Loading...
CC 2019-08-13_08e Amendment to Agreement_Bridge Street Bridge ProjectMEMORANDUM TO: CITY COUNCIL FROM: TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR BY: JILL MCPEEK, CAPITAL IMPROVEMENT PROJECT MANAGER SUBJECT: CONSIDERATION OF A SEVENTH AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES WITH QUINCY ENGINEERING, INC. FOR THE BRIDGE STREET BRIDGE PROJECT DATE: AUGUST 13, 2019 SUMMARY OF ACTION: Amend an existing Agreement to allow additional engineering services by reallocating existing Task Budget items that have been eliminated or delivered under budget for the Bridge Street Bridge Rehabilitation project. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The City has been successful in securing 100% funding through the Local Highway Bridge Program (HBP) funds for the Bridge Street Bridge project. There are no additional impacts anticipated to staff time or resources. RECOMMENDATION: It is recommended the City Council: 1. Approve a Seventh Amendment to the Agreement for Consultant Services ("Seventh Amendment") with Quincy Engineering, Inc. to include additional services at no increased cost for the subject project; and 2. Authorize the Mayor to execute the Seventh Amendment. BACKGROUND: On May 22, 2012, the Council approved an Agreement with Quincy Engineering, Inc. for design phase services for the Bridge Street Bridge project. Subsequently, six amendments to the Agreement for Consultant Services have been executed. ANALYSIS OF ISSUES: Additional services of the Quincy Engineering team were requested during the utility coordination/design and right of way acquisition process. These services included additional exhibits, conference calls and field meetings in order to complete the temporary and permanent utilities design and to obtain the necessary temporary construction easements from the adjacent property owners. Also, additional coordination to incorporate the various components of the final construction documents will be required Item 8.e. - Page 1 CITY COUNCIL CONSIDERATION OF A SEVENTH AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES WITH QUINCY ENGINEERING, INC. FOR THE BRIDGE STREET BRIDGE PROJECT AUGUST 13, 2019 PAGE 2 in order to produce a complete package for submittal to Caltrans. To allow for these additional services, it is proposed that the budget be reallocated in order to use money from under budget items to perform other tasks within the contract, with no change in the total contract amount. In addition, to ensure Quincy Engineering’s availability for engineering support during the construction phase of the project, it is proposed that the contact time be extended. The following table illustrates the proposed reallocation costs along with a corrected history of prior amendments: Phase I Prelim Eng & Environ Phase II Final Design Utility Phase Final Design Total Original Contract – May 22, 2012 Quincy Engineering 467,000.00 390,000.00 0.00 857,000.00 City Staff / Cont Mgt / QA 64,400.00 58,500.00 0.00 122,900.00 Subtotal 531,400.00 448,500.00 0.00 979,900.00 Amendment No. 1 – May 27, 2014 (1) Quincy Engineering 39,895.19 0.00 0.00 39,895.19 City Staff / Cont Mgt / QA 10,104.81 0.00 0.00 10,104.81 Subtotal 50,000.00 0.00 0.00 50,000.00 Amendment No. 2 – Jan 27, 2015 Quincy Engineering 22,003.00 78,089.83 0.00 100,092.83 City Staff / Cont Mgt / QA 3,276.98 11,630.19 0.00 14,907.17 Subtotal 25,279.98 89,720.02 0.00 115,000.00 Amendment No. 3 – July 18, 2016 0.00 Quincy Engineering 0.00 0.00 0.00 0.00 City Staff / Cont Mgt / QA 0.00 0.00 0.00 0.00 Subtotal 0.00 0.00 0.00 0.00 Amendment No. 4 – March 16, 2017 Quincy Engineering 0.00 0.00 0.00 0.00 City Staff / Cont Mgt / QA 0.00 0.00 0.00 0.00 Subtotal 0.00 0.00 0.00 0.00 Amendment No. 5 – July 25, 2017 Quincy Engineering 0.00 39,585.65 0.00 39,585.65 City Staff / Cont Mgt / QA 0.00 -39,585.65 0.00 -39,585.65 Subtotal 0.00 0.00 0.00 0.00 Amendment No. 6 – March 13, 2018 Quincy Engineering -67,289.21 67,289.21 68,805.93 68,805.93 City Staff / Cont Mgt / QA 0.00 0.00 31,194.07 31,194.07 Subtotal -67,289.21 67,289.21 100,000.00 100,000.00 Item 8.e. - Page 2 CITY COUNCIL CONSIDERATION OF A SEVENTH AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES WITH QUINCY ENGINEERING, INC. FOR THE BRIDGE STREET BRIDGE PROJECT AUGUST 13, 2019 PAGE 3 (1) Amendment No. 1 were additional services as requested by Caltrans and were tracked separately. Therefore, these amounts are not reflected in the Quincy Engineering Budget Status Report Phase 1. Phase I Prelim Eng & Environ Phase II Final Design Utility Phase Final Design Total Amendment No. 7 – August 13, 2019 Quincy Engineering -5,481.28 5,481.28 0.00 0.00 City Staff / Cont Mgt / QA 0.00 0.00 0.00 0.00 Subtotal -5,481.28 5,481.28 0.00 0.00 Totals Quincy Engineering 456,127.70 580,445.97 68,805.93 1,105,379.60 City Staff / Cont Mgt / QA 77,781.79 30,544.54 31,194.07 139,520.40 Subtotal 533,909.49 610,990.51 100,000.00 1,244,900.00 ALTERNATIVES: The following alternatives are provided for the Council’s consideration: 1. Approve a Seventh Amendment to the Agreement; 2. Do not approve a Seventh Amendment to the Agreement; or 3. Provide direction to staff. ADVANTAGES: Approval of the Seventh Amendment will allow for the completion of the 90% and 100% design plans, specifications and estimates for the rehabilitation of the Bridge Street bridge. Bringing the Bridge Street bridge up to standard loading conditions will remove the 3-ton maximum load limit and would allow fire and delivery trucks to utilize Bridge Street as a route. DISADVANTAGES: Some traffic related disruption within the Village will be present during construction activities. ENVIRONMENTAL REVIEW: No environmental review is needed to approve the Seventh Amendment. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted at City Hall and on the City’s website in accordance with Government Code Section 54954.2. Item 8.e. - Page 3 CONSULTANT SERVICES AGREEMENT AMENDMENT NO. 7 This Seventh Amendment ("Seventh Amendment") to Consultant Services Agreement (“CSA”) by and between the CITY OF ARROYO GRANDE (“City”) and QUINCY ENGINEERING, INC. (“Consultant”) is made and entered into this 13th day of August 2019. WHEREAS, the parties entered into a CSA dated May 22, 2012, for preliminary engineering work on the Bridge Street Bridge Improvement project; and WHEREAS, the First Amendment to the CSA was approved on May 27, 2014, which included an increase in scope and fee to perform additional analysis and more detailed costs estimates as requested by Caltrans to determine funding eligibility of the rehabilitation alternative; and WHEREAS, the Second Amendment to the CSA was approved on January 27, 2015, which included an increase in scope and fee to carry two design alternatives through the environmental process of Phase I, and to complete Phase II - Final Design Plans, Specifications and Estimates (PS&E) and Permitting, and extended the contract Agreement term; and WHEREAS, the Third Amendment to the CSA was approved on July 18, 2016, which included a no cost change for extra work required to complete the project by a reallocation within the existing budget; and WHEREAS, the Fourth Amendment to the CSA was approved on March 16, 2017, which included a no cost change for extra work required to complete the project by a reallocation within the existing budget; and WHEREAS, the Fifth Amendment to the CSA was approved on July 27, 2017, which included an increase in scope and fee to prepare an alternatives evaluation and preliminary cost estimates for the permanent waterline relocation and temporary/ permanent relocation of the existing sanitary sewer crossing Arroyo Grande Creek for grant programming purposes; and WHEREAS, the Sixth Amendment to the CSA was approved on March 13, 2018, which allowed for the design of both temporary and permanent utility relocations required as part of the project, and extended the contract Agreement term; and WHEREAS, the parties desire to further modify the CSA as set forth herein. NOW THEREFORE, for valuable consideration the receipt and sufficiency of which is acknowledged, the parties agree as follows: Item 8.e. - Page 4 1. Section 1 (“TERM”) of the Agreement, shall be modified in its entirety to read as follows: This Agreement shall be extended and remain and continue in effect until May 31, 2022, unless sooner terminated pursuant to the provisions of this Agreement. 2. To include the additional services at no increased cost by task reallocation as specified in Exhibit “A” attached hereto and incorporated herein by this reference. 3. Except as modified herein, all other terms and conditions set forth in the CSA, as amended, shall remain unchanged. IN WITNESS WHEREOF, CITY and CONSULTANT have executed this Seventh Amendment the day and year first above written. QUINCY ENGINEERING, INC. By:________________________________ John Quincy, President By:________________________________ Caren Ray Russom, Mayor Attest: ________________________________ Kelly Wetmore, City Clerk Item 8.e. - Page 5 THIS PAGE INTENTIONALLY LEFT BLANK Item 8.e. - Page 6