Loading...
CC 2019-08-13_08i Contract for Animal Care and Control Services_PP Presentation San Luis Obispo County New Animal Services Facility Update August 16, 2019 1 History April 2016 Approval of DB Pilot Project February 2017 MOA Approved November 2017 Atascadero/Paso Robles Opt Out June 2018 MOA Amendment No. 1 Approved August 2018 – August 2019 D-B Selection Process Quick recap of each milestone. Highlight $1M taken off top by County in Amendment No. 1 Discuss Selection Process work effort (CMPM RFP and selection, Development of Bridging Documents, RSOQ and RFP. Contractor Outreach and evaluation process) 2 Bridging Documents Program Development Preliminary Design Value Engineering Deductive Provisional Scopes Enhancements Fiber/Cameras Permitting Constraints On-site Soils Active Project Steering Committee B-B requires Bridging Documents Needs Assessment, Program Development. Approx. 30% Design to be included in D-B RFP RFP structured with DPS and Enhancements to allow County to pick from a “menu” of scope. Fiber, Cameras and Permitting to be provided by County – Will save cost Geotech prepared after MOA executed identified poor soils Steering Committee has actively guided project 3 MOA vs Proposals MOA Budget $13,176,500 Based on 2014-15 Construction Climate Amendment No.1 ($12,176,500) Proposals Foundation Development Material Costs (tariffs) Skilled Labor Requirements Escalation / Current Contractor Demand Project Start (2017 vs 2020) 4 Projected Total Project Costs Note that Proposals included deductive and additive scope that resulted in an upper and lower proposal. Recommended Scope Includes: Fiberglass Doors at Strategic Locations Kennel Waste Flushing System Exterior Treatments to Capture Natural Light Cost Effective Life Cycle Materials Recommended Scope Does Not Include: Shared Dog Walk with WOODS Extensive Landscaping Emergency Generator 5 Financing Cost Estimate Recommended Scope Does Not Include: Shared Dog Walk with WOODS Extensive Landscaping Emergency Generator 6 2019 2019 Today Jul Aug Sep Oct Nov Proposals Received 7/16/2019 Steering Committee Confirms Selection 8/7/2019 MOA Comments Due 9/13/2019 County Board Agenda packet due 10/24/2019 County Awards D-B Contract 11/5/2019 35 days 7/17/2019 - 8/21/2019 Design Proposals Evaluation and Selection 48 days 8/21/2019 - 10/24/2019 City/County MOA Amendment Development and Approvals 30 days 8/22/2019 - 9/6/2019 Design Build Contract Negotiations 15 days 9/23/2019 - 10/7/2019 Finalize Design Build Contract 18 days 10/7/2019 - 10/24/2019 Contracts Signed Selection Committee Meeting 8/21/2019 Draft MOA to Cities 9/06/2019 MOA Amendment development - 1.5 weeks MOA City reviews and comments - 1 week Final comments incorporated into MOA – 4 Days MOA City Counsel agenda and approvals - 1 month Final MOA to Cities 9/18/2019 1 2 3 4 Timeline Action Item Timeline if award of contract is to occur prior to when proposals expire Walk thru timeline in detail. Explain what Cities and County need to do to meet Nov. 5 Award Date 7 Questions? 8