Loading...
CC 2021-04-27_11b Streets Selection_2021 Street Repairs project_PP PresentationConsideration of Alternatives for the 2021 Street Repairs Presented by Joe Ririe P.E. & Bill Robeson 1 Presentation Goals Pavement Basics (Pavement 101) Pavement Preservation Principles Current Pavement System Conditions Consideration of Alternatives Review of Previous Plan Discuss Proposed Plan 2 Pavement Basics (Pavement 101) 3 What Determines a Pavement Section? 4 Pavement Deterioration Curve 5 Pavement Deterioration 6 The Impact of Sun and Water 7 The Impact of Heavy Loads 8 Common Pavement Distresses 9 Evaluating Common Pavement Distresses Alligator cracking Block cracking Distortions Longitudinal / transverse cracking Patches Rutting / depressions Weathering / Raveling 10 Evaluating Pavement The Pavement Condition Index 100 – 91 = Excellent 90 – 71 = Good 70 – 51 = Fair 50 – 31 = Poor 30 – 0 = Failed Developed by the U. S. Army Corp of Engineers during World War II and standardized by ASTM, the PCI is an objective and rational basis for determining pavement condition and establishing maintenance priorities. 11 Applying the RIGHT TREATMENT to the RIGHT PAVEMENT at the RIGHT TIME using the RIGHT MATERIALS Pavement Preservation Principles 12 Pavement Preservation Timing 13 Good Pavement Management Best-First Management Worst-First Management Critical-Point Management 14 Maintained Road System Roadway Replacement Cost = $268,000,000 15 $1,020,113 $885,439 $857,584 $701,092 $1,004,699 $1,125,000 $620,000 $894,000 $1,121,000 $1,230,000 Year Budget Consequences $1,020,113 $885,439 $857,584 $701,092 $1,004,699 $1,125,000 $620,000 $894,000 $1,121,000 $1,230,000 Year $1,020,113 $885,439 $857,584 $701,092 $1,004,699 $1,125,000 $620,000 $894,000 $1,121,000 $1,230,000 Year Current Budget Current Budget 16 Previous Plan 2019 Base Bid: West Branch Street and Traffic Way – Digouts & Striping and East Cherry – Digouts & Overlay (~$936,000) 2020 Curb Ramps on James Way 2021 Overlay & Striping on James Way 17 2021 Critical Street Prioritization Valley Road – Sunrise Terrace to Creek Bridge Corbett Canyon Road – Route 227 to City Limits (n/o Gularte Road) Fair Oaks Avenue – South Halcyon Road to Fred Grieb Bridge Wesley Street – End of Street (n/o Larchmont Drive) to West Branch Street Vernon Street – End of Street (n/o Larchmont Drive) to West Branch Street East Grand Avenue – Halcyon Road to El Camino Real North Halcyon Road – El Camino Real to East Grand Avenue South Elm Street – Ash Street to City Limits (Paul Place) (3 Segments) Rancho Parkway – James Way to West Branch Street $13,000,000 to rehabilitate all listed streets segments 18 Valley Road Sunrise Terrace to Bridge (n/o of Los Berros Road) Structurally Deficient: 5-1/2 inches of Hot Mix Asphalt Current Weighted PCI: 27 Repairs needed in travel lanes: 40% 19 Structurally Deficient: 4 inches of Hot Mix Asphalt Current Weighted PCI: 68 Repairs needed in travel lanes: 39% Corbett Canyon Road Route 227 to City Limits (n/o of Gularte Rd) 20 Structurally Deficient: 2-3/4 inches of Hot Mix Asphalt Current Weighted PCI: 50 Repairs needed in travel lanes: 70% Fair Oaks Avenue South Halcyon Road to Bridge (e/o Woodland Drive) 21 Structurally Deficient: 4 inches of Hot Mix Asphalt Current Weighted PCI: 12 Repairs needed in travel lanes: 73% Wesley Street End of Street (n/o Larchmont Dr) to West Branch Street 22 Structurally Deficient: 3-3/4 inches of Hot Mix Asphalt Current Weighted PCI: 1 Repairs needed in travel lanes: 80% Vernon Street End of Street to West Branch Street 23 Structurally Deficient: 5 inches of Hot Mix Asphalt Current Weighted PCI: 42 Repairs needed in travel lanes: 75% South Elm Street The Pike to City Limits 24 Structurally Deficient: 3/4 inches of Hot Mix Asphalt Current Weighted PCI: 66 Repairs needed in travel lanes: 42% East Grand Avenue Halcyon Road to El Camino Real 25 Structurally Deficient: 3-1/4 inches of Hot Mix Asphalt Current Weighted PCI: 46 Repairs needed in travel lanes: 52% North Halcyon Road El Camino Real to East Grande Avenue 26 Structurally Deficient: 2-1/2 inches of Hot Mix Asphalt Current Weighted PCI: 47 Repairs needed in travel lanes: 67% South Elm Street Ash Street to Farroll Avenue 27 Structurally Deficient: 1 inch of Hot Mix Asphalt Current Weighted PCI: 75 Repairs needed in travel lanes: 18% South Elm Street Farroll Avenue to The Pike 28 Structurally Deficient: 3-3/4 inches of Hot Mix Asphalt Current Weighted PCI: 55 Repairs needed in travel lanes: 48% Rancho Parkway James Way to West Branch Street 29 Proposed Plan $ 1,216,000 $ 1,338,000 30 Questions/Discussion 31