PC R 92-139225�
RESOLUTION NO. 92-1392
A RFSOLUTION OF THE PLANNING COr�IlVIISSION OF
THE CITY OF ARROYO GRANDE RECONIlV�NDING
ADOPTION OF A MITIGATED NEGATIVE DECLARATION
FOR THE ORIGINAL RANCHO GRANDE PARK PLAN BY
THE CITY COUNCIL, AND RECOMMENDING THAT Tf1E
CITY CLERK FII.E A NOTICE OF DETERNIINATION
WHEREAS, on February 11, 1992, the City Council requested the Planning Commission
to review and make recommendations on an Expanded Initial Study for the Original Park Plan
and the Parks and Recreation Commission Alternative Park Plan; and
WHEREAS, the Planning Commission has conducted four (4) public hearings on the
Expanded Initial Study on the Original Park Plan and the Alternative Park Plan; and
WHEREAS, the Planning Commission has received public testimony regarding the
Expanded Initial Study during public hearings; and �
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City
of Arroyo Grande, California as follows:
1. The Planning commission recommends that the City Council adopt the negative
declaration with the mitigation measures outlined in Attachment "A", in.compliance with
CEQA;
2. The Planning commission hereby further states that the information contained in the
Expanded Initial Study has been reviewed and considered by the members of the
Planning Commission.
On motion of Commissioner Tappan, seconded by Commissioner Soto, and on the
following roll call vote, to wit:
AYES: Commissioners Tappan, Soto, Carr, Moore, Souza, and Chairman Brandy
NOES: None
ABSENT: None
ABSTAIN: Commissioner Reilly
the foregoing Resolution was passed and adopted this 17th day of November, 1992.
ATTEST;
� \ Oac�e�..� � h ..-►.�
Nancy Brovd�, Commission Clerk Drew randy, Chairm
�� .�':'`�: �.
25�
ATTACHMENT "A"
RANCHO GRANDE PAItK ORIGINAL PLAN
Mri'IGATION MEASURES
GRADING
a. The project shall be subject to the City's grading ordinance (303�C.S.) and other
regulations and policies regarding grading and erosion.
Timing: Prior and during construction
Responsible Dept.: Parks and Recreation, Public Works
b. The report entitled "Rancho Grande Park Grading Plan Review" shall be reviewed
and approved by the City Engineer. All erosion control measures included in the report as
revised by the City Engineer sha11 be incorporated into the project.
Timing: Prior to grading permit approval; during construction
Responsible Dept: Parks and Recreation, Public Works
c. The slope at the corner of Collado Corte and Avenida de Diamante shall be
redesigned to use variable slope ratios and undulation of tops and toes of the slope.
Timing: Prior to grading permit submittal
Responsible Dept.: Parks and Recreation
d. Grading shall be prohibited between October 31 and April 1;
Timing: During construction
Responsible Dept.: Parks and Recreation, Public Works
AIR QUALITY
Short-term Construction
a. Water trucks or sprinkler systems shall be used in sufficient quantities to prevent
airborne dust from leaving the site. Frequency of watering will vary with existing weather
conditions, but, at a minimum, should include the wetting of all actively worked areas at least
once in the morning and once in the afternoon. Increased watering frequency would be required
whenever wind speeds exceed 15 mph.
b. All dirt stock-pile areas shall be sprayed daily as needed. At a minimum,
stockpiles should be watered once in the morning and once in the afternoon. In order to prevent
airborne dust from leaving the site, increased watering would be required if wind speeds exceed
15 mph.
c. Permanent dust control measures identified in the approved project revegetation
and landscape plans shall be implemented as soon as possible following completion of any soil
disturbing activities.
d. Exposed ground areas that are planned to be reworked at dates greater than one
month after initial grading shall be sown with a fast-germinating native grass seed and watered
until vegetation is established.
e. All disturbed soil areas not subject to revegetation shall be stabilized using
approved chemical soil binders, jute netting, or other methods approved in advance by the
APCD.
f. Vehicle speed for all construction vehicles shall not exceed 15 mph on any
unpaved surface at the construction site.
g. A comprehensive construction activity management plan designed to minimize the
amount of large construction equipment operating during any given time period.
�- -. . ,.�
_ ,,; �.. .
-. � �; .,, . 1
,,
2 5���';
h.
Construction truck trips shall be scheduled during non-peak hours to reduce peak
hour emissions.
Timing: During construction
Responsible Dept.: Parks and Recreation
NOISE
a. Construction shall occur only between the hours of 7 a. m. and 5 p. m.
Timing: During construction of Phase I and Phase II
Responsible Dept.: Parks and Recreation
b. The noise nuisance shall be reduced by implementing the following midgation
measures:
1. Ytevise conduit plan to preclude installation of public address system.
Timing: Prior to construction of Phase I
Responsible Dept.: Parks and Recreation
2. Prohibit amplified musical instruments or live bands in amphitheater,
unless otherwise authorized by the City Council.
Timing: Prior to construction of Phase II
Responsible Dept.: City Manager
3. Park maintenance in Rancho Grande Park is to be performed between the
hours of 8 a. m, and 6 p. m, only
Timing:On-going �
Responsible Dept.: Parks and Recreation
4. Athletic lights, if installed, shall not be used after 9:00 p. m. Sunday
through Thursday, and 10:00 p. m. Friday and Saturday. Strictly enforce park
closing at 10:00 p. m.
Timing: On-going after park opens
Responsible Dept.: Parks and Recreation
c. Implement a park scheduling system where the following facilities could not be
used by large groups at the same time:
Ball fields and Recreation Building
Picnic area and Recreation Building
Picnic area and ball fields
Timing: Prior to opening of Phase II of park
I�esponsible Dept.: Parks and Recreation
LIGHT/GLARE
a. Security Lights - A lighting plan shall be submitted to the Parks and Recreation
Director and approved by the City Council, subject to a public hearing, prior to construction of
Phase II of the pazk. The lighdng plan shall be compatible with existing and proposed residential
uses, serve to reduce or eliminate glare onto neighboring land uses and direct lighting downward
and not into the sky. The plan shall illustrate the methods to be used to shield and direct light
away from residential uses. Lighting shall not exceed 0.5 foot candles beyond the property line
and shall not blink, flash, oscillate or be of unusually high intensity of brightness.
Timing: Prior to construction of Phase II
Responsible Dept.: Parks and Recreation Director, City Council
b. Athletic Lights - A lighdng plan shall be submitted to the Parks and Recreadon
Director and approved by the City Council, subject to a public hearing, prior to construction of
Phase II of the park. If the lighting plan is not approved, then no athletic lighting shall be
permitted. The lighting plan shall be compatible with existing and proposed residential uses,
serve to >reduce� or eliminate glare onto neighboring land uses and direct lighting downward and
nct.,�nto the sky. The plan shall specify the light levels in initial and maintaineti footcandles,
uniformity, and efficiency. Athletic lighting shall not be used after 9:00 p.m. Sunday through
Thursday and 10 p.m. Friday and Saturday. Lighting shall not exceed 0.5 foot candles at the
property line.
Timing: Prior to construction of Phase II
�� .° Responsible Dept.: Parks and Recreation, City Council
2
25�8�
c. Glare - Tennis and basketball courts shall be surfaced with material that reduces
reflection from any lighting. Section 9-10.110 F. of Development Code prohibits direct or
reflected glare so as to be visible from any property line on which the same is produced.
Timing: During Phase II construction
Responsible Dept.: Parks and Recreation
Diamante at the northwest boundary with lot 30 of Tract 1132.
Timing: Prior to issuance of grading permit
Responsible Dept.: Parks and Recreation
LAND USE
a. The master plan shall be revised to eliminate the driveway on Avenida de
b. The master plan shall be redesigned to include a 3 foot high wall or berm along
the parking areas facing James Way and Avenida de Diamante.
Timing: Prior to approval of grading permit
Responsible Dept.: Park and Recreation
c. The master plan shall be redesignerl to increase the landscaping setback to ten feet
along the northwest boundary with lot 30 of Tract 1132. This will require elimination of two
parking spaces.
Timing: Prior to construction of Phase II
Responsible Dept.: Park and Recreation
TRANSPORTATION/CIItCULATION
Project Access and Internal Circulation
a. Redesign the plan so that full service access to the park site is provided via only
one driveway onto James Way in approximately the location of the proposed eastern driveway.
The full service driveway should be rerlesigned to the satisfaction of .the Public Works Director
to provide for a 50 foot tangent section back from James Way, then a 50 foot radius curve and
another 50 foot tangent section before parking is provided. A median should also be constructed
in the driveway throat to separate ingressing and egressing driveway vehicles.
Timing: Prior to issuance of grading permit
Responsible Dept.: Parks and Recreation, Fire, Public Works
Timing: Prior to issuance of grading permit
Responsible Dept.: Parks and Recreation, Fire, Public Works
b. Redesign the plan so that secondary full service access onto Avenida de Diamante
is reduced to only one driveway in approximately the location of the proposed southern
driveway. Bicycle and pedestrian access shall be included along Avenida de Diamante.
c. All driveways and drive aisles shall be designed to meet Fire Department turning
radius standards. The corner defined by the basketball court should be redesigned for better sight
distance and ease of circulation between parking areas. The redesign of this area shall include
a safe pedestrian crossing from the parking area to the basketball court.
Timing: Prior to issuance of grading permit
Responsible Dept.: Parks and Recreation, Fire
Bicycles
a. Designate an area on the plan for parking and locking of bicycles.
Timing: Prior to issuance of building permit
Responsible Dept.: Parks and Recreation
Transit - None required.
.. �..,� rt ..
�TuT��C �F�tVICFS
. � . ..
Water � . �
a. All plumbing fixtures shall be of an ultra-low flush and flow nature including, but
not limited to:
3
1) Toilets designed to use a maximum of 1.5 gallons of water per flush,
2) I.avatory and kitchen sinks designed to use a maximum of 2 gallons of
water per minute, and
3) Urinals and associated flushometer valves designeti to use a maximum of
1 gallon of water per flush.
Timing: Prior to issuance of building permits
Responsible Dept.: Parks and Recreation, Building
b. Water heating systems shall be designed to conserve water by the installation of
"on demand hot water" type heaters, recirculating hot water systems or other designed water
conserving systems meeting the approval of the Building Official. All hot water pipes shall be
fully insulated.
Timing: Prior to issuance of building permits, during construction
Responsible Dept.: Parks and Recreation, Building
c. Systems designed to use greywater for irrigation of landscaping shall be installed.
The design of such systems shall be submitted to the Building Official for approval prior to
issuance of building permits.
Timing: Prior to issuance of building permits
Responsible Dept.: Parks and Recreation, Building
prior to the issuance of building permits.
Timing: Prior to issuance of building permits
Responsible Dept.: Parks and Recreation, Building
d. Rainwater collection systems for the imgation of on site landscaping shall be
installed. The design of such systems shall be submitted to the Building Official for approval
e. All on site water pipes shall include valves to reduce water pressure to 50 or less
pounds of pressure per square inch.
Timing: Prior to issuance of building permits
Responsible Dept.: Parks and Recreation, Building
f. The manufacturer's name and model of each type of water saving fixture to be
utilized shall be submitted to the building department for approval before installation.
Timing: Prior to issuance of building permits
Responsible Dept.: Parks and Recreation, Building
g. Drought tolerant landscaping shall be utilized in any area not requiring turf at
build out. The landscaping and irrigation plans shall be revised accordingly. An automadc
landscape irrigation system incorporating time clocks and/or moisture sensors shall be installed.
Tnming: Prior to installakion of imgation system
Responsible Dept.: Parks and Recreation
Sewer None required
Fire None required.
Police None required.
AESTH]ETICS
a. Restrict height of all buildings not to exceed one story and 15 feet in height.
Timing: At time of building plan preparation.
Responsible Dept.: Parks and Recreation, Building
b. Picnic shelters and play area are to be constructed of materials and colors similar
to the homes irr the surrounding neighborhoods.
Timing: Prior to .Phase II construction
Respons�ble Dept.: Pazks and Recreation
4
259
,�,.,,.� .�,,
260
c. The City Architectural Advisory Committee and the Rancho Grande Homeowner's
Architectural Committee shall review elevations for the recreation building, score/restroom
building, play area, amphitheater, maintenance building, and picnic shelters. The Rancho Grande
Homeowner's Architectural Committee shall have no authority other than what already may be
present in the current covenants, conditions, and restrictions.
Timing: Prior to approval of building permits
Responsible Dept.: Parks and Recreation �
d. All mechanical equipment, whether on the ground or elsewhere, shall be screened
from public view with materials architecturally compatible with the main structure.
Timing: Prior to approval of building permits
Responsible Dept.: Parks and Recreation, Building
e. Surface elevation of the tennis courts shall be reduced to no more than 10 feet
above the lowest adjacent street elevation or relocated to another area of the park.
Timing: Prior to approval of grading permit
Responsible Dept.: Parks and Recreation
RECREATION
a. Review building plans for barrier free access.
Timing: Prior to issuance of building permit.
Responsible Dept.: Parks and Recreation, Building
b. Provide suitable ramps in any outdoor area where steps are to be constructed (i.e.,
bleachers). �
Timing: Review prior to beginning of construction of Phase II, during construction of
Phase II
Responsible Dept.: Parks and Recreation
� •
` ,.�w ` ^:,: .,, . : .. , . . `
5