CC 2024-10-22_09c Award 2024 Streets RepairItem 9.c. MEMORANDUM TO: City Council FROM: Bill Robeson, Assistant City Manager/Public Works Director BY: Shannon Sweeney, City Engineer SUBJECT: Notice of Award, 2024 Streets Repair Project, PW 2024-01 DATE: October 22, 2024 RECOMMENDATION: 1) Award a construction contract for the 2024 Streets Repair Project to Papich Construction, Inc. (Papich) for $3,999,889; and 2) Authorize the City Manager to approve change orders of 10% of the contract amount, $399,989.90, for unanticipated costs during the construction phase of the 2024 Streets Repair Project. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The FY 2024-25 budget includes $4,430,000 for the Pavement Management Program (PMP) consisting of the following funds: $390,000 of Regional SHA, $2,360,000 of the general fund, $450,000 of SB 1 Funds, $966,833 of Measure-O 2006 Local Sales Tax Fund, $204,207 of American Rescue Plan Act (ARPA), and $58,960 of CDBG. Construction, contingency, and special materials testing costs total $4,495,083.90, which exceeds the FY 2024-25 budget of $4,430,000 by $65,083.90. Carryover from FY 2023- 24 of over $1 million in unspent funds is sufficient to address this shortfall and will be included in the FY 2024-25 First Quarter Financial Status Report. BACKGROUND: On May 23, 20231, the City Council directed staff to apply $3 million from excess reserves in addition to the base amount of $1.25 million to pavement maintenance and repair for FY 2024-25. Staff value engineered the information available in the 2022 PMP to provide a recommended list of work to be done with available funds. In addition to critical point strategy, staff considered other factors, including the cost efficiency of applying only one kind of maintenance treatment, the management and staging efficiency of focusing on 1https://pub-arroyogrande.escribemeetings.com/Meeting.aspx?Id=74822b16-71f6-4fe0-aa17- d79c53a03287&Agenda=PostMinutes&lang=English Page 52 of 135 Item 9.c. City Council Notice of Award, 2024 Streets Repair Project, PW 2024-01 October 22, 2024 Page 2 locations on a neighborhood-basis rather than a single street-basis, economies of scale that arise as a result of one large single project rather than multiple small ones, and the bidding competitiveness that occurs when the City bids a larger project. On January 23, 20242, staff presented a priority project list of neighborhood-based street locations along with a commercial street (Station Way) that is in poor condition for the 2024 PMP. The recommended list from that staff report is shown below. Based on Council direction, staff proceeded with project development for the top four locations listed in Table 1. Table 1: Recommended Priority List The City worked with the design consultant to develop plans and specifications. The engineer’s estimate as designed was $4,617,934.18. A Notice Inviting Bids was issued on September 12, 2024. The Notice Inviting Bids was published in the local paper, posted on the City’s website, and distributed to plan rooms. Five bids were received by the bid opening date and time of October 1, 2024, 2:00 PM, ranging from $3,999,899 to $5,894,610, as shown in Attachment 1. The low bid of $3,999,889 with a 10% contingency of $399 ,989.90 totals $4,399,888.90. Five consultants from the City’s on-call list were solicited for scope and fee for special materials testing. Three declined to provide a proposal. The two proposals received by the deadline of October 1, 2024, ranged from $95,195 to $154,673. ANALYSIS OF ISSUES: Based on the costs presented in Table 1 for all four priority projects, costs would have exceeded the available budget by a substantial amount, with almost $1 million dedicated to retrofitting curb ramps to meet current Americans with Disabilities Act (ADA) 2 https://pub-arroyogrande.escribemeetings.com/filestream.ashx?DocumentId=9743 Cost Based Cost Based Total Cost Cumulative Savings on PMP on Testing Estimated Cost from PMP Stagecoach $5,658,000 $2,266,000 44 $528,000 $2,794,000 $2,794,000 $2,864,000 Rancho Grande Ph 1 $2,874,000 $1,319,000 10 $120,000 $1,439,000 $4,233,000 $1,435,000 Brighton $2,518,000 $1,133,000 20 $240,000 $1,373,000 $5,606,000 $1,145,000 Station Wy $953,000 $664,000 4 $48,000 $712,000 $6,318,000 $241,000 Andre Dr $687,000 $395,000 8 $96,000 $491,000 $6,809,000 $196,000 Woodland $2,583,000 $2,317,000 20 $240,000 $2,557,000 $9,366,000 $26,000 Via La Barranca $649,000 $698,000 3 $36,000 $734,000 $10,100,000 -$85,000 I $15,922,000 $8,792,000 109 $1,308,000 $10,100,000 $10,100,000 $5,822,000 Cost of Curb RampsLocation# of Curb Ramps Page 53 of 135 Item 9.c. City Council Notice of Award, 2024 Streets Repair Project, PW 2024-01 October 22, 2024 Page 3 regulations. Staff evaluated curb ramps in the project areas and determined that most meet exception criteria that preclude the need to retrofit them. As a result, only 11 curb ramps will be retrofit as part of this project, at a considerable cost savings. The 2024 Streets Repair project contract time is 20 working days for the work on Station Way, and concurrently, 80 working days for the entire project. Staff has had early contact with both property owners and businesses on Station Way. The intent is for re- construction of Station Way to be completed well before construction of the Traffic Way Bridge, currently scheduled to begin in April 2025. Due to timing constraints associated with Station Way for the Traffic Way Bridge Project, efforts to reduce the overall costs of the Project through methods such as economies of scale with neighboring jurisdictions were unable to be reached. However, staff will continue to communicate with neighboring jurisdictions for opportunities to partner on these efforts to potentially further reduce costs in the future. ALTERNATIVES: The following alternatives are provided for the Council’s consideration: A. Staff’s recommendation: 1) Award a construction contract for the 2024 Streets Repair Project to Papich Construction, Inc. (Papich) for $3,999,889; and 2) Authorize the City Manager to approve change orders of 10% of the contract amount, $399,989.90, for unanticipated costs during the construction phase of the 2024 Streets Repair Project; B. Do not approve staff’s recommendations and request further information; C. Modify staff’s recommendation and approve; or D. Provide other direction to staff. ADVANTAGES: Completing the 2024 Streets Repair Project will extend the service life of the treated street segments, reduce future costs and provide a smoother safer driving surface. New striping will be installed, which will provide safer driving facilities. DISADVANTAGES: There will be traffic impacts to the traveling public during construction. Staff will require traffic control to be in place during construction to minimize the impacts. The traveling public, neighborhoods, and the businesses on Station Way will be given advanced notice of the work. City and consultant inspectors will be at the site during construction to adjust the traffic control as needed (driveway access, etc.). ENVIRONMENTAL REVIEW: The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guideline Section 15301 covering the repair and maintenance of Page 54 of 135 Item 9.c. City Council Notice of Award, 2024 Streets Repair Project, PW 2024-01 October 22, 2024 Page 4 existing streets, sidewalks, gutters and similar facilities. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted at City Hall and on the C ity’s website in accordance with Government Code Section 54954.2. ATTACHMENTS: 1. Bid Opening Log Sheet 2. Proposed Agreement Page 55 of 135 ATTACHMENT 1 Page 56 of 135 ATTACHMENT 2 Page 57 of 135 Page 58 of 135 Page 59 of 135 Page 60 of 135 Page 61 of 135 Page 62 of 135 Page 63 of 135 Page 64 of 135 Page 65 of 135 Page 66 of 135 Page 67 of 135 Page 68 of 135 Page 69 of 135 Page 70 of 135 Page 71 of 135 Page 72 of 135 Page 73 of 135 Page 74 of 135 Page 75 of 135 Page 76 of 135 Page 77 of 135 Page 78 of 135 Page 79 of 135 Page 80 of 135 Page 81 of 135 Page 82 of 135 Page 83 of 135 Page 84 of 135 Page 85 of 135 Page 86 of 135 Page 87 of 135 Page 88 of 135 Page 89 of 135 Page 90 of 135 Page 91 of 135 Page 92 of 135 Page 93 of 135 Page 94 of 135 Page 95 of 135 Page 96 of 135 Page 97 of 135 Page 98 of 135 Page 99 of 135 Page 100 of 135 Page 101 of 135 Page 102 of 135 Page 103 of 135 Page 104 of 135 Page 105 of 135 Page 106 of 135 Page 107 of 135 Page 108 of 135 Page 109 of 135 Page 110 of 135 Page 111 of 135 Page 112 of 135