Loading...
CC 2016-06-28_10b UWMP PPJune 28, 2016 Final Draft Review 2015 Urban Water Management Plan City Council Meeting 1 Presentation Topics Background Purpose Changes Since the 2010 UWMP Components of the UWMP Plan Preparation System Description System Demands System Supplies Water Supply Reliability Water Shortage Contingency Planning Demand Management Measures Q & A 2015 Urban Water Management Plan 2 Background Urban Water Management Planning Act (Division 6 Part 2.6 of the California Water Code §10610 - 10656) 3,000 connections or 3,000 acre-feet per year (afy) Submit an Urban Water Management Plan (UWMP) to the California Department of Water Resources (DWR) every five years City has submitted UWMPs since 1985—most recently in 2012 2015 Urban Water Management Plan 3 Purpose Statutory requirement for State funding Standardized water planning resource for: State- California Water Plan Region- Integrated Regional Water Management Plan (IRWMP) County- County Master Water Report, and SLO County General Plan-Resource Summary Report City- City General Plan and Water Supply Assessments (WSAs), Water and Wastewater Master Plans City customers- customer programs outreach and education 2015 Urban Water Management Plan 4 Changes Since the 2010 UWMP 2015 Urban Water Management Plan 5 Components of the UWMP Plan Preparation System Description System Demands System Supplies Water Supply Reliability Water Shortage Contingency Planning Demand Management Measures 2015 Urban Water Management Plan 6 Plan Preparation 2015 Urban Water Management Plan 7 System Description 5.87 square miles 2015 Metered Connections: 6,605 2015 City Population: 17,731 (Department of Finance) 2015 Water Service Area Population: 17,636 2015 Water Use: 2,239 acre-feet 2015 Urban Water Management Plan 8 System Description cont. Why the difference in populations? Portions of City in southwest served by OCSD Customers served outside of City Limits 2015 Urban Water Management Plan 9 System Demands Select base daily per capita water use based on a selected 10 year historical average Selected 10-year average from 1999-2008 (191 gpcd) SB7 Per Capita Target Calculation Methods Method 1: 80% of Base Daily Per Capita Water Use Method 2: Performance standards applied to indoor residential use; landscaped area water use; and CII uses Method 3: 95% of Regional Target in California Water Plan Method 4: DWR BMP Water Savings 2015 Urban Water Management Plan 1995 2004 2001 2010 10 System Demands cont. 2015 Urban Water Management Plan 11 System Supplies Sources Groundwater Santa Maria Valley Groundwater Basin Pismo Formation Lopez Reservoir Other Potential Future Sources Water Purchases Recycled Water Desalinated Water 2015 Urban Water Management Plan 12 Water Supply Reliability 2015 Urban Water Management Plan 13 Water Supply Reliability cont. 2015 Urban Water Management Plan 14 Water Supply Reliability cont. Reliability of Groundwater and Lopez Reservoir Potential seawater intrusion Habitat Conservation Plan (HCP) Low Reservoir Response Plan (LRRP) Supplemental Water Supply Sources Lopez Surplus Lopez Reservoir Spillway Raising Supplemental State Water via the Coastal Branch and Lopez Pipelines Recycled Water- SSLOCSD and Pismo Beach Desalinated Water- Diablo Canyon Power Plant Stormwater System 2015 Urban Water Management Plan 15 Water Shortage Contingency Planning 2015 Urban Water Management Plan 16 Demand Management Measures (DMMs) The City implements all applicable DMMs and some additional DMMs including: Cash for Grass Water Efficient Washer Rebates Smart Irrigation Controller Plumbing Retrofits 2015 Urban Water Management Plan 17 Questions? 2015 Urban Water Management Plan 18 Reference Figures 2015 Urban Water Management Plan 19 2015 Urban Water Management Plan 20 2015 Urban Water Management Plan 21 2015 Urban Water Management Plan 22 2015 Urban Water Management Plan 23 2015 Urban Water Management Plan 24 2015 Urban Water Management Plan 25