Time employee 35.93 36.87
MINIMUM CALL-OUT RATE
2 hours at 1.5
times billing rate
2 hours at 1.5
times billing rate
EQUIPMENT BILLING RATE (per hour)
Pickup Truck 17.00 17.00
Service Truck 42.00 42.00
Backhoe 43.00 43.00
CAT Generator 82.00 82.00
Loader 50.00 50.00
6" Pump 23.00 23.00
Dump/Flat Bed Truck (5-7 yds)36.00 36.00
Sewer/Vacuum/Jet Truck 125.00 125.00
Chipper 44.00 44.00
Concrete Saw 10.00 10.00
Air Compressor 17.00 17.00
5-Ton Roller 30.00 30.00
Mini Excavator 60.00 60.00
Skid Steer 50.00 50.00
MATERIAL COST: (cost plus tax)
Concrete (per yard)195.00 195.00
Sand (per ton)25.00 25.00
Class II Base (per ton)30.00 30.00
A/C (per ton)100.00 100.00
Fee Description
PUBLIC WORKS SERVICES
Fiscal Year 2019-20
MASTER FEE SCHEDULE
City of Arroyo Grande
Item 9.b. - Page 48