Loading...
R 4931RESOLUTION NO. 4931 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE UPDATING OPERATING FEES SET FORTH IN THE MASTER FEE SCHEDULE WHEREAS, in January 2015 the City of Arroyo Grande retained Wohlford Consulting to conduct a User (operating) Fee Study for City services; and WHEREAS, operating fees are intended to be paid by persons utilizing the program or service and to reimburse the City for the actual cost of said program or service; and WHEREAS, the City has established a proposed Master Fee Schedule based on the User Fee Study, which includes fees related to planning, building, engineering, police, recreation, and public works charges; and WHEREAS, the City Council has considered the question of whether or not to adjust or establish User (operating) Fees for City services to reflect the estimated amount that is required to recover the actual cost to the City of providing such services; and WHEREAS, the City Council adopted a methodology to annually update fees in order to reflect the change in the actual cost to the City of providing services and reduce the subsidy of the General Fund for planning related services; and WHEREAS, the amount of the fees does not exceed the cost of providing the City services; and WHEREAS, at a duly noticed public meeting, the City Council considered all verbal and written presentations that were made regarding the proposed fees; and WHEREAS, at least ten days prior to the public meeting, the City made available to the public data indicating the amount of cost, or estimated cost required to provide the services for which the fee or service charge is levied and the revenue sources anticipated to provide the service, including General Fund revenues. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Arroyo Grande as follows: The schedule of fees entitled “Master Fee Schedule” in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full, is hereby adopted. Fees shall be adjusted annually by modifying the adopted value up or down in conformance with the annual change in the City’s budgeted labor costs. The factor for the adjustment of the fees shall be calculated and established each year by the Director of Administrative Services. Additional phased increases of Planning fees shall be implemented at 15% per year for two years, until an overall cost recovery level of 80% is achieved for Planning related fee activities. BE IT FURTHER RESOLVED by the City Council that this Resolution shall be effective August 26, 2019. On motion of Council Member George, seconded by Council Member Barneich, and on the following roll call vote, to wit: AYES: Council Members George, Barneich, Paulding, and Mayor Ray Russom NOES: None ABSENT: Council Member Storton the foregoing Resolution was passed and adopted this 25th day of June, 2019. RESOLUTION NO. 1493 t PAGE 3 < . aik CAR' R Y ' t ;,M, MAYOR ATTEST: J SICA MATSON, DEPUTY CITY CLERK APPROVED AS TO CONTENT: JAM . AN, CITY MANAGER APPROVED AS TO FORM: H HER WHITHAM, CITY ATTORNEY Issued by the Administrative Services Department CITY OF ARROYO GRANDE Fiscal Year 2019-20 MASTER FEE SCHEDULE Fees effective August 26, 2019 Exhibit "A" City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2019-20 Hourly rates for all City staff positions will be calculated and provided by the Administrative Services Department. In the absence of an established fee for service, the City will recover costs based on the reasonable time and materials required to provide the service, as calculated by the Administrative Services Department FY 2019-20 Fee Budget 40.00$ Financial Statements copy costs Business License Fees: (Basic fees are prorated per the application date: Jan 1-Jun 30, 100%; Jul 1-Dec 31, 50%) Basic Fee--All businesses except Specific License Fees listed below 34.00* >Per Employee, Partner, or Associate (Except those listed below)5.00 Specific License Fees: Contractor 64.00* Motels & Hotels (Basic Fee)34.00* >per room 1.00 Trailer Parks 34.00* >per space 1.00 Hospitals, Sanitariums, Rest or Nursing Homes 44.00* >per bed 3.00 Taxi Cabs 49.00* >per vehicle 15.00 Billboards 129.00* Commercial Auctions - Per Year 89.00* Commercial Auctions - Per Day of Auctioning 29.00* Circuses and similar shows (per day)70.00 + $4 State Fee Bazaars and street fairs: >Small Bazaars (1-4 displays or exhibits) per display per every two (2) days 15.00 + $4 State Fee >Large Bazaars (5 or more displays or exhibits) per day 70.00 + $4 State Fee * Includes $4 per license per State law (AB 1379) Copies, per page (Black and White)0.20 Color copies Actual cost Maps--Chamber of Commerce 1.00 Utility Fees and Penalties: Renter's Deposit 180.00 New Utility Account Set Up Fee 40.00 Past Due Penalty (% of Past Due Total)10% Lock Cut Replacement Fee 15.00 Reconnection Fee (Reconnect by City Personnel)90.00 Unauthorized Reconnection Fee (Reconnect by non-City Personnel)180.00 Returned check fee (NSF) -Per CA Civil Code Section 1719 25.00 Fee Description City of Arroyo Grande ADMINISTRATIVE SERVICES Fiscal Year 2019-20 MASTER FEE SCHEDULE FY 2019-20 Fee City Council Meeting Audio CD 5.00/each City Council Meeting DVD Vendor cost Candidate Filing Fee no charge Candidate Statement actual cost Notice of Intent to Circulate Petition (EC 9202)200.00 Copies, per page (Black and White)0.20 Color copies Actual cost Copies of records sent to a commercial copier Actual cost Document Certification 10.00 Fair Political Practices Commission Forms: Statement of Economic Interests Form 700 (GC 81008)0.10/page Campaign Statements (GC 81008)0.10/page Retrieval fee for statements 5 or more years old (GC 81008)5.00/request Notary (per signature)15.00 Fee Description CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Fee Description FY 2019-20 Fee Printing/Copying Charges: 8 1/2" x 11 (per page)0.20$ 18" x 30 (per page)3.00 24" x 36" (per page)4.00 36" x 48" (per page)5.00 Standard Plans 35.00 Land Use Map and Zoning Maps (each) 24x36 3.00 36x48 4.00 Overtime Inspections (per hour- 2 hour min.)158.00 Map Review - Final (LLA, PM, TM 0-2 Lots)5,874.00 Each Additional Lot 140.00 Additional Map Review - After 3 2,797.00 Encroachment Permit - Minor (pod, dumpster)57.00 Encroachment Permit - Standard - per Month 698.00 Encroachment Permit - Franchise Annual 17,475.00 Certificate of Compliance 2,159.00 Certificate of Correction / Merger 781.00 Transporation Permit - each occurrence 40.00 Public Improvement Plan - Plan Check (based on Engineer's estimate of construction cost): $0 - 10,000 2,576.00 $10,001 - 50,000 2,961.00 $50,001 - 100,000 3,408.00 $100,001 - 250,000 3,925.00 $250,001 - 500,000 5,459.00 $500,001 - 1.0 Million 7,119.00 Each additional $500,000 (over $1M)2,192.00 Additional Review Public Improvement Plan - Plan Check - After 3 (based on Engineer's estimate of construction cost): $0 - 10,000 625.00 $10,001 - 50,000 701.00 $50,001 - 100,000 779.00 $100,001 - 250,000 931.00 $250,001 - 500,000 1,233.00 $500,001 - 1.0 Million 2,141.00 Each additional $500,000 (over $1M)907.00 ENGINEERING Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Fee Description FY 2019-20 Fee ENGINEERING Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Grading / Drainage / Erosion Plan Review: 0 - 50 cy 1,276.00$ 50 cy to 100 cy 1,370.00 100 cy to 1,0000 cy 1,547.00 1,000 cy to 10,000 cy 1,724.00 10,000 cy to 100,000 cy 1,900.00 Hydraulic / Hydrology Report Review 801.00 SWPPP Review 801.00 Stormwater Control Plan Review 801.00 Inspection Agreement, including Subdivision Agreement (based on Engineer's estimate of construction cost): $0 - 10,000 747.00 $10,001 - 50,000 1,943.00 $50,001 - 100,000 3,718.00 $100,001 - 250,000 7,422.00 $250,001 - 500,000 14,276.00 $500,001 - 1.0 Million 27,697.00 Each additional $500,000 (over $1M)13,484.00 Major Project with a Contract Engineer - Actual cost of Contractor passed directly through to Applicant Major Project with a Contract Engineer - City Project Management and Administrative Charge 1,289.00 FY 2019-20 Fee COPY FEES Development Code w/out Appendices 50.00$ Appendix 1 15.00 Appendix 2 5.00 Development Code w/Appendices 70.00 General Plan 25.00 Housing Element 2003 35.00 General Plan EIR 12.00 Design Guidelines for Historic Districts 25.00 Design Guidelines for Traffic Way/Station Way 6.00 Design Guidelines for Mixed Use Districts 30.00 East Grand Avenue Enhancement Plan 20.00 Land Use Map and Zoning Maps (each) 24 x 36 3.00 36 x 48 4.00 DVD (Planning Commission meetings)Vendor cost Audio recording copies 5.00 Copies, per page (Black and White)0.20 Color copies Actual cost Arroyo Grande Bike Plan 26.00 IN-LIEU FEES Downtown Parking in lieu fee (per resolution 3994)24,000.00 Affordable Housing in lieu fee 5% PROCESSING FEES Notary (per signature)15.00 Annexation - deposit (fee based on actual time at staff at hourly rates)20,000.00 Time and Materials (if project exceeds 50 hours of staff time) Appeals: CD Director to Planning Commission 491.00 Planning Commission to City Council 1,163.00 Certificate of Compliance 3,512.00 Fee Description COMMUNITY DEVELOPMENT Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande FY 2019-20 Fee Fee Description COMMUNITY DEVELOPMENT Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Conditional Use Permit: Project - Major (multi building)14,347.00$ Time and Materials (if project exceeds 50 hours of staff time) Project - Minor (routine) - as det'd by CDD 6,212.00 Amendment 3,137.00 Development Agreement - deposit 24,024.00 Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Major 16,187.00 Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment - Minor 8,901.00 Environmental Impact Determination: Initial Study Fee 3,412.00 Negative Declaration (in addition to Initial Study Fee)554.00 Mitigated Neg Dec (in addition to Initial Study Fee)2,318.00 General Plan Amendment (Major)16,187.00 Time and Materials (if project exceeds 50 hours of staff time) General Plan Amendment (Minor)8,901.00 Home Occupation Permit 166.00 Lot Line Adjustment 3,326.00 Lot Merger / Reversion to Acreage 3,273.00 Mailing Label Production 406.00 Request for Meeting Continuance 461.00 Minor Use Permit - Architectural Review Major (e.g. subdivision if PUD or CUP is not concurrently processed)5,145.00 Minor (e.g. single lot)923.00 Minor Use Permit - Historic Resource Designation 1,472.00 Minor Use Permit - Large Family Day Care 561.00 Minor Use Permit - Minor Exception 999.00 Minor Use Permit - Plot Plan Review 735.00 Minor Use Permit - Temporary Use Permit 294.00 Minor Use Permit - Viewshed Review:1,130.00 FY 2019-20 Fee Fee Description COMMUNITY DEVELOPMENT Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Planned Unit Development Permit (Major)15,261.00$ Time and Materials (if project exceeds 50 hours of staff time) Planned Unit Development Permit (Minor)7,301.00 Planning Commission lnterpretation or Waiver 1,810.00 Pre-Application 1,228.00 Public Art Permit 927.00 Research (deposit)221.00 Signs: Planned Sign Program 2,391.00 Administrative Sign Permit 343.00 Administrative Sign Program 1,347.00 Specific Plan or Amendment (deposit)23,978.00 Time and Materials (if project exceeds 50 hours of staff time) Tentative Parcel Map (0-4 lots)9,537.00 with Vesting (added to base fee)591.00 Amendment 4,620.00 Tentative Tract Map: 5-20 lots 15,670.00 over 20 lots 18,190.00 with Vesting (added to base fee)1,535.00 Amendment 6,879.00 Time Extension 2,568.00 Variance 3,633.00 Zoning Compliance Letter 147.00 Fee Description FY 2019-20 Fee ANIMAL CONTROL / IMPOUND Dog Impound Fee 1st Impound 23.00$ 2nd Impound 45.00 3rd Impound +68.00 Cat Impound Fee 1st Impound 23.00 2nd Impound 45.00 3rd Impound +68.00 PERMITS & LICENSES: Alarm Permit Original Application Permit Processing Fee 107.00 Annual Renewal Permit Processing Fee 50.00 False Alarm Response Fourth False Alarm within 12 months 169.00 Fifth False Alarm within 12 months 339.00 Sixth or more false alarm within 12 months (per incident)507.00 Block Party Permit Block Party Permit 29.00 Commercial Filming / Still Photography Permit Permit Processing Fee 57.00 Commercial Filming (per day)282.00 Still Photography (per day)112.00 City Staff Assigned - 4 hour minimum (if applicable)overtime rate Concealed Weapons Permit Original Application Police Department Investigation Fee 112.00$ Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)93.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Identification Card 23.00 Concealed Weapons Permit Biennial Renewal: Police Department Investigation Fee 29.00 Dept of Justice Renewal Fee (DOJ passthrough fee paid by applicant)52.00 Identification Card 23.00 Mobile Vendor Permit Permit Processing Fee 141.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Mobile Vendor Employee Permit Permit Processing Fee 141.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost POLICE Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Fee Description FY 2019-20 Fee POLICE Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Sidewalk Vending Permit Permit Processing Fee 280.00 Palmreader Fortune Teller Permit - Original Application Permit Processing Fee 141.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Palmreader Fortune Teller Permit - Annual Renewal Permit Renewal Processing 112.00 Palmreader Fortune Teller Establishment Permit - Original Application Permit Processing Fee 141.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Dept of Justice & FBI fingerprint process (DOJ passthrough fee paid by applicant)actual cost Palmreader Fortune Teller Establishment Permit - Renewal Application Permit Processing Fee 112.00 Public Safety and Welfare Permit: Less than 200 Non-Commercial Event 57.00 More than 200 Non-Commercial Event 112.00 Commercial Event 141.00 Second Hand Dealer Permit Original Application Permit Processing Fee 141.00 Live Scan Fingerprint Rolling Fee (per penal code section 13300)25.00 Dept of Justice & FBI Fingerprint process (DOJ passthrough fee paid by applicant)actual cost Second Hand Dealer Permit Biennial Renewal City Processing Fee 112.00 Solicitation Permit (per solicitor) Permit Processing Fee 141.00$ Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Processing Fee actual cost Taxi Cab Driver Permit Original Application Permit Processing Fee 141.00 Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Taxi Cab Driver Permit Annual Renewal Annual Renewal 112.00 Tobacco Retailers License Permit Processing Fee 141.00 Fee Description FY 2019-20 Fee POLICE Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande OTHER FEES Citation correction certification 29.00 Civil Witness Fee (Deposit)275.00 Copies, per page (Black and White).20 per page Copies - Color copies per page 5.00 Court Ordered Booking 141.00 Criminal history summary examination Live Scan Fingerprint Rolling Fee (per PC 13300)25.00 Dept of Justice & FBI Fingerprint Process actual cost Disturbance 415PC Second Response 169.00 Third Response 339.00 Fourth Response 563.00 Emergency DUI Response -Impaired Driver Accident - Actual Time @ Staff Hourly Rates actual cost Local Records Check 16.00 Photographs per disc 25.00 Property Handling for Mailing / Shipping actual cost Replacement of lost/stolen Permits, Licenses and registration receipts 50.00 Repossessed Vehicle (per GC 41612)15.00 Subpoena Duces Tecum Production of Records for Subpoena deuces Tecum 15.00 .20 per page produced actual cost postage/shipping actual cost Custodian of Records Court Appearance 275.00 Vehicle Release - Impound/Stored Vehicle Release 57.00 Vehicle Release 30-day Impound Release Review 84.00 Clearance letter 50.00 Fee Description Plan Check Fee FY 19-20 Inspection Fee FY 19-20 Cellular/Mobile Phone, free-standing NEW 1,111.00$ 1,584.00$ Cellular Tower with Equipment Shelter 1,111.00 1,776.00 Cellular Tower Equipment Demolition 427.00 447.00 Awning (not patio cover) Tents / Canopies / Booths 115.00 174.00 194.00 353.00 Close Existing Openings 115.00 237.00 Compliance Inspections/Reinspections 215.00 290.00 Deck (with Calcs)249.00 311.00 Demolition 115.00 365.00 Demolition - MultiFamily/Commercial 115.00 365.00 Door 115.00 250.00 Fence or Wall (wood, chain link, wrought iron): >6 feet in height, 1st 100 s.f.115.00 319.00 Each additional 100 sf 88.00 115.00 Fence or Freestanding Wall (masonry / garden): City Standard, 1st 100 s.f.115.00 319.00 Each additional 100 sf 88.00 115.00 Engineered Wall, 1st 100 sf 149.00 319.00 Each additional 100 sf 122.00 115.00 Fireplace (masonry or pre-fab)115.00 231.00 Flag pole (greater than 6 feet in height)115.00 231.00 Grading (Cut and Fill): 0-50 Cubic Yards (Cut and Fill)149.00 231.00 Each Add'l 50 CY (or portion thereof)73.00 174.00 Pilaster each 10 115.00 231.00 Lighting pole (each)115.00 197.00 Stucco Applications 72.00 231.00 Retaining Wall (concrete or masonry): First 50 sf 238.00 264.00 Each additional 50 sf 210.00 149.00 Re-roofing: Composition - no tear off 95.00 222.00 Other roofs (first 10 squares)95.00 222.00 Each additional 10 squares 23.00 55.00 Roof Structure Replacement 149.00 264.00 Sauna - steam 115.00 277.00 Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande Change of Occupancy No T.I. w/ plan check & Inspection BUILDING MISC Fee Description Plan Check Fee FY 19-20 Inspection Fee FY 19-20 Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande BUILDING MISC Siding: Stone and Brick Veneer (interior or exterior)95.00$ 277.00$ All Other 72.00 277.00 Signs: Directional / Menu 238.00 277.00 Freeway sign 546.00 305.00 Ground / Roof / Projecting Signs 227.00 264.00 Wall, Illuminated 95.00 277.00 Skylight (Residential each)72.00 244.00 Skylight (Commercial) one 95.00 244.00 Spa or Hot Tub (Pre-fabricated)95.00 277.00 Stairs - per story 348.00 264.00 Storage Racks each set of plans 403.00 331.00 Temporary Utility Connection or Occupancy - 95.00 Window or Sliding Glass Door (first)238.00 264.00 Each additional 210.00 123.00 Board of Appeals 895.00 - Business License Inspection 45.00 69.00 Business License Re-inspection 45.00 36.00 Product Review 673.00 - Disabled Access Compliance Inspection 134.00 90.00 Supplemental Plan Check Fee (first 1/2 hour)122.00 - Each Additional 1/2 hour (or portion thereof)110.00 - Supplemental Inspection Fee (first 1/2 hour)- 122.00 Each Additional 1/2 hour (or portion thereof)- 110.00 - 233.00 Each additional hour - 220.00 After Hours Inspection 2 hour minimum - 233.00 Each additional hour - 220.00 After Hours Plan Review 2 hour minimum 233.00 - Each additional hour 220.00 - Copies, per page (Black and White) 0.20 per page Color copies actual costs Emergency (Non-Scheduled) Call-Out Fee (first hour) 2 hour minimum Fee Description Plan Check Fee FY 19-20 Inspection Fee FY 19-20 Fire Sprinkler Systems - New Construction: 1-50 Heads 221.00$ 242.00$ 51-100 Heads 277.00 344.00 101-200 Heads 500.00 412.00 Every 200 Heads above 200 220.00 158.00 Fire Sprinkler Systems -Tenant Improvements: 1-25 Heads 221.00 242.00 26-100 Heads 334.00 378.00 Every 100 Heads above 100 110.00 253.00 Fire Alarm System (including Sprinkler Monitor System) - New Construction: 1-50 Devices 221.00 242.00 51-100 Devices 277.00 344.00 Every 50 Devices above 100 110.00 227.00 Fire Alarm System (including Sprinkler Monitor System) - Tenant Improvements: 1-50 Devices 221.00 276.00 51-100 Devices 277.00 378.00 Every 50 Devices above 100 167.00 227.00 Other Suppression Systems: Inert Gas Systems 388.00 485.00 Dry Chemical Systems 221.00 485.00 Wet Chemical/Kitchen Hood 332.00 485.00 Foam Systems 221.00 663.00 Paint Spray Booth 499.00 719.00 Other Fire Fees: Hydrants/Underground Fire Service Plan Check 444.00 - Hydrant Flow Test (existing hydrants)- 663.00 Special Event Inspection (e.g., fairs) These are group events, when multiple booths/t Booth / Tent 59.00 64.00 Booth / Tent with Electricity 84.00 104.00 Booth / Tent with Cooking (includes Electricity)91.00 125.00 Special Event Application Review - 24.00 Additional Fire related services are provided by Five Cities Fire Authority (FCFA). See the FCFA fee schedule for fees. City of Arroyo Grande BUILDING FIRE Fiscal Year 2019-20 MASTER FEE SCHEDULE Fee Description Plan Check Fee FY 19-20 Inspection Fee FY 19-20 ADMINISTRATIVE (BASE) FEES: Permit Issuance and Administration 113.00$ -$ MECHANICAL PERMIT FEES FAU less than 100,000 Btu/h 56.00 68.00 FAU greater than 100,000 Btu/h 56.00 103.00 Floor furnace (including vent)56.00 137.00 Suspended, wall, or floor-mounted heaters 56.00 103.00 Appliance vents not included in an appliance permit 56.00 103.00 Boiler or compressor, from 15 HP to 30 HP / absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h.56.00 103.00 Boiler or compressor, from 30 HP to 50 HP / absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h.110.00 137.00 Boiler or compressor, over 50 HP / absorption system over 1,750,000 Btu/h.166.00 103.00 Air-handling unit, including attached ducts.110.00 103.00 Air-handling unit over 10,000 CFM 166.00 137.00 Evaporative cooler 56.00 68.00 Ventilation fan connected to a single duct 110.00 103.00 Ventilation system (not a portion of heating or a/c system)166.00 137.00 Incinerator, residential 276.00 204.00 Commercial or Industrial-type incinerator 331.00 204.00 Misc. appliances or equipment.166.00 137.00 Stand Alone Mechanical Plan Check (hourly rate)220.00 - Other Mechanical Inspections (per hour)- 137.00 PLUMBING / GAS PERMIT FEES: Plumbing fixtures 56.00 68.00 Building sewer 110.00 103.00 Rainwater systems (per drain)56.00 68.00 Gray Water system 166.00 170.00 Private sewage disposal system 166.00 170.00 Water Heater 110.00 68.00 Industrial waste pretreatment interceptor 56.00 103.00 Water piping and/or water treating equipment (each)56.00 103.00 Repair or alteration of drainage or vent piping, each fixture 56.00 103.00 Each lawn sprinkler system on any one meter 56.00 68.00 Backflow devices each unit 110.00 68.00 Atmospheric-type vacuum breakers: 1-5 units 110.00 68.00 Atmospheric-type vacuum breakers: each unit over 5 units 110.00 68.00 Stand Alone Plumbing Plan Check (hourly rate)220.00 - Other Plumbing and Gas Inspections (per hour)- 137.00 MASTER FEE SCHEDULE City of Arroyo Grande BUILDING MPE Fiscal Year 2019-20 Fee Description Plan Check Fee FY 19-20 Inspection Fee FY 19-20 MASTER FEE SCHEDULE City of Arroyo Grande BUILDING MPE Fiscal Year 2019-20 SYSTEM FEES: Swimming Pools 166.00$ 238.00$ Outdoor Events 166.00 103.00 Electric generator and electrically-driven rides 110.00 103.00 Mechanically-driven rides/ attractions with electrical lighting 166.00 103.00 Each system of area and booth lighting 110.00 103.00 Temporary Power Service 110.00 68.00 Temporary power pole 110.00 68.00 Sub poles (each)56.00 47.00 UNIT FEES: Receptacle, Switch, and Lighting Outlets First 10 110.00 68.00 Each Additional 10 56.00 34.00 Lighting Fixtures: First 10 110.00 68.00 Each additional 10 56.00 34.00 Pole or platform-mounted lighting fixtures (each)110.00 103.00 Theatrical-type lighting fixtures or assemblies (each)110.00 137.00 Residential Appliances (each)110.00 68.00 Nonresidential Appliances 166.00 137.00 Residential appliances and self-contained, nonresidential appliances, (each)166.00 137.00 Appliances not exceeding one horsepower (HP) kilowatt (KW), or kilovolt-ampere (KVA), in rating,(each)220.00 137.00 Power Apparatus: Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus (all sizes)166.00 68.00 Signs, Outline Lighting, and Marquees: Signs, Outline Lighting, or Marquees supplied from one branch circuit (each)110.00 103.00 Additional branch circuits within the same sign, outline lighting system, or marquee (each)110.00 68.00 Service or Panel: 200 amp or less Electrical Panel (each)166.00 137.00 Over 200 amp up to 1000 amp Electrical Panel (each)276.00 170.00 Over 1000 amp Electrical Panel (each)441.00 204.00 Fee Description Plan Check Fee FY 19-20 Inspection Fee FY 19-20 MASTER FEE SCHEDULE City of Arroyo Grande BUILDING MPE Fiscal Year 2019-20 UNIT FEES (continued): 110.00$ 103.00$ 110.00 137.00 Photovotaic Systems - each 166.00 204.00 Stand Alone Electrical Plan Check (hourly rate)220.00 - Other Electrical Inspections (per hour)- 137.00 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth Miscellaneous Apparatus, Conduits, and Conductors Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 2,000 4,716$ 0.212$ 8,000 5,988$ 0.285$ 1 A-1 20,000 9,411$ 0.309$ 40,000 15,594$ 0.207$ 100,000 28,028$ 0.280$ 1,000 3,042$ 0.244$ 4,000 3,773$ 0.331$ 2 A-2 10,000 5,761$ 0.359$ 20,000 9,349$ 0.241$ 50,000 16,587$ 0.332$ 250 1,593$ 0.334$ 1,000 1,843$ 0.405$ 3 A 2,500 2,451$ 0.442$ 5,000 3,557$ 0.285$ 12,500 5,692$ 0.455$ 1,000 3,042$ 0.244$ 4,000 3,773$ 0.331$ 4 A-3 10,000 5,761$ 0.359$ 20,000 9,349$ 0.241$ 50,000 16,587$ 0.332$ 500 2,173$ 0.295$ 2,000 2,616$ 0.386$ 5 R-4 5,000 3,775$ 0.420$ 10,000 5,874$ 0.278$ 25,000 10,050$ 0.402$ 250 1,593$ 0.334$ 1,000 1,843$ 0.405$ 6 A-3 2,500 2,451$ 0.442$ 5,000 3,557$ 0.285$ 12,500 5,692$ 0.455$ 2,000 3,669$ 0.157$ 8,000 4,610$ 0.215$ 7 E 20,000 7,195$ 0.233$ 40,000 11,859$ 0.157$ 100,000 21,307$ 0.213$ 250 1,593$ 0.334$ 1,000 1,843$ 0.405$ 8 E 2,500 2,451$ 0.442$ 5,000 3,557$ 0.285$ 12,500 5,692$ 0.455$ Educational Building - TI Educational Building - Complete Assembly Group - Theaters Assembly Group - Restaurants, nightclubs Church and Religious Bldg - TI Congregate Care - Complete Church and Religious Bldg - Complete Assembly Group - TI City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 500 1,834$ 0.220$ 2,000 2,165$ 0.280$ 9 S-2 5,000 3,003$ 0.304$ 10,000 4,523$ 0.199$ 25,000 7,509$ 0.300$ 1,000 3,042$ 0.244$ 4,000 3,773$ 0.331$ 10 R-1 10,000 5,761$ 0.359$ 20,000 9,349$ 0.241$ 50,000 16,587$ 0.332$ 1,000 1,787$ 0.104$ 4,000 2,100$ 0.132$ 11 R-1 10,000 2,893$ 0.144$ 20,000 4,329$ 0.094$ 50,000 7,146$ 0.143$ 250 1,545$ 0.313$ 1,000 1,779$ 0.374$ 12 R-1 2,500 2,341$ 0.409$ 5,000 3,364$ 0.262$ 12,500 5,329$ 0.426$ 500 2,286$ 0.313$ 2,000 2,757$ 0.396$ 13 B 5,000 3,945$ 0.431$ 10,000 6,100$ 0.282$ 25,000 10,324$ 0.413$ 1,000 1,569$ 0.080$ 4,000 1,811$ 0.098$ 14 B 10,000 2,396$ 0.107$ 20,000 3,461$ 0.068$ 50,000 5,511$ 0.110$ 100 1,362$ 0.575$ 400 1,534$ 0.646$ 15 B 1,000 1,922$ 0.709$ 2,000 2,631$ 0.439$ 5,000 3,949$ 0.790$ 1,000 3,042$ 0.244$ 4,000 3,773$ 0.331$ 16 F 10,000 5,761$ 0.359$ 20,000 9,349$ 0.241$ 50,000 16,587$ 0.332$ Parking Garage - Complete Industrial Building - Complete Offices, etc. - TI Offices, etc. - Shell Offices, etc. - Complete Hotel Low/Mid Rise - TI Hotel Low/Mid Rise - Shell Hotel Low/Mid Rise - Complete Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 1,000 2,076$ 0.137$ 4,000 2,487$ 0.178$ 17 F 10,000 3,555$ 0.193$ 20,000 5,488$ 0.128$ 50,000 9,324$ 0.186$ 250 1,545$ 0.313$ 1,000 1,779$ 0.374$ 18 F 2,500 2,341$ 0.409$ 5,000 3,364$ 0.262$ 12,500 5,329$ 0.426$ 500 2,076$ 0.274$ 2,000 2,487$ 0.356$ 19 S-1 5,000 3,555$ 0.387$ 10,000 5,488$ 0.256$ 25,000 9,324$ 0.373$ 500 1,449$ 0.135$ 2,000 1,651$ 0.157$ 20 S-1 5,000 2,121$ 0.172$ 10,000 2,979$ 0.108$ 25,000 4,603$ 0.184$ 100 1,521$ 0.752$ 400 1,746$ 0.900$ 21 S-1 1,000 2,286$ 0.982$ 2,000 3,268$ 0.626$ 5,000 5,148$ 1.030$ 500 2,173$ 0.295$ 2,000 2,616$ 0.386$ 22 M 5,000 3,775$ 0.420$ 10,000 5,874$ 0.278$ 25,000 10,050$ 0.402$ 500 1,449$ 0.135$ 2,000 1,651$ 0.157$ 23 M 5,000 2,121$ 0.172$ 10,000 2,979$ 0.108$ 25,000 4,603$ 0.184$ 100 1,521$ 0.752$ 400 1,746$ 0.900$ 24 M 1,000 2,286$ 0.982$ 2,000 3,268$ 0.626$ 5,000 5,148$ 1.030$ Retail Sales - TI Retail Sales - Shell Retail Sales - Complete Repair Garage & Service St - TI Repair Garage & Service St - Shell Repair Garage & Service St - Complete Industrial Building - TI Industrial Building - Shell Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 2,000 2,076$ 0.069$ 8,000 2,487$ 0.089$ 25 - 20,000 3,555$ 0.097$ 40,000 5,488$ 0.064$ 100,000 9,324$ 0.093$ 1,000 3,042$ 0.244$ 4,000 3,773$ 0.331$ 26 I 10,000 5,761$ 0.359$ 20,000 9,349$ 0.241$ 50,000 16,587$ 0.332$ 1,000 1,834$ 0.110$ 4,000 2,165$ 0.140$ 27 I 10,000 3,003$ 0.152$ 20,000 4,523$ 0.100$ 50,000 7,509$ 0.150$ 100 1,738$ 0.992$ 400 2,036$ 1.244$ 28 I 1,000 2,782$ 1.354$ 2,000 4,136$ 0.882$ 5,000 6,783$ 1.357$ 1,000 3,042$ 0.244$ 4,000 3,773$ 0.331$ 29 B 10,000 5,761$ 0.359$ 20,000 9,349$ 0.241$ 50,000 16,587$ 0.332$ 1,000 1,834$ 0.110$ 4,000 2,165$ 0.140$ 30 B 10,000 3,003$ 0.152$ 20,000 4,523$ 0.100$ 50,000 7,509$ 0.150$ 250 1,738$ 0.397$ 1,000 2,036$ 0.498$ 31 B 2,500 2,782$ 0.542$ 5,000 4,136$ 0.353$ 12,500 6,783$ 0.543$ 500 2,317$ 0.328$ 2,000 2,808$ 0.433$ 32 - 5,000 4,106$ 0.469$ 10,000 6,453$ 0.312$ 25,000 11,140$ 0.446$ Medical/24 Hour Care - Shell Medical/24 Hour Care - Complete Warehouse - Complete Restaurant - Complete Medical Offices - TI Medical Offices - Shell Medical Offices - Complete Medical/24Hour Care - TI Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 500 1,593$ 0.167$ 2,000 1,843$ 0.203$ 33 - 5,000 2,451$ 0.221$ 10,000 3,557$ 0.142$ 25,000 5,692$ 0.228$ 250 1,472$ 0.280$ 1,000 1,682$ 0.329$ 34 - 2,500 2,176$ 0.359$ 5,000 3,074$ 0.228$ 12,500 4,785$ 0.383$ 250 2,028$ 0.525$ 1,000 2,422$ 0.682$ 35 I-4 2,500 3,444$ 0.740$ 5,000 5,295$ 0.489$ 12,500 8,961$ 0.717$ 100 1,738$ 0.992$ 400 2,036$ 1.244$ 36 I-4 1,000 2,782$ 1.354$ 2,000 4,136$ 0.882$ 5,000 6,783$ 1.357$ 500 1,883$ 0.231$ 2,000 2,229$ 0.295$ 37 H 5,000 3,113$ 0.321$ 10,000 4,716$ 0.210$ 25,000 7,872$ 0.315$ 500 2,317$ 0.328$ 2,000 2,808$ 0.433$ 38 H 5,000 4,106$ 0.469$ 10,000 6,453$ 0.312$ 25,000 11,140$ 0.446$ 100 1,738$ 0.992$ 400 2,036$ 1.244$ 39 H 1,000 2,782$ 1.354$ 2,000 4,136$ 0.882$ 5,000 6,783$ 1.357$ 200 1,352$ 0.282$ 800 1,521$ 0.316$ 40 - 2,000 1,900$ 0.346$ 4,000 2,592$ 0.214$ 10,000 3,877$ 0.388$ Commercial Building - Foundation Hazardous H - T I Hazardous H - Shell Hazardous H - Complete Day Care Facility - TI Day Care Facility - Complete Restaurant - TI Restaurant - Shell Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 200 1,400$ 0.308$ 800 1,585$ 0.354$ 41 - 2,000 2,010$ 0.388$ 4,000 2,786$ 0.242$ 10,000 4,240$ 0.424$ 1,000 3,042$ 0.244$ 4,000 3,773$ 0.331$ 42 R-2 10,000 5,761$ 0.359$ 20,000 9,349$ 0.241$ 50,000 16,587$ 0.332$ 1,000 2,451$ 0.139$ 2,000 2,590$ 0.717$ 43 R-3 3,000 3,307$ 0.374$ 5,000 4,055$ 0.531$ 7,500 5,382$ 0.718$ 667 1,441$ 0.081$ 1,333 1,495$ 0.276$ 44 R-3 2,000 1,679$ 0.215$ 3,333 1,965$ 0.250$ 5,000 2,381$ 0.476$ 333 1,373$ 0.145$ 667 1,422$ 0.443$ 45 R-3 1,000 1,569$ 0.382$ 1,667 1,824$ 0.425$ 2,500 2,178$ 0.871$ 800 1,250$ 0.049$ 1,600 1,290$ 0.100$ 46 R-3 2,400 1,370$ 0.125$ 4,000 1,569$ 0.121$ 6,000 1,811$ 0.302$ 667 1,250$ 0.059$ 1,333 1,290$ 0.120$ 47 R-3 2,000 1,370$ 0.150$ 3,333 1,569$ 0.145$ 5,000 1,811$ 0.362$ 120 1,096$ 0.235$ 480 1,180$ 0.186$ 48 - 1,200 1,315$ 0.212$ 2,400 1,569$ 0.106$ 6,000 1,953$ 0.325$ Commercial Coach - Complete Prefabricated Dwelling - Complete Manufactured Home - Complete Moved Building - Residential Single-Family - Production/Repeat Single-Family (custom or model) Apartment Building Commercial Building - Addition Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 240 1,096$ 0.117$ 960 1,180$ 0.093$ 49 - 2,400 1,315$ 0.106$ 4,800 1,569$ 0.053$ 12,000 1,953$ 0.163$ 500 1,121$ 0.061$ 2,000 1,212$ 0.053$ 50 - 5,000 1,370$ 0.059$ 10,000 1,665$ 0.031$ 25,000 2,134$ 0.085$ 167 1,250$ 0.237$ 333 1,290$ 0.480$ 51 U 500 1,370$ 0.599$ 833 1,569$ 0.579$ 1,250 1,811$ 1.449$ 40 1,159$ 0.874$ 160 1,264$ 0.813$ 52 U 400 1,459$ 0.902$ 800 1,820$ 0.505$ 2,000 2,425$ 1.213$ 200 1,738$ 0.496$ 800 2,036$ 0.622$ 53 - 2,000 2,782$ 0.677$ 4,000 4,136$ 0.441$ 10,000 6,783$ 0.678$ 200 1,690$ 0.470$ 800 1,972$ 0.583$ 54 - 2,000 2,672$ 0.636$ 4,000 3,944$ 0.413$ 10,000 6,420$ 0.642$ 50 1,140$ 0.654$ 200 1,238$ 0.590$ 55 U 500 1,415$ 0.656$ 1,000 1,743$ 0.358$ 2,500 2,280$ 0.912$ 50 1,140$ 0.654$ 200 1,238$ 0.590$ 56 U 500 1,415$ 0.656$ 1,000 1,743$ 0.358$ 2,500 2,280$ 0.912$ Pool/Spa - Standard Plan Commercial Carport Accessory Building - Commercial Commercial Building - Repair Commercial Building - Remodel Residential Garage Manufactured Building - Foundation Modular Building - Complete Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 167 1,441$ 0.325$ 333 1,495$ 1.103$ 57 R-3 500 1,679$ 0.859$ 833 1,965$ 0.998$ 1,250 2,381$ 1.905$ 333 1,645$ 0.213$ 667 1,716$ 0.883$ 58 R-2 1,000 2,010$ 0.570$ 1,667 2,390$ 0.722$ 2,500 2,992$ 1.197$ 333 1,237$ 0.115$ 667 1,275$ 0.220$ 59 R-3 1,000 1,348$ 0.289$ 1,667 1,541$ 0.275$ 2,500 1,770$ 0.708$ 667 1,380$ 0.074$ 1,333 1,430$ 0.225$ 60 R-2 2,000 1,580$ 0.194$ 3,333 1,838$ 0.216$ 5,000 2,198$ 0.440$ 333 1,069$ 0.071$ 667 1,092$ 0.284$ 61 R-3 1,000 1,187$ 0.188$ 1,667 1,312$ 0.235$ 2,500 1,508$ 0.603$ 83 1,028$ 0.230$ 167 1,047$ 0.893$ 62 U 250 1,122$ 0.636$ 417 1,228$ 0.763$ 625 1,387$ 2.219$ 133 1,028$ 0.144$ 267 1,047$ 0.558$ 63 U 400 1,122$ 0.397$ 667 1,228$ 0.477$ 1,000 1,387$ 1.387$ 83 1,028$ 0.230$ 167 1,047$ 0.893$ 64 U 250 1,122$ 0.636$ 417 1,228$ 0.763$ 625 1,387$ 2.219$ Residential Patio Cover Residential Carport Accessory Building - Residential Residential Building - Foundation Multi-Family Residential - Remodel Single-Family Residential - Remodel Multi-Family Residential - Addition Single-Family Residential - Addition Note:All fees include MPE plan checks. Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING PLAN CHECK Fiscal Year 2019-20 MASTER FEE SCHEDULE 83 1,163$ 0.379$ 167 1,195$ 1.759$ 65 U 250 1,342$ 1.008$ 417 1,510$ 1.364$ 625 1,794$ 2.870$ 83 1,130$ 0.338$ 167 1,158$ 1.542$ 66 U 250 1,286$ 0.920$ 417 1,440$ 1.212$ 625 1,692$ 2.708$ Residential Patio Enclosure Residential Balcony/Deck Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 2,000 3,270$ 0.400$ 8,000 5,669$ 0.347$ 1 A-1 20,000 9,833$ 0.298$ 40,000 15,797$ 0.338$ 100,000 36,051$ 0.361$ 1,000 2,654$ 0.631$ 4,000 4,546$ 0.654$ 2 A-2 10,000 8,473$ 0.540$ 20,000 13,871$ 0.639$ 50,000 33,033$ 0.661$ 250 719$ 0.749$ 1,000 1,281$ 0.265$ 3 A 2,500 1,679$ 0.292$ 5,000 2,409$ 0.260$ 12,500 4,362$ 0.349$ 1,000 2,161$ 0.496$ 4,000 3,648$ 0.623$ 4 A-3 10,000 7,385$ 0.494$ 20,000 12,329$ 0.610$ 50,000 30,618$ 0.612$ 500 1,387$ 0.614$ 2,000 2,308$ 0.696$ 5 R-4 5,000 4,395$ 0.534$ 10,000 7,066$ 0.698$ 25,000 17,531$ 0.701$ 250 536$ 0.546$ 1,000 945$ 0.218$ 6 A-3 2,500 1,272$ 0.224$ 5,000 1,831$ 0.217$ 12,500 3,456$ 0.276$ 2,000 3,209$ 0.391$ 8,000 5,556$ 0.345$ 7 E 20,000 9,697$ 0.295$ 40,000 15,605$ 0.336$ 100,000 35,749$ 0.357$ 250 536$ 0.546$ 1,000 945$ 0.218$ 8 E 2,500 1,272$ 0.224$ 5,000 1,831$ 0.217$ 12,500 3,456$ 0.276$ Church and Religious Bldg - Complete Assembly Group - TI Assembly Group: Restaurants, nightclubs Assembly Group - Theaters Educational Building - TI Educational Building - Complete Church and Religious Bldg - TI Congregate Care - Complete City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 500 719$ 0.374$ 2,000 1,281$ 0.133$ 9 S-2 5,000 1,679$ 0.146$ 10,000 2,409$ 0.130$ 25,000 4,362$ 0.174$ 1,000 2,161$ 0.496$ 4,000 3,648$ 0.623$ 10 R-1 10,000 7,385$ 0.494$ 20,000 12,329$ 0.610$ 50,000 30,618$ 0.612$ 1,000 769$ 0.201$ 4,000 1,371$ 0.070$ 11 R-1 10,000 1,788$ 0.078$ 20,000 2,564$ 0.068$ 50,000 4,603$ 0.092$ 250 536$ 0.546$ 1,000 945$ 0.218$ 12 R-1 2,500 1,272$ 0.224$ 5,000 1,831$ 0.217$ 12,500 3,456$ 0.276$ 500 2,408$ 1.230$ 2,000 4,254$ 0.790$ 13 B 5,000 6,622$ 0.741$ 10,000 10,326$ 0.760$ 25,000 21,729$ 0.869$ 1,000 436$ 0.109$ 4,000 764$ 0.048$ 14 B 10,000 1,053$ 0.047$ 20,000 1,523$ 0.048$ 50,000 2,973$ 0.059$ 100 317$ 0.763$ 400 546$ 0.404$ 15 B 1,000 788$ 0.360$ 2,000 1,148$ 0.412$ 5,000 2,384$ 0.477$ 1,000 2,100$ 0.479$ 4,000 3,537$ 0.619$ 16 F 10,000 7,248$ 0.489$ 20,000 12,137$ 0.606$ 50,000 30,316$ 0.606$ Hotel Low/Mid Rise - TI Hotel Low/Mid Rise - Shell Hotel Low/Mid Rise - Complete Industrial Building - Complete Offices, etc. - TI Offices, etc. - Shell Offices, etc. - Complete Parking Garage - Complete Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 1,000 507$ 0.129$ 4,000 894$ 0.053$ 17 F 10,000 1,210$ 0.054$ 20,000 1,745$ 0.053$ 50,000 3,320$ 0.066$ 250 692$ 0.719$ 1,000 1,231$ 0.258$ 18 F 2,500 1,618$ 0.282$ 5,000 2,322$ 0.254$ 12,500 4,226$ 0.338$ 500 1,018$ 0.411$ 2,000 1,635$ 0.648$ 19 S-1 5,000 3,578$ 0.466$ 10,000 5,910$ 0.654$ 25,000 15,721$ 0.629$ 500 477$ 0.241$ 2,000 838$ 0.101$ 20 S-1 5,000 1,142$ 0.101$ 10,000 1,648$ 0.101$ 25,000 3,169$ 0.127$ 100 317$ 0.763$ 400 546$ 0.404$ 21 S-1 1,000 788$ 0.360$ 2,000 1,148$ 0.412$ 5,000 2,384$ 0.477$ 500 1,111$ 0.461$ 2,000 1,803$ 0.660$ 22 M 5,000 3,782$ 0.483$ 10,000 6,199$ 0.665$ 25,000 16,173$ 0.647$ 500 584$ 0.300$ 2,000 1,034$ 0.115$ 23 M 5,000 1,380$ 0.121$ 10,000 1,985$ 0.114$ 25,000 3,698$ 0.148$ 100 317$ 0.763$ 400 546$ 0.404$ 24 M 1,000 788$ 0.360$ 2,000 1,148$ 0.412$ 5,000 2,384$ 0.477$ Retail Sales - TI Retail Sales - Shell Retail Sales - Complete Repair Garage & Service St - TI Repair Garage & Service St - Shell Repair Garage & Service St - Complete Industrial Building - TI Industrial Building - Shell Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 2,000 2,865$ 0.356$ 8,000 5,000$ 0.222$ 25 - 20,000 7,660$ 0.201$ 40,000 11,689$ 0.218$ 100,000 24,776$ 0.248$ 1,000 2,161$ 0.496$ 4,000 3,648$ 0.623$ 26 I 10,000 7,385$ 0.494$ 20,000 12,329$ 0.610$ 50,000 30,618$ 0.612$ 1,000 538$ 0.138$ 4,000 950$ 0.055$ 27 I 10,000 1,278$ 0.056$ 20,000 1,841$ 0.054$ 50,000 3,471$ 0.069$ 100 285$ 0.684$ 400 490$ 0.383$ 28 I 1,000 720$ 0.330$ 2,000 1,051$ 0.394$ 5,000 2,233$ 0.447$ 1,000 2,161$ 0.496$ 4,000 3,648$ 0.623$ 29 B 10,000 7,385$ 0.494$ 20,000 12,329$ 0.610$ 50,000 30,618$ 0.612$ 1,000 554$ 0.142$ 4,000 979$ 0.056$ 30 B 10,000 1,312$ 0.058$ 20,000 1,890$ 0.055$ 50,000 3,547$ 0.071$ 250 723$ 0.752$ 1,000 1,286$ 0.267$ 31 B 2,500 1,687$ 0.293$ 5,000 2,419$ 0.261$ 12,500 4,377$ 0.350$ 500 1,111$ 0.461$ 2,000 1,803$ 0.660$ 32 - 5,000 3,782$ 0.483$ 10,000 6,199$ 0.665$ 25,000 16,173$ 0.647$ Medical/24 Hour Care - Shell Medical/24 Hour Care - Complete Warehouse - Complete Restaurant - Complete Medical Offices - TI Medical Offices - Shell Medical Offices - Complete Medical/24Hour Care - TI Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 500 492$ 0.250$ 2,000 866$ 0.103$ 33 - 5,000 1,176$ 0.104$ 10,000 1,697$ 0.103$ 25,000 3,245$ 0.130$ 250 723$ 0.752$ 1,000 1,286$ 0.267$ 34 - 2,500 1,687$ 0.293$ 5,000 2,419$ 0.261$ 12,500 4,377$ 0.350$ 250 1,111$ 0.923$ 1,000 1,803$ 1.320$ 35 I-4 2,500 3,782$ 0.966$ 5,000 6,199$ 1.330$ 12,500 16,173$ 1.294$ 100 255$ 0.598$ 400 434$ 0.363$ 36 I-4 1,000 652$ 0.303$ 2,000 955$ 0.376$ 5,000 2,082$ 0.416$ 500 1,111$ 0.461$ 2,000 1,803$ 0.660$ 37 H 5,000 3,782$ 0.483$ 10,000 6,199$ 0.665$ 25,000 16,173$ 0.647$ 500 461$ 0.232$ 2,000 809$ 0.100$ 38 H 5,000 1,108$ 0.098$ 10,000 1,600$ 0.100$ 25,000 3,094$ 0.124$ 100 255$ 0.598$ 400 434$ 0.363$ 39 H 1,000 652$ 0.303$ 2,000 955$ 0.376$ 5,000 2,082$ 0.416$ 200 255$ 0.299$ 800 434$ 0.181$ 40 - 2,000 652$ 0.152$ 4,000 955$ 0.188$ 10,000 2,082$ 0.208$ Commercial Building - Foundation Hazardous H- T I Hazardous H - Shell Hazardous H - Complete Day Care Facility - TI Day Care Facility - Complete Restaurant - TI Restaurant - Shell Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 200 285$ 0.342$ 800 490$ 0.192$ 41 - 2,000 720$ 0.165$ 4,000 1,051$ 0.197$ 10,000 2,233$ 0.223$ 1,000 2,073$ 0.513$ 4,000 3,611$ 0.589$ 42 R-2 10,000 7,147$ 0.500$ 20,000 12,148$ 0.562$ 50,000 28,996$ 0.580$ 1,000 1,887$ 1.123$ 2,000 3,010$ 1.147$ 43 R-3 3,000 4,157$ 1.028$ 5,000 6,212$ 0.841$ 7,500 8,314$ 1.108$ 667 1,188$ 0.998$ 1,333 1,853$ 0.974$ 44 R-3 2,000 2,503$ 0.837$ 3,333 3,619$ 0.771$ 5,000 4,904$ 0.981$ 333 205$ 0.386$ 667 334$ 0.406$ 45 R-3 1,000 469$ 0.367$ 1,667 714$ 0.281$ 2,500 948$ 0.379$ 800 156$ 0.128$ 1,600 258$ 0.135$ 46 R-3 2,400 366$ 0.126$ 4,000 568$ 0.091$ 6,000 750$ 0.125$ 667 156$ 0.154$ 1,333 258$ 0.162$ 47 R-3 2,000 366$ 0.151$ 3,333 568$ 0.109$ 5,000 750$ 0.150$ 120 125$ 0.204$ 480 198$ 0.233$ 48 - 1,200 366$ 0.153$ 2,400 550$ 0.250$ 6,000 1,449$ 0.241$ Moved Building - Residential Single-Family - Production / Repeat Single-Family (custom or model) Apartment Building Commercial Coach - Complete Prefabricated Dwelling - Complete Manufactured Home - Complete Commercial Building - Addition Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 240 125$ 0.102$ 960 198$ 0.117$ 49 - 2,400 366$ 0.077$ 4,800 550$ 0.125$ 12,000 1,449$ 0.121$ 500 125$ 0.049$ 2,000 198$ 0.056$ 50 - 5,000 366$ 0.037$ 10,000 550$ 0.060$ 25,000 1,449$ 0.058$ 167 251$ 0.920$ 333 405$ 0.954$ 51 U 500 564$ 0.859$ 833 850$ 0.679$ 1,250 1,133$ 0.906$ 40 242$ 1.409$ 160 412$ 0.888$ 52 U 400 625$ 0.730$ 800 917$ 0.922$ 2,000 2,023$ 1.011$ 200 474$ 0.598$ 800 832$ 0.253$ 53 - 2,000 1,135$ 0.252$ 4,000 1,639$ 0.253$ 10,000 3,155$ 0.315$ 200 474$ 0.598$ 800 832$ 0.253$ 54 - 2,000 1,135$ 0.252$ 4,000 1,639$ 0.253$ 10,000 3,155$ 0.315$ 50 150$ 0.624$ 200 244$ 0.590$ 55 U 500 421$ 0.415$ 1,000 628$ 0.628$ 2,500 1,569$ 0.628$ 50 184$ 0.804$ 200 304$ 0.639$ 56 U 500 496$ 0.476$ 1,000 734$ 0.667$ 2,500 1,735$ 0.694$ Pool/Spa - Standard Plan Commercial Carport Accessory Building - Commercial Commercial Building - Repair Commercial Building - Remodel Residential Garage Manufactured Building - Foundation Modular Building - Complete Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 167 301$ 1.082$ 333 481$ 1.109$ 57 R-3 500 666$ 0.988$ 833 996$ 0.806$ 1,250 1,331$ 1.065$ 333 794$ 1.350$ 667 1,244$ 1.329$ 58 R-2 1,000 1,687$ 1.150$ 1,667 2,453$ 1.036$ 2,500 3,317$ 1.327$ 333 284$ 0.517$ 667 457$ 0.524$ 59 R-3 1,000 631$ 0.474$ 1,667 947$ 0.383$ 2,500 1,266$ 0.506$ 667 409$ 0.360$ 1,333 649$ 0.362$ 60 R-2 2,000 891$ 0.319$ 3,333 1,316$ 0.272$ 5,000 1,769$ 0.354$ 333 251$ 0.460$ 667 405$ 0.477$ 61 R-3 1,000 564$ 0.430$ 1,667 850$ 0.340$ 2,500 1,133$ 0.453$ 83 172$ 1.326$ 167 283$ 1.407$ 62 U 250 400$ 1.299$ 417 617$ 0.958$ 625 816$ 1.306$ 133 156$ 0.769$ 267 258$ 0.812$ 63 U 400 366$ 0.757$ 667 568$ 0.545$ 1,000 750$ 0.750$ 83 156$ 1.231$ 167 258$ 1.299$ 64 U 250 366$ 1.211$ 417 568$ 0.871$ 625 750$ 1.200$ Residential Patio Cover Residential Carport Accessory Building - Residential Residential Building - Foundation Multi-Family Residential - Remodel Single-Family Residential - Remodel Multi-Family Residential - Addition Single-Family Residential - Addition Fee # CBC (ICC) Use Type Occupancy Size Basis (square feet) Base Fee FY 19-20 Each Additional SF FY 19-20 City of Arroyo Grande INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION BUILDING INSPECTION Fiscal Year 2019-20 MASTER FEE SCHEDULE 83 156$ 1.231$ 167 258$ 1.299$ 65 U 250 366$ 1.211$ 417 568$ 0.871$ 625 750$ 1.200$ 83 156$ 1.231$ 167 258$ 1.299$ 66 U 250 366$ 1.211$ 417 568$ 0.871$ 625 750$ 1.200$ Residential Patio Enclosure Residential Balcony/Deck FY 2019-20 Copies, per page (Black and White)0.20$ Park Facility Use Fees: Park Event Fee (over 80 people)per use 255.00 Bounce House per use 26.00 Strother Park-Large Barbecue per use 103.00 Strother Park-Security Deposit per use 50.00 Strother Park-Small Barbecue per use 58.00 Strother Park-Security 1,2,3 per use 100.00 Strother Park Deposit per use 50.00 Elm Street Park-Barbecue per use 103.00 Elm Street Park-Security Deposit per use 50.00 Rancho Grande Park - Large BBQ per use 103.00 Rancho Grande Park - Small BBQ (areas 2 and 3)per use 58.00 Kingo Park per use 58.00 Kingo Park Deposit per use 50.00 Rotary Bandstand Fees: Rent per use 124.00 Deposit per use 50.00 Soto Sports Complex Use Fees: Campbell Field Rental Fee per hour 21.00 Campbell Field Rental Fee (with lights)per hour 47.00 Pilg Field Rental Fee per hour 21.00 Pilg Field Rental Fee (with lights)per hour 47.00 Santos Field Rental Fee per hour 21.00 Volunteer Field Rental Fee per hour 21.00 Volunteer Field with Lights Rental per hour 47.00 Ikeda Field Rental per hour 21.00 Ikeda Field with Lights Rental per hour 47.00 Porter Field Rental Fee per hour 27.00 Porter Field with Lights Rental per hour 56.00 Tennis Court Rental-1 court per hour 12.00 Tennis Courts - 4 courts per day 121.00 Pickleball Club - Annual Fee 110.00 Food Booth Rental Fee (Soto)per day 200.00 Food Vendor Space Rental Fee 15% of Gross Cleaning Deposit per use 325.00 Meeting Room Rental Fee (Jaycee room)per day 27.00 Field Prep Fees (except Porter)per prep 63.00 Field Prep Fees - Porter per prep 94.00 Tournament Sch. & Coordination Fee per tournament 89.00 Tournament Non-Refundable Booking Fee 302.00 Tournament Staff Attendant per hour 25.00 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2019-20 RECREATION SERVICES FY 2019-20 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2019-20 RECREATION SERVICES Soto Sports Complex Use Fees - APPROVED YOUTH GROUPS: Field Rental (practice and league games) - each field per hour 3.00$ Concession Stand Fee - Buildings per hour 6.00 Concession Stand Fee - Mobile per hour 4.00 Non-resident - per participant 3.00 Fundraiser Event Fee 200.00 Woman's Club Use Fees: Non-Resident Fee Mon-Thur, before 5 pm per hour 68.00 Partial day rental - Mon - Thurs, after 5 pm per hour 68.00 Full day rental - Friday, Saturday, or Sunday 752.00 Second day rental - Friday, Saturday or Sunday 376.00 Security Deposit (No Alcohol/No Band)400.00 Security Deposit (with Alcohol)1,000.00 Building Supervision Fee per hour 25.00 Rental Fee (on-going users): Non-profit groups/Service clubs/Youth groups: (20 or less attendees)per hour 4.00 (21 - 50 attendees)"5.00 (51 or more attendees)"6.00 Groups with reciprocal services "4.00 Private groups or clubs:per hour (20 or less attendees)"13.00 (21 - 50 attendees)"15.00 (51 or more attendees)"16.00 Groups with reciprocal services "7.00 For-profit groups per hour 36.00 Custodial Fee (special event rentals only)150.00 Reservation Cancellation Fees: If cancelled 30 days or more ahead of event 100.00 If cancelled less than 30 days ahead of event 200.00 Amenities Fees: Chairs per chair 1.00 Tables per table 2.00 Audio/Visual system use per day 52.00 Community Garden Deposit 50.00 Community Garden Plot per 6 months 45.00 FY 2019-20 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2019-20 RECREATION SERVICES Mark M. Millis Community Center (formerly Elm Street Community Center) Use Fees: Rental Fee per hour 41.00$ Rental Fee - full day per day 211.00 Building Supervision Fee per hour 25.00 Security deposit 200.00 Adult Sport League Fees: Adult Softball 515.00 Adult Basketball 438.00 Non-Resident Fee 10.00 Pre-School Fees: Annual Registration Fee per child 25.00 Play & Learn-Tues & Thur.per hour 6.00 Play & Learn-Mon, Wed & Fri."6.00 Kindergartens in Training "6.00 Summer Play & Learn "6.00 Late Pick-up Fees: First late pick-up per child 5.00 Second late pick-up "10.00 Third late pick-up "20.00 Children In Motion Program: Children In Motion Annual Registration per child 25.00 Branch School - Mornings 5 Days Per Week per 4 wks 143.00 4 Days Per Week "121.00 3 Days Per Week "97.00 2 Days Per Week "68.00 Branch School - Afternoons 5 Days Per Week per 4 wks 261.00 4 Days Per Week "223.00 3 Days Per Week "178.00 2 Days Per Week "125.00 Extra Day - Branch School Morning per day 10.00 Afternoon "17.00 Late Start Monday per day 5.00 FY 2019-20 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2019-20 RECREATION SERVICES Children In Motion Fees (continued): Kindercare - Branch School 5 Days Per Week per 4 wks 285.00$ 4 Days Per Week "243.00 3 Days Per Week "194.00 2 Days Per Week "137.00 Extra Day per day 19.00 Ocean View School - Mornings 5 Days Per Week per 4 wks 143.00 4 Days Per Week "121.00 3 Days Per Week "97.00 2 Days Per Week "68.00 Ocean View School - Afternoons 5 Days Per Week per 4 wks 285.00 4 Days Per Week "243.00 3 Days Per Week "194.00 2 Days Per Week "137.00 Extra Day - Ocean View School Morning per day 10.00 Afternoon "19.00 Late Start Monday per day 5.00 Mark M. Millis Community Center (formerly Elm Community Center) - Afternoons Care Plan A 5 Days Per Week per 4 wks 166.00 4 Days Per Week "142.00 3 Days Per Week "113.00 2 Days Per Week "80.00 Mark M. Millis Community Center (formerly Elm Community Center) - Afternoons Care Plan B 5 Days Per Week per 4 wks 428.00 4 Days Per Week "364.00 3 Days Per Week "291.00 2 Days Per Week "205.00 Winter/Spring/Summer - Full Day 5 Days Per Week per week 215.00$ 4 Days Per Week "182.00 3 Days Per Week "151.00 Minimum Days (teacher work day/early release) Regular day of attendance per day 13.00 Non-regular day of attendance "23.00 FY 2019-20 Fee Description City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2019-20 RECREATION SERVICES Children In Motion Fees (continued): Late Pick-up Fees: Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00 Pickup 6:01 - 6:15 pm per child 10.00 Pickup 6:16 - 6:30 pm "20.00 Pickup 6:31 - 6:45 pm "30.00 FY 2019-20 LABOR COSTS (per hour): DURING REGULAR WORK HOURS: Full Time employee 74.41$ Part Time employee 24.58 AFTER REGULAR WORK HOURS: Full Time employee 111.61 Part Time employee 36.87 MINIMUM CALL-OUT RATE 2 hours at 1.5 times billing rate EQUIPMENT BILLING RATE (per hour) Pickup Truck 17.00 Service Truck 42.00 Backhoe 43.00 CAT Generator 82.00 Loader 50.00 6" Pump 23.00 Dump/Flat Bed Truck (5-7 yds)36.00 Sewer/Vacuum/Jet Truck 125.00 Chipper 44.00 Concrete Saw 10.00 Air Compressor 17.00 5-Ton Roller 30.00 Mini Excavator 60.00 Skid Steer 50.00 MATERIAL COST: (cost plus tax) Concrete (per yard)195.00 Sand (per ton)25.00 Class II Base (per ton)30.00 A/C (per ton)100.00 Fee Description PUBLIC WORKS SERVICES Fiscal Year 2019-20 MASTER FEE SCHEDULE City of Arroyo Grande OFFICIAL CERTIFICATION I, JESSICA MATSON, Deputy City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 4931 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 25th day of June, 2019. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 27th day of June, 2019. 9SSICA MATSON, DEPUTY CITY CLERK