Loading...
R 5173 RESOLUTION NO. 5173 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARROYO GRANDE UPDATING OPERATING FEES SET FORTH IN THE MASTER FEE SCHEDULE WHEREAS, in January 2015 the City of Arroyo Grande retained Wohlford Consulting to conduct a User (operating) Fee Study for City services; and WHEREAS, operating fees are intended to be paid by persons utilizing the program or service and to reimburse the City for the actual cost of said program or service; and WHEREAS, the City has established a proposed Master Fee Schedule based on the User Fee Study, which includes fees related to planning, building, engineering, police, recreation, and public works charges; and WHEREAS, the City Council has considered the question of whether or not to adjust or establish User (operating) Fees for City services to reflect the estimated amount that is required to recover the actual cost to the City of providing such services; and WHEREAS, the City Council adopted a methodology to annually update fees in order to reflect the change in the actual cost to the City of providing services and reduce the subsidy of the General Fund for planning related services; and WHEREAS, the amount of the fees does not exceed the estimated cost of providing the City services; and WHEREAS, at a duly noticed public meeting, the City Council considered all verbal and written presentations that were made regarding the proposed fees; and WHEREAS, at least ten days prior to the public meeting, the City made available to the public data indicating the amount of cost, or estimated cost required to provide the services for which the fee or service charge is levied and the revenue sources anticipated to provide the service, including General Fund revenues. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Arroyo Grande as follows: 1. The schedule of fees entitled "Master Fee Schedule" in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full, is hereby adopted. 2. Fees shall be adjusted annually by modifying the adopted value up or down in conformance with the annual change in the City's budgeted labor costs. The factor for the adjustment of the fees shall be calculated and established each year by the Director of Administrative Services. RESOLUTION NO. 5173 PAGE 2 BE IT FURTHER RESOLVED by the City Council that this Resolution shall be effective June 13, 2022. On motion of Council Member Storton, seconded by Mayor Ray Russom, and by the following roll call vote, to wit: AYES: Council Members Storton, Paulding, Barneich, George, and Mayor Ray Russom NOES: None ABSENT: None the foregoing Resolution was passed and adopted this 12th day of April, 2022. RESOLUTION NO. 5173 PAGE 3 a; CAREN RAY RUSSOM, MAYOR ATTEST: J SSICA MATSON, CITY CLERK APPROVED AS TO CONTENT: INIVA I alC W TNEY M a'ONALD, CITY MANAGER APPROVED AS TO FORM: TIMOTH J. CARMEL, CITY ATTORNEY RESOLUTION NO. 5173 PAGE 4 -,: CITY OF EXHIBIT A „Old GRAI : C A LI FO R N IA2 CITY OF ARROYO GRANDE MASTER FEE SCHEDULE Fiscal Year 2022-23 Fees effective June 13, 2022 Issued by the Administrative Services Department RESOLUTION NO. 5173 PAGE 5 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 Hourly rates for all City staff positions will be calculated and provided by the Administrative Services Department. In the absence of an established fee for service, the City will recover costs based on the reasonable time and materials required to provide the service, as calculated by the Administrative Services Department RESOLUTION NO. 5173 PAGE 6 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 ADMINISTRATIVE SERVICES Fee Description FY 2019-20 Fee FY 2022-23 Fee Budget $ 40.00 $ 40.00 Financial Statements copy costs copy costs Business License Fees: (Basic fees are prorated per the application date:Jan 1-Jun 30, 100%; Jul 1-Dec31, 50%) Basic Fee--All businesses except Specific License Fees listed below 34.00* 34.00* >Per Employee, Partner, or Associate(Except those listed below) 5.00 5.00 Specific License Fees: Contractor 64.00* 64.00* Motels&Hotels(Basic Fee) 34.00* 34.00* >per room 1.00 1.00 Trailer Parks 34.00* 34.00* >per space 1.00 1.00 Hospitals,Sanitariums, Rest or Nursing Homes 44.00* 44.00* >per bed 3.00 3.00 Taxi Cabs 49.00* 49.00* >per vehicle 15.00 15.00 Billboards 129.00* 129.00* Commercial Auctions-Per Year 89.00* 89.00* Commercial Auctions-Per Day of Auctioning 29.00* 29.00* Circuses and similar shows(per day) 70.00 70.00 +$4 State Fee Bazaars and street fairs: >Small Bazaars(1-4 displays or exhibits)per display per every two(2) days 15.00 15.00 +$4 State Fee >Large Bazaars(5 or more displays or exhibits)per day 70.00 70.00 +$4 State Fee *Includes$4 per license per State law(AB 1379) Copies,per page(Black and White) 0.20 0.20 Color copies Actual cost Actual cost Maps--Chamber of Commerce 1.00 1.00 Utility Fees and Penalties: Renter's Deposit 180.00 180.00 New Utility Account Set Up Fee 40.00 40.00 Past Due Penalty(%of Past Due Total) 10% 10% Lock Cut Replacement Fee 15.00 15.00 Reconnection Fee(Reconnect by City Personnel) 50.00 52.00 Unauthorized Reconnection Fee(Reconnect by non-City Personnel) 180.00 180.00 Returned check fee(NSF)-Per CA Civil Code Section 1719 25.00 25.00 RESOLUTION NO. 5173 PAGE 7 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 ADMINISTRATIVE SERVICES Fee Description FY 2019-20 Fee FY 2022-23 Fee Administrative Fine for Municipal Code Violations 1st Violation in a 12 month period 100.00 100.00 2nd Violation of the same ordinance 200.00 200.00 3rd or future Violation of the same ordinance 500.00 500.00 Administrative Fines for Building and Safety Violations[Government Codes Sections 25132 and 36900(c)] 1st Violation 130.00 130.00 2nd Violation of the same ordinance within one year 700.00 700.00 Each additional Violation of same ordinance within one year of first violation 1,300.00 1,300.00 For commercial property that has an existing building at the time of the violation and the owner failed to remove visible refuse or prohibit unauthorized use of the property, a fine for each additional violation of the same ordinance within 2 years of the first violation 2,500.00 2,500.00 Late Penalty Failure to pay fine within the time period set forth in any citation 10%of fine 10%of fine Failure to pay fine and penalty after 60 days,with interest(on penalty amount) 7% 7% Inspection fee if not timely corrected/abated after receiving notice 100.00 100.00 RESOLUTION NO. 5173 PAGE 8 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 CITY CLERK/LEGISLATIVE AND INFORMATION SERVICES Fee Description FY 2019-20 Fee FY 2022-23 Fee City Council Meeting Audio CD 5.00/each 5.00/each City Council Meeting DVD Vendor cost Vendor cost Candidate Filing Fee no charge no charge Candidate Statement actual cost actual cost Notice of Intent to Circulate Petition (EC 9202) 200.00 200.00 Copies, per page(Black and White) 0.20 0.20 Color copies Actual cost Actual cost Copies of records sent to a commercial copier Actual cost Actual cost Document Certification 10.00 10.00 Fair Political Practices Commission Forms: Statement of Economic Interests Form 700 (GC 81008) 0.10/page 0.10/page Campaign Statements(GC 81008) 0.10/page 0.10/page Retrieval fee for statements 5 or more years old (GC 81008) 5.00/request 5.00/request Notary(per signature) 15.00 15.00 RESOLUTION NO. 5173 PAGE 9 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 ENGINEERING Fee Description FY 2019-20 Fee FY 2022-23 Fee Printing/Copying Charges: 8 1/2"x 11 (per page) $ 0.20 $ 0.20 18"x 30 (per page) 3.00 3.00 24"x 36" (per page) 4.00 4.00 36"x 48" (per page) 5.00 5.00 Standard Plans 35.00 35.00 Land Use Map and Zoning Maps (each) 24x36 3.00 3.00 36x48 4.00 4.00 Overtime Inspections(per hour-2 hour min.) 158.00 162.00 Map Review- Final (LLA, PM,TM 0-2 Lots) 5,874.00 6,040.00 Each Additional Lot 140.00 144.00 Additional Map Review-After 3 2,797.00 2,876.00 Encroachment Permit-Minor(pod,dumpster) 57.00 59.00 Encroachment Permit-Small Size - 180.00 Encroachment Permit-Standard -per Month 698.00 718.00 Encroachment Permit-Franchise Annual 17,475.00 17,970.00 Certificate of Compliance 2,159.00 2,220.00 Certificate of Correction I Merger 781.00 803.00 Transporation Permit-each occurrence 40.00 41.00 Public Improvement Plan -Plan Check(based on Engineer's estimate of construction cost): $0 - 10,000 2,576.00 2,649.00 $10,001 -50,000 2,961.00 3,045.00 $50,001 - 100,000 3,408.00 3,504.00 $100,001 -250,000 3,925,00 4,036.00 $250,001 -500,000 5,459.00 5,613.00 $500,001 - 1.0 Million 7,119.00 7,320.00 Each additional$500,000(over$1 M) 2,192.00 2,254.00 Additional Review Public Improvement Plan -Plan Check- After 3(based on Engineer's estimate of construction cost): $0 - 10,000 625.00 643.00 $10,001 -50,000 701.00 721.00 $50,001 - 100,000 779.00 801.00 $100,001 -250,000 931.00 957.00 $250,001 -500,000 1,233.00 1,268.00 $500,001 - 1.0 Million 2,141.00 2,202.00 Each additional$500,000(over$1 M) 907.00 933.00 RESOLUTION NO. 5173 PAGE 10 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 ENGINEERING Fee Description FY 2019-20 Fee FY 2022-23 Fee Grading/Drainage/Erosion Plan Review: 0-50 cy $ 1,276.00 $ 1,312.00 50 cy to 100 cy 1,370.00 1,409.00 100 cy to 1,0000 cy 1,547.00 1,591.00 1,000 cy to 10,000 cy 1,724.00 1,773.00 10,000 cy to 100,000 cy 1,900.00 1,954.00 Hydraulic/Hydrology Report Review 801.00 824.00 SWPPP Review 801.00 824.00 Stormwater Control Plan Review 801.00 824.00 Inspection Agreement,including Subdivision Agreement (based on Engineer's estimate of construction cost): $0 - 10,000 747.00 768.00 $10,001 -50,000 1,943.00 1,998.00 $50,001 - 100,000 3,718.00 3,823.00 $100,001 -250,000 7,422.00 7,632.00 $250,001 -500,000 14,276.00 14,680.00 $500,001 - 1.0 Million 27,697.00 28,481.00 Each additional$500,000(over$1M) 13,484.00 13,866.00 Major Project with a Contract Engineer-Actual cost of Contractor passed directly through to Applicant Major Project with a Contract Engineer-City Project Management and Administrative Charge 1,289.00 1,325.00 RESOLUTION NO. 5173 PAGE 11 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 COMMUNITY DEVELOPMENT Fee Description FY 2019-20 Fee FY 2022-23 Fee COPY FEES Development Code w/out Appendices $ 50.00 $ 50.00 Appendix 1 15.00 15.00 Appendix 2 5.00 5.00 Development Code w/Appendices 70.00 70.00 General Plan 25.00 25.00 Housing Element 2003 35.00 35.00 General Plan EIR 12.00 12.00 Design Guidelines for Historic Districts 25.00 25.00 Design Guidelines for Traffic Way/Station Way 6.00 6.00 Design Guidelines for Mixed Use Districts 30.00 30.00 East Grand Avenue Enhancement Plan 20.00 20.00 Land Use Map and Zoning Maps (each) 24 x 36 3.00 3.00 36 x 48 4.00 4.00 DVD(Planning Commission meetings) Vendor cost Vendor cost Audio recording copies 5.00 5.00 Copies, per page(Black and White) 0.20 0.20 Color copies Actual cost Actual cost Arroyo Grande Bike Plan 26.00 26.00 IN-LIEU FEES Downtown Parking in lieu fee (per resolution 3994) 24,000.00 24,000.00 Affordable Housing in lieu fee 5% 5% PROCESSING FEES Notary(per signature) 15.00 15.00 Annexation -deposit(fee based on actual time at staff at hourly rates) 20,000.00 20,000.00 Time and Materials(if project exceeds 50 hours of staff time) Appeals: CD Director to Planning Commission 491.00 505.00 Planning Commission to City Council 1,163.00 1,196.00 Certificate of Compliance 3,512.00 3,611.00 RESOLUTION NO. 5173 PAGE 12 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 COMMUNITY DEVELOPMENT Fee Description FY 2019-20 Fee FY 2022-23 Fee Conditional Use Permit: Project-Major(multi building) $ 14,347.00 $ 14,753.00 Time and Materials (if project exceeds 50 hours of staff time) Project-Minor(routine)-as det'd by CDD 6,212.00 6,388.00 Amendment 3,137.00 3,226.00 Development Agreement-deposit 24,024.00 24,704.00 Time and Materials(if project exceeds 50 hours of staff time) Dev. Code Amendment- Major 16,187.00 16,645.00 Time and Materials (if project exceeds 50 hours of staff time) Dev. Code Amendment-Minor 8,901.00 9,153.00 Environmental Impact Determination: Initial Study Fee 3,412.00 3,509.00 Negative Declaration (in addition to Initial Study Fee) 554.00 570.00 Mitigated Neg Dec(in addition to Initial Study Fee) 2,318.00 2,384.00 General Plan Amendment(Major) 16,187.00 16,645.00 Time and Materials(if project exceeds 50 hours of staff time) General Plan Amendment(Minor) 8,901.00 9,153.00 Home Occupation Permit 166.00 171.00 Lot Line Adjustment 3,326.00 3,420.00 Lot Merger/Reversion to Acreage 3,273.00 3,366.00 Mailing Label Production 406.00 417.00 Request for Meeting Continuance 461.00 474.00 Minor Use Permit-Architectural Review Major(e.g. subdivision if PUD or CUP is not concurrently processed) 5,145.00 5,291.00 Minor(e.g. single lot) 923.00 949.00 Minor Use Permit-Historic Resource Designation 1,472.00 1,514.00 Minor Use Permit-Large Family Day Care 561.00 577.00 Minor Use Permit-Minor Exception 999.00 1,027.00 Minor Use Permit-Plot Plan Review 735.00 756.00 Minor Use Permit-Temporary Use Permit 294.00 302.00 Minor Use Permit-Viewshed Review: 1,130.00 1,162.00 RESOLUTION NO. 5173 PAGE 13 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 COMMUNITY DEVELOPMENT Fee Description FY 2019-20 Fee FY 2022-23 Fee Planned Unit Development Permit(Major) $ 15,261.00 $ 15,693.00 Time and Materials(if project exceeds 50 hours of staff time) Planned Unit Development Permit(Minor) 7,301.00 7,508.00 Planning Commission Interpretation or Waiver 1,810.00 1,861.00 Pre-Application 1,228.00 1,263.00 Public Art Permit 927.00 953.00 Research (deposit) 221.00 227.00 Signs: Planned Sign Program 2,391.00 2,459.00 Administrative Sign Permit 343.00 353.00 Administrative Sign Program 1,347.00 1,385.00 Specific Plan or Amendment(deposit) 23,978.00 24,657.00 Time and Materials(if project exceeds 50 hours of staff time) Tentative Parcel Map(0-4 lots) 9,537.00 9,807.00 with Vesting (added to base fee) 591.00 608.00 Amendment 4,620.00 4,751.00 Tentative Tract Map: 5-20 lots 15,670.00 16,113.00 over 20 lots 18,190.00 18,705.00 with Vesting (added to base fee) 1,535.00 1,578.00 Amendment 6,879.00 7,074.00 Time Extension 2,568.00 2,641.00 Variance 3,633.00 3,736.00 Zoning Compliance Letter 147.00 151.00 RESOLUTION NO. 5173 PAGE 14 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 POLICE Fee Description FY 2019-20 Fee FY 2022-23 Fee ANIMAL CONTROL/IMPOUND Dog Impound Fee 1st Impound $ 23.00 $ 24.00 2nd Impound 45.00 46.00 3rd Impound + 68.00 70.00 Cat Impound Fee 1st Impound 23.00 24.00 2nd Impound 45.00 46.00 3rd Impound + 68.00 70.00 PERMITS& LICENSES: Alarm Permit Original Application Permit Processing Fee 107.00 110.00 Annual Renewal Permit Processing Fee 50.00 51.00 False Alarm Response Fourth False Alarm within 12 months 169.00 174.00 Fifth False Alarm within 12 months 339.00 349.00 Sixth or more false alarm within 12 months(per incident) 507.00 521.00 Block Party Permit Block Party Permit 29.00 30.00 Commercial Filming/Still Photography Permit Permit Processing Fee 57.00 59.00 Commercial Filming (per day) 282.00 290.00 Still Photography(per day) 112.00 115.00 City Staff Assigned -4 hour minimum (if applicable) overtime rate overtime rate Concealed Weapons Permit Original Application Police Department Investigation Fee $ 112.00 $ 115.00 Dept of Justice& FBI fingerprint process(DOJ passthrough fee paid by applicant) 93.00 93.00 Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 25.00 Identification Card 23.00 24.00 Concealed Weapons Permit Biennial Renewal: Police Department Investigation Fee 29.00 30.00 Dept of Justice Renewal Fee (DOJ passthrough fee paid by applicant) 52.00 52.00 Identification Card 23.00 24.00 Mobile Vendor Permit Permit Processing Fee 141.00 145.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 25.00 Dept of Justice& FBI Fingerprint Process actual cost actual cost Mobile Vendor Employee Permit RESOLUTION NO. 5173 PAGE 15 Permit Processing Fee 141.00 145.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 25.00 Dept of Justice& FBI Fingerprint Process actual cost actual cost RESOLUTION NO. 5173 PAGE 16 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 POLICE Fee Description FY 2019-20 Fee FY 2022-23 Fee Sidewalk Vending Permit Permit Processing Fee 280.00 280.00 Palmreader Fortune Teller Permit-Original Application Permit Processing Fee 141.00 145.00 Dept of Justice & FBI fingerprint process(DOJ passthrough fee paid by applicant) actual cost actual cost Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 25.00 Palmreader Fortune Teller Permit-Annual Renewal Permit Renewal Processing 112.00 115.00 Palmreader Fortune Teller Establishment Permit-Original Application Permit Processing Fee 141.00 145.00 Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 25.00 Dept of Justice& FBI fingerprint process(DOJ passthrough fee paid by applicant) actual cost actual cost Palmreader Fortune Teller Establishment Permit-Renewal Application Permit Processing Fee 112.00 115.00 Public Safety and Welfare Permit: Less than 200 Non-Commercial Event 57.00 59.00 More than 200 Non-Commercial Event 112.00 115.00 Commercial Event 141.00 145.00 Second Hand Dealer Permit Original Application Permit Processing Fee 141.00 145.00 Live Scan Fingerprint Rolling Fee(per penal code section 13300) 25.00 25.00 Dept of Justice & FBI Fingerprint process(DOJ passthrough fee paid by applicant) actual cost actual cost Second Hand Dealer Permit Biennial Renewal City Processing Fee 112.00 115.00 Solicitation Permit(per solicitor) Permit Processing Fee $ 141.00 $ 145.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 25.00 Dept of Justice & FBI Fingerprint Processing Fee actual cost actual cost Taxi Cab Driver Permit Original Application Permit Processing Fee 141.00 145.00 Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 25.00 Dept of Justice& FBI Fingerprint Process actual cost actual cost Taxi Cab Driver Permit Annual Renewal RESOLUTION NO. 5173 PAGE 17 Annual Renewal 112.00 115.00 Tobacco Retailers License Permit Processing Fee 141.00 145.00 RESOLUTION NO. 5173 PAGE 18 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 POLICE Fee Description FY 2019-20 Fee FY 2022-23 Fee OTHER FEES Citation correction certification 29.00 30.00 Civil Witness Fee(Deposit) 275.00 275.00 Copies, per page (Black and White) .20 per page .20 per page Copies-Color copies per page 5.00 5.00 Court Ordered Booking 141.00 145.00 Criminal history summary examination Live Scan Fingerprint Rolling Fee(per PC 13300) 25.00 25.00 Dept of Justice& FBI Fingerprint Process actual cost actual cost Disturbance 415PC Second Response 169.00 174.00 Third Response 339.00 349.00 Fourth Response 563.00 579.00 Emergency DUI Response-Impaired Driver Accident -Actual Time @ Staff Hourly Rates actual cost actual cost Local Records Check 16.00 16.00 Photographs per disc 25.00 25.00 Property Handling for Mailing/Shipping actual cost actual cost Replacement of lost/stolen Permits, Licenses and registration receipts 50.00 51.00 Repossessed Vehicle(per GC 41612) 15.00 15.00 Subpoena Duces Tecum Production of Records for Subpoena deuces Tecum 15.00 15.00 .20 per page produced actual cost actual cost postage/shipping actual cost actual cost Custodian of Records Court Appearance 275.00 275.00 Vehicle Release-Impound/Stored Vehicle Release 57.00 59.00 Vehicle Release 30-day Impound Release Review 84.00 86.00 Clearance letter 50.00 51.00 RESOLUTION NO. 5173 PAGE 19 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING MISC Plan Check Inspection Fee Plan Check Inspection Fee Fee Description Fee FY 19-20 FY 19-20 Fee FY 22-23 FY 22-23 Cellular/Mobile Phone, free-standing NEW $ 1,111.00 $ 1,584.00 $ 1,142.00 $ 1,629.00 Cellular Tower with Equipment Shelter 1,111.00 1,776.00 1,142.00 1,826.00 Cellular Tower Equipment Demolition 427.00 447.00 439.00 460.00 Awning (not patio cover)Tents/Canopies/ Booths 115.00 174.00 118.00 179.00 Change of Occupancy No T.I. w/plan check & Inspection 194.00 353.00 199.00 363.00 Close Existing Openings 115.00 237.00 118.00 244.00 Compliance Inspections/Reinspections 215.00 290.00 221.00 298.00 Deck (with Calcs) 249.00 311.00 256.00 320.00 Demolition 115.00 365.00 118.00 375.00 Demolition-MultiFamily/Commercial 115.00 365.00 118.00 375.00 Door 115.00 250.00 118.00 257.00 Fence or Wall(wood, chain link, wrought iron): >6 feet in height, 1st 100 s.f. 115.00 319.00 118.00 328.00 Each additional 100 sf 88.00 115.00 90.00 118.00 Fence or Freestanding Wall (masonry/garden): City Standard, 1st 100 s.f. 115.00 319.00 118.00 328.00 Each additional 100 sf 88.00 115.00 90.00 118.00 Engineered Wall, 1st 100 sf 149.00 319.00 153.00 328.00 Each additional 100 sf 122.00 115.00 125.00 118.00 Fireplace(masonry or pre-fab) 115.00 231.00 118.00 238.00 Flag pole(greater than 6 feet in height) 115.00 231.00 118.00 238.00 Grading (Cut and Fill): 0-50 Cubic Yards(Cut and Fill) 149.00 231.00 153.00 238.00 Each Add'I 50 CY(or portion thereof) 73.00 174.00 75.00 179.00 Pilaster each 10 115.00 231.00 118.00 238.00 Lighting pole(each) 115.00 197.00 118.00 203.00 Stucco Applications 72.00 231.00 74.00 238.00 Retaining Wall(concrete or masonry): First 50 sf 238.00 264.00 245.00 271.00 Each additional 50 sf 210.00 149.00 216.00 153.00 Re-roofing: Composition- no tear off 95.00 222.00 98.00 228.00 Other roofs (first 10 squares) 95.00 222.00 98.00 228.00 Each additional 10 squares 23.00 55.00 24.00 57.00 Roof Structure Replacement 149.00 264.00 153.00 271.00 Sauna-steam 115.00 277.00 118.00 285.00 RESOLUTION NO. 5173 PAGE 20 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING MISC Plan Check Inspection Fee Plan Check Inspection Fee Fee Description Fee FY 19-20 FY 19-20 Fee FY 22-23 FY 22-23 Siding: Stone and Brick Veneer(interior or exterior) $ 95.00 $ 277.00 $ 98.00 $ 285.00 All Other 72.00 277.00 74.00 285.00 Signs: Directional/Menu 238.00 277.00 245.00 285.00 Freeway sign 546.00 305.00 561.00 314.00 Ground/Roof/Projecting Signs 227.00 264.00 233.00 271.00 Wall, Illuminated 95.00 277.00 98.00 285.00 Skylight(Residential each) 72.00 244.00 74.00 251.00 Skylight(Commercial) one 95.00 244.00 98.00 251.00 Spa or Hot Tub(Pre-fabricated) 95.00 277.00 98.00 285.00 Stairs-per story 348.00 264.00 358.00 271.00 Storage Racks each set of plans 403.00 331.00 414.00 340.00 Temporary Utility Connection or Occupancy - 95.00 - 98.00 Window or Sliding Glass Door(first) 238.00 264.00 245.00 271.00 Each additional 210.00 123.00 216.00 126.00 Board of Appeals 895.00 - 920.00 - Business License Inspection 45.00 69.00 46.00 71.00 Business License Re-inspection 45.00 36.00 46.00 37.00 Product Review 673.00 - 692.00 - Disabled Access Compliance Inspection 134.00 90.00 138.00 93.00 Supplemental Plan Check Fee(first 1/2 hour) 122.00 - 125.00 - Each Additional 1/2 hour(or portion thereof) 110.00 - 113.00 - Supplemental Inspection Fee(first 1/2 hour) - 122.00 - 125.00 Each Additional 1/2 hour(or portion thereof) - 110.00 - 113.00 Emergency(Non-Scheduled)Call-Out Fee(first hour) 2 hour minimum - 233.00 - 240.00 Each additional hour - 220.00 - 226.00 After Hours Inspection 2 hour minimum - 233.00 - 240.00 Each additional hour - 220.00 - 226.00 After Hours Plan Review 2 hour minimum 233.00 - 240.00 - Each additional hour 220.00 - 226.00 - Copies, per page(Black and White) 0.20 per page Color copies actual costs City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING FIRE Plan Check Inspection Fee Plan Check Inspection Fee Fee Description Fee FY 19-20 FY 19-20 Fee FY 22-23 FY 22-23 Fire Sprinkler Systems- New Construction: 1-50 Heads $ 221.00 $ 242.00 $ 227.00 $ 249.00 51-100 Heads 277.00 344.00 285.00 354.00 101-200 Heads 500.00 412.00 514.00 424.00 Every 200 Heads above 200 220.00 158.00 226.00 162.00 Fire Sprinkler Systems-Tenant Improvements: 1-25 Heads 221.00 242.00 227.00 249.00 26-100 Heads 334.00 378.00 343.00 389.00 Every 100 Heads above 100 110.00 253.00 113.00 260.00 Fire Alarm System (including Sprinkler Monitor System)-New Construction: 1-50 Devices 221.00 242.00 227.00 249.00 51-100 Devices 277.00 344.00 285.00 354.00 Every 50 Devices above 100 110.00 227.00 113.00 233.00 Fire Alarm System (including Sprinkler Monitor System)-Tenant Improvements: 1-50 Devices 221.00 276.00 227.00 284.00 51-100 Devices 277.00 378.00 285.00 389.00 Every 50 Devices above 100 167.00 227.00 172.00 233.00 Other Suppression Systems: Inert Gas Systems 388.00 485.00 399.00 499.00 Dry Chemical Systems 221.00 485.00 227.00 499.00 Wet Chemical/Kitchen Hood 332.00 485.00 341.00 499.00 Foam Systems 221.00 663.00 227.00 682.00 Paint Spray Booth 499.00 719.00 513.00 739.00 Other Fire Fees: Hydrants/Underground Fire Service Plan Check 444.00 - 457.00 - Hydrant Flow Test(existing hydrants) - 663.00 - 682.00 Special Event Inspection (e.g., fairs)These are group events, when multiple booths/tents are erected Booth/Tent 59.00 64.00 61.00 66.00 Booth/Tent with Electricity 84.00 104.00 86.00 107.00 Booth/Tent with Cooking (includes Electricity) 91.00 125.00 94.00 129.00 Special Event Application Review - 24.00 - 25.00 Additional Fire related services are provided by Five Cities Fire Authority(FCFA).See the FCFA fee schedule for fees. City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING MPE Plan Check Inspection Fee Plan Check Inspection Fee Fee Description Fee FY 19-20 FY 19-20 Fee FY 22-23 FY 22-23 ADMINISTRATIVE (BASE) FEES: Permit Issuance and Administration $ 113.00 $ - $ 116.00 $ - MECHANICAL PERMIT FEES FAU less than 100,000 Btu/h 56.00 68.00 58.00 70.00 FAU greater than 100,000 Btu/h 56.00 103.00 58.00 106.00 Floor furnace(including vent) 56.00 137.00 58.00 141.00 Suspended, wall, or floor-mounted heaters 56.00 103.00 58.00 106.00 Appliance vents not included in an appliance permit 56.00 103.00 58.00 106.00 Boiler or compressor, from 15 HP to 30 HP/ absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h. 56.00 103.00 58.00 106.00 Boiler or compressor, from 30 HP to 50 HP/ absorption system from 1,000,000 Btu/h to 1,750,000 Btu/h. 110.00 137.00 113.00 141.00 Boiler or compressor, over 50 HP/ absorption system over 1,750,000 Btu/h. 166.00 103.00 171.00 106.00 Air-handling unit, including attached ducts. 110.00 103.00 113.00 106.00 Air-handling unit over 10,000 CFM 166.00 137.00 171.00 141.00 Evaporative cooler 56.00 68.00 58.00 70.00 Ventilation fan connected to a single duct 110.00 103.00 113.00 106.00 Ventilation system (not a portion of heating or a/c system) 166.00 137.00 171.00 141.00 Incinerator, residential 276.00 204.00 284.00 210.00 Commercial or Industrial-type incinerator 331.00 204.00 340.00 210.00 Misc. appliances or equipment. 166.00 137.00 171.00 141.00 Stand Alone Mechanical Plan Check(hourly rate) 220.00 - 226.00 - Other Mechanical Inspections(per hour) - 137.00 - 141.00 PLUMBING/GAS PERMIT FEES: Plumbing fixtures 56.00 68.00 58.00 70.00 Building sewer 110.00 103.00 113.00 106.00 Rainwater systems(per drain) 56.00 68.00 58.00 70.00 Gray Water system 166.00 170.00 171.00 175.00 Private sewage disposal system 166.00 170.00 171.00 175.00 Water Heater 110.00 68.00 113.00 70.00 Industrial waste pretreatment interceptor 56.00 103.00 58.00 106.00 Water piping and/or water treating equipment 56.00 103.00 58.00 106.00 Repair or alteration of drainage or vent piping, each fixture 56.00 103.00 58.00 106.00 Each lawn sprinkler system on any one meter 56.00 68.00 58.00 70.00 Backflow devices each unit 110.00 68.00 113.00 70.00 Atmospheric-type vacuum breakers: 1-5 units 110.00 68.00 113.00 70.00 Atmospheric-type vacuum breakers: each unit over 5 units 110.00 68.00 113.00 70.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING MPE Plan Check Inspection Fee Plan Check Inspection Fee Fee Description Fee FY 19-20 FY 19-20 Fee FY 22-23 FY 22-23 PLUMBING/GAS PERMIT FEES(continued): Stand Alone Plumbing Plan Check(hourly rate) $ 220.00 $ - $ 226.00 $ - Other Plumbing and Gas Inspections(per hour) - 137.00 - 141.00 SYSTEM FEES: Swimming Pools 166.00 238.00 171.00 245.00 Outdoor Events 166.00 103.00 171.00 106.00 Electric generator and electrically-driven rides 110.00 103.00 113.00 106.00 Mechanically-driven rides/attractions with electrical 166.00 103.00 171.00 106.00 Each system of area and booth lighting 110.00 103.00 113.00 106.00 Temporary Power Service 110.00 68.00 113.00 70.00 Temporary power pole 110.00 68.00 113.00 70.00 Sub poles(each) 56.00 47.00 58.00 48.00 UNIT FEES: Receptacle, Switch, and Lighting Outlets First 10 110.00 68.00 113.00 70.00 Each Additional 10 56.00 34.00 58.00 35.00 Lighting Fixtures: First 10 110.00 68.00 113.00 70.00 Each additional 10 56.00 34.00 58.00 35.00 Pole or platform-mounted lighting fixtures(each) 110.00 103.00 113.00 106.00 Theatrical-type lighting fixtures or assemblies 110.00 137.00 113.00 141.00 Residential Appliances (each) 110.00 68.00 113.00 70.00 Nonresidential Appliances 166.00 137.00 171.00 141.00 Residential appliances and self-contained, nonresidential appliances, (each) 166.00 137.00 171.00 141.00 Appliances not exceeding one horsepower(HP) kilowatt(KW), or kilovolt-ampere (KVA), in rating,(each) 220.00 137.00 226.00 141.00 Power Apparatus: Motors, generators, transformers, rectifiers, synchronous converters,capacitors, industrial heating,air conditioners and heat pumps, cooking or baking equipment, and other apparatus(all sizes) 166.00 68.00 171.00 70.00 Signs,Outline Lighting, and Marquees: Signs, Outline Lighting, or Marquees supplied from one branch circuit(each) 110.00 103.00 113.00 106.00 Additional branch circuits within the same sign, outline lighting system, or marquee (each) 110.00 68.00 113.00 70.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING MPE Plan Check Inspection Fee Plan Check Inspection Fee Fee Description Fee FY 19-20 FY 19-20 Fee FY 22-23 FY 22-23 UNIT FEES(continued): Service or Panel: 200 amp or less Electrical Panel(each) $ 166.00 $ 137.00 $ 171.00 $ 141.00 Over 200 amp up to 1000 amp Electrical Panel 276.00 170.00 284.00 175.00 Over 1000 amp Electrical Panel(each) 441.00 204.00 453.00 210.00 Miscellaneous Apparatus, Conduits, and Conductors 110.00 103.00 113.00 106.00 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth 110.00 137.00 113.00 141.00 Photovotaic Systems-each 166.00 204.00 171.00 210.00 Stand Alone Electrical Plan Check(hourly rate) 220.00 - 226.00 - Other Electrical Inspections(per hour) - 137.00 - 141.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 T 2,000 $ 4,716 $ 0.212 $ 4,849 $ 0.218 8,000 $ 5,988 $ 0.285 $ 6,157 $ 0.293 1 A-1 Assembly Group -Theaters 20,000 $ 9,411 $ 0.309 $ 9,677 $ 0.318 40,000 $ 15,594 $ 0.207 $ 16,036 $ 0.213 100,000 $ 28,028 $ 0.280 $ 28,821 $ 0.288 1,000 $ 3,042 $ 0.244 $ 3,128 $ 0.251 4,000 $ 3,773 $ 0.331 $ 3,880 $ 0.341 2 A 2 Assembly Group Restaurants, 10,000 $ 5,761 $ 0.359 $ 5,924 $ 0.369 nightclubs 20,000 $ 9,349 $ 0.241 $ 9,613 $ 0.248 50,000 $ 16,587 $ 0.332 $ 17,056 $ 0.341 250 $ 1,593 $ 0.334 $ 1,638 $ 0.343 1,000 $ 1,843 $ 0.405 $ 1,895 $ 0.417 3 A Assembly Group-TI 2,500 $ 2,451 $ 0.442 $ 2,520 $ 0.455 5,000 $ 3,557 $ 0.285 $ 3,658 $ 0.293 12,500 $ 5,692 $ 0.455 $ 5,853 $ 0.468 1,000 $ 3,042 $ 0.244 $ 3,128 $ 0.251 4,000 $ 3,773 $ 0.331 $ 3,880 $ 0.341 4 A-3 Church and Religious Bldg 10,000 $ 5,761 $ 0.359 $ 5,924 $ 0.369 Complete 20,000 $ 9,349 $ 0.241 $ 9,613 $ 0.248 50,000 $ 16,587 $ 0.332 $ 17,056 $ 0.341 500 $ 2,173 ' $ 0.295 $ 2,234 $ 0.304 2,000 $ 2,616 $ 0.386 $ 2,690 $ 0.397 5 R-4 Congregate Care-Complete 5,000 $ 3,775 $ 0.420 $ 3,881 $ 0.432 10,000 $ 5,874 $ 0.278 $ 6,040 $ 0.286 25,000 $ 10,050 $ 0.402 $ 10,334 $ 0.413 250 $ 1,593 $ 0.334 $ 1,638 $ 0.343 1,000 $ 1,843 $ 0.405 $ 1,895 $ 0.417 6 A-3 Church and Religious Bldg-TI 2,500 $ 2,451 $ 0.442 $ 2,520 $ 0.455 5,000 $ 3,557 $ 0.285 $ 3,658 $ 0.293 12,500 $ 5,692 $ 0.455 $ 5,853 $ 0.468 2,000 $ 3,669 $ 0.157 $ 3,772 $ 0.161 8,000 $ 4,610 $ 0.215 $ 4,740 $ 0.222 7 E Educational Building-Complete 20,000 $ 7,195 $ 0.233 $ 7,399 $ 0.240 40,000 $ 11,859 $ 0.157 $ 12,195 $ 0.162 100,000 $ 21,307 $ 0.213 $ 21,910 $ 0.219 250 $ 1,593' $ 0.334 $ 1,638 $ 0.343 1,000 $ 1,843 $ 0.405 $ 1,895 $ 0.417 8 E Educational Building-TI 2,500 $ 2,451 $ 0.442 $ 2,520 $ 0.455 5,000 $ 3,557 $ 0.285 $ 3,658 $ 0.293 12,500 $ 5,692 $ 0.455 $ 5,853 $ 0.468 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 500 $ 1,834 $ 0.220 $ 1,886 $ 0.226 2,000 $ 2,165 $ 0.280 $ 2,226 $ 0.288 9 S-2 Parking Garage-Complete 5,000 $ 3,003 $ 0.304 $ 3,088 $ 0.313 10,000 $ 4,523 $ 0.199 $ 4,651 $ 0.205 25,000 $ 7,509 $ 0.300 $ 7,721 $ 0.309 1,000 $ 3,042 $ 0.244 $ 3,128 $ 0.251 4,000 $ 3,773 $ 0.331 $ 3,880 $ 0.341 10 R-1 Hotel Low/Mid Rise-Complete 10,000 $ 5,761 $ 0.359 $ 5,924 $ 0.369 20,000 $ 9,349 $ 0.241 $ 9,613 $ 0.248 50,000 $ 16,587 $ 0.332 $ 17,056 $ 0.341 1,000 $ 1,787 $ 0.104 $ 1,838 $ 0.107 4,000 $ 2,100 $ 0.132 $ 2,160 $ 0.136 11 R-1 Hotel Low/Mid Rise-Shell 10,000 $ 2,893 $ 0.144 $ 2,975 $ 0.148 20,000 $ 4,329 $ 0.094 $ 4,452 $ 0.097 50,000 $ 7,146 $ 0.143 $ 7,348 $ 0.147 250 $ 1,545 $ 0.313 $ 1,588 $ 0.322 1,000 $ 1,779 $ 0.374 $ 1,829 $ 0.385 12 R-1 Hotel Low/Mid Rise-TI 2,500 $ 2,341 $ 0.409 $ 2,407 $ 0.421 5,000 $ 3,364 $ 0.262 $ 3,459 $ 0.269 12,500 $ 5,329 $ 0.426 $ 5,480 $ 0.438 500 $ 2,286 $ 0.313 $ 2,351 $ 0.322 2,000 $ 2,757 $ 0.396 $ 2,835 $ 0.407 13 B Offices, etc. -Complete 5,000 $ 3,945 $ 0.431 $ 4,056 $ 0.443 10,000 $ 6,100 $ 0.282 $ 6,273 $ 0.290 25,000 $ 10,324 $ 0.413 $ 10,616 $ 0.425 1,000 $ 1,569 $ 0.080 $ 1,614 $ 0.083 4,000 $ 1,811 $ 0.098 $ 1,862 $ 0.100 14 B Offices, etc. - Shell 10,000 $ 2,396 $ 0.107 $ 2,464 $ 0.110 20,000 $ 3,461 $ 0.068 $ 3,559 $ 0.070 50,000 $ 5,511 $ 0.110 $ 5,667 $ 0.113 100 $ 1,362 $ 0.575 $ 1,400 $ 0.591 400 $ 1,534 $ 0.646 $ 1,578 $ 0.665 15 B Offices, etc. -TI 1,000 $ 1,922 $ 0.709 $ 1,977 $ 0.729 2,000 $ 2,631 $ 0.439 $ 2,706 $ 0.452 5,000 $ 3,949 $ 0.790 $ 4,061 $ 0.812 1,000 $ 3,042 $ 0.244 $ 3,128 $ 0.251 4,000 $ 3,773 $ 0.331 $ 3,880 $ 0.341 16 F Industrial Building-Complete 10,000 $ 5,761 $ 0.359 $ 5,924 $ 0.369 20,000 $ 9,349 $ 0.241 $ 9,613 $ 0.248 50,000 $ 16,587 $ 0.332 $ 17,056 $ 0.341 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 1,000 $ 2,076 $ 0.137 $ 2,134 4,000 $ 2,487 $ 0.178 $ 2,557 $ 0.183 17 F Industrial Building-Shell 10,000 $ 3,555 $ 0.193 $ 3,655 $ 0.199 20,000 $ 5,488 $ 0.128 $ 5,644 $ 0.131 50,000 $ 9,324 $ 0.186 $ 9,588 $ 0.192 250 $ 1,545 $ 0.313 $ 1,588 $ 0.322 1,000 $ 1,779 $ 0.374 $ 1,829 $ 0.385 18 F Industrial Building-TI 2,500 $ 2,341 $ 0.409 $ 2,407 $ 0.421 5,000 $ 3,364 $ 0.262 $ 3,459 $ 0.269 12,500 $ 5,329 $ 0.426 $ 5,480 $ 0.438 500 $ 2,076 $ 0.274 $ 2,134 $ 0.282 2,000 $ 2,487 $ 0.356 $ 2,557 $ 0.366 19 S-1 Repair Garage&Service St- 5,000 $ 3,555 $ 0.387 $ 3,655 $ 0.398 Complete 10,000 $ 5,488 $ 0.256 $ 5,644 $ 0.263 25,000 $ 9,324 $ 0.373 $ 9,588 $ 0.384 500 $ 1,449 $ 0.135 $ 1,490 $ 0.138 2,000 $ 1,651 $ 0.157 $ 1,697 $ 0.161 20 S-1 Repair Garage &Service St-Shell 5,000 $ 2,121 $ 0.172 $ 2,181 $ 0.176 10,000 $ 2,979 $ 0.108 $ 3,063 $ 0.111 25,000 $ 4,603 $ 0.184 $ 4,734 $ 0.189 100 $ 1,521' $ 0.752' $ 1,564 $ 0.773 400 $ 1,746 $ 0.900 $ 1,796 $ 0.926 21 S-1 Repair Garage&Service St-TI 1,000 $ 2,286 $ 0.982 $ 2,351 $ 1.010 2,000 $ 3,268 $ 0.626 $ 3,361 $ 0.644 5,000 $ 5,148 $ 1.030 $ 5,293 $ 1.059 500 $ 2,173 $ 0.295 $ 2,234 $ 0.304 2,000 $ 2,616 $ 0.386 $ 2,690 $ 0.397 22 M Retail Sales-Complete 5,000 $ 3,775 $ 0.420 $ 3,881 $ 0.432 10,000 $ 5,874 $ 0.278 $ 6,040 $ 0.286 25,000 $ 10,050 $ 0.402 $ 10,334 $ 0.413 500 $ 1,449 $ 0.135 $ 1,490 $ 0.138 2,000 $ 1,651 $ 0.157 $ 1,697 $ 0.161 23 M Retail Sales-Shell 5,000 $ 2,121 $ 0.172 $ 2,181 $ 0.176 10,000 $ 2,979 $ 0.108 $ 3,063 $ 0.111 25,000 $ 4,603 $ 0.184 $ 4,734 $ 0.189 100 $ 1,521 $ 0.752 $ 1,564 $ 0.773 400 $ 1,746 $ 0.900 $ 1,796 $ 0.926 24 M Retail Sales-TI 1,000 $ 2,286 $ 0.982 $ 2,351 $ 1.010 2,000 $ 3,268 $ 0.626 $ 3,361 $ 0.644 5,000 $ 5,148 $ 1.030 $ 5,293 $ 1.059 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 2,000 $ 2,076 $ 0.069 $ 2,134 8,000 $ 2,487 $ 0.089 $ 2,557 $ 0.091 25 - Warehouse-Complete 20,000 $ 3,555 $ 0.097 $ 3,655 $ 0.099 40,000 $ 5,488 $ 0.064 $ 5,644 $ 0.066 100,000 $ 9,324 $ 0.093 $ 9,588 $ 0.096 1,000 $ 3,042 $ 0.244 $ 3,128 $ 0.251 4,000 $ 3,773 $ 0.331 $ 3,880 $ 0.341 26 I Medical/24 Hour Care-Complete 10,000 $ 5,761 $ 0.359 $ 5,924 $ 0.369 20,000 $ 9,349 $ 0.241 $ 9,613 $ 0.248 50,000 $ 16,587 $ 0.332 $ 17,056 $ 0.341 1,000 $ 1,834 $ 0.110 $ 1,886 $ 0.113 4,000 $ 2,165 $ 0.140 $ 2,226 $ 0.144 27 I Medical/24 Hour Care-Shell 10,000 $ 3,003 $ 0.152 $ 3,088 $ 0.156 20,000 $ 4,523 $ 0.100 $ 4,651 $ 0.102 50,000 $ 7,509 $ 0.150 $ 7,721 $ 0.154 100 $ 1,738 ' $ 0.992 $ 1,788 $ 1.020 400 $ 2,036 $ 1.244 $ 2,094 $ 1.279 28 I Medical/24Hour Care-TI 1,000 $ 2,782 $ 1.354 $ 2,861 $ 1.392 2,000 $ 4,136 $ 0.882 $ 4,254 $ 0.907 5,000 $ 6,783 $ 1.357 $ 6,974 $ 1.395 ,0.0 14 4. 44 , I. 4,000 $ 3,773 $ 0.331 $ 3,880 $ 0.341 29 B Medical Offices-Complete 10,000 $ 5,761 $ 0.359 $ 5,924 $ 0.369 20,000 $ 9,349 $ 0.241 $ 9,613 $ 0.248 50,000 $ 16,587 $ 0.332 $ 17,056 $ 0.341 1,000 $ 1,834 $ 0.110 $ 1,886 $ 0.113 4,000 $ 2,165 $ 0.140 $ 2,226 $ 0.144 30 B Medical Offices- Shell 10,000 $ 3,003 $ 0.152 $ 3,088 $ 0.156 20,000 $ 4,523 $ 0.100 $ 4,651 $ 0.102 50,000 $ 7,509 $ 0.150 $ 7,721 $ 0.154 250 $ 1,738 $ 0.397 $ 1,788 $ 0.408 1,000 $ 2,036 $ 0.498 $ 2,094 $ 0.512 31 B Medical Offices-TI 2,500 $ 2,782 $ 0.542 $ 2,861 $ 0.557 5,000 $ 4,136 $ 0.353 $ 4,254 $ 0.363 12,500 $ 6,783 $ 0.543 $ 6,974 $ 0.558 500 $ 2,317 $ 0.328 $ 2,382 $ 0.337 2,000 $ 2,808 $ 0.433 $ 2,888 $ 0.445 32 - Restaurant-Complete 5,000 $ 4,106 $ 0.469 $ 4,222 $ 0.483 10,000 $ 6,453 $ 0.312 $ 6,636 $ 0.321 25,000 $ 11,140 $ 0.446 $ 11,455 $ 0.458 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 500 $ 1,593 $ 0.167 $ 1,638 $ 0.172 2,000 $ 1,843 $ 0.203 $ 1,895 $ 0.208 33 - Restaurant-Shell 5,000 $ 2,451 $ 0.221 $ 2,520 $ 0.227 10,000 $ 3,557 $ 0.142 $ 3,658 $ 0.146 25,000 $ 5,692 $ 0.228 $ 5,853 $ 0.234 250 $ 1,472 $ 0.280 $ 1,514 $ 0.288 1,000 $ 1,682 $ 0.329 $ 1,730 $ 0.339 34 - Restaurant-TI 2,500 $ 2,176 $ 0.359 $ 2,237 $ 0.370 5,000 $ 3,074 $ 0.228 $ 3,161 $ 0.234 12,500 $ 4,785 $ 0.383 $ 4,920 $ 0.394 250 $ 2,028' $ 0.525 $ 2,086 $ 0.539 1,000 $ 2,422 $ 0.682 $ 2,490 $ 0.701 35 1-4 Day Care Facility-Complete 2,500 $ 3,444 $ 0.740 $ 3,542 $ 0.761 5,000 $ 5,295 $ 0.489 $ 5,445 $ 0.503 12,500 $ 8,961 $ 0.717 $ 9,214 $ 0.737 100 $ 1,738' $ 0.992 $ 1,788 $ 1.020 400 $ 2,036 $ 1.244 $ 2,094 $ 1.279 36 1-4 Day Care Facility-TI 1,000 $ 2,782 $ 1.354 $ 2,861 $ 1.392 2,000 $ 4,136 $ 0.882 $ 4,254 $ 0.907 5,000 $ 6,783 $ 1.357 $ 6,974 $ 1.395 500 $ 1,883 $ 0.231 $ 1,936 $ 0.237 2,000 $ 2,229 $ 0.295 $ 2,292 $ 0.303 37 H Hazardous H -Complete 5,000 $ 3,113 $ 0.321 $ 3,201 $ 0.330 10,000 $ 4,716 $ 0.210 $ 4,849 $ 0.216 25,000 $ 7,872 $ 0.315 $ 8,094 $ 0.324 500 $ 2,317 $ 0.328 $ 2,382 $ 0.337 2,000 $ 2,808 $ 0.433 $ 2,888 $ 0.445 38 H Hazardous H -Shell 5,000 $ 4,106 $ 0.469 $ 4,222 $ 0.483 10,000 $ 6,453 $ 0.312 $ 6,636 $ 0.321 25,000 $ 11,140 $ 0.446 $ 11,455 $ 0.458 100 $ 1,738 $ 0.992 $ 1,788 $ 1.020 400 $ 2,036 $ 1.244 $ 2,094 $ 1.279 39 H Hazardous H -T I 1,000 $ 2,782 $ 1.354 $ 2,861 $ 1.392 2,000 $ 4,136 $ 0.882 $ 4,254 $ 0.907 5,000 $ 6,783 $ 1.357 $ 6,974 $ 1.395 200 $ 1,352 $ 0.282 $ 1,390 $ 0.290 800 $ 1,521 $ 0.316 $ 1,564 $ 0.325 40 - Commercial Building- Foundation 2,000 $ 1,900 $ 0.346 $ 1,953 $ 0.356 4,000 $ 2,592 $ 0.214 $ 2,665 $ 0.220 10,000 $ 3,877 $ 0.388 $ 3,987 $ 0.399 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 200 $ 1,400 $ 0.308 $ 1,440 $ 0.317 800 $ 1,585 $ 0.354 $ 1,630 $ 0.364 41 - Commercial Building-Addition 2,000 $ 2,010 $ 0.388 $ 2,067 $ 0.399 4,000 $ 2,786 $ 0.242 $ 2,865 $ 0.249 10,000 $ 4,240 $ 0.424 $ 4,360 $ 0.436 1,000 $ 3,042 $ 0.244 $ 3,128 $ 0.251 4,000 $ 3,773 $ 0.331 $ 3,880 $ 0.341 42 R-2 Apartment Building 10,000 $ 5,761 $ 0.359 $ 5,924 $ 0.369 20,000 $ 9,349 $ 0.241 $ 9,613 $ 0.248 50,000 $ 16,587 $ 0.332 $ 17,056 $ 0.341 1,000 $ 2,451 $ 0.139 $ 2,520 $ 0.143 2,000 $ 2,590 $ 0.717 $ 2,663 $ 0.737 43 R-3 Single-Family(custom or model) 3,000 $ 3,307 $ 0.374 $ 3,400 $ 0.385 5,000 $ 4,055 $ 0.531 $ 4,170 $ 0.546 7,500 $ 5,382 $ 0.718 $ 5,535 $ 0.738 667 $ 1,441 ' $ 0.081 $ 1,482 $ 0.083 1,333 $ 1,495 $ 0.276 $ 1,537 $ 0.283 44 R-3 Single-Family- Production/Repeat 2,000 $ 1,679 $ 0.215 $ 1,726 $ 0.221 3,333 $ 1,965 $ 0.250 $ 2,021 $ 0.257 5,000 $ 2,381 $ 0.476 $ 2,448 $ 0.490 333 $ 1,373 $ 0.145 $ 1,412 $ 0.150' 667 $ 1,422 $ 0.443 $ 1,462 $ 0.456 45 R-3 Moved Building-Residential 1,000 $ 1,569 $ 0.382 $ 1,614 $ 0.393 1,667 $ 1,824 $ 0.425 $ 1,876 $ 0.437 2,500 $ 2,178 $ 0.871 $ 2,240 $ 0.896 800 $ 1,250 $ 0.049 $ 1,286 $ 0.051 1,600 $ 1,290 $ 0.100 $ 1,326 $ 0.103 46 R-3 Manufactured Home-Complete 2,400 $ 1,370 $ 0.125 $ 1,409 $ 0.128 4,000 $ 1,569 $ 0.121 $ 1,614 $ 0.124 6,000 $ 1,811 $ 0.302 $ 1,862 $ 0.310 667 $ 1,250 $ 0.059 $ 1,286 $ 0.061 1,333 $ 1,290 $ 0.120 $ 1,326 $ 0.123 47 R-3 Prefabricated Dwelling-Complete __ 2,000 $ 1,370 $ 0.150 $ 1,409 $ 0.154 3,333 $ 1,569 $ 0.145 $ 1,614 $ 0.149 5,000 $ 1,811 $ 0.362 $ 1,862 $ 0.372 120 $ 1,096 $ 0.235 $ 1,127 $ 0.242 480 $ 1,180 $ 0.186 $ 1,214 $ 0.192 48 - Commercial Coach-Complete 1,200 $ 1,315 $ 0.212 $ 1,352 $ 0.218 2,400 $ 1,569 $ 0.106 $ 1,614 $ 0.109 6,000 $ 1,953 $ 0.325 $ 2,008 $ 0.335 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 240 $ 1,096 $ 0.117 $ 1,127 960 $ 1,180 $ 0.093 $ 1,214 $ 0.096 49 - Modular Building-Complete 2,400 $ 1,315 $ 0.106 $ 1,352 $ 0.109 4,800 $ 1,569 $ 0.053 $ 1,614 $ 0.055 12,000 $ 1,953 $ 0.163 $ 2,008 $ 0.167 500 $ 1,121 $ 0.061 $ 1,152 $ 0.063 2,000 $ 1,212 $ 0.053 $ 1,246 $ 0.054 50 Manufactured Building- 5,000 $ 1,370 $ 0.059 $ 1,409 $ 0.061 Foundation 10,000 $ 1,665 $ 0.031 $ 1,712 $ 0.032 25,000 $ 2,134 $ 0.085 $ 2,195 $ 0.088 167 $ 1,250 $ 0.237 $ 1,286 $ 0.243 333 $ 1,290 $ 0.480 $ 1,326 $ 0.494 51 U Residential Garage 500 $ 1,370 $ 0.599 $ 1,409 $ 0.616 833 $ 1,569 $ 0.579 $ 1,614 $ 0.595 1,250 $ 1,811 $ 1.449 $ 1,862 $ 1.489 40 $ 1,159 $ 0.874 $ 1,192 $ 0.898 160 $ 1,264 $ 0.813 $ 1,300 $ 0.836 52 U Pool/Spa-Standard Plan 400 $ 1,459 $ 0.902 $ 1,500 $ 0.927 800 $ 1,820 $ 0.505 $ 1,871 $ 0.519 2,000 $ 2,425 $ 1.213 $ 2,494 $ 1.247 200 $ 1,738 $ 0.496 $ 1,788 $ 0.510 800 $ 2,036 $ 0.622 $ 2,094 $ 0.640 53 - Commercial Building- Remodel 2,000 $ 2,782 $ 0.677 $ 2,861 $ 0.696 4,000 $ 4,136 $ 0.441 $ 4,254 $ 0.453 10,000 $ 6,783 $ 0.678 $ 6,974 $ 0.697 200 $ 1,690 $ 0.470 $ 1,738 $ 0.483 800 $ 1,972 $ 0.583 $ 2,028 $ 0.600 54 - Commercial Building- Repair 2,000 $ 2,672 $ 0.636 $ 2,748 $ 0.654 4,000 $ 3,944 $ 0.413 $ 4,055 $ 0.424 10,000 $ 6,420 $ 0.642 $ 6,601 $ 0.660 50 $ 1,140 $ 0.654 $ 1,172 $ 0.672 200 $ 1,238 $ 0.590 $ 1,273 $ 0.607 55 U Accessory Building-Commercial 500 $ 1,415 $ 0.656 $ 1,455 $ 0.675 1,000 $ 1,743 $ 0.358 $ 1,792 $ 0.368 2,500 $ 2,280 $ 0.912 $ 2,344 $ 0.938 50 $ 1,140 $ 0.654 $ 1,172 $ 0.672 200 $ 1,238 $ 0.590 $ 1,273 $ 0.607 156 U Commercial Carport 500 $ 1,415 $ 0.656 $ 1,455 $ 0.675 1,000 $ 1,743 $ 0.358 $ 1,792 $ 0.368 2,500 $ 2,280 $ 0.912 _ $ 2,344 $ 0.938 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 167 __$ 1,441 $ 0.325 $ 1,482 $ 0.334 333 $ 1,495 $ 1.103 $ 1,537 $ 1.134 57 R-3 Single Family Residential 500 $ 1,679 $ 0.859 $ 1,726 $ 0.883 Addition 833 $ 1,965 $ 0.998 $ 2,021 $ 1.027 1,250 $ 2,381 $ 1.905 $ 2,448 $ 1.959 333 $ 1,645 $ 0.213 $ 1,691 $ 0.219 667 $ 1,716 $ 0.883 $ 1,764 $ 0.908 58 R-2 Multi-Family Residential -Addition 1,000 $ 2,010 $ 0.570 $ 2,067 $ 0.586 1,667 $ 2,390 $ 0.722 $ 2,458 $ 0.743 2,500 $ 2,992 $ 1.197 $ 3,077 $ 1.231 333 $ 1,237 $ 0.115 $ 1,272 $ 0.118 Single Family Residential 667 $ 1,275 $ 0.220 $ 1,311 $ 0.226 59 R-3 Remodel 1,000 $ 1,348 $ 0.289 $ 1,387 $ 0.297 1,667 $ 1,541 $ 0.275 $ 1,585 $ 0.282 2,500 $ 1,770 $ 0.708 $ 1,820 $ 0.728 667 $ 1,380 $ 0.074 $ 1,419 $ 0.077 1,333 $ 1,430 $ 0.225 $ 1,470 $ 0.231 60 R-2 Multi-Family Residential - Remodel 2,000 $ 1,580 $ 0.194 $ 1,624 $ 0.199 3,333 $ 1,838 $ 0.216 $ 1,890 $ 0.223 5,000 $ 2,198 $ 0.440 $ 2,261 $ 0.452 333 $ 1,069 $ 0.071 $ 1,099 $ 0.073 667 $ 1,092 $ 0.284 $ 1,123 $ 0.292 61 R-3 Residential Building-Foundation 1,000 $ 1,187 $ 0.188 $ 1,221 $ 0.193 1,667 $ 1,312 $ 0.235 $ 1,349 $ 0.242 2,500 $ 1,508 $ 0.603 $ 1,551 $ 0.620 83 $ 1,028 $ 0.230 $ 1,057 $ 0.237 167 $ 1,047 $ 0.893 $ 1,077 $ 0.918 62 U Accessory Building-Residential __ 250 $ 1,122 $ 0.636 $ 1,154 $ 0.654 417 $ 1,228 $ 0.763 $ 1,263 $ 0.785 625 $ 1,387 $ 2.219 $ 1,426 $ 2.282 133 $ 1,028 $ 0.144 $ 1,057 $ 0.148 267 $ 1,047 $ 0.558 $ 1,077 $ 0.574 63 U Residential Carport 400 $ 1,122 $ 0.397 $ 1,154 $ 0.409 667 $ 1,228 $ 0.477 $ 1,263 $ 0.490 1,000 $ 1,387 $ 1.387 $ 1,426 $ 1.426 83 $ 1,028 $ 0.230 $ 1,057 $ 0.237 167 $ 1,047 $ 0.893 $ 1,077 $ 0.918 64 U Residential Patio Cover 250 $ 1,122 $ 0.636 $ 1,154 $ 0.654 417 $ 1,228 $ 0.763 $ 1,263 $ 0.785 625 $ 1,387 $ 2.219 $ 1,426 $ 2.282 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING PLAN CHECK Note: PLAN CHECK VARIABLE FEE SCHEDULE FOR NEW CBC (ICC) Each Each Use Size Basis Base Fee Additional Base Fee Additional Fee# Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 83 $ 1,163 $ 0.379 $ 1,196 167 $ 1,195 $ 1.759 $ 1,229 $ 1.809 65 U Residential Balcony/Deck 250 $ 1,342 $ 1.008 $ 1,380 $ 1.036 417 $ 1,510 $ 1.364 $ 1,552 $ 1.402 625 $ 1,794 $ 2.870 $ 1,844 $ 2.951 83' $ 1,130 $ 0.338 $ 1,162 $ 0.348 167 $ 1,158 $ 1.542 $ 1,191 $ 1.586 66 U Residential Patio Enclosure 250 $ 1,286 $ 0.920 $ 1,323 $ 0.946 417 $ 1,440 $ 1.212 $ 1,480 $ 1.247 625 $ 1,692 $ 2.708 $ 1,740 $ 2.784 , City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 2,000 $ 3,270 $ 0.400 $ 3,362 $ 0.411 8,000 $ 5,669 $ 0.347 $ 5,829 $ 0.357_ 1 A-1 Assembly Group-Theaters 20,000 $ 9,833 $ 0.298 $ 10,112 $ 0.307 40,000 $ 15,797 $ 0.338 $ 16,244 $ 0.347 100,000 $ 36,051 $ 0.361 $ 37,072 $ 0.371 1,000 $ 2,654 $ 0.631 $ 2,729 $ 0.648 4,000 $ 4,546 $ 0.654 $ 4,674 $ 0.673 2 A 2 Assembly Group: Restaurants, 10,000 $ 8,473 $ 0.540 $ 8,712 $ 0.555 nightclubs 20,000 $ 13,871 $ 0.639 $ 14,263 $ 0.657 50,000 $ 33,033 $ 0.661 $ 33,968 $ 0.679 250 $ 719 $ 0.749 $ 740 $ 0.770 1,000 $ 1,281 $ 0.265 $ 1,317 $ 0.273 3 A Assembly Group-TI 2,500 $ 1,679 $ 0.292 $ 1,726 $ 0.300 5,000 $ 2,409 $ 0.260 $ 2,477 $ 0.268 12,500 $ 4,362 $ 0.349 $ 4,485 $ 0.359 _ 1,000 $ 2,161 $ 0.496 $ 2,222 $ 0.510 4,000 $ 3,648 $ 0.623 $ 3,752 $ 0.640 4 A-3 Church and Religious Bldg- 10,000 $ 7,385 $ 0.494 $ 7,594 $ 0.508 Complete 20,000 $ 12,329 $ 0.610 $ 12,678 $ 0.627 50,000 $ 30,618 $ 0.612 $ 31,485 $ 0.630 500 $ 1,387 $ 0.614 $ 1,426 $ 0.631 2,000 $ 2,308 $ 0.696 $ 2,373 $ 0.715 5 R-4 Congregate Care-Complete 5,000 $ 4,395 $ 0.534 $ 4,519 $ 0.549 10,000 $ 7,066 $ 0.698 $ 7,265 $ 0.717 25,000 $ 17,531 $ 0.701 $ 18,027 $ 0.721 250 $ 536 $ 0.546 $ 551 $ 0.561 1,000 $ 945 $ 0.218 $ 972 $ 0.224 6 A-3 Church and Religious Bldg-Tl 2,500 $ 1,272 $ 0.224 $ 1,308 $ 0.230 5,000 $ 1,831 $ 0.217 $ 1,883 $ 0.223 12,500 $ 3,456 $ 0.276 $ 3,553 $ 0.284 2,000 $ 3,209 $ 0.391 $ 3,299 $ 0.402 8,000 $ 5,556 $ 0.345 $ 5,713 $ 0.355 7 E Educational Building-Complete 20,000 $ 9,697 $ 0.295 $ 9,971 $ 0.304 40,000 $ 15,605 $ 0.336 $ 16,046 $ 0.345 100,000 $ 35,749 $ 0.357 $ 36,761 $ 0.368 250 $ 536 $ 0.546 $ 551 $ 0.561 1,000 $ 945 $ 0.218 $ 972 $ 0.224 8 E Educational Building-TI 2,500 $ 1,272 $ 0.224 $ 1,308 $ 0.230 5,000 $ 1,831 $ 0.217 $ 1,883 $ 0.223 12,500 $ 3,456 $ 0.276 $ 3,553 $ 0.284 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 500 $ 719 $ 0.374 $ 740 $ 0.385 2,000 $ 1,281 $ 0.133 $ 1,317 $ 0.136 9 S-2 Parking Garage-Complete 5,000 $ 1,679 $ 0.146 $ 1,726 $ 0.150 10,000 $ 2,409 $ 0.130 $ 2,477 $ 0.134 25,000 $ 4,362 $ 0.174 $ 4,485 $ 0.179 1,000 $ 2,161 $ 0.496 $ 2,222 $ 0.510 4,000 $ 3,648 $ 0.623 $ 3,752 $ 0.640 10 R-1 Hotel Low/Mid Rise-Complete 10,000 $ 7,385 $ 0.494 $ 7,594 $ 0.508 20,000 $ 12,329 $ 0.610 $ 12,678 $ 0.627 50,000 $ 30,618 $ 0.612 $ 31,485 $ 0.630 1,000 $ 769 $ 0.201 $ 791 $ 0.206 4,000 $ 1,371 $ 0.070 $ 1,410 $ 0.071 11 R-1 Hotel Low/Mid Rise- Shell 10,000 $ 1,788 $ 0.078 $ 1,839 $ 0.080 20,000 $ 2,564 $ 0.068 $ 2,636 $ 0.070 50,000 $ 4,603 $ 0.092 $ 4,734 $ 0.095 250 $ 536 $ 0.546 $ 551 $ 0.561 1,000 $ 945 $ 0.218 $ 972 $ 0.224 12 R-1 Hotel Low/Mid Rise-TI 2,500 $ 1,272 $ 0.224 $ 1,308 $ 0.230 5,000 $ 1,831 $ 0.217 $ 1,883 $ 0.223 12,500 $ 3,456 $ 0.276 $ 3,553 $ 0.284 500 $ 2,408 $ 1.230 $ 2,476 $ 1.265 2,000 $ 4,254 $ 0.790 $ 4,374 $ 0.812 13 B Offices, etc. -Complete 5,000 $ 6,622 $ 0.741 $ 6,810 $ 0.762 10,000 $ 10,326 $ 0.760 $ 10,618 $ 0.782 25,000 $ 21,729 $ 0.869 $ 22,344 $ 0.894 1,000 $ 436 $ 0.109 $ 449 $ 0.112 4,000 $ 764 $ 0.048 $ 786 $ 0.049 14 B Offices, etc. - Shell 10,000 $ 1,053 $ 0.047 $ 1,083 $ 0.048 20,000 $ 1,523 $ 0.048 $ 1,566 $ 0.050 50,000 $ 2,973 $ 0.059 $ 3,057 $ 0.061 100 $ 317 $ 0.763 $ 326 $ 0.784 400 $ 546 $ 0.404 $ 561 $ 0.415 15 B Offices, etc. -TI 1,000 $ 788 $ 0.360 $ 810 $ 0.370 2,000 $ 1,148 $ 0.412 $ 1,180 $ 0.424 5,000 $ 2,384 $ 0.477 $ 2,452 $ 0.490 1,000 $ 2,100 $ 0.479 $ 2,160 $ 0.492 4,000 $ 3,537 $ 0.619 $ 3,637 $ 0.636 16 F Industrial Building -Complete 10,000 $ 7,248 $ 0.489 $ 7,453 $ 0.503 _ 20,000 $ 12,137 $ 0.606 $ 12,480 $ 0.623 50,000 $ 30,316 $ 0.606 $ 31,174 $ 0.623 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 1,000 $ 507 $ 0.129 $ 522 $ 0.133 4,000 $ 894 $ 0.053 $ 919 $ 0.054 17 F Industrial Building-Shell 10,000 $ 1,210 $ 0.054 $ 1,244 $ 0.055 20,000 $ 1,745 $ 0.053 $ 1,795 $ 0.054 50,000 $ 3,320 $ 0.066 $ 3,414 $ 0.068 250 $ 692 $ 0.719 $ 712 $ 0.739 1,000 $ 1,231 $ 0.258 $ 1,266 $ 0.265 18 F Industrial Building-TI 2,500 $ 1,618 $ 0.282 $ 1,664 $ 0.290 5,000 $ 2,322 $ 0.254 $ 2,388 $ 0.261 12,500 $ 4,226 $ 0.338 $ 4,345 $ 0.348 500 $ 1,018 $ 0.411 $ 1,047 $ 0.423 2,000 $ 1,635 $ 0.648 $ 1,681 $ 0.666 19 S-1 Repair Garage&Service St 5,000 $ 3,578 $ 0.466 $ 3,680 $ 0.479 Complete 10,000 $ 5,910 $ 0.654 $ 6,077 $ 0.673 25,000 $ 15,721 $ 0.629 $ 16,166 $ 0.647 500 $ 477 $ 0.241 $ 490 $ 0.247 2,000 $ 838 $ 0.101 $ 861 $ 0.104 20 S-1 Repair Garage&Service St 5,000 $ 1,142 $ 0.101 $ 1,174 $ 0.104 Shell 10,000 $ 1,648 $ 0.101 $ 1,695 $ 0.104 25,000 $ 3,169 $ 0.127 $ 3,259 $ 0.130 100 $ 317 $ 0.763 $ 326 $ 0.784 400 $ 546 $ 0.404 $ 561 $ 0.415 21 S-1 Repair Garage& Service St-TI 1,000 $ 788 $ 0.360 $ 810 $ 0.370 2,000 $ 1,148 $ 0.412 $ 1,180 $ 0.424 5,000 $ 2,384 $ 0.477 $ 2,452 $ 0.490 500 $ 1,111 $ 0.461 $ 1,142 $ 0.475 2,000 $ 1,803 $ 0.660 $ 1,854 $ 0.679 22 M Retail Sales-Complete 5,000 $ 3,782 $ 0.483 $ 3,890 $ 0.497 10,000 $ 6,199 $ 0.665 $ 6,374 $ 0.684 25,000 $ 16,173 $ 0.647 $ 16,631 $ 0.665 500 $ 584 $ 0.300 $ 601 $ 0.308 2,000 $ 1,034 $ 0.115 $ 1,063 $ 0.119 23 M Retail Sales- Shell 5,000 $ 1,380 $ 0.121 $ 1,419 $ 0.125 10,000 $ 1,985 $ 0.114 $ 2,042 $ 0.117 25,000 $ 3,698 $ 0.148 $ 3,803 $ 0.152 100 $ 317 $ 0.763 $ 326 $ 0.784 400 $ 546 $ 0.404 $ 561 $ 0.415 24 M Retail Sales-TI 1,000 $ 788 $ 0.360 $ 810 $ 0.370 2,000 $ 1,148 $ 0.412 $ 1,180 $ 0.424 5,000 $ 2,384 $ 0.477 $ 2,452 $ 0.490 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 2,000 $ 2,865 $ 0.356 $ 2,946 $ 0.366 8,000 $ 5,000 $ 0.222 $ 5,142 $ 0.228 25 - Warehouse- Complete 20,000 $ 7,660 $ 0.201 $ 7,876 $ 0.207 40,000 $ 11,689 $ 0.218 $ 12,020 $ 0.224 100,000 $ 24,776 $ 0.248 $ 25,477 $ 0.255 1,000 $ 2,161 $ 0.496 $ 2,222 $ 0.510 4,000 $ 3,648 $ 0.623 $ 3,752 $ 0.640 26 I Medical/24 Hour Care 10,000 $ 7,385 $ 0.494 $ 7,594 $ 0.508 Complete 20,000 $ 12,329 $ 0.610 $ 12,678 $ 0.627 50,000 $ 30,618 $ 0.612 $ 31,485 $ 0.630 1,000 ' $ 538 $ 0.138 $ 553 $ 0.141 4,000 $ 950 $ 0.055 $ 977 $ 0.056 27 I Medical/24 Hour Care-Shell 10,000 $ 1,278 $ 0.056 $ 1,315 $ 0.058 20,000 $ 1,841 $ 0.054 $ 1,893 $ 0.056 50,000 $ 3,471 $ 0.069 $ 3,570 $ 0.071 100 $ 285 $ 0.684 $ 293 $ 0.703 400 $ 490 $ 0.383 $ 504 $ 0.394 28 I Medical/24Hour Care-TI 1,000 $ 720_ $ 0.330 $ 741 $ 0.340 2,000 $ 1,051 $ 0.394 $ 1,080 $ 0.405 5,000 $ 2,233 $ 0.447 $ 2,297 $ 0.459 1,000 $ 2,161 $ 0.496 $ 2,222 $ 0.510 4,000 $ 3,648 $ 0.623 $ 3,752 $ 0.640 29 B Medical Offices-Complete 10,000 $ 7,385 $ 0.494 $ 7,594 $ 0.508 20,000 $ 12,329 $ 0.610 $ 12,678 $ 0.627 50,000 $ 30,618 $ 0.612 $ 31,485 $ 0.630 1,000 $ 554 ' $ 0.142 $ 569 $ 0.146 4,000 $ 979 $ 0.056 $ 1,006 $ 0.057 30 B Medical Offices-Shell 10,000 $ 1,312 $ 0.058 $ 1,349 $ 0.059 20,000 $ 1,890 $ 0.055 $ 1,943 $ 0.057 50,000 $ 3,547 $ 0.071 $ 3,647 $ 0.073 250 $ 723 $ 0.752 $ 743 $ 0.773 1,000 $ 1,286 $ 0.267 $ 1,323 $ 0.274 31 B Medical Offices-TI 2,500 $ 1,687 $ 0.293 $ 1,734 $ 0.301 5,000 $ 2,419 $ 0.261 $ 2,488 $ 0.268 12,500 $ 4,377 $ 0.350 $ 4,500 $ 0.360 500 $ 1,111 $ 0.461 $ 1,142 $ 0.475 2,000 $ 1,803 $ 0.660 $ 1,854 $ 0.679 32 - Restaurant-Complete 5,000 $ 3,782 $ 0.483 $ 3,890 $ 0.497 _ 10,000 $ 6,199 $ 0.665 $ 6,374 $ 0.684 25,000 $ 16,173 $ 0.647 $ 16,631 $ 0.665 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 500 $ 492 $ 0.250 $ 505 $ 0.257 2,000 $ 866 $ 0.103 $ 890 $ 0.106 33 - Restaurant-Shell 5,000 $ 1,176 $ 0.104 $ 1,209 $ 0.107 10,000 $ 1,697 $ 0.103 $ 1,745 $ 0.106 25,000 $ 3,245 $ 0.130 $ 3,337 $ 0.133 250 $ 723 $ 0.752 $ 743 $ 0.773 1,000 $ 1,286 $ 0.267 $ 1,323 $ 0.274 34 - Restaurant-TI 2,500 $ 1,687 $ 0.293 $ 1,734 $ 0.301 5,000 $ 2,419 $ 0.261 $ 2,488 $ 0.268 12,500 $ 4,377 $ 0.350 $ 4,500 $ 0.360 250 $ 1,111 $ 0.923 $ 1,142 $ 0.949 1,000 $ 1,803 $ 1.320 $ 1,854 $ 1.357 35 1-4 Day Care Facility-Complete 2,500 $ 3,782 $ 0.966 $ 3,890 $ 0.994 5,000 $ 6,199 $ 1.330 $ 6,374 $ 1.368 12,500 $ 16,173 $ 1.294 $ 16,631 $ 1.330 100 $ 255 $ 0.598 $ 262 $ 0.614 400 $ 434 $ 0.363 $ 446 $ 0.373 36 1-4 Day Care Facility-TI 1,000 $ 652 $ 0.303 $ 670 $ 0.312 2,000 $ 955 $ 0.376 $ 982 $ 0.386 5,000 $ 2,082 $ 0.416 $ 2,141 $ 0.428 500 $ 1,111 $ 0.461 $ 1,142 $ 0.475 2,000 $ 1,803 $ 0.660 $ 1,854 $ 0.679 37 H Hazardous H -Complete 5,000 $ 3,782 $ 0.483 $ 3,890 $ 0.497 10,000 $ 6,199 $ 0.665 $ 6,374 $ 0.684 25,000 $ 16,173 $ 0.647 $ 16,631 $ 0.665 500 $ 461 $ 0.232 $ 474 $ 0.239 2,000 $ 809 $ 0.100 $ 832 $ 0.102 38 H Hazardous H -Shell 5,000 $ 1,108 $ 0.098 $ 1,140 $ 0.101 10,000 $ 1,600 $ 0.100 $ 1,645 $ 0.102 25,000 $ 3,094 $ 0.124 $ 3,181 $ 0.127 100 $ 255 $ 0.598 $ 262 $ 0.614 400 $ 434 $ 0.363 $ 446 $ 0.373 39 H Hazardous H-T I 1,000 $ 652 $ 0.303 $ 670 $ 0.312 2,000 $ 955 $ 0.376 $ 982 $ 0.386 5,000 $ 2,082 $ 0.416 $ 2,141 $ 0.428 200 $ 255 $ 0.299 $ 262 $ 0.307 800 $ 434 $ 0.181 $ 446 $ 0.186 40 Commercial Building 2,000 $ 652 $ 0.152 $ 670 $ 0.156 Foundation 4,000 $ 955 $ 0.188 $ 982 $ 0.193 10,000 $ 2,082 $ 0.208 $ 2,141 $ 0.214 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 200 $ 285 $ 0.342 $ 293 $ 0.352 800 $ 490 $ 0.192 $ 504 $ 0.197 41 - Commercial Building-Addition 2,000 $ 720 $ 0.165 $ 741 $ 0.170 4,000 $ 1,051 $ 0.197 $ 1,080 $ 0.203 10,000 $ 2,233 $ 0.223 $ 2,297 $ 0.230 1,000 $ 2,073 $ 0.513 $ 2,132 $ 0.527 4,000 $ 3,611 $ 0.589 $ 3,713 $ 0.606 42 R-2 Apartment Building 10,000 $ 7,147 $ 0.500 $ 7,349 $ 0.514 20,000 $ 12,148 $ 0.562 $ 12,492 $ 0.577 50,000 $ 28,996 $ 0.580 $ 29,817 $ 0.596 1,000 $ 1,887 $ 1.123 $ 1,941 $ 1.155 2,000 $ 3,010 $ 1.147 $ 3,095 $ 1.179 43 R-3 Single-Family(custom or model) 3,000 $ 4,157 $ 1.028 $ 4,274 $ 1.057 5,000 $ 6,212 $ 0.841 $ 6,388 $ 0.864 7,500 $ 8,314 $ 1.108 $ 8,549 $ 1.140 667 $ 1,188 $ 0.998 $ 1,222 $ 1.026 1,333 $ 1,853 $ 0.974 $ 1,906 $ 1.002 44 R-3 Single Family Production/ 2,000 $ 2,503 $ 0.837 $ 2,574 $ 0.861 Repeat 3,333 $ 3,619 $ 0.771 $ 3,721 $ 0.793 5,000 $ 4,904 $ 0.981 $ 5,043 $ 1.009 333 $ 205 $ 0.386 $ 211 $ 0.396 667 $ 334 $ 0.406 $ 343 $ 0.417 45 R-3 Moved Building- Residential 1,000 $ 469 $ 0.367 $ 482 $ 0.377 1,667 $ 714 $ 0.281 $ 734 $ 0.289 2,500 $ 948 $ 0.379 $ 975 $ 0.390 800 $ 156 $ 0.128 $ 160 $ 0.132 1,600 $ 258 $ 0.135 $ 265 $ 0.139 46 R-3 Manufactured Home-Complete 2,400 $ 366 $ 0.126 $ 377 $ 0.130 4,000 $ 568 $ 0.091 $ 584 $ 0.093 6,000 $ 750 $ 0.125 $ 771 $ 0.128 667 $ 156 $ 0.154 $ 160 $ 0.158 1,333 $ 258 $ 0.162 $ 265 $ 0.167 47 R-3 Prefabricated Dwelling 2,000 $ 366 $ 0.151 $ 377 $ 0.156 Complete - 3,333 $ 568 $ 0.109 $ 584 $ 0.112 5,000 $ 750 $ 0.150 $ 771 $ 0.154 120 $ 125 $ 0.204 $ 129 $ 0.209 480 $ 198 $ 0.233 $ 204 $ 0.240 48 - Commercial Coach - Complete _ 1,200 $ 366 $ 0.153 $ 377 $ 0.157 2,400 $ 550 $ 0.250 $ 566 $ 0.257 6,000 $ 1,449 $ 0.241 $ 1,490 $ 0.248 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 240 $ 125 $ 0.102 $ 129 $ 0.105 960 $ 198 $ 0.117 $ 204 $ 0.120 49 - Modular Building-Complete 2,400 $ 366 $ 0.077 $ 377 $ 0.079 4,800 $ 550 $ 0.125 $ 566 $ 0.128 12,000 $ 1,449 $ 0.121 $ 1,490 $ 0.124 500 $ 125 $ 0.049 $ 129 $ 0.050 2,000 $ 198 $ 0.056 $ 204 $ 0.058 50 Manufactured Building- 5,000 $ 366 $ 0.037 $ 377 $ 0.038 Foundation — 10,000 $ 550 $ 0.060 $ 566 $ 0.062 25,000 $ 1,449 $ 0.058 $ 1,490 $ 0.060 167 $ 251 $ 0.920 $ 259 $ 0.946 333 $ 405 $ 0.954 $ 416 $ 0.981 51 U Residential Garage 500 $ 564 $ 0.859 $ 580 $ 0.883 833 $ 850 $ 0.679 $ 874 $ 0.698 1,250 $ 1,133 $ 0.906 $ 1,165 $ 0.932 40 $ 242 $ 1.409 $ 249 $ 1.449 160 $ 412 $ 0.888 $ 423 $ 0.913 52 U Pool/Spa-Standard Plan 400 $ 625 $ 0.730 $ 642 $ 0.751 800 $ 917 $ 0.922 $ 943 $ 0.948 2,000 $ 2,023 $ 1.011 $ 2,080 $ 1.040 200 $ 474 $ 0.598 $ 487 $ 0.614 800 $ 832 $ 0.253 $ 856 $ 0.260 53 - Commercial Building- Remodel 2,000 $ 1,135 $ 0.252 $ 1,167 $ 0.259 4,000 $ 1,639 $ 0.253 $ 1,686 $ 0.260 10,000 $ 3,155 $ 0.315 $ 3,244 $ 0.324 200 $ 474 $ 0.598 $ 487 $ 0.614 800 $ 832 $ 0.253 $ 856 $ 0.260 54 - Commercial Building- Repair 2,000 $ 1,135 $ 0.252 $ 1,167 $ 0.259 4,000 $ 1,639 $ 0.253 $ 1,686 $ 0.260 10,000 $ 3,155 $ 0.315 $ 3,244 $ 0.324 50 $ 150 6.624 $ 154 $ —0.641 Accessory Building- 200 $ 244 $ 0.590 $ 250 $ 0.607 55 U 500 $ 421 $ 0.415 $ 432 $ 0.427 Commercial 1,000 $ 628 $ 0.628 $ 646 $ 0.645 2,500 $ 1,569 $ 0.628 $ 1,614 $ 0.646 50 $ 184 $ 0.804 $ 189 $ 0.827 200 $ 304 $ 0.639 $ 313 $ 0.657 56 U Commercial Carport 500 $ 496 $ 0.476 $ 510 $ 0.489 1,000 $ 734 $ 0.667 $ 755 $ 0.686 2,500 $ 1,735 $ 0.694 $ 1,784 $ 0.714 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 167 $ 301 $ 1.082 $ 310 $ 1.113 333 $ 481 $ 1.109 $ 495 $ 1.141 57 R-3 Single Family Residential 500 $ 666 $ 0.988 $ 685 $ 1.016 Addition 833 $ 996 $ 0.806 $ 1,024 $ 0.829 1,250 $ 1,331 $ 1.065 $ 1,369 $ 1.095 333 $ 794 $ 1.350 $ 816 $ 1.388 667 $ 1,244 $ 1.329 $ 1,279 $ 1.367 58 R-2 Multi Family Residential 1,000 $ 1,687 $ 1.150 $ 1,734 $ 1.183 Addition 1,667 $ 2,453 $ 1.036 $ 2,523 $ 1.066 2,500 $ 3,317 $ 1.327 $ 3,411 $ 1.364 333 $ 284 $ 0.517 $ 292 $ 0.532 667 $ 457 $ 0.524 $ 470 $ 0.539 59 R-3 Single Family Residential 1,000 $ 631 $ 0.474 $ 649 $ 0.487 Remodel 1,667 $ 947 $ 0.383 $ 974 $ 0.394 2,500 $ 1,266 $ 0.506 $ 1,302 $ 0.521 667 $ 409 $ 0.360 $ 421 $ 0.370 1,333 $ 649 $ 0.362 $ 668 $ 0.372 60 R-2 Multi Family Residential 2,000 $ 891 $ 0.319 $ 916 $ 0.328 Remodel _ 3,333 $ 1,316 $ 0.272 $ 1,353 $ 0.280 5,000 $ 1,769 $ 0.354 $ 1,819 $ 0.364 333 $ 251 $ 0.460 $ 259 $ 0.473 667 $ 405 $ 0.477 $ 416 $ 0.490 61 R-3 Residential Building 1,000 $ 564 $ 0.430 $ 580 $ 0.442 Foundation 1,667 $ 850 $ 0.340 $ 874 $ 0.349 2,500 $ 1,133 $ 0.453 $ 1,165 $ 0.466 83 $ 172 $ 1.326 $ 177 $ 1.363 167 $ 283 $ 1.407 $ 291 $ 1.447 62 U Accessory Building -Residential 250 $ 400 $ 1.299 $ 412 $ 1.336 417 $ 617 $ 0.958 $ 634 $ 0.985 625 $ 816 $ 1.306 $ 839 $ 1.343 133 $ 156 $ 0.769 $ 160 $ 0.791 267 $ 258 $ 0.812 $ 265 $ 0.835 63 U Residential Carport 400 $ 366 $ 0.757 $ 377 $ 0.778 667 $ 568 $ 0.545 $ 584 $ 0.560 1,000 $ 750 $ 0.750 $ 771 $ 0.771 83 $ 156 $ 1.231 $ 160 $ 1.266 167 $ 258 $ 1.299 $ 265 $ 1.336 64 U Residential Patio Cover 250 $ 366 $ 1.211 $ 377 $ 1.245 417 $ 568 $ 0.871 $ 584 $ 0.896 625 $ 750 $ 1.200 $ 771 $ 1.234 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 BUILDING INSPECTION INSPECTION VARIABLE FEE SCHEDULE FOR NEW CONSTRUCTION CBC (ICC) Each Each Fee Use Size Basis Base Fee Additional Base Fee Additional # Type Occupancy (square feet) FY 19-20 SF FY 19-20 FY 22-23 SF FY 22-23 83 $ 156 $ 1.231 $ 160 $ 1.266 167 $ 258 $ 1.299 $ 265 $ 1.336 65 U Residential Balcony/Deck 250 $ 366 $ 1.211 $ 377 $ 1.245 417 $ 568 $ 0.871 $ 584 $ 0.896 625 $ 750 $ 1.200 $ 771 $ 1.234 83 $ 156 $ 1.231 $ 160 $ 1.266 167 $ 258 $ 1.299 $ 265 $ 1.336 66 U Residential Patio Enclosure 250 $ 366 $ 1.211 $ 377 $ 1.245 417 $ 568 $ 0.871 $ 584 $ 0.896 625 $ 750 $ 1.200 $ 771 $ 1.234 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 RECREATION SERVICES FY 2019-20 FY 2022-23 Fee Description Fee Fee Copies, per page(Black and White) $ 0.20 $ 0.20 Park Facility Use Fees: Park Event Fee (over 80 people) per use 255.00 262.00 Bounce House per use 26.00 27.00 Strother Park-Large Barbecue per use 103.00 106.00 Strother Park-Security Deposit per use 50.00 50.00 Strother Park-Small Barbecue per use 58.00 60.00 Strother Park-Security 1,2,3 per use 100.00 103.00 Strother Park Deposit per use 50.00 50.00 Elm Street Park-Barbecue per use 103.00 106.00 Elm Street Park-Security Deposit per use 50.00 50.00 Rancho Grande Park- Large BBQ per use 103.00 106.00 Rancho Grande Park-Small BBQ (areas 2 and 3) per use 58.00 60.00 Kingo Park per use 58.00 60.00 Kingo Park Deposit per use 50.00 50.00 Rotary Bandstand Fees: Rent per use 124.00 128.00 Deposit per use 50.00 50.00 Soto Sports Complex Use Fees: Campbell Field Rental Fee per hour 21.00 22.00 Campbell Field Rental Fee(with lights) per hour 47.00 48.00 Pilg Field Rental Fee per hour 21.00 22.00 Pilg Field Rental Fee(with lights) per hour 47.00 48.00 Santos Field Rental Fee per hour 21.00 22.00 Volunteer Field Rental Fee per hour 21.00 22.00 Volunteer Field with Lights Rental per hour 47.00 48.00 Ikeda Field Rental per hour 21.00 22.00 Ikeda Field with Lights Rental per hour 47.00 48.00 Porter Field Rental Fee per hour 27.00 28.00 Porter Field with Lights Rental per hour 56.00 58.00 Tennis Court Rental-1 court per hour 12.00 12.00 Tennis Courts -4 courts per day 121.00 124.00 Pickleball Club-Annual Fee 110.00 110.00 Food Booth Rental Fee (Soto) per day 200.00 206.00 Food Vendor Space Rental Fee 15% of Gross 15%of Gross Cleaning Deposit per use 325.00 325.00 Meeting Room Rental Fee(Jaycee room) per day 27.00 28.00 Field Prep Fees (except Porter) per prep 63.00 65.00 Field Prep Fees- Porter per prep 94.00 97.00 Tournament Sch. &Coordination Fee per tournament 89.00 92.00 Tournament Non-Refundable Booking Fee 302.00 311.00 Tournament Staff Attendant per hour 25.00 26.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 RECREATION SERVICES FY 2019-20 FY 2022-23 Fee Description Fee Fee Soto Sports Complex Use Fees-APPROVED YOUTH GROUPS: Field Rental(practice and league games)-each field per hour $ 3.00 $ 3.00 Field Rental(practice and league games)-each field (with lights) per hour 29.00 30.00 Concession Stand Fee- Buildings per hour 6.00 6.00 Concession Stand Fee- Mobile per hour 4.00 4.00 Non-resident-per participant 3.00 3.00 Fundraiser Event Fee 200.00 200.00 Woman's Club Use Fees: Non-Resident Fee Mon-Thur, before 5 pm per hour 68.00 70.00 Partial day rental-Mon -Thurs, after 5 pm per hour 68.00 70.00 Full day rental-Friday, Saturday, or Sunday 752.00 773.00 Second day rental-Friday, Saturday or Sunday 376.00 387.00 Security Deposit(No Alcohol/No Band) 400.00 400.00 Security Deposit(with Alcohol) 1,000.00 1,000.00 Building Supervision Fee per hour 25.00 26.00 Rental Fee(on-going users): Non-profit groups/Service clubs/Youth groups: (20 or less attendees) per hour 4.00 4.00 (21 -50 attendees) " 5.00 5.00 (51 or more attendees) 6.00 6.00 Groups with reciprocal services " 4.00 4.00 Private groups or clubs: per hour (20 or less attendees) 13.00 13.00 (21 -50 attendees) " 15.00 15.00 (51 or more attendees) " 16.00 16.00 Groups with reciprocal services " 7.00 7.00 For-profit groups per hour 36.00 37.00 Custodial Fee(special event rentals only) 150.00 150.00 Reservation Cancellation Fees: If cancelled 30 days or more ahead of event 100.00 100.00 If cancelled less than 30 days ahead of event 200.00 200.00 Amenities Fees: Chairs per chair 1.00 1.00 Tables per table 2.00 2.00 Audio/Visual system use per day 52.00 53.00 Community Garden Deposit 50.00 50.00 Community Garden Plot per 6 months 45.00 46.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 RECREATION SERVICES FY 2019-20 FY 2022-23 Fee Description Fee Fee Mark M. Millis Community Center(formerly Elm Street Community Center) Use Fees: Rental Fee per hour $ 41.00 $ 42.00 Rental Fee-full day per day 211.00 217.00 Building Supervision Fee per hour 25.00 26.00 Security deposit 200.00 200.00 Adult Sport League Fees: Adult Softball 515.00 530.00 Adult Basketball 438.00 450.00 Non-Resident Fee 10.00 10.00 Pre-School Fees: Annual Registration Fee per child 25.00 25.00 Play& Learn-Tues&Thur. per hour 6.00 6.00 Play& Learn-Mon, Wed & Fri. 6.00 6.00 Kindergartens in Training " 6.00 6.00 II Summer Play& Learn 6.00 6.00 Late Pick-up Fees: First late pick-up per child 5.00 5.00 Second late pick-up " 10.00 10.00 Third late pick-up " 20.00 20.00 Children In Motion Program: Children In Motion Annual Registration per child 25.00 25.00 Branch School - Mornings 5 Days Per Week per 4 wks 143.00 147.00 4 Days Per Week 121.00 124.00 3 Days Per Week II97.00 100.00 2 Days Per Week 68.00 70.00 Branch School-Afternoons 5 Days Per Week per 4 wks 261.00 268.00 4 Days Per Week " 223.00 229.00 3 Days Per Week II178.00 183.00 2 Days Per Week II125.00 129.00 Extra Day- Branch School Morning per day 10.00 10.00 Afternoon 17.00 17.00 Late Start Monday per day 5.00 5.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 RECREATION SERVICES FY 2019-20 FY 2022-23 Fee Description Fee Fee Children In Motion Fees(continued): Kindercare- Branch School 5 Days Per Week per 4 wks $ 285.00 $ 293.00 4 Days Per Week 243.00 250.00 3 Days Per Week 194.00 199.00 2 Days Per Week 137.00 141.00 Extra Day per day 19.00 20.00 Ocean View School -Mornings 5 Days Per Week per 4 wks 143.00 147.00 4 Days Per Week 121.00 124.00 3 Days Per Week 97.00 100.00 2 Days Per Week 68.00 70.00 Ocean View School -Afternoons 5 Days Per Week per 4 wks 285.00 293.00 4 Days Per Week 243.00 250.00 3 Days Per Week 194.00 199.00 2 Days Per Week 137.00 141.00 Extra Day-Ocean View School Morning per day 10.00 10.00 Afternoon 19.00 20.00 Late Start Monday per day 5.00 5.00 Mark M. Millis Community Center(formerly Elm Community Center)-Afternoons Care Plan A 5 Days Per Week per 4 wks 166.00 171.00 4 Days Per Week 142.00 146.00 3 Days Per Week 113.00 116.00 2 Days Per Week 80.00 82.00 Mark M. Millis Community Center(formerly Elm Community Center)-Afternoons Care Plan B 5 Days Per Week per 4 wks 428.00 440.00 4 Days Per Week 364.00 374.00 3 Days Per Week 291.00 299.00 2 Days Per Week 205.00 211.00 Winter/Spring/Summer- Full Day 5 Days Per Week per week 215.00 221.00 4 Days Per Week 182.00 187.00 3 Days Per Week 151.00 155.00 Minimum Days(teacher work day/early release) Regular day of attendance per day 13.00 13.00 Non-regular day of attendance 23.00 24.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 RECREATION SERVICES FY 2019-20 FY 2022-23 Fee Description Fee Fee Children In Motion Fees (continued): Late Pick-up Fees: Children in Motion is open until 6:00 pm. Additional fees apply for children picked up after 6:00 Pickup 6:01 -6:15 pm per child $ 10.00 $ 10.00 Pickup 6:16-6:30 pm 20.00 20.00 Pickup 6:31 -6:45 pm 30.00 30.00 City of Arroyo Grande MASTER FEE SCHEDULE Fiscal Year 2022-23 PUBLIC WORKS SERVICES Fee Description FY 2019-20 Fee FY 2022-23 Fee LABOR COSTS (per hour): DURING REGULAR WORK HOURS: Full Time employee $ 74.41 $ 74.61 Part Time employee 24.58 25.13 AFTER REGULAR WORK HOURS: Full Time employee 111.61 111.92 Part Time employee 36.87 37.70 2 hours at 1.5 2 hours at 1.5 MINIMUM CALL-OUT RATE times billing rate times billing rate EQUIPMENT BILLING RATE(per hour) Pickup Truck 17.00 17.00 Service Truck 42.00 42.00 Backhoe 43.00 43.00 CAT Generator 82.00 82.0 Loader 50.00 50.0 6" Pump 23.00 23.0 Dump/Flat Bed Truck (5-7 yds) 36.00 36.00 Sewer/Vacuum/Jet Truck 125.00 125.00 Chipper 44.00 44.00 Concrete Saw 10.00 10.00 Air Compressor 17.00 17.00 5-Ton Roller 30.00 30.00 Mini Excavator 60.00 60.00 Skid Steer 50.00 50.00 MATERIAL COST: (cost plus tax) Concrete(per yard) 195.00 195.00 Sand (per ton) 25.00 25.00 Class II Base (per ton) 30.00 30.00 A/C (per ton) 100.00 100.00 OFFICIAL CERTIFICATION I, JESSICA MATSON, City Clerk of the City of Arroyo Grande, County of San Luis Obispo, State of California, do hereby certify under penalty of perjury, that the attached Resolution No. 5173 was passed and adopted at a regular meeting of the City Council of the City of Arroyo Grande on the 12th day of April, 2022. WITNESS my hand and the Seal of the City of Arroyo Grande affixed this 14th day of April, 2022. JESSICA MATSON, CITY CLERK