CC 2021-03-09_08e Award Contract_Ikeda Field Barrier Removal ProjectMEMORANDUM TO: CITY COUNCIL FROM: BILL ROBESON, ASSISTANT CITY MANAGER/PUBLIC WORKS DIRECTOR BY: JILL MCPEEK, CAPITAL IMPROVEMENT PROJECT MANAGER SUBJECT: CONSIDERATION OF AN AWARD OF CONTRACT TO R. BURKE CORPORATION FOR CONSTRUCTION OF THE IKEDA FIELD BARRIER REMOVAL PROJECT, PW 2020-06 DATE: MARCH 9, 2021 SUMMARY OF ACTION: Award a construction contract for the Ikeda Field Barrier Removal Project. Work is anticipated to begin in April 2021. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The amended FY 2020-21 Capital Improvement Program (CIP) budget includes $144,692 of 2019 and 2020 Community Development Block Grant (CDBG) funds and $31,981 of Park Improvement funds for a total of $176,673 for the Ikeda Field Barrier Removal Project. On December 8, 2020, the Council provided preliminary approval of $31,981 of 2021 CDBG funds for the project. On January 26, 2021, the Council approved the use of $31,981 Park Improvement funds for the project should the City not receive the additional approvals required from the City, County of San Luis Obispo (County), and the U.S. Department of Housing and Urban Development (HUD) for the 2021 CDBG funds. If approvals for the 2021 CDBG funds are received, the $31,981 of Park Improvement funds will be returned to the fund balance. Staff time will be necessary to provide construction management and inspection services for the project. RECOMMENDATION: It is recommended the City Council: 1) Award a contract for the Ikeda Field Barrier Removal Project to R. Burke Corporation in the amount of $130,421.80; 2) Authorize the City Manager to approve change orders for 10% of the contract amount, $130,421.80, for unanticipated costs during the construction phase of the project (total construction costs = $130,421.80 + $13,042.18 = $143,463.98). BACKGROUND: On January 26, 2021, the City Council approved the construction plans and specifications and authorized the solicitation of bids for the Ikeda Field Barrier Removal Project. The Base Bid scope of work will provide an Americans with Disabilities Act (ADA) accessible ramp from the Soto Sports Complex parking lot to the Ikeda Field bleacher area. The ramp will be constructed so that it can also be used for vehicle access to both Ikeda Field Item 8.e. - Page 1 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO R. BURKE CORPORATION FOR CONSTRUCTION OF THE IKEDA FIELD BARRIER REMOVAL PROJECT, PW 2020-06 MARCH 9, 2021 PAGE 2 and Volunteer Field for maintenance and large community events such as sports tournaments and Cops and Kids Day. The project scope also included an Add Alternative Bid item for eight trees to replace those removed prior to the project that were conflicting with the proposed construction. ANALYSIS OF ISSUES: On February 18, 2021, eleven bids were received for the Ikeda Field Barrier Removal Project. Following review and mathematical verification, the lowest Base Bid was received from R. Burke Corporation in the amount of $122,421.80. The project specifications state that the lowest bidder will be determined using the Base Bid. R. Burke Corporation’s Base Bid has been determined to be responsive and R. Burke Corporation to be a responsible bidder. In addition, R. Burke Corporation’s total project bid of $130,421.80 is approximately $9,600 below the engineer’s estimate of $140,000. Therefore, an award of a construction contract to R. Burke Corporation, consisting of the Base Bid and the Add Alternative Bid item, is being recommended as outlined below. 2019 & 2020 CDBG Park Improvement * Total Design and Survey $ 29,539 $ 29,539 Contract Admin / Inspection $ 3,670 $ 3,670 Construction $ 111,483 $ 18,939 $ 130,422 Base Bid 111,483 10,939 122,422 Add Alt - Replacement Trees 8,000 8,000 Construction Contingencies (10%) 13,042 13,042 Total Expenditures $ 144,692 $ 31,981 $ 176,673 * Return to Park Improvement fund balance if approvals for 2021 CDBG funds are received. The estimated contract time is 45 working days, and it is anticipated work will be accomplished in April and May 2021. ALTERNATIVES: The following alternatives are provided for the Council’s consideration: 1. Approve the recommended actions as proposed; 2. Award a construction contract to the lowest responsive/responsible bidder but do not award the Add Alternative Bid item; 3. Do not award a construction contract for the project at this time; or 4. Provide other direction to staff. Item 8.e. - Page 2 CITY COUNCIL CONSIDERATION OF AN AWARD OF CONTRACT TO R. BURKE CORPORATION FOR CONSTRUCTION OF THE IKEDA FIELD BARRIER REMOVAL PROJECT, PW 2020-06 MARCH 9, 2021 PAGE 3 ADVANTAGES: The project will eliminate current barriers to ADA access at Ikeda Field. DISADVANTAGES: During construction there may be intermittent disruptions to those wanting to utilize Ikeda Field. ENVIRONMENTAL REVIEW: The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(c) covering minor alterations of existing pedestrian facilities. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted at City Hall and on the City’s website in accordance with Government Code Section 54954.2. Attachment: 1. Bid Opening Log Sheet Item 8.e. - Page 3 ATTACHMENT 1 Item 8.e. - Page 4 Item 8.e. - Page 5 THIS PAGE INTENTIONALLY LEFT BLANK Item 8.e. - Page 6