Loading...
PC R 04-1928RESOLUTION NO. 192a A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ARROYO GRANDE APPROVING AMENDED CONDITIONAL USE PERMIT 04-002 LOCATED AT 751 SOUTH TRAFFIC WAY, APPLI�D FOR BY THE SANTA MARIA FM GROUP OF THE LDS CHURCH WHEREAS, the applicant has filed Amended Conditional Use Permit 04-002 to construct an addition of 2,828 square feet of classroom and office space to an existing church, remove the existing stage, and remodel two existing restrooms to ADA compliance; and WHEREAS, the Planning Commission of the City of Arroyo Grande has considered Amended Conditional Use Permit 04-002 at a public hearing on June 15, 2004 in accordance with the Development Code of the City of Arroyo Grande; and WHEREAS, the Planning Commission has found that this �roject is consistent with the General Plan and the Development Code; and WHEREAS, the Planning Commission has reviewed this project in compliance with the California Environmental Quality Act (CEQA1, the State CEQA Guidelines, and the Arroyo Grande Rules and Procedures for Implementation of CEQA; and WHEREAS, the Planning Commission finds, after due study, deliberation and public hearing, the following circumstances exist: Conditional Use Permit Findings: 1. The proposed use is permitted within the Public Facilities district pursuant to the provisions of Section 16.44.040 of the Development Code, and complies with all applicable provisions of the Development Code, the goals and objectives of the Arroyo Grande General Pian, and the development policies and standards of the City. 2. As conditioned, the proposed use will not impair the integrity and character of the district in which it is to be established or I�cated. 3. The site is suitable for the type and intensity of use that is proposed. 4. There are adequate provisions for water, sanitation, and public utilities and services to ensure the public health and safety. 5. The proposed use will not be detrimental to the public health, safety, or welfare, or materially injurious to properties and improvements in the vicinity because the proposed project would not create any adverse environmental impacts. RESOLUTION NO. 1928 ACUP 04-002 PAGE20F4 NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Arroyo Grande hereby approves Amended Conditional Use Permit 04-002, with the above findings and subject to the conditions as set forth in Exhibit "A", attached hereto and incorporated herein by this reference. On motion by Brown, seconded by Fowler, and by the following roll call vote, to wit: AYES: Commissioners Brown and Fowler, Chair Guthrie NOES: None ABSENT: Commissioners Arnold and Keen the foregoing Resolution was adopted this 15th day of June, 2004. ATTEST: ��' KATHY ME OZA, SECRETARY TO THE COMMISSION TO CONT RC�B STRONG; " COMMUNITY DEVELO ENT DIRECTOR ES G,CITHRIE, CHAIR RESOLUTION NO. 1928 ACUP 04-002 PAGE 3 OF 4 EXHIBIT "A" CONDITIONS OF APPROVAL AMENDED CONDITIONAL USE PERMIT 04-002 751 SOUTH TRAFFIC WAY MUNITY DEVELOPMENT DEPARTMENT GENERAL CONDITIONS: 1. 2. The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project. This application shall automatically expire on June 15, 2006. 3. The applicant shall agree to defend at his/her sole expense any action brought against the City, its present or former agents, officers, or employees because of the issuance of said approval, or in anyway relating to the implementation thereof, or in the alternative, to relinquish such approval. � The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations under this condition: BUILDING AND FIRE DEPARTMENT CONDITIONS 4. 5. 6. 7. 8. 9. 10 Fire sprinkle the entire existing building and new addition or provide other fire protection and safety measures to the satisfaction of the Fire Chief. The project shall have a fire flow of 1,500 gallons per minute for a duration of 3 hours in conjunction with fire sprinkling. Provide secondary fire access to the property that is acceptable to the City. The project shall comply with the most recent editions of all California Building and Fire Codes, as adopted by the City of Arroyo Grande. Provide complete compliance with State and Federal disabled access requirements. All fire lanes must be posted and enforced, per Police Department and Fire Department guidelines. Prior to occupancy, fire hydrants shall be installed, per Fire Department and RESOLUTION NO. 1928 ACUP 04-002 PAGE40F4 Public Works Department standards. 1 1. Prior to occupancy, the applicant must provide an approved "security key vault" per Building and Fire Department guidelines. 12. Prior to issuance of a building permit, pay Water Neutralization, Traffic Impact, Traffic Signalization, Building Permit, Strong Motion Instrumentation Program, Fire Protection, and Police Facilities fees, all to be based on codes and rates in effect at the time of building permit issuance. PUBLIC WORKS DEPARTMENT CONDITIONS 13. Replace any existing backflow prevention devices on-site with backflow prevention devices that meet current standards. 14. Any new connections to the water main shall be reviewed and approved by the Director of Public Works. � �