PC R 95-1496RCSOLUTION NO. 95-149G
A R�SOLUTION OF T'I-I� PLANNING COMMISSION OF
THE CITY OF ARROYO GRAND� PROVIDING AN
INT�RPR�TATION Ri:GARDING SETI3ACIC AND LOT
COVERAG�STANDARDS
�
L�
WIIEREAS, the Development Code was adopted by the City Council on May 14, 1991,
and became effective on June 13, 1991; and
WII�R�AS, a footnote at the bottom of Tables 9.05.040-A, 9.06.050-A and 9.06.050-B
states if a lot was created before June 13, 1991, buildings may conform with the setback and lot
coverage standards of tlie previous zone, as outlined in Appendix C.W.D.2.19 of tlie
Development Code; aiid
WIICR�AS, Section 9-01.110 (G)(3) of the Development Code provides the Planning
Commission with the authority to clarify ambiguities; and
WI-IEREAS, the Planning Commission has been requested to make a formal
interpretation of tl�e applicability of saicl footnote to lots created prior to June 13, 1991, which
are suUsequently reconfigured through a lot ]ine adjustment.
WI-i�REAS, a lot line adjustment does not technically create new lots.
��
NOVV, TIICRCFORE, BC I'I' RCSOLVED that the Planning Commission of the City
of Arroyo Grande hereby makes the interpretation tliat the footnote at the bottom of Tables
9.05.040-A, 9.06.050-A ancl 9.06.050-B of the Development Code applies to lots legally createcl
prior to June 13, 1991 which are subsequently reconfigured through the lot line adjustment
process.
On motion of Commissioner Deviny, seconded by Comrnissioner Tappan, and by the
following roll call vote, to wit:
AY�S: Commissioners Tappan, Sofo, Carr, Deviny, Hatchet, Beck and
�
�J
Chairperson Keen
NOrS None
AI3S�NT: None
the foregoing Resol�ition was �assed and adopted this 3rd day of January, 1995.
ATT�ST:
Nancy Bro , Commission Clerk
/ % �
`���. �,�
�• � .